North and South Mimico STS Rehabilitation South Mimico Project … · 2018-05-24 · 2354 2 35 2352...

15
388 168 389 378 372 369 373 383 392 172 174 119 120 127 139 140 161 113 114 115 129 159 162_776 167 2557 2556 2555 2554 2553 2551 2549 2548 2547 2545 2544 2543 2540 2539 2538 2536 2535 2534 2533 2462 2460 2451 2450 2449 2319 2317 2309 2308 2307 2306 2301 2298 2294 2292 2284 2281 2280 2275 2270 2266 2259 2256 2255 2252 2250 2248 2247 2238 2237 2232 382 121 2552 2550 2546 2542 2541 2530 2463 2456 2318 2273 2269 2262 2261 2272 2249 390 386 379 387 377 371 374 381 171 173 123 124 128 134 136 137 152 147 148 145 149 153 158 157 160 112 142 144 165 2242 2464 2461 2457 2455 232 2316 2315 2312 2310 2305 2304 2302 2300 2299 2296 2295 2291 2290 2288 2285 2283 2282 2279 2278 2274 2271 2268 2267 2265 2264 2263 2260 2258 2254 2253 2251 2246 2244 2243 2241 2236 2234 2276_774 2277_775 125 133 132 135 146 2459 2458 2454 2 2314 2313 2311 2303 2297 2289 2287 2286 2257 2245 2240 2239 2235 2233 156_772 111 2293 385 376 393 593 592 591 590 588 587 586 584 583 582 581 579 78 77 6 774A 2375A 2378A _764 762_2374 589 585 2376A 2377A 2380A Berry Road Oakfield Drive LEGEND Project Date Scale Figure Prepared By: Verified By: KC JCN January, 2018 TA8607 1:500 ± 0 10 20 30 40 5 Meters 12m Buffer around LOD (March 2017) Tree Identified for Retention 653 Dead Tree 736 Butternut 2438 Dripline Tree Protection Zone North and South Mimico STS Rehabilitation South Mimico Project Area Tree Impacts Ravine and Natural Features Bylaw Boundary Limit of Disturbance (Oct 25, 2017) Bypass Phase 1 (Oct 25, 2017) Bypass Phase 2 (Oct 25, 2017) Bypass Phase 3 (Oct 25, 2017) Bypass Phase 4 (Oct 25, 2017) Proposed Sanitary Sewer Rehabilitation (Oct 25, 2017) Access Road Crossing (Oct 25, 2017) Manhole 5F Impacted Tree 560 Tree Identified for Removal 514 Access Road (Oct 25, 2017) Staging Area, Construction, Silt, and Tree Protection Fences (Oct 25, 2017) 12m Buffer around LOD (May 11, 2017) Tree Already Removed 2376A Additional Impacted Area (Jan 2018)

Transcript of North and South Mimico STS Rehabilitation South Mimico Project … · 2018-05-24 · 2354 2 35 2352...

Page 1: North and South Mimico STS Rehabilitation South Mimico Project … · 2018-05-24 · 2354 2 35 2352 2351 2350 2341 23 8 2340 2339 2338 2336 2335 233 4 233 2 2333 2331 233 0 2329 272

388168

389378

372

369 348339

343

342346352

353

364

373

383392

172174

119120

127

139 140

161

113

114

115

129

159162_776

167

2663

266126602659

2658

2655

2557

25562555

2554

25532551

2549 25482547

2545

2544

25432540

25392538

25372536

2535

2534

2533

2532

2531

25292528

25262525

2524

2520

2462

2460 245324522451

24502449 2447

2445

24442443

24422440

24382436

24342433

24302429

24162415

2412

23942393

23312330

2329

23282327

2325

2324

2319

2317

23092308

23072306 2301

2298

22942292

2284

2281

2280

2275

2270

2266 2259

2256

2255

2252

2250

2248

2247

22382237

2232

382

121

2662

25522550

2546

25422541

25302527

2463

2456

24482446

2441

2437

2435

2431

2428

23232322

2321

2318

2273 2269

22622261

349

2272

2249

350

390

386 379

387377

371

370

368367

359358

356 351

362 361345

344

340

347354

363365

366

374

381

171173

123

124 128

134136

137 152

147 148

145 149

153

158

157

160

112

142

144

165

2242

2657

2656

24642461 2457

2455

24272426

24242423 2422

24212414

2398

23262320

2316

2315

23122310

23052304

2302

23002299

2296

22952291

2290

2288

2285

2283

2282

22792278

22742271

2268

2267 22652264

2263

2260

2258

22542253

22512246

22442243

2241

22362234

2276_774

2277_775357

125

133132

135

146

24592458

24542439 2425

2413

2397

2314

23132311

23032297

22892287

2286

2257

2245

2240

2239 2235

2233

156_772

111

2293

385360

2396

341355376393

593

592

591590

588587

586

584583

582581

579578

577

575574

573572

570569

568567

566

565564

563562

774A

2375A

2378A763_764

762_2374

589

585

580

576

571

2376A2377A

2879A

2380A

Berry

Road

Oakfie

ld Drive

LEGEND

Project

Date

Scale

Figure

Prepared By:

Verified By:KC

JCN

January, 2018TA8607

1:500±0 10 20 30 405Meters

12m Buffer around LOD (March 2017)

Tree Identified for Retention653Dead Tree736Butternut2438

DriplineTree Protection Zone

North and South MimicoSTS Rehabilitation

South Mimico Project AreaTree Impacts

Ravine and Natural Features BylawBoundary

Limit of Disturbance (Oct 25, 2017)Bypass Phase 1 (Oct 25, 2017)Bypass Phase 2 (Oct 25, 2017)Bypass Phase 3 (Oct 25, 2017)Bypass Phase 4 (Oct 25, 2017)Proposed Sanitary Sewer Rehabilitation (Oct 25, 2017)

Access Road Crossing (Oct 25, 2017)

Manhole

5F

Impacted Tree560Tree Identified for Removal514

Access Road (Oct 25, 2017)

Staging Area, Construction, Silt, andTree Protection Fences (Oct 25, 2017)

12m Buffer around LOD (May 11, 2017)

Tree Already Removed2376A

Additional Impacted Area (Jan 2018)

Page 2: North and South Mimico STS Rehabilitation South Mimico Project … · 2018-05-24 · 2354 2 35 2352 2351 2350 2341 23 8 2340 2339 2338 2336 2335 233 4 233 2 2333 2331 233 0 2329 272

388168

389378

372

369 348339

337

336334

325

319

324323

314316

308309

310

311

302 297 293

291

289

287 191

198

199

290343

342346352

353

364

373

383392

172174

139 140

161

159162_776

167

187188

189190

261

262

263265

264

266 267

2557

25562555

2554

25532551

2549 25482547

2545

2544

25432540

25392538

25372536

2535

2534

2533

2532

2531

25292528

25262525

2524

25232522 2521

2520 2519

2518

25172516

2515

2513

2510 25092508

2507

2506

2505

25042503 2502

2501 25002499

24982497

2496

2493

2492

24912490

2489

2488 24872486

2484

24822481

2480

2478

2476

24752474

24732472

2471

2468

2462

2460 245324522451

24502449 2447

2445

24442443

24422440

24382436

24342433 2432

24302429

2420

24182417

24162415

2412

24112410

2409

2408

2407

2405 2404

2401

2400

2399

23942393

23862383

2375 2372

2370

2367

2365 2364

2361

23592356

2355

23542353

23522351

2350

23482341

2340

2339

2338 23362335

2334

23332332

23312330

2329

23282327

2325

2324

2284

2281

2280

2275

22562252

22502247

22382237

2232

22122206

2205 220422032202

22002199

2197

2196

2194

301

292

382

25522550

2546

25422541

25302527

2514

25122511

2495

24942485

24832477

24702469

2463

2456

24482446

2441

2437

2435

2431

2428

2419 2406

2403

2402

2395

2392

23912385

23842379

2378 23772376

23742373

2369

2363

2362

2357

2347

2337

23232322

2321

209

2208

2201

2198 21952193

3492249

350

390

386 379

387377

371

370

368367

359358

356 351

362 361345

344

340

333

326328

331330

320

318

322

321

317315

312

307

306

304

300

296

295195 194

288

197347354

363365

366

374

381

171173

134

137 152

147 148

145149

153

158

157

160

142

144

165

2242

2479

2467

24642461 2457

2455

24272426

24242423 2422

24212414

2398 23822381

23712368

2366

2360

2349

234523442343

23262320

2291

2290

2288

2285

2283

2282

22792278

2258

22542253

22512246

22442243

2241

22362234

2214

2211

2210

22072276_774

2277_775357

305

303

133

135

146

24662459

2458

24542439 2425

2413

2397 2380

2342

22892287

2286

2257

2245

2240

2239 2235

2233

156_772

335332

313

298

2465

2389

2358

2346

385360 329

299

2396

23902388

2387

597596

595

341355376393

774A

Oakfie

ld Drive

LEGEND

Project

Date

Scale

Figure

Prepared By:

Verified By:KC

JCN

January, 2018TA8607

1:500±0 10 20 30 405Meters

12m Buffer around LOD (March 2017)

Tree Identified for Retention653Dead Tree736Butternut2438

DriplineTree Protection Zone

North and South MimicoSTS Rehabilitation

South Mimico Project AreaTree Impacts

Ravine and Natural Features BylawBoundary

Limit of Disturbance (Oct 25, 2017)Bypass Phase 1 (Oct 25, 2017)Bypass Phase 2 (Oct 25, 2017)Bypass Phase 3 (Oct 25, 2017)Bypass Phase 4 (Oct 25, 2017)Proposed Sanitary Sewer Rehabilitation (Oct 25, 2017)

Access Road Crossing (Oct 25, 2017)

Manhole

5G

Impacted Tree560Tree Identified for Removal514

Access Road (Oct 25, 2017)

Staging Area, Construction, Silt, andTree Protection Fences (Oct 25, 2017)

12m Buffer around LOD (May 11, 2017)

Tree Already Removed2376A

Additional Impacted Area (Jan 2018)

Page 3: North and South Mimico STS Rehabilitation South Mimico Project … · 2018-05-24 · 2354 2 35 2352 2351 2350 2341 23 8 2340 2339 2338 2336 2335 233 4 233 2 2333 2331 233 0 2329 272

348339

337

336334

325

319

324323

314316

308309

310

311

302 297 293

291

289

287 191

198

199

290343

342346187

188

189190

261

262

263265

264

266 267268

269272

273

275

259

2506

2497

2496

2493

2492

24912490

2489

2488 24872486

2484

24822481

2480

2478

2476

24752474

24732472

2471

2468

2432

2408

2405 2404

2401

2400

2399

23942393

23862383

2375 2372

2370

2367

2365 2364

2361

23592356

2355

23542353

23522351

2350

23482341

2340

2339

2338 23362335

2334

23332332

2331

2225

2224

2223

22222221

2220

2217

22122206

2205 220422032202

22002199

2197

2196

2194

301

292

2495

24942485

24832477

24702469

2406

2403

2402

2395

2392

23912385

23842379

2378 23772376

23742373

2369

2363

2362

2357

2347

23372219

2218

209

2208

2201

2198 21952193

349 344

340

333

326328

331330

320

318

322

321

317315

312

307

306

304

300

296

295195 194

288

197

271

274

258

2479

2467

2422

24212398 23822381

23712368

2366

2360

2349

234523442343

22162215

2214

2213

2211

2210

2207305

303

2466

2397 2380

2342

335332

313

298

2465

2389

2358

2346

329

299

2396

23902388

2387

597596

595

341

279

280281

282

285284

LEGEND

Project

Date

Scale

Figure

Prepared By:

Verified By:KC

JCN

January, 2018TA8607

1:500±0 10 20 30 405Meters

12m Buffer around LOD (March 2017)

Tree Identified for Retention653Dead Tree736Butternut2438

DriplineTree Protection Zone

North and South MimicoSTS Rehabilitation

South Mimico Project AreaTree Impacts

Ravine and Natural Features BylawBoundary

Limit of Disturbance (Oct 25, 2017)Bypass Phase 1 (Oct 25, 2017)Bypass Phase 2 (Oct 25, 2017)Bypass Phase 3 (Oct 25, 2017)Bypass Phase 4 (Oct 25, 2017)Proposed Sanitary Sewer Rehabilitation (Oct 25, 2017)

Access Road Crossing (Oct 25, 2017)

Manhole

5H

Impacted Tree560Tree Identified for Removal514

Access Road (Oct 25, 2017)

Staging Area, Construction, Silt, andTree Protection Fences (Oct 25, 2017)

12m Buffer around LOD (May 11, 2017)

Tree Already Removed2376A

Additional Impacted Area (Jan 2018)

Page 4: North and South Mimico STS Rehabilitation South Mimico Project … · 2018-05-24 · 2354 2 35 2352 2351 2350 2341 23 8 2340 2339 2338 2336 2335 233 4 233 2 2333 2331 233 0 2329 272

179177

181

259

186

185

1802231

2228

2227

2226

2191

2190

2138

2137

2132

2131

2130

2129

2128

2127

2126

2125

2124

2230178

176

182

183

258

2229

2192

175

279

280281

282

285284

Bonnyview Drive

LEGEND

Project

Date

Scale

Figure

Prepared By:

Verified By:KC

JCN

January, 2018TA8607

1:500±0 10 20 30 405Meters

12m Buffer around LOD (March 2017)

Tree Identified for Retention653Dead Tree736Butternut2438

DriplineTree Protection Zone

North and South MimicoSTS Rehabilitation

South Mimico Project AreaTree Impacts

Ravine and Natural Features BylawBoundary

Limit of Disturbance (Oct 25, 2017)Bypass Phase 1 (Oct 25, 2017)Bypass Phase 2 (Oct 25, 2017)Bypass Phase 3 (Oct 25, 2017)Bypass Phase 4 (Oct 25, 2017)Proposed Sanitary Sewer Rehabilitation (Oct 25, 2017)

Access Road Crossing (Oct 25, 2017)

Manhole

5I

Impacted Tree560Tree Identified for Removal514

Access Road (Oct 25, 2017)

Staging Area, Construction, Silt, andTree Protection Fences (Oct 25, 2017)

12m Buffer around LOD (May 11, 2017)

Tree Already Removed2376A

Additional Impacted Area (Jan 2018)

Page 5: North and South Mimico STS Rehabilitation South Mimico Project … · 2018-05-24 · 2354 2 35 2352 2351 2350 2341 23 8 2340 2339 2338 2336 2335 233 4 233 2 2333 2331 233 0 2329 272

179177

1812231

2228

2227

2146214521442143

21422141

2140

2139

2138

2137

2134

2133

2132

2131

2130

2129

2128

2127

2126

2125

2124

2123

2122

2121 2120 21192118

211621152114 2113

2112 2111

2230

2117

178

176

2229175

Bonnyvie

w Drive

LEGEND

Project

Date

Scale

Figure

Prepared By:

Verified By:KC

JCN

January, 2018TA8607

1:500±0 10 20 30 405Meters

12m Buffer around LOD (March 2017)

Tree Identified for Retention653Dead Tree736Butternut2438

DriplineTree Protection Zone

North and South MimicoSTS Rehabilitation

South Mimico Project AreaTree Impacts

Ravine and Natural Features BylawBoundary

Limit of Disturbance (Oct 25, 2017)Bypass Phase 1 (Oct 25, 2017)Bypass Phase 2 (Oct 25, 2017)Bypass Phase 3 (Oct 25, 2017)Bypass Phase 4 (Oct 25, 2017)Proposed Sanitary Sewer Rehabilitation (Oct 25, 2017)

Access Road Crossing (Oct 25, 2017)

Manhole

5J

Impacted Tree560Tree Identified for Removal514

Access Road (Oct 25, 2017)

Staging Area, Construction, Silt, andTree Protection Fences (Oct 25, 2017)

12m Buffer around LOD (May 11, 2017)

Tree Already Removed2376A

Additional Impacted Area (Jan 2018)

Page 6: North and South Mimico STS Rehabilitation South Mimico Project … · 2018-05-24 · 2354 2 35 2352 2351 2350 2341 23 8 2340 2339 2338 2336 2335 233 4 233 2 2333 2331 233 0 2329 272

2152215121502149

21482147

2146214521442143

2136

2135

2134

2122

2121 2120 21192118

211621152114 2113

2112 21112110

21092108

21072106

2105

2117

Bonnyview Drive

LEGEND

Project

Date

Scale

Figure

Prepared By:

Verified By:KC

JCN

January, 2018TA8607

1:500±0 10 20 30 405Meters

12m Buffer around LOD (March 2017)

Tree Identified for Retention653Dead Tree736Butternut2438

DriplineTree Protection Zone

North and South MimicoSTS Rehabilitation

South Mimico Project AreaTree Impacts

Ravine and Natural Features BylawBoundary

Limit of Disturbance (Oct 25, 2017)Bypass Phase 1 (Oct 25, 2017)Bypass Phase 2 (Oct 25, 2017)Bypass Phase 3 (Oct 25, 2017)Bypass Phase 4 (Oct 25, 2017)Proposed Sanitary Sewer Rehabilitation (Oct 25, 2017)

Access Road Crossing (Oct 25, 2017)

Manhole

5K

Impacted Tree560Tree Identified for Removal514

Access Road (Oct 25, 2017)

Staging Area, Construction, Silt, andTree Protection Fences (Oct 25, 2017)

12m Buffer around LOD (May 11, 2017)

Tree Already Removed2376A

Additional Impacted Area (Jan 2018)

Page 7: North and South Mimico STS Rehabilitation South Mimico Project … · 2018-05-24 · 2354 2 35 2352 2351 2350 2341 23 8 2340 2339 2338 2336 2335 233 4 233 2 2333 2331 233 0 2329 272

21642163

2162

2161

21602159

2158

215521542153

215221512150 2136

21092108

21072106

2105 2104

21032102 2101

2100

20992098

2097 2096

Bonnyview Drive

Lorne

Aven

ue

LEGEND

Project

Date

Scale

Figure

Prepared By:

Verified By:KC

JCN

January, 2018TA8607

1:500±0 10 20 30 405Meters

12m Buffer around LOD (March 2017)

Tree Identified for Retention653Dead Tree736Butternut2438

DriplineTree Protection Zone

North and South MimicoSTS Rehabilitation

South Mimico Project AreaTree Impacts

Ravine and Natural Features BylawBoundary

Limit of Disturbance (Oct 25, 2017)Bypass Phase 1 (Oct 25, 2017)Bypass Phase 2 (Oct 25, 2017)Bypass Phase 3 (Oct 25, 2017)Bypass Phase 4 (Oct 25, 2017)Proposed Sanitary Sewer Rehabilitation (Oct 25, 2017)

Access Road Crossing (Oct 25, 2017)

Manhole

5L

Impacted Tree560Tree Identified for Removal514

Access Road (Oct 25, 2017)

Staging Area, Construction, Silt, andTree Protection Fences (Oct 25, 2017)

12m Buffer around LOD (May 11, 2017)

Tree Already Removed2376A

Additional Impacted Area (Jan 2018)

Page 8: North and South Mimico STS Rehabilitation South Mimico Project … · 2018-05-24 · 2354 2 35 2352 2351 2350 2341 23 8 2340 2339 2338 2336 2335 233 4 233 2 2333 2331 233 0 2329 272

2189

2175

2174

2173

21722171

2170

21692168

2167

21662165

21642163

2162

2161

21602159

2158

215521542153

2100

20992098

2097 2096

Park Lawn Road

Lorne

Aven

ue

Ringle

y Ave

nue

LEGEND

Project

Date

Scale

Figure

Prepared By:

Verified By:KC

JCN

January, 2018TA8607

1:500±0 10 20 30 405Meters

12m Buffer around LOD (March 2017)

Tree Identified for Retention653Dead Tree736Butternut2438

DriplineTree Protection Zone

North and South MimicoSTS Rehabilitation

South Mimico Project AreaTree Impacts

Ravine and Natural Features BylawBoundary

Limit of Disturbance (Oct 25, 2017)Bypass Phase 1 (Oct 25, 2017)Bypass Phase 2 (Oct 25, 2017)Bypass Phase 3 (Oct 25, 2017)Bypass Phase 4 (Oct 25, 2017)Proposed Sanitary Sewer Rehabilitation (Oct 25, 2017)

Access Road Crossing (Oct 25, 2017)

Manhole

5M

Impacted Tree560Tree Identified for Removal514

Access Road (Oct 25, 2017)

Staging Area, Construction, Silt, andTree Protection Fences (Oct 25, 2017)

12m Buffer around LOD (May 11, 2017)

Tree Already Removed2376A

Additional Impacted Area (Jan 2018)

Page 9: North and South Mimico STS Rehabilitation South Mimico Project … · 2018-05-24 · 2354 2 35 2352 2351 2350 2341 23 8 2340 2339 2338 2336 2335 233 4 233 2 2333 2331 233 0 2329 272

202

2189

2188

21872186

21852184

218321822181

21802179

2178

2177

2176

2175

2174

2173

21722171

2157

2076

2075

20092008

20062005

2003

2002

2001

2007

2004

Park Lawn Road

The Q

ueen

sway

LEGEND

Project

Date

Scale

Figure

Prepared By:

Verified By:KC

JCN

January, 2018TA8607

1:500±0 10 20 30 405Meters

12m Buffer around LOD (March 2017)

Tree Identified for Retention653Dead Tree736Butternut2438

DriplineTree Protection Zone

North and South MimicoSTS Rehabilitation

South Mimico Project AreaTree Impacts

Ravine and Natural Features BylawBoundary

Limit of Disturbance (Oct 25, 2017)Bypass Phase 1 (Oct 25, 2017)Bypass Phase 2 (Oct 25, 2017)Bypass Phase 3 (Oct 25, 2017)Bypass Phase 4 (Oct 25, 2017)Proposed Sanitary Sewer Rehabilitation (Oct 25, 2017)

Access Road Crossing (Oct 25, 2017)

Manhole

5N

Impacted Tree560Tree Identified for Removal514

Access Road (Oct 25, 2017)

Staging Area, Construction, Silt, andTree Protection Fences (Oct 25, 2017)

12m Buffer around LOD (May 11, 2017)

Tree Already Removed2376A

Additional Impacted Area (Jan 2018)

Page 10: North and South Mimico STS Rehabilitation South Mimico Project … · 2018-05-24 · 2354 2 35 2352 2351 2350 2341 23 8 2340 2339 2338 2336 2335 233 4 233 2 2333 2331 233 0 2329 272

202

21572156

215521542153

2100

20992098

2097 20962095

20942093

2092

20912090

2089

2088

2087

20862085

20832082

2081 2080

20792078

2077

2076

2075

2010

20092008

20062005

2003

2002

2001

2084

2007

2004

2013

The Q

ueen

sway

Cathron Street

Bonnyview Drive

LEGEND

Project

Date

Scale

Figure

Prepared By:

Verified By:KC

JCN

January, 2018TA8607

1:500±0 10 20 30 405Meters

12m Buffer around LOD (March 2017)

Tree Identified for Retention653Dead Tree736Butternut2438

DriplineTree Protection Zone

North and South MimicoSTS Rehabilitation

South Mimico Project AreaTree Impacts

Ravine and Natural Features BylawBoundary

Limit of Disturbance (Oct 25, 2017)Bypass Phase 1 (Oct 25, 2017)Bypass Phase 2 (Oct 25, 2017)Bypass Phase 3 (Oct 25, 2017)Bypass Phase 4 (Oct 25, 2017)Proposed Sanitary Sewer Rehabilitation (Oct 25, 2017)

Access Road Crossing (Oct 25, 2017)

Manhole

5O

Impacted Tree560Tree Identified for Removal514

Access Road (Oct 25, 2017)

Staging Area, Construction, Silt, andTree Protection Fences (Oct 25, 2017)

12m Buffer around LOD (May 11, 2017)

Tree Already Removed2376A

Additional Impacted Area (Jan 2018)

Page 11: North and South Mimico STS Rehabilitation South Mimico Project … · 2018-05-24 · 2354 2 35 2352 2351 2350 2341 23 8 2340 2339 2338 2336 2335 233 4 233 2 2333 2331 233 0 2329 272

202

2076

2075

2071

2070BP170120682067

2066

2064

2063

2062

2061

2060

2058

20572056

2054

20532052 2051

204820472046

2045

2044 2043

2040

20392038

2037

2035

20332030

2025

2024

2023

2022

20212020

20192018

2017

2015

2012

2011

2010

20092008

20062005

2003

2002

2001 2065

2059

205520502049

2042

20412034

2007

2004

20742073

2072

2036

20312029

2028

20272026

2016

20142013

2032

594

BP1726

BP1725 BP1724BP1709

BP1707BP1706

BP1705

BP1704

BP1703

BP1702

BP1708

Cathron Street

LEGEND

Project

Date

Scale

Figure

Prepared By:

Verified By:KC

JCN

January, 2018TA8607

1:500±0 10 20 30 405Meters

12m Buffer around LOD (March 2017)

Tree Identified for Retention653Dead Tree736Butternut2438

DriplineTree Protection Zone

North and South MimicoSTS Rehabilitation

South Mimico Project AreaTree Impacts

Ravine and Natural Features BylawBoundary

Limit of Disturbance (Oct 25, 2017)Bypass Phase 1 (Oct 25, 2017)Bypass Phase 2 (Oct 25, 2017)Bypass Phase 3 (Oct 25, 2017)Bypass Phase 4 (Oct 25, 2017)Proposed Sanitary Sewer Rehabilitation (Oct 25, 2017)

Access Road Crossing (Oct 25, 2017)

Manhole

5P

Impacted Tree560Tree Identified for Removal514

Access Road (Oct 25, 2017)

Staging Area, Construction, Silt, andTree Protection Fences (Oct 25, 2017)

12m Buffer around LOD (May 11, 2017)

Tree Already Removed2376A

Additional Impacted Area (Jan 2018)

Page 12: North and South Mimico STS Rehabilitation South Mimico Project … · 2018-05-24 · 2354 2 35 2352 2351 2350 2341 23 8 2340 2339 2338 2336 2335 233 4 233 2 2333 2331 233 0 2329 272

2071

2070BP170120682067

2066

2064

2063

2062

2061

2060

2058

20572056

2054

20532052 2051

204820472046

2045

2044 2043

2040

20392038

2037

2035

20332030

2025

2024

2023

2022

20212020

20192018

2017

2015

2012

2011

2010

2065

2059

205520502049

2042

20412034

20742073

2072

2036

20312029

2028

20272026

2016

20142013

2032

594

BP1726

BP1725 BP1724

BP1723BP1722

BP1721

BP1718

BP1716

BP1715

BP1712BP1711

BP1710BP1709

BP1707BP1706

BP1705

BP1704

BP1703

BP1702

BP1720

BP1719

BP1717

BP1714

BP1713

BP1708

LEGEND

Project

Date

Scale

Figure

Prepared By:

Verified By:KC

JCN

January, 2018TA8607

1:500±0 10 20 30 405Meters

12m Buffer around LOD (March 2017)

Tree Identified for Retention653Dead Tree736Butternut2438

DriplineTree Protection Zone

North and South MimicoSTS Rehabilitation

South Mimico Project AreaTree Impacts

Ravine and Natural Features BylawBoundary

Limit of Disturbance (Oct 25, 2017)Bypass Phase 1 (Oct 25, 2017)Bypass Phase 2 (Oct 25, 2017)Bypass Phase 3 (Oct 25, 2017)Bypass Phase 4 (Oct 25, 2017)Proposed Sanitary Sewer Rehabilitation (Oct 25, 2017)

Access Road Crossing (Oct 25, 2017)

Manhole

5Q

Impacted Tree560Tree Identified for Removal514

Access Road (Oct 25, 2017)

Staging Area, Construction, Silt, andTree Protection Fences (Oct 25, 2017)

12m Buffer around LOD (May 11, 2017)

Tree Already Removed2376A

Additional Impacted Area (Jan 2018)

Page 13: North and South Mimico STS Rehabilitation South Mimico Project … · 2018-05-24 · 2354 2 35 2352 2351 2350 2341 23 8 2340 2339 2338 2336 2335 233 4 233 2 2333 2331 233 0 2329 272

68

98

846

854 856855 858

861862

668

911914

876877

606

841

632633

667666

664663

660

100654

653 650648

647645

644643

639

2977 2974

2972 2970 2968

2959

2958

2957

2951

2922

2918

29092906

2905

2904

290329022899

2898

28962897

28952893

28912889

2886

28852884

2386A

2387_97

859

605

662

101

655

652

651

649

646

2973 2969

2956

2926

2917

29082907

29012900

28942892

2890

2888

2887

889

661

844

845

853

851852 857

865 880

863

883

884

887888 894

916

875

874607

634

2976

29672966

2965

2964

2960

29232921

29202919

2910

882

881

885

2911

864866

895

901

636A

2928

2971

547546545

543

542

541

540539

538

537

536 535

534 530529

527

524

2389A

2388A

544

533526

525

528

532

Reid Manor

LEGEND

Project

Date

Scale

Figure

Prepared By:

Verified By:KC

JCN

January, 2018TA8607

1:500±0 10 20 30 405Meters

12m Buffer around LOD (March 2017)

Tree Identified for Retention653Dead Tree736Butternut2438

Tree Protection Zone

North and South MimicoSTS Rehabilitation

South Mimico Project AreaTree Protection Measures

Ravine and Natural Features BylawBoundary

Limit of Disturbance (Oct 25, 2017)Bypass Phase 1 (Oct 25, 2017)Bypass Phase 2 (Oct 25, 2017)Bypass Phase 3 (Oct 25, 2017)Bypass Phase 4 (Oct 25, 2017)Proposed Sanitary Sewer Rehabilitation (Oct 25, 2017)

Access Road Crossing (Oct 25, 2017)

Manhole

6A

Impacted Tree560

Access Road (Oct 25, 2017)

Staging Area, Construction, Silt, andTree Protection Fences (Oct 25, 2017)

12m Buffer around LOD (May 11, 2017)

Mulch and Steel Plating

Tree Identified for RemovalTree Already Removed2376A

Additional Impacted Area (Jan 2018)

Page 14: North and South Mimico STS Rehabilitation South Mimico Project … · 2018-05-24 · 2354 2 35 2352 2351 2350 2341 23 8 2340 2339 2338 2336 2335 233 4 233 2 2333 2331 233 0 2329 272

739

741

740

730

723731

733

720

722

725

726

728

742743

744

736

734

717719

711

716714

713

810766

826825

824 822807

2883

2877

2738

273627352734

27332732 2730

2728

2726

721

724

727729

745

718712

715

823

2878

27312729 2727

27252724

2723

68

98

846

854 856855 858

861862

668

911914

876877

606

841

632633

667666

664663

660

100654

653 650648

647645

644643

639

2977 2974

2972 2970 2968

2959

2958

2957

2951

2950

29492948

2945

29442943

2939

29382936

2935 2934

29332932

29312922

2918

29092906

2905

2904

290329022899

2898

28962897

28952893

28912889

2886

28852884

2386A

859

605

662

101

655

652

651

649

646

2973 2969

2956

29472946 2942

2941

2940

29372926

2924

2917

29082907

29012900

28942892

2890

2888

2887

889

661

844

845

853

851852 857

865 880

863

883

884

887888 894

916

875

874607

634

732748

737 735

821815

2976

29672966

2965

2964

2960

29232921

29202919

2910

882

881

885

2911

864866

895

901751

827

813

636A

2928

2971

547546545

543

542

541

540539

538

537

536 535

534 530529

527

524

523

519

514

510

508506

505504

502501

544

533526

525

522520

509

507

503

528

521

532

LEGEND

Project

Date

Scale

Figure

Prepared By:

Verified By:KC

JCN

January, 2018TA8607

1:500±0 10 20 30 405Meters

12m Buffer around LOD (March 2017)

Tree Identified for Retention653Dead Tree736Butternut2438

Tree Protection Zone

North and South MimicoSTS Rehabilitation

South Mimico Project AreaTree Protection Measures

Ravine and Natural Features BylawBoundary

Limit of Disturbance (Oct 25, 2017)Bypass Phase 1 (Oct 25, 2017)Bypass Phase 2 (Oct 25, 2017)Bypass Phase 3 (Oct 25, 2017)Bypass Phase 4 (Oct 25, 2017)Proposed Sanitary Sewer Rehabilitation (Oct 25, 2017)

Access Road Crossing (Oct 25, 2017)

Manhole

6B

Impacted Tree560

Access Road (Oct 25, 2017)

Staging Area, Construction, Silt, andTree Protection Fences (Oct 25, 2017)

12m Buffer around LOD (May 11, 2017)

Mulch and Steel Plating

Tree Identified for RemovalTree Already Removed2376A

Additional Impacted Area (Jan 2018)

Page 15: North and South Mimico STS Rehabilitation South Mimico Project … · 2018-05-24 · 2354 2 35 2352 2351 2350 2341 23 8 2340 2339 2338 2336 2335 233 4 233 2 2333 2331 233 0 2329 272

739

741

740

730

723731

733

720

722

725

726

728

742743

744

736

734

717719

699

700

711

716714

713

810

495494

493

490489

766

826825

824 822807 800

782 772

430429

28832881

2880

287728752874

2873

2871

2870

2869

28682867

2866

2863

28572856

2855 2854

2853

2852

2851

2850 2848

28472843

2841

2840

2839

2837

2836

2835

2834

2833 2832

2831

28282827

28262825

2824 2823

28212816 2815

2814 2813

28122811

28102807

28042803

2738

273627352734

27332732 2730

2728

2726

27222721

2717

27192718 2716

2715

2713

27032702

2701

26992697

2696

2695 26932692

2691

2689

721

724

727729

745

718

701

712715

793

768

823

2879

2878

2872 28592858

28492846

2845

2844

2842

2838

2830

2805

27312729 2727

27252724

27232720

2714

2711

2700 26942690

668

911914

2959

2958

2957

2951

2950

29492948

2945

29442943

2939

29382936

2935 2934

29332932

29312922

2918

29092906

2956

29472946 2942

2941

2940

29372926

2924

2917

29082907

916

732748

737 735817

779767

491 487477

442

821815 783 773

470

2960

29232921

29202919

2910

2862

2860

28292822

2820

2809 2808

27122710

2708

778

2911

2861

27092707

895

901751

780

769827

813

2928

543541

539

538

536 535

534 530529

527

524

523

519

518

517516

515

514

512511

510

508

506

505504

502501

533526

525

522520

513

509

507

503

528

521

532

LEGEND

Project

Date

Scale

Figure

Prepared By:

Verified By:KC

JCN

January, 2018TA8607

1:500±0 10 20 30 405Meters

12m Buffer around LOD (March 2017)

Tree Identified for Retention653Dead Tree736Butternut2438

Tree Protection Zone

North and South MimicoSTS Rehabilitation

South Mimico Project AreaTree Protection Measures

Ravine and Natural Features BylawBoundary

Limit of Disturbance (Oct 25, 2017)Bypass Phase 1 (Oct 25, 2017)Bypass Phase 2 (Oct 25, 2017)Bypass Phase 3 (Oct 25, 2017)Bypass Phase 4 (Oct 25, 2017)Proposed Sanitary Sewer Rehabilitation (Oct 25, 2017)

Access Road Crossing (Oct 25, 2017)

Manhole

6C

Impacted Tree560

Access Road (Oct 25, 2017)

Staging Area, Construction, Silt, andTree Protection Fences (Oct 25, 2017)

12m Buffer around LOD (May 11, 2017)

Mulch and Steel Plating

Tree Identified for RemovalTree Already Removed2376A

Additional Impacted Area (Jan 2018)