No limits No boundaries · The company’s broad customer base includes dredging operators, oil and...
Transcript of No limits No boundaries · The company’s broad customer base includes dredging operators, oil and...
No limitsNo boundaries
IHC Handling Systems product overview 2014/2015
3Product overview 2014/2015
‘Lots of reasons why.’ IHC Handling Systems
5Product overview 2014/2015 Company vision
w w
IHC MerwedeNo limitsNo boundaries
No limits, no boundaries. This means
that issues such as ‘large’, ‘heavy’
and ‘deep’ are relative terms to us.
The crux is identifying opportunities
and translating these into practical
applications. As a global expert in the
field of tools for installing foundations
and structures, we know our market.
And our market - in turn - is fully
aware of what we have to offer as a
technology innovator, as a reliable
partner and as a producer of efficient
fail-safe tools to ensure the best
possible safety.
IHC Handling Systems, part of IHC
Merwede, is a leading supplier of
high-quality handling systems and
services as well as a problem solver
for handling issues. At IHC Handling
Systems we have a rich history as
an innovative company experienced
through various offshore installation
or removal ‘challenges’. We have been
ahead of market developments for
many years now. How? Innovation
and thinking in terms of the market
are deeply entrenched in our
company’s DNA. We enjoy limitless
conceptualisation.
Together with our sister companies
IHC Hydrohammer® and IHC Sea Steel
we offer a full package of offshore
installation equipment, either from
our standard range of products or to
our clients specific needs or require-
ments. We invite you to step into our
world in order to learn more about
our company, products and services
and the reason we are proud to say
‘No limits, no boundaries’.
IHC Merwede is focussed on the continuous development of design and construction
activities for the specialist maritime sector. It is the global market leader for efficient
dredging and mining vessels and equipment – with vast experience accumulated
over decades – and a reliable supplier of custom-built ships and supplies for offshore
construction.
IHC Merwede has in-house expertise for engineering and manufacturing innovative
vessels and advanced equipment, as well as providing life-cycle support. Its integrated
systematic approach has helped to develop optimum product performance and
long-term business partnerships.
The company’s broad customer base includes dredging operators, oil and gas
corporations, offshore contractors and government authorities.
IHC Merwede has over 3,000 employees based at various locations in The Nether-
lands, Brazil, China, Croatia, France, India, Malaysia, the Middle East, Nigeria, Serbia,
Singapore, Slovakia, South Africa, the United Kingdom and the United States.
Technological innovation will remain the company’s underlying strength through its
continuous investment in research and development. Moreover, it helps to safeguard
a sustainable environment.
7Product overview 2014/2015
DalianLafayette, LA
Broussard Louisiana / Hydro-Ram Inc.
Rio de Janeiro
Houston, TX
Wayne, NJ
Stocksfield
Blandford ForumKomarno
Lago
Cape Town
s
Dubai / Hytec International L.L.C.
Kuala Lumpur / Panah Jaya Services Sdn Bhd
Perth / Machinery Supply
Ho Chi Minh / STAR Engineering Joint Stock CompanyMumbai
Singapore
Guangzhou
Shanghai
TianjinBeijingBelgrade
Pescara / SB Oil Tools
The Netherlands
RijeVerberie
ka
Seoul / Equipment & Service Inc.
Agents IHC Handling SystemsIHC MerwedeIHC Merwede | Agents IHC Handling Systems
Company vision
Locations in the worldThe Netherlands, Brazil, China, Croatia, France, India, Malaysia, the Middle East, Nigeria, Serbia, Singapore, Slovakia, South Africa, the United Kingdom and the United States.
9Product overview 2014/2015 Oil & Gas
Oil & Gas
Structures
IHC Handling Systems
long history in the Oil
& Gas industry has
a strong connection
with the installation
of structures. The
challenges, faced by
our customers led
to the design and fa
brication of dedicated
equipment which
‘nowadays’ is avail
able on a rental or a
purchase basis.
Deep Water
Over the years, the
Oil & Gas industry
moved (and still is
moving) from shallow
to deeper, and even
ultradeep waters. IHC
Handling Systems sup
ported its customers
during this ‘evolution’
by designing and
producing equipment
capable of with
standing deep water
con ditions.
Pipelay
IHC Handling Systems
involvement in the
pipelaying market
started in the mid 90’s
with the supply of our
first line-up clamps.
Since then, the growth
of offshore activities
led to a demand for a
wide range of equip
ment, all of which is
currently available
within our product
range.
Decommissioning
A relatively new
market in which IHC
Handling Systems
is involved in is the
removal market. The
removal of structures,
jackets, subsea tem
plates and pipelines
requires specialised
and customised
equipment or, in other
cases, equipment that
is a ‘spin-off’ from
existing tools.
We invite you to step into our world of equipment in order to learn more about our company and the reason we are proud to say ‘Your world, our challenge’.
11Product overview 2014/2015 Content
Oil & Gas StructuresInternal Lifting Tool (ILT) 25
External Lifting Tool (ELT) 29
Upending Frame (UF) 31
Leveling Tool (LT) 35
Pile Anti Running Clamp (PARC) 39
Jacket Pile Gripper (JPG) 41
Hydraulic Release Shackle (HRS) 45
Pile Plug (PiPl) 47
Skidding System (SkS) 49
Bear Cage (BC) 51
Deep WaterDeep Water Internal Lifting Tool (ILT) 53
Pin Release Mechanism (PRM) 55
Chain Clamp (CC) 57
Suction Pile Lifting Frame (SPLF) 59
Accumulator Set (AS) 61
Hydraulic Release Shackle (HRS) 63
Subsea Connection Frame (SCF) 65
PipelayPipe Recovery Tool (PRT) 67
Pipe Abandonment Tool (PAT) 69
Abandonment & Recovery Cable Connector (A&R) 71
Pin Release Mechanism (PRM) 73
Bear Cage (BC) 75
DecommissioningInternal Lifting Tool (ILT) 77
External Lifting Tool (ELT) 79
Buoyancy Clamps (BuC) 81
Hydraulic Release Shackle (HRS) 83
13Product overview 2014/2015 Wind
ILT
Stru
ctur
esO
il &
Gas
Jackets & Tripods
The offshore wind
industry is currently
moving into deeper
waters and due to the
everincreasing capa
city of wind turbines,
jackets and tripods are
more often chosen
as foundation type.
For the installation of
structure foun dations
IHC Handling Systems
can contribute its
experiences from the
Oil & Gas market.
Monopiles
Since 2001, IHC
Handling Systems
is involved in the
in stallation of
monopiles, starting
with the installation
of the Horns Rev I
project off the Danish
coast. Since then, IHC
Handling Systems
has been involved in
95% of all monopile
projects that followed
Horns Rev I.
Gravity Based
A rare type of
foun dation is the
Gravity Base foun
dation, which requires
huge constructions
to be handled and
installed offshore.
IHC Handling Systems
experience in handling
and lifting heavy
constructions is an
assurance for the
successful installation
of these foundations.
Deck Equipment
Apart from the equip
ment used during
the installation of
foundations, IHC
Handling Systems is
increasingly involved
in the handling of
structures, piles, etc
on deck of installation
vessels, this varies
from the hydraulic
operated pile storage
frames to guiding and/
or positioning frames.
The offshore wind business is clearly a growth market. During the coming decades sizeable wind farms will be created, especially offshore. IHC Handling Systems has been involved in this market from the very early start and nowadays, it is a very important ‘second’ pillar of the business.
Wind
15Product overview 2014/2015 Content
Wind MonopilesUpending Tool (UT) 85
Flange Pile Upending Tool (FPUT) 89
Monopile Plug (MoPl) 91
Jacket & TripodsInternal Lifting Tool (ILT) 93
Upending Frame (UF) 95
Leveling Tool (LT) 97
Jacket Pile Gripper (JPG) 99
Hydraulic Release Shackle (HRS) 101
Pile Plug (PiPl) 103
Gravity BasedPin Release Mechanism (PRM) 105
Deck EquipmentStacking Frame (SF) 107Pile Guiding and Positioning Frame (PGPF) 109Saddle & Hook (S&H) 111
17Product overview 2014/2015 Concepts
ILT
Stru
ctur
esO
il &
Gas
IHC Handling Systems has a rich history as an innovative ‘problem-solving’ company and has gained extensive exp erience through various offshore installation or removal ‘challenges’. Innovation and thinking in terms of solutions for our customers are deeply entrenched in our company, starting from our experienced sales team, through our engineering and our service department. IHC Handling Systems is capable of limitless conceptualization.
Concepts
19Product overview 2014/2015 Content
Concepts VariousFlange Structure Lifting Tool (FSLT) 113
Pipe Cutter (PC) 115
Upending Hinge (UH) 117
Hammer Gripper (HG) 119
21Product overview 2014/2015 Supporting Equipment
All IHC Handling Systems equipment is hydraulically operated, both for surface and for subsea operations. IHC offers its cus tomers complete equipment packages, which result in a ‘plug-and-play’ solution. A major advantage for our customers is the fact that they can rely on equipment packages that already have been tested as an assembly. Obviously, having one single point of contact for an equipment package that consists of several components is an additional benefit for the customer.
SupportingEquipment
23Product overview 2014/2015 Content
Supporting Equipment VariousHydraulic Power Pack 5,5 kW (PP5.5) 121
Hydraulic Power Pack 22 kW (PP22) 123
Diesel Power Pack ( PP157) 125
Hydraulic Hose Reel 2 x 160m / 2x 320m / 4x 160m (HR) 127
Hydraulic Hose Reel 6 x 200m (HR) 129
Hot Stab (HS) 131
25Product overview 2014/2015
ILTInternal Lifting Tool
Stru
ctur
esO
il &
Gas
ILT
ILT’s are used for upending of piles, conductors and lifting of jackets, templates, buoyancy tanks and modules.
• Standardpilerange16”-96”
• Liftingcapacitiesof200t-2000t
• Standardoperatingwaterdepthis500m
• Specialmodificationsallowfor:
-pileOD108”
-waterdepthupto2500m
-capacityupto2000t
-CertifiedanddesignedaccordingLloyds
LiftingAppliances
• Availableforrental&purchase
AnevolutioninILTusehastakenplaceover
theyearsfromsimplepilehandlingintouse
duringvariousinstallations,suchas:
• Liftingofbouyancytanks
• Liftingofjackets
• Liftingoftopsidemodules
• Liftingofsubseamanifolds
Specifications Applications
16”-30”200t 20”-36”300t 24”-42”250t 42”-60”500t 60”-96”1200t
TheILT“family”consistsoffivestandardsizerangeswithdifferentliftingcapacities.
Product Range
27Product overview 2014/2015
ILT
Stru
ctur
esO
il &
Gas
TheILTisequippedwithIHC’sinnovative
FailSafePrinciple:
• Mechanicalloadappliedonthetoolin
longitudinaldirectionresultsinatransversal
forceonthepilewhichcreatesthe
‘locking/failsafe’connection
2013 OSX-3-Brazil
2013 Diyabekir-Turkmenistan
2013 KMA-Malaysia
2012 EMEPMITE-A,TA-Q,TE-B-Malaysia
2012 FSOErawan-2mooringinstallation-
Thailand
2012 Bubut&Danau-Brunei
2012 EPRDEkofiskcessation-NorthSea
2012 PertaminaHuluEnergy-Indonesia
2011 PierceManifoldInstallation-NorthSea
2011 SHWEproject-Myanmar
2011 D1project-India
2011 EssoKipperTuna-Australia
2011 MHNRe-development-India
2011 Montara-Australia
2011 BienDong1-Vietnam
2010 Gumusut-Kakap-Malaysia
2010 DevilCreek-Australia
2010 GajahBaru-Indonesia
2010 CastorT&I-Spain
2010 KNPG-Bjacket-Malaysia
2010 Ekosfiskremoval-NorthSea
Projects prior to 2010 upon request
Fail Safe Principle Projects
ILTInternal Lifting Tool
29Product overview 2014/2015
ELTExternal Lifting Tool
Stru
ctur
esO
il &
Gas
ELTELT’s are used for pile upending, pile
lifting and as a hang off clamp.
• Pilerange20”-112”
• Liftingcapacityupto1200t
• Max.operatingdepthof250m
• CertifiedanddesignedaccordingLloyds
LiftingAppliances
• Availableforpurchase
TheELThassomespecificinnovativefeatures.
• SubseaoperationviaROVorumbilical
• ELTcanbeoptionaldeliveredwithsideopening
• Centralizingsystemimprovingpositionprior
toclamping
• Pileupendinginadualcraneoperation
• Useashang-offclamp
• Useatemporaryclampingdeviceduring
weldingoflegpiles
TheELTisequippedwithIHC’sinnovative
FailSafePrinciple
• Mechanicalloadappliedonthetoolin
longitudinaldirectionresultsinatransversal
forceonthepilewhichcreatesthe
‘locking/failsafe’connection
2012 ConocoEldfisk-Norway
2012 NorthRankinB-Austalia
2012 Jasmine-NorthSea
2010 CastorT&I-Spain
2009 NorthWestHutton-Norway
2009 Peregrino-Brasil
2009 Mexilhao-Brasil
2008 TombuaLandana-Angola
Projects prior to 2008 upon request
Specifications
Features
Applications
Fail Safe Principle
Projects
31Product overview 2014/2015
UFUpending Frame
Stru
ctur
esO
il &
Gas
UF
Upending Frames enable offshore installa tion contractors to increase their sphere of activity and efficiency by upending long piles with a relatively short crane boom.
• Pilerange54”-108”
• 600tholdingcapacity
• RequiresILTatthepiletop
• Availableforrental&purchase
• Hydraulicallyoperated
• Rotationofframe0°-100°
• Lateralfreedomofmovement±10°
• Fullpileweightcanbetakenbyframe
• Framecanbeequippedwithinclinosensor
foraccuratedigitalangleinformation
• Newdesignwithhydraulichingeback
2013KPOC-Malaysia
2013 KBBNorthernHubproject-Malaysia
2012 GlobalTech1OffshoreWindFarm-
Germany
2012 HaiThach/BienDong-Vietnam
2012 Cendorphase2-Malaysia
2011 Yetagun-C-Myanmar
2011 B-193AP&B-193AQ-India
2011 BienDongMT1-Vietnam
2011 DaiHung-Vietnam
2010 F23R-Malaysia
2009 ChimSao-Vietnam
2007 KrishanaGodavari-India
Projects prior to 2007 upon request
Specifications
Features
Projects
33Product overview 2014/2015
UFUpending Frame
Stru
ctur
esO
il &
Gas
UF
Thelatestframesareequippedwithahydraulic
hingebackoption,thisadditionaldeviceallows
theUpendingFrametoreturnintoitshorizontal
positionwithoutadditionaltools,suchastugger
winchesand/orcranes.Thislatestdesign
furtherimprovestheefficiencyofoffshore
operations.
Developments
35Product overview 2014/2015
LTLeveling Tool
Stru
ctur
esO
il &
Gas
LT
The Leveling Equipment can be used for leveling of jackets and/or templates.
• Surfaceandsubsealevelingoperations
• Levelingcapacityupto3000t
• Failsafedesign
• CertifiedanddesignedaccordingLloyds
LiftingAppliances
• Availableforrental&purchase
• Subsealevelingtool
• Levelingcapacity1600t-3000t
• Pilerange72”-102”
• Guideconerequiresanintegratedrolled
verticalringonlytofacilitatelevelingtool
• Levelingtooloperatesindependentfrom
pilestickup
• OperatesincombinationwithaJacket
• Freeorientationduringinstallationoftool
• Abovewaterandsubseause
• Levelingcapacity200t/800t/1600t
• Adjustabletoallpilediameters
• Stroke1000mm/1800mm
• Emergencyreleaseviahot-stab(ROV)
• Stick-upheightvariable
• Recommendedtooperateincombination
withaJacketPileGripperduringsubsea
leveling
• Nospecialpreparationstojacket/template
structurearerequired:
-Connectswithpileguide/catcherplate
insubseause
-Connectswithjacketpadeyeinsurfaceuse
Specifications
Features 1600t – 3000t equipment
Features 200t – 1600t equipment
37Product overview 2014/2015
LTLeveling Tool
Stru
ctur
esO
il &
Gas
LT
TheLTisequippedwithIHC’sinnovativeFail
SafePrinciple:
• Mechanicalloadappliedonthetoolin
longitudinaldirectionresultsinatransversal
forceonthepilewhichcreatesthe
‘locking/failsafe’connection
2013 ThangLongDongDoProject-Vietnam
2012 FortiesAlpha-NorthSea
2012 JasmineII-NorthSea
2012 GreaterEkofisk-Norway
2011 DaiHung-Vietnam
2011 JasmineI-NorthSea
2009 ChimSao-Vietnam
2009 alhall&Harding-NorthSea
2007 Ledong-China
2007 Xijiang23-1-China
2006 PanyPY31-China
2006 Britsats-NorthSea
Projects prior to 2006 upon request
Fail Safe Principle Projects
39Product overview 2014/2015
PARCPile Anti Running Clamp
Stru
ctur
esO
il &
Gas
PARCSpecific designed Clamp to stop
pile running during pile driving.
• Pilerange30”-84”
• Topreventdamagetojacket,craneand
hammercausedbyrunningpiles
• Hydraulicallycontrolled
• Availableforpurchase
• PARCstopspilesfromrunning
• PARCoperatesincombinationwithastandard
powerpackandhighpressureaccumulatorset
• InitiallowclampingpressureofPARCduring
piledriving,tocreatepile/clampcontact
• Whenpilerunningoccursenergyfromthe
accumulatorpackageisreleaseinorderto
stopthepilerunwithinmilliseconds
• Automatedormanualsystem
• PARChastheabilitytoovercometransversal
weldsbetweenpilesections
2011 Pemex-Mexico
2009 Severalprojects-India
2007 Pemex-Mexico
Specifications
Features Projects
41Product overview 2014/2015
JPGJacket Pile Gripper
Stru
ctur
esO
il &
Gas
JPGPile grippers are used to create a
temporary connection between the skirt pile and jacket.
• Capacitiesarelimitless
• Pilediametersarelimitless
• Hydraulicallyoperated
• 3rdpartycertificationisoptional
• Availableforpurchase
• Securingjacketduringbadweather
conditionsandabandonment
• Retainingelevatedpositionafterleveling
• Provideshighjacketstabilityduring
groutingprocess
• Operatedfromsurfacewithsubsea
redundancycontrol
• Optionalcompletelysubseacontrolled
• Optionalmultiplehydrauliccircuits
• Extensivetrackrecord
Specifications
Features
43Product overview 2014/2015
JPGJacket Pile Gripper
Stru
ctur
esO
il &
Gas
JPG
• Re-usableJacketPileGripper;
-Specialjacketpilegripperdesigntobe
re-usedonprojectwithmultiplejackets
-Connectiontoskirtsleevebymechanicalor
hydraulicoperatedpinconnection
• Inside-outJacketPileGripper;
-Jacketpilegripperwhichispartofthepile
gripsinternallyinskirtsleeveorbucket
arrangement
2013 Laila-Malaysia
2013 EdvardGrieg-NorthSea
2013 Montrose-NorthSea
2013 MartinLinge-Norway
2013 Kepodang-Malaysia
2012 FortiesAlpha-NorthSea
2012 JasmineII-NorthSea
2011 JasmineI-NorthSea
2011 HornseaMetMast-NorthSea
2011 DaiHung-Vietnam
2010 EAPLKipperTuna-Australia
2010 GreaterEkofisk-Norway
2009 Valhall&Harding-NorthSea
2008 Baraka-Tunesia
2007 Heera-India
2007 BohaiPhaseII-China
2006 Ikalou-Congo
2006 Ikalousud-Congo
2006 Britsats-NorthSea
Projects prior to 2006 upon request
Specials Projects
45Product overview 2014/2015
HRSHydraulic Release Shackle
Stru
ctur
esO
il &
Gas
HRS
Hydraulic release shackles are used for lifting and positioning structures both subsea as well as at the surface.
• Capacity17,5t-2000t
• Remotecontrolledengagementand
disengagementofshackles
• Availableforrental&purchase
• Independentofshacklebrand
• Ultradeepwaterversionsavailable
• Hydraulicoperatedpin
• Standardsuitablefor500mwaterdepth
• Several,optional,back-upactivation
methodsavailable:
-HotStab
-Secondaryback-upcylinders
-Accumulators
-Mechanicalback-up
Newpatentedmechanicalpinlockdesign.
2013 NexenGoldenEagle-NorthSea
2013 EldfiskII-NorthSea
2013 EllDolphin-Australia
2013 WashitGas-UAE
2012 Britannia-NorthSea
2012 Togi-NorthSea
2012 HST&HSDProject-Vietnam
2012 JasmineII-NorthSea
2011 OIG-Norway
2011 Liwan-China
2011 DaiHung-Vietnam
2011 LondonArrayOWF-NorthSea
2011 HornseaMeteorologicalMast-NorthSea
2011 TotalGabonAnguille-Gabon
2010 Topaz-Asia
2010 CapeLambert-Australia
2009 OrmondeOWF-Belgium
2009 AlphaVentusOWF-Germany
2009 Montara-Australia
2008 Montara-Australia
Projects prior to 2008 upon request
Specifications
Features
New
Projects
47Product overview 2014/2015
PiPlPile Plug
Stru
ctur
esO
il &
Gas
PiPlPile plugs create an air and water
tight seal at one or both ends of a pile.
• Canbeusedincombinationwithall
standardfoundationpilesizes
• Hydraulicallycontrolledfromsurfaceor
byROV
• Availableforpurchase
• Suitableforupendingand/ortransportation
• Suitableforshallowwaterdepths
• Availableforstraightandangledpipeends
• Hydraulicallyoperated
SpecialILTwithafixedpileplugattached.
• PileplugintegratedwithILTwhichallows
foracombinedoperationofpileupending
andsealing
2012 SHWE-Myanmar
2009 ChimSao-Vietnam
Specifications
Features
Latest development
Projects
49Product overview 2014/2015
SkSSkidding System
Stru
ctur
esO
il &
Gas
SkSSkidding systems are used for accurate
positioning, load out of heavy objects or launch of jacket structures.
• Hydraulicpush-pullsystem
• Movementofloadsupto10.000t
• Availableforrental&purchase
• Doublehydraulicsystem:grippingand
push-pull
• Easytooperate
• Controllableandaccuratepositioning
• Nospecialskidbeampreparations
• Lowmaintenancecosts
• Pressurizegripperjacksonbeam
• Extendskidjacks(=pushobject)
• Releasegripperjacks
• Retractskidjacks
2012 SHWE-Myanmar
2011 Netmak-Turkeye
2010 FDS2-Saipem
2009 Mexilhão-Brazil
2008 WellEnhancer-Helix
2007 PerencoGroup23-Congo
Projects prior to 2007 upon request
Specifications
Features
Skidding principle
Projects
51Product overview 2014/2015
BCBear Cage
Stru
ctur
esO
il &
Gas
BC
Bear cages are used to line up piles prior to welding.
• Suitableforvariousdiameters
• Foruseatsurfaceonly
• Lineupoftwopilesections
• Canoperateonbatteredpiles
• Hydraulicclamping
• Capacitytoholdfullpilesectionweight
• Weldingplatformcanbeintegratedindesign
2012 Pemex-GulfofMexico
2012 Ceyhan-Caspian
2011 Pemex-GulfofMexico
2010 Block17-Angola
2009 Camarupin-Brazil
2008 India-PunjiLloyd
2007 Pemex-GulfofMexico
Projects prior to 2007 upon request
Specifications
Features
Projects
53Product overview 2014/2015
ILTDeep water Internal Lifting Tool
Dee
p W
ater
Oil
& G
asIL
T
Deep water ILT’s are used for lifting and positioning mooring piles, conductors and subsea structures in ultra deep waters.
• Standardpilerange16”-96”
• Liftingcapacitiesof200t-1200t
• Maximumoperatingdepthof2500m
• CertifiedanddesignedaccordingLloyds
LiftingAppliances
• Availableforrental&purchase
• ILTcontrolpanelisROVoperated
• Built-inaccumulatorpack
TheILTisequippedwithIHC’sinnovativeFail
SafePrinciple:
• Mechanicalloadappliedonthetoolin
longitudinaldirectionresultsinatransversal
forceonthepilewhichcreatesthe
‘locking/failsafe’connection
2013 BigFoot-GulfofMexico
2010 Block31-Angola
2010 Gumusut-Kakap-Malaysia
2008 KikehII-Malaysia
2007 KikehI-Malaysia
2003 KizombaA-Angola
Specifications
Features
Fail Safe Principle
Projects
55Product overview 2014/2015
PRMPin Release Mechanism
Dee
p W
ater
Oil
& G
asPR
MPin release mechanisms are operated in deep water for the installation of templates, structures and suction piles.
• Custommadedesign
• Liftingcapacitiesupto2000t
• Maximumoperatingdepthof3000m
• CertifiedanddesignedaccordingLloyds
LiftingAppliances
• Availableforpurchase
• Canbeintegratedinanystructureorlifting
beamarrangement
• Hydraulicoperatedpin
• Hydraulicenergythroughaccumulators
• Mechanicalback-up
• Manyadditional(back-up)optionsavailable
-HotStab
-Secondarycylinders
-Separatehydrauliccircuits
2013 Jack&St.MaloFPU-GulfofMexico
2013 LuciusFPU-GulfofMexico
2011 KizombaSatalites-Angola
2011 CastoroII
2010 Valhall-NorthSea
2009 Mexilhão-Brazil
2008 BC-10-Brazil
2006 IndepenceHub-GulfofMexico
2005 ThortonBankOWF-Belgium
2004 Thunderhorse-GulfofMexico
2004 MadDog-GulfofMexico
2004 AtlantisChains-GulfofMexico
Projects prior to 2004 upon request
Specifications
Features
Projects
57Product overview 2014/2015
CCChain Clamp
Dee
p W
ater
Oil
& G
asCC
Chain clamps are used for the positioning of deep water mooring chains.
• Projectrelatedliftingcapacities
• Unlimitedoperatingdepth
• CertifiedanddesignedaccordingLloyds
LiftingAppliances
• Availableforpurchase
• Positioningofdeepwatermooringchain
• Variouschainlinksizespossible
• Failsafedesign
• HydraulicreleasebyROV
2004 Holstein-GulfofMexico
2004 Thunderhorse-GulfofMexico
2004 AtlantisChains-GulfofMexico
2003 Gunnison-GulfofMexico
2003 Vastar-GulfofMexico
2002 HornMountain-GulfofMexico
Specifications
Features Projects
59Product overview 2014/2015
SPLFSuction Pile Lifting Frame
Dee
p W
ater
Oil
& G
asSP
LFSuction pile lifting frames are specifi-cally designed for upending and lifting of suction piles for deep water moorings.
• Pilediametersupto6700mm
• Operatingdepthupto3000m
• CertifiedanddesignedaccordingLloyds
LiftingAppliances
• Availableforpurchase
• Upendingandpositioningofsuctionpiles
• Deepwaterapplicationswithaccumulator
• ROVoperated
• Standardmodulardesignframeadaptsto
variouspilediameters
2013 Jack&St.MaloFPU-GulfofMexico
2013 LuciusFPU-GulfofMexico
2011 KizombaSatalites-Angola
2006 IndepenceHub-GulfofMexico
2004 Thunderhorse-GulfofMexico
2004 MadDog-GulfofMexico
2004 AtlantisChains-GulfofMexico
2003 Vastar-GulfofMexico
2003 Gunnison-GulfofMexico
Projects prior to 2003 upon request
Specifications
Features Projects
61Product overview 2014/2015
ASAccumulator Set
Dee
p W
ater
Oil
& G
asA
S
Hydraulic energy supply for deep water tool applications.
• Maxoperatingdepthof3000m
• Maxworkingpressure500bar
• Availableforpurchase
• Availableinvarioussizes
• FullyROVoperated
• ROVaccessfromthreesides(incl.pressure
readout)
• Severalback-upoperationspossible,
includingsubseahydraulicpump
2011 KizombaSatalites-Angola
2006 IndepenceHub-GulfofMexico
2004 Thunderhorse-GulfofMexico
2004 MadDog-GulfofMexico
2004 AtlantisChains-GulfofMexico
2003 Vastar-GulfofMexico
2003 Nikika-GulfofMexico
2003 Gunnison-GulfofMexico
2003 Valhall-Norway
2002 NaKika-GulfofMexico
2002 HornMountain-GulfofMexico
Specifications
Features Projects
63Product overview 2014/2015
HRSHydraulic Release Shackle
Dee
p W
ater
Oil
& G
as
HRS
Hydraulic release shackles are used for lifting piles, subsea structures, modules and templates.
• Capacity17,5t-2000t
• Maxoperatingdepth3000m
• Remotecontrolledengagementand
disengagementofshackles
• FullyROVoperated
• Independentofshacklebrand
• Availableforpurchase
• Several,optional,back-upactivation
methodsavailable:
-HotStab
-Secondaryback-upcylinders
-Accumulators
-Mechanicalback-up
Newpatentedmechanicalpinlockdesign.
2013 Jack&St.MaloFPU-GulfofMexico
2012 Togi-Norway
2012 Laggan&Tormore-UK
2009 OrmenLange-Norway
Specifications
Features Projects
New
65Product overview 2014/2015
SCF Subsea Connection Frame
Dee
p W
ater
Oil
& G
asSC
FSubsea connection frames can be used for the connection of mooring chains.
• Usedtoreconnectmooringchains
• Usedduringinstallationofnewmooring
chains
• Re-usableframeforseverallinksizes
• Availableforpurchase
• Integratedsystemredundancy
• Subseaconnectionoperation
• OperatedbyROVfromsubseacontrolpanel
• PinlockingbyROV
• Designedforre-use
2013 Banff-NorthSea
2011 Cascade&Chinook-GulfofMexico
2009 NeptuneDeepwater-BostonUSA
2009 Peregrino-Brazil
2008 FPSOBergeHelene-Mauritania
Specifications
Features Projects
67Product overview 2014/2015
PRTPipe Recovery Tool
Pipe
lay
Oil
& G
asPR
TA tool specifically designed for the recovery of pipes or pipelines.
• Capacityupto1000t
• Piperange8”-42”
• Maxwaterdepth3000m
• Subseade-wateringpossible
• CertifiedanddesignedaccordingLloyds
LiftingAppliances
• Availableforrental&purchase
• Longfrictionpadspreventoverstressingof
pipewall
• Removableliftingarmallowsforretrieval
viastinger
ThePRTequippedwithIHC’sinnovativeFail
SafePrinciple:
• Mechanicalloadappliedonthetoolin
longitudinaldirectionresultsinatransversal
forceonthepipewhichcreatesthe
‘locking/failsafe’connection
2013Gorgon-Australia
2012 Desfa-Greece
2012 Castorone
2011 Castorpipeline-Spain
2009 Peregrino-Brazil
2008 Gjøa-NorthSea
2008 SouthPars-Iran
2008 Halfdan-Denmark
2006 Tangguh-Indonesia
2006 OrmenLange-Norway
Specifications
Features
Fail Safe Principle
Projects
69Product overview 2014/2015
PATPipe Abandonment Tool
Pipe
lay
Oil
& G
asPA
TA tool designed to seal off a pipeline in case of abandonment.
• Moreefficientabandonmentprocess
comparedtoexistingtechniques
• Extendspipelayoperationtime
• CertifiedanddesignedaccordingLloyds
LiftingAppliances
• Availableforpurchase
• Doublesealelementsealsoffpipeline
• Longfrictionpadspreventoverstressingof
pipewall
• Integratedhydraulics
• Integratedcheckvalveforsubseadewatering
ThePATisequippedwithIHC’sinnovative
FailSafePrinciple:
-Mechanicalloadappliedonthetoolin
longitudinaldirectionresultsinatransversal
forceonthepipewhichcreatesthe
‘locking/failsafe’connection
2011 Goliat-Norway
2010 Marulk-Norway
2007 Morvin-Norway
2006 Asgard-Norway
2006 FramEast-Norway
2006 Alvheim-Norway
Specifications
Features Projects
Fail Safe Principle
71Product overview 2014/2015
A&R A&R Cable Connector
Pipe
lay
Oil
& G
asA
&R
• Capacityupto1000t
• Max.waterdepth3500m
• CertifiedanddesignedaccordingLloyds
LiftingAppliances
• Availableforpurchase
• Constructiondesignallowstofollow
stingerradius
• Primaryreleasehydraulicallybyacoustic
signalfromthesurface
• SecondaryreleasebyROVoperatedspindle
• Sensorsforopen/closeindication
• Releaseunder50tload
1. Hull
2. Latch
3.Mainhook
4. Releasehook(2x)
5. LoadcellsandA&Rcableconnection
2009 StandardequipmentAllseas Solitaire
2009 Independencetrail-GulfofMexico
3
4
52
1
Specifications
Features Projects
Components
A tool to lay down or recover pipelines from the seabed.
73Product overview 2014/2015
PRMPin Release Mechanism
Pipe
lay
Oil
& G
asPR
MPin release mechanisms can be used for the installation of pipelines or PLEM constructions.
• Custommadedesign
• Liftingcapacitiesupto2000t
• Maximumoperatingdepthof3000m
• CertifiedanddesignedaccordingLloyds
LiftingAppliances
• Availableforpurchase
• Subseasystem
• Powersupplyviaintegratedaccumulator(s)
• Several,optional,back-upactivation
methodsavailable:
-HotStab
-Secondaryback-upcylinders
-Mechanicalback-up
2013FDS2assets-Italy
Various-notbyname
Specifications
Features Projects
75Product overview 2014/2015
BCBear Cage
Pipe
lay
Oil
& G
asBC
Bear cages are used to line up pipes prior to welding.
• Foruseatsurfaceonly
• Suitableforavariousrangeofdiameters
• Finalweldbetweenlandfallandseapipeline
• Hydraulicclamping
• Hydrauliccontrolledweldgapadjust
• Clampandlineupoftwopipeends
2012 Baku-Azerbaijan
2010 Block17-Angola
2009 Camarupin-Brazil
2008 AlAqaba-Jordania
2007 Balgzand-TheNetherlands
Specifications
Features Projects
77Product overview 2014/2015
ILTInternal Lifting Tool
Dec
omm
issi
onin
gO
il &
Gas
ILT
The ILT can be used for lifting structures, structure sections and topside modules during decommissioning operations.
• HighlongitudinalcapacityInternalLiftingTool
• ILT’sareequippedwithaccumulatorsto
overcomeuseofhoses
• ILT’sareequippedwithIHC’sinnovative
FailSafePrinciple
• CertifiedanddesignedaccordingLloyds
LiftingAppliances
• Availableforrental&purchase
2013 Ekofisk2/4S-Norway
2012 Ekofisk-Norway
2012 Togi-Norway
2010 NorthWestHutton-UK
2009 FriggDP2-Norway
2005 FriggDP1-Norway
2005 BrentSparFlareTower-Norway
20”-36”300t36”-54”1000t54”-84”1750t 84”-120”2500t
Specifications Projects
79Product overview 2014/2015
ELTExternal Lifting Tool
Dec
omm
issi
onin
gO
il &
Gas
ELTELT’s can be used for lifting structures or
structure sections during decommissioning operations.
• Pilerange72”-112”
• Liftingcapacityupto1200t
• Max.operatingdepthof250m
• CertifiedanddesignedaccordingLloyds
LiftingAppliances
• Availableforpurchase
• ELT’sareequippedwithIHC’sinnovative
FailSafePrinciple
• SubseaoperationviaROVorumbilical
• ELT’scanbedesignedwithsideopening
• Integratedcentralizingsystemfortool
positioning
2010 NorthWestHutton-UK
Specifications
Features Projects
81Product overview 2014/2015
BuCBuoyancy Clamp
Dec
omm
issi
onin
gO
il &
Gas
BuCClamping equipment integrated in buoyancy
tanks can be used for the removal of offshore structures in floating condition.
• Fullycomputercontrolledoperation
• Availableforpurchase
2009 FriggDP2-Norway
Upperclamp
Lowerclamp
Upperpullinsystem(750t)
Lowerpullinsystem(750t)
Specifications
Components
Projects
83Product overview 2014/2015
HRSHydraulic Release Shackle
Dec
omm
issi
onin
gO
il &
Gas
HRS
Remote controlled engagement and disengagement of shackles.
• Capacity17,5t-2000t
• Liftingandhandlingsupportduringthe
dismantleofstructures
• Remotecontrolledengagementand
disengagementofshackles
• Independentofshacklebrand
• Availableforrental&purchase
• Hydraulicoperatedpin
• Standardsuitablefor500mwaterdepth
• Adjustableforanyshacklebrand
• Manyadditional(back-up)optionsavailable:
-HotStab
-Mechanicalback-up
Newpatentedmechanicalpinlockdesign.
2009 FriggDP2-Norway
Specifications
Features Projects
New
85Product overview 2014/2015
UTUpending Tool
Mon
opile
sU
T
Upending Tool for upending large diameter piles (monopiles).
• Liftdiametersupto6500mm
• Liftingcapacitiesof290t,700tand1000t
• CertifiedanddesignedaccordingLloyds
LiftingAppliances
• Availableforrental
• Adjustabletoanydiameter(withinrange)
• Hydraulicallyoperated
• UT’sareequippedwithIHC’sinnovative
FailSafePrinciple
• Nospecialpreparationsofpile
• Optionaljiggerwinch
• CompatiblewithIHCMonopilePlugs(pag.91)
• Optionaltoolmonitoringsystems
Specifications
Jigger Winch
Excl. Jigger Winch
Operating Steps
Features
Win
d
87Product overview 2014/2015
UTUpending Tool
Mon
opile
sW
ind
UT
2014 WestermostRough-NorthSeaUK
2013 Northwind-NorthSeaBelgium
2013 GwyntyMor-IrishSeaUK
2013 HelWin&BorWinOWF-Germany
2013 WestofDuddonSands-IrishSeaUK
2012 GwyntyMor-IrishSeaUK
2012 LondonArray-NorthSeaUK
2012 Meerwind-NorthSeaGermanBight
2011 Teesside-NorthSeaUK
2011 Lincs-NorthSeaUK
2011 SheringhamShoal-NorthSeaUK
2011 LondonArray-NorthSeaUK
2010 BalticI-BalticSeaGermany
2010 Belwind-Belgium
2009 Thanet-NorthSeaUK
2009 BardI-Germany
2009 Walney1-IrishSeaUK
2008 RhylFlats-IrishSeaUk
2008HornsRevII-NorthSeaDenmark
Projects prior to 2008 upon request
Projects
New design Upending Tool 1000t
89Product overview 2014/2015
FPUTFlange Pile Upending Tool
Mon
opile
sW
ind
FPU
TFlange pile upending tools are used for the upending and lifting of large diameter piles with an integrated flange.
• Usingtheflangegeometryasasupport
duringlifting
• Liftingcapacitiesupto750t
• CertifiedanddesignedaccordingLloyds
LiftingAppliances
• Availableforrental&purchase
• Remotelyoperatedusingintegratedpower
pack
• Allcontactareascoveredwithprotective
material
• Optionaltoolmonitoringsystems
• Nospecialpreparationsofpile
• Integratedredundancy
2013 Amrumbank-NorthSeaGermany
2013 HumberGateway-NorthSeaUK
2003 ScrobySands-NorthSeaUK
Specifications
Features Projects
91Product overview 2014/2015
MoPIMonopile Plug
Mon
opile
sW
ind
MoP
l Monopile plugs create an air and water tight seal at one or both ends of a pile.
• Formonopilediametersupto8000mm
• CertifiedanddesignedaccordingLloyds
LiftingAppliances
• Availableforpurchase
• Patenteddesign
• Towingdirectlyonplug
• Nospecialpreparationstomonopiles
required
• Canbeusedincombinationwith
UpendingTool(pag.85)
• Sealingbysolidrubber
• Hydraulicallyoperated
• Designincludesredundancy
2010 Belwind-NorthSeaBelgium
2009 Walney1-IrishSeaUK
2008 RhylFlats-IrishSeaUk
2008 GunfleetSands-NorthSeaUK
Specifications
Features Projects
93Product overview 2014/2015
ILTInternal Lifting Tool
Win
dJa
cket
s &
Tri
pods
ILT
ILT’s are used for upending/lifting of piles, tripods, jackets and modules.
• Standardpilerange16”-96”
• Standardliftingcapacitiesof200t–1200t
• Specialliftingcapacitiesupto2000t
• Standardoperatingwaterdepthis500m
• CertifiedanddesignedaccordingLloyds
LiftingAppliances
• Availableforrental&purchase
ILT’sareequippedwithIHC’sinnovative
FailSafePrinciple:
-Mechanicalloadappliedonthetoolin
longitudinaldirectionresultsinatransversal
forceonthepipewhichcreatesthe
‘locking/failsafe’connection
OWF2013 WestofDuddonSands-IrishSea
2012 BorkumWest2-Germany
2011 HornseaMeteorologicalMast-NorthSea
2010Walney2-IrishSea
2007 Lynn&InnerDowsing-NorthSea
Oil & Gas2012 EMEPMITE-A,TA-Q,TE-B-Malaysia
2012 FSOErawan-2mooringinstallation-
Thailand
2012 Bubut&Danau-Brunei
2012 EPRDEkofiskcessation-NorthSea
2012 PertaminaHuluEnergy-Indonesia
2011 PierceManifoldInstallation-NorthSea
2011 SHWEproject-Myanmar
2011 D1project-India
2011 EssoKipperTuna-Australia
2011 MHNRe-development-India
2011 Montara-Australia
2011 BienDong1-Vietnam
Projects prior to 2011 upon request
Specifications
Features
Projects
95Product overview 2014/2015
UFUpending Frame
Win
dJa
cket
s &
Tri
pods
UF
The upending frame enables installation contractors to increase their sphere of activity and efficiency by upending long piles with a relatively short crane boom.
• Pilerange54”-108”
• RequiresILTatthepiletop
• 600tholdingcapacity
• Otherdimensionsandcapacitiesupon
request
• Availableforrental&purchase
• Hydraulicallyoperated
• Hydraulichingebackoption
• Rotationofframe0°-100°
• Lateralfreedomofmovement±10°
• Framecanbeequippedwithinclinosensor
foraccuratedigitalangleinformation
• Newdesignwithhydraulichingeback
OWF2013 SylWin-Germany
2012 NordSeeOst-Germany
2012 GlobalTech1-Germany
Oil & Gas2013 KPOC-Malaysia
2012 HaiThach/BienDong-Vietnam
2012 Cendorphase2-Malaysia
2011 Yetagun-C-Myanmar
2011 B-193AP&B-193AQ-India
2011 BienDongMT1-Vietnam
2011 DaiHung-Vietnam
2010 F23R-Malaysia
2009 ChimSao-Vietnam
2007 KrishanaGodavari-India
Projects prior to 2007 upon request
Specifications
Features
Projects
97Product overview 2014/2015
LTLeveling Tool
Win
dJa
cket
s &
Tri
pods
LT
Leveling tools can be used for leveling of jackets and tripods.
• SurfaceandSubsealevelingoperations
• Availablecapacities200t,400t,800t,3000t
• Pilerange54”-108”
• CertifiedanddesignedaccordingLloyds
LiftingAppliances
• Availableforrental&purchase
• LT’sareequippedwithIHC’sinnovative
FailSafePrinciple
• Connectstopilecatcherplate
• EmergencyreleaseviaROVhotstab
OWF2013WestofDuddonSands-IrishSea
2012 NordSeeOst-Germany
2012 GlobalTech1-Germany
Oil & Gas2012 FortiesAlpha-NorthSea
2012 JasmineII-NorthSea
2012 GreaterEkofisk-Norway
2011 DaiHung-Vietnam
2011 JasmineI-NorthSea
2009 ChimSao-Vietnam
2009 Valhall&Harding-NorthSea
2007 Ledong-China
2007 Xijiang23-1-China
2006 PanyPY31-China
2006 Britsats-NorthSea
Projects prior to 2006 upon request
Specifications
Features
Projects
99Product overview 2014/2015
JPGPile Gripper
Win
dJa
cket
s &
Tri
pods
JPGPile grippers are used to create a
temporary connection between the skirt pile and jacket.
• Capacitiesarelimitless
• Pilediameterislimitless
• CertificationbyLloydsoptional
• Consumable(singleuse)orre-usable
• Forpre-pilingorpost-piling
• Availableforpurchase
• Securingjacketduringbadweather
conditionsandabandonment
• Retainingelevatedpositionafterleveling
• Provideshighjacketstabilityduringgrouting
process
• Multiplehydrauliccircuitspossible
• Extensivetrackrecord
• Optionalcompletelysubseacontrolled
• ROVoperable(clamp/release)
OWF2013WestofDuddonSands-IrishSea
2012 NordSeeOst-Germany
2011 HornseaMeteorologicalMast-NorthSea
Oil & Gas2013 Laila-Malaysia
2013 EdvardGrieg-NorthSea
2013Montrose-NorthSea
2013MartinLinge-Norway
2013 Kepodang-Malaysia
2012 FortiesAlphaNorthSea
2012 JasmineII-NorthSea
2011 JasmineI-NorthSea
2011 DaiHung-Vietnam
2010 EAPLKipperTuna-Australia
2010 GreaterEkofisk-Norway
Projects prior to 2010 upon request
Specifications
Features
Projects
101Product overview 2014/2015
HRSHydraulic Release Shackle
Win
dJa
cket
s &
Tri
pods
HRS
Hydraulic release shackles are used for lifting and positioning of structures or foundation piles.
• Capacity17,5t-2000t
• Independentofshacklebrand
• Remotecontrolledengagementand
disengagementofshackles
• Availableforrental&purchase
• Hydraulicoperatedpin
• Standardsuitablefor500mwaterdepth
• Several,optional,back-upactivationmethods
available
• Mechanicalback-up
Newpatentedmechanicalpinlockdesign.
OWF2013 Northwind-Belgium
2013 Haliade-Belgium
2011 LondonArray-UK
2011 NorthSeaMeteorologicalMast-North
Sea
2009 Ormonde-Belgium
2009 AlphaVentus-Germany
Oil & Gas2012 Britannia-NorthSea
2012 Togi-NorthSea
2012 HST&HSDProject-Vietnam
2012 JasmineII-NorthSea
2011 OIGNorway
2011 Liwan-China
2011 DaiHung-Vietnam
2011 TotalGabonAnguille-Gabon
2010 Topaz-Asia
2010 CapeLambert-Australia
2009 Montara-Australia
2008 Montara-Australia
Projects prior to 2008 upon request
Specifications
Features
New
Projects
103Product overview 2014/2015
PiPlPile Plug
Win
dJa
cket
s &
Tri
pods
PiPlPile plugs create an air and water
tight seal at one or both ends of a pile.
• Canbeusedincombinationwithall
standardfoundationpilesizes
• Hydraulicallycontrolledfromsurfaceor
byROV
• Availableforpurchase
• Suitableforupendingand/ortransportation
• Suitableforshallowwaterdepths
• Availableforstraightandangledpipeends
• Hydraulicallyoperated
SpecialILTwithafixedpileplugattached.
• PileplugintegratedwithILTwhichallows
foracombinedoperationofpileupending
andsealing
OWF2010Belwind-Belgium
2009Walney1-UK
2008RhylFlats-UK
2008GunfleetSands-UK
Oil & Gas2012SHWE-Myanmar
2009ChimSao-Vietnam
Specifications
Features
Latest development
Projects
105Product overview 2014/2015
PRMPin Release Mechanism
Win
dG
ravi
ty B
ased
PRMPin release mechanisms are used in
custom-made lifting applications.
• Standardsuitablefor500mwaterdepth
• Custommadedesign
• Liftingcapacitiesupto2000t
• CertifiedanddesignedaccordingLloyds
LiftingAppliances
• Availableforpurchase
Specificallyusedfortheconnectionbetween
thecraneandthegravitybasedfoundation.
OWF2011 HornseaMeteorologicalMast-UK
2008 ThortonBank1-Belgium
Specifications
Features Projects
107Product overview 2014/2015
SFStacking Frame
Win
dD
eck
Equi
pmen
tSF
• Storageandhandlingoffoundationpiles
• Efficientuseofdeckspace
• Availableforpurchase
• Fullyhydraulicallyoperated
• Optiontouseincombinationwithupending
supportsuchas:
-saddle&hook
-pileguideandpositioningframe
OWF2009 BARDI-Germany
Stacking frames are used for stacking and handling multiple foundation piles on deck of an installation vessel.
Specifications
Features Projects
109Product overview 2014/2015
PGPFPile Guide and Positioning Frame
Win
dD
eck
Equi
pmen
tPG
PFThe frame can be used for guiding of foundation piles during upending and positioning of these piles during pile-driving.
• Increaseofcraneefficiency,noverticalpile
movementafterupending
• Significantreductionofoffshoreinstallation
time
• Accuratepositioningofmonopile
• Adjustingverticalityofmonopileafter
upending
• Availableforpurchase
• Innovativedesign
• Handlingofpilediametersupto6000mm
• Hookholdingcapacity700t
• MaximumtiltingmotionofPGPF±6˚
• Upendinganglerange0°-93°
• Optiontouseincombinationwithother
IHCdeckequipment
• Upendingtoolrequiredattopofmonopile
forupending
OWF2012 Meerwind-Germany
Specifications
Features
Projects
111Product overview 2014/2015
S&HSaddle & Hook
Win
dD
eck
Equi
pmen
tS&
HThe saddle and hook system creates a controlled fixed hinge point during the upending of long foundation piles.
• Providesanextendedworkingwindowfor
offshorecranes
• Significantreductionofoffshoreinstallation
time
• Availableforpurchase
• Hooktakesaxialloadofpile
• Saddletoguidepilesduringupending
• Hookretrievableviaawinch
• Liftingcapacitiesupto1000t
OWF2009BARDI-Germany
Specifications
Features Projects
113Product overview 2014/2015
FSLTFlange Structure Lifting Tool
Equipment designed to lift structures equipped with a connection flange.
Vari
ous
Conc
epts
FSLT
• Liftingoftransistionpieces,jacketsand
tripods
• Nospecialarrangementonflangerequired
• Increaseinefficiencyduringoffshore
operations
• Currentdesignfor1000tandpilediameter
6000mm
• CertifiedanddesignedaccordingLloyds
LiftingAppliances
• Availableforpurchase
• Remotelyoperatedusingintegrated
powerpack
• Integratedopticalwarningsystems
• Zeroforcesonflangeduringlifting
• Integratedredundancy
• DifferentliftingpointsforCOGadjustment
• Remotelyoperated
• Integratedhydraulicpowerpack
• Minimumofbendingstressesinpile
Specifications Features
115Product overview 2014/2015
PCPipe Cutter
Vari
ous
Conc
epts
PC
Equipment designed to cut jacket and structures.
• Hydraulicallyoperated
• Innovativemanipulatorarmallowsfor
subsearepositioning
• Currentdesignsforpipesize12”-36”
and24”-48”
• Pipecuttingforces1000t-1300t
• Designedformaximumwaterdepthof150m
• Costandtimeeffectivedesigncomparedto
existingalternatives
Specifications
117Product overview 2014/2015
UHUpending Hinge
Vari
ous
Conc
epts
UH
Equipment designed to support the pile tip of monopiles during upending on deck.
• Piletipismechanicallockedduringupending
• Duringentireupendingsequence±6˚
transversalfreedom
• Hydraulichingeback
Specifications
119Product overview 2014/2015
HGHammer Gripper
Vari
ous
Conc
epts
HG
Optional hydraulic hammer equipment.
• Gripperframedesignedforliftingpiles
withahydraulichammer
• Reducethenumberofequipmentchanges
duringanoffshoreoperation
• Timeefficientinstallation
• Liftingtoolforhydraulichammer
• Verticalpileliftandhandlingonly
GrippingTheupendingframetakesthefulllongitudinal
forcebygrippingthepilepriortolifting.
LiftingThepilecanbeliftedintopositionbya
specialgrippingframeconnectedtoahydraulic
hammeroranInternalLiftingTool.
Specifications
121Product overview 2014/2015
PP5.5Hydraulic Power Pack 5,5kW
Pow
er P
ack
Supp
orti
ng E
quip
men
tPP
5.5
Power Pack ILTStandard power pack of 5,5Kw - 350 bar max
Power Pack Leveling ToolStandard power pack
5,5kW - 350 bar max (200t, 400t tools)
Power Pack PARCStandard power pack of 5,5kW - 350 bar max
Power Pack Jacket Pile GripperStandard power pack of 5,5Kw - 350 bar max
Power Pack Hydraulic Release ShackleStandard power pack of 5,5Kw - 350 bar max
Power Pack Pile PlugStandard power pack of 5,5Kw - 350 bar max
Power Pack Bear CageStandard power pack of 5,5Kw - 350 bar max
Power Pack Pin Release MechanismStandard power pack of 5.5Kw - 350 bar max,
water glycol fluid
Power Pack Chain ClampStandard power pack of 5.5Kw - 350 bar max,
water glycol fluid
Power Pack Suction Pile Lifting FrameStandard power pack of 5.5Kw - 350 bar max,
water glycol fluid
Power Pack Accumulator SetStandard power pack of 5.5Kw - 350 bar max,
water glycol fluid
Power Pack Hydraulic Release ShackleStandard power pack of 5.5Kw - 350 bar max,
water glycol fluid
Power Pack Connection FrameStandard power pack of 5.5Kw - 350 bar max,
water glycol fluid
Power Pack PRTStandard power pack of 5.5Kw - 350 bar max,
water glycol fluid
Power Pack PATStandard power pack of 5.5Kw - 350 bar max,
water glycol fluid
Power Pack Pin ReleaseStandard power pack of 5.5Kw - 350 bar max,
water glycol fluid
• Supply of hydraulic energy to operate
hydraulic equipment
• In combination with hose reel standard
supporting equipment of IHC
• Multi voltage, multi cycle E-motor
• 9 ltr/min at 1750 rpm
• Max. operating pressure 350 bar
• Hydraulic fluids; mineral or environmental
friendly oil, water glycol
• ILT - Internal Lifting Tool
• LT 200t - Leveling Tool 200t
• PARC - Pile Anti Running Clamp
• JPG - Jacket Pile Gripper
• HRS - Hydraulic Release Shackle
• PiPl - Pile Plug
• UF - Upending Frame
• BC - Bear Cage
• SPLF - Suction Pile Lifting Frame
• PRM - Pin Release Mechanism
• SCF - Subsea Connection Frame
• PRT - Pipe Recovery Tool
• PAT - Pipe Abandonment Tool
• UT - Upending Tool
Applicable for following IHC equipment
Features
Specifications
123Product overview 2014/2015
PP22Hydraulic Power Pack 22kW
Pow
er P
ack
Supp
orti
ng E
quip
men
tPP
22
Power Pack ELTStandard power pack of 22kW - 350 bar max
Power Pack Upending FrameStandard power pack of 22kW - 350 bar max
Power Pack Leveling ToolStandard power pack, 22kW - 350 bar max
(800t, 3000t tools)
Power Pack Deep Water ILTStandard power pack of 22Kw - 350 bar max,
water glycol fluid
Power Pack Upending ToolStandard power pack of 22kW - 350 bar max
• Supply of hydraulic energy to operate
hydraulic equipment
• In combination with hose reel standard
supporting equipment of IHC
• Multi voltage, multi cycle E-motor
• 24 l/min at 1750 rpm
• Max. operating pressure 350 bar
• Hydraulic fluids; mineral or environmental
friendly oil, water glycol
• ELT - External Lifting Tool
• LT 800t - Leveling Tool 800t
• LT 3000t - Leveling Tool 3000t¹
• UT - Upending Tool
• UF - Upending Frame
¹ 2x 28.5 l/min at 1750 rpm – 400 bar
Applicable for following IHC equipment
Features
Specifications
125Product overview 2014/2015
PP157Diesel Hydraulic Power Pack 157 kW
Pow
er P
ack
Supp
orti
ng E
quip
men
tPP
157
• Supply of hydraulic energy to operate
hydraulic equipment
• Diesel driven Volvo Penta motor
• 220 l/min at 2100 rpm
• Max operating pressure 380 bar
• Hydraulic fluids; mineral or environmental
friendly oil
• SkS - Skidding System
Applicable for following IHC equipment
Features
Specifications
127Product overview 2014/2015
HRHydraulic Hose Reel 2x160m / 2x 320m / 4x 160m
Hos
ehee
lSu
ppor
ting
Equ
ipm
ent
HR
Hose Reel ILTHose reel with 2 pc 1/2”high pressure hose,
min 2x 160m
Hose Reel Leveling Tool (200t, 800t)Hose reel with 4 pc 1/2”high pressure hose,
min 2x 160m
Hose Reel PARCHose reel with 2 pc 1/2”high pressure hose,
min 2x 160m
Hose Reel Jacket Pile GripperHose reel with 2 pc 1/2”high pressure hose,
min 2x 160m
Hose Reel Pile PlugHose reel with 2 pc 1/2”high pressure hose,
min 2x 160m
Hose Reel Bear CageHose reel with 2 pc 1/2”high pressure hose,
min 2x 160m
Hose Reel Deep Water ILTHose reel with 2 pc ½” high pressure hoses 40m
Hose Reel Chain ClampHose reel with 2 pc ½” high pressure hoses 40m
Hose Reel Suction Pile Lifting FrameHose reel with 2 pc ½” high pressure hoses 40m
Hose Reel Accumulator SetHose reel with 2 pc ½” high pressure hoses 40m
Hose Reel Hydraulic Release ShackleHose reel with 2 pc 1/2”high pressure hose,
min 2x 160m
Hose Reel Connection FrameHose reel with 2 pc 1/2”high pressure hose,
min 2x 160m
Hose Reel PRTHose reel with 2 pc ½” high pressure hoses 2x
400m (depending on water depth)
Hose Reel PATHose reel with 2 pc ½” high pressure hoses 2x
400m (depending on water depth)
Hose Reel Pin Release MechanismHose reel with 2 pc 1/2”high pressure hose,
min 2x 160m
• Connection between power pack and
hydraulic equipment
• In combination with hose reel standard
supporting equipment of IHC
• Hose internal diameter ½”
• Hose length 2x 160m, 2x 320m or 4x 160m
• Average reel speed 15 m/min
• Max. pull force 580kg
• ILT - Internal Lifting Tool
• ELT - External Lifting Tool
• LT 200t - Leveling Tool 200t¹
• LT 800t - Leveling Tool 800t¹
• JPG - Jacket Pile Gripper
• HRS - Hydraulic Release Shackle
• PiPl - Pile Plug
• BC - Bear Cage
• PRT - Pipe Recovery Tool
• PAT - Pipe Abandonment Tool
• UT - Upending Tool
• PARC –-Pile Anti Running Clamp
¹ 4 hoses required
Applicable for following IHC equipment
Features
Specifications
129Product overview 2014/2015
HRHydraulic Hose Reel 6x200m
Hos
ehee
lSu
ppor
ting
Equ
ipm
ent
HR
• Connection between power pack and
hydraulic equipment
• In combination with hose reel standard
supporting equipment of IHC
• Hose internal diameter ¾” & ½”
• Hose length 6x 200m
• Average reel speed 25 m/min
• Max pull force 2670kg
• LT 3000t - Leveling Tool 3000t
• ELT - External Lifting Tool
Hose Reel ELTHose reel with min 6 pc ½” high pressure hose
lines 250m
Hose Leveling Tool (3000t)Hose reel with min 6 pc ½” high pressure hose
lines 250m
Applicable for following IHC equipment
Features
Specifications
131Product overview 2014/2015
HSHot Stab
Hot
Sta
bSu
ppor
ting
Equ
ipm
ent
HS
• Connection between power pack and
hydraulic equipment subsea
• Can be used in combination with hose reel
for shallow water
• ILT uses an IHC design hot stab
• Deep water applications use an
Oceaneering type hot stab
• Hydraulic fluids; mineral or environmental
friendly oil, water glycol
• LT 200t - Leveling Tool 200t
• LT 800t - Leveling Tool 800t
• LT 3000t - Leveling Tool 3000t
• JPG - Jacket Pile Gripper
• HRS - Hydraulic Release Shackle
• SPLF - Suction Pile Lifting Frame
• PRM - Pin Release Mechanism
• SCF - Subsea Connection Frame
• PRT - Pipe Recovery Tool
• PAT - Pipe Abandonment Tool
ILT hotstab Oceaneering hotstab
Hot Stab ILTMale hot stab connector (IHC type)
Hot Stab ELTMale hot stab connector dual line
(Oceaneering)
Hot Stab Leveling ToolMale hot stab connector dual line
(Oceaneering)
Hot Stab Hydraulic Release ShackleMale hot stab connector dual line
(Oceaneering)
Hot Stab Pin Release MechanismMale hot stab connector dual line
(Oceaneering)
Hot Stab ShacklesMale hot stab connector dual line
(Oceaneering)
Hot Stab Jacket Pile GripperMale hot stab connector dual line
(Oceaneering)
Hot Stab Deep Water ILTMale hot stab connector dual line
(Oceaneering)
Hot Stab Chain ClampMale hot stab connector dual line
(Oceaneering)
Hot Stab Suction Pile Lifting FrameMale hot stab connector dual line
(Oceaneering)
Hot Stab Accumulator SetMale hot stab connector dual line
(Oceaneering)
Hot Stab Connection FrameMale hot stab connector dual line
(Oceaneering)
Hot Stab PRTMale hot stab connector dual line
(Oceaneering)
Hot Stab PATMale hot stab connector dual line
(Oceaneering)
Applicable for following IHC equipment
Features
Specifications
Colofon
text/editorial: IHC Handling Systems
photography: IHC Handling Systems & Clients
design: toelgroep, concept + creatie