Transcript of Northern New Jersey FSS Optimization Lean Six Sigma
®
Northern New Jersey FSS Optimization
Lean Six SigmaLean Six Sigma
May 15, 2009
®
NNJ FSS Optimization Lean Six Sigma
Flat Distribution Plan
Define Phase
NNJ LSS FSS OptimizationDefine Phase – Action Items
Goal Statement (SMART – SSpecific MMeasurable AAchievable RRelevant TTimely):
Align DVD, NNJ Metro, Kilmer, West Jersey, and Newark Flat distribution to maximize the flow of machineable flats to FSS and thus achieving the highest FSS % (85% initially). Goal also includes eliminating APPS rejects at both NJI-BMC and at DVD.
Baseline 0% FSS. Goal is 80 % FSS or higher.
Eliminate DVD APPS Rejects.
Eliminate NJ-BMC APPS Rejects.
Project Goal Measured by:
1. FSS %
2. 146 volume %
3. Carrier Cased volume
Project Scope:
All NNJ plants (DVD, NNJ Metro, Kilmer, West Jersey, and Newark)
USPS Flats Guiding Principles
1. Always run the committed mail first, then balance the planned run time volume with uncommitted mail
a. Deliver on-time, every time
b. Keep classes segregated until carrier route or DPS
2. FSS schedule drives preceding schedules (align & synchronize using pull system methodology)
3. Maximize automation of Flat Operations End-to-End (Arrival at acceptance unit to delivery at DU)
4. Mail is always sorted to the finest depth of sort
a. Only ship 100% finalized product to downstream operations
5. 100% adherence to dispatch of value (DOV) and clearance times (CTs)
6. Adhere to labeling, placarding, & color coding procedures
7. Transportation
a. Adhere to flats operating plan schedules
NNJ LSS FSS Optimization
USPS Flats Guiding Principles
USPS Flats Guiding Principles
NNJ LSS FSS Optimization
Aligning APPS/SPBS/AFSM & FSS Processes
What Needs to be Done to Align the Processes ?
1. Eliminate rejects– all bundles flowing from APPS must be finalized to the finest depth of sort.
2. Minimize the flow of loose pieces from APPS due to broken bundles
3. Align Flats Distribution
Alignment across all NNJ facilities Improve flow, transport, and processing time Eliminate missing FSS processing times
®
NNJ FSS Optimization Lean Six Sigma
Flat Distribution Plan
Measure Phase
NNJ LSS FSS Optimization
DVD STD Flats Current Process Flow Chart
3 & 5 digit Pallets
3 digit sacks
5 digit sacks machineable
5 digit sacks non-
machineable
3 digit sacks
5 digit sacks
HSUS
APPS STD
SPBS STD
AFSM 145 Prime
AFSM 146 STD
Delivery
3 digit bundles
5 Digit Sacks
Mailers
NJ BMC
HSTS
SUPPLIER PROCESS
Dispatch
3 di
git s
acks
sh
akeo
ut 5 di
git n
on- C
R
bund
les
5 digit CR bundles
Dispatch
Newark AFSM100 146 STD
5 digit bundles
Dispatch
Dispatch
UFSM1000 & Manual
OUTPUT
5 digit sacks DVD zones
5 digit sacks NWK zones
5 digit non-machineable bundles
5 digit CR bundles
NNJ LSS FSS Optimization
DVD 2C Flats Current Process Flow Chart
3 & 5 digit Pallets
3 digit sacks
5 digit sacks machineable
5 digit sacks non-
machineable
HSUS
APPS 2C AFSM MMP
AFSM 146 FCM
Delivery
Mailers
SUPPLIER PROCESS
Dispatch
Dispatch
UFSM1000 MMP
OUTPUT
5 Digit Sacks
Dispatch5 digit CR bundles
3 digit bundles
Dispatch5 digit non CR
bundles
5 D
igit
sack
s C
R
& n
on C
R
3 D
igit
bund
les
Dispatch
Broken bunles Machineable
Bro
ken
bund
les
Non
M
achi
neab
le
L009 Sites
Manual Cases 2C
(desitnating)
07099 working tubs (machineable flats)
NNJ LSS FSS Optimization
Other NNJ Plants Current Process Flow Chart
NNJ Metro SPBS
NNJ Metro AFSM 146
Delivery
Mailers
DVD
SUPPLIER PROCESS OUTPUT
West Jersey SPBS
Kilmer SPBSKilmer
AFSM 146
West Jersey AFSM 146
UFSM1000 & Manual
UFSM1000 & Manual
UFSM1000 & Manual
NNJ LSS FSS Optimization
NNJ Current Distribution Profile (APPS, SPBS, AFSM, UFSM)
NNJ LSS FSS Optimization
NNJ Current Flat Distribution Profile (STD Runs)
Standard Bundle Runs
NNJ LSS FSS Optimization
NJI BMC Current Flat Distribution Profile
NNJ LSS FSS Optimization
Data Collection Goals:
Data Collection Goals:
•Identify a drop shipment arrival profile at all NNJ Plants and at the NJ-BMC(STD and PER)
•Pieces at risk at the APPS at DVD and NJ-BMC