North-West Elevation South-East Elevation
Transcript of North-West Elevation South-East Elevation
ABCDEFG
ExistingPipebridge
Dispensing & PackingBuilding
Admin Block
3CR Refinery Western Roadway
2510 5685 7120 7115 2735 3190
A-LFA-FFL
53700
A-LFB-FFL
57200
A-LFC-FFL
60700
A-LFD-FFL
64200
A-LRA-FFL
67700
A-LRB-TOP
71700
Concrete sandwich panel25-15-35/160
PPC galvanized aluminium flashing / coping.25-80-50/105
Galvanized PFC metal profilebetween concrete sandwich panel andmetal composite wall
Metal composite wall cladding system25-80-52/150
Stick curtain walling system25-80-15/175
Stick curtain walling system25-80-15/175
28355
45-65-40/335
Spandrel Toughened Glass
P-LFA-FFL
53700
P-LFB-FFL
57800
P-LFC-FFL
61900
P-LFD-FFL
66000
P-LRA-FFL
70100
P-LRB-TOP
71700
17 15 13 12 11 10 8 7 6 4 3 25
ReagentsReagents
Analytical Laboratory 3CR Refinery
Admin Block
Central Services
ExistingPipebridge Concrete sandwich panel
25-15-35/160
Translucent panel system25-50-95/170
PPC galvanized aluminium flashing / coping.25-80-50/105
Galvanized PFC metal profilebetween concrete sandwichpanel and metal composite wall
Metal composite wall cladding system25-80-52/150
Metal composite wallcladding system
25-80-52/150
GoodsEntrance
1061528606395337541253815381533603860641050005000516099804000
A-LFA-FFL
53700
A-LFB-FFL
57200
A-LFC-FFL
60700
A-LFD-FFL
64200
A-LRA-FFL
67700
A-LRB-TOP
71700
91416
PU12
Translucent panel system25-50-95/170
PPC galvanized aluminiumflashing / coping.
25-80-50/105
1
P-TOC
80900
P-LRC-TOP
74600
20918
Main Entrance
75606
10515
88285
P-LFA-FFL
53700
P-LFB-FFL
57800
P-LFC-FFL
61900
P-LFD-FFL
66000
P-LRA-FFL
70100
P-LRB-TOP
71700
171513121110876432 5
AnalyticalLaboratoryPU12 Central Services 3CR Refinery
Process Hall Admin Block
10615 2860 6395 3375 4125 3815 3815 3360 3860 6410 5000 5000 5160 9980 4000
A-LFA-FFL
53700
A-LFB-FFL
57200
A-LFC-FFL
60700
A-LFD-FFL
64200
A-LRA-FFL
67700
A-LRB-TOP
71700
9 14 16
Concrete sandwich panel25-15-35/160
PPC galvanized aluminium flashing / coping.25-80-50/105
Galvanized PFC metal profilebetween concrete sandwich paneland metal composite wall
Metal composite wall cladding system25-80-52/150
Stick curtain walling system25-80-15/175
Translucent panel system25-50-95/170
1P-TOC
80900
P-LRC-TOP
74600
Metal composite wallcladding system
25-80-52/150
10515
ExistingPipebridge
New Substation &Generator
Service pipe shield, extent andrating to be confirmed by JM
P-LFA-FFL
53700
P-LFB-FFL
57800
P-LFC-FFL
61900
P-LFD-FFL
66000
P-LRA-FFL
70100
P-LRB-TOP
71700
A B C D E F G
3190 2735 7115 7120 5685 2510
Western Roadway 3CR Refinery
Process Hall
PGMR BuildingTo be demolished
Concrete sandwich panel25-15-35/160
PPC galvanized aluminiumflashing / coping.
25-80-50/105
Galvanized PFC metal profilebetween concrete sandwich panel
and metal composite wall
Metal composite wallcladding system
25-80-52/150
Translucent panel system25-50-95/170
Metal composite wallcladding system25-80-52/150
P-TOC
80900
P-LRC-TOP
74600
ExistingPipebridge
28355
Drawings not to be scaled and used for construction.Drawings to be read and printed in colour in conjunctionwith: - Architectural Specification: 0303-TCR1-BWT-A1-XXX-SP-A-0201 - All GA's ending with -21xx - Fire strategy drawings ending with -23xx - Detail drawings ending with -24xx - Wall Scope drawings ending with -28xx - Finishes drawings ending with -29xx - RCP drawings ending with -30xx - Doors/ Schedules ending with -31xx - Stair drawings ending with -34xx - M&E and Structural Engineer's drawings
Level Abbreviations Key
. Level Floor X
. Level Roof X
. Floor Finish Level
. Top of Parapet
. Top of Chimney
LFX
LRX
FFL
TOP
TOC
45-65-40/335
Spandrel Toughened Glass
Scale: Paper Size:
Drawing Number:
Project:
Drawing Title:
Client:
Do not scale from this drawing. All dimensions to be
verified on site prior to the commencement of any work
or the production of any shop drawings. All
discrepancies to be reported to Bryden Wood
Technology Ltd. This drawing is to be read in
conjunction with all related Consultant’s drawings and
any other relevant information. This drawing is the
copyright of Bryden Wood Technology Ltd.
CONTROL AND
MITIGATION
MEASURES
HAZARD IDENTIFICATION LEGEND:
Revision:
Key Plan:
HAZARD
IDENTIFICATION
(if none state 'nonerelevant')
NOTE:
Hazards listed above are only those considered
significant risks and:
a) not likely to be obvious to a competent contractor
or other designers;b) unusual; orc) likely to be difficult to manage effectively
Status:
A1
+44 (0)[email protected]
Bryden Wood
100 Gray's Inn Road,
London, WC1X 8AL, UK
0 1 5 10
1:200
3CR
CONFIDENTIAL AND LEGALLY PRIVILEGED
P04.01
0303-TCR1-BWT-A1-ZZZ-DR-A-2104
Elevations
Johnson Matthey 3CR
General Arrangement
See Designers RiskAssessment0303-TCR1-BWT-ZZ-XXX-HS-Z-0101
See Designers RiskAssessment0303-TCR1-BWT-ZZ-XXX-HS-Z-0101
D2
1 : 200
South-East Elevation2
1 : 200
North-East Elevation3
1 : 200
South-West Elevation4
1 : 200
North-West Elevation1
1 2
3
4
REV DATE DESCRIPTION DWN CHK APP
P01 2018-03-02 Preliminary Issue JLR JLR MW
P02 2018-04-06 For Review & Comment JLR MW RG
P03 2018-07-02 Issued for Planning CC MW PON
P04.01 2018-11-16 Issued for Tender CC RA RY