North Wales Connection. Planning Inspectorate – National Infrastructure Directorate 17 September 2012. Agenda. Introductions Gavin Crook – Lead Project Manager, North Wales Connection Graham Denison Smith – Senior Consents Officer, North Wales Connection - PowerPoint PPT Presentation

Transcript of North Wales Connection

Page 1: North Wales Connection

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

North Wales Connection

Planning Inspectorate – National Infrastructure Directorate17 September 2012

Page 2: North Wales Connection

2

Agenda

Introductions

Gavin Crook – Lead Project Manager, North Wales Connection

Graham Denison Smith – Senior Consents Officer, North Wales Connection

Steve Knight-Gregson – Principal Specialist Major Projects

Current Public Position

Background / engagement to-date

Public Messaging

Project need

Project Launch

Strategic options

Preliminary preferred option

Route and Site Options

Key project information

Page 3: North Wales Connection

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

North Wales Connection

Current Public Position

Page 4: North Wales Connection

4

Project Need Contracted Generation

1GW - 2018

2GW - 2017/2021

3.6GW – 2020/2022

Page 5: North Wales Connection

5

Background / engagement to-dateRegular Stakeholder Interfaces

Monthly public drop in events supporting Horizon.

Horizon Public Liaison Group meetings; Presentation to Stakeholders & Interest Groups e.g. National Farmers Union Wales

Energy Island Strategic Forum; strategic, communications, consent and health & safety workstreams.

Bi-annual stakeholder event chaired by DECC.

Stakeholders Include;

Welsh Assembly Government (WAG), Department of Energy & Climate Change (DECC), Countryside Council for Wales (CCW), Environment Agency Wales (EAW), Snowdonia National Park, CADW, North Wales County Council Officers, Generators i.e. Horizon, Celtic Array and developers i.e. Land and Lakes, Skerries

Key Activities to date:

Community Survey (Jun 11)

1st Statutory engagement Workshop (Jul 11)

Anglesey Show (Aug 10, 11 & 12)

Newsletter Issued (Oct 10 & 11)

2nd Statutory engagement Workshop (Nov 11)

Route corridor one-2-one’s (Feb 12)

Stakeholder Briefings (Aug\Sept 12)

Page 6: North Wales Connection

6

Public Messaging

National Grid Business; the electricity network in the UK

National Grids obligations, Electricity Act 1989 duties.

‘To develop an economic, efficient & co-ordinated system of electricity transmission’

The UK energy challenge

Existing National Grid network in North Wales

‘Currently one double circuit 400kV overhead line between Wylfa and Pentir’

Technologies in use and available across the network

Connection agreements in place

‘Existing network in North Wales unable to accommodate amount of power proposed’

Approach to strategic optioneering and consenting

‘We will present information for consultation; proposed in Autumn 2012‘.

Page 7: North Wales Connection

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

North Wales Connection

Project Launch

Page 8: North Wales Connection

8

Strategic options

Page 9: North Wales Connection

9

Preliminary preferred option

Page 10: North Wales Connection

10

Consents: Planning Inspectorate

Consultation Stage One – seeking opinion on: Findings of SOR •Route and crossing preference• Areas of sensitivity• Consultation process

Subsequent Stages: Announcement of preferred route corridor • Route alignment consultation • Pre application consultation

Corridor Options for Wylfa-Pentir

Page 11: North Wales Connection

11

Consents: Local Planning Approval

Consultation Stage One - seeking opinion on:• Findings of SOR• Substation locations•Key concerns/issues•Consultation process Subsequent Stages: Announcement of preferred substation/ public engagement

Site Options in vicinity of Bryncir

Page 12: North Wales Connection

12

Consents:Permitted Development

Consultation Stage One - seeking opinion on:• Findings of SOR• Route corridor and potential route alignment• Issues/concerns • Consultation process Subsequent Stages:• Announcement of preferred route alignment/public engagement

Cabling across Glaslyn

Page 13: North Wales Connection

Place your chosen image here. The four corners must just cover the arrow tips. For covers, the three pictures should be the same size and in a straight line.

North Wales Connection

Key Project Information

Page 14: North Wales Connection

14

Key project information

Project Name – North Wales Connection

Project Location – Anglesey/Gwynedd

Grid Reference (for PINS website) – Wylfa Substation SH 35253 93797

Project Description – Proposed 400kV electricity transmission reinforcements in North Wales to connect planned new nuclear electricity generation on Anglesey and Irish Sea offshore wind

Applicant – National Grid Electricity Transmission Plc

Contact details –

North Wales Connection Communications Team

Freephone number 0800 990 3567

Email [email protected]

Web www.nationalgrid.com/northwalesconnection

First Public Consultation dates – 3rd October 2012 to 21st December 2012

EIA scoping date – 2013/2014

DCO submission date – 2015