NOAA’s Fleet of ShipsOperations and Replacement
Challenges
CDR Cecile Daniels, NOAA Corps
Deputy – Program Services Division
Office of Marine and Aviation Operations
September 14, 2010
![Page 2: NOAA’s Fleet of Ships Operations and Replacement Challenges CDR Cecile Daniels, NOAA Corps Deputy – Program Services Division Office of Marine and Aviation.](https://reader036.fdocuments.in/reader036/viewer/2022062518/5697bf9d1a28abf838c94087/html5/thumbnails/2.jpg)
O&M Trends
2
![Page 3: NOAA’s Fleet of Ships Operations and Replacement Challenges CDR Cecile Daniels, NOAA Corps Deputy – Program Services Division Office of Marine and Aviation.](https://reader036.fdocuments.in/reader036/viewer/2022062518/5697bf9d1a28abf838c94087/html5/thumbnails/3.jpg)
OMAO vs NOAA
3
![Page 4: NOAA’s Fleet of Ships Operations and Replacement Challenges CDR Cecile Daniels, NOAA Corps Deputy – Program Services Division Office of Marine and Aviation.](https://reader036.fdocuments.in/reader036/viewer/2022062518/5697bf9d1a28abf838c94087/html5/thumbnails/4.jpg)
Operational Funding
• Annual appropriations (O&M) fund core operations of OMAO fleet and shore side support staff– Approx 3,300 operating days on NOAA ships – Approx 750 chartered vessel operating days
• Even with budget increases, challenged to meet NOAA mission requirements
4
![Page 5: NOAA’s Fleet of Ships Operations and Replacement Challenges CDR Cecile Daniels, NOAA Corps Deputy – Program Services Division Office of Marine and Aviation.](https://reader036.fdocuments.in/reader036/viewer/2022062518/5697bf9d1a28abf838c94087/html5/thumbnails/5.jpg)
Capital Asset Funds
• Procurement, Acquisition and Construction (PAC) funds received for ship construction and major repair / service life extension
• Challenges– Acquisition cost estimate– Maintenance costs– Life cycle costs / service life assumptions– Performance measures / return on investment
5
![Page 6: NOAA’s Fleet of Ships Operations and Replacement Challenges CDR Cecile Daniels, NOAA Corps Deputy – Program Services Division Office of Marine and Aviation.](https://reader036.fdocuments.in/reader036/viewer/2022062518/5697bf9d1a28abf838c94087/html5/thumbnails/6.jpg)
Acquisition Cost Estimates
• Requirements definition• Multi-purpose craft or unique capability?
– Common suite of capabilities• Cost trade-off study limitations• Estimation tools for advanced research
ships limited– Initial budget cost estimate accuracy +/- 40%,
but estimate held as max cost by NOAA / DOC / OMB
6
![Page 7: NOAA’s Fleet of Ships Operations and Replacement Challenges CDR Cecile Daniels, NOAA Corps Deputy – Program Services Division Office of Marine and Aviation.](https://reader036.fdocuments.in/reader036/viewer/2022062518/5697bf9d1a28abf838c94087/html5/thumbnails/7.jpg)
Maintenance Costs
• Appropriate maintenance and reliability / availability levels not specified
• Current maintenance constrained by appropriated funds results in substantial work backlog
• Aging fleet• Newer ships increasingly complex
7
![Page 8: NOAA’s Fleet of Ships Operations and Replacement Challenges CDR Cecile Daniels, NOAA Corps Deputy – Program Services Division Office of Marine and Aviation.](https://reader036.fdocuments.in/reader036/viewer/2022062518/5697bf9d1a28abf838c94087/html5/thumbnails/8.jpg)
Life cycle costs / service life assumptions
• No effective way to estimate life cycle costs and perform trade-offs during concept development stage
• Common support / training advantages and savings
• 30-year service life realistic given tendency to operate for 35-50 years?
8
![Page 9: NOAA’s Fleet of Ships Operations and Replacement Challenges CDR Cecile Daniels, NOAA Corps Deputy – Program Services Division Office of Marine and Aviation.](https://reader036.fdocuments.in/reader036/viewer/2022062518/5697bf9d1a28abf838c94087/html5/thumbnails/9.jpg)
Performance measures / return on investment
• Effective budget defense for capital acquisition requires– Science-based outcome performance
measures– Efficiency measures– Approved plan (e.g. Ship Recap Plan)
9
![Page 10: NOAA’s Fleet of Ships Operations and Replacement Challenges CDR Cecile Daniels, NOAA Corps Deputy – Program Services Division Office of Marine and Aviation.](https://reader036.fdocuments.in/reader036/viewer/2022062518/5697bf9d1a28abf838c94087/html5/thumbnails/10.jpg)
NOAA Ship Recapitalization Plan
• Oct08 - Submitted to Congress
10
![Page 11: NOAA’s Fleet of Ships Operations and Replacement Challenges CDR Cecile Daniels, NOAA Corps Deputy – Program Services Division Office of Marine and Aviation.](https://reader036.fdocuments.in/reader036/viewer/2022062518/5697bf9d1a28abf838c94087/html5/thumbnails/11.jpg)
SRP1 Execution
• FSV6 construction on schedule• FSV5 (Shallow-draft) design and
construction delayed to FY13 start (at the earliest)
• FSV7 (Miller Freeman) replacement delayed to FY13 start (at the earliest)
• NSV class design and construction delayed
11
![Page 12: NOAA’s Fleet of Ships Operations and Replacement Challenges CDR Cecile Daniels, NOAA Corps Deputy – Program Services Division Office of Marine and Aviation.](https://reader036.fdocuments.in/reader036/viewer/2022062518/5697bf9d1a28abf838c94087/html5/thumbnails/12.jpg)
Questions?
12
http://www.omao.noaa.gov/
Mission To safely and efficiently operate NOAA ships and aircraft, incorporate emerging data acquisition technologies, and provide a specialized professional team responsive to NOAA programs.
VisionTo be the best in class for sea and air operations and data acquisition for NOAA and the Nation.