Northeast Regional Corrections Center (NERCC) Campus Improvements

8
I. Project Basics 1) Name of the local government or political subdivision that is submitting the request: Arrowhead Regional Corrections 2) Project title: Northeast Regional Corrections Center (NERCC) Campus Improvements 3) Project priority number (if the applicant is submitting multiple requests): Priority #: 1 of 1 for the 5 county region. 4) Project location (please list town(s)/city(ies) and county(ies): Saginaw, St. Louis County, Minnesota 5) Ownership and Operation: Who will own the facility: Arrowhead Regional Corrections (5 County Region) Who will operate the facility: Arrowhead Regional Corrections (5 County Region) Names of any private entities that will occupy/use any portion of the building: N/A 6) Project contact person (name, phone number and email address): Kay Arola, Executive Director of Arrowhead Regional Corrections, (218) 726-2640, (218) 348-6563, [email protected] II. Project Description 7) Description and Rationale: Provide a brief project description and rationale (one page maximum). This request is for $4,000,000 in State bond funding to construct, remodel, furnish and equip the NERCC campus buildings that support farm operations, educational programming, work readiness, and vocational training. There is the potential to expand to include an industry on the campus. The facility is located in Saginaw, Minnesota in St. Louis County and is a Minnesota Department of Corrections licensed class VI Rule 2911 correctional facility for up to 150 adult men from the five counties in Northeastern Minnesota. Attachment A For Local Governments Requesting a 2014 Capital Appropriation 10

description

Local Governments Requesting a 2014 Capital Appropriation

Transcript of Northeast Regional Corrections Center (NERCC) Campus Improvements

Page 1: Northeast Regional Corrections Center (NERCC) Campus Improvements

I. Project Basics 1) Name of the local government or political subdivision that is submitting the request:

Arrowhead Regional Corrections 2) Project title:

Northeast Regional Corrections Center (NERCC) Campus Improvements

3) Project priority number (if the applicant is submitting multiple requests):

Priority #: 1 of 1 for the 5 county region.

4) Project location (please list town(s)/city(ies) and county(ies):

Saginaw, St. Louis County, Minnesota

5) Ownership and Operation:

Who will own the facility: Arrowhead Regional Corrections (5 County Region)

Who will operate the facility: Arrowhead Regional Corrections (5 County Region) Names of any private entities that will occupy/use any portion of the building: N/A

6) Project contact person (name, phone number and email address):

Kay Arola, Executive Director of Arrowhead Regional Corrections, (218) 726-2640, (218) 348-6563, [email protected]

II. Project Description 7) Description and Rationale: Provide a brief project description and rationale (one

page maximum).

This request is for $4,000,000 in State bond funding to construct, remodel, furnish and equip the NERCC campus buildings that support farm operations, educational programming, work readiness, and vocational training. There is the potential to expand to include an industry on the campus. The facility is located in Saginaw, Minnesota in St. Louis County and is a Minnesota Department of Corrections licensed class VI Rule 2911 correctional facility for up to 150 adult men from the five counties in Northeastern Minnesota.

Attachment A

For Local Governments Requesting a 2014 Capital Appropriation

10

Page 2: Northeast Regional Corrections Center (NERCC) Campus Improvements

The Northeast Regional Corrections Center (NERCC) campus facilities are of various ages and in varying conditions. The overall infrastructure has numerous components and systems that are at the critical needs stage and/or at the end of their useful lifecycle. There are many building systems that are close to failure and very inefficient. This project would make the campus more energy efficient, improve the cost-effectiveness of operations, and upgrade building systems to current life and safety standards. Investing in this asset preservation ensures the future viability of this correctional facility meeting the needs of the Northeast region of the state. NERCC Administration and St. Louis County Property Management have identified the following project areas:

1. Please see the attached detailed project list identifying specific NERCC outbuilding issues and costs, and the NERCC campus map which correlates to the buildings numbered 1 through 42. Items 43 through 54 identify broader infrastructure projects.

8) Square Footage: For new construction projects, identify the new square footage planned. For remodeling, renovation or expansion projects, identify the total square footage of current facilities, the square footage to be renovated, and/or the new square footage to be added. Total NERCC Campus Acreage: 3,200 acres. The attached campus map details the square footage of each building. The proposed project includes both remodeling and new construction of some of the campus outbuildings. Included in this request is approximately 17,000 square feet of new construction and approximately 60,000 square feet of remodeling / upgrading.

III. Project Financing The following table describing the total amount of financial resources needed and the proposed uses of funds must be submitted for each project.

Enter amounts in thousands ($100,000 should be entered as $100). Enter the amount of state funding requested on the line “State GO Bonds

Requested”. Uses of Funds must show how all funding sources will be used, not just the state

funding requested. In most cases, the state share should not exceed 50% of the total project cost.

Do the project cost estimates include inflation (see question 10 below)? ___Yes _X__No

Sources of Funds Dollars in Thousands

Prior Years

For 2014

For 2015

For 2016

Total

11

Page 3: Northeast Regional Corrections Center (NERCC) Campus Improvements

State GO Bonds Requested 4,000 4,000 Funds Already Committed State Funds City Funds County Funds Other Local Government Funds Federal Funds Non-Governmental Funds Pending Contributions City Funds County Funds 6,000 6,000 Other Local Government Funds Federal Funds Non-Governmental Funds I TOTAL* 10,000 10,000 Uses of Funds Dollars in Thousands

Prior Years

For 2014

For 2015

For 2016

Total

Land Acquisition Predesign (required for projects over $1.5 M) 200 200 Design (including construction administration) 200 200 Project Management 200 200 Construction 8,400 8,400 Furniture/Fixtures/Equipment 1,000 1,000 Relocation (not bond-eligible) TOTAL* 10,000 10,000 *Totals must be the same.

IV. Other Project Information

10) Project schedule. Identify the date (month/year) when construction crews are expected to first arrive on site, and the date (month/year) when construction will be completed with a certificate of occupancy. Anticipated Start Date: September of 2014. Anticipated Occupancy Date: September of 2015 anticipated completion. Facility will be occupied during construction.

12

Page 4: Northeast Regional Corrections Center (NERCC) Campus Improvements

(For facilities projects, this information will also be used to calculate an inflation cost, us in the Building Projects Inflation Schedule posted on the Minnesota Management and Budget website.

11) Predesign. For projects with a total construction cost of $1.5 million or more:

Has a project predesign been completed? __X__ Yes _____ No If so, has the predesign been submitted to the Commissioner of Administration? _____ Yes _X___ No

12) State operating subsidies. Identify any new or additional state operating dollars

that will be requested for this project. (Specify the amount and year, if applicable).

None identified at this time.

13) Sustainable building guidelines. Discuss how the project meets or exceeds the Minnesota Sustainable Building Guidelines established under Minnesota Statutes, section 16B.325, which may be found at http://www.msbg.umn.edu/. These are now mandatory for all new buildings or major renovations receiving state bond funding. The Minnesota Sustainable Building Guidelines have been reviewed and this project will meet or exceed the requirements of that statute. Priority is being given to upgrading lighting, heating, and ventilation systems to be more energy efficient and cost effective while meeting all life and safety codes. This practice is also consistent with our internal policy requirements for all new construction and remodeling projects.

14) Sustainable building designs. Explain the extent to which the project will use

sustainable building designs, if applicable. When bidding any project, St. Louis County Property Management and Purchasing insist that architects design each project with sustainability, energy efficiency and cost-effectiveness in mind (over the long term). Property Management tracks the performance of all of the buildings it manages and is motivated to ensure appropriate sustainable building design elements have been considered and implemented where possible on each project it manages. This project will follow this same practice.

15) Resolution of support and priority designation. Has the governing body of the

applicant passed a resolution of support (which indicates the project’s priority number if the applicant is submitting multiple requests)? _____ Yes __X__ No

If so, please attach the signed resolution. If not, please indicate when the resolution will be coming (and forward the resolution to MMB when available): _August of, 2013.

13

Page 5: Northeast Regional Corrections Center (NERCC) Campus Improvements

N.E.R.C.C. Outbuilding Issues & CostsBUILDING # NAME DESCRIPTION OF IMPROVEMENTS COST ESTIMATE

1 MAIN BUILDING NOT INCLUDED 6,000,000.00$

2 BOILER NONE

3 RECREATION SHED NONE

4 CHIP BUILDING NONE

5 GARDEN SHED NONE

6 SHADE PLANTS NEW GREENHOUSE PLASTIC 5,000.00$

7 SUN PLANTS NEW GREENHOUSE PLASTIC 5,000.00$

8 STORAGE BUILDING NONE

9 SCRAP IRON SHED NONE

10 TRACTOR / WELDING SHOP ADD CAMERAS 7,500.00$ PROVIDE EXHAUST AND MAKEUP AIR 70,500.00$ NEW LP HEATING SYSTEM; ABANDON WOOD 25,000.00$

11 WOOD SHED NONE

12 BOILER NONE

13 MAINTENANCE SHOP ADD CAMERAS 5,000.00$ NEW LP HEATING SYSTEM; ABANDON WOOD 25,000.00$

14 TRIHEY GARAGE NONE

15 TOOL SHED NONE

16 CARPENTRY SHOP ADD CAMERAS 7,500.00$ PROVIDE MAKEUP AIR 73,800.00$

17 FUEL STATION NONE

18 GARAGE PROVIDE EXAUST AND MAKEUP AIR 78,000.00$

19 WOOD SHED NONE

20 BOILER NONE

21 SCHOOL HOUSE NEW BOILER AND DEHUMIDIFICATION 240,000.00$ UPGRADE ELECTRICAL SERVICE FOR DEHUMIDIFICATION 15,000.00$ CARD ACCESS READERS 12,000.00$ ADD CAMERAS 10,000.00$ ADD/IMPROVE FIRE ALARM ANNUNCIATE AT MAIN BUILDING 5,000.00$

22 CHIP BUILDING NONE

23 GARAGE STORAGE ROOF AND SIDING REPAIR 10,000.00$

24 PUMP HOUSE UPGRADE SAND FILTRATION SYSTEM 60,000.00$

25 GRANARY NEW RUBBER ROOF 30,000.00$

26 ROOT CELLAR PROVIDE OCCUPANCY CONTROLLED VENTILLATION 25,000.00$ NEW LIGHTING 10,000.00$ SECOND EXIT 30,000.00$

27 CHICKEN BARN ADD CAMERAS 5,000.00$

28 GREENHOUSE STORAGE NONE

29 BOILER NONE

30 GREENHOUSE ADD CAMERAS 7,500.00$ NEW ASPHALT SHINGLE ROOF 9,000.00$

31 SHED NONE

32 HOG BARN NEW METAL ROOFING 25,000.00$

33 MECHANICAL SHED NONE

34 TURKEY BARN NONE

35 ROLL-OFF CONTAINER NONE

36 STORAGE BUILDING NONE

37 STORAGE BUILDING NONE

38 PROCESSING HOUSE TEMPORARY LP HEATING SYSTEM 15,000.00$ VEGETABLE PROCESSING 5,000.00$ ADD CAMERAS 7,500.00$ DEMO BUILDING 50,000.00$ NEW PROCESSING BUILDING 900,000.00$

39 HAY BARN DEMO BUILDING 100,000.00$ NEW POLE BUILDING 60,000.00$

40 LAUNDRY BUILDING DEMO BUILDING 50,000.00$

41 OLD MAINTENANCE BUILDING DEMO BUILDING 20,000.00$

42 HOUSE DEMO BUILDING 15,000.00$

14

Page 6: Northeast Regional Corrections Center (NERCC) Campus Improvements

N.E.R.C.C. Campus Issues & CostsSITE ITEM # Name Description of improvements COST ESTIMATE

43 SOFTBALL FIELD GRADE SITE 15,000.00$ SEED OUTFIELD 5,000.00$

44 BASKETBALL COURT NEW PLAYING SURFACE AND LINES 25,000.00$

45 MAIN DRIVE RESURFACE 250,000.00$

46 ELECTRICAL SERVICE NEW ELECTRICAL SERVICE TO CAMPUS 500,000.00$

47 FIRE PROTECTION UPGRADE FIRE SERVICE TO OUTBUILDINGS 200,000.00$

48 LIGHTING UPGRADE UPGRADE ENTIRE CAMPUS 150,000.00$

49 FIBER OPTIC FIBER LOOP TO CONNECT ENTIRE CAMPUS 150,000.00$

50 SEPTIC UPGRADES 200,000.00$

51 FUEL TANK REMOVAL 30,000.00$

52 MAIN DRIVE CONTROL GATE 10,000.00$

53 SECOND ACCESS ROAD 441,700.00$

54 BRIDGE INSPECTION 5,000.00$

10,000,000.00$ TOTAL COST

15

Page 7: Northeast Regional Corrections Center (NERCC) Campus Improvements

16

Page 8: Northeast Regional Corrections Center (NERCC) Campus Improvements

17