Masterplanning, placemaking, approval processing, as well as the design of the Main Street were provided for this 120 acre Town Center in the Stapleton redevelopment. Design and drawings were also provided for 50% of the Main Street and all of the Forest City buildings in the power center. Large portions of the original Stapleton airport runways were used to repave the new community. LOCATION: Denver, Colorado STATS: 600,000 sqft Powercenter Retail 540,000 sqft Lifestyle Retail, Main Street, and Restaurants CLIENT: Forest City Commercial STATUS: Completed 2007 NORTHFIELD AT STAPLETON MASTERPLANNING | RETAIL ARCHITECTURE PLANNING INTERIORS THE ULHERN GROUP
Transcript of NORTHFIELD AT STAPLETON€¦ · 07/12/2017 · Center in the Stapleton redevelopment. Design and...
Masterplanning, placemaking, approval
processing, as well as the design of the Main
Street were provided for this 120 acre Town
Center in the Stapleton redevelopment.
Design and drawings were also provided for
50% of the Main Street and all of the Forest
City buildings in the power center. Large
portions of the original Stapleton airport
runways were used to repave the new
community.
LOCATION: Denver, Colorado
STATS:
600,000 sqft Powercenter Retail
540,000 sqft Lifestyle Retail, Main Street,
and Restaurants
CLIENT: Forest City Commercial
STATUS: Completed 2007