![Page 1: Northwest Power and Conservation Council Preliminary Cost-Effectiveness Energy Star Tier 2 Vending Regional Technical Forum 19 September 2006.](https://reader035.fdocuments.in/reader035/viewer/2022072006/56649d0d5503460f949e21a5/html5/thumbnails/1.jpg)
Northwest Power and ConservationCouncil
Preliminary Preliminary Cost-EffectivenessCost-Effectiveness
Energy Star Tier 2 VendingEnergy Star Tier 2 Vending
Regional Technical ForumRegional Technical Forum
19 September 200619 September 2006
![Page 2: Northwest Power and Conservation Council Preliminary Cost-Effectiveness Energy Star Tier 2 Vending Regional Technical Forum 19 September 2006.](https://reader035.fdocuments.in/reader035/viewer/2022072006/56649d0d5503460f949e21a5/html5/thumbnails/2.jpg)
slide 2
Northwest Power and ConservationCouncil
Preliminary Cost-EffectivenessPreliminary Cost-EffectivenessAssumptionsAssumptions
Tier 1 is baseline for new & refurbTier 1 is baseline for new & refurb 12 year machine life12 year machine life 6 year remaining life for existing machines6 year remaining life for existing machines Refurbs every 6 years Refurbs every 6 years Life after refurb is 6 yearsLife after refurb is 6 years Machine savings shaped like residential refrigeratorMachine savings shaped like residential refrigerator Off-hour control savings shaped like Vending Off-hour control savings shaped like Vending
MiserMiser
![Page 3: Northwest Power and Conservation Council Preliminary Cost-Effectiveness Energy Star Tier 2 Vending Regional Technical Forum 19 September 2006.](https://reader035.fdocuments.in/reader035/viewer/2022072006/56649d0d5503460f949e21a5/html5/thumbnails/3.jpg)
slide 3
Northwest Power and ConservationCouncil
Preliminary Cost-EffectivenessPreliminary Cost-EffectivenessCases to ConsiderCases to Consider
New Machine: New Site or Replace
Existing Machine at End of Life
Early Replacement:Early Replacement with
New Tier 2 Machine
Refurb:Refurbish Existing with
Tier 2 Kit
Savings – T1 minus T2 for 12 years
Savings – Add 400 kWh/year with controls enabled
Savings – Exist minus T2 for 6 years plus T1 minus T2 for remaining 6 years
Savings – Add 400 kWh/year with controls enabled
Savings – Exist minus T2 for 3 years plus T1 minus T2 for 3 years
Savings – Add 400 kWh/year with controls enabled
![Page 4: Northwest Power and Conservation Council Preliminary Cost-Effectiveness Energy Star Tier 2 Vending Regional Technical Forum 19 September 2006.](https://reader035.fdocuments.in/reader035/viewer/2022072006/56649d0d5503460f949e21a5/html5/thumbnails/4.jpg)
slide 4
Northwest Power and ConservationCouncil
Savings AssumptionsSavings Assumptions
MeasureMeasure Savings (kWh/year)Savings (kWh/year)
Existing Machine to Tier 1Existing Machine to Tier 1 13001300
Existing Machine to Tier 2Existing Machine to Tier 2 17401740
Tier 1 Machine to Tier 2Tier 1 Machine to Tier 2 440440
Tier 1 Machine to Tier 2 Tier 1 Machine to Tier 2 Refurb KitRefurb Kit
545545
Enable Off-hour controls Enable Off-hour controls on Tier 2 machineon Tier 2 machine
400400
![Page 5: Northwest Power and Conservation Council Preliminary Cost-Effectiveness Energy Star Tier 2 Vending Regional Technical Forum 19 September 2006.](https://reader035.fdocuments.in/reader035/viewer/2022072006/56649d0d5503460f949e21a5/html5/thumbnails/5.jpg)
slide 5
Northwest Power and ConservationCouncil
Cost AssumptionsCost Assumptions
MeasureMeasure Incremental CostIncremental Cost
Tier 2 New Glass FrontTier 2 New Glass Front $170$170
Tier 2 New Stack VendorTier 2 New Stack Vendor $50$50
Tier 2 Refurb Kit Tier 2 Refurb Kit $200$200
![Page 6: Northwest Power and Conservation Council Preliminary Cost-Effectiveness Energy Star Tier 2 Vending Regional Technical Forum 19 September 2006.](https://reader035.fdocuments.in/reader035/viewer/2022072006/56649d0d5503460f949e21a5/html5/thumbnails/6.jpg)
slide 6
Northwest Power and ConservationCouncil
Results – New MachinesResults – New Machines
MeasureMeasure B/C B/C RatioRatio
New Machine - Stack Vendor - Tier 1 to Tier 2 UpgradeNew Machine - Stack Vendor - Tier 1 to Tier 2 Upgrade 3.83.8
New Machine - Stack Vendor - Tier 1 to Tier 2 Upgrade - New Machine - Stack Vendor - Tier 1 to Tier 2 Upgrade - With Off-Hour ControlsWith Off-Hour Controls
7.07.0
New Machine - Glass Front - Tier 1 to Tier 2 UpgradeNew Machine - Glass Front - Tier 1 to Tier 2 Upgrade 1.11.1
New Machine - Glass Front - Tier 1 to Tier 2 Upgrade - With New Machine - Glass Front - Tier 1 to Tier 2 Upgrade - With Off-Hour ControlsOff-Hour Controls
2.12.1
![Page 7: Northwest Power and Conservation Council Preliminary Cost-Effectiveness Energy Star Tier 2 Vending Regional Technical Forum 19 September 2006.](https://reader035.fdocuments.in/reader035/viewer/2022072006/56649d0d5503460f949e21a5/html5/thumbnails/7.jpg)
slide 7
Northwest Power and ConservationCouncil
Results – Early Replacements Results – Early Replacements with New Machineswith New Machines
MeasureMeasure B/C B/C RatioRatio
Existing Machine - Stack Vendor - Early Replacement to Tier 2Existing Machine - Stack Vendor - Early Replacement to Tier 2 15.015.0
Existing Machine - Stack Vendor - Early Replacement to Tier 2 Existing Machine - Stack Vendor - Early Replacement to Tier 2 - With Off-Hour Controls- With Off-Hour Controls
18.218.2
Existing Machine - Glass Front - Early Replacement to Tier 2Existing Machine - Glass Front - Early Replacement to Tier 2 4.44.4
Existing Machine - Glass Front - Early Replacement to Tier 2 - Existing Machine - Glass Front - Early Replacement to Tier 2 - With Off-Hour ControlsWith Off-Hour Controls
5.45.4
![Page 8: Northwest Power and Conservation Council Preliminary Cost-Effectiveness Energy Star Tier 2 Vending Regional Technical Forum 19 September 2006.](https://reader035.fdocuments.in/reader035/viewer/2022072006/56649d0d5503460f949e21a5/html5/thumbnails/8.jpg)
slide 8
Northwest Power and ConservationCouncil
Results – RefurbsResults – Refurbs
MeasureMeasure B/C B/C RatioRatio
Existing Machine - Stack Vendor - Early Refurb to Tier 2Existing Machine - Stack Vendor - Early Refurb to Tier 2 2.32.3
Existing Machine - Stack Vendor - Early Refurb to Tier 2 - Existing Machine - Stack Vendor - Early Refurb to Tier 2 - With Off-Hour ControlsWith Off-Hour Controls
2.72.7
![Page 9: Northwest Power and Conservation Council Preliminary Cost-Effectiveness Energy Star Tier 2 Vending Regional Technical Forum 19 September 2006.](https://reader035.fdocuments.in/reader035/viewer/2022072006/56649d0d5503460f949e21a5/html5/thumbnails/9.jpg)
slide 9
Northwest Power and ConservationCouncil
Total Savings PotentialTotal Savings Potential
About 1 MWa per 4000 MachinesAbout 1 MWa per 4000 Machines– New 10%New 10%– Early Replacement 40%Early Replacement 40%– Refurbish 50%Refurbish 50%– Half with controls enabledHalf with controls enabled
PNW Market PNW Market – ~4000 New machines per year~4000 New machines per year– ~120,000 Existing machines~120,000 Existing machines