Page 1: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

NORTH DAKOTA

DEPARTMENT OF MINERAL RESOURCES:

NorthSTAR January 2019

Visit Us: www.dmr.nd.gov

Page 2: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

2

Agenda

• Introduction

• What is NorthSTAR?

• Project Schedule

• Demonstration

• Next Steps

Page 3: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

Introduction

NORTH DAKOTA

DEPARTMENT OF MINERAL RESOURCES

3

Page 4: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

The Oil and Gas Division regulates the drilling and production of oil and

gas in North Dakota. Our mission is to encourage and promote the

development, production, and utilization of oil and gas in the state in

such a manner as will prevent waste, maximize economic recovery,

and fully protect the correlative rights of all owners to the end that the

landowners, the royalty owners, the producers, and the general public

realize the greatest possible good from these vital natural resources.

Michael Ziesch – Project Sponsor, DMR

Katie Haarsager – Organizational Change Management Lead, DMR

Jay Ziegler – Lead Architect, Solution Provider

Correna Hula – Project Manager, Solution Provider

Dan Jarvis – Ground Water Protection Council

Introduction

4

Page 5: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

What is NorthSTAR?

NorthSTAR

5

Page 6: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

NorthSTAR - North Dakota Statewide

Tracking And Reporting System is the

branding of the Ground Water Protection

Council’s well management system – Risk

Based Data Management System (RBDMS)

Sponsored by the US Department of Energy

NorthSTAR will used by North Dakota

operators and regulators. It is a cloud based

application designed to help manage

information by streamlining operations,

simplifying processes, providing a better

way for Operators and Division to

collaborate, collect and analyze data.

What is NorthSTAR?

6

Page 7: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

Project Purpose and Objectives

• Purpose • To upgrade the agency’s legacy

information management system. It will include several resource saving components including electronic form acceptance to save manual data entry.

• Objectives • Improve reporting

• Improve processes

• Allow for electronic form submission

• Allow for more data gathering and analysis

7

Page 8: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

Project Schedule

NorthSTAR

8

Page 9: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

Project Schedule

• Bond Management

• Entity Management

• General

• Well Management

• (Well Stim & Idle

Well)

• Transfer

• Production

• UIC

• Inspections

• Facility (Part 1)

• Hearing and Docket

• Facility (Part 2)

• Compliance

• Incidents

R1.0

~7 Months

R2.0

~9 Months

R3.0

~9 Months

R4.0

~3 Months

9

9/1/2020 - 11/30/2020

RELEASE 4.0

1/1/2020 - 8/31/2020

RELEASE 3.0

10/1/2018 - 4/30/2019

RELEASE 1.0

5/1/2019 - 12/31/2019

RELEASE 2.0

Page 10: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

Demonstration

NorthSTAR

10

Page 11: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

NorthSTAR Demonstration

11

• Entity Management

• Operator data is entered in RBDMS

• Operator submits form to identify an Administrator

• The Administrator will manage permissions within the operator company

• DMR will establish RBDMS permissions for the Administrator

• Operator Administrator manages operator contact information in RBDMS

Page 12: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

12

Page 13: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

13

Page 14: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

14

Page 15: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

15

Page 16: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

16

Page 17: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

17

Page 18: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

18

Page 19: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

19

Page 20: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

20

Page 21: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

21

Page 22: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

Data Entry Methods

NorthSTAR

22

Page 23: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

Data Entry Methods

• Manual Forms

(Internal/External Users)

• HTML replacing most PDF

• Initial Validation

• Feedback on form status

• Bulk Upload

(XML option)

• Initial Validation

• Feedback on form status

• Ability to partially accept

form data

• Return error records to operator

23

Page 24: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

Fixing Validation Errors or Warnings

24

• The user can manually fix errors on each record, or

• The user can resubmit the file (previously submitted

data will be replaced).

24

Page 25: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

Next Steps

NorthSTAR

25

Page 26: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

NorthSTAR Next Steps

26

• Project Updates Sign Up

• Sign up to receive important updates about the project

• Check For Updates

• https://www.dmr.nd.gov/oilgas/northstar.asp

• Operator Feedback

• Your feedback is valuable to us

• Impact on Business Process

• Prepare for the impact on your business process and how data is

reported to DMR

Page 27: NORTH DAKOTA DEPARTMENT OF MINERAL RESOURCES: … · 2019-01-16 · Project Purpose and Objectives •Purpose •To upgrade the agency’s legacy information management system. It

NORTH DAKOTA

DEPARTMENT OF MINERAL RESOURCES

CONTACT US 600 East Boulevard Ave. – Dept. 405

Bismarck, ND 58505

Phone: 701.328.8020

Email: [email protected]

www.dmr.nd.gov 27