NORSOK LE Standards
Y-002 Life Extension for Transportation SystemsU-009 Life Extension for Subsea Systems
© Det Norske Veritas AS. All rights reserved.
NORSOK LE Standards
08.06.2012
Life Extension - Overview
3
Flexible Flowlines
MIS-BE-3D-PR-0064
Intrafield Pipelines
Subsea Well Templatewith Protection Structure
Rigid Flowlines
Subsea Manifold, Process Modules & Metering
Intrafield Flowlines
Umbilical
PLEM
IntermediarTowhead
Subsea
Export Subsea Structur
FlowlineJumper
Riser-to-FlowlineInterfac
MidwaterBuoy
MidwaterArche
DynamiFlexibles
Bend Tie-in
Riser (Pipe/Lines)Riser J-tubes (Platform
Diagram 1. Representative System Schematic showing Subsea Interfaces
Green: Subsea Red: Pipelines Blue: StructuresYellow: Wells
Umbilical
SSIV,HIPPS or P/L Isolation Valves
Well, Wellhead and Structural Stability (Wells)
Workover,W/L & CT Systems (Wells)
External Intervention Systems
Offshore Loading systems
© Det Norske Veritas AS. All rights reserved.
NORSOK LE Standards
08.06.2012
Rammeverk
Søknadsprosess i forbindelse med samtykkesøknadOLF Guideline 122 gir veiledning om denne prosessen
Tekniske veiledninger innenfor aktivitetsområdene til OLF er utviklet. Områdene er identifisert med:
Bærende konstruksjoner NORSOK standard N-006 (April 2009)Transport system NORSOK standard Y-002 (December 2010)Subsea system NORSOK standard U-009 (March 2011)Boring og brønn Inkl. i OLF Guideline 122 Prosess topside systemer Inkl. i OLF Guideline 122HSE & tekniske sikkerhetssystemer Inkl. i OLF Guideline 122
4
© Det Norske Veritas AS. All rights reserved.
NORSOK LE Standards
08.06.2012
Containment and Integrity The main service/criterion for a transport system is containment. Failure of the
transportation systems are identified by
- leak- rupture/burst- collapse
Technical integrity is also the primary concern in the standard for subsea systems, but operational integrity is taken into consideration where this is essential for the system (e.g. umbilical, control system, etc.)
5
© Det Norske Veritas AS. All rights reserved.
NORSOK LE Standards
08.06.2012
Life Extension Process
6
Initiate Lifetime Extension Process
STOP
Decommission at end of current design life
Reassessment
(Prognostic)
Integrity acceptable
Modificationsfeasible
Identify modifications
Document
Implement
Yes
No
Yes No
Define
Life Extension Premises
Integrity Assessment
(Diagnostic)
© Det Norske Veritas AS. All rights reserved.
NORSOK LE Standards
08.06.2012
Skisse av identifisert integritetsnivå mot tid
7
Reassessment
Condition assessment
Provide information on assuring confidence in the system and on actions that need to be taken to achieve the objective of life extension with respect to the acceptable level of risk.
© Det Norske Veritas AS. All rights reserved.
NORSOK LE Standards
08.06.2012
DefinisjonerDesign life
The design life is the specified period for which the integrity of the system is documented in the original design with anticipated maintenance, but withoutrequiring substantial repair.
Service Life
The time length the system is intended to operate. The service life is a part of theapplication toward authorities.
8
© Det Norske Veritas AS. All rights reserved.
NORSOK LE Standards
08.06.2012
Integrity Management System
9
© Det Norske Veritas AS. All rights reserved.
NORSOK LE Standards
08.06.2012
Life Extension Premises Authority regulations
- The latest authority regulations apply to the transportation system
Design Standards- Gaps shall be assessed toward latest standards and the risk shall be assessed
Design Premise- Describes the operational and design limits for the system, e.g. operational pressure
Threats to the transportation system may cause- Leak/ Rupture/ Collapse
System Overview- Battery limit is from pig trap to pig trap, but other may apply- Interact with multiple other systems along the transport route
11
© Det Norske Veritas AS. All rights reserved.
NORSOK LE Standards
08.06.2012
Kjenne kontra anta i tilstandskontroll
12
Requalification toward lifetime
extension required
Condition is Quantified
through direct measurement
Condition by Design
Condition by Operational Experience
Condition unknown
Condition Control
Additional information from
design and service is
required to evaluate
qualified life
Premises in design is fulfilled and design life
is validated
Operation outside design
premises identified
The condition as basis for further
operation is qualified
Assessment of operation
history provide a qualified
condition status
Remedial actions required
Remedial actions required
to quantify condition
Remedial actions required
to quantify condition
Remedial actions may be
required to quantify condition
Remedial actions not
required
© Det Norske Veritas AS. All rights reserved.
NORSOK LE Standards
08.06.2012
Reassessment process
14
Reassessment
Lifetime Extension Premises
Improved calculation
method
Identify Modification
Integrity Acceptable
NO
Document
YES
Improved Inspection data
Improved Monitoring data
YES
STOPDecommission at
end of current design life
NO
Reassessment(Prognostic)
Feasibility
Eva
luat
e ot
her o
ptio
ns
Integrity Assessment (Diagnostic)
© Det Norske Veritas AS. All rights reserved.
NORSOK LE Standards
08.06.2012
Tilstandsbasert vurdering
16
Model andcalculations Local responsePremises
Assumptions
Improved model/
technology
Improved computing
capacity
Monitoring and inspection
data
Direct Measurement
data
Material and component
requirements
Damage/ degradation
estimates
Condition based data
Technology development
© Det Norske Veritas AS. All rights reserved.
NORSOK LE Standards
08.06.2012
Modifikasjoner
Skadebegrensningstiltak
Intervensjon
Reparasjon
Utskiftning
17
© Det Norske Veritas AS. All rights reserved.
NORSOK LE Standards
08.06.2012
Resultat fra en levetidsforlengelse Dokumentasjon av teknisk integritet
Plan for modifikasjoner
Input til planer for målinger og inspeksjon
Dette vil være et godt grunnlag for å dokumentere teknisk integritet i forbindelse med en levetidsforlengelse for transportsystem
18
© Det Norske Veritas AS. All rights reserved.
NORSOK LE Standards
08.06.2012
NORSOK Standard U-009Report Format
20
Annex per Discipline
Main Body – asfor TransportationSystem
Annex A -System Requirements
© Det Norske Veritas AS. All rights reserved.
NORSOK LE Standards
08.06.2012
NORSOK Standard U-009Appendices
21
© Det Norske Veritas AS. All rights reserved.
NORSOK LE Standards
08.06.2012
Annex A – System RequirementsInterfaces between Sub-Systems and Components
23
© Det Norske Veritas AS. All rights reserved.
NORSOK LE Standards
08.06.2012
Safeguarding life, property and the environment
www.dnv.com
26