North Hydro Company Profile-2015

download North Hydro Company Profile-2015

of 13

Transcript of North Hydro Company Profile-2015

  • 8/10/2019 North Hydro Company Profile-2015

    1/13

    2015 NORTH HYDRO AND ENGINEERING PVT LTD.

    w w w . n o r t h h y d r o . c o m . n p | T i k u l i g a d h - 1 8 , R u p a n d e h i Page 1

    NORTH HYDRO ND ENGINEERING PVT LTD

    Tillotama Municipality

    Tikuligadh-18, Rupandehi

    +977-071-620888, 562976|[email protected]|www.northhydro.com.np

    mailto:%[email protected]:%[email protected]:%[email protected]://www.northhydro.com.np/http://www.northhydro.com.np/http://www.northhydro.com.np/mailto:%[email protected]
  • 8/10/2019 North Hydro Company Profile-2015

    2/13

    2015 NORTH HYDRO AND ENGINEERING PVT LTD.

    w w w . n o r t h h y d r o . c o m . n p | T i k u l i g a d h - 1 8 , R u p a n d e h i Page 2

    The Company

    Nepal hydropower source is from North belt where high Himalayas stand for natura

    topography in building high potential energy. This is the point where we are motivated t

    established a dedicated to manufacturing company in the field of hydropower.

    North Hydro and Engineering Pvt Ltd, located at Khairiya

    Tikuligadh-18, Tillottama Municipality, Rupandehi was establishe

    in 2013 by the dedicated team of technocrats, engineers and hydr

    power professionals. The company is registered as company act o

    Government of Nepal.

    Since its inception in 2013, it has claimed its glory in the market bythe mission Dedicated to Fabricate stating the completion of th

    job on time every time. North hydro and engineering Pvt Ltd i

    determined to play significant role in hydro power developments in Nepal. The company i

    ready to commit the timely ending of the job undertaken.

    North Hydro also undertakes the manufacturing of major components of Hydro Electri

    Projects (HEPs) and also manufactures the major components of HEPs with customer

    design & drawing by reverse engineering where design & drawings are not available with

    customers.North Hydro & Engineering Pvt Ltd is committed to fulfill customer needs and expectatio

    at affordable price with international quality in service and products by fulfilling all lega

    requirements and continually improving established Quality Management System.

    The Team

  • 8/10/2019 North Hydro Company Profile-2015

    3/13

    2015 NORTH HYDRO AND ENGINEERING PVT LTD.

    w w w . n o r t h h y d r o . c o m . n p | T i k u l i g a d h - 1 8 , R u p a n d e h i Page 3

    Company is being managed by qualified and experienced professionals who joined our company from reputed similar organizations

    the area of business management, finance management, project management, Design & Engineering, Site management and Quality

    management.

  • 8/10/2019 North Hydro Company Profile-2015

    4/13

    2015 NORTH HYDRO AND ENGINEERING PVT LTD.

    w w w . n o r t h h y d r o . c o m . n p | T i k u l i g a d h - 1 8 , R u p a n d e h i Page 4

    The Team

    Er. Tanka Prasad Kandel,Chairman Er. Tanka Kandel is renowned for his excellency in operating business successfully. He received his

    Masters of Engineering in Civil from Russia. His vision for staring North Hydro and Engineering is spin offsuccess from preceding hydro mechanical fabrication, North Engineering Company Pvt Ltd, Butwal. He

    is active in social responsible activity as well, including Technical Adviser to Butwal Chamber ofIndustry, Former President of Nepal Engineers Association-Butwal.

    He has been active in expanding business philosophy including in education sector namely, EverestEnglish Boarding School, Plastic Industry, Micro Hydro Engineering Industry, Everest EngineeringConsultancy. He has gained his charm in business arena at Butwal for his success and ethical vision.

    Dott. Ing. Suraj Pandey,CEO Suraj Pandey joined North Hydro since its inception in 2013 as a mechanical engineer. He holds his

    bachelor of engineering in mechanical engineering from Kathmandu University in 2007 with first classand then Masters of Science by Research in Mechanical Engineering from Kathmandu University andUniversity of Padova, Italy as Erasmus Mundus Scholar. He has more than 7 years of experience inmanufacturing, product design, research and development in various capacities from research assistantto senior research and design engineer. He has outstanding commitment to any project he hasundertaken. In 2014 November, he has been felicitated by Research Council Norway, NORAD,Norwegian Embassy at Kathmandu, SINTEF Energy Research Norway and Renewable Nepal Program at

    Kathmandu University.Arjun Dhakal

    Manager-Production/Q&C Mr. Arjun Dhakal holds Diploma in Mechanical Engineering from Butwal Technical Institute. He has morethan a decade of experience in manufacturing and fabrication industries at national and atinternational level, he has experience in metal and non metal destructive and non destructive testingsat EXOVA, a UK based multinational level testing laboratory located at Qatar. He joined North Hydrosince 2013. He is responsible in managing production, quality and control at the main premisesworkshop held at Rupandehi.

    Krishna SharmaManger-Site Management Mr. Krishna Sharma holds Diploma in Civil Engineering from Butwal Technical Institute. He has more

    than two decades of experience in Micro Hydro and Small Hydro in terms of site survey and sitemanagement. His experience in Micro Hydro installation has surpassed more than 100 power plants. Healso served North Hydro as Project Manager for Khani Khola Hydro Electric Project [2.0 MW]

    Er. Santosh BhandariManager - Engineering

    Division

    Er. Santsoh Bhandari received his Bachelor of Engineering in Mechanical Engineering from AnnaUniversity, Tamil Nadu-India. He joined North Hydro since 2013 as a mechanical engineer. Since thenhe is responsible for engineering design/review for reverse engineering drawings.

    Er. Santosh BhandariManager - Engineering

    Division

    Mr. Shom Shrestha has a long hand on experience in the field of hydro mechanical fabrication startingfrom his experience from Development and Consultancy Service (DCS), Butwal. Mr. Shrestha holdsDiploma in Mechanical Engineering from Butwal Technical Institute. His experience counts more thantwo decades of production planning and drafting. His ability to dedicate for precision manufacturingmakes North Hydro and Engineering as one of the main competence in hydro mechanical fabrication.

  • 8/10/2019 North Hydro Company Profile-2015

    5/13

    2015 NORTH HYDRO AND ENGINEERING PVT LTD.

    w w w . n o r t h h y d r o . c o m . n p | T i k u l i g a d h - 1 8 , R u p a n d e h i Page 5

    Major Areas of Work Expertise

    Penstock Pipe line (30 mm thickness, minimum diameter 400 mm)

    Gates & Stop Log (Radial and Vertical Design and Fabrication Drawing)

    Expansion Joints

    Site Erection and Commissioning

    Spiral Casing

    Project Management ( Tools using MS-Project)

    CAD drawings (Auto Desk and Solid Works)

    Turbine Repair and Maintenance

    Design, Fabrication and Installation of Hydro Power Equipments (Head Race/Penstock pipe,

    Bell Mouth, Bifurcation, Gates, Bends)

    Telephone number: +977-71-620888

    Email: [email protected]

    Year of Establishment

    North Hydro and Engineering 2013

    Corporate Registration

    Date of Registration: 2013-02-20

    Registration No: 109858/069/070

    VAT Registration

    Date of Registration: 2069-11-20

    VAT Registration No: 305647957

    Name and address of contact person:

    Name and Designation of Contact Person: Suraj Pandey, MS in Mechanical Engineering

    (Chief Executive Officer)

    Address: Butwal-8

    Durga Mandir Line

    Telephone number (Office): +977-71-620888

    Mobile: 9857034816

    Email : [email protected]

    mailto:[email protected]:[email protected]:[email protected]
  • 8/10/2019 North Hydro Company Profile-2015

    6/13

    2015 NORTH HYDRO AND ENGINEERING PVT LTD.

    w w w . n o r t h h y d r o . c o m . n p | T i k u l i g a d h - 1 8 , R u p a n d e h i Page 6

    How We Work

    Our Key to Success for Hydro Mechanical Competence: We treat every project uniquely

    Every project is unique and so is the site topography.

    Already in the bidding phase, fabrication/manufacturing processes, well-tailored to project-specific constraints, contractu

    requirements and geographic realities, are streamlined with the processes and the overall erection/construction project. Fo

    elaboration of an economic budget framework factors like staffing requirements, building site, necessary equipment/machine

    and the demand for supporting and special structures are determined.

    Manufacturing and Transportatio

    You'll find North Hydro projects all over Nepal. As manufacturing in workshop only doesnot always represent the most economic solutions. We however examine the

    possibilities of fabrication at the site or nearby site. It is clear that, majority portion ofworks for hydro mechanical represents bulky pipeline andsometimes transportation cost wi ll influence the project initial investment makinghigh. Depending on headrace/penstock diameters and total tonnages we decide,whether pre-manufacturing at our workshop or manufacturing directly on site is themore economic solution.

    After examination and checking of different scenarios, we define a unique andcustomized execution strategy for each project. This is how we believe and treat yourproject uniquely.

    Installation, Erection and Safety

    Installation is a task which we accomplish together with our experienced projectmanager, engineers, foreman and pool of technician. Our site manager and his teamare supported on site by effective and competent supervisor with whom we alreadyhave had a long and successful commitment.

    Work safety and health protection enjoys one of our top priorities on all our constructionsites. Project-specific risk analysis and the thus derived protective measures to beobserved constitute the basis for safety instructions and training, as well as for the useof personal protective equipment for each employee.

  • 8/10/2019 North Hydro Company Profile-2015

    7/13

    2015 NORTH HYDRO AND ENGINEERING PVT LTD.

    w w w . n o r t h h y d r o . c o m . n p | T i k u l i g a d h - 1 8 , R u p a n d e h i Page 7

    Services: One Stop Solution to your HM Lot

    Our corporate business ethics comes with our commitment, timely delivery an

    whenever it comes for the hydropower development project; our entire tea

    understands the value of time during project execution works. Moreover, our teams ar

    always excited to work for national development projects. We just don't show oucraftsmanship to the job piece, we add texture with our commitment, honesty, quali

    and true spirit of business. We are that of sure, once doing business with us, we nev

    let you to think of other option. After all, we too understand the value of econom

    flowing with your hydropower development projects.

    With this regard, on behalf of North Hydro Team, we wish to take great opportunity to

    work for your dream hydropower project to become technically and financially

    successful.

    Dott. Ing. Suraj Pandey, MSc in Mechanical Engineerin

    CEO, North Hydro and Engineering Pvt L

    [email protected]

    Fabrication:Pipes, Stoplog, Gate, Bell Mouth, Expansion Joints, Bends, Bifurcation, Reducer, Trashrack

    Manhole, Saddle Plate, PH Roof Truss

    We understand the requirement of hydro power projects in terms of hydro mechanical contractor scope. We are a team o

    experienced engineers, managers, foreman, technician and erector. We apply lean manufacturing techniques wheneve

    special items of hydro mechanical components have to be fabricated in order to win competence. Our team understands th

    requirement of the projects job order and is active in fabricating/manufacturing assigned job order. Moreover, with our larg

    working space under the same hood having latest equipment installed with various numbers of welding machines, tools an

    good reputation from our genuine vendor makes us to deliver the job order on time.

    Bifurcation is essential part ofhydro mechanical. With onestream of pipe conveyingwater, it helps to divide thewater for multiple turbinegenerating unit

    Our plate bending machine having capability to bend up to30 mm thickness and 3000 mm wide provides cost effectivesolutions for fabricating headrace, penstock pipe,expansion joints ring and reducer pipes.

    Our capabilities also includes in design andfabrication of segment mitered bends. With ourstaff trained from the technical institutefabricate bends precisely achieving accuratebend angle which can be easily erected at thesite without any problem.

  • 8/10/2019 North Hydro Company Profile-2015

    8/13

    2015 NORTH HYDRO AND ENGINEERING PVT LTD.

    w w w . n o r t h h y d r o . c o m . n p | T i k u l i g a d h - 1 8 , R u p a n d e h i Page 8

    Site Works:Supply, Erection, Testing and Commissioning

    By the time while moving to this section, fabrication/manufacturing is just 50 % of work done in a hydro mechanical lo

    turnkey. Supplying the fabricated material from the workshop to the site is always a challenging. With seasonal market rate fo

    the transportation, which accounts normally 10 % of project progress, is determinant factor for the project completion durationAlthough seems simple for transportation, we never take transportation management and logistic simply. We believe it to be

    critical path management (CPM) for achieving milestone on fabricated material to the site work. In this regard, we have

    small team of personnel having wide network with transportation agency all over Nepal and skilled with site demand an

    supply management from the workshop.

    For erection, we have a experienced team of personnel, who has gained more than decade of experience in handling mas

    number of people at the site. At North, we believe, completion and handing over the project ahead of the deadline is a symb

    of team spirit and team management. Apart from fabrication and supply, we always believe, site erection work accounts nex

    25 % of the project progress and success. Our site manager and office/workshop manager strongly prepare short terms an

    long term strategic plans before site mobilizations. Our site experts prepare plans using computerized project managemen

    software in order to track and execute the project. For every project site, we depute our own management staff in order t

    communicate the daily progress whereby meeting our every milestones and achievements of short term and long term

    strategic plans.

  • 8/10/2019 North Hydro Company Profile-2015

    9/13

    2015 NORTH HYDRO AND ENGINEERING PVT LTD.

    w w w . n o r t h h y d r o . c o m . n p | T i k u l i g a d h - 1 8 , R u p a n d e h i Page 9

    Site Works: Machine Equipment Human Resource

    We mobilize a team of experienced humanresources personnel in following hierarchy order

    in order to execute the project. Based upon theproject site topography and time linecommitment we multiply our team groups inorder to catch up the progress.

    Site Manager

    Administration and Finance Officer

    Mechanical Supervisor

    Welder (G-certified)

    Mechanical Foreman

    Mechanical Technician

    Semi-Skilled

    Painter

    Tractor Driver

    Machine/Equipment's/Resources for the Site

    1.

    Back up Diesel Generator (62 KVA, 82.5 KVA, 180

    KVA), Kirloskar Make

    2. Inverter Series-Rectifier Portable Welding Machine

    (400 A) - Qnty: 15 Sets

    3. Chain Block Pulley (5 Ton) - Qnty: 15 Sets

    4. Chain Block Pulley (3 Ton) - Qnty: 10 Sets

    5. V-Lever (3 Ton) - Qnty: 8 Sets

    6. Turn Buckle (M40 & M60) - Qnty: 4 sets each

    7. Max Puller (8 Ton): Qnty: 4 Sets

    8. Electric Winch Machine (5 Ton) - Qnty: 1 Set

    9. Mobile Tractor (50 HP) - Qnty: 1 Nos.

    10.Hydraulic Jack (10 T, 20 T, 30 T & 50 T) - 3 set

    each

    11.

    Grinding Machine (4", 5" & 7") - Qnty: 10 nos. each

    12.Electric Chain Hoist (3 T) - Qnty: 1 Nos.

    13.Electrode Oven Portable + Fixed type - Qnty: 10

    Nos + 2 Nos

    14.Magnetic Drill Machine (40 mm) - Qnty: 2 Nos

    15.Gas Cutting Set - Qnty: 10 Sets

    16.

    Survey Equipment - Qnty: 1 Set

  • 8/10/2019 North Hydro Company Profile-2015

    10/13

    2015 NORTH HYDRO AND ENGINEERING PVT LTD.

    w w w . n o r t h h y d r o . c o m . n p | T i k u l i g a d h - 1 8 , R u p a n d e h i Page 10

    Pressure Vessels: Headrace Penstock Pipes

    A

    TWI-UK basedG-Welder Certified

    Company

    Our Capabilities: Bending of plates up to thickness 30 mm X 3000

    mm width in to pipe shells with our hydraulic plate

    bending machine.

    In-situ hydraulic operated edge bending.

    Minimum diameter: 400 mm

    Supplementary EOT Crane

    350 Ton of folding capacity

    For your reference: On an average 17 number of

    shells can be rolled per day (12 hours) with shell

    diameter 2100 mm, thickness: 12 mm, width: 2500

    mm.

    Our Quality Assurance options for your project

    Welding StandardsAmerican Society of Mechanical Engineer (ASME),

    Section IX, Pressure Vessel

    Non Destructive Testing (NDT)

    Visual Inspection, Dye Penetrant Test (DPT), UltrasonicTest (>12mm), Radiography, Magnetic Particle Test(MPT)

    Quality: Dimensional

    Marking, Edge Preparation and Cutting, Edge Bendingand Ovality Check

    Corrosion Protection and PaintingRust Converter, Zinc Rich Primer, Coal Tar Epoxy

    Welding of Pressure Pipe

    For pressure vessel welding we are equipped with 12

    numbers of ESAB make, robust, 400 A, Rectifier series

    welding generator at the workshop.Electrode:E-7018 or equivalent

    Brand: D&H Scheron, ESAB, MODI, ATLANTIC, MARUTI

    Welding Position: 3G, 4G and 6G

    Certified G-Welders are deployed for welding pressure

    vessel.

    G-Welders: 9 Nos.

    Skilled Welder: 5

    Foreman: 3

    Skilled Technician-Mechanical: 5

  • 8/10/2019 North Hydro Company Profile-2015

    11/13

    2015 NORTH HYDRO AND ENGINEERING PVT LTD.

    w w w . n o r t h h y d r o . c o m . n p | T i k u l i g a d h - 1 8 , R u p a n d e h i Page 11

    COMPLETED/ON-GOING PROJECTS

    Hydropower Company Developer Remarks

    Naugarh Gad Hydro Power,

    (8.5 MW), DarchulaApi Power Company Limited

    Reducer Fabrication(16 mm thickness),

    Status:Completed in 11 days

    Naugarh Gad Hydro Power,

    (8.5 MW), DarchulaApi Power Company Limited

    Penstock Pipe Fabrication

    10 mm X 2100 mm dia,

    12 mm X 2000 mm dia,

    8 mm X 1700 mm dia

    Status:Completed 110 meter in 1

    month

    Naugarh Gad Hydro Power,

    (8.5 MW), DarchulaApi Power Company Limited

    Bifurcation rolling

    16 mm thickness

    Status: Completed in 5 days

    Naugarh Gad Hydro Power,

    (8.5 MW), DarchulaApi Power Company Limited

    Gates (Vertical)

    Status: On-progress

    Sanima Mai Hydro Power,

    (22 MW, Illam)Sanima Hydro

    Power House Turbine Erection

    and Commissioning

    Technical assistance

    (Mechanical)

    Status:Completed in 3 months

    Khani Khola Hydropower Co. Ltd,(2.0 MW, Lalitpur)

    Khani Khola Hydropower Co.Ltd

    Complete Package

    Status:On-going ( Deadline: 4

    months, December 2014)

    Features:2200 meters headrace pipe

    140 meters penstock

    18 Nos Expansion Joints

    34 Nos Bends

  • 8/10/2019 North Hydro Company Profile-2015

    12/13

    2015 NORTH HYDRO AND ENGINEERING PVT LTD.

    w w w . n o r t h h y d r o . c o m . n p | T i k u l i g a d h - 1 8 , R u p a n d e h i Page 12

    Logistic Support

    Total Number of room in the office building 7

    Total number of Desktop/Laptops 5

    Total number of printers and scanner 3

    Total number of photo copier 1

    LAN connection Yes

    Internet (256 kbps) Yes, NT-WiMAX

    Number of Vehicle 3

    CAD Software Yes (AutoCAD, Litio2, SOLIDWORKS)

    Modelling and Simulation Yes (ANSYS, CFD & FLUENT)

    Project Accounting Software Yes, (Microsoft Accounting)

    Project Management Software Yes, (Microsoft Project)

    Design and Drafting Team Personnel 4

    Telephone Yes

    Company own domain website and email Yes (www.northhydro.com.np)

    Quality Control Manual Yes, (110 pages)

    http://www.northhydro.com.np/http://www.northhydro.com.np/
  • 8/10/2019 North Hydro Company Profile-2015

    13/13

    2015 NORTH HYDRO AND ENGINEERING PVT LTD.

    CONTACT US

    We are not far...

    We definitely advise you to trip our place and nearby at 25 km is the World Heritage Site, Lumbini,where Lor

    Siddhartha Gautam Buddha was born.Our team is always delighted to see you in our office. We are well connected with major highways and airports. We ar

    just 8 km from Siddhartha Gautam Buddha Domestic Airport and 2 km from Siddhartha Highway.

    NORTH HYDRO AND ENGINEERING PVT LTDTILOTTAMA MUNICIPALITY

    RUPANDEHI+977-71+620888, 562976

    WWW.NORTHHYDRO.COM.NP

    We are social:

    Facebook.com/hydronorth

    http://en.wikipedia.org/wiki/Lumbinihttp://en.wikipedia.org/wiki/Lumbinihttp://en.wikipedia.org/wiki/Lumbinihttp://www.northhydro.com.np/http://www.northhydro.com.np/http://en.wikipedia.org/wiki/Lumbini