Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard...

42
Norfolk Vanguard Offshore Wind Farm Guide to the Application Development Consent Order Applicant: Norfolk Vanguard Limited Document Reference: 1.4 Pursuant to APFP Regulation: 5(2)(q) Date: 30 May 2019 Revision: Version 9 (Deadline 8) Author: Womble Bond Dickinson Photo: Kentish Flats Offshore Wind Farm

Transcript of Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard...

Page 1: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm

Guide to the Application Development Consent Order Applicant: Norfolk Vanguard Limited Document Reference: 1.4 Pursuant to APFP Regulation: 5(2)(q) Date: 30 May 2019 Revision: Version 9 (Deadline 8) Author: Womble Bond Dickinson Photo: Kentish Flats Offshore Wind Farm

Page 2: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Date Issue

No.

Remarks / Reason for Issue Author Checked Approved

30/05/19 Final JT JA/GK RS

Page 3: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Limited

Norfolk Vanguard Offshore Wind Farm

Guide to the Application

(For Deadline 8)

Document Reference 1.4

APFP Regulation 5(2)(q)

Author Womble Bond Dickinson

Date 30 May 2019

Revision 9

Page 4: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 1

1. INTRODUCTION

1.1 This document provides a guide to Norfolk Vanguard Limited's (the Applicant) Development Consent Order (DCO) application for the Norfolk Vanguard Offshore Wind Farm (the Project). It sets out which document version is the most up to date.

1.2 This is a live document and will be updated when updates or revisions to existing documents are made and new documents are submitted to the Planning Inspectorate.

1.3 This document has also been requested by the Planning Inspectorate through the Rule 8 letter dated 19 December 2018.

2. MASTER DOCUMENT LIST

2.1 The master document list table is set out on the following pages and provides a full list of all the documents submitted to date, indicating either the latest revision (if applicable) or when a new document was submitted.

2.2 For ease of navigation these documents are grouped by volumes as follows:

Volume Details

1. Application Form Provides details of the specific application information required by the Planning Inspectorate

2. Plans Contains the plans which show the location of the Project and the works proposed

3. Development Consent Order Outlines the legal powers sought by the Applicant to construct and maintain the Project

4. Compulsory Acquisition Information Provides details of the powers of compulsory acquisition that are sought

5. Reports/Statements Contains documents required to be submitted with the DCO application

6. Environmental Impact Assessment Contains information showing how the Applicant has assessed the potential impact on the environment

7. Additional information for specific types of infrastructure

Contains specified documents required to be submitted for an application for an offshore wind farm

8. Other documents Includes additional documents produced in support of the application

9. Pre-Examination submissions Contains documents that were submitted to the Planning Inspectorate by the Applicant between Acceptance and the start of Examination

10. Examination submissions Documents submitted to the Planning Inspectorate during the course of the examination

Page 5: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 2

2.3 Sections 1-8 of the table below identify the associated electronic files for the documents produced for submission. This is a live document and will be updated when updates or revisions to existing documents are made and new documents are submitted to the Planning Inspectorate. The table identifies the volume, title, submission date and version of the document. The green colour coding in the right-hand column indicates that a document is the most recent version, and the amber colour coding indicates that the document has been superseded and updates (1) are ongoing, or (2) have been made and the document is ready for recirculation into the Examination. Section 10 of the table below tracks when either new documents or updated documents have been submitted into the Examination at each deadline. The Examination Documents adopt the following format for document referencing: “ExA; [shortened document name]; [volume number] [Deadline] [Document number]”. For example, responses to the Relevant Representations has the following document reference: ExA; RR; 10.D1.1. Where an Application Document (volume 1-8 in table 2.2) has been updated and re-submitted pursuant to an Examination deadline, the document referencing will follow the original format but with an updated version number – for example, the Guide to the Application submitted for Deadline 1 is document 1.4 (version 2).

Page 6: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page iii

Reference Document Submission Date Version/Revision Status and update

1 Application form

1.1 Cover letter to the Planning Inspectorate June 2018 1

1.2 Application Form June 2018 1

1.3 Copies of newspaper notices June 2018 1

1.4 Guide to the Application June 2018 1 Updated for Deadline 8

1.5 Application Index June 2018 1

1.6 Draft section 55 checklist June 2018 1

2 Plans

2.1

Location plan June 2018 1

Updated for Deadline 2, dealing with proposals in the Change Report (see below, document reference Pre-ExA; Change Report; 9.3).

2.2

Land plan (Onshore and Offshore) June 2018 1

Onshore updated for Deadline 2, dealing with section 51 advice and the Change Report, and updated for Deadline 4 to deal with the Minor Change Request

2.3 Special category land plan June 2018 1

2.4

Works plan June 2018 1

Offshore updated for Deadline 4 to reflect the drafting in the dDCO to clarify that Work No.4A should extend into the Offshore Wind Farm sites in accordance

Page 7: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 4

Reference Document Submission Date Version/Revision Status and update

with the impacts assessed in the Environmental Statement.

2.5 Access to works plan June 2018 1

Updated for Deadline 2, dealing with section 51 advice and the Change Report.

2.6 Plan showing public rights of way to be temporarily stopped up

June 2018 1

Updated for Deadline 2, dealing with section 51 advice and the Change Report.

2.7 Plan showing streets to be temporarily stopped up

June 2018 1

Updated for Deadline 2, dealing with section 51 advice and the Change Report.

2.8 Plan of statutory/non-statutory sites or features of nature conservation

June 2018 1

2.9 Plan(s) showing statutory or non-statutory historic or scheduled monument sites/features of the historic environment

June 2018 1

2.10 Plan showing any Crown land (Onshore and Offshore)

June 2018 1

2.11 Important hedgerows plan June 2018 1

Updated for Deadline 2, dealing with the Change Report.

3 Development Consent Order

3.1 Draft Development Consent Order June 2018 1 Updated for Deadline 8

3.2 Explanatory Memorandum June 2018 1 Updated for Deadline 8

Page 8: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 5

Reference Document Submission Date Version/Revision Status and update

3.3 Note on Requirements and Conditions in the Development Consent Order

June 2018 1 Updated for Deadline 8

4 Compulsory acquisition information

4.1 Statement of Reasons June 2018 1 Updated for Deadline 8

4.2 Funding Statement June 2018 1 Updated for Deadline 8

4.3 Book of Reference June 2018 1 Updated for Deadline 8

5 Reports/Statements

5.1 Consultation Report June 2018 1

5.2 Statement of Engagement with Section 79(1) of the Environmental Protection Act 1990

June 2018 1

5.3 Information for the Habitats Regulations Assessment

June 2018 1

5.4 Consents and licences required under other legislation

June 2018 1

6 Environmental Impact Assessment

6.1 Environmental Statement June 2018 1

6.2 Technical Appendices and Figures June 2018 1

6.3 Non-Technical Summary June 2018 1

Page 9: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 6

Reference Document Submission Date Version/Revision Status and update

6.4 Scoping Opinion June 2018 1

6.5 Schedule of Mitigation June 2018 1

7 Additional information for specific types of infrastructure

7.1 Cable Statement June 2018 1

7.2 Safety Zone Statement June 2018 1

8 Other documents

8.1 Outline Code of Construction Practice June 2018 1 Updated for Deadline 7.

8.2 Planning Statement June 2018 1

8.3 Design and Access Statement June 2018 1

8.4 Public Rights of Way Strategy June 2018 1

8.5 Outline Written Scheme of Investigation (Onshore)

June 2018 1 Updated for Deadline 8

8.6 Outline Written Scheme of Investigation (Offshore)

June 2018 1

8.7 Outline Landscape and Ecological Management Strategy

June 2018 1 Updated for Deadline 7.

8.8 Outline Traffic Management Plan June 2018 1 Updated for Deadline 8.

8.9 Outline Travel Plan June 2018 1

8.10 Outline Access Management Plan June 2018 1 Updated for Deadline 8.

Page 10: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 7

Reference Document Submission Date Version/Revision Status and update

8.11 Outline Offshore Operations and Maintenance Plan

June 2018 1 Updated for Deadline 7.

8.12 Offshore In Principle Monitoring Plan June 2018 1 Updated for Deadline 7.

8.13 Draft Marine Mammal Mitigation Protocol June 2018 1

8.14 Outline Project Environmental Management Plan

June 2018 1 Updated for Deadline 7.

8.15 Site Characterisation Report June 2018 1

Updated at Deadline 2, dealing with proposals in the Change Report.

8.16 Outline Scour Protection and Cable Protection Plan

June 2018 1 Updated for Deadline 7.

8.17 In Principle Norfolk Vanguard Southern North Sea candidate Special Area of Conservation (cSAC) Site Integrity Plan

June 2018 1

8.18 Outline Marine Traffic Monitoring Strategy June 2018 1

8.19 Outline Fisheries and Co-Existence Plan

Deadline 2 / 30 January 2019

1 Introduced for Deadline 2 as a result of consultation with the MMO and fisheries stakeholders

9 Pre-Examination documents

PB4476-008-001 The Applicant’s Response to Section 51 Advice from The Planning Inspectorate

October 2018 1

Pre-ExA; OCP Report; 9.2

A strategic approach to selecting a grid connection point for Norfolk Vanguard and Norfolk Boreas

October 2018 1

Page 11: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 8

Reference Document Submission Date Version/Revision Status and update

Pre-ExA; Change Report; 9.3

Change Report December 2018 1

Pre-ExA; Errata; 9.4 Application Documents Errata December 2018 1

10. Examination documents

Deadline 1

ExA; RR; 10.D1.1 Response to Relevant Representations Deadline 1 / 16 January 2019

1

ExA; WR; 10.D1.2 Applicant's Written Representation Deadline 1 / 16 January 2019

1

ExA; WQ; 10.D1.3 Responses to the ExA’s Written Questions Deadline 1 / 16 January 2019

1

ExA; WQApp1.1; 10.D1.3

Appendix 1.1 Horlock Rules Deadline 1 / 16 January 2019

1

ExA; WQApp3.1; 10.D1.3

Appendix 3.1 Red-throated diver displacement

Deadline 1 / 16 January 2019

1

ExA; WQApp3.2; 10.D1.3

Appendix 3.2 Collision Risk Modelling: update and clarification

Deadline 1 / 16 January 2019

1

ExA; WQApp3.3; 10.D1.3

Appendix 3.3 Operational Auk and Gannet Displacement: update and clarification

Deadline 1 / 16 January 2019

1

ExA; WQApp3.4; 10.D1.3

Appendix 3.4 Furness, et al. 2013. Evidence review to support the identification of potential conservation measures for selected species of seabirds.

Deadline 1 / 16 January 2019

1

Page 12: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 9

Reference Document Submission Date Version/Revision Status and update

ExA; WQApp3.5; 10.D1.3

Appendix 3.5 Furness, 2015. Non-breeding season populations of seabirds in UK waters: Population sizes for Biologically Defined Minimum Population Scales (BDMPS).

Deadline 1 / 16 January 2019

1

ExA; WQApp3.6; 10.D1.3

Appendix 3.6 Wade, et al. 2016. Incorporating data uncertainty when estimating potential vulnerability of Scottish seabirds to marine renewable energy developments.

Deadline 1 / 16 January 2019

1

ExA; WQApp3.7; 10.D1.3

Appendix 3.7 Furness, et al. 2018. Nocturnal flight activity of northern gannets Morus bassanus and implications for modelling collision risk at offshore wind farms.

Deadline 1 / 16 January 2019

1

ExA; WQApp3.8; 10.D1.3

Appendix 3.8 Cleasby, et al. 2015. Three-dimensional tracking of a wide-ranging marine predator: flight heights and vulnerability to offshore wind farms.

Deadline 1 / 16 January 2019

1

ExA; WQApp3.9; 10.D1.3

Appendix 3.9 Garthe & Hüppop, 2004. Scaling possible adverse effects of marine wind farms on seabirds: developing and applying a vulnerability index.

Deadline 1 / 16 January 2019

1

ExA; WQApp3.10; 10.D1.3

Appendix 3.10 Green, et al. 2016. Lack of sound science in assessing wind farm impacts on seabirds.

Deadline 1 / 16 January 2019

1

ExA; WQApp3.11; 10.D1.3

Appendix 3.11 McGregor, et al. 2018. A stochastic collision risk model for seabirds in flight.

Deadline 1 / 16 January 2019

1

Page 13: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 10

Reference Document Submission Date Version/Revision Status and update

ExA; WQApp3.12; 10.D1.3

Appendix 3.12 O’Brien, et al. 2018. Red-Throated Diver Energetics Project - 2018 Field Season Report.

Deadline 1 / 16 January 2019

1

ExA; WQApp3.13; 10.D1.3

Appendix 3.13 O’Brien, et al. 2017. Implicit assumptions underlying simple harvest models of marine bird populations can mislead environmental management decisions.

Deadline 1 / 16 January 2019

1

ExA; WQApp5.1; 10.D1.3

Appendix 5.1 Comparison of MarLIN and Norfolk Vanguard sensitivity definitions for benthic receptors

Deadline 1 / 16 January 2019

1

ExA; WQApp6.1; 10.D1.3

Appendix 6.1 Relationship Between Design Parameters in Draft Development Consent Order and Environmental Statement

Deadline 1 / 16 January 2019

1

ExA; WQApp11.1; 10.D1.3

Appendix 11.1 Cable Route Info Sheet (Autumn 2018)

Deadline 1 / 16 January 2019

1

ExA; WQApp12.1; 10.D1.3

Appendix 12.1 Vattenfall and National Grid EMF Information

Deadline 1 / 16 January 2019

1

ExA; WQApp12.2; 10.D1.3

Appendix 12.2 RAF report on the recovery of an F16 near Necton

Deadline 1 / 16 January 2019

1

ExA; WQApp14.1; 10.D1.3

Appendix 14.1 Updated LVIA Figures 29.11a and 29.11b

Deadline 1 / 16 January 2019

1

ExA; WQApp16.1; 10.D1.3

Appendix 16.1 Norfolk Vanguard and Norfolk Boreas Site Investigation Phase II

Deadline 1 / 16 January 2019

1

ExA; WQApp16.2; 10.D1.3

Appendix 16.2 TerraConsult 2017 Ground Investigations Report: Crossing 1

Deadline 1 / 16 January 2019

1

Page 14: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 11

Reference Document Submission Date Version/Revision Status and update

ExA; WQApp16.3; 10.D1.3

Appendix 16.3 TerraConsult 2017 Ground Investigations Report: Crossing 2

Deadline 1 / 16 January 2019

1

ExA; WQApp16.4; 10.D1.3

Appendix 16.4 TerraConsult 2017 Ground Investigations Report: Crossing 3

Deadline 1 / 16 January 2019

1

ExA; WQApp16.5; 10.D1.3

Appendix 16.5 TerraConsult 2017 Ground Investigations Report: Crossing 4&5

Deadline 1 / 16 January 2019

1

ExA; WQApp16.6; 10.D1.3

Appendix 16.6 TerraConsult 2017 Ground Investigations Report: Crossing 6&7

Deadline 1 / 16 January 2019

1

ExA; WQApp16.7; 10.D1.3

Appendix 16.7 TerraConsult 2017 Ground Investigations Report: Happisburgh

Deadline 1 / 16 January 2019

1

ExA; WQApp18.1; 10.D1.3

Appendix 18.1 CRoW Open Access Land Figures

Deadline 1 / 16 January 2019

1

ExA; WQApp19.1; 10.D1.3

Appendix 19.1 Evidence and Examples of Skills and Supply Chain Engagement

Deadline 1 / 16 January 2019

1

ExA; WQApp19.2; 10.D1.3

Appendix 19.2 Norfolk Vanguard and Norfolk Boreas Onshore Works Supply chain workshop

Deadline 1 / 16 January 2019

1

ExA; WQApp19.3; 10.D1.3

Appendix 19.3 Biggar Economics Study (2016)

Deadline 1 / 16 January 2019

1

ExA; WQApp20.1; 10.D1.3

Appendix 20.1 Gantt Chart Deadline 1 / 16 January 2019

1

ExA; WQApp20.2; 10.D1.3

Appendix 20.2 Topographic Survey: Onshore substation and National Grid substation extension

Deadline 1 / 16 January 2019

1

Page 15: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 12

Reference Document Submission Date Version/Revision Status and update

ExA; WQApp20.3; 10.D1.3

Appendix 20.3 Relevant Representations relating to Marine Mammals

Deadline 1 / 16 January 2019

1

ExA; WQApp22.1; 10.D1.3

Appendix 22.1 Annex A – List of all objections to the granting of compulsory acquisition powers

Deadline 1 / 16 January 2019

1

ExA; WQApp22.2; 10.D1.3

Appendix 22.2 Annual Report and Financial Statement

Deadline 1 / 16 January 2019

1

ExA; WQApp23.1; 10.D1.3

Appendix 23.1 Integrity Matrices Deadline 1 / 16 January 2019

1 Updated for Deadline 7

Rep1 - SOCG - 1.1

Statement of Common Ground between Norfolk Vanguard Limited and Anglian Water Service Ltd

Deadline 1 / 16 January 2019

1 Updated for Deadline 8

Rep1 - SOCG - 2.1

Statement of Common Ground between Norfolk Vanguard Limited and Breckland Council

Deadline 1 / 16 January 2019

1 Updated for Deadline 8

Rep1 - SOCG - 3.1

Statement of Common Ground between Norfolk Vanguard Limited and Broadland Council

Deadline 1 / 16 January 2019

1 Updated for Deadline 4

Rep1 - SOCG - 10.1

Statement of Common Ground between Norfolk Vanguard Limited and Cadent Gas limited

Deadline 1 / 16 January 2019

1 Updated for Deadline 8

Rep1 - SOCG - 4.1

Statement of Common Ground between Norfolk Vanguard Limited and East Anglia THREE Limited

Deadline 1 / 16 January 2019

1 Updated for Deadline 4

Page 16: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 13

Reference Document Submission Date Version/Revision Status and update

Rep1 - SOCG - 27.1

Statement of Common Ground between Norfolk Vanguard Limited and Eastern Inshore Fisheries and Conservation Agency

Deadline 1 / 16 January 2019

1 Updated for Deadline 8

Rep1 - SOCG - 6.1

Statement of Common Ground between Norfolk Vanguard Limited and Environment Agency

Deadline 1 / 16 January 2019

1 Updated for Deadline 4

Rep1 - SOCG - 7.1

Statement of Common Ground between Norfolk Vanguard Limited and Highways England

Deadline 1 / 16 January 2019

1 Updated for Deadline 8

Rep1 - SOCG - 8.1

Statement of Common Ground between Norfolk Vanguard Limited and Historic England

Deadline 1 / 16 January 2019

1 Updated for Deadline 8

Rep1 - SOCG - 11.1

Statement of Common Ground between Norfolk Vanguard Limited and Marine Management Organisation

Deadline 1 / 16 January 2019

1 Updated for Deadline 7

Rep1 - SOCG - 30.1

Statement of Common Ground between Norfolk Vanguard Limited and Maritime and Coastguard Agency

Deadline 1 / 16 January 2019

1 Updated for Deadline 7

Rep1 - SOCG - 28.1

Statement of Common Ground between Norfolk Vanguard Limited and Ministry of Defence

Deadline 1 / 16 January 2019

1 Updated for Deadline 5

Rep1 - SOCG - 5.1

Statement of Common Ground between Norfolk Vanguard Limited and National Farmers Union

Deadline 1 / 16 January 2019

1 Updated for Deadline 4

Rep1 - SOCG - 26.1

Statement of Common Ground between Norfolk Vanguard Limited and National Federation of Fishermen's Organisations

Deadline 1 / 16 January 2019

1 Updated for Deadline 5

Page 17: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 14

Reference Document Submission Date Version/Revision Status and update

Rep1 - SOCG - 9.1

Statement of Common Ground between Norfolk Vanguard Limited and National Grid

Deadline 1 / 16 January 2019

1 Updated for Deadline 8

Rep1 - SOCG - 29.1

Statement of Common Ground between Norfolk Vanguard Limited and NATS En-Route Safeguarding

Deadline 1 / 16 January 2019

1

Rep1 - SOCG - 13.1

Statement of Common Ground between Norfolk Vanguard Limited and Natural England

Deadline 1 / 16 January 2019

1 Updated for Deadline 5

Rep1 - SOCG - 22.1

Statement of Common Ground between Norfolk Vanguard Limited and Necton Parish Council

Deadline 1 / 16 January 2019

1

Rep1 - SOCG - 12.1

Statement of Common Ground between Norfolk Vanguard Limited and Network Rail Infrastructure Limited

Deadline 1 / 16 January 2019

1 Updated for Deadline 8

Rep1 - SOCG - 15.1

Statement of Common Ground between Norfolk Vanguard Limited and Norfolk County Council

Deadline 1 / 16 January 2019

1 Updated for Deadline 4

Rep1 - SOCG - 17.1

Statement of Common Ground between Norfolk Vanguard Limited and North Norfolk District Council

Deadline 1 / 16 January 2019

1 Updated for Deadline 8

Rep1 - SOCG - 18.1

Statement of Common Ground between Norfolk Vanguard Limited and Orsted Hornsea Project Three

Deadline 1 / 16 January 2019

1 Updated for Deadline 7

Rep1 - SOCG - 23.1

Statement of Common Ground between Norfolk Vanguard Limited and Oulton Parish Council

Deadline 1 / 16 January 2019

1

Page 18: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 15

Reference Document Submission Date Version/Revision Status and update

Rep1 - SOCG - 19.1

Statement of Common Ground between Norfolk Vanguard Limited and Royal Society for the Protection of Birds

Deadline 1 / 16 January 2019

1 Updated for Deadline 8

Rep1 - SOCG - 14.1

Statement of Common Ground between Norfolk Vanguard Limited and Royal Yachting Association

Deadline 1 / 16 January 2019

1

Rep1 - SOCG - 20.1

Statement of Common Ground between Norfolk Vanguard Limited and The Wildlife Trust

Deadline 1 / 16 January 2019

1 Updated for Deadline 8

Rep1 - SOCG - 31.1

Statement of Common Ground between Norfolk Vanguard Limited and Trinity House

Deadline 1 / 16 January 2019

1 Updated for Deadline 8

Rep1 - SOCG - 16.1

Statement of Common Ground between Norfolk Vanguard Limited and Whale and Dolphin Conservation

Deadline 1 / 16 January 2019

1 Updated for Deadline 8

ExA; Commonality; 10.D1.4

Statement of Commonality of Statements of Common Ground

Deadline 1 / 16 January 2019

1 Updated for Deadline 8

1.4 Guide to the Application Deadline 1 / 16 January 2019

2 Updated for Deadline 8

ExA; CA; 10.D1.5 Notification of Wish to Attend an Accompanied Site Inspection

Deadline 1 / 16 January 2019

1

ExA; CA; 10.D1.6 The Compulsory Acquisition schedule Deadline 1 / 16 January 2019

1 Updated for Deadline 8

ExA; AS; 10.D1.7 Responses to Additional Submissions Deadline 1 / 16 January 2019

1

Page 19: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 16

Reference Document Submission Date Version/Revision Status and update

ExA;AS;10.D1.8A

Additional Submissions: Happisburgh HDD Feasibility

Deadline 1 / 16 January 2019

1

ExA;AS;10.D1.8B Additional Submissions: Landfall Info Sheet Deadline 1 / 16 January 2019

1

ExA;AS;10.D1.8C Additional Submissions: Substation Info Sheet

Deadline 1 / 16 January 2019

1

Deadline 2

1.4 Guide to the Application Deadline 2 / 30 January 2019

3 Updated for Deadline 8

ExA;WRR:10.D2.2 Applicant's comments on Written Representations

Deadline 2 / 30 January 2019

1

ExA; WQR; 10.D2.3 Applicant’s Comments on Responses to the ExA’s First Written Questions

Deadline 2 / 30 January 2019

1

ExA;LIR;10.D2.4A (NCC)

Applicant Response to Norfolk County Council Local Impact Report

Deadline 2 / 30 January 2019

1

ExA;LIR;10.D2.4B (Breckland)

Applicant Response to Breckland District Council Local Impact Report

Deadline 2 / 30 January 2019

1

ExA;LIR;10.D2.4C (BDC)

Applicant Response to Broadland District Council Local Impact Report

Deadline 2 / 30 January 2019

1

ExA;LIR;10.D2.4D (NNDC)

Applicant Response to North Norfolk District Council Local Impact Report

Deadline 2 / 30 January 2019

1

Page 20: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 17

Reference Document Submission Date Version/Revision Status and update

ExA;R17;10.D2.5 Response to further information requested by the Examining Authority: Response to Rule 17 Letter to the Ministry of Defence

Deadline 2 / 30 January 2019

1

2.1 Location plan Deadline 2 / 30 January 2019

2

2.2 Land plan (Onshore) Deadline 2 / 30 January 2019

2 Updated for Deadline 4

2.4 Works plan Deadline 2 / 30 January 2019

2 Updated for Deadline 4

2.5 Access to works plan Deadline 2 / 30 January 2019

2

2.6 Plan showing public rights of way to be temporarily stopped up

Deadline 2 / 30 January 2019

2

2.7 Plan showing streets to be temporarily stopped up

Deadline 2 / 30 January 2019

2

2.11 Important hedgerows plan Deadline 2 / 30 January 2019

2

3.1 Draft Development Consent Order Deadline 2 / 30 January 2019

2 Updated for Deadline 8

3.1 (Tracked) Draft Development Consent Order (Track Changes)

Deadline 2 / 30 January 2019

1 Updated for Deadline 8

ExA;DCOSchedule;10.D2.6

Schedule of changes to the draft DCO Deadline 2 / 30 January 2019

1 Updated for Deadline 8

Page 21: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 18

Reference Document Submission Date Version/Revision Status and update

3.2 Explanatory Memorandum

Deadline 2 / 30 January 2019

2 Updated for Deadline 8

3.2 (Tracked) Explanatory Memorandum (Track Changes) Deadline 2 / 30 January 2019

1 Updated for Deadline 8

4.1 Statement of Reasons Deadline 2 / 30 January 2019

2 Updated for Deadline 8

4.1 (Tracked) Statement of Reasons (Track Changes) Deadline 2 / 30 January 2019

1 Updated for Deadline 8

4.3 Book of Reference Deadline 2 / 30 January 2019

2 Updated for Deadline 8

4.3 (Tracked) Book of Reference (Tracked) Deadline 2 / 30 January 2019

1 Updated for Deadline 8

8.10 Outline Access Management Plan

Deadline 2 / 30 January 2019

2 Updated for Deadline 8

8.15 Site Characterisation Report

Deadline 2 / 30 January 2019

2

8.15 (Tracked) Site Characterisation Report (Track Changes)

Deadline 2 / 30 January 2019

1

8.19 Outline Fisheries Liaison and Co-existence Plan

Deadline 2 / 30 January 2019

1

Deadline 3

1.4 Guide to the Application Deadline 3 / 14 February 2019

4 Updated for Deadline 8

Page 22: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 19

Reference Document Submission Date Version/Revision Status and update

ExA; ISH; 10.D3.1 Written summary of the Applicant's oral case at Issue Specific Hearing 1 – Onshore Environmental Matters

Deadline 3 / 14 February 2019 1

ExA; ISH; 10.D3.2 Written summary of the Applicant's oral case at Issue Specific Hearing 2 – Offshore Environmental Matters

Deadline 3 / 14 February 2019 1

ExA; ISH; 10.D3.3 Written summary of the Applicant's oral case at Issue Specific Hearing 3 – the draft Development Consent Order

Deadline 3 / 14 February 2019 1

ExA; OFH; 10.D3.4 Written summary of the Applicant's oral case at the Open Floor Hearing

Deadline 3 / 14 February 2019

1

ExA; ISH; 10.D3.1A Plan Showing Hornsea Project Three Compound at Oulton

Deadline 3 / 14 February 2019

1

ExA; ISH; 10.D3.1B Anaerobic digester appeal decision Deadline 3 / 14 February

2019 1

ExA; ISH; 10.D3.1C Hornsea Project Three HGV Haul Road Reduction Report

Deadline 3 / 14 February 2019

1

ExA; ISH; 10.D3.1D Consideration of EN-1 Climate Change policy in the application

Deadline 3 / 14 February 2019

1

ExA; ISH; 10.D3.1E-1 Documents provided for links for LVIA character assessment – Broadland District Council

Deadline 3 / 14 February 2019

1

As noted in the Deadline 3 Cover Letter, Figure 2.2 from the LVIA has not been included as a standalone document due to file size restrictions. A link to the document on the District Council's website has been provided in place of this figure.

Page 23: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 20

Reference Document Submission Date Version/Revision Status and update

ExA; ISH; 10.D3.1E-2 Documents provided for links for LVIA character assessment – Breckland District

Deadline 3 / 14 February 2019

1

ExA; ISH; 10.D3.1E-3 Documents provided for links for LVIA character assessment – North Norfolk District Council

Deadline 3 / 14 February 2019 1

ExA; ISH; 10.D3.1E-4 Documents provided for links for LVIA character assessment – Norfolk and Suffolk Brecks

Deadline 3 / 14 February 2019 1

ExA; ISH; 10.D3.1F Lightning Masts Information Sheet Deadline 3 / 14 February

2019 1

ExA; ISH; 10.D3.1G 19m Onshore Converter Station Photomontages

Deadline 3 / 14 February 2019

1

ExA; ISH; 10.D3.1H National Grid substation indicator lights information note

Deadline 3 / 14 February 2019

1

ExA; ISH; 10.D3.1I Plan Showing Indicative Tree Removal Deadline 3 / 14 February

2019 1

ExA; ISH; 10.D3.1J Plan Showing Marriott’s Way Cumulative Visual Effects

Deadline 3 / 14 February 2019

1

ExA; ISH; 10.D3.2A

Draft Habitats Regulation Assessment for Review of Consented Offshore Wind Farms in the Southern North Sea Harbour Porpoise SCI

Deadline 3 / 14 February 2019

1

ExA; Com; 10.D3.5 Applicant’s Comments on Deadline 2 Submissions

Deadline 3 / 14 February 2019

1

Page 24: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 21

Reference Document Submission Date Version/Revision Status and update

ExA; AS; 10.D3.6 Additional Submissions – Migrant non-seabird collision risk modelling

Deadline 3 / 14 February 2019

1 Updated at Deadline 6

Deadline 4

ExA; Commonality; 10.D1.4

Statement of Commonality of Statements of Common Ground (updated)

Deadline 4 / 13 March 2019

2 Updated at Deadline 8

Rep2 - SOCG - 1.1 Statement of Common Ground between Norfolk Vanguard Limited and Anglian Water Service Ltd

Deadline 4 / 13 March 2019 2 Updated for Deadline 8

Rep2 - SOCG - 2.1 Statement of Common Ground between Norfolk Vanguard Limited and Breckland Council

Deadline 4 / 13 March 2019 2 Updated for Deadline 8

Rep2 - SOCG - 3.1 Statement of Common Ground between Norfolk Vanguard Limited and Broadland Council

Deadline 4 / 13 March 2019 2

Rep2 - SOCG - 10.1 Statement of Common Ground between Norfolk Vanguard Limited and Cadent Gas limited

Deadline 4 / 13 March 2019 2 Updated at Deadline 8

Rep2 - SOCG - 4.1 Statement of Common Ground between Norfolk Vanguard Limited and East Anglia THREE Limited

Deadline 4 / 13 March 2019 2

Rep2 - SOCG - 27.1 Statement of Common Ground between Norfolk Vanguard Limited and Eastern Inshore Fisheries and Conservation Agency

Deadline 4 / 13 March 2019 2 Updated for Deadline 8

Rep2 - SOCG - 6.1 Statement of Common Ground between Norfolk Vanguard Limited and Environment Agency

Deadline 4 / 13 March 2019 2

Page 25: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 22

Reference Document Submission Date Version/Revision Status and update

Rep1 - SOCG - 24.1 Statement of Common Ground between Norfolk Vanguard Limited and Happisburgh Parish Council

Deadline 4 / 13 March 2019 1

Rep2 - SOCG - 7.1 Statement of Common Ground between Norfolk Vanguard Limited and Highways England

Deadline 4 / 13 March 2019 2 Updated for Deadline 8

Rep2 - SOCG - 8.1 Statement of Common Ground between Norfolk Vanguard Limited and Historic England

Deadline 4 / 13 March 2019 2 Updated for Deadline 8

Rep2 - SOCG - 11.1 Statement of Common Ground between Norfolk Vanguard Limited and Marine Management Organisation

Deadline 4 / 13 March 2019 2

Rep2 - SOCG - 30.1 Statement of Common Ground between Norfolk Vanguard Limited and Maritime and Coastguard Agency

Deadline 4 / 13 March 2019 2 Updated at Deadline 7

Rep2 - SOCG - 5.1 Statement of Common Ground between Norfolk Vanguard Limited and National Farmers Union

Deadline 4 / 13 March 2019 2

Rep2 - SOCG - 12.1 Statement of Common Ground between Norfolk Vanguard Limited and Network Rail Infrastructure Limited

Deadline 4 / 13 March 2019

2

Rep2 - SOCG - 15.1 Statement of Common Ground between Norfolk Vanguard Limited and Norfolk County Council

Deadline 4 / 13 March 2019

2

Rep2 - SOCG - 17.1 Statement of Common Ground between Norfolk Vanguard Limited and North Norfolk District Council

Deadline 4 / 13 March 2019

2 Updated at Deadline 8

Page 26: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 23

Reference Document Submission Date Version/Revision Status and update

Rep2 - SOCG - 18.1 Statement of Common Ground between Norfolk Vanguard Limited and Orsted Hornsea Project Three

Deadline 4 / 13 March 2019

2 Updated at Deadline 7

Rep2 - SOCG - 31.1 Statement of Common Ground between Norfolk Vanguard Limited and Trinity House

Deadline 4 / 13 March 2019

2 Updated at Deadline 8

1.4 Guide to the Application Deadline 4 / 13 March 2019

5 Updated for Deadline 8

2.2 Land plan (Onshore) Deadline 4 / 13 March 2019 3

Updated to reflect changes to National Grid overhead line works

2.4 Works plan (Offshore)

Deadline 4 / 13 March 2019

2

Updated to reflect the drafting in the dDCO to clarify that Work No.4A should extend into the Offshore Wind Farm sites in accordance with the impacts assessed in the Environmental Statement.

3.1 Draft Development Consent Order Deadline 4 / 13 March 2019

3 Updated at Deadline 8

3.1 (Tracked) Draft Development Consent Order (Track Changes)

Deadline 4 / 13 March 2019

1 Updated at Deadline 8

ExA;DCOSchedule;10.D2.6

DCO Schedule of Changes Deadline 4 / 13 March 2019

2 Updated at Deadline 8

3.2 Explanatory Memorandum Deadline 4 / 13 March 2019

3 Updated for Deadline 8

Page 27: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 24

Reference Document Submission Date Version/Revision Status and update

3.2 (Tracked) Explanatory Memorandum Deadline 4 / 13 March 2019

1 Updated for Deadline 8

4.3 Book of Reference Deadline 4 / 13 March 2019

3 Updated for Deadline 8

4.3 (Tracked) Book of Reference (Tracked) Deadline 4 / 13 March 2019

1 Updated for Deadline 8

ExA; CA; 10.D1.6 The Compulsory Acquisition schedule (updated)

Deadline 4 / 13 March 2019

2 Updated for Deadline 8.

ExA; ISH1; 10.D4.1 Minor Change Request: Amendment to land rights sought at the existing National Grid Substation

Deadline 4 / 13 March 2019

1

ExA; ISH1; 10.D4.2 Substation Access Briefing Note Deadline 4 / 13 March 2019

1

ExA; ISH1; 10.D4.3 A47 Access Options Figures Deadline 4 / 13 March 2019

1

ExA; ISH2; 10.D4.4

Consideration of Cumulative Impacts on Marine Mammals - Delivery of the Site Integrity Plan

Deadline 4 / 13 March 2019

1

ExA; ISH2; 10.D4.5 Offshore Parameters; Comparison with East Anglia THREE and Hornsea Project Three

Deadline 4 / 13 March 2019

1

ExA; FurtherWQ; 10.D4.6

Responses to the ExA’s Further Written Questions

Deadline 4 / 13 March 2019

1

Page 28: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 25

Reference Document Submission Date Version/Revision Status and update

ExA; FurtherWQApp1.1; 10.D4.6

Appendix 1.1 Checklist of East Inshore and Offshore Marine Plans Objectives

Deadline 4 / 13 March 2019

1

ExA; FurtherWQApp1.2; 10.D4.6

Appendix 1.2 Checklist of East Inshore and Offshore Marine Plans Objectives

Deadline 4 / 13 March 2019

1

ExA; FurtherWQApp2.1; 10.D4.6

Appendix 2.1 Power Lines: Demonstrating compliance with EMF public exposure guidelines

Deadline 4 / 13 March 2019

1

ExA; FurtherWQApp3.1; 10.D4.6

Appendix 3.1 Ornithology Aerial Surveys: Dates and Times

Deadline 4 / 13 March 2019

1

ExA; FurtherWQApp19.1; 10.D4.6

Appendix 19.1 CfD Process Criteria Deadline 4 / 13 March 2019

1

ExA; FurtherWQApp22.1; 10.D4.6

Appendix 22.1 Norfolk Vanguard and Norfolk Boreas Outline Programme

Deadline 4 / 13 March 2019

1

ExA; FurtherWQApp23.1; 10.D4.6

Appendix 23.1 East Anglia THREE, Information for Habitats Regulations Assessment Appendix 3 Apportioning of the Flamborough Head and Filey Coast pSPA Gannet Population among North Sea Offshore Windfarms

Deadline 4 / 13 March 2019

1

ExA; FurtherWQApp23.2; 10.D4.6

Appendix 23.2 East Anglia THREE, Information for Habitats Regulations Assessment Appendix 4 : Apportioning of the Flamborough Head and Filey Coast

Deadline 4 / 13 March 2019

1

Page 29: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 26

Reference Document Submission Date Version/Revision Status and update

pSPA Kittiwake Population among North Sea Offshore Wind Farms

ExA; Comments; 10.D4.7

Comments on Deadline 3 Submissions Deadline 4 / 13 March 2019

1

ExA; AS; 10.D4.8 NE Position Statement Deadline 4 / 13 March 2019

1

Deadline 5

1.4 Guide to the Application Deadline 5 / 20 March 2019

6 Updated for Deadline 8

ExA; ISH1; 10.D5.1 Cumulative Impact Assessment – Traffic and Transport (+ appendices)

Deadline 5 / 20 March 2019

1

ExA; FurtherWQ; 10.D5.2

Comments on Responses to ExA's Further Written Questions

Deadline 5 / 20 March 2019

1

ExA; Comments; 10.D5.3

Comments on Deadline 4 Submissions Deadline 5 / 20 March 2019

1

ExA; Commonality; 10.D1.4 (version 3)

Statement of Commonality Deadline 5 / 20 March 2019

3 Updated at Deadline 8

Rep2 - SOCG - 10.1 Statement of Common Ground between Norfolk Vanguard Limited and Cadent Gas limited

Deadline 5 / 20 March 2019

3 Updated for Deadline 8

Rep2 - SOCG - 28.1 Statement of Common Ground between Norfolk Vanguard Limited and Ministry of Defence

Deadline 5 / 20 March 2019

2

Page 30: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 27

Reference Document Submission Date Version/Revision Status and update

Rep1 - SOCG - 26.1 Statement of Common Ground between Norfolk Vanguard Limited and National Federation of Fishermen's Organisations

Deadline 5 / 20 March 2019

2 Updated for Deadline 8

Rep2 - SOCG - 9.1 Statement of Common Ground between Norfolk Vanguard Limited and National Grid

Deadline 5 / 20 March 2019

2 Updated for Deadline 8

Rep1 - SOCG - 13.1 Statement of Common Ground between Norfolk Vanguard Limited and Natural England

Deadline 5 / 20 March 2019

2

Rep1 - SOCG - 19.1 Statement of Common Ground between Norfolk Vanguard Limited and Royal Society for the Protection of Birds

Deadline 5 / 20 March 2019

2 Updated for Deadline 8

Deadline 6

1.4 Guide to the Application Deadline 6 / 5 April 2019 7 Updated for Deadline 8

ExA; CA; 10.D1.6 (version 3)

The Compulsory Acquisition schedule (updated)

Deadline 6 / 5 April 2019 3 Updated for Deadline 8

ExA; ISH4; 10.D6.1 Written summary of the Applicant's oral case at Issue Specific Hearing 4

Deadline 6 / 5 April 2019 1

ExA; ISH4; 10.D6.2 Figures showing the landfall HGV access route and the cable crossing point with Hornsea Project Three

Deadline 6 / 5 April 2019 1

ExA; ISH4; 10.D6.3 Unresolved Traffic Matters with Norfolk County Council Position Statement

Deadline 6 / 5 April 2019 1

ExA; ISH4; 10.D6.4 Hornsea Project Three VISSIM Appendix 8 – Main Construction Compound Access Strategy

Deadline 6 / 5 April 2019 1

Page 31: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 28

Reference Document Submission Date Version/Revision Status and update

ExA; ISH4; 10.D6.5 Unresolved Traffic Matters with Highways England Position Statement

Deadline 6 / 5 April 2019 1

ExA; ISH4; 10.D6.6 Broadland District Council Noise and Vibration Position Statement

Deadline 6 / 5 April 2019 1

ExA; ISH4; 10.D6.7 Implications of Updated Vibration Assessment Undertaken by Hornsea Project Three at Cawston

Deadline 6 / 5 April 2019 1

ExA; ISH4; 10.D6.8 North Norfolk District Council Position Statement - HGV Waiting Areas and Cart Gap seawall

Deadline 6 / 5 April 2019 1

ExA; ISH4; 10.D6.9 Onshore Ecology Clarification Notes Position Statement

Deadline 6 / 5 April 2019 1

ExA; ISH5; 10.D6.10 Written summary of the Applicant's oral case at Issue Specific Hearing 5

Deadline 6 / 5 April 2019 1

ExA; CAH; 10.D6.11 Written summary of the Applicant's oral case at the Compulsory Acquisition Hearing

Deadline 6 / 5 April 2019 1

ExA; CAH; 10.D6.12 The Crown Estate Commissioners - Position Statement

Deadline 6 / 5 April 2019 1

ExA; CAH; 10.D6.13 The National Trust Land Agreement Position Statement

Deadline 6 / 5 April 2019 1

ExA; Comments; 10.D6.14

Applicant's Comments on Deadline 5 Written Submissions

Deadline 6 / 5 April 2019 1

Page 32: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 29

Reference Document Submission Date Version/Revision Status and update

ExA; AS; 10.D6.15 Norfolk Vanguard Offshore Wind Farm Offshore Ornithology: Deterministic Collision Risk Modelling

Deadline 6 / 5 April 2019 1 Updated at Deadline 7

ExA; AS; 10.D6.16

Lesser Black-backed Gull Alde Ore Estuary Population Viability Analysis

Deadline 6 / 5 April 2019 1

ExA; AS; 10.D6.17

Norfolk Vanguard Offshore Wind Farm Offshore Ornithology: Assessment Update for Deadline 6

Deadline 6 / 5 April 2019 1

ExA; AS; 10.D6.18

Norfolk Vanguard Offshore Wind Farm Migrant non-seabird Collision Risk Modelling: Revision of REP3-038, addressing Natural England comments

Deadline 6 / 5 April 2019 1

Deadline 7

1.4 Guide to the Application Deadline 7 / 2 May 2019 8 Updated for Deadline 8

3.1 (version 5) Applicant’s revised draft DCO (clean) Deadline 7 / 2 May 2019 5 Updated for Deadline 8

3.1 (version 5) Applicant’s revised draft DCO (tracked change)

Deadline 7 / 2 May 2019 5 Updated for Deadline 8

ExA;DCOSchedule;10.D2.6 (Version 4)

Applicant’s revised draft DCO Schedule of Changes

Deadline 7 / 2 May 2019 4 Updated for Deadline 8

3.3 (version 2) Note on Requirements and Conditions in the Development Consent Order

Deadline 7 / 2 May 2019 2 Updated for Deadline 8

8.1 (version 2) Outline Code of Construction Practice Deadline 7 / 2 May 2019 2

Page 33: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 30

Reference Document Submission Date Version/Revision Status and update

8.7 (version 2) Outline Landscape and Ecological Management Strategy

Deadline 7 / 2 May 2019 2

8.8 (version 2) Outline Traffic Management Plan Deadline 7 / 2 May 2019 2 Updated for Deadline 8

8.11 (version 2) Outline Offshore Operations and Maintenance Plan

Deadline 7 / 2 May 2019 2

8.12 (version 2) Offshore In Principle Monitoring Plan Deadline 7 / 2 May 2019 2

8.14 (version 2) Outline Project Environmental Management Plan

Deadline 7 / 2 May 2019 2

8.16 (version 2) Outline Scour Protection and Cable Protection Plan

Deadline 7 / 2 May 2019 2

8.20 Haisborough Hammond and Winterton Special Area of Conservation (SAC) Site Integrity Plan

Deadline 7 / 2 May 2019 1

8.21 Outline Operational Drainage Plan Deadline 7 / 2 May 2019 1 Updated at Deadline 8.

8.22 Outline Skills and Employment Strategy Deadline 7 / 2 May 2019 1

8.23 Development Principles Deadline 7 / 2 May 2019 1 Updated at Deadline 8.

ExA; WQApp23.1; 10.D1.3 (version 2)

Updated HRA integrity matrices Deadline 7 / 2 May 2019 2

ExA; Commonality; 10.D1.4 (version 4)

Updated Statement of Commonality Deadline 7 / 2 May 2019 4

Updated at Deadline 8.

Page 34: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 31

Reference Document Submission Date Version/Revision Status and update

ExA; ISH6; 10.D7.1 Written summary of the Applicant's oral case at Issue Specific Hearing 6 – Environmental Matters

Deadline 7 / 2 May 2019 1

ExA; ISH6; 10.D7.1A Proposed Fisheries Management Area Areas–Norfolk Vanguard position statement

Deadline 7 / 2 May 2019 1

ExA; ISH7; 10.D7.2 Written summary of the Applicant's oral case at Issue Specific Hearing 7 – the draft Development Consent Order

Deadline 7 / 2 May 2019 1

ExA; OFH; 10.D7.3 Written summary of the Applicant's oral case at the Open Floor Hearing 3

Deadline 7 / 2 May 2019 1

ExA; ISH6; 10.D7.4

Unresolved Traffic Matters with Highways England Position Statement

Deadline 7 / 2 May 2019 1

ExA; ISH6; 10.D7.5

Details of Proposed Mitigation for Link 41

Deadline 7 / 2 May 2019 1

ExA; ISH6; 10.D7.6 Hornsea Project Three Final Construction Traffic Management Plan

Deadline 7 / 2 May 2019 1

ExA; ISH6; 10.D7.7 Noise Mitigation Measures at the Old Railway Gatehouse Position Statement

Deadline 7 / 2 May 2019 1

ExA; ISH6; 10.D7.8 North Norfolk District Council Little London and Happisburgh Position Statement

Deadline 7 / 2 May 2019 1

ExA; ISH6; 10.D7.9 Air quality assessment for Old Railway Gatehouse Position Statement

Deadline 7 / 2 May 2019 1

ExA; ISH6; 10.D7.10 Technical Guidance Regarding Interaction between Cables and Parallel Assets

Deadline 7 / 2 May 2019 1

Page 35: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 32

Reference Document Submission Date Version/Revision Status and update

ExA; ISH6; 10.D7.11 Natural England Offshore wind cabling: Ten years experience and recommendations

Deadline 7 / 2 May 2019 1

ExA; ISH6; 10.D7.12

Harbour Porpoise Special Area of Conservation: Southern North Sea. Conservation Objectives and Advice on Operations

Deadline 7 / 2 May 2019 1

ExA; ISH6; 10.D7.13 Conservation Objectives in accordance with ISH 6 Action Point 28

Deadline 7 / 2 May 2019 1

ExA; ISH6; 10.D7.14

Evaluation of the Implications of the Proposals for Closed Areas to Fishing for the Commercial Fisheries Cumulative Impact Assessment

Deadline 7 / 2 May 2019 1

ExA; ISH6; 10.D7.15 Substation Access Clarification Technical Note Highways England Agreement In Principle

Deadline 7 / 2 May 2019 1

ExA; ISH7; 10.D7.16 Hornsea Project Three draft DCO Deadline 7 / 2 May 2019 1

ExA; ISH7; 10.D7.17 Update on discussions with MMO, Trinity House and MCA regarding wording of arbitration clauses and associated matters.

Deadline 7 / 2 May 2019 1

ExA; Comments; 10.D7.20

Applicant's Comments on Deadline 6 Written Submissions

Deadline 7 / 2 May 2019 1

ExA; Comments; 10.D7.20A

Vattenfall Annual and Sustainability Report 2017. Applicant's Comments on Deadline 6 Written Submissions: Appendix 1

Deadline 7 / 2 May 2019 1

Page 36: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 33

Reference Document Submission Date Version/Revision Status and update

ExA; Comments; 10.D7.20B

Alternative Construction Traffic Routes at Cawston. Applicant's Comments on Deadline 6 Written Submissions: Appendix 2

Deadline 7 / 2 May 2019 1

ExA; AS; 10.D7.21 Offshore Ornithology Cumulative and In-combination Collision Risk Assessment Update for Deadline 7

Deadline 7 / 2 May 2019 1

ExA; AS; 10.D7.21A Responses to Natural England initial comments on the Alde-Ore Estuary SPA lesser black-backed gull PVA

Deadline 7 / 2 May 2019 1

ExA; AS; 10.D7.22 Natural England Position Statement at Deadline 7

Deadline 7 / 2 May 2019 1

ExA; AS; 10.D7.23 Counsel's written opinion in relation to arbitration

Deadline 7 / 2 May 2019 1

Rep3 - SOCG - 11.1

Statement of Common Ground with Marine Management Organisation

Deadline 7 / 2 May 2019 3

Rep3 - SOCG - 30.1

Statement of Common Ground with Maritime and Coastguard Agency

Deadline 7 / 2 May 2019 3

Rep3 - SOCG - 18.1

Statement of Common Ground with Orsted Hornsea Project Three

Deadline 7 / 2 May 2019 3

Rep3 - SOCG - 31.1

Statement of Common Ground with Trinity House

Deadline 7 / 2 May 2019 3 Updated at Deadline 8.

Deadline 8

1.4 Guide to the Application Deadline 8 / 30 May

2019 9

Page 37: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 34

Reference Document Submission Date Version/Revision Status and update

3.1 (version 6) Draft Development Consent Order Deadline 8 / 30 May

2019 6

3.1 (version 6)

Draft Development Consent Order (tracked changes)

Deadline 8 / 30 May 2019

2

3.2 (version 5) Explanatory Memorandum Deadline 8 / 30 May 2019

5

3.2 (version 5)

Explanatory Memorandum (tracked changes)

Deadline 8 / 30 May 2019

5

3.3 (version 3)

Note on Requirements and Conditions in the Development Consent Order

Deadline 8 / 30 May 2019

3

4.1 (version 3) Statement of Reasons Deadline 8 / 30 May

2019 3

4.2 (version 2) Funding Statement Deadline 8 / 30 May

2019 2

4.3 (version 4) Book of Reference Deadline 8 / 30 May

2019 4

8.5 (version 2)

Outline Written Scheme of Investigation (Onshore) (clean)

Deadline 8 / 30 May 2019

2

8.5 (version 2)

Outline Written Scheme of Investigation (Onshore) (tracked changes)

Deadline 8 / 30 May 2019

2

8.8 (version 3) Outline Traffic Management Plan (clean) Deadline 8 / 30 May

2019 3

8.8 (version 3)

Outline Traffic Management Plan (tracked changes)

Deadline 8 / 30 May 2019

3

Page 38: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 35

Reference Document Submission Date Version/Revision Status and update

8.10 (version 3) Outline Access Management Plan (clean) Deadline 8 / 30 May

2019 3

8.10 (version 3)

Outline Access Management Plan (tracked changes)

Deadline 8 / 30 May 2019

3

8.21 (version 2) Outline Operational Drainage Plan (clean) Deadline 8 / 30 May

2019 2

8.21 (version 2)

Outline Operational Drainage Plan (tracked changes)

Deadline 8 / 30 May 2019

2

8.23 (version 2) Development Principles Deadline 8 / 30 May

2019 2

ExA; Commonality; 10.D1.4 (version 5)

Statement of Commonality Deadline 8 / 30 May 2019

5

ExA; CA; 10.D1.6 (version 4)

Compulsory Acquisition Schedule Deadline 8 / 30 May 2019

4

ExA;DCOSchedule;10.D2.6 (version 5)

DCO Schedule of Changes Deadline 8 / 30 May 2019

5

ExA; ISH6; 10.D8.2 Unresolved Traffic Matters Joint Position Statement with Norfolk County Council

Deadline 8 / 30 May 2019

1

ExA; ISH6; 10.D8.3 Cawston Conservation Area Heritage Statement Traffic Management Measures Proposed along the B1145 in Cawston

Deadline 8 / 30 May 2019

1

ExA; Comments; 10.D8.4

Applicant’s comments on Deadline 7 submissions

Deadline 8 / 30 May 2019

1

Page 39: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 36

Reference Document Submission Date Version/Revision Status and update

ExA; Comments; 10.D8.4A

Appendix 1: Integrated Offshore Transmission Project Conclusions and Recommendations

Deadline 8 / 30 May 2019

1

ExA; RIES; 10.D8.5 Comments on the Report on the Implications of European Sites (RIES)

Deadline 8 / 30 May 2019

1

ExA; SoC; 10.D8.6 Applicant's Comments on the Examining Authority's draft DCO Schedule of Changes

Deadline 8 / 30 May 2019

1

ExA; AS; 10.D8.7 Appropriateness of the use of the Calculation of Road Traffic Noise Method

Deadline 8 / 30 May 2019

1

ExA; AS; 10.D8.8 Precaution in ornithological assessment for offshore wind farms

Deadline 8 / 30 May 2019

1

ExA; AS; 10.D8.8A Kittiwake Age Structure in the Southern North Sea

Deadline 8 / 30 May 2019

1

ExA; AS; 10.D8.9 Commercial Fisheries Position Statement Deadline 8 / 30 May 2019

1

ExA; AS; 10.D8.10 Offshore Ornithology Auk Displacement Assessment Update for Deadline 8

Deadline 8 / 30 May 2019

1

ExA; AS; 10.D8.11 Consideration of potential impacts related to continuous periods of operation

Deadline 8 / 30 May 2019

1

ExA; AS; 10.D8.12 Position Statement: North Norfolk District Council Requested Requirement to Address Perceived Tourism Impacts

Deadline 8 / 30 May 2019

1

ExA; AS; 10.D8.13 Network Rail Position Statement Deadline 8 / 30 May 2019

1

Page 40: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 37

Reference Document Submission Date Version/Revision Status and update

ExA; AS; 10.D8.14 The National Trust Land Agreement Position Statement

Deadline 8 / 30 May 2019

1

ExA; Rule17; 10.D8.16

The Applicant’s Responses to the Examining Authority’s Rule 17 Requests for Further Information

Deadline 8 / 30 May 2019

1

ExA; Rule17; 10.D8.16A

Appendix 1: Hornsea Project THREE Detailed Response to Examining Authority's Question 2.2.7

Deadline 8 / 30 May 2019

1

ExA; Rule17; 10.D8.16B

Appendix 2: Consent letter from the Crown Estate Commissioners pursuant to Section 135 Planning Act 2008

Deadline 8 / 30 May 2019

1

ExA; Rule17; 10.D8.16C

Appendix 3: Applicant's Response to Further Question 5.4 and 5.5

Deadline 8 / 30 May 2019

1

ExA; AS; 10.D8.17 Natural England Position Statement at Deadline 8

Deadline 8 / 30 May 2019

1

ExA; AS; 10.D8.18 NATS Radar Mitigation Agreement Position Statement

Deadline 8 / 30 May 2019

1

ExA; AS; 10.D8.19 Oulton Parish Council Position Statement –Reducing Impacts of Construction Traffic

Deadline 8 / 30 May 2019

1

Rep3 - SOCG - 1.1 Statement of Common Ground between Norfolk Vanguard Limited and Anglian Water Service Ltd

Deadline 8 / 30 May 2019

3

Rep3 - SOCG - 2.1 Statement of Common Ground between Norfolk Vanguard Limited and Breckland Council

Deadline 8 / 30 May 2019

3

Page 41: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 38

Reference Document Submission Date Version/Revision Status and update

Rep3 – SOCG – 7.1 Statement of Common Ground between Norfolk Vanguard Limited and Highways England

Deadline 8 / 30 May 2019

3

Rep3 – SOCG – 8.1 Statement of Common Ground between Norfolk Vanguard Limited and Historic England

Deadline 8 / 30 May 2019

3

Rep3 - SOCG - 9.1 Statement of Common Ground between Norfolk Vanguard Limited and National Grid

Deadline 8 / 30 May 2019

3

Rep3 - SOCG - 10.1 Statement of Common Ground between Norfolk Vanguard Limited and Cadent Gas Limited

Deadline 8 / 30 May 2019

3

Rep2 - SOCG - 16.1 Statement of Common Ground between Norfolk Vanguard Limited and Whale and Dolphin Conservation

Deadline 8 / 30 May 2019

2

Rep3 - SOCG - 17.1 Statement of Common Ground between Norfolk Vanguard Limited and North Norfolk District Council

Deadline 8 / 30 May 2019

3

Rep3 - SOCG - 19.1 Statement of Common Ground between Norfolk Vanguard Limited and Royal Society for the Protection of Birds

Deadline 8 / 30 May 2019

3

Rep2 - SOCG - 20.1 Statement of Common Ground between Norfolk Vanguard Limited and The Wildlife Trust

Deadline 8 / 30 May 2019

2

Rep3 - SOCG - 26.1 Statement of Common Ground between Norfolk Vanguard Limited and National Federation of Fishermen's Organisations

Deadline 8 / 30 May 2019

3

Page 42: Norfolk Vanguard Offshore Wind Farm Guide to the Application · 2019. 6. 3. · Norfolk Vanguard Offshore Wind Farm Page 1 1. INTRODUCTION 1.1 This document provides a guide to Norfolk

Norfolk Vanguard Offshore Wind Farm Page 39

Reference Document Submission Date Version/Revision Status and update

Rep3 - SOCG - 27.1 Statement of Common Ground between Norfolk Vanguard Limited and Eastern Inshore Fisheries and Conservation Agency

Deadline 8 / 30 May 2019

3

Rep4 – SOCG – 31.1 Statement of Common Ground between Norfolk Vanguard Limited and Trinity House

Deadline 8 / 30 May 2019

3