No. T^ · of “Eme ited the by a team 16 British Safety ants & re” by isors. ( HR ) &M – . y...
Transcript of No. T^ · of “Eme ited the by a team 16 British Safety ants & re” by isors. ( HR ) &M – . y...
GAIL (India) LimitedCorporate HSE Department
IOM
Ref-. No. GAIL/NOIDA/CO-HSBl2l20l6-17
1. HVJ and Non HVJ Gas Pipeline Installations.2. LPG Pipeline Installations.3. Process Plants.
Overall HSE Score stands at92. l6 for the month of May, 2016.
General Manager (HSE)
To : All OICs (as per the mailing list)
CC: fbr favor of infbrmation to:
. C&MD
. Director (MarketingiBD/Finance/HR/Project)
'' ED ( PD/CRO )lED (O&M-CR)/ED(0&M-CO)/ED(0IC-Pata)/ ED(IA)/ ED(pC)/ED(E&P)/ ED(HR/I{RD)/GM(SR)
Dated: T^
June, 2016
SUB: MONTHLY HSE scoRE REPORT - Mav 2016
HSE Score Report for the month of May 2016 containingfor the following Installations / Plants is sent herewith forinformation please.
inter alia HSE Scoreyour kind perusal &
1. GSM
2. LPi
3. E&C
4. Atp
5. BJ
6. AhR
7. JC
8. ID
Gas ( O&Safety CManagemLife SavePipelines imparting Exception& DirectoCR ) & EDA team ofto study practices. BBS FollJamnagar,A meetingheld at MResponse Jt DirectoCompressInspectionDepartme
&M ), NCouncil fo
ment. er programon themetraining t
n report onor ( ProjecD ( PC-O&f HSE offiProcess S
low up v, Mumbaig of officiMumbai oCentre”.
or (Indussor Stationn was carrent of Fact
P
CR receivor strong
m was oe “Use Sto GAIL en Monthlycts ) on 31&M ) & G
ficial visiteSafety Ma
visit were , Nasirabaials from Oon 19th M
strial Hean. ried out attories, Gov
Cor
Monthly
Page 1 of 14
ved Interncommitm
organizedSpecified mployees
y Safety D1st May 2GM ( SR )ed HPCL anagemen
organisedad & SamaOil & GasMay 2016
alth & S
t the premvernment
rporate H
HSE Sco
Hig
4
ational Sament to g
at variouMaterial, contract
Day was re016. ED (were conRefibery,
nt in place
d at Abuakhiali. s Sector C6 for con
afety) In
mises of Dof Andhra
HSE Depa
ore Repor
ghlights
afety Awagood Hea
us locatiol – Prevepersonnelviewed by(O&M)-C
nnected thrMumbai
e and to
u Road, A
Companiesnstruction
dore, vis
DT Vizaga Pradesh.
artment
rt: May 20
ard from alth and
ons of Plent Failul & supervy Director
CO, ED ( Orough VCon 6th Maunderstan
Agartala,
s & Ministof “Eme
ited the
g by a team.
016
British Safety
ants & re” by visors. r ( HR ) O&M – .
ay 2016 nd best
Hazira,
try was ergency
Jhabua
m from
GROUUPWISE
Sl. Categ
01 HVJ
02 REGI
03 PROC
04 LPG
OVER
93.1
90
80
82
84
86
88
90
92
94
96
98
100
Apr.16
80828486889092949698100
HSE SCO
gory
NATURAL
IONAL PIP
CESS PLAN
PIPELINES
ERALL HSE
92.160
90
6May.16
P
ORE
M
L GAS PIPE
PELINES
NTS
S
ESCORE
HSE Pe(
Achieve
HSE Scor
Achieve
Page 2 of 14
May, 2016
ELINE
erformancHSE Scor
ement IM
re vs IMo
ement
4
6
HSE S
92.56
90.50
91.40
94.20
92.16
ceTrendre)
MoU Target
oU target
IMoU Targe
core
IMoU T
t
t
Target: 90
1
3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
1 1 1 1 1 1 0 0 1 0 1 0 1 1 1 1 1 0 1 1 1 1 1 1 0 0 1 0 0 1 1 1
2
(b) 2 2 2 2 2 2 2 1 1 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 1 2 2 2
(c) 2 2 2 2 2 2 2 2 2 2 2 1 2 2 2 2 2 2 2 2 2 2 2 2 2 1 2 2 2 2 2 2
3
(a) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
(b) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
4
(a) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
(b) 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
(c) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
5
(a) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
6
(a) 1 1 1 1 1 0 1 1 1 0 1 0 0 0 0 0 1 1 1 0 0 1 1 1 1 1 1 1 0 1 1 1
7
(a) 1 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 0 1 1 1 1 1 1 1 1 0 1
(b) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
8 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
9
(a) 2 2 0 0 2 2 2 2 2 2 2 2 2 0 2 2 0 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
Viz
ag
Pat
a
Usa
r
Vag
hodi
a
Vij
aipu
r
Lon
i Reg
ion
Man
sara
mpu
ra
Facility Design, construction & pre-start up review
Control of defeat and reliability of critical system and devices
Display of critical SOP
Risk analysis and management
Risk analysis
Process safety information
HAZOP study
Pre-start up review
Display of MSDs
Display of Electrical area classification
1
HSE SCORE AT A GLANCE FOR THE MONTH OF May 2016
Category ---> Process Plants L P G P/L Stations
Chh
ains
a
HVJ NG P/L Stations Regional NG P/L Stations
Koc
hi
Ben
galu
ru
Vad
odar
a
Aga
rtal
a
Gan
dhar
Vij
aipu
r
Vag
hodi
a
Dib
iyap
ur
Kai
lara
s
G K
ondu
ru
Che
rlap
alli
ELEMENTS
Nas
irab
ad
Abu
Ros
d
Raj
ahm
undr
y
Pud
uchh
ery
(a) Safety Suggestion from Employee
1 1 1
Sam
akhi
ali
Jam
naga
r
Kan
dla
NC
R
Mum
bai
HSE Leadership and Commitment (M)
Employees Participation
Sl
WORK CENTRE --->
Max
. P
ts.
Haz
ira
Jhab
ua
Khe
ra
11 1 1 1 1 1
Safety Committee meeting(Q)
1 1 1 1 1 11 1 1 1 11 1 1
Third Paty Services
Safety Rule Violation
Monthly HSE briefing Undertaken by OIC/WIC
Unsafe condition/Act reported by employees
11 1 11 1 1
Review of HSE policy (Y)
Work Permit System
Job safety analysis
Personal Safety
Workplace monitoring
Availability of PPEs
Page 3 of 14
Viz
ag
Pat
a
Usa
r
Vag
hodi
a
Vij
aipu
r
Lon
i Reg
ion
Man
sara
mpu
ra
HSE SCORE AT A GLANCE FOR THE MONTH OF May 2016
Category ---> Process Plants L P G P/L Stations
Chh
ains
a
HVJ NG P/L Stations Regional NG P/L Stations
Koc
hi
Ben
galu
ru
Vad
odar
a
Aga
rtal
a
Gan
dhar
Vij
aipu
r
Vag
hodi
a
Dib
iyap
ur
Kai
lara
s
G K
ondu
ru
Che
rlap
alli
ELEMENTS
Nas
irab
ad
Abu
Ros
d
Raj
ahm
undr
y
Pud
uchh
ery
Sam
akhi
ali
Jam
naga
r
Kan
dla
NC
R
Mum
baiSl
WORK CENTRE --->
Max
. P
ts.
Haz
ira
Jhab
ua
Khe
ra
(b) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 0 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
10
(a) 1 1 1 1 1 0 1 1 1 1 1 1 1 1 1 1 1 1 1 1 0 1 1 1 1 1 1 0 1 1 1 1
(b) 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
(c) 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 1 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
(d) 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
(e) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
(f) 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 2 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3 3
(g) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
(h) 2 2 2 0 2 2 2 2 2 2 2 2 2 0 2 2 2 2 2 2 2 2 2 2 2 2 2 0 2 2 0 2
11
(a) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
(b) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
(c) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
(d) 2 2 2 2 2 0 0 2 0 2 2 2 0 2 2 2 2 2 2 0 2 0 2 2 2 2 2 2 2 2 2 2
(e) 3 1 3 3 3 1 0 3 0 1 0 3 3 3 3 2 2 3 3 1 3 3 1 3 3 3 3 3 3 3 3 3
12 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
13 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5 5
14
(a) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
(b) 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 12 18 18 18 18 18 18 18 18 18
(c) 2 2 2 0 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
15
(a) 4 0 4 4 0 4 0 4 0 4 0 0 4 0 0 0 4 0 0 0 0 0 4 4 0 4 0 0 4 0 4 4
Training:Health,Safety and Environment
Management of Change
Calibration/Resetting
Incident Investigation and analysis
Incident Reporting
Operation and Maintenance (Procedure)
Safety Toolbox Talk
Fire & Safety Manpower
Fire Detection & Alarm System
Fire Water-Based System & Non-Water based system
Fire Fighting Appliances
Fire Fighting Chemicals
Critical Instruments
Communication System
Near miss Incidents
Pipeline Thickness
Pressure Vessels
Portable equipments
Load bearing Installed equipment
Safe Operating Procedures
Inspection and Maintenance
Incident Reporting, Investigation and analysis
Health Monitoring
Occupational Health
Page 4 of 14
Viz
ag
Pat
a
Usa
r
Vag
hodi
a
Vij
aipu
r
Lon
i Reg
ion
Man
sara
mpu
ra
HSE SCORE AT A GLANCE FOR THE MONTH OF May 2016
Category ---> Process Plants L P G P/L Stations
Chh
ains
a
HVJ NG P/L Stations Regional NG P/L Stations
Koc
hi
Ben
galu
ru
Vad
odar
a
Aga
rtal
a
Gan
dhar
Vij
aipu
r
Vag
hodi
a
Dib
iyap
ur
Kai
lara
s
G K
ondu
ru
Che
rlap
alli
ELEMENTS
Nas
irab
ad
Abu
Ros
d
Raj
ahm
undr
y
Pud
uchh
ery
Sam
akhi
ali
Jam
naga
r
Kan
dla
NC
R
Mum
baiSl
WORK CENTRE --->
Max
. P
ts.
Haz
ira
Jhab
ua
Khe
ra
(b) 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
16
(a) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
(b) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
(c) 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
(d) 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1 1
17 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2 2
18
(a) 8 7 8 7 4 8 7 4 4 8 3 7 8 3 8 8 5 5 2 8 6 7 0 7 1 8 7 7 7 8 8 8
(b) 4 3 4 4 4 4 4 3.5 3.5 4 2.5 3.5 1.5 4 4 4 4 4 4 4 4 4 4 4 2.5 4 4 4 4 4 3.5 4
100 92 98 93 92 94 89 93.5 85.5 96 86.5 91.5 93.5 85 95 90 92 92 90 91 92 92 84 99 86.5 98 95 91 96 96 96.5 10019 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0
92.00 98.00 93.00 92.00 94.00 89.00 93.50 85.50 96.00 86.50 91.50 93.50 85.00 95.00 90.00 92.00 92.00 90.00 91.00 92.00 92.00 84.00 99.00 86.50 98.00 95.00 91.00 96.00 96.00 96.50 #####
Excel Excel Excel Excel Excel VG Excel VG Excel VG Excel Excel VG Excel Excel Excel Excel Excel Excel Excel Excel VG Excel VG Excel Excel Excel Excel Excel Excel Excel
Sl
1
2345
Environment related accident/incident
≥70 & <80 GOOD ≥60 & <70 FAIR Below 60 POOR
RATING
90 - 100 EXCELLENT
≥80 & <90 V. GOOD
91.40 94.20
Overall HSE Score 92.16
92.56 90.50
HSE Score Achieved
Rating
Groupwise HSE Score
Internal HSE audit (Including IUSA) observations & Compliance
Environment Management
Occupational Health Facility
Hazardous waste
Environment audit by external agencies
Environment Monitoring
External HSE audit Observations & Compliance
Compliance audit
Emergency planning and Response:Onsite Mock Drill
TotalScore Deduction on NC
Page 5 of 14
Page 6 of 14
Highlights of HSE Activities for the Month - May, 2016
Highlights of HSE Activities at Work Centres are summarized below:
1. Behavior Based Safety (BBS):
BBS schedule meetings of functional committee and Steering Committee organised at various sites.
BBS follow up visit by representatives from M/S Obul Consultancy at Abu Road, Agartala, Hazira, Jamnagar, Mumbai, Nasirabad, Samakhiali.
2. Emergency Response and Disaster Management Plan (ERDMP) / Mock Drill:
Quarterly On-Site Mock Drill organised at Pata for Leakage scenario.
Outside fire call was attended by the Fire & Safety deptt at G Kondruru, Nasirabad, Pata, Vaghodia & Vijaipur.
3. External Safety Audit
External Safety Audit conducted by M/s CEIL at Abu Road & Nasirabad.
T4S audit as per PNGRB Regulation of Khera & Mumbai ( Maharashtra ) region
pipeline system has been conducted by M/s Intertek Moody International Private Limited.
4. OISD Audit
Audit for Dabhol Panvel Pipeline (DPPL) region has been conducted by OISD team
Delhi from 10-14th May 2016.
5. Other Highlights
02 nos of LPG pipeline awareness program conducted under Loni Region for villagers and district administration.
Pipeline Representative from Vaghodia attended meeting of Local Crisis Group, Vaghodia at Mamlatdar Office Vaghodia.
Safety Awareness Program conducted at village Narvalia in District Jhabua..
Page 7 of 14
Community Awareness program on Natural Gas Pipelines safety and Dos & Don’ts in case of leakage are being conducting by hiring local focus group and arranging in PL ROU Villages. In 2nd phase 150 villages covered so far.
Pig launching & receiving activities carried out at Agartala, Cherlapalli, G Kondruru & Hazira.
*****
Page 8 of 14
Near-miss Incidents Reported by Work Centres:
Near miss incidents have been reported from various sites in the month of May 2016. Notable near-miss incidents are summarized as below:
Abu Road: On 28.05.16 at 15:50 hrs, Pig receiver line modification job was under progress. Before performing cutting and welding the line was purged with nitrogen. One nitrogen cylinder was kept at site, during movement one worker was struck with cylinder and cylinder got tilted. It was observed that the cylinder was tied up with a structure using a thin rope at middle of the cylinder. Cherlapally: On 21.05.2016, Job of foundation breaking was under progress at the FWPH using Tractor mounted Air Compressor, when suddenly the boiling radiator water of the tractor started gushing out of the radiator. Fireman on standby immediately informed to the tractor breaker operator and operator in turn immediately stopped the tractor and the job. As the hot water splashed when no person was in close proximity, no person was injured. As the tractor was stopped just in time, further heating of the tractor & further consequences were avoided. Chhainsa: On 24.05.2016 at 1630 hrs, Installation of tin sheets was being done on the iron angle frame structure around GTC-A stack by contract worker of M/s Venture Engg. While working, a piece of iron angle and tin sheets were lying on top of the shed. Due to sudden change in the weather, strong wind started blowing and forcing the worker to stop the job. But, before he could collect his tools and other small leftover pieces of angle & sheets, the wind moved a cut section of the sheet and thereby making an iron piece placed on it to fly in the air. The piece straight away came to the ground. Luckily, it didn’t injure anyone as the area was barricaded to limit the movement of persons below the working level. Gandhar: On 05.05.2016 at 10:30 hrs, Mr. Raj Ilyas I, while on plant round near main control room his head strikes with dense bushes of tree which were hanging on the roadside. Luckily nothing untoward happened. It has a potential to cause injury if someone passed from that area during night hours. On receipt of information immediately information given to horticulture dept. for removing the trees dense bushes which are obstructing the pathway to avoid such incidents in future. Khera: On 28.05.2016, worker involved in the construction of drain near new FWPH slipped from the edge of the under construction drain. Fortunately he did not suffer injury. Loni: On 24.05.2016 at 20:00 hrs, Mr. Om Prakash, Foot Patroller was on his way for LPG pipeline foot patrolling. When he reached at SV- 65, he hears some unusual sound from the process area. After going near to the process area with security person on duty, he observed that there was small LPG leakage from the flange of TE- SV- 65. They immediately informed the Madanpur Khadar Control Room regarding the same. As per instructions of C/r they isolated the TE and thus leakage got stopped. Maintenance team reached at the site and replaced the damaged gasket of the leaking flange. Had Mr. Om Prakash not noticed the leakage in time, it would be a major incident. NCR: On 16.05.2016, during the pigging activity at Dadri terminal, it was observed that at BNPL Launcher site as there is no space for movement around launcher tray & height is also
Page 9 of 14
around more than a meter. After pushing of pig in launcher barrel, Push rod of 4” dia pipe around 4 meters length and more than 100 kg weight is to be removed from tray by two persons. One person was on platform around tray and another person jumped from platform of one meter height because there are no steps to come down from platform. After jumping both persons fell and very narrowly escaped from injury. Pata: On 16.05.2016 at 08:44 hrs, Mr. Sooraj Pal Singh Manager (GPU Opns.) reported that the newly erected pipe rack of pc-2 near GPU C/R and between GPU/GCU plant has cable tray at the top this cable tray is covered with GI sheets, .during heavy wind these sheets (size around 3x8 feet) are being detached from cable tray and fell down on roadside and in plant area. If someone crossing the road during heavy wind may get injured fatally by flying metal sheet. Rajahmundry: On 11.05.2016 at 11:15 hrs, the construction job of modification of KKD-1 old PCV line 14”/ 6” reducer cutting and bewailing was under progress at Tatipaka Terminal Process Area. Simultaneously another job of opening the 14” Ball Valve flange of the same line was also being done at a distance of 10 meters. While removing the flange, suddenly condensate of approx. 2-3 Litres was gushed out from the line and spread out nearly 1-2 meters radius. Without expecting and noticing the same by the cutting and bewailing team, they tried to continue the grinding job. On seeing the sparks from grinding job, the Fireman at the site immediately responded and operated the DCP Extinguishers on the condensate spread area and successfully prevented to catch the fire. Otherwise the grinding sparks have potential to ignite fire on condensate. Vadodara: On 28.05.2016 at 11:30 hrs, during monthly maintenance of fire -fighting equipment a Contract Fire man who was approaching the terminal, narrowly missed by the flying spark generated inside factory into his eyes. Vaghodia: On 03.05.2016 at 2300 hrs, live burning flying lamp (Chinese flying Lamp) was dragging and descending with air draft and fell near the NTGG Plant area. Mr. Ratnakar Wagh was on safety round and notice descending burning flying lamp, when the lamp touched the ground near the NTGG Plant it was still burning. Immediately he responds with nearby fire extinguishers and burning flying lamp extinguishers. Vijaipur: On 26.05.2016, Crane was engaged for calibration of DVPL-C machine discharge line PSV by HVJ Instr. While removing PSV, smoke observed from crane control panel. Also On-Off switch of crane was also found non-functioning but anyhow operator managed to switch-off the crane by cutting its control wiring. As crane was operating in hazardous area & looking into high potential risk in the area, incident should be investigated. Vizag: On 11.05.2016, as the air conditioning system inside the conference hall of technical building was not effective Electrical Dept. personnel placing Stand Fans inside the conference hall. While placing the stand, the fan portion got loose at stand stem top threaded joint. The fan was not electrically connected at that time. The stem & the fan were made connected properly before charging & starting of the fan.
Page 10 of 14
Details of Deduction of Marks in the Month of May 2016
Sl. No.
Name of Installation Marks Deducted
Element No.
Reason for Mark Deduction
1.
HV
J N
G P
/L S
TA
TIO
NS
Hazira
2 11 ( e ) PSV monitoring / testing not done as due
4 15 (a ) 100% manpower not covered for health check up
1 18 (a) Pending ESA (OISD June 2014) points
1 18 (b) Pending IUSA (26.11.2013) points
2. Jhabua 2 9 ( a ) JSA not done 100%
3. Khera
2 9 ( a ) JSA not done 100%
2 10 ( h ) SOP not reviewed as due
2 14 ( c ) Incident dt 08.01.2016 recommendations
1 18 (a) Pending ESA (CEIL July 2014) points
4. Vijaipur, CS
4 15 ( a ) 100% manpower not covered for health check up
4 18 ( a ) Pending T4S Audit points 28.07.2011
5. Vaghodia, CS
1 6 Safety violation by contract employees
1 10 (a) Available Staff+ Outsourced <95% of Std. Requirement
2 11 ( d ) Thickness testing not done as due
2 11 ( e ) PSV monitoring /testing not done as due
6. Dibiyapur
1 1 HSE policy not reviewed as due
2 11 ( d ) Pipeline thickness survey not done as due
3 11(e) PSV/LEL monitoring /testing not done as due
4 15 ( e ) 100% manpower not covered for health check up
1 18 ( a ) Pending OISD ( Aug 2014 ) point
7. Kailaras
1 1 HSE policy not reviewed as due
1 2 ( b ) 95% of previous Safety Committee meetings not complied
4 18 ( a ) Pending T4S audit (16.08.2011) points
Page 11 of 14
Sl. No.
Name of Installation Marks Deducted
Element No.
Reason for Mark Deduction
0.5 18 ( b ) Pending ( IUSA 27.11.2014 ) points
8. NCR
1 2 (b) 95% of previous Safety Committee meetings not complied
2 11 ( d ) Pipeline thickness survey not done as due
3 11(e) LEL detector & PSV monitoring /testing not done as due
4 15 ( e ) 100% manpower not covered for health check up
4 18 (a) Pending T4S Audit ( 11.08.2011) points
0.5 18( b ) Pending IUSA point of Aug 2014
9. Chhainsa
1 1 HSE policy not reviewed as due 1 6 Safety violation by contract
employees 2 11(e) PSV monitoring /testing not done
as due
10.
RE
GIO
NA
L N
G P
/L S
TA
TIO
NS
Mumbai
3 11 ( e ) PSV monitoring/testing not done as due
4 15 ( e ) 100% manpower not covered for health check up
5 18 (a) Pending ESA (OISD 06.12.2010) points
1.5 18 (b) Pending IUSA (26.03.2013) points
11. Rajahmundry
1 1 HSE policy not reviewed as due
1 2 (c) No. of reported unsafe conditions = 2
1 6 Safety violation by contract employees
4 15 ( e ) 100% manpower not covered for health check up
1 18 (a) Pending ESA ( CEIL Nov., 2014) points
0.5 18 ( b ) Pending ISA ( Feb 2015 ) point
12.
Puducherry
1 4 ( b ) Area classification drawing not displayed at site
1 6 Safety Violation by Contract employees
Page 12 of 14
Sl. No.
Name of Installation Marks Deducted
Element No.
Reason for Mark Deduction
2 11 ( d ) Pipeline thickness survey not done as due
2.5 18 (b) Pending IUSA (26.11.2010) points
13. Vadodara
1 6 Safety Violation by Contract employees
1 7 ( a ) Workplace monitoring not done
2 9 ( a ) JSA not done 100%
2 10 ( h ) SOP not reviewed as due
4 15 ( e ) 100% manpower not covered for health check up
5 18 (a) Pending ESA (CEIL 19.03.2011) points
14. Agartala
1 6 Safety Violation by Contract employees
4 15 ( e ) 100% manpower not covered for health check up
15. Kochi
1 4 ( c ) SOP not displayed
1 6 Safety Violation by Contract employees
2 10 ( c ) Fire pumps availability < 90%
1 10 (f) DCP quantity not 100% available
1 11(e) LEL Det monitoring /testing not done as due
4 15 ( e ) 100% manpower not covered for health check up
16. Bengaluru
2 9 ( a ) JSA not done 100%
2 9 ( b ) Safety tool box talk not done 100%
1 11(e) LEL Det monitoring /testing not done as due
3 18 (a) Pending T4S audit (31.01.2013) points
17.
PR
OC
ESS
PL
AN
TS
Gandhar
1 1 HSE policy not reviewed as due
4 15 ( e ) 100% manpower not covered for health check up
3 18 (a) Pending ESA (OISD 15.06.2012) points
18. Pata 4 15 ( e ) 100% manpower not covered for
health check up
Page 13 of 14
Sl. No.
Name of Installation Marks Deducted
Element No.
Reason for Mark Deduction
6 18 (a) Pending ESA ( OISD Feb 2010) points
19. Usar
1 6 Safety Violation by Contract employees
2 11 ( d ) Pipeline thickness survey not done as due
2 11 ( e ) PSV testing not done as due
4 15 ( e ) 100% manpower not covered for health check up
20. Vaghodia, GPU
1 6 Safety Violation by Contract employees
1 10 (a) Available Staff+ Outsourced <95% of Std. Requirement
4 15 ( e ) 100% manpower not covered for health check up
2 18 (a) Pending ESA (OISD 21.11.2013) points
21. Vijaipur, GPU
1 7 ( a ) Work place monitoring not done as due
2 11 ( d ) Pipeline thickness survey not done as due
4 15 ( e ) 100% manpower not covered for health check up
1 18 (a) Pending ESA( CEIL Oct 2014) points
22.
LP
G P
/L S
TA
TIO
NS
Loni Region
2 11 ( e ) PSV testing not done as due
6 14 ( b ) Non Reportable Incident ( Gas Leakage )
8 18 ( a ) Pending ESA (OISD Nov 2001) points
23. Mansharampura 1 18 (a) Pending ESA (CEIL Nov 2014)
points
24. Nasirabad
1 1 HSE policy not reviewed as due
4 15 ( e ) 100% manpower not covered for health check up
7 18 (a) Pending ESA (OISD 23.02.2009) points
1.5 18 (b) Pending IUSA (05.07.2012) points
25. Abu Road 1 1 HSE policy not reviewed as due
1 2 ( c ) Unsafe Condition given = 4
Page 14 of 14
Sl. No.
Name of Installation Marks Deducted
Element No.
Reason for Mark Deduction
26. Samakhiali
4 15 ( e ) 100% manpower not covered for health check up
1 18 (a) Pending ESA (CEIL Nov 2014) points
27. Jamnagar
1 1 HSE policy not reviewed as due
1 10 (a) Available Staff+ Outsourced <95% of Std. Requirement
2 10 ( h ) SOP not reviewed as due
4 15 ( e ) 100% manpower not covered for health check up
1 18 (a) Pending ESA (CEIL Nov 2014) points
28. Kandla
1 1 HSE policy not reviewed as due
1 2 ( b ) 95% of previous Safety Committee meetings not complied
1 6 Safety Violation by Contract employees
1 18 (a) Pending ESA (CEIL Nov 2014) points
29. Vizag 4 15 ( e ) 100% manpower not covered for
health check up
30. G Konduru
1 7 ( a ) Work place monitoring not done as due
2 10 ( h ) SOP not reviewed as due
0.5 18 ( b ) Pending ISA ( Mar 2015) points
31. Cherlapalli NIL