environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/EIA/21032018...Document No....
Transcript of environmentclearance.nic.inenvironmentclearance.nic.in/writereaddata/EIA/21032018...Document No....
Document No. EIA/CI&F/2017/1/R01
March-2018
Environmental Impact Assessment
For
MANUFACTURING OF TECHNICAL GRADE
PESTICIDES 500 TPA
At
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA
REENGUS DISTRICT SIKAR
(RAJASTHAN)
“CENTRAL INSECTICIDES & FERTILIZERS”
Prepared By
EQMS India Pvt. Ltd. 304 & 305, 3rd Floor, Plot No. 16, Rishabh Towers,
Community Centre, Karkardooma, Delhi – 110 092
Telephone: + 91 1130003200
E-mail: [email protected] Web site: www.eqmsindia.com
2018
MANUFACTURING OF TECHNICAL GRADE PESTICIDES, 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page i
TABLE OF CONTENT
Chapter 1 : INTRODUCTION ............................................................................................... 1
1.1 IMPORTANCE AND NEED OF AN EIA ..................................................................... 1
1.1.1 Need for the Project and its Importance to the Country and Region .......................... 1
1.1.2 Demand Supply Gap ................................................................................................. 2
1.1.3 Imports vs. Indigenous Production ............................................................................. 2
1.2 PROJECT & PROJECT PROPONENT ..................................................................... 2
1.3 PROJECT SITE ......................................................................................................... 3
1.4 REGULATORY FRAMEWORK ................................................................................. 5
1.5 METHDOLOGY ......................................................................................................... 6
1.6 SCOPE & OBJECTIVES OF THE EIA STUDY .......................................................... 6
1.7 TERMS OF REFERENCE ......................................................................................... 7
1.8 STRUCTURE OF REPORT ....................................................................................... 7
Chapter 2 : PROJECT DESCRIPTION ................................................................................. 9
2.1 GENERAL ................................................................................................................. 9
2.2 LOCATION & SITE OTHER FEATURES ................................................................... 9
2.2.1 Connectivity ............................................................................................................... 9
2.2.2 Social Infrastructure Available ................................................................................... 9
2.2.3 Alternate Sites ......................................................................................................... 12
2.3 PROJECT PROPOSED PRODUCTS ...................................................................... 13
2.4 PROCESS DETAILS ............................................................................................... 13
2.4.1 Thiram ..................................................................................................................... 14
2.4.2 Ziram ....................................................................................................................... 15
2.4.3 Equipment List ......................................................................................................... 16
2.5 RAW MATERIALS ................................................................................................... 17
2.5.1 Bulk Storages .......................................................................................................... 17
2.6 UTILITIES ............................................................................................................... 18
2.6.1 Land ........................................................................................................................ 18
2.6.2 Water Requirement ................................................................................................. 18
2.6.3 Power Requirement ................................................................................................. 19
2.6.4 Fuel Requirement .................................................................................................... 19
2.6.5 Employment Generation (Direct and Indirect) due to the project ............................. 19
2.7 ENVIRONMENTAL ASPECTS ................................................................................ 19
MANUFACTURING OF TECHNICAL GRADE PESTICIDES, 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page ii
2.7.1 Waste Water Generation ......................................................................................... 19
2.7.2 Emissions ................................................................................................................ 22
2.7.3 Hazardous Waste and Other Solid Waste ............................................................... 23
2.8 PROJECT COST & ENVIRONMENTAL RELATED BUDGET ................................. 24
2.9 CORPORATE SOCIAL RESPONSIBILITY .............................................................. 24
2.10 PROJECT COMPLETION ....................................................................................... 25
3.1 PROJECT COST ..................................................................................................... 25
3.2 TYPE OF INDUSTRIES NEAR THE PROJECT SITE ............................................. 25
Chapter 3 : DESCRIPTION OF ENVIRONMENT................................................................ 26
3.1 BACKGROUND AND SALIENT ENVIRONMENTAL FEATURES OF THE STUDY
AREA 26
3.1.1 Environmental Setting and Salient Environmental Features of the Project Area ...... 26
3.1.2 Site Connectivity ...................................................................................................... 30
3.1.2.1 Habitation near project site ...................................................................................... 30
3.1.2.2 Archaeological protected areas ............................................................................... 31
3.1.3 Existing Sources of Pollution within 10 km area ....................................................... 31
3.2 PHYSICAL ENVIRONMENT ................................................................................... 33
3.2.1 Drainage Pattern ..................................................................................................... 33
3.2.2 Topography ............................................................................................................. 33
3.3 LAND USE PATTERN ............................................................................................. 37
3.4 GEOLOGY .............................................................................................................. 39
3.4.1 Seismicity and Associated Hazards ......................................................................... 40
3.5 SOIL ........................................................................................................................ 40
3.5.1 Regional Soil Types ................................................................................................. 41
3.5.2 Soil Classification of District ..................................................................................... 41
3.5.3 Cropping Pattern ..................................................................................................... 41
3.6 METEOROLOGICAL DATA (30 YEARS AVG.) ....................................................... 42
3.6.1 Wind Speed and Direction ....................................................................................... 43
3.6.2 Relative Humidity .................................................................................................... 43
3.6.3 Temperature ............................................................................................................ 43
3.6.4 Rainfall .................................................................................................................... 43
3.6.5 Calm Periods ........................................................................................................... 43
3.6.6 Site specific Met Data: ............................................................................................. 43
MANUFACTURING OF TECHNICAL GRADE PESTICIDES, 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page iii
3.6.7 Inversion Occurrence: ............................................................................................. 44
3.6.8 Barometric Pressures .............................................................................................. 46
3.6.9 Primary Data Collection: Monitoring Plan and Quality Assurance Procedures ......... 46
3.7 AIR ENVIRONMENT ............................................................................................... 49
3.7.1 Selection of Monitoring Stations .............................................................................. 49
3.7.2 Analysis of Ambient Air Quality: ............................................................................... 49
3.7.3 Observation on Ambient Air Quality ......................................................................... 51
3.8 AMBIENT NOISE QUALITY .................................................................................... 51
3.8.1 Noise Levels in the Study Area ................................................................................ 51
3.9 WATER ENVIRONMENT ........................................................................................ 52
3.9.1 Ground Water .......................................................................................................... 52
3.9.2 Usage Purpose of Ground Water ............................................................................. 52
3.9.3 Depth to Ground Water Table .................................................................................. 53
3.9.4 Ground Water Quality .............................................................................................. 53
3.9.5 Surface Water Quality ............................................................................................. 56
3.9.6 Soil Sampling and Analysis ..................................................................................... 57
3.9.7 Soil Characteristics & Interpretation of Analytical Results & Conclusions ................ 58
3.9.8 Chemical Characteristics of Soil .............................................................................. 58
3.9.9 Demography ............................................................................................................ 70
Chapter 4 : Impacts Assessment and Prediction ............................................................ 87
4.1. GENERAL ............................................................................................................... 87
4.2. CONSTRUCTION PHASE ....................................................................................... 88
4.2.1. Air Environment ........................................................................................ 90
4.2.2. Predicted GLC due to CIF Greenfield Project ............................................ 91
4.2.3. Measures for fugitive emission .................................................................. 96
4.2.4. Odour control for solid handling ................................................................ 96
4.2.5. Odour control for Liquid ............................................................................. 96
4.3. NOISE ENVIRONMENT .......................................................................................... 97
4.3.1. Impacts due to Transportation ................................................................... 97
4.3.2. Impact on Community ............................................................................... 97
4.4. WATER ENVIRONMENT ........................................................................................ 98
4.4.1. Water Demand .......................................................................................... 98
4.5. LAND ENVIRONMENT ........................................................................................... 99
MANUFACTURING OF TECHNICAL GRADE PESTICIDES, 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page iv
4.5.1. Land Diversion .......................................................................................... 99
4.5.2. Land Deterioration .................................................................................... 99
4.6. BIOLOGICAL ENVIRONMENT................................................................................ 99
4.6.1. Flora ....................................................................................................... 100
4.6.2. Fauna ..................................................................................................... 100
4.6.3. CREP Guidelines .................................................................................... 100
4.7. SOCIO – ECONOMIC ENVIRONMENT ................................................................ 101
4.8. INFRASTRUCTURE .............................................................................................. 101
Chapter 5 : Environment Management Plan & Environmental Monitoring program... 103
5.1 INTRODUCTION ................................................................................................... 103
5.2 ENVIRONMENT MANAGEMENT PLAN ............................................................... 103
5.2.1 Air Environment ...................................................................................... 104
5.2.2 Water Environment ................................................................................. 105
5.2.2.1 Rain Water Harvesting ............................................................................ 106
5.2.3 Land Environment ................................................................................... 106
5.2.4 Noise Environment .................................................................................. 107
5.2.5 Biological Environment ............................................................................ 108
5.2.6 Socio-economic Environment .................................................................. 110
5.2.7 Charter on Corporate Responsibility for Environmental Protection (CREP)
110
5.2.8 Environmental Management Cell ............................................................ 110
5.2.9 Environmental Monitoring Plan ............................................................... 111
Chapter 6 : Risk Assessment& DISASTER MANAGEMENT PLAN ............................... 113
6.1 INTRODUCTION ................................................................................................... 113
6.2 RISK ASSESSMENT ............................................................................................. 113
6.3 RISK SCREENING APPROACH ........................................................................... 115
6.4 HAZARDOUS MATERIALS STORAGE ................................................................. 118
6.5 QRA APPROACH ................................................................................................. 118
6.6 THERMAL HAZARDS ........................................................................................... 119
6.7 TOXIC RELEASE .................................................................................................. 121
6.8 DATA LIMITATIONS ............................................................................................. 121
6.9 LIKELY FAILURE SCENARIOS ............................................................................ 121
6.10 WEATHER EFFECT .............................................................................................. 121
MANUFACTURING OF TECHNICAL GRADE PESTICIDES, 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page v
6.11 INCIDENTS IMPACTS .......................................................................................... 121
6.12 CONSEQUENTIAL IMPACTS ............................................................................... 124
6.13 THERMAL AND EXPLOSION HAZARDS ............................................................. 124
6.14 TOXIC HAZARDS ................................................................................................. 124
6.15 OTHER HAZARDS ................................................................................................ 124
6.16 OTHER TOXIC HAZARDS .................................................................................... 124
6.16.1 General Control Measures ..................................................................................... 124
6.17 FLAMMABLE GAS FIRES ..................................................................................... 124
6.18 PROCESS SAFETY SYSTEM TO BE DEVELOPED AT CIF ................................ 125
6.19 SAFETY SYSTEM FOR TOXIC MATERIAL HANDLING ....................................... 126
6.20 WORK PLACE MONITORING PLAN .................................................................... 127
6.21 ARRANGEMENT FOR ENSURING HEALTH AND SAFETY OF WORKERS
ENGAGED IN HANDLING OF TOXIC MATERIALS .......................................................... 128
6.22 SAFETY RECOMMENDATIONS ........................................................................... 128
6.23 COMMONLY RECOMMENDED CONTROL MEASURES ..................................... 128
6.24 OCCUPATIONAL HEALTH AND SAFETY ............................................................ 129
6.25 EMERGENCY MANAGEMENT PLAN ................................................................... 130
6.26 ERGONOMIC AND PSYCHOSOCIAL HAZARDS ................................................. 131
6.26.1 Key Process Safety Measures ............................................................................... 131
6.27 TRANSPORTATION ............................................................................................. 132
6.28 EMERGENCY FACILITIES ................................................................................... 135
6.29 EMERGENCY MANAGEMENT PLAN [EMP] ........................................................ 136
6.30 RESPONSIBILITIES & ROLE OF KEY PERSONNEL ........................................... 137
6.30.1 Over all In-charge –President (Operation) ............................................................. 137
6.30.2 Chief Site Coordinator- Manager (Prod.) ............................................................... 137
6.30.3 Chief Maintenance Coordinator- GM (Maintenance) .............................................. 138
6.30.4 Chief Service Coordinator - Manager (HR) ............................................................ 138
6.30.5 Chief Material Coordinator- Manager (Materials) ................................................... 138
6.30.6 Incident Controller Concerned Plant -Manager Concerned Plant ........................... 139
6.30.7 Shift In charge (Concerned Plant): ......................................................................... 139
6.30.8 Security Officer Vehicle Control and Security Personnel Deployment at the Locations
139
6.30.9 Fire & Safety Controller- Incharge (F&S) ............................................................... 140
6.30.10 Fire Control Room In-Charge ................................................................................ 140
MANUFACTURING OF TECHNICAL GRADE PESTICIDES, 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page vi
6.30.11 Fire Supervisor should also ensure the following: .................................................. 140
6.31 POST EMERGENCY RECOVERY ........................................................................ 141
6.32 ACCIDENT INVESTIGATION ................................................................................ 141
6.33 DAMAGE ASSESSMENT ...................................................................................... 141
6.34 CLEAN-UP AND RESTORATION ......................................................................... 142
6.35 CONCLUSION & RECOMMENDATIONS ............................................................. 142
6.36 PUBLIC HEARING ................................................................................................ 143
Chapter 7 : Summary and Conclusion ........................................................................... 149
7.1. PRELUDE ............................................................................................................. 149
7.2. REGULATORY COMPLIANCE ............................................................................. 149
7.3. BASELINE CONDITIONS ...................................................................................... 149
7.4. ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES ............................ 149
7.5. RECOMMENDATIONS ......................................................................................... 150
Chapter 8 : DISCLOSURE OF CONSULTANTS .............................................................. 151
LIST OF TABLE
Table 2.1: Co-ordinates of the project site ............................................................................. 9
Table 2.2: List of Proposed Products and Production Capacity ........................................... 13
Table 2.3: Mass Balance – Thiram ...................................................................................... 14
Table 2.4: Mass Balance – Ziram ........................................................................................ 15
Table 2.5: Lists of Plant and Machines ................................................................................ 16
Table 2.6: Details of Raw Material with Quantity ................................................................. 17
Table 2.7: Bulk Storages ..................................................................................................... 17
Table 2.8: Plot Area Break up ............................................................................................. 18
Table 2.9: Water Requirement ............................................................................................ 18
Table 2.10: Fuel Details ...................................................................................................... 19
Table 2.11: Utilities & Process Stacks Details ..................................................................... 23
Table 2.12: Emission Load .................................................................................................. 23
Table 2.13: National Emission Standards for Pesticide Manufacturing and Formulation Industry ........................................................................................................................ 23
Table 2.14: Waste Generation Quantity .............................................................................. 24
Table 2.15: Project Cost ...................................................................................................... 24
Table 3.1: Co-ordinates of the project site ........................................................................... 26
Table 3.2: Salient Environmental Features of Proposed Site ............................................... 27
Table 3.3: Land Use of the Study Area ............................................................................... 37
MANUFACTURING OF TECHNICAL GRADE PESTICIDES, 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page vii
Table 3.4: Fertility status – major nutrients and problematic soils of Sikar district ................ 41
Table 3.5: Area under Different Crops, 2011 ....................................................................... 41
Table 3.6: Production and Productivity of Major Crops, 2011 .............................................. 42
Table 3.7: Meteorological Data of Sikar (Period 1974-1990) ............................................... 42
Table 3.8: Monthly Percentages of Calm Periods ................................................................ 43
Table 3.9: Meteorological Data of Project Site .................................................................... 44
Table 3.10: Summary of Methodology for Primary/Secondary Baseline Data Collection ..... 46
Table 3.11: Ambient Air Quality Monitoring Locations ......................................................... 49
Table 3.12: Ambient Air Quality Monitoring Results for (24-hour average) .......................... 50
Table 3.13: Ambient Air Quality Monitoring Results for (24-hour average) .......................... 50
Table 3.14: Ambient Noise Monitoring Locations ................................................................ 51
Table 3.15: Ambient Noise Quality in Study Area ................................................................ 52
Table 3.16: The Details of Ground Water Resources of Sikar District (MCM/YEAR) ........... 53
Table 3.17: Name of Ground Water Sampling Locations ..................................................... 54
Table 3.18:Ground Water Quality ........................................................................................ 54
Table 3.19: Ground Water Quality ....................................................................................... 55
Table 3.20: Soil Sampling Locations ................................................................................... 57
Table 3.21: Physiochemical Characteristics of Soil ............................................................. 57
Table 3.22: Vegetation profile observed in the study area ................................................... 62
Table 3.23: Vegetable, pulses, and crops in the study area ................................................ 64
Table 3.24: Butterflies spotted in the area ........................................................................... 64
Table 3.25: Reptiles present in the area .............................................................................. 65
Table 3.26: Avifauna present in the area ............................................................................. 65
Table 3.27: Mammalian Species Present in the Study Area ................................................ 66
Table 3.28: Domesticated Mammalian species present in the Study Area .......................... 67
Table 3.29:Caste wise Population Distribution of Study Area Villages ................................. 70
Table 3.30: Male-female wise Literates & Illiterates ............................................................ 75
Table 3.31: Occupational Pattern in the Study Area Villages ............................................... 76
Table 3.32:Village-wise Basic Amenities Availability ........................................................... 83
Table 4.1: Stack Parameters ............................................................................................... 91
Table 4.2: Emission Load .................................................................................................... 91
Table 4.3: Summary of Maximum 24-hour Incremental GLC due to the Proposed Greenfield Project Stacks .............................................................................................................. 92
Table 4.4: Summary of Maximum GLC at Monitoring Locations due to the Proposed Project .................................................................................................................................... 92
Table 4.5: CREP Guidelines Compliance .......................................................................... 100
Table 5.1: List of Plant species to be planted .................................................................... 109
MANUFACTURING OF TECHNICAL GRADE PESTICIDES, 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page viii
Table 5.2: Capital Expenditure on green belt development ............................................... 110
Table 5.3: Revenue Expenditure (Annual) on green belt development .............................. 110
Table 5.4: Environmental Monitoring Program .................................................................. 111
Table 6.1: Liquid/Gaseous Bulk Storages ......................................................................... 115
Table 6.2: Hazardous Analysis Raw materials stored in Bulk ............................................ 116
Table 6.3: Hazard Analysis - Products .............................................................................. 117
Table 6.4: Risk Classification ............................................................................................ 118
Table 6.5: Effects due to Incident Radiation Intensity ........................................................ 119
Table 6.6: Thermal Radiation Impact to Human ................................................................ 120
Table 6.7: Tolerable Intensities for Various Objects .......................................................... 120
Table 6.8: Damage due to Overpressure .......................................................................... 120
Table 6.9: Different Failure Scenarios ............................................................................... 121
Table 6.10: Hazards Scenario Impact ............................................................................... 122
Table 6.11: Transportation, Unloading and Handling safety Measures .............................. 132
MANUFACTURING OF TECHNICAL GRADE PESTICIDES, 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page ix
LIST OF FIGURE
Figure 1.1: Project Location .................................................................................................. 4
Figure 1.2: Plant Boundary (Google Image) .......................................................................... 5
Figure 2.1: Toposheet (Buffer Map of 10 Km Radius from the Project Site) ........................ 11
Figure 2.2: Site Layout of Proposed Project ........................................................................ 12
Figure 2.3: Water Balance .................................................................................................. 19
Figure 2.4: Block Diagram of ETP ....................................................................................... 21
Figure 2.5: Proposed Scrubbing System ............................................................................. 22
Figure 3.1: Environmental Setting of the 10 Km Radius of the Plant Site ............................ 29
Figure 3.2: Site Photographs ............................................................................................... 30
Figure 3.3: Google View of SKS Industrial Area Showing Project Site ................................ 32
Figure 3.4: Drainage Map of Study Area ............................................................................. 34
Figure 3.5: Contours in 10 km Area Around Project Site ..................................................... 36
Figure 3.6: Digital Elevation Map of 10 Km Area (Project Site) ............................................ 36
Figure 3.7: Graph Showing Land Use of the Study Area (10 km Radius) ............................ 37
Figure 3.8: Land Use Map of 10 Km Area (Project Site) ...................................................... 38
Figure 3.9: Geomorphology of Sikar district (source: GSI Resource map) ........................... 39
Figure 3.10: Seismic Zones of India .................................................................................... 40
Figure 3.11: Wind Rose Diagram (March 2016 to June 2016) ............................................. 44
Figure 3.12: Sampling Monitoring Locations ....................................................................... 48
Figure 3.13: Ground Water Table Map of Sikar District ....................................................... 53
Figure 3.14: Proposed RICCO Industrial Area Gihlot and scrub vegetation ......................... 68
Figure 3.15: Vegetation accounts with faunal life forms in the study area............................ 69
Figure 3.16: Vegetation accounts with faunal life forms in the study area............................ 70
Figure 3.17: Male-female wise Population Distribution ........................................................ 72
Figure 3.18: SC Population in Study Area ........................................................................... 73
Figure 3.19: ST Population in Study Area ........................................................................... 73
Figure 3.20: Male-Female wise Distribution of Literates & Illiterates .................................... 74
Figure 3.21: Workers Scenario ............................................................................................ 79
Figure 3.22: Composition of Main Workers Population ........................................................ 80
Figure 3.23: Distribution of Composition of Marginal Workers ............................................. 80
MANUFACTURING OF TECHNICAL GRADE PESTICIDES, 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page x
LIST OF ANNEXURES
Annexure I: Accreditation Letter of Consultant
Annexure II: Copy of Terms of Reference
Annexure III: Compliance of Terms of Reference
Annexure IV: MSDS of Chemicals
Annexure V: Minutes of Meeting (MoM) for Public Hearing
Annexure VI: Analysis reports
MANUFACTURING OF TECHNICAL GRADE PESTICIDES, 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page 1
CHAPTER 1 : INTRODUCTION
1.1 IMPORTANCE AND NEED OF AN EIA
Government of India, as per its policy has given emphasis on Sustainable Development.
While it is supporting the industrial growth, the environmental protection has been made the
integrated criteria for this support. In line with this policy, Ministry of Environment & Forests
has defined elaborated ‘Environment Clearance (EC)’ framework under The Environmental
(Protection) Act, 1986 (Environmental Impact Assessment Notification, 2006) for
establishing/expanding an industry/development project. The EC process takes into
consideration local conditions, public concerns, effectiveness of impact assessment and
proposed mitigation measures in sustaining environmental equilibrium. The base
documentation/study report, called Environmental Impact Assessment (EIA) detailing
baseline conditions, environmental impacts, mitigation measures and management plan is
required to be prepared for start of EC process. Prior Environmental Clearance is required
from concerned authorities for all projects detailed in the ‘Schedule’ as given in the
‘Notification dated: 14th September 2006’. The insecticide (technical) projects are listed as
category A under EIA notification. As per this category all pesticides projects require
environmental clearance. EIA report is mandatory for appraisal by expert committee prior to
EC. Since EIA preparation and compliance to EC requirement is time consuming, MoEF has
started accepting one season-based EIA study to reduce the overall clearance cycle time.
1.1.1 Need for the Project and its Importance to the Country and or Region
Pesticide usage has become essential in order to maximize agriculture production and
reduce public health pestilence. The rapid changes in cropping patterns, increased
fertilization and adoption of programs for high yielding varieties have all contributed to
increased use of pesticides.
Agriculture is an important sector of the Indian economy and vital for the food and nutritional
security of the nation. Ensuring food security for more than 1 billion Indians with diminishing
cultivable land resources is a herculean task. This necessitates use of high yielding variety
of seeds, balanced use of fertilizers, judicious use of quality pesticides along with education
of farmers and use of modern farming techniques. In order to meet the needs of a growing
population, agricultural production and protection technology have to play a crucial role.
Substantial food production is lost due to insect pests, plant pathogens, weeds, rodents,
birds, nematodes and during storage.
Pesticides industry has developed substantially and has contributed significantly towards
India’s agriculture and public health. In value terms the size of the Indian pesticide industry is
$3.8 billion in the year 2011. India is a predominant exporter of pesticides to USA, Europe
and African countries.
This chapter provides background information of the project, need of the project,
need of the EIA study, scope and EIA methodology adopted and structure of the
report.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES, 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page 2
Pesticides are essential input for agriculture and the project will provide adequate availability
of the required products at cheaper rates and will also reduce the import quantities.
1.1.2 Demand Supply Gap
The Indian pesticides industry is characterized by low capacity utilization. The present total
installed capacity is 146,000 tonnes and has a low capacity utilization of< 60%. The industry
suffers from high inventory owing to seasonal and irregular demand on account of
monsoons. The consumption of pesticides in India is low in comparison to other countries.
There is a marked difference in the consumption pattern of pesticides in India vis-à-vis the
rest of the world. Insecticides account for 76% of the total domestic market. On the other
hand, herbicides and fungicides have a significantly higher share in the global market. Crops
like cotton, wheat and rice to gather account for 70% of total agrochemical consumption. The
consumption of pesticides in India is low in comparison to other countries
The industry suffers from high inventory (owing to seasonal & irregular demand on account
of monsoons) and long credit periods to farmers, thusmaking operations' working capital'
intensive. India due to its inherent strength of low-cost flow manufacturing and qualified low-
cost manpoweris a net exporter of pesticides to countries such as USA and Some European
& African countries Exports formed~37% of total industry turnover in FY 13.
Since the requirement of Pesticides is increasing @ 10% to 15% every year, there is a huge
gap between the demand and supply
1.1.3 Imports vs. Indigenous Production
India is the 4th largest producer of pesticides after USA, Japan and China. India is the
second largest producer of pesticides in Asia. The Indian pesticides industry has been
growing at 8-9% p.a. over the past five years (FY07-FY11). Industry size is estimated to be
$3.8 billion in FY11 with exports accounting for 50% of the market. Over the XIIth plan
period, the segment is expected to grow at 12-13% p.a. with domestic demand growing at 8-
9% p.a. and export demand at 15-16%p.a. Three broad categories of companies are present
in the industry-Multi-National, Indian including the public-sector companies and small sector
units. There are about 125 technical grade pesticides manufacturers in the country of which
about 60 are in the organized sector, and 10 are, multinationals. There are about 800
pesticides formulators in the country. Most Indian technical manufacturers are focused on off
patent pesticides.
At present more than 70% requirement is fulfilled by import and there is urgent need to
create indigenous manufacturing facilities to provide better Quality at optimum cost.
1.2 PROJECT & PROJECT PROPONENT
Central Insecticides & Fertilizers Pvt. Ltd (henceforth CIF) proposes a Greenfield project
for manufacturing of technical grade pesticides (Fungicides; 500 MTPA) namely - Thiram,
Ziram at plot no E-23A, SKS industrial area Reengus, district Sikar, Rajasthan. Central
Insecticides and Fertilizers Private Limited is a Private incorporated on 29 October 1997. It is
classified as Non-Govt. Company and is registered at Registrar of Companies, Mumbai. The
proposed project falls under category 5 (b), Pesticides industry and pesticide specific
intermediates (excluding formulations) which shall be treated as Category “A” as per the EIA
notification dated 14th September, 2006 as amended till date.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES, 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page 3
The new plant will be designed with the basic concept of green chemistry with modifications
to optimize energy utilization and with significant reduction of manual interface. To meet the
target production rate, all equipment capacities and their sizes will be optimized.
Total cost of the project is Rs. 6 crores only.
1.3 PROJECT SITE
The proposed project is at plot no E-23A, RIICO SKS industrial area Reengus, district-Sikar, Rajasthan. The site is well connected to NH-11 (Agra-Jaipur-Bikaner) at an aerial distance ~2.05 Km in ENE direction.
Major railway station for public transportation is Jaipur Railway Station located at an aerial distance of ~24 Km in SW Direction from the project site. Nearest airport from project site is Jaipur Airport located at an aerial distance of ~ 60.73 Km in SSE Direction.
Nearest habitation are Villages Parasrampura 1.03 km NE; Sargoth 2.53 km SE and Reengus-3.40 Km in NNW.
Project location is shown in Figure 1.1 & 1.2.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES, 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page 4
Figure 1.1: Project Location
MANUFACTURING OF TECHNICAL GRADE PESTICIDES, 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page 5
Figure 1.2 : Plant Boundary (Google Image)
1.4 REGULATORY FRAMEWORK
Environmental Rules & Regulations
Prior Environmental Clearance is required from concerned authorities for all projects detailed
in the ‘Schedule’ as given in the ‘Notification date 14th September, 2006’.as field project and
will subjected all rules and regulation as applicable to the plants of its categories. The
proposed project is a Category ’A’ project and will require clearance from Ministry of
Environment and Forest, New Delhi.
During Operational Stage: compliance monitoring programme viz. annual consents under
Water (Prevention and Control of Pollution; water cess) Act, 1974; Air (Prevention and
Control of Pollution) Act, 1981; authorization under Hazardous Waste (Management &
Handling) Rules, 1989/2000/2008; Environment (Protection) Act, 1986; requirements and
statutory norms as per Rajasthan State Pollution Control Board etc..
In addition to environmental regulatory compliance, other applicable statutory rules and
regulations including (but not limited to) are the following:
o Fuels and other hazardous (Inflammable & Explosives) materials storages (As per Chief Controller of Explosives, Nagpur; rules and guide lines)
o Labour laws and Safety guide lines as per Labour Commissioner, Government of Haryana
o Boiler Regulations as per Chief Inspector of Boilers, Government of Haryana (small & low pressure boiler).
o ESIC etc.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES, 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page 6
1.5 METHDOLOGY
The Environmental Impact Assessment Report has been prepared based on the following
steps:
Familiarization with the Project: At the initial stages of the project, a site visit and
reconnaissance survey was undertaken. Based on the findings of the survey, the data
requirement and gaps were identified. The baseline data was collected from various
secondary data sources. Air quality monitoring, noise levels, traffic volume study, soil and
water sample analysis was carried out as per the environmental regulations relevant for
project.
Identification of Impacts: Based on the existing site conditions observed from the survey
works and sample analysis, environmental scoping has been carried out and all relevant
environmental and social issues requiring investigations during the EIA were identified. All
significant negative impact was earmarked for environmental mitigation measures. The
existing environmental and infrastructure conditions in the adjacent localities were also
reviewed to identify the possible shortcomings in the project.
EMP and Environmental Monitoring: In order to mitigate the negative environmental and
social impacts, mitigation measures were identified. The detailed plan for the management
of environmental components was then formulated in the form of an Environmental
Management Plan (EMP). Environmental monitoring requirements to ensure effectiveness of
recommended environmental measures and compliance with environmental standards
together with the institutional arrangements for their implementation were recommended.
Evaluation of impacts after, considering the mitigation, were evaluated using the rapid
impact assessment matrix method. It has been shown in the report that the suggested
mitigation measures can bring down the adverse negative impacts to the minimum level to
create such facilities that are in harmony with the environment.
1.6 SCOPE & OBJECTIVES OF THE EIA STUDY
This EIA report is prepared to comply with TOR given by the MoEF&CC as per the guideline.
The scope of study includes detailed characteristics of environmental components. For the
purpose of environmental assessment, the villages in the surrounding 10 km area have been
surveyed and relevant data has been collected. The objectives of this EIA are:
• To describe the project and associated works together with the requirements for carrying out the expansion.
• To identify and describe the elements of the community and environment likely to be affected by the project, and/or likely to cause impacts by the project, including both the natural and man-made environment.
• To identify and quantify any environmental impacts associated with the proposed expansion and recommend appropriate mitigation measures.
• To identify existing landscape and visual quality in the study area so as to evaluate the landscape and visual impacts of the proposed expansion project.
• To propose mitigation measures to minimize pollution, environmental disturbance and nuisance during construction and operation of the project.
• To identify, assess and specify methods, measures and standards, to be included in the detailed design, construction and operation of the project which are
MANUFACTURING OF TECHNICAL GRADE PESTICIDES, 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page 7
necessary to mitigate these impacts and reduce them to allowable levels within established standards/guidelines.
• To identify and justify the need for environmental monitoring to define the scope of the requirements necessary to ensure the implementation and the effectiveness of the environmental protection and pollution control measures adopted.
• To identify constraints associated with the mitigation measures recommended in this EIA.
• To identify any additional studies necessary to fulfil the objectives to the requirements of this EIA Study.
1.7 TERMS OF REFERENCE
Terms of Reference (TOR) were discussed during Minutes for 4th expert appraisal committee
(Industrial-2) meeting held during 11-12th FEBRUARY, 2016 finalized the ‘TORs’ for
preparation of EIA/EMP. The EIA report prepared as per ToRs given by EAC, MoEF&CC
vide letter no. J-11011/08/2016-IA II (I) dtd: 05th April 2016. After careful review of all the
details, the application & report is to be made for EC for the proposed expansion project.
The TOR compliance enclosed as an Annexure II.
1.8 STRUCTURE OF REPORT
The report has been suitably structured covering various aspects like project description,
baseline conditions, environmental impacts, mitigation measuresand environmental
management plan. The EIA report has been prepared chapter wise in accordance with the
generic structure suggested by MoEF in the EIA notification. The report of the EIA study for
the proposed expansion projects has been prepared in the following structure.
Chapter – 1 (Introduction)
• Purpose of the report
• Identification of project andproject proponent
• Brief description of nature, size, location of the project and its importance to the region and country
• Scope of the study – details of regulatory scoping carried out
Chapter – 2 (Project Description)
✓ Condensed description of aspects of the project
✓ Description contains the details of the following:
• Type of project
• Need for the project and project site layout
• Technology and process description
• Project description, project site, salient features, technology used etc. which give important information for EIA purpose
• Brief note on resource/utility requirements, project cost and funds allotted for EMS.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES, 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page 8
Chapter – 3 (Description of the Environment)
• Study area, period, sampling frequency, components and methodology used for analysis.
• Establishment of baseline for valued environmental components, as identified in the scope.
• Base maps of all environmental components
Chapter – 4 (Anticipated Environmental Impacts and Mitigation Measures)
• Details of investigated environmental impacts due to project location, emission from proposed project, regular operations and final decommissioning.
• Measures for minimizing and / or offsetting adverse impacts identified
• Assessment of significance of impacts
• Mitigation measures
Chapter – 5 (Environment Management Plan & Environmental Monitoring Programme)
Technical aspects of environmental monitoring for the effectiveness of mitigation measures (incl. Measurement methodologies, frequency, location, data analysis, emergency procedures, budget and procurement schedules)
Description of the administrative aspects of ensuring that mitigation measures are implemented and their effectiveness and Monitoring Plan. This chapter consists of:
• Mitigation measures for impacts
• Pollution Prevention Plan
• Greenbelt Development Plan
• Environment Management Cell
• Monitoring Plan
• Budgetary Provisions for EMS
Chapter – 6 (Additional Study – Risk Assessment and Disaster Management Plan)
• Hazard Identification
• Risk Assessment and control/prevention measures
• Disaster ManagementPlan
• Emergency Preparedness Plan
Chapter – 7 (Summary and Conclusion)
It includes justification for the proposed expansion project and summary of the EIA report.
Chapter – 8 (Disclosure of Consultant Engaged)
Details (experience and education) of the EIA Consultant engaged in EIA report preparation.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page 9
CHAPTER 2 : PROJECT DESCRIPTION
2.1 GENERAL
Central Insecticides & Fertilizers Pvt. Ltd.; (henceforth CIF) proposes a Greenfield
project for manufacturing of technical grade pesticides (Fungicides) namely - Thiram, Ziram
at Plot No. E-23A, SKS Industrial Area ‘Reengus’, district-Sikar, Rajasthan.The proposed
project falls under category 5 (b), Pesticides industry and pesticide specific intermediates
(excluding formulations) which shall be treated as Category “A” as per the EIA notification
dated 14th September 2006 as amended till date.
2.2 LOCATION& SITE OTHER FEATURES
The project is coming at plot NO E-23A SKS Industrial Area Reengus District Sikar, Rajasthan. The project site falls in geological Survey of India of Topo Sheet No.-45, M-11. The co-ordinates of the project site are given below:
Table 2.1: Co-ordinates of the Project Site
Corner Latitude Longitude
A 27°20'03.07 75°35'02.14"
B 27°20'03.21 75°35'03.65"
C 27°20'05.91 75°35'01.58
D 27°20'06.07 75°35'03.06"
Map Showing General Location, specific Location and Project boundary &, Toposheet
(buffer map of 10 km radius from the project site) Project Layout is enclosed at Figures 2.1;
2.2, respectively.
2.2.1 Connectivity
By Road: The site is well connected to NH-11 (Agra-Jaipur-Bikaner) at an aerial distance
~2.05 Km in ENE direction.
By Rail:Major railway station for public transportation is Jaipur Railway Station located at an
aerial distance of ~24 Km in SW Direction from the project site.
By Air: Nearest airport from project site is Jaipur Airport located at an aerial distance of ~
60.73 Km in SSE Direction.
Nearest Water Body- Mendha River -1.6 km, NW
2.2.2 Social Infrastructure Available
Scattered Habitation: Village Parasrampura 1.03 km NE; Village Sargoth 2.53 km SE; Village
Reengus 3.40 km in NNW
This chapter deals with the project details of the proposed pestiside manufacturing
plant, project location, size & magnitude of operation including associated activities
required by and for the project, proposed schedule for approval and
implementation, including technical details of raw material, quality and quantity etc.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page 10
Other Facilities:
• Mahala Residential Public School, 3.56 Km, NNW,
• Emmanuel Mission School, 3.85 Km NNW,
• Shri Gyarsi Devi Choukhani Primary Sanskrit School, 4.10 Km NW,
• Govt. School Parasrampura 1.83 km NE;
• Govt. School Sargoth
• Dhayal Hospital and Research Centre 3.75 Km, NNW,
• Govt. Hospital Reengus 4.20 Km NNW, Govt. Hospital Sargoth
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT PLOT
NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT SIKAR
RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS.”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page 11
Figure 2.1: Toposheet (Buffer Map of 10 Km Radius from the Project Site)
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS.”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page 12
Figure 2.2: Site Layout of Proposed Project
2.2.3 Alternate Sites
Proposed site is owned by the proponent and same is situated in the notified RIICO
industrial area hence alternative sites are not identified.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS.”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page 13
2.3 PROJECT PROPOSED PRODUCTS
The design capacity of the proposed plant will be 500 MTA. It is proposed to manufacture
two Pesticide products on a daily basis based on the prevailing market requirement. Details
of all the proposed products are listed in Table 2.2.
Table 2.2: List of Proposed Products and Production Capacity
S. No. Name of Product Production(MT/Annum)
1 Thiram 400
2 Ziram 100
Total 500
CIF will not be using or producing pesticides of banned category.Other utilities like Cooling
tower will be located in to the Plants.
2.4 PROCESS DETAILS
Manufacturing process steps of pesticides with their mass balance are describe]\d in this section
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS.”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page 14
Since the proposed products donot use any solvent, the “Solvent Recovery” step is not applicable in the project.
2.4.1 Thiram
Sodium complex salt is reacted with CS2 under presence of water and Na2CO3. Bottom
aqueous layer is disposed of to ETP whereas top organic layer is washed with water to form
crude Thiram. End technical grade product is obtained after filtration and drying.
Equation
Table 2.3: Mass Balance –Thiram
Sl.No Raw Materials Input/ MT of
Product (MT)
1 Sodium Complex Salt NaT 1.4394
2 CS2 0.1999
3 Water 4.8314
4 Na2CO3 0.0500
Total 6.5207
Sl.No Output/MT of Product Remark
Product Liquid Effluent
Air Emission
Recovery Solid Waste
1 Thiram - - 1.0000 - Product
2 Aqueous Layer 5.4874 - - - To ETP
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS.”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page 15
3 Drying Loss - 0.0333 - - Vent Scrubber
Total 5.4874 0.0333 1.0000
6.5207
2.4.2 Ziram
Sodium dimethyl dithiocarbamal 40% solution is charged into the reactor to which water and
zinc sulphateheptahydrate is added. The reaction mass is stirred for two hours and filtered,
washed to give ziram.(C) Water is charged into the reactor to which added ziram wet cake.
The reaction mass is stirred for 2-3 hrs and packed Ziram 27% cs.
Equation
Table 2.4: Mass Balance – Ziram
Sl.No Raw Materials Input/ MT of
Product (MT)
1 Sodium Dimethyl DithioCarbamal 40%Solution 0.7038
2 Water 1.5673
3 Zinc SulphateHeptahydrate 0.2801
Total 2.551
Sl.No Output/MT of Product Remark
Product Liquid Effluent
Air Emission
Recovery Solid Waste
1 Ziram - - 1.0000 - Product
2 Aqueous Layer 1.551 - - - To ETP
Total 1.551 - 1.0000
2.551
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS.”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page 16
2.4.3 Equipment List
For the proposed project equipment mentioned in Table 2.5 shall be in place:
Table 2.5: Lists of equipment
S. No Machine Description Capacity – No.
1. S.S. REACTOR 2KL-1
2. S.S. REACTOR 3KL-1
3. S.S. REACTOR 4KL-1
4. S.S. REACTOR 5KL-1
5. FILTER PRESS 23*18-2
6. FILTER PRESS 46 x 36-1
7. NOTCH FILTER 2000 LT-1
8. CENTRIFUGE 250-300 Kg.-1
9. FLUID BED DRIER 60 Kg.-1
10. RIBBON BLENDER 600 Kg.-2
11. COOLING TOWER 25 TR-2
12. COOLING TOWER 35 TR-2
13. CHILLING COMP. 17 TR-2
14. CHILLING COMP. 17 TR
15. VACCUM EJECTOR 730 mm/hg-2
16. OPIL VACCUM PUMP 730 mm/hg-3
17. SCRUBBER SYSTEM 1500 rpm-2
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS.”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page 17
S. No Machine Description Capacity – No.
S. No. Utilities Description Make Capacity
18. TUBEWELL PUMP ROCKWELL 700 LTR/MIN
19. FIRE PUMP KIRLOSKAR 18LPS/90M/30HP
RPM2830
20. BLOWER (AIR POLLUTION) AIR TECH 1000CFM
21. BLOWER (AIR POLLUTION) AIR TECH 100 CFM
22. GEN-SET CIMINS 250 KVA
23. AIR COMPRESSOR IONGERSOL RAND 12 CFM
24. FIRE SIREN EXPRESS 50 KM
25. PROCESS PUMP-1 KIRLOSKAR 6.0 KL/HR
26. PROCESS PUMP-2 KIRLOSKAR 6.0 KL/HR
27. PROCESS STORAGE TANK SAIFA ENGG. 100 KL
28. STORAGE TANK SAIFA ENGG. 100 KL
29. WATER COOLER SHRI RAM 80 LTR/Hrs/60/120
2.5 RAW MATERIALS
Raw material shall be sourced from registered supplier within India and Imported (if required)
based on the need and availability. Details of raw material along with the Quantity and
Means of storage are given in Table 2.6.
Table 2.6: Details of Raw Material with Quantity
S. No. Raw Material Consumption (TPA)
Thiram
1 Dimethyl amine (40%) 400
2 Carbon di sulphide 280
3 Caustic soda 132
4 Hydrogen peroxide 60
5 Sulphuric acid 80
Ziram
1 Dimethyl amine (40%) 90
2 CS2 60
3 Caustic Soda 32
4 Zinc Sulphate 95
2.5.1 Bulk Storages
The following liquid raw materials will be stored in bulk with all safety measures including dyke wall etc.
Table 2.7: Bulk Storages
S No. Material Storage Quantity
1 DMA 10 KL Storage tank
2 Caustic Lye 5 Kl Tanlk
3 Sulphuric Acid 5 Kl Tank
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS.”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page 18
4 Carbon Disulphide 5 KL Tank
5 Sulphuric Acid 5 KL Tank
2.6 UTILITIES
2.6.1 Land
Proposed project is in RIICO industrial area. Plot area of the project consists of 3770.0 m2 of
land which includes manufacturing of technical grade pesticides plant. The land breaks up
for the proposed project is as below:
Table 2.8: Plot Area Break-Up
Particulars Area (Sq.m) Percentage (%)
Plant Area 1960.4 52
Roads/Corridors 301.6 8
Plantation 1244.1 33
Open Area 263.9 7
Total 3770.0 100
2.6.2 Water Requirement
Daily fresh water demand will be 5 KLD which will be sourced from RIICO water supply. By
implementing various recycle/reuse schemes water will be reused/recycled for cleaning floor
washing and cooling towers. Water consumption & Waste water generation breakup is given
in Table 2.9
Table 2.9: Water Requirement (one time)
Particulars Quantity (KLD)
Industrial Operation 3.5
Domestic 1.5
Recycling 1.0
Fresh Water Demand 5.0
One Time Fresh Water Demand 6 KLD
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS.”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page 19
Figure 2.3: Water Balance
2.6.3 Power Requirement
The power requirements will be 300 KVA. DG set of capacity 300 KVA will be used in the
plant for power back up. The permission for 300 KVA power supply from electricity board will
be obtained
2.6.4 Fuel Requirement
HSD will be used for the proposed DG Sets (~65liter/day max) for emergency power. Details of the same are tabulated in Table 2.10.
Table 2.10: Fuel Details
S. No. Type of Fuel Used in Quantity Source
1 HSD DG sets ~65 ltr/day During Power Failure; Local Depot suppliers
2.6.5 Employment Generation (Direct and Indirect) due to the Project
During the construction phase, around 25 workers and during operational phase around 20-
25 workers (including contractors) will be required. Local skilled and semi-skilled workers will
be engaged during construction phase of the project. Local skilled and semi-skilled workers
will be engaged during construction phase. The positives impact includes enhanced direct
employment for technical/administrative works and in direct employment opportunities for
transporters of raw materials and finished goods.
2.7 ENVIRONMENTAL ASPECTS
2.7.1 Waste Water Generation
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS.”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page 20
The waste water will be generated from the process, utilities and domestic area. The process
effluent will be treated in ETP (Capacity 5 KLD also for future use). The ETP design will be
based on pesticide industries requirement. The equipments or necessary steps will be installed
as per requirement. Tentative design is given below, Domestic sewage will be disposed off in
to septic tank followed by soak pit.
Details of ETP
• The effluent generated from the process will be sent to ETP for further treatment resulting in zero liquid discharge. The treated waste water will be used in gardening and rest recycled for cleaning, floor washing, and cooling towers.
• Sewage generated from the domestic use will be sent to septic tank for further treatment. Stream segregation at source will be carried out for segregation of high pollution level and low pollution level of streams.
Wastewater Treatment Methodology
TDS streams i.e. utilities blow downs, as a combined stream shall be treated in ETP consisting of Secondary Biological Treatment and Tertiary Treatment followed by RO. The RO reject will be evaporated for salt removal while RO permeate will be used in plant area.
Waste water generated from the proposed pesticides manufacturing plant is segregated into separate streams depending on their pollution levels as given in wastewater treatment methodology.
The high TDS and high COD stream from the process plant) containing inorganic salts is segregated and sent to an Oil & Grease separator and then to an Equalization Tank.The oil & grease, if any, is collected and disposed off.
The effluent from the equalization tank is then pumped into a lime treatment/ neutralistion tank. The tank contents are mixed by aeration through an under-water air grid. Lime slurry / HCl is added to get a pH of 10 – 11.The mixture is then treated with alum solution, flocculating agent and send to a primary settler.The settled sludge is dewatered on a sludge drying bed from where it is sent to an approved land fill and leachate will be transferred to equalization tank.
Neutralised effluent is pumped to a clariflocculater vessel of adequate capacity where coagulants are added. Two coagulant solution preparation tanks are provided to ensure continuous supply of coagulant. The sludge settled at the bottom is continuously scraped and discharged to sludge drying beds. This sludge is hazardous waste and dispatched to designated site for storage.
Clarified effluent is pumped out to buffer tanks of adequate capacity. These tanks are provided with aeration grid to ensure mixing and to avoid anaerobic conditions. From buffer tank, effluents pumped to aeration tanks for biodegradation.
Action Plan for Zero Liquid Discharge
The wastewater generated from the entire unit will be treated in ETP followed by RO as described above and the treated water will be completely recycled and reused in plant
premises resulting Zero Liquid Discharge. Also the overall water demand of fresh water will
be reduced by water conservation plan like condensate recovery from the steam.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT PLOT
NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT SIKAR,
RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 Page 21
Figure 2.4: Block Diagram of ETP
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT PLOT NUMBER: E-
23A SKS INDUSTRIAL AREA REENGUS DISTRICT SIKAR RAJASTHAN BY “CENTRAL
INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01
2.7.2 Emissions
Emissions in the proposed project will be mainly from process and utilities (DG set).
1. Gaseous emission from fuel use in DG set consist of common pollutants like SO2, NO2, and PM would be discharged into atmosphere through Stack of suitable
height.
2. Green belt will be developed covering >33% of the total project area, around the
plant boundary as dust preventive barrier.
3. Odor Control System: The vents of the batch tanks and liquid raw materials are
connected to scrubber to absorb any odor producing gases and chemicals.
4. The drying of the product (if required) is done in a closed type continuous filter to
avoid the exposure of any chemicals to human being.
5. Volatile organic chemicals are carefully handled in a closed system, thereby
preventing any discharge of these chemicals into the air.
6. Process emission quality will be maintained (through use of scrubbing system) as
per the following standards:
• H2S <45 mg/Nm³
• NH3 <175 mg/Nm³
• HCl <20 mg/Nm³
• SO2 <40 mg/Nm³
• Cl2 <9 mg/Nm³
7. Adequate systems shall be if required provided to capture the emissions from process plants & maintain the emission quality as per recommended guidelines with central scrubber having caustic solution, before venting it in to the atmosphere. Design is given in Figure 2.5.
Figure 2.5: Proposed Scrubbing System
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT PLOT NUMBER: E-
23A SKS INDUSTRIAL AREA REENGUS DISTRICT SIKAR RAJASTHAN BY “CENTRAL
INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01
Table 2.11: Utilities & Process Stacks Details
Stack Attached to
Sources
Stack Height, m Flow in Nm³/hr
Temperature 0C
Pollutant Concentration
in mg/Nm³ Height Diameter
DG Set–I (300
KVA) 12 0.2 ---- 150
During Power failure only
Process 10 0.2 300 35 PM < 20 Cl2 < 05 HCl <20
Table 2.12: Emission Load
S.
No
Stack attached to/
Pollutant
Pollutant Concentration
mg/Nm3
Flow (Nm3/hr)/
Temp. 0C
Pollution Load
gm/hr
1 Process PM < 20 35 6
CS2 < 05 1.5
HCl <20 6
Table 2.13: National Emission Standards for Pesticide Manufacturing and Formulation
Industry
S. No. Parameter Not to exceed (mg/Nm3)
1 HCl 20
2 Cl2 05
3 H2S 05
4 P2O5 (as H3PO4) 10
5 NH3 30
6 Particulate matter within the form of pesticide compounds 20
7 CH3Cl 20
8 HBr 05
2.7.3 Hazardous Waste and Other Solid Waste
Main solid wastes of concern include waste generated from process and sludge generated from effluent treatment plant, and container residues
The hazardous waste is generated at various stages of the manufacturing activity. The
disposal methodology generally adopted by pesticide industry is as stated below: -
• The domestic and industrial wastewater generated will be segregated based on
effluent content.
• Minor quantities of construction waste will be generated in the form of packaging
material and construction waste. Proper care will be taken for handling and
reduction of the solid waste generated during construction phase.
During Construction Phase:
Construction waste likely to be generated during the site formation works include waste wood from concrete form work; spent concrete; waste steel bars from concrete reinforcement activities; and material and equipment wrappings.;
Municipal wastes generated by site workers.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT PLOT NUMBER: E-
23A SKS INDUSTRIAL AREA REENGUS DISTRICT SIKAR RAJASTHAN BY “CENTRAL
INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01
Management: Recyclable waste (metal, concrete etc.) will be sold to the vendors.
The inert waste (brick, masonry, aggregates etc.) will be used for making of driveway & pathway within the site.
All above waste are will be collected and stored at separate identified place and suitably disposed off to authorized agencies.
Table 2.14: Waste Generation Quantity
S. No. Solid Waste Quantity Management
1 ETP Sludge (Chemical Sludge)
50 Kg/Month The dried sludge will be stored at the isolated place in TSDF bags and will be sent to the CTDF, Udaipur periodically.
2 Process Waste/Residues
100 kg/Month will be sent to the TSDF, Udaipur periodically
Used oil – 10 kg per month
Hazardous solid waste shall be handled, stored and disposed of as per Hazardous and other Wastes (management and Transboundry Movement) Rules 2016 amended till date.
2.8 PROJECT COST & ENVIRONMENTAL RELATED BUDGET
The overall investment in the project is 600 lacs About Rs. 54.00 Lac capital and Recurring
6.0 lacs is proposed for the environment protection program.
Table 2.15: ENVIRONMENTAL RELATED BUDGET
S.No. Particulars Capital Cost, Rs. in
Lakhs Recurring Cost,
Rs.
1. Air Pollution Control 14 1,40,000
2. Water Pollution Control 14 1,40,000
3. Noise Pollution Control 5 1,00,000
4. Environment Monitoring and Management
8 80,000
5. Occupational Health 8 80,000
6. Green Belt 5 60,000
Total 54.00 6,00,000
2.9 CORPORATE SOCIAL RESPONSIBILITY
• On the basis of the socio-economic baseline data’s, survey conducted and the
impact assessment, the projects for CSR (Corporate Social Responsibility)
activities will be identified.
• Adequate amount for fulfilling the responsibility towards the region will be
allocated / apportioned and an effective plan to meet the responsibilities will be
drafted.
• An Evaluation of the Management Plan will be drafted, which shall help in the
timely investment of the CSR amount and guide in fulfilling the responsibilities.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT PLOT NUMBER: E-
23A SKS INDUSTRIAL AREA REENGUS DISTRICT SIKAR RAJASTHAN BY “CENTRAL
INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01
2.10 PROJECT COMPLETION
The construction is likely to start after getting Environmental Clearance and NOC/CTE from
the EAC and SPCB. The project may take 18 months for completion.
2.11 PROJECT COST
The cost of project is Rs. 6.00 crores.
2.12 TYPE OF INDUSTRIES NEAR THE PROJECT SITE
In Sikar, RIICO had developed industrial areas at Sikar, Neemkathana, Srimadhopur,
Khandela, Reengus, SKS Reengus, Fatehpur and Ramgarh Shekhawati and Ajitgarh. RIICO
had also developed a growth centre at Palsana. Other than RIICO area village Ajmeri,
Haripura and Jugalpura, Toda, Dabla, Patan Industrialized in mineral based industries.
• Airen Metals (P) Ltd.
• Sidhi Vinayak Containers Pvt. Ltd.,
• Shalimar Pellet Feeds Ltd.,
• Shera Metal Pvt. Ltd.,
• Asoka Cables Pvt. Ltd.,
• Sugna Foods Ltd.,
• Aksh Technologies Ltd.,
• Raj. Spinning & Weaving Mills.
• H.S.B. Agro Ind.Pvt. Ltd.
• Binani Cement Limited Village Sirohi, (Neemkathana) Sikar (Rajasthan)
• Agrobiotech Industries Ltd.,
• Arsh Dairy Max Ltd.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 26
CHAPTER 3 : DESCRIPTION OF ENVIRONMENT
3.1 BACKGROUND AND SALIENT ENVIRONMENTAL FEATURES OF THE STUDY AREA
Generation of environmental baseline of a project area is an important phase of any Environmental Assessment process. Baseline data provide vital information on the existing environmental quality in which a development is planned. In this study, the environmental characteristics of the project area were established through extensive literature search, field sampling/measurements, laboratory analysis, consultation and data interpretation.
Secondary data from literature search were also obtained from the Govt. sources i.e. Meteorological Department, CPCB/SPCB publications, and other related Govt. Sources. The baseline environmental data generation has been done for the period of 15th March 2016 to 15th June 2016.M/s Kamal Enviro & Food Lab Pvt. Ltd., Gurgaon-Haryana with EQMS team carried out sampling and testing. The study area within a 10 km radius around the proposed plant site has been considered as impact zone for EIA study. Primary and secondary data has been collected for 10 Km radius of the project site.
3.1.1 Environmental Setting and Salient Environmental Features of the Project Area
The proposed site is located at Plot Number: E-23 A SKS Industrial Area Reengus, District Sikar (Rajasthan). The proposed project is coming in the notified RIICO Industrial area. Mendha River is located about 1.6 km away from the plant site in northwest direction. National Highway no 11 (Agra—Jaipur-Bikaner) is passing about 2.05 km from plant site in north east direction. The project site falls in geological survey of India of Topo sheet no-45 M -11. The co-ordinates of the project site are given in Table 3.1.
Table 3.1: Co-ordinates of the project site
Corner Latitude Longitude
A 27°20'03.07 75°35'02.14"
B 27°20'03.21 75°35'03.65"
C 27°20'05.91 75°35'01.58
D 27°20'06.07 75°35'03.06"
Environmental setting of the 10 Km radius of the plant site is presented at Figure 3.1. Site environmental features are also visible through site photographs shown at Figure 3.2. There are no environmentally sensitive components such as National Park, Wildlife Sanctuary, Elephant / Tiger Reserve, migratory routes of fauna and wet land present within 15 Km
This Chapter describes the baseline environmental conditions around the project site
for various environmental attributes, viz., and physical, biological and socio-economic,
within the 10 km radial zone, which is termed as the study area. Topography, soil,
water, meteorology, air, noise, and land constitute the physical environment, whereas
flora and fauna constitute the biological environment. Demographic details and
occupational pattern in the study area constitute socio-economic environment. Baseline
environmental conditions are based on the field studies carried out during the study
period 15th March 2016 to 15th June 2016 at and around the proposed site and through
secondary data collected from published sources.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 27
radius of plant site. No reserved and protected forest area present within 10 km area of the site. The Salient Environmental Features of plant site is summarised at Table 3.2.
Table 3.2: Salient Environmental Features of Proposed Site
S.No. Areas Name/ Identity
Aerial distance (within 15 km.) Proposed project location boundary
1 Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value
No There are no areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value
2 Areas which are important or sensitive for ecological reasons – Wetlands, watercourses or other water bodies, coasted zone, biospheres, mountains, forests
Yes Mendha River -1.6 km, NW
3 Areas used by protected, important or sensitive species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration
No There are not Areas protected under international conventions, national or local legislation for their ecological, landscape, cultural or other related value
4 Inland, coastal, marine or underground waters
No Not applicable
5 State, National boundaries No There is no State, National boundaries in the 20 km Radius area.
6 Routes or facilities used by the public for access to recreation or other tourist, pilgrim areas
Yes NH-11 2.05 Km, ENE MDR-43, 3.46 Km, NNE
7 Defense installations No There are no Defense installations.
8 Densely populated or built-up area
Yes Scattered Habitation Village Parasrampura 1.03 km NE; Sargoth 2.53 km SE; Reengus – 3.40 Kms. NNW
9 Areas occupied by sensitive man-made land uses (hospitals, schools, places of worship, community facilities)
Yes Education Facility: Mahala Residential Public School, 3.56 Km, NNW, Emmanuel Mission School, 3.85 Km NNW, Shri Gyarsi Devi Choukhani Primary Sanskrit School, 4.10 Km NW, Govt. School Parasrampura 1.83 km NE; Govt. School Sargoth Medical Facility: Dhayal Hospital and Research Centre 3.75 Km, NNW, Govt. Hospital Reengus 4.20 Km NNW, Gov. Hospital Sargoth
10 Areas containing important, high quality or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals)
No Not applicable
11 Areas already subjected to pollution or environmental
No NA
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 28
S.No. Areas Name/ Identity
Aerial distance (within 15 km.) Proposed project location boundary
damage (Those where existing environmental standards are exceeded)
12 Areas susceptible to natural hazard which could cause the project to present environmental problems (earthquakes, subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)
No Project area falls in the seismic zone-III (Moderate Risk Zone)
(Source: Secondary source)
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT PLOT
NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT SIKAR
RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 29
Figure 3.1: Environmental Setting of the 10 Km Radius of the Plant Site
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 30
(Source: Site Visit)
Figure 3.2: Site Photographs
3.1.2 Site Connectivity
Road and Railways: The site is well connected to NH-11 (Agra—Jaipur-Bikaner) at an aerial distance ~2.05 Km in ENE direction.
The district head quarter is directly connected to Delhi and Jaipur. Total length of Rail line is 239 K.M. nearest railways station is Reengus located about 3.4 km from plant site. Major railway station for public transportation is Jaipur Railway Station located at an aerial distance of ~24 Km in SW Direction from the project site.
Air ways: Nearest airport from project site is Jaipur Airport located at an aerial distance of ~ 60.73 Km in SSE Direction.
3.1.2.1 Habitation near project site
Site is located in Shree Khatu Shyam Industrial area near Reengus, Sikar Rajasthan. Nearest villages from the proposed site area Parasrampura about 1.03 km in NE, Sargoth village about 2.53 km in SE; Reengus village about 3.40 Kms in NNW. Nearest schools are Govt. School Parasrampura located about 1.83 km in NE, Mahala Residential Public School about 3.56 Km in NNW, Emmanuel Mission School about 3.85 Km in NNW, Shri Gyarsi Devi Choukhani Primary Sanskrit School about 4.10 Km in NW, Govt.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 31
3.1.2.2 Archaeological Protected Areas
No archaeological site of national and international importance is present within 300 m of the plant site as well as 10 km area of the project site.
3.1.3 Existing Sources of Pollution within 10 km Area
Site is located in Shree Khatu Shyam Industrial area near Reengus, Sikar Rajasthan. SKS industrial area is developed by RIICO. Reengus industrial area is developed in 127.37 ha. Total no. of plots allotted is 128. There is about 82 industrial units are operating in SKS Reengus. There is another industrial area i.e. SKS Reengus extension which is under development. Total area of SKS Reengus extension is about 70.32 ha. The industries operation in the industrial area is mainly food processing, chemical industries and other small-scale industries.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT PLOT
NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT SIKAR, RAJASTHAN
BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 32
Figure 3.3: Google View of Area Showing Project Site
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 33
3.2 PHYSICAL ENVIRONMENT
District Sikar is situated in Arid Rajasthan Plain. The northwestern portion of the district forms part of the Great Indian Desert. The sand dunes in this area generally blow from southwest to northeast direction. The hills in the district form part of the Aravali range. Ranges of Aravali runs from south to north and divide the district almost into two parts. The hills have steep slopes and are generally wooded. The hills peaks, which have attained considerable height in the hill system of the district at Ragunathgarh, Harsh, Deogarh and Shyamgarh region etc., The hills in the district provide stones for building purposes which are of dull white color. There is no perennial river in the district, but there are five streams of some significance in the western region namely, Mendha, Kantli, Dokan, Krishnawati and Sabi. There is only one lake in the district at Peethampuri in Neemkathana Tehsil, but this is insignificant from the irrigation point of view. It is a small depression where rains water accumulates and lasts for few months. Similarly, there is no big tank in the district.
3.2.1 Drainage Pattern
There is no perennial river present within 10 km study area. Drainage pattern in study area is not well developed and stream or nala present in the study area are only activates in the rainy season and disappear in sandy fields after covering some distance. Mendha River is main surface water body present within the study area. However, Mendha River is a seasonal river. Other streams are also present in the 10 km area which is almost dry except during monsoon. Drainage map of study area is shown in Figure 3.4.
3.2.2 Topography
The Sikar district is located in the north-east part of the state at an average height of 422 meter above mean sea level. Jhunjhunu District bound it on the north on the northwest by Churu District, on the southwest by Nagaur District and on the southeast by Jaipur District. It also touches Mahendragarh District of Haryana on its northeast corner. The district is divisible into two main topographic areas. The western region is characterized by sand-dunes and eastern half of hill ranges. The extra north area is around Ramgarh is a semi-desert and the southern part of the district has loamy fertile land.
Topography within proposed plant site: The project site is almost flat and the elevation of the project area ranges between 470 to 475 meters above MSL. However, the project site is sloping slightly towards west and northwest direction.
Topography of site and surrounding 10 Km area: The topography of the project site and the study area of 10 km radial zone are almost plain. The average elevation of the project site is ranges between 440-475 meters above mean sea level. Contour Map and Digital elevation map (DEM1) of the 10 km area around project site is shown in Figure 3.5. Digital elevation map of the study area is shown in Figure 3.6
1The contours in Toposheet have been digitized in the GIS environment and assigned the respective elevation values in meters
with reference to the mean sea level. Using the SRTM (Shuttle Radar Topography Mission) data, the elevation values has been verified
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT PLOT
NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT SIKAR, RAJASTHAN
BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 34
Figure 3.4: Drainage Map of Study Area
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT PLOT
NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT SIKAR, RAJASTHAN
BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 35
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT PLOT
NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT SIKAR, RAJASTHAN
BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 36
Figure 3.5: Contours in 10 km Area Around Project Site
Figure 3.6: Digital Elevation Map of 10 Km Area (Project Site)
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 37
3.3 LAND USE PATTERN
Land use analysis was carried out using remote Sensing Data. Interpretation approach based on systematic digital imaging was used for delineating the land use classes. The demarcation of boundaries falling under different land use/land cover units is done using different colours assigned to different land use/land cover units of satellite imagery2.
Land use of project site is industrial. Most of the land within the 10 km area of the project site is agricultural land. As per the land use based on satellite image, about 71% of the land is under Agricultural Land. 9.0% of land is under vegetation, 3.0% of the land is under settlement and rest of the land is under other uses (Refer Figure 3.7 and 3.8 and Table 3.3).
Table 3.3: Land Use of the Study Area
S. No. Land Use Category Area ( Sq km) Area in %
1. Agricultural Land 222.71 71
2. Water body 0.01 0.00
3. Open Shrub Land 53.32 17
4.. Settlement 11 3.0
5. Vegetation 27.47 9.0
Total 314.51 100
(Source: Satellite image analysis by EQMS)
(Source: Satellite image analysis by EQMS)
Figure 3.7: Graph Showing Land Use of the Study Area (10 km Radius)
2The satellite Imagery of Indian Remote Sensing Satellite (IRS- ID, sensor P6, LISS III) of 24 m resolution was used. The Swath of the imagery is 141 Km x 141 Km. Band used are 4, 3, 2 and 5. LANDSAT imagery of 30 meter resolution and 185 x 185 km swath is also used for the comparative and overall analysis of the area. LISS III imagery and LANDSAT 4-5 TM imagery were used for the complete coverage of the study area
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT PLOT
NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT SIKAR, RAJASTHAN
BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 38
Figure 3.8: Land Use Map of 10 Km Area (Project Site)
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 39
3.4 GEOLOGY3
Geomophologically the district is classified into seven geomorphic unit’s namely longitudinal dune, transverse dune, obstacle dunes, sand sheet, piedmont, ridge and valley and pediment. The shadow zones behind ridge and valley acting as sand barriers are the only areas used for cultivation of seasonal crops. The study area lies in zone of traverse dune (Figure 3.9).
Geologically the Sikar district is comprising of Post Delhi and Delhi subgroup formations. The geological succession of Sikar district is as follows:
Formation Rock Type
Recent sub recent
Post Delhi
Alibagh Group
Delhi Sub group
Alwar group
Sand, alluvium etc.
Granites and Pegmatite (Intrusive)
Schist and Dolomite
Marble and Phyllites
Quartzite, Schist and Conglomerates
Figure 3.9: Geomorphology of Sikar District (Source: GSI Resource Map)
3 Source: Sikar Report: Central Ground Water Board.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 40
3.4.1 Seismicity and Associated Hazards
IMD has divided India into different seismic zone and Sikar district, Rajasthan is fallen under third zone, although little part of Rajasthan also falls under fourth and fifth zone. The seismic zoning map of India shows four distinct seismic zones and is attached as Figure 3.10.
• Zone - II: This is said to be the least active seismic zone.
• Zone - III: It is included in the moderate seismic zone.
• Zone - IV: This is considered to be the high seismic zone.
• Zone - V: It is the highest seismic zone.
According to IMD micro zonation map of the India the study area falls under Zone-III. It means that the area is covered under “Moderate Seismicity-Hazard Zone.
Figure 3.10: Seismic Zones of India
3.5 SOIL
Soils may be defined as a thin layer of earth's crust that serves as a natural medium for the growth of plants wherein root zone develops. It is the unconsolidated mineral matter that has been subjected to and influenced by genetic and environmental factors. Soils serve as a reservoir of nutrients for plants and crops and also provide mechanical anchorage and favourable tilts. Soil is the seat of many macro and micro flora like algae, fungi, earthworms, bacteria etc. These are very beneficial in promoting soil reactions and decomposing the organic matter by which essential nutrients for plants are liberated.
Project Site
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 41
3.5.1 Regional Soil Types
Soil of the region falls within rainfall zone of 300 – 500 mm. The soil is sandy loam, sallow depth red soils in depressions. Table 3.4 shows nutrient level in the Sikar soil including area coverage of saline and sodic soil. The nutrient status of the Sikar soil is graded as low to medium level.
Table 3.4: Fertility Status – Major Nutrients and Problematic Soils of Sikar District
Status
Nutrient Saline
Soil (Ha)
Sodic or Alkaline (Ha) N P K
L M M 59936 30036
(Source: Vital Agricultural Statistics 2004-05, Directorate of Agriculture, Rajasthan)
3.5.2 Soil Classification of District
The soils of the district have been broadly classified by Agriculture Department, Govt. of Rajasthan are Desertic soil, Red desertic soil, Serozems, Saline soil, Lithosols, Regosols and Old alluvium.
Agriculture is major sector contributing in the state economy and remains the main-stay of the population of the District as well as State. Land form, slope, soils and natural resources are some of the important factors which control the land use pattern of the district. There is no perennial river in the district. The most important rivers in the district are Mendha, Kantli, Dohan, Krishnawati and Sabi. Net area under irrigation is 37.98% of the total geographical area of the district. There is no major irrigation project in the district and Dug wells & tube wells are the main source of irrigation. Almost 95% of the total annual rainfall is received during the southwest monsoon, which enters the district in the last week of June and withdraws in the middle of September.
3.5.3 Cropping Pattern
Due to unavailability of irrigation facilities as well as scanty rainfall in the study area the agriculture practices are not so well developed. Irrigation is also restricted to areas with good ground-water potential. Agriculture is mainly practice during monsoon season. The main crops grown in the study area during rainy season are Bajra, sesamum and kharif pulses. Wheat, barley, mustard and gram are grown as irrigated crops.
The major Kharif crops are bajra, jowar, pulses, maize and groundnut. Main Rabi crops are wheat, barley, gram and oilseeds. Cotton is an important cash crop that is grown in the district. Cropping Pattern of Sikar District for Kharif and Rabi season is presented in Table 3.5 & 3.6 which are given as follows;
Table 3.5: Area under Different Crops, 2011
S. No. Major Cultivated Crops Total Area(,000-ha) Irrigated Rain fed
1 Bajra 298 98 200
2 Cluster Bean 81 - 81
3 Cowpea 59 - 59
4 Moong 15 - 15
5 Moth 9 - 9
6 Wheat 85 85 -
7 Barley 26 26 -
8 Mustard 80 80 -
9 Gram 38 38 -
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 42
S. No. Major Cultivated Crops Total Area(,000-ha) Irrigated Rain fed
Horticulture Crops-Fruits
10 Aonla & Ber 1.8
Horticulture Crops-Vegetables
11 All Vegetable 6.5
12 Onion 5.0
Medicinal & Aromatic Crops
13 Aloe Vera 0.02
14 Genda 0.05
Fodder Crops
15 Total Fodder Crop Area 10.5
(Source-http://www.nicra-icar.in/nicrarevised/images/statewiseplans/Rajastan%20(Pdf) /RAU ,%20 Bikaner/ RAJ7-Sikar-30-06-2011.pdf)
Table 3.6: Production and Productivity of Major Crops, 2011
S. No.
Major Cultivated
Crops
Kharif Rabi
Summer
Total
Prodn. (,000-t)
Prodty. ( Kg/ha)
Prodn. (,000-t)
Prodty. ( Kg/ha)
Prodn. (,000-t)
Prodty. ( Kg/ha)
1 Pearl Millet 329 935 - - - 329 935
2 Cluster Bean 44 440 - - - 44 440
3 Cowpea 25 429 - - - 25 429
4 Mung Bean 4 294 - - - 4 294
5 Moth Bean 2.5 278 - - - 2.5 278
6 Wheat - - 256 3009 - 256 3009
7 Barley - - 72 2793 - 72 2793
8 Mustard - - 87 1059 - 87 1059
9 Gram - - 39 1032 - 39 1032
Major Horticulture Crops
10 Aonla & Ber - - 3.6 2003 - 3.6 2003
11 Vegetables - - 81.6 12500 - 81.6 12500
(Source-http://www.nicra-icar.in/nicrarevised/images/statewiseplans/Rajastan%20(Pdf)/ RAU,%20 Bikaner/RAJ7-Sikar-30-06-2011.pdf)
3.6 METEOROLOGICAL DATA (30 Years Avg)
The meteorological parameters play a vital role in transport and dispersion of pollutants in the atmosphere. Historical meteorological data were obtained from climatological tables pertaining to Sikar (as the nearest representative IMD station) for the period 1974-1990 and is summarised in Table 3.7.
Table 3.7: Meteorological Data of Sikar (Period 1974-1990)
Month Temperature (deg C) daily
Relative Humidity,
%
Rainfall Wind speed
Pre-dominant wind direction
Cloud cover
Barometric Pressure,
Max Min Max Min In mm Kmph From Octas Hpa
January 22.7 4.3 61 37 5.2 4.0 W 0.9 968.0
February 25.5 7.1 53 34 13.3 4.4 W 0.8 965.9
March 31.3 12.6 47 30 4.8 4.5 W, NW 0.7 963.3
April 36.8 18.5 41 26 4.6 4.8 W, NW 0.6 959.8
May 39.7 22.9 47 31 27.8 5.5 W, NW 0.8 956.5
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 43
Month Temperature (deg C) daily
Relative Humidity,
%
Rainfall Wind speed
Pre-dominant wind direction
Cloud cover
Barometric Pressure,
Max Min Max Min In mm Kmph From Octas Hpa
June 39.6 25.7 56 37 41.0 6.7 W 1.2 953.4
July 35.3 24.9 73 59 215.0 6.6 W 2.5 951.7
August 33.6 24.1 77 63 145.1 4.3 W, S 2.4 953.0
September 34.2 22.2 68 51 55.6 4.4 W 1.3 957.2
October 34.2 16.7 54 34 3.1 4.6 W 0.3 962.3
November 29.3 10.0 53 35 4.1 3.2 W 0.4 966.4
December 23.8 5.1 58 38 6.2 3.1 W 0.7 968.1
(Source-IMD Sikar)
3.6.1 Wind Speed and Direction
The wind speed was mostly between 3.1 – 6.7 km/hour for all the months. The wind speed during summer season was mostly between 4.5 – 5.5 km/hr while during rainy season, it was between 4.3 – 6.7 km/hr and in winter months wind speed ranges between 4.1 – 6.2 km/hr. The predominant wind direction is from west direction and Northwest. During study period (pre-monsoon) season the wind flows from west direction and Northwest
3.6.2 Relative Humidity
The air is generally dry in the region except during monsoon. February-March are driest with relative humidity between 53-47%. The maximum humidity during rainy season is 77% and minimum was 37%. High humidity is found during daytime and low humidity values during night time in all the months.
3.6.3 Temperature
December and January constitute winter months with daily mean minimum temperature around 22.7oC to 23.8oC and May is the hottest month with daily mean maximum temperature around 39.6oC.
3.6.4 Rainfall
The annual total rainfall is ~ 525 mm. Over 80% of the total annual rainfall is received during the monsoon period between June & September.
3.6.5 Calm Periods
The calm period constitutes an important factor in the dispersion of air pollution. The calm period is more during night time compared to daytime. The maximum calm period occurs during September to February. Monthly calm is shown Table 3.8.
Table 3.8: Monthly Percentages of Calm Periods
Calm Period, % Day 85 81 78 83 65 57 67 76 78 85 88 87
Night 69 73 67 62 51 61 69 73 69 76 79 71
(Source-IMD Sikar)
3.6.6 Site Specific Met Data:
An automatic met station was established at site to collect the site-specific data. The predominant wind direction was from West, and Northwest direction. Clam conditions remains 10% of the time. The summery of the met data is summarised in Table 3.9. Wind rose diagram of Sikar is shown in Figure 3.11.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 44
Table 3.9: Meteorological Data of Project Site
Month/Time Temperature (deg C)
Relative Humidity, %
Wind Speed Range,
m/s
Predominant Wind Direction
Max Min Max Min (Blowing from)
March-April 2016 37 17 65 7 0.5 to 7.2 W, NW April -May 2016 41 23 44 4
May-June 2016 42 25 74 5
(Source-World Weather on line.com)
(Source-IMD)
Figure 3.11: Wind Rose Diagram (March 2016 to June 2016)
3.6.7 Inversion Occurrence:
Mixing Height values of the site has been obtained from isopleths given in CPCB Publication “Spatial Distribution of Hourly Mixing Depth over Indian Region“-PROBES/88/2003-03. The seasonal mixing height data (in m) is given below.
Time (IST) Winter Summer Season Post-Monsoon
5.00 -- 100 --
6.00 -- 100 --
7.00 50 100 50
8.00 100 200 200
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 45
Time (IST) Winter Summer Season Post-Monsoon
9.00 200 400 400
10.00 500 700 500
11.00 800 1000 600
12.00 1000 1000 800
13.00 1200 1000 1000
14.00 1200 1000 1000
15.00 1200 1000 1000
16.00 1000 1000 800
17.00 800 1000 600
18.00 700 1000 600
19.00 -- 1000 600
The frequency of occurrence of elevated inversions at 5.30 AM and 5.30 PM over Central Indiashows lower values of 15% and less. The percentage frequencies of ground-based inversions with top heights at 00 GMT and 12 GMT as well as the percentage frequencies of elevated inversions at 00 GMT and 12 GMT are shown below (Central India).
Percentage Frequencies of Elevated Inversions (00 GMT)
Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
03 06 08 05 10 09 03 06 11 04 03 01
Percentage Frequencies of Elevated Inversions (12 GMT)
Jan Feb Mar Apr May Jun July Aug Sept Oct Nov Dec
00 04 01 04 02 04 02 01 05 02 03 01
High ground-based inversions at 5.30 AM of the order of 90% and above is observed over Central India (including eastern part) during November and December. At 5.30 PM the ground-based inversions are below 5% all over central India. The distribution of the top heights of the inversion layers over central India for 5.30 AM shows deep formation with heights varying between 400 and 1500 m. At 5.30 PM the distribution is insignificant.
Mixing height (Pre Monsoon Season )
100 100 100
200
400
1000
700
1000100010001000 10001000 10001000
0
200
400
600
800
1000
1200
5:00
AM
6:00
AM
7:00
AM
8:00
AM
9:00
AM
10:00
AM
11:00
AM
12:00
PM
1:00
PM
2:00
PM
3:00
PM
4:00
PM
5:00
PM
6:00
PM
7:00
PM
Time, IST
Mix
ing
Heig
ht
in m
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 46
3.6.8 Barometric Pressures
The station level barometric pressure at IMD Sikar site ranges between 953.0 to 968.0 h Pa. The station level pressure is high in winter months and low in during rainy season.
3.6.9 Primary Data Collection: Monitoring Plan and Quality Assurance Procedures
The study period and methodology for primary data collection is followed as per the CPCB guidelines in line with TOR prescribed by MoEF&CC. Summary of monitoring plan with sampling testing methodology followed is summarised in Table 3.10. Environment monitoring location map given in Figure 3.12.
Table 3.10: Summary of Methodology for Primary/Secondary Baseline Data Collection
Parameters No. of
Sampling Locations
Frequency/ Study Period
Remark
Ambient Air Quality
PM (10), PM(2.5), SO2,
Nox, VOC, CO, CL2, and HCL
8 locations (Refer Fig. No.3.4 )
Twice a
Week
(15th March 2016 to 15th June 2016)
AAQ monitoring was carried out at 8 locations (representing upwind, downwind and crosswind directions of the site). 24 hours sampling at each location was carried out as per CPCB guide lines (CPCB Gazette notification dated 18.11.2009 on AAQ).
Meteorology
Temperature, Humidity, Wind speed, Direction, Rainfall etc.
One location
Hourly
(15th March 2016 to 15th June 2016)
Met station was established at site to analyse the hourly meteorology data.
Surface & Ground Water Quality
Physical, chemical and biological parameters as per IS 10,500
7 Locations
(Refer Fig. No.3.4 )
Once
During study period
Ground water: ground water sampling was conducted at 7 locations. Samples were preserved, transported and analysed for different parameters based on APHA methods. Temp, conductivity and pH which were measured instantaneously at site itself.
Soil
Texture, bulk density, pH, conductivity, cation exchange capacity, organic matter, Total N,P,K, and Heavy metals etc.
5 locations Once in season
Soil samples were collected at five locations and analysed as per IARI method
Noise
Noise profiling for 24 hrs (day and night time)
8 locations
(Refer Fig. No.3.4 )
Once in season
Noise monitoring was conducted within the 10 km area of project site for noise profiling for 24 hrs using integrated sound level meter, as per CPCB guidelines.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 47
Parameters No. of
Sampling Locations
Frequency/ Study Period
Remark
Ecology
Flora & Fauna
Once Primary survey/ Secondary sources
Terrestrial Ecology
Demography & Socioeconomic
- Once Primary survey/ Secondary sources
(Source: Primary/Secondary Baseline Data Collection)
Standard methods and procedures have been strictly adhered to in the course of this study. QA/QC procedures were strictly followed which covers all aspects of the study, and includes sample collection, handling, laboratory analyses, data coding, statistical analyses, presentation and communication of results. All analysis was carried out in NABL accredited/recognized laboratory.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT PLOT
NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT SIKAR
RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 48
Figure 3.12: Sampling Monitoring Locations
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 49
3.7 AIR ENVIRONMENT
Air environment is an important component of EIA report. The project activities like construction, Vehicle movement, boiler and process emissions, operation of DG sets, fugitive emissions from various material handing activities and plant operation will contaminate the ambient air quality. The base line data of the study area collated during field studies is summarised under following sections.
3.7.1 Selection of Monitoring Stations
Eight (8) numbers of monitoring stations were set up to assess the prevailing ambient air quality within the study area. The CPCB guide lines were adhered for monitoring network design. However, certain adjustments were incorporated because of local infrastructure. Logistic considerations as ready accessibility, security, availability of reliable power supply etc. were examined while finalizing the monitoring locations. The locations of the AAQ monitoring stations were based on the frequent wind directions besides at the location of sensitive receptor as human habitation for exposure assessment.
Ambient air quality monitoring was carried out at eight locations within the study area during 15st March, 2016 to 15th June 2016 with the frequency of weekly two samples of 24 hours average (8 hrs. avg. for CO) each at each location. All the ambient air analysis with respect to each parameter were analysed as per CPCB guidelines. The AAQ monitoring locations with their terrain feature are provided in Table 3.11. Map showing locations of Air Sampling is given in Figure 3.12.
Table 3.11: Ambient Air Quality Monitoring Locations
Code Name of Location Distance & Direction w.r.t to
plant site
Category Lat - Long
AQ-1 Near Project Site 0.12 km, E Industrial N- 27° 20.057, E- 75° 35.107
AQ-2 RIICO Area Near DS Milk Plant
0.54, SE Industrial N- 27° 19.904, E- 75° 35.317
AQ-3 Parasrampura 0.94, E Rural N- 27° 19.975, E- 75° 35.584
AQ-4 Garhi 2.47, SE Rural N- 27° 19.128, E- 75° 36.115
AQ-5 Sargot 2.59, SE Rural N- 27° 19.470, E- 75° 36.537
AQ-6 Harsolai 1.14, SW Rural N- 27° 19.743, E- 75° 34.413
AQ-7 Sector-16 Ringas 2.55, NW Mix Commercial
N- 27° 20.796, E- 75° 33.760
AQ-8 Khatodiya Ki Dhani 3.32, SE Rural N- 27° 19.696, E- 75° 37.007
(Source: Please prefer Figure 3.12)
3.7.2 Analysis of Ambient Air Quality:
Ambient Air Quality test results are shown in Table 3.12 & 3.13.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT PLOT
NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT SIKAR
RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 50
Table 3.12: Ambient Air Quality Monitoring Results (for 24-hour average)
Location AAQ Location
PM10 (µg/m3) PM 2.5 (µg/m3) SO2 (µg/m3) NOx (µg/m3)
Code Max Min Mean Max Min Mean Max Min Mean Max Min Mean
AQ-1 Near Project Site 76 48 64 30 20 27 8.5 5.6 7.2 15.4 10.5 13.2
AQ-2 RIICO Area Near DS Milk Plant
80 50 66 33 21 29 9.0 6.5 7.8 17.8 12.2 15.0
AQ-3 Parasrampura 66 40 51 29 17 22 8.2 6.2 7.3 16.3 11.8 14.4
AQ-4 Garhi 61 42 52 26 18 22 7.3 5.0 6.1 14.2 9.6 12.3
AQ-5 Sargot 63 44 55 26 19 23 7.6 5.3 6.6 15.0 10.2 12.6
AQ-6 Harsolai 56 38 48 23 15 19 7.5 5.0 6.3 16.1 11.5 14.0
AQ-7 Sector-16 Ringas 60 43 50 25 18 21 9.0 6.6 7.9 14.8 10.5 12.8
AQ-8 Khatodiya Ki Dhani 58 39 49 24 17 19 8.8 5.8 7.4 16.5 12.0 14.2
Source: Kamal Enviro & Food Lab Pvt. Ltd., Gurgaon-Haryana
Table 3.13: Ambient Air Quality Monitoring Results (for 24-hours average)
Location
Code AAQ Location
CO (mg/m3) VOC (mg/m3) HCL (µg/m3)
Max Min Mean Max Min Mean Avg.
AQ-1 Near Project Site 0.31 0.15 0.22 <0.1 <0.1 <0.1 <1.0
AQ-2 RIICO Area Near DS Milk Plant 0.44 0.24 0.35 <0.1 <0.1 <0.1 <1.0 AQ-3 Parasrampura <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <1.0 AQ-4 Garhi 0.25 0.15 0.20 <0.1 <0.1 <0.1 <1.0 AQ-5 Sargot 0.26 0.13 0.20 <0.1 <0.1 <0.1 <1.0 AQ-6 Harsolai <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <1.0 AQ-7 Sector-16 Ringas 0.30 0.18 0.26 <0.1 <0.1 <0.1 <1.0 AQ-8 Khatodiya Ki Dhani <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <1.0
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 51
3.7.3 Observation on Ambient Air Quality
PM10 (µg/m3): PM10 of the study area were found well in the National Ambient Air Quality standard.PM10 levels were found ranging from 39 to 80 µg/m3. The highest PM10 levels were found at RIICO industrial area (80 µg/m3) and Project site (76 µg/m3) while the lowest levels was found at Village Khatodia ki Dhani (39 µg/m3). The PM10 in the study area is contributed mainly by industrial emissions, vehicular emissions, and re-suspended dust from paved roads and open areas as well as from industrial activities.
PM2.5 (µg/m3): PM2.5 of the study area was found well in the National Ambient Air Quality standard. PM2.5level was found ranging from 15 to 33 µg/m3. The highest PM2.5 level was observed at RIICO industrial area (33 µg/m3) and Project site. While in other locations the PM2.5level was quite below the NAAQS.
SO2 (µg/m3): SO2level of the study area was found well in the National Ambient Air Quality standard. SO2 level were found ranging from 5.0 to 9.0 µg/m3. The SO2 level of the Study area is well within the NAAQS Standard of 80 µg/m3. The main source of SO2 emission is vehicular sources
NOx (µg/m3): NOx level of the study area was found well in the National Ambient Air Quality standard. NOx level was found ranging from 9.6 to 17.8 µg/m3. The highest level of NOx was found at RIICO industrial area the main source of NOx emission is industrial & vehicular sources.
NH3 (µg/m3): NH3level of the study area was found well in the National Ambient Air Quality standard.
Other Parameters:
CO level in the study area ranges between 0.1 to 0.44-mg/m3, which is well within the NAAQS. VOC, HCL and CL2 were not detected in the study area.
3.8 AMBIENT NOISE QUALITY
The noise level in study area was measured at eight locations. As mentioned earlier a sound level meter has been used to measure noise levels as instant values which are integrated over a given period to give Leq values as a weighted average. At each location, readings were taken at uniform interval of. 5 seconds over a period of 10 minutes per hour for twenty-four hours’ period, with further divisions of day and night noise as per CPCB guidelines (between 6.00 A.M to 10.00 P.M and between 10.01 P.M to 5.59 A.M representing day and night period noise levels).
3.8.1 Noise Levels in the Study Area
Ambient noise measurement was taken at 8 locations within 10 km area of the project site. Noise monitoring location and noise results for day time and night time is presented in Table 3.14 & 3.15 respectively.
Table 3.14: Ambient Noise Monitoring Locations
Location Code
Name of Location Distance & Direction w.r.t., Site
Features Coordinates
N-1 Project Site 0.12 km, E Industrial
N- 27° 20.057, E- 75° 35.107
N-2 RIICO Area Near DS Milk Plant
0.54, SE Industrial N- 27° 19.904, E- 75° 35.317
N-3 Parasrampura 0.94, E Residential
N- 27° 19.975, E- 75° 35.584
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 52
Location Code
Name of Location Distance & Direction w.r.t., Site
Features Coordinates
N-4 Sargot 2.47, SE Residential N- 27° 19.128,
E- 75° 36.115
N-5 Garhi 2.59, SE Residential N- 27° 19.470,
E- 75° 36.537
N-6 Harsolai 1.14, SW Residential N- 27° 19.743,
E- 75° 34.413
N-7 Sector-16 Ringas 2.55, NW
Mix Commercial
N- 27° 20.796, E- 75° 33.760
N-8 Khatodiya Ki Dhani 3.32, SE Residential
N- 27° 19.696, E- 75° 37.007
(Source: Please prefer Figure 3.12)
Table 3.15: Ambient Noise Quality in Study Area
S. No.
Locations Category dB(A) Leq Day time
Standard dB(A) Leq
dB(A) Leq Night time
Standard dB(A) Leq
1. Project Site Industrial 59.6 75 53.3 65
2. RIICO Area Near DS Milk Plant
Industrial 63.9 75 54.8 65
3. Parasrampura Residential 52.6 55 43.4 45
4. Sargot Residential 50.5 55 41.6 45
5. Garhi Residential 49.3 55 41.2 45
6. Harsolai Residential 48.7 55 40.8 45
7. Sector-16 Ringas
Mix Commercial 58.5 65 46.2 55
8. Khatodiya Ki Dhani
Residential 49.6 55 41.0 45
Source: Kamal Enviro & Food Lab Pvt. Ltd., Gurgaon-Haryana
Observation of Ambient Noise Quality
Ambient noise level of the study area is within the prescribed National Ambient Noise Quality Standard for respective residential, commercial and industrial zone at all the monitoring locations.
3.9 WATER ENVIRONMENT
3.9.1 Ground Water
Groundwater is the water present beneath Earth's surface in soilpore spaces and in the fractures of rock formations. Groundwater is the water found underground in the cracks and spaces in soil, sand and rock. It is stored in and moves slowly through geologic formations of soil, sand and rocks called aquifers.
3.9.2 Usage Purpose of Ground Water
The study area (10 km) falls in Dhod and Piprali block of Sikar district. Annual ground water recharge of Piprali and Dhod block is 34.87 MCM and 44.40 MCM respectively, net annual ground water availability is 31.38 MCM and 39.96 MCM respectively. The stage of ground water development in Piprali and Dhod block is 196.82% and 157.86% respectively. Both
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 53
block area categorized in over exploited zone. Details of ground water resources in Piprali and Dhod block and Sikar districts given in Table 3.16.
Table 3.16: The Details of Ground Water Resources of Sikar District (MCM/YEAR)
Block Area of Block
(Sq.Km.)
Annual Ground Water
Recharge (MCM)
Net Annual Ground Water
Availability (MCM)
Existing Gross
Ground Water
Draft for Irrigation
(MCM)
Existing Gross
Ground Water Draft for Dom.& Industrial Use(MCM)
Existing Gross
Ground Water
Draft for All Uses (MCM)
Stage of Ground Water
Development (%)
Dhod 911.15 44.4076 39.9668 53.5787 9.5137 63.0924 157.86
Piprali 807.66 34.8759 31.3883 51.0899 10.6890 61.7789 196.82
Sikar District 7880.85 334.2306 302.1155 392.7958 69.5186 462.3144 153.03
(Source: Ground water voucher Sikar district)
3.9.3 Depth to Ground Water Table
The groundwater storage is largely controlled by the prevailing hydrogeological and geomorphic conditions. Besides, magnitude of input (recharge) to the ground water system and output (discharge) from it also influences the status of groundwater regime. The study area falls in Piprali and Dhod block of Sikar District. The depth to ground water in the district ranges from 10 to 60 mbgl in pre monsoon period whereas it ranges from 30 to >70 mbgl in post monsoon period. Depth to water table in District is provided in Figure 3.13.
Pre monsoon season
Post Monsoon
(Source: Ground water voucher Sikar district)
Figure 3.13: Ground Water Table Map of Sikar District
3.9.4 Ground Water Quality
Drinking water requirement of the study area is adequately met through ground water resources. To assess the ground water quality of the study area eight ground water samples were collected from different locations within the study area and analysed as per standard method. The water samples were examined for physico-chemical parameters as well as for bacteriological parameters. Samples for chemical analyses were collected in polyethylene carboys. Samples for bacteriological analyses were collected in sterilized bottles (APHA Method). The details of sampling locations with distance from site and sources are presented
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 54
in Table 3.17. Map showing water sampling location is given in Figure 3.12. Analysis results of groundwater are presented in Table 3.18.
Table 3.17: Name of Ground Water Sampling Locations
S. No. Stations Source Distance from site Lat Long
GW1 Project Site Borewell 0.12 km, E N-27º20.057 E-75º35.107
GW2 Parasrampura Borewell 0.94, E N-27º19.975 E-75º35.584
GW3 Harsoli Handpump 1.14, SW N-27º19.743 E-75º34.413
GW4 Khatodiya Ki Dhani
Borewell 3.32, SE N-27º19.696 E-75º37.007
GW5 Ward -16 Ringas Handpump 2.55, NW N-27º20.796 E-75º33.760
GW6 Sargoth Borewell 2.47, SE N-27º19.470 E-75º36.537
GW7 Garhi Borewell 2.59, SE N-27º19.128 E-75º36.115
GW8 RIICO Area (Near DS Milk Plant)
Borewell 0.54, SE N-27º19.904 E-75º35.317
(Source: Please prefer Figure 3.12)
Table 3.18: Ground Water Quality
S. No.
Parameters GW1
GW2
GW3
GW4
Method Desired Limit
/Permissible Limit
1 pH value 7.74 7.66 7.90 7.92 APHA-4500 6.5-8.5/ No relexation
2 Temperature 0C 27.2 27.0 27.5 27.1 IS:3025 Part 9
--
3 Conductivity,
mhos/cm
354 565 450 332 APHA-4500 --
4 Turbidity (NTU) 0.68 0.92 0.84 0.62 APHA-2030B
1-5
5 Total Dissolved solids mg/l
238 388 320 224 APHA-2540B
500/2000
6 Total Suspended solids mg/l
0.4 0.6 0.2 0.2 APHA-2540D
--
7 Total Hardness as CaCO3 mg/l
154 248 184 136 APHA-2340C
200/600
8 Chloride as Cl mg/l 28 46 34 24.8 APHA-4500B
250/1000
9 Total Alkalinity mg/l 126 204 150 116 IS:3025Part 23
200/600
10 Sulphates as SO4
mg/l 11.6 22 16.5 10.8 APHA-
4500E 200/400
11 Nitrates as NO3 mg/l 0.19 0.21 0.20 0.30 APHA-4500 45/No relexation
12 Fluoride as F mg/l 0.46 0.55 0.43 0.39 APHA-4500D
1/1.5
13 Iron as Fe mg/l 0.38 0.42 0.34 0.36 APHA-3111B
0.3/No relexation
14 Zinc as Zn mg/l <0.1 <0.1 <0.1 0.10 APHA- 5/15
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 55
S. No.
Parameters GW1
GW2
GW3
GW4
Method Desired Limit
/Permissible Limit
3111B
15 Calcium as Ca mg/l 55.6 88 66 32 APHA-3500B
75/200
16 Magnesium as Mg mg/l
4.4 6.8 5.4 9.8 APHA-3500B
30/100
17 Sodium as Na mg/l 6.2 7.8 4.5 4.6 APHA-3500 --
18 Potassium as K mg/l 1.1 1.5 0.8 0.9 APHA-3500 KB
--
19 Cadmium as Cd mg/l <0.01 <0.01 <0.01 <0.01 APHA-3111B
0.003/No elexation
20 Copper as Cu mg/l <0.01 <0.01 <0.01 <0.01 APHA-3111B
0.05/1.5
21 Nickel as Ni mg/l <0.01 <0.01 <0.01 <0.01 APHA-3111B
0.02/No relexation
22 Lead as Pb mg/l <0.01 <0.01 <0.01 <0.01 APHA-3111B
0.01/No relexation
23 Mercury as Hg mg/l <0.001 <0.001 <0.001 <0.001 APHA-3112 0.001/0.001
24 Chromium (Total as Cr) mg/l
<0.05 <0.05 <0.05 <0.05 APHA-3111B
0.5/No relexation
25 Arsenic as As mg/l <0.025 <0.025 <0.025 <0.025 APHA-3114 0.01/0.05
26 Phenolic compound mg/l
<0.001 <0.001 <0.001 <0.001 IS:3025Part 43
0.001/0.002
27 Total coliform MPN/100ml
Nil Nil Nil Nil APHA-9230B
Nil
Source: Kamal Enviro & Food Lab Pvt. Ltd., Gurgaon-Haryana
Table 3.19: Ground Water Quality
S. No.
Parameters GW5
GW6
GW7
GW8
Method Desired Limit
/Permissible Limit
1 pH value 7.72 7.86 7.78 7.58 APHA-4500 6.5-8.5/ No relexation
2 Temperature 0C 27.6 27.4 27.3 27.2 IS:3025 Part 9 --
3 Conductivity,
mhos/cm
1132 658 604 624 APHA-4500 --
4 Turbidity (NTU) 1.2 1.0 0.98 0.92 APHA-2030B 1-5
5 Total Dissolved solids mg/l
786 472 422 418 APHA-2540B 500/2000
6 Total Suspended solids mg/l
4.2 3.8 4.0 2.0 APHA-2540D --
7 Total Hardness as CaCO3 mg/l
496 288 264 258 APHA-2340C 200/600
8 Chloride as Cl mg/l 92 54 48 46 APHA-4500B 250/1000
9 Total Alkalinity mg/l 398 218 210 206 IS:3025 Part 200/600
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 56
S. No.
Parameters GW5
GW6
GW7
GW8
Method Desired Limit
/Permissible Limit
23
10 Sulphates as SO4
mg/l 44 24.8 23.6 22.8 APHA-4500E 200/400
11 Nitrates as NO3 mg/l 0.48 0.22 0.20 0.018 APHA-4500 45/No relexation
12 Fluoride as F mg/l 0.56 0.75 0.68 0.66 APHA-4500D 1/1.5
13 Iron as Fe mg/l 0.49 0.46 0.36 0.32 APHA-3111B 0.3/No relexation
14 Zinc as Zn mg/l <0.1 <0.1 <0.1 <0.1 APHA-3111B 5/15
15 Calcium as Ca mg/l 178 102 94 90 APHA-3500B 75/200
16 Magnesium as Mg mg/l
13.6 8.7 7.8 7.4 APHA-3500B 30/100
17 Sodium as Na mg/l 22 18 12 10 APHA-3500 --
18 Potassium as K mg/l 2.8 1.3 1.2 1.0 APHA-3500 KB
--
19 Cadmium as Cd mg/l
<0.01 <0.01 <0.01 <0.01 APHA-3111B 0.003/No elexation
20 Copper as Cu mg/l <0.01 <0.01 <0.01 <0.01 APHA-3111B 0.05/1.5
21 Nickel as Ni mg/l <0.01 <0.01 <0.01 <0.01 APHA-3111B 0.02/No relexation
22 Lead as Pb mg/l <0.01 <0.01 <0.01 <0.01 APHA-3111B 0.01/No relexation
23 Mercury as Hg mg/l <0.001 <0.001 <0.001 <0.001 APHA-3112 0.001/0.001
24 Chromium (Total as Cr) mg/l
<0.05 <0.05 <0.05 <0.05 APHA-3111B 0.5/No relexation
25 Arsenic as As mg/l <0.025 <0.025 <0.025 <0.025 APHA-3114 0.01/0.05
26 Phenolic compound mg/l
<0.001 <0.001 <0.001 <0.001 IS:3025 Part 43
0.001/0.002
27 Total Coliform MPN/100ml
Nil Nil Nil Nil APHA-9230B Nil
Source: Kamal Enviro & Food Lab Pvt. Ltd., Gurgaon-Haryana
Observation on Ground Water Quality
The Physico-chemical characteristics of the ground water samples were in good agreement with IS: 10500 permissible limits. Total dissolve solids values are well within the desirable limit except water sample of Reengus location. Total Hardness, calcium, Magnesium and chloride values are slightly above the desirable limit but within the permissible limits specified under Drinking Water Standard (IS: 10500). As regards heavy metals, only Fe and Zn were present but quite lower in concentration whereas the other heavy metals were in traces. Hence, the GW of the study area is neither contaminated nor high in any metallic contamination from any natural sources.
3.9.5 Surface Water Quality
Most of the surface water sources in the study area are seasonal. All the surface water sources in the study area were dry during study period. Hence no surface water sample was collected.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 57
3.9.6 Soil Sampling and Analysis
The soil samples were collected from Six (06) selected locations during the pre-monsoon season. The samples collected from all the locations were homogeneous representatives of each location. At random five sub-locations were identified at each location and soil samples were collected from 5 to15-cm below the surface. It was uniformly mixed before homogenizing the soil samples. The samples about 500-gms were packed in polythene bags labelled in the field with location & number and sent to the laboratory for the analysis of various physicochemical parameters. Soil sampling locations were selected based on the local geological formation and the agricultural practices.
For studying soil quality in the study area, sampling locations were selected to assess the existing soil conditions in and around the proposed project site representing various land use conditions. The homogenized samples were analyzed for selected physicochemical parameters. Soil sampling locations with their distance & directions with respect to the proposed project site are presented in Table 3.20 & shown in Figure3.12.
Table 3.20: Soil Sampling Locations
Location Code
Sampling Locations Distance, km & Direction w.r.t. the Project Site
Location Remark
S-1 Project Site 0.12 km, E Industrial
S-2 Harsolai 1.14, SW Rural
S-3 Parasrampura 0.94, E Rural
S-4 Gadhi 2.47, SE Rural
S-5 Sargoth 2.59, SE Rural
S-6 Ringus (Ward No. 16) 2.55, NW Mix Commercial
(Source: Please refer Figure 3.12)
Table 3.21: Physiochemical Characteristics of Soil
S. No.
Parameters
Unit
Project Site S-1
S-2
S-3
S-4
S-5
S-6
Physical Characteristics
1. Color - Brown Brown Brown Brown Brown Brown
2. Textural Class USDA System
Sandy Loam
Sandy Loam
Sandy Clay
Sandy Loam
Sandy Loam
Sandy Loam
3. Particle Size Distribution
i) Sand (0.02 to 0.20-mm)
% 54 56 55 53 54 56
ii) Silt (0.002 to 0.02-mm)
% 32 28 10 31 29 29
iii) Clay (< 0.002-mm) % 14 16 35 16 17 15
4. Porosity % 44.9 47.9 49.4 46.0 43.4 44.2
5. Bulk Density gm/cc 1.46 1.38 1.34 1.43 1.50 1.48
6. Water Holding Capacity
% 28.4 30.2 26.4 30.8 29.2 29.8
7. Permeability cm/hr 1.57 1.21 0.19 1.23 1.08 1.37
Chemical Characteristics
8. pH 20% Slurry 7.88 7.96 7.86 8.12 7.68 7.81
9. Conductivity (EC) µmhos/cm 116 126 135 107 112 120
10. Cation Exchange Capacity (CEC)
Meq/100-gm
8.8 9.5 7.6 9.8 10.5 9.2
11. Organic Matter % 0.72 0.83 0.79 0.76 0.71 0.85
12. Organic Carbon % 0.42 0.48 0.46 0.44 0.41 0.49
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 58
S. No.
Parameters
Unit
Project Site S-1
S-2
S-3
S-4
S-5
S-6
13. Sodium as Na mg/kg 4.15 5.26 4.22 4.45 3.62 4.82
14. Available Nutrients
i) Nitrogen as N kg/ha 265.8 245.6 254.5 260.2 272.4 269.5
ii) Phosphorus as P kg/ha 18.5 24.8 17.9 16.6 20.5 18.8
iii) Potassium as K kg/ha 136.4 144.9 130.6 135.2 133.2 139.7
15. Sodium Absorption Ratio (SAR)
- 0.85 0.72 0.75 0.76 0.95 0.88
Source: Kamal Enviro & Food Lab Pvt. Ltd., Gurgaon-Haryana
3.9.7 Soil Characteristics& Interpretation of Analytical Results & Conclusions
Physical characteristics of soil greatly influence its use and behaviour towards plant growth.
• Soil Texture
Texturally the soils of study area are observed as Sandy Loam and Sandy Clay Soils.
• Bulk Density
Bulk density of soil relates to the combined volumes of the solids and pore spaces. Soil with a high pore space with loose solid particles will have lower bulk density than those that are more compact and have less pore space. This is directly related to the movement of air and water through soil thus affecting the productivity. The bulk density of the soils was found in the range of 1.34 to 1.50-gm/cm³.
• Water Holding Capacity
Water-holding capacity is usually defined as the amount of water that soil can hold. Soil that have fine particles are able to hold more water than coarse soils while rock fragments cannot hold any water and contribute negatively to soil water-holding capacity. The type and composition of soil are the controlling factors in this case. Water Holding Capacity of study area soils was observed as 26.4 to 30.8%.
3.9.8 Chemical Characteristics of Soil
• Soil Reaction Classes and Critical Limits for Macro & Micro Nutrients in Soil
According to Soil Survey Manual (IARI, 1970), the soils are grouped under different soil reaction classes viz; extremely acidic (pH<4.5), very strongly acidic (pH 4.5-5.0 ), strongly acidic (pH 5.1-5.5), moderately acidic (pH 5.6-6.0), slightly acidic (pH 6.1-6.5), neutral (pH 6.6-7.3), slightly alkaline (pH 7.4-7.8), moderately alkaline (pH 7.9-8.4), strongly alkaline (pH 8.5-9.0).The soils are rated as low (below 0.50 %), medium (0.50-0.75 %) and high (above 0.75 %) in case of organic carbon, low (<280-kg/ha), medium (280 to 560-kg/ha) and high (>560-kg/ha) in case of available Nitrogen, low (<10-kg/ha), medium (10 to 25-kg/ha) and high (>25-kg/ha) for available Phosphorus, low (<108-kg/ha), medium (108 to 280-kg/ha) and high (>280-kg/ha) for available Potassium and low (<10-mg/kg), medium (10-20-mg/kg) and high (>20-mg/kg) for available Sulphur, (Singh et. al. 2004, Mehta et. al.1988). Critical limits of Fe, Mn, Zn, Cu and B, which separate deficient from non-deficient soils followed in India, are 4.5, 2.0 & 0.5, 0.2 and 0.5-mg/kg respectively. (Follet & Lindsay-1970 and Berger & Truog-1940)
• Soil Reaction
Soil pH is an important soil property, which affects the availability of several plant nutrients. It is a measure of acidity and alkalinity and reflects the status of base saturation. The soil pH ranges from 7.68 to 8.12, thereby indicating the soils are slightly alkaline to moderately alkaline.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 59
• Organic Carbon
The effect of soil organic matter on soil properties is well recognized. Soil organic matter plays a vital role in supplying plant nutrients, Cation Exchange Capacity (CEC), improving soil aggregation and hence water retention and soil biological activity. The organic carbon content of soil varied from 0.41 to 0.49% (0.71 to 0.85% as organic matter), thereby implying that soils are low in organic carbon contents.
• Macronutrients
Nutrients like nitrogen (N), phosphorus (P) and potassium (K) are considered as primary nutrients and Sulphur (S) as secondary nutrient. These nutrients help in proper growth, development and yield differentiation of plants and are generally required by plants in large quantity.
• Available Nitrogen
Nitrogen is an integral component of many compounds including chlorophyll and enzyme essential for plant growth. It is an essential constituent for amino acids which is building blocks for plant tissue, cell nuclei and protoplasm. It encourages aboveground vegetative growth and deep green color to leaves. Deficiency of nitrogen decreases rate and extent of protein synthesis and results into stunted growth and develop Chlorosis. Available nitrogen content in the surface soils ranges between 245.6 & 272.4-kg/ha thereby indicates that soils are low in available nitrogen content.
• Available Phosphorus
Phosphorus is an important component of adenosine di-phosphate (ADP) and adenosine tri-phosphate (ATP), which involves in energy transformation in plant. It is essential component of deoxyribonucleic acid (DNA), the seat of genetic inheritance in plant and animal. Phosphorous take part in important functions like photosynthesis, nitrogen fixation, crop maturation, root development, strengthening straw in cereal crops etc. The availability of phosphorous is restricted under acidic and alkaline soil reaction mainly due to P-fixation. In acidic condition it gets fixed with aluminum and iron and in alkaline condition with calcium. Available phosphorus content ranged between 16.6 & 24.8-kg/ha thereby indicating that soils are having medium in available phosphorus.
• Available Potassium
Potassium is an activator of various enzymes responsible for plant processes like energy metabolism, starch synthesis, nitrate reduction and sugar degradation. It is extremely mobile in plant and help to regulate opening and closing of stomata in the leaves and uptake of water by root cells. It is important in grain formation and tuber development and encourages crop resistance for certain fungal and bacterial diseases. Available potassium content in these soils ranges between 130.6 & 144.9-kg/ha thereby is indicating that the soils are with medium levels of available potassium content. Thus, the soil of the study area is moderate fertile.
Methodology for Biological Environment
For the purpose of surveying the vegetation quadrates were laid to record phyto- sociological features of the vegetation. The vegetation data collected for phytosociological information were analyzed. Besides measuring these parameters, other biodiversity aspects in the terms of endemic status, conservation status and life form have been enumerated. For all the plant species found in the area during ecological survey, Red Data Books of the Botanical survey of India have been screened to verify their conservation status. The information was also collected from secondary sources for reference purposes.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 60
The sampling sites were selected based on the Landuse pattern of the study area and after preliminary survey of the study area within 10km radius from the periphery of proposed project. Project area has been defined as core zone (CZ) and surrounding area has been defined as Buffer Zone (BZ).
Terrestrial Ecology
Floral resources
A detail investigation was made to understand overall vegetation profile and floral resource characteristics within 10 km radius of the proposed project area. The present study on the floral assessment is based on the field survey of the project influenced area. The plant species were identified with the help of taxonomists of related fields and nearby Scientific Institutions. Besides the collection of plant species, information was also collected with vernacular names of plant species made by local inhabitants.
Faunal Resources
Faunal species was observed through conducting field survey in the project site (core zone) and surrounding areas (buffer zone) for identification of important animal groups such as butterflies (insects), birds, mammals, reptiles, and fisheries etc.
For authentication of field data, secondary data was also collected from various published and unpublished reports. The Forest Working Plans of the concerned Forest Divisions is also used as the secondary information source on the wildlife of the area. In addition to this, interaction with local people for extracting information on the presence and relative abundance of various animal species
Aquatic Ecology
Field survey was conducted in the project site and adjoining areas which shows that there is no perennial surface water bodies like pond, lake, river, canal etc. are present in the study area. Therefore, the data collection with respect to fisheries is limited to commercial fisheries available in the market only. No natural fisheries have been found present in the study area. However, the general methodology which in use for aquatic environment is mentioned for reference purposes only.
The qualitative and quantitative analysis of phytoplankton, periphyton and zooplankton is estimated by methods adopted in APHA (1995). The phytoplankton and periphyton is identified upto genera and species level with the help of Edmondson (1992, 2nd edition), Hustedt and Jensen (1985), Sarod and Kamat (1984). The zooplankton is identified by using literatures of Edmondson (1992, 2nd edition), Battish (1992) and Kundo 1986).
The macro benthic fauna is identified after Edmunds (1978), Yankson and Kendall (2001), Olaniyan (1968) and Schreider (1990). Identification of fishes is done with the help of the document by Talwar and Jhingran (1991).
Terrestrial Environment
Fuel Wood: The main source of fuel is from cow dung cake, woody stem of Arhar and Mustard crops, most of the domestic fuel requirement is met from Agro By-product and cow dung cake. Rest is met out from the forest out side the village boundary.
Fodder: Villages under the project surrounding area do not have any significant dependency on forest-based fodder as these sources are not available in the forests. Some locals preferred khejri, kikar, grasses and other thorn scrubs etc.
Fruit Trees: Preference for fruit trees are solicited in terms of attributes like production, market availability and timber wood value. Overall Mango, Jamun, Guava, Ber, Lemmon, is found most preferred fruit trees amongst the farmers of surrounding area. However, the area
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 61
is devoid of major commercial practices related to Orchard and Horticulture due to arid to semi arid type climatic conditions.
Timber/Commercial Plants: Farmers Preference for timber plants are Sheesham, Teak, Khair etc., which are grown by the forest department as well as by the locals.
Agriculture: Mustard, Guar, Arhar, Wheat, Gram, Jowar, Bajra, are most preferred agriculture crop in the area.
Vegetation Profile of the Study Area
The vegetation present in the buffer zone is dry deciduous and scrubby vegetation. Grass is conspicuous, herbs are scattered and climbers are not reported.
A floral enlistment of trees, shrubs and herbs, grasses, farm vegetation & orchards with their scientific names, common names and the family to which they belong is presented in a tabular format as Tables 3.22 and shown in Plates. The core zone area includes project site, existing power plant site and colony area of the project site whereas Buffer zone is surrounding area up to 10 km radius from the periphery of project site.
The tree cover of the study area consists of mixes of khair (Acacia catechu), ber (Zisyphus mauratians), kakon (Flacourtis indica), raunj (Acacia leucophloea), tendu (diospyros melanoxylon), salar (Boswellia serrata), gurjan (Lannea coromandelica), safed dhok (Anogeissus latifolia), kadu (Steroulia urons), jhinja (Bauhinja racemosa), Kalan (Mitragyna parvifolia).
The under growth mostly comprises of jharber (Zizyphus nummularia), adusa (Adhdtoda vasion), adhashishi (Xanthium strumarium linn), dasan (Rhus mysorensis), jal (Capparis sepiaria), gangeran (Grewia tenax), jarkhed (Grewia falvescens), panwar (Cassia tora) and hijhara (Achyranthes aspera), kolikanda (Urginea indica), thor (Euphoribia nerifolia), gugal (Commiphora wightii) etc.
The ground flora supports good growth of grasses like pelarda (Apluda mutica), lampla (Aristida spp), kalilamp (Heteropogon contortus), sedua (Chrysopogon fulvus), rosha (Cymbopogon martinii), and ratedi (Themeda quadrivalvis) etc.
Scrub forests containing kakera (Maytenus emargimata) and kakon (Falcourtia indica). The lands in the area generally support khejra (prosopis cineraria), polu (Salyadora oleoides) and karil (Ca-pparis decidua), Fairly extensive patches of khair and ber are found growing in scrub on bardas.
Inland Dune Scrub Forests of this type are generally confined to the old deposits of blown up sand and correspond to IS1 Desert Dune scrub (Champion and Seth's classification). The soil is generally dry and impoverished due to lack of humus and the vegetation is principally thorny and zerophytic. The growing stock consists of stunted and crooked trees of kakera (Gymnosporia spinosa), kakon (Flacourtia indica), raunj (Acacia lcucophleea), roheda (Tecomella undulata), chillal (Holoptelia integrifolia), goya (Dischrostachys cinerea), saintha (Bauhunia raeemosa) kheri (Acacia senegal), khejra (Propsopis cineraria), neem (Azadirachta indica).
The undergrowth consists of bushes of khimp (Leptadenia pyrortechnica), akda (Calotropis procera), kair (capparis decidus), bonli (Acacia jacquemontii), kharsana (Crotolaria burhia), sivali (Grewia flavescens) etc. The common herbs and grasses are indigofera species, dhamasa (Aristida species) and Panicum turgidum etc.
Banda which is partially parasitic attacks the branches of salar, which consequently gets dried ups. The other parasitic plant like amarbel, which is completely parasitic, attack babul, churel, ber, khejari and even dhok and reduces their lifespan.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 62
No climbers, which affect the plants, are guj, aamali, pilwana; moreda, gudmar etc are seen in the area that may be due to absent of any perennial water body. However, growth of some epiphytes during wet season sometimes affect khajur, khejari etc.
Table 3.22: Vegetation Profile observed in the Study Area
Scientific Name Family Common / Local Name
Trees
Gymnosporia spinosa Celastraceae Kakera
Flacourtia indica Salicaceae Kakon
Acacia leucophloea Fabaceae Raunj reonja
Tecomella undulata Bignoniaceae Roheda
Holoptelia integrifolia Ulmaceae Chillal/ papri
Dischrostachys cinerea Fabaceae Goya- khair
Bauhunia raeemosa Fabaceae Saintha/ jhinja
Acacia senegal Fabaceae Kheri
Propsopis cineraria* Fabaceae Khejra
Melia azaderach Meliaceae Neem
Acacia catechu Fabaceae Khair
Butea monosperma Papilionaceae Chhola/khankra
Lannea coromondelion Anacardiaceae Gurjan
Diospyros melanoxylon Ebenaceae Tondu /tendu
Steroulia urons Malvaceae Kadu
Mitragyna parvifolia Rubiaceae Kalan /kalam
Syzigium cuminii Myrtaceae Jamun
Mangifera indica Anacardiaceae Aam
Zisyphus mauratians Rhamnaceae Ber
Anogeissus pendula Combretaceae Dhok
Anogeissus intifolia Combretaceae Dhok
Anogeissus latifolia Combretaceae Safed dhok
Boswellia serrata Burseraceae Salar
Maytenus emargimata Celastraceae Kakera
Gmelina arborea Lamiaceae Gameri
Mallotus phillipinensis Euphorbiaceae Rolli /sinduri
Cassia tora /Senna tora Fabaceae Panwar
Ziziphus jujuba Rhamnaceae Jhar ber
Milletia pinnata Fabaceae Karanj
Phoenix sylvestris Arecaceae Khajur
Citrus medica Rutaceae Neebu
Ficus lacor Moraceae Pakhar
Ficus religiossa Moraceae Pipal
Ficus bengalensis Moraceae Bargad
Toona cilia Meliaceae Tuna
Cardia dycotoma Boraginaceae Gunda, Lasoda
Eucalyptus sp Myrtaceae safeda
Delbergia shisso Fabaceae Shisham
Morus alba Moraceae shahtoot
Albizia lebbeck Fabaceae Siris
Boswellia Serrata Burseraceae Salai Guggul
Pterocarpus marsupium Fabaceae Kinu
Syzygium cuminii Myrtaceae Jamun
Psidium sp Myrtaceae Guava
Undergrowth – Bushes/Shrubs
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 63
Scientific Name Family Common / Local Name
Leptadenia pyrortechnica Apocynaceae Khimp
Commiphora wightii Burseraceae Gugal
Calotropis procera Asclepiadaceae Akda
Capparis decidua Capparaceae Kair /karil
Capparis sepiaria Capparis sepiaria Jal/ hins
Acacia jacquemontii Fabaceae Bonli-kikar
Crotolaria burhia Fabaceae Kharsana-sania
Grewia flavescens Tiliaceae Sivali / chapren
Grewia tenax Tiliaceae Gangrene / gangan
Zizyphus numularia Rhamnaceae Ber jhari / jhar ber
Mimosa rubicaulis Fabaceae Jhanjhani
Urginea indica Asparagaceae Kolikanda
Capparis zeylenica Capparaceae Moreds
Euphorbia royleana Euphorbiaceae Thor
Euphorbia nivulia Euphorbiaceae Thor
Euphorbia hirta Euphorbiaceae Thor
Salyadora oleoides Salvadoraceae Polu /pilu
Rhus mysorensis Anacardiaceae Darsan / dasni
Indigofera tinctoria Fabaceae Neel
Lawsonia inermis Lythraceae Menhadi/ henna
Barleria priopetus Acanthaceae Peeli kanteli vjradanti
Argemone mexicana Papaveraceae Satyanashi/ prickly poppy
Herbs & Grasses
Apluda mutica Poaceae Pelarda
Aristida spp Poaceae Lampla/ dhamasa
Heteropogon contoritus Poaceae Kalilamp
Chrysopogon fulvus Poaceae Sedua /goria
Apluda mutica Poaceae Bhanjura /noll arda
Cymbopogon martinii Poaceae Rosha
Themeda quadrivalvis, Poaceae Ratedi
Heteropogon contortus Poaceae Surwala/sukhala
Chloris barbata Poaceae Windmill / finger grass
Setaria glauca Poaceae Foxtail grass
Panicum turgidum Poaceae Murat /tussock grass
Desmostachya bipinnata Poaceae Dab/ kusha grass
Dendrocalamus strictus Poaceae Bamboo grass
Bambusa arundinacea Poaceae Baans
Saccharum munja Poaceae Munj
Dichanthium annulatum Poaceae Karad/ sheda grass
Barleria acanthoides Acanthaceae Chapari-herb
Lepidagathis trinervis nees Acanthaceae pathar-phor buti
Peristrophe bicalyculata (retz.) Acanthaceae Peristrophe
Xanthium strumarium linn Asteraceae Adhashishi
Achyranthes aspera Amaranthaceae Hijhara
Tribulus terrestris Pedaliacae chota gokhru
Pedalium murex Pedaliacae Bara gokhru
Creepers/Climbers
Abrus precatorius Fabaceae Ratti/ chirmi
Mucuna prurita Fabaceae Kawanch
Ichnocarpus frutescens Apocynaceae Dudhi- black sariva
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 64
Scientific Name Family Common / Local Name
Oxalis corniculata Oxalidaceae Tripatti
Asparagus dumosus Asparagaceae Naharkanta
(Source ; Primary Data & Secondary data from forest working plan and other literature), * Declared as State Tree
Table 3.23: Vegetable, Pulses and Crops in the Study Area
Scientific Name Family Common Name
Spinacia oleracea Amaranthaceae Palak Spinach
Allium sp Amaryllidaceae Onion pyas
Coriandrum sativum Apiaceae Coriander
Brassica oleracea Brassicaceae Cabbage
Brassica oleracea Brassicaceae Cauliflower
Ricinus communis Euphorbiaceae Castor Oil plant
Cajanus cajan Fabaceae Tuver
Arachis hypogaea Fabaceae Pea nut-ground nut
Pisum sativum Fabaceae Matar pea
Phaseolus vulgaris Fabaceae Beans
Sorghum vulgare Poaceae Fodder /grains
Zea mays Poaceae Corn (macca)
Pennisetum ryphoides Poaceae Bajra
Capsicum spp Solanaceae Chilly
Brassica juncea Brassicaceae Sarson
Triticum sativum Poaceae Wheat
Cyamopsis tetragondoba Fabaceae Gwar
Vigna acontifolia Fabaceae Moth
Phaseolas radiatus Fabaceae Moong
(Sources: Based on Primary Survey and Secondary Data)
Faunal resources
For enumeration of faunal resources, ground surveys are carried out by trekking the impact zone for identification of important animal groups such as birds, mammals, and reptiles, inhabiting the area, adjoining forest on the slopes, hill top and agricultural fields. The information of important animal group such as butterflies, birds, reptiles and mammals were collected by trekking inhabiting area, and in the project site along the boundary i.e. agricultural fields etc present in the impact zone (Plates). The lists of animals recorded during this study are given in following Table 3.25.
Insects: Ten species of butterflies were sited in the area are listed in Table 3.24. Among them cabbage fly was found occurring commonly. The fauna listed consists of mostly ‘common’ and generalist species as none of the animal species is threatened globally as per the IUCN Red list 2007.
Table 3.24: Butterflies Spotted in the Area
S. No. Butterflies Family Common Name
1 Precis lemonias Nymphalidae Lemon pansy
2 Danaus genutia Nymphalidae Common tiger
3 Euploea core Nymphalidae Common Indian Crow
4 Junonia hierta Nymphalidae Yellow Pansy
5 Pachliopta hector Papilionidae Crimsone rose
6 Pieris canidia Pieridae Indian Cabbage White
7 Genopteryx rhamni Pieridae Common brimstone
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 65
8 Eurema hecabe Pieridae Lemmon grass yellow
9 Zizeeria knysna Lycaenidae Dark grass blue
10 Leptosia nina Pieridae The Psyche
(Sources: Based on Primary Survey and Secondary Database)
Reptiles: Out of 10 species of reptiles recorded, 5 species of lizards and 5 species of snakes are recorded in common in occurrence. Out of these snakes, cobra is protected under schedule II of Indian wild life protection act (1972). None of the reptile species is present in the IUCN Red List of threatened animals (2007).
Table 3.25: Reptiles Present in the Area
S.No. Scientific Name Common Name
Snakes
1 Bungarus caeruleus Karait*
2 Naja naja Cobra*
3 Vipera russelli Russell’s viper*
4 Eryx johni Red sand boa- or Domuhi*
5 Ptyas mucosus Rat snake *
Lizards, Monitor
6 Calotis versicolor Rock lizard
7 Hemidactylus flaviviridis Yellow-bellied house gecko
8 Varanus bengalensis Indian Monitor-Goh
9 Chamaeleo zeylanicus Girgit*
10 Uromasyx hardwickii Spiny-tailed Lizard
(Sources: Based on Primary Survey and Secondary Data)
Avifauna: The buffer zone and core zone having similar morphology of semi- arid climatic conditions. There is no such classified forest present in the area except the scrub forests and agriculture land. Therefore, most of the species present are adapted to the open, undulating to flat terrain with scattered scrubs of low bushes to jungle babool, beri, kair, khejri type plants. The list of bird species recorded during primary survey and from secondary information collected from the forest working plan and other sources are shown in Table 3.26.
Table 3.26: Avifauna Present in the Area
S. No. Scientific Name Common Name
1 Columa livia Gmelin Blue Roack pigeon
2 Bubulcus ibis Catle Egret
3 Turdoides caudatus Common babbler
4 Acridotheres tristis Common Myna
5 Ploceus philippinus Common weaver bird, baya
6 Pavo cristatus Linnaeus Common Pea Fowl
7 Corvus splendens Viellot House crow
8 Eudynamya scolopacea Koel
9 Merops superciliosus/ orientali Green Bee eater
10 Streptopelia senegalensis Little Brown Dove
11 Streptopelia risoria Indian ring dove
12 Streptopelia decaocto Indian ring dove
13 Upupa epops Hoopoe
14 Nectarinia asiatica /Cinnyris asiaticus Purple Sunbird
15 Vanellus malabaricus Yellow-wattled Lapwing
16 Athena brama Spotted Owlet
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 66
S. No. Scientific Name Common Name
17 Orthotomus sutorius Tailer Bird- phudki
18 Passer domesticus The house sparrow
19 Psittacula krameri Parrot
20 Sarcogyps calvus Asian King Vulture- Indian Black Vulture
21 Milvus migrans Common Pariah Black kite
22 Falco tinnunculus Common kestral
23 Circaetus gallicus Short-toed Eagle - Snakes Eagle
24 Falco jugger Laggar Falcon
25 Buteo buteo Common Buzzard
26 Gyps fulvus Eurasian Griffon
27 Lanchura striata Munia
28 Bubo coromandus Dusky Owl-ullu
29 Francolins francolins Teetar
30 Saxicoloides fulicatus Indian robin
31 Petronia xanthocollis Jungle chidi-yellow throated sparrow
32 Dinopium benghalense Kathphora-woodpecker
33 Turdoides striatus Saat bahin-Jungle babbler
34 Turdoides malcolmi Grey babbler-scrubs
35 Cuculus varius Papiha—brain fever bird
36 Pycnonotus cafer Redvented bulbul
37 Pycnonotus leucotis White-eared Bulbul
38 Rhipidura aureola Flycatcher- White-browed Fantail
39 Coracias benghalensis Indian Roller--neelkanth
40 Perdicula asiatica Jungle bush quail
41 Coturnix coturnix Common quail
42 Eremopterix griseus Ashy-crowned Sparrow-Lark
43 Ammomanes cinctura Bar-tailed Desert Lark
44 Ammomanes phoenicurus Rufous-tailed Lark
45 Mirafra erythroptera Indian Bush Lark
46 Mirafra affinis Jerdon's Bush Lark
47 Lonchura atricapilla Black headed munia
48 Zoothera citrina Orange head thrush
49 Muscicapa striata Spotted flycatcher
50 Dicrurus remifer Lesser racket tailed drongo
51 Dicrurus dsimillis Bechstenin Black Drogo
55 Emberiza stewarti White capped bunting
56 Saxicola macrorhynchus White-browed Bush Chat
(Sources: Based on Primary Survey and Secondary Data)
Mammals: The main among rodents are saheli and wild rats. Saheli consumes seeds and small plants including semal, khazur etc. The rats also affect seeds and soft plants. Among wild mammals, Neel Gai, is widely occurring in the area both in forest land as well as surrounding area land. Other species occurring in the area are listed in Table 3.27.
Table 3.27: Mammalian Species Present in the Study Area
S.No. Scientific Name Common Name
1 Cuon alpinus Jungle kutta
2 Vulpes bengalensis Indian Fox
3 Canis aureus Golden Jackal geeder
4 Fellis chaus Jungle cat-
5 Vulpes vulpes Desert Fox
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 67
S.No. Scientific Name Common Name
6 Boselaphus tragocamelus* Neel gai
7 Hystrix indica Sahhi-she-indian porcupine
8 Hemiechunus auritus Jhau chuha
9 Pteropus giganteus Chamgadar-Indian Flying-fox
10 Felis libyca Desert Cat
11 Felis chaus* Jungle Cat
12 Mus muscatus* Mouse
13 Rattus rattus House rat
14 Lepus nigricollis Hare-khargosh
15 Bandicota bengalensis Indian Mole rat
16 Herpestes edwardsi* Mongoose
17 Funambulus pennati* Palm squirrel
18 Suncus murinus House shrew
(Sources: Based on *Primary Survey and Secondary Data)
Domestic Animals: There are a large number of domestic animals in the region, which are mainly dependent on the open forests land and waste land of the village. The livestock of the area is dependent on the vegetation of open forests and agricultural land.
Table 3.28: Domesticated Mammalian Species Present in the Study Area
S. No. Domesticated Mammals Common Name
1 Bos indicus Cow
2 Bubalus indicus Buffalo
3 Cains familieris Dog
4 Capra hircus Goat
5 Equus cabilus Horse
6 Equus hermionus Ass
7 Felis domesticus Cat
8 Ovius polic Sheep
9. Camelus dromedarius Camel
(Sources: Based on Primary Survey and Secondary Data)
Aquatic Ecology
As such, there is no natural and perennial water bodies in form of lake, river, canal or stream are found present in the core zone and buffer zone upto 10km area. However, some village are having bawri or dug wells and low-lying area developed into water storage ponds where rainwater get store during rainy season. Agricultural practices and drinking water requirement of the area is meeting from the ground water aquifer. Therefore, no aquatic life has been found present in the area with respect to fisheries, planktons, benthos etc.
Fisheries and Aquatic Life
No natural or commercial fishery activities are observed within 10 Km radius of the existing premises, and hence proposed project activities are not envisaged to have any adverse effect on fisheries and aquatic life.
Rare and Endangered Species
During the study, no endangered species of flora and fauna was observed in the study area and same has also been confirmed from the record of State Forest Department as per Red data book of Botanical Survey of India and Wild Life (Protection) Act 1972.
Ecological Sensitive Areas
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 68
No major eco-system / biosphere reserves have been identified within the periphery of the project site. Also, the study area does not contain any such features having great historical or archaeological importance.
Calotropis procera Grass
Zizyphus sp. Sachrum sp.
Figure 3.14: Proposed RICCO Industrial Area and Scrub Vegetation
Khejari –A State Tree with Baya Nests Agricultural Field ploughed by Camel
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 69
Jowar Fields, Pigeon and Yellow wattled
lapwing Indian Ring Dove
Figure 3.15: Vegetation Accounts with Faunal Life forms in the Study Area
Scrub Vegetation Scrubs Vegetation
Phoenix sp. Acacia Sp.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 70
Capparis decidua Capparis sp.
Sun Bird Goats
Figure 3.16: Vegetation Accounts with Faunal Life forms in the Study Area
3.9.9 Demography
Demography is one of the important indicators of environmental health of an area. It includes population, number of residential houses and households (families), literacy rate, population density, etc. In order to assess the demographic features of the study area, census data for both, Sikar & Jaipur Districts, in Rajasthan state for the year 2011 was compiled and placed in the tabulated and graphical presentation.
Population Distribution
As per the Census Record of India 2011, the Total population of the study area was recorded as 137684 persons of thirty-eight (38) revenue villages and one (01) Town namely Reengus (M) of two districts namely Sikar & Jaipur in Rajasthan. Total number of ‘Households’ was observed as 21307 in the study area. Male-female wise total population was recorded as 71147 males (51.7%) and 66537 (48.3%) females respectively. Caste wise male-female population distribution of study area villages is given in Table 3.29 as follows.
Table 3.29: Caste wise Population Distribution of Study Area Villages
Tehsil Village Households Population SC ST
P M F M F M F
Sri Madhopur (District Sikar)
Reengus(M) 4107 26139 13696 12443 1718 1572 344 309
Mahroli 1486 8885 4553 4332 895 898 116 122
Bharni 554 3578 1836 1742 223 216 5 4
Arniya 903 6625 3408 3217 237 212 3 5
Sikar (District Sikar)
Badhadar 498 2894 1519 1375 321 269 0 1
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 71
Tehsil Village Households Population SC ST
P M F M F M F
Sri Madhopur (District Sikar)
Kolwa 325 2312 1157 1155 188 185 134 130
Jalalpur 181 1284 652 632 71 62 0 0
Parasrampura 274 1769 897 872 38 39 61 48
Shimarla Jageer
665 4386 2225 2161 108 99 127 145
Sargoth 928 6391 3289 3102 317 280 55 56
Patwari Ka Bas
558 4034 2080 1954 303 285 0 0
Bhopatpura 483 2929 1511 1418 177 181 53 54
Lakhni 645 4308 2243 2065 377 387 142 112
Malakali 214 1313 673 640 51 52 0 0
Jaitusar 392 2533 1255 1278 326 327 14 15
Devipura 146 939 489 450 35 27 0 0
Kotri Dhaylan 599 3815 2015 1800 253 225 209 191
Chomu (District Jaipur)
Bagri 235 1417 748 669 162 149 93 86
Sirsa 229 1710 914 796 46 33 0 0
Ranjeetpura 221 1418 749 669 77 67 6 13
Nangal Govind
326 2180 1155 1025 224 189 38 31
Kishanpura 850 5089 2736 2353 641 503 86 75
Haboo Ka Bas
98 524 267 257 15 14 35 30
Bagron Ka Bas
178 1097 557 540 41 35 8 5
Asti Kalan 671 4078 2032 2046 136 137 85 79
Bhutera 526 3184 1611 1573 370 363 52 44
Madho Ka Bas
23 155 82 73 21 15 0 0
Udgwar 449 3014 1546 1468 404 388 131 117
Chhota Gudha
198 1357 684 673 75 74 35 31
Nangal Kalan 492 3300 1687 1613 277 236 38 34
Raisingh Ka Bas
214 1352 704 648 0 0 72 60
Dhodhsar 827 4927 2532 2395 911 845 67 65
Nadiya 163 1245 621 624 0 0 1 0
Singod Khurd 716 4514 2345 2169 462 427 125 109
Singod Kalan 835 5631 2874 2757 141 135 44 45
Chak Charanwas
45 335 171 164 2 3 0 0
Aleesar 656 4270 2215 2055 122 120 309 297
Baga Ka Bas 111 879 466 413 70 60 47 44
Phulera (Jaipur District)
Gadri 286 1874 953 921 102 113 50 43
Total 21307 137684 71147 66537 9937 9222 2585 2400
Source-Census of India 2011
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 72
Sex Ratio
The ‘Sex Ratio’ is a numeric relationship between females & males and bears paramount importance in the present-day scenario where the un-ethnic pre-determination of sex and killing of female foetus during pregnancy is practiced by unscrupulous medical practitioners against the rule of the law of the country.
As per the census records of 2011, the study area is falling in two (02) districts namely Sikar & Jaipur of Rajasthan. The ‘Sex Ratio’ in both districts was observed as 944 & 910 females respectively and the same was also observed as 935 females per 1000 males in the study area. The male-female wise population distribution in thirty-eight (38) villages & one (01) town named Reengus (M) covered under the study area is depicted by graphical representation shown in Figure 3.17.
Figure 3.17: Male-female wise Population Distribution
SC & ST Population
On the basis of the caste wise population distribution of the ‘Scheduled Caste’population consisting of 9937 males (51.9%) & 9222 females (48.1%) respectively in the study area, accounts for 13.9% to the total population. As per the census records of 2011, the ‘Scheduled Tribe’ population consisting of 2585 males & 2400 females respectively and accounts 3.6% to the total population (as 137684 persons) in the study area. It implies that 82.5% of the total population belongs to the general category of the peoples in the study area.
Male-female wise distribution of SC & ST population in the study area villages is graphically represented in Figure 3.18 & 3.19 respectively.
0
20000
40000
60000
80000
100000
120000
140000
160000
Total Population Males Females
Total Population
Total Population
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 73
Figure 3.18: SC Population in Study Area
Figure 3.19: ST Population in Study Area
Literacy Rate
Literacy rate is quantifiable indicator to assess the development status of an area or region. The male-female wise statistical data of literate & illiterate population of study area is presented in Table 3.30. It is evident from the Table 3.31 that the Male-female wise literates are observed as 52802 & 33867persons implies that the literacy rate is 63.0% with male and female percentages being as 38.6 & 24.6% respectively. The illiterates are 37.1% to the total population of which male & female illiterates are 18345 (13.3%) & 32670 persons (23.7%) respectively. The Male-female wise graphical presentation of literates & illiterates population of the study area villages is given in Figure 3.20.
0
5000
10000
15000
20000
25000
Total SC Male SC Female SC
Scheduled Castes
0
1000
2000
3000
4000
5000
6000
Total ST Population Male ST Female ST
Scheduled Tribes
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 74
Figure 3.20: Male-Female Wise Distribution of Literates & Illiterates
0
10000
20000
30000
40000
50000
60000
70000
80000
90000
100000
TotalLiterates
MaleLiterates
FemaleLiterates
TotalIlliterates
MaleIlliterates
FemaleIlliterates
Male-Femalewise Literates & Illitrates
Male-Femalewise Literates & Illitrates
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT PLOT
NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT SIKAR
RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 75
Table 3.30: Male-Female Wise Literates & Illiterates
Tehsil (District) Village Total Population Literates Illiterates
Male Female Male Female
Sri Madhopur (District Sikar)
Reengus (M) 26139 10399 7100 3297 5343
Mahroli 8885 3443 2514 1110 1818
Bharni 3578 1400 831 436 911
Arniya 6625 2352 1440 1056 1777
Sikar Badhadar 2894
1165 700 354 675 (District Sikar)
Sri Madhopur (District Sikar)
Kolwa 2312 814 558 343 597
Jalalpur 1284 455 279 197 353
Parasrampura 1769 661 447 236 425
Shimarla Jageer 4386 1604 1001 621 1160
Sargoth 6391 2378 1528 911 1574
Patwari Ka Bas 4034 1612 994 468 960
Bhopatpura 2929 1182 770 329 648
Lakhni 4308 1713 1035 530 1030
Malakali 1313 554 323 119 317
Jaitusar 2533 961 629 294 649
Devipura 939 353 224 136 226
Kotri Dhaylan 3815 1556 877 459 923
Chomu (District Jaipur)
Bagri 1417 543 309 205 360
Sirsa 1710 731 404 183 392
Ranjeetpura 1418 586 325 163 344
Nangal Govind 2180 823 467 332 558
Kishanpura 5089 2013 1188 723 1165
Haboo Ka Bas 524 198 136 69 121
Bagron Ka Bas 1097 371 296 186 244
Asti Kalan 4078 1450 927 582 1119
Bhutera 3184 1151 731 460 842
Madho Ka Bas 155 64 29 18 44
Udgwar 3014 1177 737 369 731
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT PLOT
NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT SIKAR
RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 76
Tehsil (District) Village Total Population Literates Illiterates
Male Female Male Female
Chhota Gudha 1357 449 286 235 387
Nangal Kalan 3300 1230 776 457 837
Raisingh Ka Bas 1352 512 307 192 341
Dhodhsar 4927 1907 1247 625 1148
Nadiya 1245 449 290 172 334
Singod Khurd 4514 1728 1078 617 1091
Singod Kalan 5631 2091 1371 783 1386
Chak Charanwas 335 116 56 55 108
Aleesar 4270 1568 1003 647 1052
Baga Ka Bas 879 356 210 110 203
Phulera (Jaipur District)
Gadri 1874 687 444 266 477
Total 137684 52802 33867 18345 32670
Source-Census of India 2011
Table 3.31: Occupational Pattern in the Study Area Villages
Tehsil Village Name
MAIN WORK_P
MAIN_CL_P
MAIN_AL_P
MAIN_HH_P
MAIN_OT_P
MARG WORK_P
MARG_CL_P
MARG_AL_P
MARG_HH_P
MARG_OT_P
Sri Madhopur (District Sikar)
Reengus (M)
6707 1483 96 453 4675 1504 129 107 312 956
Mahroli 2227 513 89 38 1587 668 358 54 11 245
Bharni 976 546 27 23 380 816 420 265 9 122
Arniya 1571 1136 46 35 354 955 843 14 8 90
Sikar Badhadar 992 617 181 17 177 342 252 78 5 7
(District Sikar)
Sri Madhopur (District Sikar)
Kolwa 477 343 7 8 119 261 135 44 10 72
Jalalpur 449 410 4 2 33 122 121 1 0 0
Parasrampura
545 416 16 6 107 247 222 5 1 19
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT PLOT
NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT SIKAR
RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 77
Tehsil Village Name
MAIN WORK_P
MAIN_CL_P
MAIN_AL_P
MAIN_HH_P
MAIN_OT_P
MARG WORK_P
MARG_CL_P
MARG_AL_P
MARG_HH_P
MARG_OT_P
Shimarla Jageer
1498 1199 85 11 203 120 27 59 0 34
Sargoth 1970 1477 102 26 365 882 638 25 198 111
Patwari Ka Bas
1051 490 22 7 532 683 478 26 107 72
Bhopatpura
718 299 31 6 382 481 417 35 2 27
Lakhni 927 540 17 2 368 1233 971 105 2 155
Malakali 593 387 31 5 170 16 5 5 0 6
Jaitusar 743 310 4 1 428 135 44 1 0 90
Devipura 305 237 12 0 56 3 1 2 0 0
Kotri Dhaylan
1073 461 118 19 475 344 212 74 0 58
Chomu (District Jaipur)
Bagri 518 405 23 3 87 189 171 16 0 2
Sirsa 795 755 1 0 39 4 3 0 0 1
Ranjeetpura
491 334 4 39 114 162 83 4 9 66
Nangal Govind
725 369 74 27 255 401 308 20 2 71
Kishanpura
1832 765 38 125 904 418 334 2 4 78
Haboo Ka Bas
195 163 7 0 25 0 0 0 0 0
Bagron Ka Bas
445 278 11 5 151 3 0 0 1 2
Asti Kalan 1273 743 14 86 430 698 361 112 0 225
Bhutera 1364 966 151 32 215 92 17 15 0 60
Madho Ka Bas
50 41 0 0 9 11 0 3 0 8
Udgwar 1148 880 95 4 169 95 10 13 5 67
Chhota 473 242 36 0 195 78 25 7 0 46
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT PLOT
NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT SIKAR
RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 78
Tehsil Village Name
MAIN WORK_P
MAIN_CL_P
MAIN_AL_P
MAIN_HH_P
MAIN_OT_P
MARG WORK_P
MARG_CL_P
MARG_AL_P
MARG_HH_P
MARG_OT_P
Gudha
Nangal Kalan
1180 784 30 6 360 389 245 3 2 139
Raisingh Ka Bas
545 226 12 6 301 48 4 2 0 42
Dhodhsar 1303 268 184 21 830 746 82 155 6 503
Nadiya 333 231 3 11 88 29 1 0 1 27
Singod Khurd
1501 1026 22 15 438 252 23 19 12 198
Singod Kalan
1506 905 116 7 478 865 125 98 215 427
Chak Charanwas
145 120 0 0 25 31 31 0 0 0
Aleesar 1576 882 93 7 594 261 90 12 0 159
Baga Ka Bas
271 205 12 15 39 119 6 36 29 48
Phulera (Jaipur District)
Gadri 761 534 112 0 115 2 1 1 0 0
Grand Total 41252 21986 1926 1068 16272 13705 7193 1418 861 4233
Abbreviations:
MAIN WORKERS POPULATION: MAIN WORK_P : Main workers total population, MAIN_CL_P : Main cultivated labour population, MAIN_AL_P : Main agricultural labour population, MAIN_HH_P : Main workers population involved in household industries, MAIN_OT_P : Main other workers population
MARGINAL WORKERS POPULATION:
MARG WORK_P : Marginal workers total population, MARG_CL_P : Marginal cultivated labors total population, MARG_AL_P : Marginal agricultural labors population, MARG_HH_P : Marginal workers involved in household industries, MARG_OT_P : Marginal other workers Population
Source-Census of India 2011
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN By “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 79
Economic Structure
The majority of people in rural parts is farmers & agricultural labors which indicates dominant agricultural economy. A small section of study area people are engaged as household industry workers. But in urban area the existing scenario is completely reversed as most of the people there are engaged in non-agricultural activity especially in local hotels/restaurants and as drivers some people also operates their vans/jeeps/cars as tourist vehicle.
During the field survey, income of a household (family) through all possible sources was recorded. Annual income helps to identify the families below poverty line. Agriculture and allied activities were reported to be the major source of income followed by non-farm wage labor, business, government & private service. The other important sources of income include government pension and income from fodder selling.
Workers Scenario (Occupational Pattern)
Occupational pattern of the concerned study area are recorded to assess skills of people. Occupational pattern also helps in identifying dominating economic activity in the area. The statistics of main and marginal workers with further break-up into category as casual, agricultural, households and other activities is shown in Table 3.31. In the study area the main and marginal workers are 30.0% & 9.9% respectively to the total population (137684) while the remaining 60.1% peoples constitute non-workers (Figure 3.21). Thus it implies that in study area the semi-skilled and non-skilled work-force required for the project is available in aplenty.
Figure 3.21: Workers Scenario
Main Workers:
The main workers are observed as (41252) 30.0% to the total population (137684) of the study area and its composition is made-up of Casual Laborers as 21986 (53.3%), Agricultural Workers population as 1926 (4.7%), Household Workers population as 1068 (2.6%) and Other Workers population as 16272 (39.4%) respectively (Figure 3.22).
Main Workers26.3%
Marginal Workers4.2%
Non-Workers69.5%
Occupational Pattern,%
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN By “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 80
Figure 3.22: Composition of Main Workers Population
Marginal Workers:
The total Marginal Workers are observed as 13705 which constitute 9.9% of the total population (137684) comprise of Marginal Casual Laborers as 7193 (52.5%), Marginal Agricultural Laborers as 1418 (10.4%), Marginal Households Laborers as 861 (6.3%) and other Marginal Workers were also observed as 4233 (30.8%) of the Total Marginal Workers respectively in the study area. Details about marginal workers in the study area are tabulated in Table 3.31.
Figure 3.23: Distribution of Composition of Marginal Workers
Basic Infrastructure (2001 Census)
A review of Basic infrastructure/amenities facility available in the study area has been done on the basis of the site survey and available information as per the census records of 2001 for the study area inhabited villages lying in two (02) districts namely Sikar & Jaipur of
Casual Labour53.3%
Agril. Labour4.7%
Household Workers
2.6%
Other Workers39.4%
Composition of Main Workers Population
Casual Labourers52.5%
Agril Labourers10.4%
Household Labourers
6.3%
Other Marginal Workers
30.8%
Marginal Workers, %
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN By “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 81
Rajasthan. The study area has a good level of infrastructure facilities and amenities like education, medical (health), drinking (potable) water, power supply (electrification), and transport & communication network. Study area is predominantly of rural environment and agriculture is the main occupation in the study area peoples.
Education Facilities
As per the village location map of 10-km radius study area, there are a total of thirty-eight (38) revenue villages and one (01) Municipal Town named Reengus (M) of Sikar & Jaipur District in Rajasthan. The study area mainly lying in two (02) tehsils (as Sri Madhopur & Sikar) of Sikar District and two (02) tehsils (as Chomu & Phulera) of Jaipur District respectively in Rajasthan itself.
Primary education facility is available in almost all the villages in the study area. There are about ninety-eight (98) primary schools in the study area villages. Most of the villages alsohave Primary and Middle school facilities and there are about thirty-five (35) Middle Schools in the revenue villages of study area. Higher secondary school (SS) facility is available only in eight (08) revenue villages of the study area. Senior Secondary School (SSS) facility is available only in one village named Dodhsar of Chomu Tehsil in Jaipur District. The educational facilities have been further strengthened now and a number of private public schools and colleges are also functioning in the vicinity of the study area. Besides, there are Engineering and Medical colleges available close to the vicinity of the study area and in Towns. Government College and other Higher education facilities are available in Towns in the area. Now there is a considerable improvement in educational facility in the district as well as in the study area. The villages / towns have no such facilities can reach within <5 to 10-km or >10-km range.
Medical Facilities
The medical facilities are provided by different agencies like Govt., & Private individuals and voluntary organizations in the study area. No primary health center (PHC) exists in the 10-km radius study area; most of the villages in the study area depend upon the only Reengus (M) Municipal town having such facility. Almost all villages are having medical facilities either at door or within <5 or 5 to10-km distance range. There are only three (03 no’s) villages have registered medical practitioners (RMP) in the study area and rest of the villages are depending on those villages for such facility.
Potable Water Facilities
Drinking water facilities are available in almost all villages and town of the study area. The study area has good potable water facilities. About eighteen (18) villages (46.2%) out of the total thirty-eight (38) villages, which are close to the towns, have tap water supply and rest of the villages depends upon the tube well & hand pumps. River water facility is not available in the study area. As per the census records of 2001, no Pond was recorded in the study area villages. In the majority of study area villages, hand pump & tube wells are commonly observed during the field visit & surveys.
Communication Facilities
Apart from Post and Telegraph (P&T) services are the main communication linkage in the study area. The area has good rail and road network, passes from the area. Only three (03) villages of the study area having railway station facility. The north-western railway line also passes across the district HQ and most of the villages availing this facility through the nearest Railway Station. Jaipur also serves as the headquarters of the North Western Railway zone of the Indian Railways since 2002. The Jaipur Division of the North Western Railway is also headquartered at Jaipur. Most of the villages in the study area have pucca road facility and only three (03) villages named Parasrampura & Sargoth of Sri Madhopur tehsil of Sikar District and Kishanpura village of Chomu tehsil in Jaipur District respectively
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR RAJASTHAN By “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 82
have Railway Station facility, most of the study area villages are served with Railway Station facility within < 05 to 10-km range; no village have navigable waterways facility in the study area, this facility is available more than >10-km distance from the village. The villages have no such facility can avail within 5 to 10-km range. Mainly One (01) town namely, Reengus (M), Sri Madhopur, Chomu and Kishangarh Renwal are available within the distance range of 08 to 36-kms from the villages / towns of the study area.
Banking Facility
The Study area has almost all the schedule commercial banks with ATM facility at urban areas and the district HQ.
Power Supply
About all (100%) revenue villages and one (01) Municipal town named Reengus (M), availing power supply facility in the study area for all purposes (EA) like domestic, agriculture, industrial & other purpose etc. Out of thirty-nine revenue villages of the study area only Five (05) revenue villages (12.8%) are electrified for Domestic & Agriculture purpose.
Village wise detailed ‘Basic Amenities Availability’ data for all study area villages and one (01) town in the study area is compiled and presented in Table 3.32 as follows.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT PLOT
NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT SIKAR
RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 83
Table 3.32:Village-wise Basic Amenities Availability
S. No.
Name of the Village
Educational Medical Drinking Water
Post & Telegraph
Communication Approach Nearest Town &
Distance, km
Power Supply
Concerned Tehsil
1 Reengus (M) ………………………………………………Urban Area……………………………………………………………………… Sri Madhopur (District Sikar)
2 Mahroli P(6), M(2), SS(1), C<5, AC(2)
Al. H <5, MCWC <5, PHC <5
T, W, HP PO(1), Tel. Con.(79)
BS, RS<5, NW>10
PR Reengus (5.0-Km)
EO
3 Bharni P(5), M(2), SS(1), C(5-10)
Al. H (5-10), MCWC (5-10), PHC (5-10), PHSC(1)
T, W, TW, HP
PO (1), Tel. Con.(12)
BS, RS(5-10), NW>10
PR,MR,FP Sri Madhopur (8.0-km)
ED, E Ag., EO, EA
4 Arniya P(6), M(1), C(5-10) Al. H (5-10), MCWC(5-10), PHC <5, PHSC(1)
W, TW, HP Yes, Tel. Con.(1)
RS(5-10), NW>10 PR,MR,FP Reengus (8.0-Km)
ED, E Ag., EO, EA
5 Badhadar P(2), M(1), C>10, AC(1)
Al. H>10, AD(1), MCWC >10, PHC <5, PHSC (1), CHW (1)
T, W, HP PO (1), Tel. Con.(10)
BS, RS>10, NW>10
PR,MR,FP Sikar (12.0-Km)
ED, E Ag., EO, EA
Sikar (District Sikar)
6 Kolwa P(1), M(1), C>10 Al. H <5, MCWC >10, PHC >10
W, TW, HP Yes, Tel. Con.(2)
BS, RS>10, NW>10
MR,FP Reengus (12.0-Km)
ED, E Ag., EO, EA
Sri Madhopur (District Sikar)
7 Jalalpur P (1), C>10 Al. H >10, MCWC >10, PHC >10
W,HP Yes, Tel. Con.(2)
RS>10, NW>10 MR,FP Reengus (8.0-Km)
ED, E Ag., EO, EA
8 Parasrampura P(1), M<5, C(5-10) Al. H>10, MCWC (5-10), HC (1), PHC >10, PHSC (1), RMP (1), CHW (1)
W,HP Yes, Tel. Con.(3)
BS, RS, NW>10 PR,MR,FP Reengus (5.0-Km)
ED, E Ag., EO, EA
9 Shimarla Jageer
P(2), M(1), C(5-10) Al. H.<5, AD (1), MCWC >10, PHC >10
T, W, TW, HP
PO(1) BS, NW>10 PR,MR,FP Reengus (5.0-Km)
ED, E Ag., EO, EA
10 Sargoth P(9), M(2), C>10 Al. H (5-10), MCWC (5-10) PHC (5-10), PHSC (1), CHW (1)
W,HP PO (1), Tel. Con.(1)
BS,RS, NW>10 PR,MR,FP Reengus (7.0-Km)
ED, E Ag., EO, EA
11 Patwari Ka Bas
P(3), M(1), C>10 Al. H (5-10), MCWC (5-10), PHC (5-10)
T, W, HP PO (1), Tel. Con.(1)
NW>10 PR,MR,FP Reengus (5.0-Km)
ED, E Ag., EO, EA
12 Bhopatpura P(3), M(1), C>10 Al. H <5, MCWC >10, PHC <5
T, W, HP PO (1), Tel. Con.(1)
BS, NW>10 PR,MR,FP Reengus (1.0-Km)
ED, E Ag., EO, EA
13 Lakhni P(4), M(2), SS(1), Al. H >10, MCWC (5- T, W, HP PO (1), Tel. BS, NW>10 PR,MR,FP Reengus ED, E
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT PLOT
NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT SIKAR
RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 84
S. No.
Name of the Village
Educational Medical Drinking Water
Post & Telegraph
Communication Approach Nearest Town &
Distance, km
Power Supply
Concerned Tehsil
C(5-10) 10) PHC (5-10), PHSC (1)
Con.(11) (5.0-Km) Ag., EO, EA
14 Malakali P(3), M(3), C>10 Al. H <5, MCWC >10, PHC <5
T, W, HP PO (1), Tel. Con.(1)
NW>10 PR,MR,FP Reengus (1.0-Km)
ED, E Ag., EO, EA
15 Jaitusar P(2), M(1), C>10 Al. H <5, MCWC >10, PHC <5
T, W, HP PO (1), Tel. Con.(1)
NW>10 PR,FP Reengus (1.0-Km)
ED, E Ag., EO, EA
16 Devipura P(1), C>10 Al. H >10, MCWC >10, PHC >10
W, HP NA NW>10 FP Reengus (6.0-Km)
ED, E Ag., EO, EA
17 Kotri Dhaylan P(3), M(1), C>10 Al. H (5-10), MCWC (5-10), PHC >10, PHSC (1), CHW (1)
W,TW,HP PO (1), Tel. Con.(1)
BS,NW>10 PR,MR,FP Reengus (6.0-Km)
ED, E Ag., EO, EA
18 Bagri P(1), M(1), C>10, AC(1)
Al. H >10, MCWC (5-10), PHC (5-10)
W,TW,HP NA BS, NW>10 PR,MR,FP Chomu (36.0-km)
ED, E Ag., EO, EA
Chomu (District Jaipur)
19 Sirsa P(1), M(1), C>10 Al. H >10, MCWC (5-10), PHC (5-10)
W,TW,HP Yes, Tel. Con.(1)
BS, NW(>10) PR,MR,FP Chomu (35.0-km)
ED, E Ag., EO, EA
20 Ranjeetpura P(1), M(1), C>10, AC(1)
Al. H>10, MCWC (5-10), PHC (5-10)
W,TW,HP NA NW>10 PR,MR,FP Chomu (35.0-km)
ED, E Ag., EO, EA
21 Nangal Govind P(1), M(1), C>10, AC(1)
Al. H>10, Ayu.d.(1), MCWC (5-10), HC (1), PHC (5-10)
W,TW,HP PO (1),Tel. Con.(2)
BS, NW>10 PR,MR,FP Chomu (35.0-km)
ED, E Ag., EO, EA
22 Kishanpura P(7), M(3), SS(1), C>10), O(1)
Al. H >10, MCWC >10, PHC (5-10), PHSC (1), FWC (1), CWC (1)
T,W,TW,HP PO (1), Tel. Con.(1)
BS,RS,NW>10 PR,MR,FP Chomu (35.0-km)
ED, E Ag., EO, EA
23 Haboo Ka Bas P(1), C>10 Al. H >10, MCWC >10, PHC (5-10), CHW (1)
T,W,TW,HP Yes, Tel. Con.(1)
BS, NW>10 PR Chomu (35.0-km)
ED, E Ag.
24 Bagron Ka Bas
P(1), M(1) ,C>10 Al. H >10, MCWC >10, PHC <5
W,HP Yes, Tel. Con.(1)
BS, NW>10 PR,MR,FP Chomu (35.0-km)
ED, E Ag., EO, EA
25 Asti Kalan P(4), M(1), SS(1), Al. H >10, MCWC T,W,HP PO (1),Tel. BS, NW>10 PR,MR,FP Chomu ED, E
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT PLOT
NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT SIKAR
RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 85
S. No.
Name of the Village
Educational Medical Drinking Water
Post & Telegraph
Communication Approach Nearest Town &
Distance, km
Power Supply
Concerned Tehsil
C>10 >10, PHC <5 Con.(1) (35.0-km) Ag., EO, EA
26 Bhutera P(5), M(1),C>10 Al. H >10, Ayu.d.(1), MCWC>10, PHC (5-10), PHSC(1), FWC(1), CHW(1), RMP (1)
T,W,TW,HP PO (1),Tel. Con.(1)
BS, NW>10 PR Chomu (35.0-km)
ED, E Ag., EO, EA
27 Madho Ka Bas P(1), C>10 Al. H >10, MCWC>10 ,PHC (5-10)
W,TW,HP NA NW(>10) FP Chomu (35.0-km)
ED, E Ag.
28 Udgwar P(3), M(1) ,SS(1), C(>10)
Al. H (>10), MCWC>10, PHC >10, CHW(1)
W,TW,HP PO (1),Tel. Con.(1)
NW(>10) PR Chomu (24.0-km)
ED, E Ag., EO, EA
29 Chhota Gudha P(1), M(1), C(<5) Al. H >10, MCWC>10, PHC>10, CHW(1)
W,TW,HP NA RS,NW(>10) PR Chomu (21.0-km)
ED, E Ag., EO, EA
30 Nangal Kalan P(2), M(1), C(5-10), AC(1)
Al. H >10, MCWC>10, PHC>10, PHSC(1), CHW(1)
W,TW,HP PO(1) NW(>10) PR Chomu (18.0-km)
ED, E Ag., EO, EA
31 Raisingh Ka Bas
P(1), C(5-10), AC(1)
Al. H >10, MCWC>10, PHC(5-10)
W,TW,HP NA BS, NW(>10) PR Chomu (18.0-km)
EA, E Ag.
32 Dhodhsar P(5), M(1), SS(1), SSS(1), C(5-10)
Al. H >10, MCWC>10, PHC(5-10), PHSC(1), CHW(1)
T,W,TW,HP PO(1), Tel. Con.(17)
BS, NW(>10) PR Chomu (17.0-km)
ED, E Ag., EO, EA
33 Nadiya P(2), C>10 Al. H >10, MCWC>10, PHC (5-10)
W,HP NA NW>10 FP Chomu (17.0-km)
EA, E Ag.
34 Singod Khurd P(1), M(1), SS(1), C>10
Al. H (>10), MCWC >10, PHC (5-10), PHSC (1)
T,W,HP Tel. Con.(4)
BS, NW>10 PR Chomu (17.0-km)
EA, E Ag.
35 Singod Kalan P(3), M(1), C>10 Al. H >10, MCWC >10, PHC >10, RMP (1)
T,HP PO(1), Tel. Con.(17)
BS, NW>10 PR,MR,FP Chomu (25.0-km)
ED, E Ag., EO, EA
36 Chak P(1), Al. H >10, AD (1), W,HP PO(1), Tel. BS<5, RS(5-10), PR,MR,FP Chomu ED, E
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT PLOT
NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT SIKAR
RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 86
S. No.
Name of the Village
Educational Medical Drinking Water
Post & Telegraph
Communication Approach Nearest Town &
Distance, km
Power Supply
Concerned Tehsil
Charanwas M(1),C(>10),O(1) MCWC >10, PHC (5-10)
Con.(1) NW(>10) (20.0-km) Ag., EO, EA
37 Aleesar P(2),M(1),SS(1), C>10,O(1)
Al. H >10, MCWC >10, PHC >10, PHSC (1)
T,W,HP PO(1), Tel. Con.(1)
BS, RS>10, NW>10
PR,MR,FP Chomu (21.0-km)
ED, E Ag., EO, EA
38 Baga Ka Bas P(1), C>10, O(1) Al. H >10, MCWC >10, PHC <5,
W,HP Yes, Tel. Con.(1)
RS >10, NW>10 MR, FP Chomu (21.0-km)
ED, E Ag., EO, EA
39 Gadri P(1), C>10 Al. H >10, MCWC (5-10), PHC <5
T,W,HP Yes, Tel. Con.(5)
BS, RS<5, NW>10
PR,MR,FP Kishangarh Renwal (10.0-km)
ED, E Ag., EO, EA
Phulera (Jaipur District)
Abbreviations:
Educational Facilities: P-Primary School, M-Middle School, SS-Higher Secondary Schools, SSS- Senior Secondary School
Medical Facilities: CHC- Community Health Centre, PHC-Primary Health Centre, PHSC-Primary Health Sub-Centre, MCWC-Maternity and Child Welfare Centre, H-Hospital, D- Dispensary, FWC-Family Welfare Centre
Drinking Water Facilities: T-Tap Water, W-Well Water, HP-Hand Pump, TW-Tube Well Water, R-River Water, Tk-Tank Water, O-Other Drinking Water Facility
Communication and Transport Facilities: PO-Post Office, SPO-Sub-Post Office, PTO- Post & Telegraph Office, Tel. - Telephone Connection, Mob. - Mobile Phone Coverage, BS-Bus Services, RS-Railways Services
Approach to Village: PR- Paved Roads, KR-Kuchha Road, FP-Foot Path
Power Supply: ED-Power Supply for Domestic use, E Ag. - Power Supply for Agricultural use, EC- Power supply for Commercial use, EA-Electricity for All Purposes
Source-http://www.censusindia.gov.in/Census_Data_2001/Village_Directory/View_data/Village_Profile.aspx
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 87
CHAPTER 4 : IMPACTS ASSESSMENT AND PREDICTION
4.1. GENERAL
The possible impact on various components of environment due to the proposed CIF
Greenfield project can be assessed in terms of:
• Beneficial or detrimental
• Naturally reversible or irreversible
• Repairable via management practices or irreparable
• Short term or long term
• Temporary or continuous
• Occurring during construction phase or operational phase
• Local, regional, national or global
• Accidental or planned (recognized before hand)
• Direct (primary) or Indirect (secondary)
• Cumulative or single
• Significant
And on;
• Physical
• Biological Environment and
• Demographic and Socio-economic Environment.
For proper assessment of significance and magnitude of environmental changes due to
construction and operational phases of the plant, the impacts are analyzed on the 10 km
radius study area around the proposed plant site for each environmental parameter. Impact
assessment study for the CIF unit is carried out by predicting net contribution of pollutants
(qualitative as well as quantitative) on overall qualitative assessment of various
environmental indicators. Prediction of impacts is an important component in environmental
impact assessment process. Several techniques and methodologies are in vogue for
predicting the impacts due to existing and proposed industrial development on physico-
ecological and socio-economic components of environment. Such predictions delineate
contribution in existing baseline data for the operational project and superimpose over the
baseline (pre-project) status of environmental quality to derive the ultimate (post-project)
scenario of the environmental conditions due to the proposed project. The quantitative
prediction of impacts lead to delineation of suitable environmental management plan needed
This chapter details the inferences drawn from the environmental impact assessment
of the proposed project. It describes the overall impacts of the project activities and
underscores the areas of concern, which need mitigation measures. Predictions have
been done based on the various quantitative and qualitative methods suggested by
MoEF & CC.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 88
for implementation during the construction, commissioning and operational phases of the
proposed project in order to mitigate the adverse impacts on environmental quality.
4.2. CONSTRUCTION PHASE
The activities of proposed Greenfield project will be confined to the project site within the
boundary of Plant complex. The present project activities will not cause any significant loss of
any important flora.
Project falls in the notified RIICO industrial area. There is no land acquisition involved. Land
Belongs to the CIF only. Proposed area for the plant is 3770.0 m². Present land use
/Landcover of the project site (Core area) is Open Shrub Land. So, there will be a Land
use\Landcover change from Open shrub land to Industrial land. It is a Long-Term Land
use/Landcover Impact. There will be no change in the Land use\Landcover outside the Plant
area. There is a River present at about 1.46km (NW) called Mendha River which is
completely dry. There will be no impact on the drainage pattern from the project activities.
There is no vegetation removal from the project site as the project site only has few shrubs.
Impacts on Land use\Landcover are given below for the core area.
• Change in Land Use\Land Cover (Core area) from Open Scrub to Industrial Land.
• Generation of Construction & Hazardous Waste
• Change in Topography due to Excavation
• Disposal of Wastewater on Land
Mitigation Measures
• Change in Land use\Land cover will be for Longer duration
• Top soil generated from various activities like excavation etc. should be stored
and preserved to use it during restoration period as far as possible
• There will be no disposal of wastewater on land (will be sent to existing ETP)
• Hazardous waste generated i.e. used oil, some containers of paints etc. and
others. These wastes are to be safely stored and disposed off as per existing
practices.
• Ensuring that water sprinkling is regularly carried out during construction activities
Emission / Gaseous Pollution
Due to different vehicular movement, construction machineries and project construction
activities (Bulk solids handling), the concentration of air pollutants can be increased. These
pollutants can affect the surrounding vegetation and nearby agricultural crops. There will be
limited construction activities at CIF.
Dust / Fumes (from machineries) Generation
Terrestrial flora can be affected by the dusty/ fumes environment to be created due to
vehicular movement/ machineries during construction phase. Increment in the density of the
dust particles (SPM)/ fumes having Sox/NOx/HC in the atmosphere can affect the
surrounding plant/ vegetation in following ways:
a) Blockage and Damage to Stomata
b) Reduction in Chlorophyll Content
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 89
c) Abrasion of Leaf Surface or Cuticle
All these disturbances ultimately affect photosynthesis process and plant metabolism that
leads to reduction in plant growth up to some extent.
Noise Pollution
Noise level of the project area will be increased during construction phase. Although there is
no specific noise-sensitive fauna has been recorded near to project site but limited avifauna
and small animals in the industrial area can be affected by increased noise level. In such
cases they can change their habitat.
Congregation of Labour
Construction activities often require a considerable workforce and associated support
services. The livelihood activities of this increased human population may contribute to local
environmental impacts in terms of collecting firewood and food as well as enhancing
recreational activities.
The impacts during construction phase normally are:
• Detrimental
• Naturally Reversible
• Short term
• Temporary
• Local
• Direct
Mitigation Measures:
Gaseous Pollution
The pollutants (SPM, SOX, NOX and others) in ambient air of the study area are low.
Development of multi-layer plantation (green belt) around the proposed project area will
further help to mitigate gaseous pollution within and around the project area.
Dust Generation
Dust generation during construction period will be managed through: Water spraying on rough roads, on powdery construction materials etc.
Effluent Discharge
There will be a negligible discharge of effluent from the proposed plant due to construction
activities, which will be directly treated inside the plant. Safe guard for rainy season runoff will
be taken to prevent any direct discharge from the plant to nearby water body. As such the
water ecology will not be affected.
Congregation of Labour
The impacts will be managed through:
• No permanent camping in vegetation rich area and riverside
• A provision of fuel for labourers engaged in construction activities
• Restriction on poaching/hunting and removal of any vegetation
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 90
Based on the field observations and interaction with local people and forest officials, it was
noticed that the project area is not associated with any National Park/Wildlife
Sanctuary/Conservation Reserve and there is no wildlife migratory routes present in the
project area. Improvement in the green cover under a regular plantation program (Greenbelt
Development Program) will not only increase the plant diversity in the area but also enhance
the habitat for wildlife especially for avifauna.
Operation Phase
4.2.1. Air Environment
The pre-project (baseline) ambient air quality status in the study area indicates that all the
criteria pollutants are well within the prescribed National Ambient Air Quality Standards
(NAAQS) for industrial, residential, rural and other areas.
• To assess the impact of air emissions from various continuous point sources, air
dispersion modelling study has been conducted with the help of ISCST3 (USEPA
dispersion model). Detailed description has been given in the following sub-
sections:
4.2.1.1 Model Details
• Air dispersion modelling can be used to predict atmospheric concentrations of
pollutants at specific locations (receptors) over specific averaging times (i.e.
annual, daily, and hourly). An atmospheric dispersion model accounts for the
emissions from a source; estimates how high into the atmosphere they will go,
how widely they will spread and how far they will travel based on temporal
meteorological data; and outputs the pattern of concentrations that will occur for
various exposure periods, thereby providing the exposure risks for different
receptors.
• In the proposed project, prediction of impacts on air environment has been
carried out employing mathematical model based on a Steady State Gaussian
Plume Dispersion Model designed for multiple point sources for short term. In the
present case, Industrial Source Complex Short-term [ISCST3] dispersion model
based on steady state Gaussian Plume Dispersion, designed for multiple point
sources for short term and developed by United States Environmental Protection
Agency (USEPA) has been used for simulations from point sources.
• The predictions for air quality during operation phase were carried out for
particulate matter less than particulate matter (PM) Hydrogen Chloride (HCl), and
Chlorine (Cl2) concentration using ISCST 3.
• The options used for short-term computations are:
• The plume rise is estimated by Briggs formulae, but the final rise is always limited
to that of the mixing layer
• Stack tip down-wash is not considered
• Buoyancy induced dispersion is used to describe the increase in plume
dispersion during the ascension phase
• Calms processing routine is used by default
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 91
• Wind profile exponents is used by default
• Flat terrain is used for computation
• Pollutants do not undergo any physico-chemical transformation
• No pollutant removal by dry deposition
• Universal Transverse Meter (UTM) coordinates have been used for computation
A uniform polar grid was used for the computation and extended to 10 km from the center of
the proposed project. In addition to that, receptors were also placed at the sampling locations
4.2.2. Predicted GLC due to CIF Greenfield Project
The main sources of air pollution due to the operation of the plant are the Boiler, Process
vent and DG stack (during power cut only). The contribution to GLCs for the pollutants i.e.
particulate matter, PM Cl, HCl etc. are predicted from continuous stack (i.e. process stack
only) over the study area proposed project considering the worst scenario. The emission load
from proposed project is given in Table below. The prediction (maximum) is based on the
expected total emission rate from the stack and is given in isopleths Figure 4.1 (A, B, C & D)
for proposed project. The additional contribution to GLC is also given below in Table 4.1.
Table 4.1: Stack Parameters
Stacks Height
(M) Dia (M)
Flow in
Nm³/hr Temp 0C
Pollutant Concentration
in mg/Nm3
DG Set–I
(300 KVA) 12 0.2 ---- 150 During Power Failure Only
Process 10 0.2 300 35 PM < 20 CS2 < 05 HCl <20
Table 4.2: Emission Load
Stack Attached to /
Pollutant
Pollutant Concentration
mg/Nm3
Flow (Nm3/hr)/
Temp. 0C
Pollution Load
gm/hr gm/s
Process
PM < 20
150/35
6.0 0.001667
Cl2 < 05 1.5 0.000417
HCl <20 6.0 0.001667
4.2.2.1 Meteorological Data
The meteorological data consists of wind speed, direction, temperature, humidity, solar
radiation, cloud cover and rainfall recorded during the months 15th March 2016 to 15th June
2016 by M/s Kamal Enviro & Food Lab Pvt. Ltd., Gurgaon-Haryana with EQMS Team,
carried out sampling and testing. Wind speed, wind direction and temperature have been
processed to extract the 24–hour mean meteorological data for application in ISCST3.
4.2.2.2 Receptor Locations
A total of about 186 receptors – 180 receptors of which were generated with a polar grid from
the centre of the proposed project and extended to 10 km. Apart from these receptors, the
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 92
sampling locations were also taken into account to assess the incremental load on the
baseline environmental scenario.
4.2.2.3 Summary of Predicted GLC’s
The summary of maximum ground level concentrations (GLC) for the proposed project is listed in Table 4.3.
Table 4.3: Summary of Maximum 24-hour Incremental GLC due to the Proposed Greenfield Project Stacks
Parameters Proposed (µ/m³) Distance (Mt) Direction
CS2 0.012 700 E, SE
HCL 0.0047 800 E, SE
PM 0.0047 700 E, SE
(Source: Modelling output results)
Maximum 24-hourly averages incremental in GLCs of Cl2, HCl and PM due to Greenfield
project during operation phase are predicted and given in Table 4.3. The isopleths of the
pollutant concentration due to the impacts associated with the operation of the proposed
project are shown in Figures 4.1 for PM, HCl and SO2 respectively. Contours of the
incremental GLCs depict that the travel of emissions from the proposed project would be
mainly in SE, quadrant.
Besides the worst GLC (maximum) predictions the GLC incremental at the sensitive
receptors (where the ambient air monitoring was carried out) was also predicted. The
predicted incremental GLC for pollutants are given in underneath Table 4.4.
Table 4.4: Summary of Maximum GLC at Monitoring Locations due to the Proposed Project
Location Code
AAQ Location
Pollutants Baseline
Concentration Max Incremental
GLC (µg/m³)
Total Conc.
(µg/m³)
AQ-1 Near Project Site
PM10 76.0000 0.0047 76.0047
PM2.5 30.0000 0.0000 30.0000
SO2 8.5000 0.0000 8.5000
NOx 15.4000 0.0000 15.4000
CO 0.3100 0.0000 0.3100
VOC <0.1 0.0000 <0.1
Cl2 0.0000 0.0120 0.0120
HCl 0.0000 0.0047 0.0047
AQ-2 RIICO Area Near DS Milk Plant
PM10 80.0000 0.0047 80.0047
PM2.5 33.0000 0.0000 33.0000
SO2 9.0000 0.0000 9.0000
NOx 17.8000 0.0000 17.8000
CO 0.4400 0.0000 0.4400
VOC <0.1 0.0000 <0.1
Cl2 0.0000 0.0120 0.0120
HCl 0.0000 0.0047 0.0047
AQ-3 Parasrampura
PM10 66.0000 0.0047 66.0047
PM2.5 29.0000 0.0000 29.0000
SO2 8.2000 0.0000 8.2000
NOx 16.3000 0.0000 16.3000
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 93
Location Code
AAQ Location
Pollutants Baseline
Concentration Max Incremental
GLC (µg/m³)
Total Conc.
(µg/m³)
CO <0.1 0.0000 <0.1
VOC <0.1 0.0000 <0.1
Cl2 0.0000 0.0120 0.0120
HCl 0.0000 0.0047 0.0047
AQ-4 Garhi
PM10 61.0000 0.0047 61.0047
PM2.5 26.0000 0.0000 26.0000
SO2 7.3000 0.0000 7.3000
NOx 14.2000 0.0000 14.2000
CO 0.2500 0.0000 0.2500
VOC <0.1 0.0000 0.0000
Cl2 0.0000 0.0120 0.0120
HCl 0.0000 0.0047 0.0047
AQ-5 Sargot
PM10 63.0000 0.0047 63.0047
PM2.5 26.0000 0.0000 26.0000
SO2 7.6000 0.0000 7.6000
NOx 15.0000 0.0000 15.0000
CO 0.2600 0.0000 0.2600
VOC <0.1 0.0000 <0.1
Cl2 0.0000 0.0120 0.0120
HCl 0.0000 0.0047 0.0047
AQ-6 Harsolai
PM10 56.0000 0.0047 56.0047
PM2.5 23.0000 0.0000 23.0000
SO2 7.5000 0.0000 7.5000
NOx 16.1000 0.0000 16.1000
CO <0.1 0.0000 <0.1
VOC <0.1 0.0000 <0.1
Cl2 0.0000 0.0120 0.0120
HCl 0.0000 0.0047 0.0047
AQ-7 Sector-16 Ringas
PM10 60.0000 0.0047 60.0047
PM2.5 25.0000 0.0000 25.0000
SO2 9.0000 0.0000 9.0000
NOx 14.8000 0.0000 14.8000
CO 0.3000 0.0000 0.3000
VOC <0.1 0.0000 <0.1
Cl2 0.0000 0.0120 0.0120
HCl 0.0000 0.0047 0.0047
AQ-8 Khatodiya Ki Dhani
PM10 58.0000 0.0047 58.0047
PM2.5 24.0000 0.0000 24.0000
SO2 8.8000 0.0000 8.8000
NOx 16.5000 0.0000 16.5000
CO <0.1 0.0000 <0.1
VOC <0.1 0.0000 <0.1
Cl2 0.0000 0.0120 0.0120
HCl 0.0000 0.0047 0.0047
(Source: Modelling output results with base line)
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 94
Discussion of the Cumulative Impacts at Monitoring Locations:
The Maximum total pollution concentration level for Particulate matter (80.007 µg/m³) at AQ-2
RIICO Area near DS Milk Plant, and other pollutant from process is HCl (0.0047 µg/m³),
which are ND (Not detectable) in base line but eliminated from the process. All the pollutants
are well under the prescribed limit.
(Source: Modelling Output)
(A) Isopleth for HCl Incremental GLC due to Proposed Greenfield Project
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 95
(Source: Modelling Output)
(C) Isopleth for PM Incremental GLC due to Proposed Greenfield Project
Mitigation Measures
The ambient air quality with respect to air pollutants will change during the operation phase of
the proposed project. However, adequate stack height has been provided for better
dispersion of flue gas as per the guidelines of CPCB. In addition, all process stacks have
been provided with high efficiency scrubbing system to control the emission within norms. In
addition to that, adequate greenbelt will be developed for further control of air pollution.
Compliance with the existing ambient air quality standards will be achieved by process
system selection as outlined above, proper system operation and implementation of the
measures as outlined in EMP. This needs to be coupled with the continuous monitoring of air
pollutants within and around the project site as well as in adjoining areas.
Environmental impacts (AAQ) resulting from proposed project can be grouped into following
Categories:
• Beneficial or detrimental--detrimental
• Naturally reversible or irreversible---Reversible
• Repairable via management practices or irreparable—Repairable to some extent through Green Belt development
• Short term or long term Short term
• Temporary or continuous-- Continuous
• Occurring during construction phase or operational phase—Operation Phase
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 96
• Local, regional, national or global--Local
• Accidental or planned (recognized before hand) -- Planned
• Direct (primary) or Indirect (secondary)-- Direct
• Cumulative or single—Single
4.2.3. Measures for fugitive emission
In proposed activities, there will be chances of generation of VOCs, HCL & Cl2 from material
handling area, process area, Volatile chemicals storage area etc. There will be also changes
of generation of PM (Dust) from packing/ finishing area. Unit will adopt following measures-
• Good house-keeping, proper maintenance and continuous observation will prevent the chances of any fugitive emission from the process plant.
• Pakka road make to reduce the fugitive emission. Water sprinkler will be provided to reduce the dusting from road transportation.
• Regular maintenance of valves, pumps and other equipment is done to prevent leakage and thus minimize the fugitive emissions of VOCs.
• Entire process is carried out in the closed reactors with proper maintenance of pressure and temperature.
• Regular periodic monitoring of work area to check the fugitive emission.
• To reduce the pollutant emission during transportation, the unit has adopted the practice of regular check-up and maintenance of vehicular engines for complete combustion of the fuel
4.2.4. Odour Control for Solid Handling
• All solid raw materials shall be charged directly to reactor through special air lock
hopper against slight negative pressure (in water column) so that no odour is
emitted to the environment.
• Solid charging nozzle in reactor shall be projected inside so that it directly falls in
to the liquid media, thereby eliminating carrying over of solid to vapour nozzle.
• Powder transfer system shall also be used where ever applicable to have zero
loss of powder into the atmosphere.
4.2.5. Odour Control for Liquid
• All liquid raw material handled in drum shall be cooled down during summer
before charging so as to minimize its vapour pressure and control of odour.
• Liquid from drums shall be charged in day tank or to reactor with the help of FLP
motorized barrel pump. alternatively, vacuum lock could also be used in day tank
for transfer of liquid from drum (pumping under vacuum). Day tank vent shall be
connected to fume gas scrubber.
• Little or partial handling area is equipped with suction hood which finally connect
with fume scrubber.
• A portable duct connection shall the mounted-on drum vent nozzle to exhaust
fume while opening lid of the drum.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 97
4.3. NOISE ENVIRONMENT
The sources of noise during the operational phase of the plant are mainly from Boilers, air compressors, blowers, pumps, vacuum pumps, ejectors and furnaces and other process equipment. The other sources of noise are the movement of vehicles along the road and DG sets. Moving machineries will be selected with caution as regard to low noise generation as well as low energy consumption.
4.3.1. Impacts due to Transportation
Noise level contributed from increased movement of light medium and heavy vehicles on the roads both within and outside the plant can be considerable depending upon the traffic density. The heavy commercial vehicles traffic is limited depending upon the material receipt and dispatch of products through road transport. The major quantity of pesticides will be dispatched through roads.
4.3.2. Impact on Community
Equivalent sound levels are often used to describe community exposures to noise. Noise survey was also carried out at eight locations outside the plant area but within the study area. The Leq for these areas is found to be well within the prescribed limits promulgated by CPCB.
The noise level norms in villages of study area are being met with respect to the norms of ‘Ambient Air Quality Standards in Respect of Noise’.
The operation of CIF proposed project will have the noise level but not much exceeding much the present noise level and as such will not have any adverse impact on the human settlement around it. The noise will not be audible beyond its boundary limit, particularly due to natural green belt and other attenuators.
Mitigation Measures:
• Noise from the plant is to be limited through:
a. High noise machineries (DG sets etc.) should have acoustic enclosures.
b. Proper / regular maintenance of machineries.
• Regular noise monitoring in work area. Any abnormal noise level to be investigated and noise source attended.
• Green belt development to arrest noise from going outside the plant.
Environmental impacts (Noise) resulting from proposed project can be grouped into following
Categories:
• Beneficial or detrimental--detrimental
• Naturally reversible or irreversible---Reversible
• Repairable via management practices or irreparable—Repairable to some extent through Green Belt development
• Short term or long term Short term
• Temporary or continuous-- Continuous
• Occurring during construction phase or operational phase-Operation Phase
• Local, regional, national or global--Local
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 98
• Accidental or planned (recognized before hand) --Planned
• Direct (primary) or Indirect (secondary)--Direct
• Cumulative or single--Single
4.4. WATER ENVIRONMENT
Impact on water environment due to CIF proposed project scheme will be in terms of additional water consumption {water demand} and waste water / effluent generation and discharge to environment.
4.4.1. Water Demand
Since the CIF proposed project will have water requirement both during construction period as well as during operation phase. The requirement during construction period will be much less.as compared to that during operation and will be met from RIICO water supply.
Water during operational phase is normally required for:
• Process
• Cooling Water
• Boiler Feed Water
• Domestic and Green Belt
Total fresh water requirement is around limited (5 KLD). This shall be met by combination of recovered and recycled water and fresh water. The water balance for the proposed project is as given as in Figure 2.4 in Chapter 2.
4.4.1.1 Effluent Generation and Discharge
Effluent conveyed to effluent treatment plant will be segregated as “High TDS effluent” and
“Low TDS effluent”. The separate treatment will be train provided for both types of effluent.
The effluent generated in the process shall be separated, will be treated in three stage ETP
followed by activated carbon filter.
Total 2 KLD of effluent is expected to be generated from the proposed project. In proposed
Scenario, effluent generated from the facility including proposed Greenfield will be led to
Effluent Treatment Plant (ETP). There will not be any discharge of effluent outside due to
proposed project. ETP details and treatment scheme are given in Chapter 2.
There will not be any discharge of wastewater on the land. Storm water is collected in drains
and released to RIICO drainage system. Hazardous wastes will be stored, managed and
handled as per hazardous and other waste (management and Transboundary Movement)
Rules, 2016. All bulk chemicals and fuel storage areas will be provided with dyke wall / bunds
to eliminate chances of any spillages/ leakages entering into the storm water drain.
No significant adverse impact on the surface and ground water or soil quality is envisaged in
view of the proposed mitigative measures.
Mitigation Measures:
• Water consumption to be controlled though eliminating / reducing any water wastage-leakages/spillage.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 99
a. Process control
• Regular monitoring of effluent sources to ETP will show process conditions and deviation from optimum water consumption.
• ETP – performance for maximum recycle of treated water.
Environmental impacts (Water) resulting from proposed project can be grouped into following
Categories:
• Beneficial or detrimental-- detrimental
• Naturally reversible or irreversible---Reversible
• Repairable via management practices or irreparable--Repairable to some extent
• Short term or long term Short term
• Temporary or continuous
• Occurring during construction phase or operational phase--Operation Phase
• Local, regional, national or global--Local
• Accidental or planned (recognized before hand) --Planned
• Direct (primary) or Indirect (secondary)--Direct
• Cumulative or Single
4.5. LAND ENVIRONMENT
The hazardous waste is generated at various stages of the manufacturing activity. The mode
of disposal is mentioned for each category of waste as per hazardous wastes (management,
handling and transboundary movement) rules, 2008. Hazardous wastes will be stored at
earmarked area with impervious flooring, shed and spillage/ leakage collection system to
eliminate rainwater contamination, chances of overflow / spillages going on to the land and
thus land/ soil contamination. CIF propose to dispose off hazardous wastes to TSDF site in
Udaipur. Most of the hazardous waste will be collected and sent /will be disposed off to TSDF
site.
4.5.1. Land Diversion
CIF project is being located in the RIICO industrial area and as such no diversion of land
from other uses is involved.
4.5.2. Land Deterioration
The hazardous waste is generated at various stages of the manufacturing activity. The mode
of disposal is mentioned for each category of waste as per hazardous wastes (management,
handling and transboundary movement) rules, 2008.
Hazardous wastes will be stored at earmarked area with impervious flooring, shed and
spillage/ leakage collection system to eliminate rainwater contamination, chances of overflow
/ spillages going on to the land and thus land/ soil contamination. CIF propose to dispose-off
hazardous wastes to TSDF site in Udaipur.
Most of the hazardous waste will be collected and sent /will be disposed-off to TSDF site.
4.6. BIOLOGICAL ENVIRONMENT
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 100
4.6.1. Flora
The CIF proposed project will have limited highly controlled emission (through scrubbers).
The emission (if any) will not adversely affect the flora in the study area. The limited treated
effluents generated will be recycled back in the process and is not going to adversely affect
the flora.
CIF is going to develop green belt in and around the plant. The development of green belt
provides habitat, food and breeding areas to birds. The green belt will attenuate the little
emission and noise from the plant.
4.6.2. Fauna
The cattle and birds living around the CIF proposed plant area are not going to be affected,
as the impact due to the plant is controlled and limited.
4.6.3. CREP Guidelines
In addition, CIF as, good corporate citizen committed to abide by CREP guide lines for
pesticide industry as give below:
The guidelines enunciated by CPCB are very helpful to mitigate environment pollution,
improve human health and benefit of cost savings by cutting cost of valuable solvent by
efficient recovery system. We (CIF) will adopt all the guidelines as stated here under.
Table 4.5: CREP Guidelines Compliance
S. No. CREP Point CIF Compliance
1 Segregation waste streams: Waste streams should be segregated into COD waste, toxic waste, low COD waste, inorganic waste etc., for the purpose of providing appropriate treatment.
Waste streams will be segregated and treated in separately.
2 Detoxification and treatment of high COD waste streams: Streams should be detoxified and treated in ETP or thermally destroyed in incinerator, as per CPCB guidelines. The waste streams should be treated suitably before taking to evaporation ponds.
CIF will have three stage ETP followed by RO system. All the treated effluents will be recycled in the process.
3 Improvement in solvent recovery: – Solvent recovery should be improved and attempts should be made to achieve at least 90% recovery wherever possible. – Rest of the solvents which cannot be recovered shall be incinerated.
CIF is not using solvents
4 Hazardous air pollutant control: – For air pollution control from processes, scrubber efficiency will be improved and maintained as per the best practicable technology for control of CI2, Bromine and VOCs. – An incinerator will be installed, where necessary.
Installed high efficiency scrubber and stacks for reducing the Air pollution. Stack emissions are well within the prescribed limits.
5 Control of fugitive emissions/ VOCs: For control of fugitive emissions (particularly for hazardous air pollutions). The industries will adopt standard engineering practices. System of leak detection
LDAR system will be followed to prevent any liquid/vapour leakages.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 101
4.7. SOCIO – ECONOMIC ENVIRONMENT
CIF proposed project will generate employment opportunities some through direct
employment and more so indirectly through services for the plant. Pesticides manufactured
by CIF proposed plant are indirectly going to contribute food grain availability by preventing
loss due to insects (to crop) and rodents (during storage) etc.
• CIF project will have some impacts also on socio – economic environment of the study area- some are as given below:
• Proposed project will result in handling of product and raw material, which will increase manpower requirement at various stages directly, or indirectly resulting in more income of people.
• CIF project would increase requirement from ancillary and auxiliary industries in the vicinity.
• With more load on infrastructure facilities – roads and rails; these facilities would need improvement.
• More income to Government through more taxes on higher amount of production.
4.8. INFRASTRUCTURE
The project located on four lanes NH-11(Agra-Bikaner-Jaipur) highway with designed PCU of
40000 per day. The count traffic load is more 10000 per day with peak local traffic of about
716 PCU (7-9 AM & 4-6 PM). The likely increase of traffic due to project is expected to
and repair (LDAR) program especially for solvents should be developed industries.
6 Upgrade of incinerators: Incinerators will be upgraded to meet CPCB norms hazardous waste incinerators. This is necessary for Halogenated compound and POPs.
NA
7 Replacement of Bio Assay test by toxicity Factor: The present bio-assay test will be replaced by Toxicity Factor test method developed by CPCB. Toxicity factor of four (TF-4) will be achieved and industries will improve their system to achieve TF- 2. TF test method will be implemented by PCBs/CPCB/ MoEF. The CPCB will organize workshops on “Toxicity Factor” for industry.
Complied
8 Minimum scale of production to afford cost of pollution load: To be decided, as industries view point is that this cannot be done as few products are costly and made in small volume. The matter will be studied in detail by MoEF/ CPCB.
Complied
9 Non-complying Units (as identified by SPCB) should meet the notified standards
Not Applicable
10 Bank guarantee to be submitted to SPCB by Non-complying units: The submissions from pesticides industry regarding speedy clearance and other will be considered by MoEF/CPCB for examination.
Not Applicable
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 102
maximum 2 to 3 trucks per day, which will not cause any additional traffic impact on the road
condition. Currently the traffic scenario and road design level are movement of material shall
be insuring follows central motor vehicle act 1989 & Hazardous waste (management,
Handling, and Trans-Boundary Movement) rules 2008 and their amendment.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 103
CHAPTER 5 : ENVIRONMENT MANAGEMENT PLAN & ENVIRONMENTAL MONITORING PROGRAM
5.1 INTRODUCTION
Prediction of the potential adverse environmental and social impacts arising from
development interventions is at the technical heart of EIA process. An equally essential
element of this process is to develop measures to eliminate, offset, or reduce impacts to
acceptable levels during implementation and operation of projects. The integration of such
measures during project implementation and operation is supported by clearly defining the
environmental impact elements and required measures as mentioned in Environmental
Management Plan (EMP).
Normally, potential impacts are identified early during the initiation of project, and
measures to avoid or minimize impacts are incorporated into the alternatives being
considered. In this respect, some of the most important measures to protect the
environment and local communities become integral to the project design, and may not be
reflected in a formal EMP.
CIF by way of EIA study propose to identify all the likely potential impacts, collect data
information and incorporate all the measures necessary to avoid or minimize impacts on
surrounding environment. It is desirable to collect even such information in the EMP to
facilitate better assessment and communication as well as improve the systems and
technologies to improve mitigation for environmental components having moderate
residual impacts.
5.2 ENVIRONMENT MANAGEMENT PLAN
Overall objective of EMP:
• Prevention: Measures aimed at impeding the occurrence of identified negative environmental impacts and/or preventing such an occurrence having harmful environmental impacts.
• Preservation: Preventing any future actions that might adversely affect an environmental resource or attribute.
• Minimization: Limiting or reducing the degree, extent, magnitude, or duration of adverse impacts.
EMP for CIF to manufacture technical grade pesticides considers the following aspects:
• Summary of the potential impacts of the proposal
• Description of the recommended mitigation measures
• Statement of their compliance with relevant standards
• Allocation of resources and responsibilities for plan implementation
• Schedule of the actions to be taken
• Program for surveillance, monitoring and auditing
• Contingency plan when impacts are greater than expected
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 104
Institutional framework includes the responsibilities for environmental management as well as responsibilities for implementing environmental measures.
5.2.1 Air Environment
The Potential impacts due to air pollution /emission from CIF proposed Greenfield project shall be in two stages mainly:
• Construction stage.
• Commissioning and operation stage.
Construction Stage Impacts:
Construction activity is limited only to the project site and for limited period only and hence
unlikely to cause any change in the ambient air quality around the proposed project. The
main air pollutants during construction stages are:
• Dust due to powdery construction materials, movement of vehicles/ personnel on un-metalled roads etc.
• Emission from construction machinery / vehicles/DG sets etc.
Key steps to control / limit the air pollution are:
• Dust Pollution: Sprinkling water on roads, covering the solid / powder material heaps during transportation and storage etc. should be followed.
• All automotive machineries (vehicles and other equipment) should be regularly checked for limits. If exhaust going beyond limits, the machine is to be attended.
Commissioning and Operation Stage Impacts:
Process emissions from the stacks at both the stages depend on two key parameters:
• Input raw materials and other inputs materials quality
• Scrubbing system
• Operational key parameters
In order to keep the process stack’s emissions within limits following key steps are proposed:
o Regular checking of input materials quality.
o Regular checking of all scrubbing system including scrubbing media (acid / alkali concentration)
o Keep check on all key operational parameters.
Fugitive Emissions: Following measures are recommended:
• Fugitive dust emissions: Keep check while handling solid / liquid raw materials/products
• All volatile raw materials should be carefully handled; Vessels storing these should always be covered.
• The control measures (through proper up keep / maintenance) and good housekeeping will considerably reduce the fugitive emission.
• Powdery Materials and ash should be transported in covered trucks,
• Leakages {of gases / liquids/ dust} should be checked and promptly attended.
Program for Surveillance, Monitoring & Auditing
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 105
• All Stacks: Regular Monitoring of stacks for key pollutants—In house laboratory as well as external accredited laboratory.
o Frequency--In House Laboratory – as per process requirement
o Frequency--External Laboratory-As per SPCB / MoEF (RO) requirement/ advice.
• Fugitive--Shop floor AAQ monitoring of air pollutants SOx, NOx, Cl2, HCl, HC and SPM should be regularly carried out---- Weekly
• Regular monitoring of shop floor environment is to be carried out to control the fugitive emission as well as shop floor safety.
Auditing: Regular monitoring records also indicate the development of process conditions/ deteriorations as regard to plant operation status/ plant emissions. Minor process leakages are indicated in Shop floor monitoring.
5.2.2 Water Environment
The Potential impacts due to Water / Effluents from CIF proposed Greenfield project shall be in two stages mainly:
• Construction stage.
• Commissioning and operation stage.
Construction Stage Impacts:
The water required in the above activities will be limited only. Moreover, this requirement
will be irregular and limited to construction phase only and hence no impact is envisaged
during construction phase. The domestic wastewater generated from the sanitation facility
will be treated in specipc tank followed by soak pits constructed temporalily at site and
hence no impact is envisaged. Key steps to limit the likely impacts are:
• Control water consumption by checking water spillage; open taps and leakages.
• Vehicle washings.
Commissioningand operation stage Impacts:
Proposed project will be having modern three stages ETP followed by RO system total
recycle of treated effluent and adhering to “Zero Effluent” policy. Following measures are
proposed for controlling water pollution and resource conservation:
• Keep checks on all process parameters to prevent abnormal conditions resulting in sudden process release. Any sudden process liquid release due to disturbance should be collected and stored. The process liquid should be recycled (if possible). In worst case (if not possible to recycle) it should be released to ETP in control manner not to disturb the treated effluent quality.
• Keep check on all process parameters to maintain process effluent quality to discharge into ETP.
• CIF should install three or more piezo metric wells at selected places (one near treated effluent pond) to see and check the ground water contamination.
• Water is a precious commodity and it should be conserved.
• Rainwater harvesting should be taken up at different places (not in the plant).
Program for Surveillance, Monitoring and Auditing
• Fresh Water quality: should be monitored as per requirement (once a day).
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 106
• ETP Inlet / Outlet: Regular Monitoring of ETP inlet / outlet water to monitor ETP performance.
• Frequency-In House Laboratory – as per process requirement
• Frequency- External Laboratory - As per SPCB / MoEF (RO) requirement/ advice.
• Plant & Storm Water Drains: Monitor/ keep watch that the storm water & plant drains are dry (except rainy season). If water is there check its source. Monitor the water quality to confirm the source. Transfer the water to ETP if polluted.
Auditing: Regular monitoring record also indicates the development of process conditions/ deteriorations as regard to effluents are concerned. Minor process leakages are indicated in plant drains monitoring.
5.2.2.1 Rain Water Harvesting
Rain Water Harvesting is a method of utilizing rain water for domestic and agricultural use
is already widely used throughout the world. It is a method which has been used since
ancient times and is increasingly being accepted as a practical method of providing
potable water in development projects throughout the world. Improve the ground water in
Industrial area is one of the main problems which is being faced by developed countries of
the world. In Industrial area, charging of underground water in natural way like rural areas
is not taking place due to large sprawl of Industrial activities.
But it is feasible by injecting the water by percolating wells. To considering the Industrial
area and various types of activities may contaminate the rain water, recharging the rain
water by injecting the rain water to underground aquifers is not advisable. Unit will partial
reuse the rain water collects from rooftop during the rainy season.
CIF realizes the importance of rainwater harvesting however it will be prudent that rain
water harvesting is not taken up in CIF plant area. This is because if some hazardous dust
(in spite of all possible precautions) gets mixed with rainwater and enter the ground water
and the ground water will get contaminated. If desired, CIF may do rain water harvesting
at alternate place with due approval from authorities.
5.2.3 Land Environment
CIF proposed Greenfield project is within the RIICO Industrial area. Hence no land use change is there.
Construction Stage Impacts:
During construction stage top soil generated from various activities like excavation etc. will
be stored and preserved to use it during restoration period as far as possible. There will be
no disposal of wastewater on land (will be sent to ETP). There will be limited amount of
hazardous waste generated i.e. used oil, some containers of paints etc. and others. These
wastes are to be safely stored and disposed off as per existing practices.
Commissioningand operation stage Impacts:
Adverse impact on land during Operation stage can be due to contact with effluents, hazardous wastes and large amount of fugitive dust. It is essential to keep a check on these adverse sources.
Program for Surveillance, Monitoring and Auditing
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 107
The surveillance and monitoring of soil in around plant boundaries indicates land health. In addition, three sources of land deterioration are as follows:
• Soil: Regular soil analysis within the plant (three places; once a quarter) and three locations outside the plant to see the soil/ land health.
• Water: CIF is ‘Zero Effluent’ plant, which rules out possibility of effluent release on land and its deterioration. However, to keep check on accidental release following measures are suggested:
o Keeps all plant operating parameters on check to avoid abnormal conditions of process water release.
o Always keep a tank of sufficient capacity (considering plant vessel size etc.) empty to store such water.
o Release these effluents gradually to Process or ETP, treat them and recycle in the plant.
• Hazardous Waste and other Solid Waste: All existing plant and additional hazardous waste due to Greenfield project will be collected and sent to TSDF site.
o Keep a check on HW waste spillage during collection, transportation and storage.
o In case of spillage, measures to be taken to restore the spillage area in original status.
• Fugitive Dust: Raw materials/ products and some other chemical mix are likely settle around the plant site and affect the soil.
o All likely sources of fugitive vapours emission should be regularly observed and blocked (if open).
o Shop floor monitoring for PM and other chemical emission to be done; Source of generation to be checked for such emission and blocked.
Auditing: Soil analysis record indicates soil health and any deterioration from original
conditions. Needful action to be taken after confirming the source of chemicals. Regular
ETP and plant area fugitive dust/other chemicals monitoring records also indicates the
development of process conditions/ deteriorations as regard to effluent and fugitive
material are concerned. Preventive actions to check the AAQ deterioration keeps the
plant area healthy as well stops land deterioration.
5.2.4 Noise Environment
The statutory national standards for noise levels at the plant boundary and at residential
areas near the plant are being and are to be met. In addition, noise level within the plant
boundary is to be within limits.
Construction Stage Impacts:
Construction activity is limited only to the project site and for limited period only and hence unlikely to cause any change in the noise levels around the proposed project. Key steps to control / limit the air pollution are:
• All automotive machineries (Vehicles, DG sets, Construction machinery and other equipment) should be regularly checked for noise levels. Noisy equipment is to be attended or discarded. Workers exposed to high noise level shall be provided with ear plugs. Site barrication and job rotation will be carried
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 108
out for workers, working hours will be restricted to day hours only, Dg sets will be provided with acoustic enclosures, temporary green belt development, honking and speed limit shall be restricted, Usage of well maintained construction equipment meeting theregulatory standards
Commissioning and Operation Stage Impacts:
During commissioning and plant operation, noise from critical equipment is regularly observed (as noise is an indicator of equipment health). Noise suppression measures such as acoustic enclosures / cabins, buffers and / or protective measures are be provided (wherever noise level is around +80 dB (A) and exposure limits to workers is likely to be more than 8 hours a day) to limit noise levels within occupational exposure limits. Areas with high noise levels are to be identified and segregated where possible and will include prominently displayed caution boards.
• Use of suitable muffler systems/enclosures/sound-proof glasspanelling on heavy equipment/pumps/blowers.
• Pumps and blowers may be mounted on rubber pads or any other noise absorbing materials
• Placement of equipments emitting high noise in an orientation that directs the noise away from sensitive receptors
• Periodic maintenance of equipments/repalcing whenevernecessary/lubrication of rotating parts, etc.
• Performance specifications for noise represent a way to insure the procured item is controlled
• Use of ear protective devices
The green belt around the plant to attenuate the noise level but instead of block plantation there should be variability in tree height and shape, as this would disperse the sound waves more efficiently. Plant that attenuate should be planted at the noise zone.
Program for Surveillance, Monitoring and Auditing
Regular (quarterly) noise monitoring is to be carried out in selected plant areas and records are to be maintained.
Auditing: Regular monitoring record also indicates the development of process conditions/ deteriorations as regard to plant equipment and also process. In case of some abnormal increase in noise level nearby plant equipment are to be checked for noise source and corrective steps taken.
5.2.5 Biological Environment
Construction Stage Impacts:
Construction activity is limited only to the project site and for limited period only. Some of the existing green belt (other than plant boundary trees) may have to be shifted or cut in order to facilitate construction activities. However compensatory plantations are to be immediately carried out.
Commissioning and Operation Stage Impacts:
Green belt is an important barrier to attenuate / arrest noise and fugitive pollution.
Greenbelt area of about 1244.1 M2 which constitutes about 33% of the total area of 3770 M2 is proposed.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 109
The following activities are proposed under the management plan to mitigate/minimize the pressure on present bio-resources.
• Plantation of Native Plant Species
• Plantation of Medicinal Value Plant Species
• Plantation of Dust Tolerant and Sound Receptor Plant Species
• Plantation of Fruit Species to enhance the Food Availability for Wildlife
All the above mention activities can be achieved through greenbelt development by using useful plant species.
Greenbelt Development
The greenbelt will be developed under proposed project areas with the strip of plants along
the roadside and around power plant area. The goal of development of greenbelt is to
maximize both ecological functionality and scenic beauty of the area. The selected species
will be indigenous and should have dust & noise tolerant, enhance aesthetics and develop
a habitat for wildlife. A plantation of sound and dust receptor as well as aesthetically
valuable species is proposed which will help in reduction of pollution (both atmospheric &
noise), reduction of stress and beautification of the area. Hardiness, longevity, a minimum
of wind through and breakage, attractiveness and minimal maintenance requirement are
some qualities of species which are to be taken into consideration during selection.
Municipal solid waste generated during construction period & during operation period, as
well as from STP will be vermi-composted and used as manure for green belt
development. Greenbelt would be developed in the form of plantation around the Project
area, Roadside plantation, and Avenue plantation in adjacent vacant land. By reviewing
the various literatures and Central Pollution Control Board guideline for greenbelt
development, following plant species has been chosen for greenbelt development listed in
Table 5.1.
Table 5.1: List of Plant Species to be planted
Scientific Name Family Habit/ Height Evergreen Deciduous
Crown Shape
Acacia catechu Mimoseae Tree, 5m E Oblong
Anogeissus pendula Combretaceae Tree E Oblong
Azadirachta indica Mileaceae Tree, 20m E Spreading
Bauhinia racemosa Caesalpinaceae Tree, 5m D Oblong
Bougainvillea spectabillis Nyctagianceae Shrub, 8 m E Oblong
Emblica officinalis Euphorbaeceae Tree, 5m D Oblong
Muraya paniculata Rutaceae Shrub, 3m E Round
Nerium indicum Apocyanaceae Shrub, 5m E Round
Prosopis cineraria Mimosideae Tree, 10 m E Spreading
Syzygium cumini Myrtaceae Tree, 20m E Oblong
Tamarindus indica Caesapinaceae Tree 20 m E Round
Lantana camara Verbeniaceae Shrub, 2 m E Round
Dalbergia latifolia Fabacea Tree, 15 m D Spreading
Melia azidarch Mileaceae Tree, 15 m D Spreading
Delonix regia Fabaceae Tree, 20 m D Spreading
Pongamia pinnata Fabacea Tree, 15 m E Round
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 110
Financial Provisions
Financial provisions for the proposed green belt development and forestation plan are as
follows:
Table 5.2: Capital Expenditure on Greenbelt Development
Particulars Amount, Rs. (Lacs)
Fees of experts/consultants for detailed work planning 0.75
Trenching & conditioning @ Rs 1,00,000/ per hectare 0.43
Plantation of trees during 1st year @ Rs 2,00,000 per hectare 0.87
Plantation of trees during 2nd year @ Rs 50,000 per hectare 0.21
Plantation of trees during 3rd year @ Rs20,000 per hectare 0.086
Total 2.36
Table 5.3: Revenue Expenditure (Annual) on Greenbelt Development
Particulars Amount, Rs. (Lacs)
Contract workers, 1 persons @ Rs300/- per day 0.75
Contingency and unforeseen expenses 0.5
Total 1.25
Program for Surveillance, Monitoring and Auditing
Biannual monitoring of green belt as regard to health of all plantations (trees, shrubs, lawns etc.) is to be carried out. Watch is to be kept on all new plantations for their growth.
5.2.6 Socio-economic Environment
Construction Stage Impacts:
Construction activity is limited only to the project site and for limited period only.
Congregation of Labour
During construction phase 25 manpower will be required per day. During Operation stage around 20 to 25 manpower will be required at various levels.
Operation Stage Impacts:
CSR Activities
• As a good corporate citizen and industry in the area CIF may consider adopting few more selected villages in developing them as model villages.
• The Entrepreneur Social Responsibility will be fulfilled with the Capital Cost of Rs. 6.0 Lacs and a Recurring cost of Rs. 60.0 Thousand for the local area development.
• The CSR activities will be identified with the need-based assessment during the Social area survey. CIF shall finalise the study and start carrying out CSR activities in coordination with district authorities.
5.2.7 Charter on Corporate Responsibility for Environmental Protection (CREP)
CIF has adopted the Charter on Corporate Responsibility for Environmental Protection (CREP). The compliance of recommendation by charter for pesticides industries has been presented in detail in Chapter 4.
5.2.8 Environmental Management Cell
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 111
CIF will have an environment management cell headed by a senior executive supported by Manager (EC) and other supporting staff. The laboratory is equipped with necessary sophisticated instruments including:
• Gas Chromatographs
• Spectrophotometers
• pH Meter
• Conductivity Meters
• Turbidity Meters
• Online ambient air monitoring stations – at three locations
• Online effluent monitoring station at final discharge point for Ph, Ammonia, etc.
• Online stack monitoring station at Reformer and NG/PA stacks for NOx and
SOx etc.
• Online meteorological station – at one location
• Flame photometers
• MSA meters
• Loviband comparator
• Oven
• BOD incubator
• Refrigerator
• Furnace
• Jar test apparatus
• Distillation assembly for determination of COD
• Gas flow meters
• BOD bottles
A team of well-trained and experienced staff carries out tests in the laboratory.
5.2.9 Environmental Monitoring Plan
CIF is carrying out environment monitoring and has necessary equipment and associated facilities. Regular monitoring of operating / plant area for fugitive dust/chemicals, noise, and inspection for any spillage of process fluids/ hazardous waste/ housekeeping is to be carried out.
However, monitoring plan proposed is as follows:
Table 5.4: Environmental Monitoring Program
Discipline Location Parameter Frequency Remarks
Meteorology One Temp. {max.; min.}; Relative humidity; Rain
Daily Being complied
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 112
Discipline Location Parameter Frequency Remarks
fall; Wind speed and direction.
Ambient Air Quality
Five HCl, HC,Cl2, SOx; Particulate matter (with pesticide compounds)
Twice a week Parameters as applicable /as per products being manufactured
Stack Emission
All continuous
stacks
HCl, CS2, SOx; NOx; Particulate matter (with pesticide compounds; As per stack design)
Once a week; Parameters as applicable /as per products being manufactured
Effluents Final Treated effluents
As per process / plant requirement
Once a day. Parameters as applicable /as per products being manufactured
Ground Water Quality (Four peizometric wells)
Four peizometric wells
Pesticides- etc. [in association with SPCB]
Quarterly Parameters as applicable /as per products being manufactured
Noise Plant area &periphery
Day & Night time noise level
Monthly Parameters as applicable /as per products being manufactured
Work area monitoring
Plant area &periphery
As per prescribed standard
Monthly Parameters as applicable /as per products being manufactured
Health Check Up
All Plant Personnel
Diseases related to pesticides
Annually -
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 113
CHAPTER 6 : RISK ASSESSMENT & DISASTER MANAGEMENT PLAN
6.1 INTRODUCTION
Industrial plants deal with materials, which are generally hazardous in nature by virtue of their intrinsic chemical properties or their operating temperatures or pressures or a combination of these. Fire, explosion, toxic release or combinations of these are the hazards associated with industrial plants using hazardous chemicals. More comprehensive, systematic and sophisticated methods of Safety Engineering, such as, Hazard Analysis and Quantitative Risk Assessment have now been developed to improve upon the integrity, reliability and safety of industrial plants.
The primary emphasis in safety engineering is to reduce risk to human life, property and environment. Some of the more important methods used to achieve this are:
➢ Quantitative Risk Analysis: Provides a relative measure of the likelihood and severity of various possible hazardous events by critically examining the plant process and design.
➢ Work Safety Analysis: The technique discerns whether the plant layout and operating procedures in practice have any inherent infirmities.
➢ Safety Audit: Takes a careful look at plant operating conditions, work practices and work environments to detect unsafe conditions.
Together, these three broad tools attempt to minimize the chances of accidents occurring. Yet, there always exists, no matter how remote, probability of occurrence of a major accident. If the accident involves highly hazardous chemicals in sufficiently large quantities, the consequences may be serious to the plant, to surrounding areas and the populations residing therein.
6.2 RISK ASSESSMENT
A three ‘levels’ risk assessment approach has been adopted for the M/s CIF proposed greenfield project to be set up at E-23A, SKS Industrial Area, Reengus, Dist. Sikar, Rajasthan. The risk assessment levels are generally consistent with the practices encountered through various assignments for medium and large chemical complexes. The brief outline of the three-tier approach is given below:
➢ Level 1 – Risk Screening
This is top-down review of worst- case potential hazards/risks, aimed primarily at identifying plant sites or areas within plant, which pose the highest risk. Various screening factors considered include:
• Inventory of hazardous materials;
• Hazardous Materials properties;
• Storage conditions (e.g. temperature and pressure);
• Location sensitivity (distance to residential areas / populace).
This chapter details risks associated with the project activities and storage of hazardous chemicals
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 114
The data / information is obtained from plant. The results provide a relative indication of the extent of hazards and potential for risk exposure.
➢ Level 2 – Major Risk Survey (Semi - Quantitative)
The survey approach combines the site inspection with established risk assessment
techniques applied both qualitative as well quantitative mode. The primary objective is to
identify and select major risks at a specific location in the plant considering possible soft
spots / weak links during operation / maintenance. Aspects covered in the risk usually
include:
• Process Hazards;
• Process Safety Management Systems;
• Fire Protection and Emergency response equipment and programs.
• Security Vulnerability;
• Impact of hazards consequences (equipment damage, business interruption, injury, fatalities);
• Qualitative risk identification of scenarios involving hazardous materials;
• Risk reduction measures.
Selection of critical scenarios and their potential of damage provide means of prioritising mitigative measures and allocate the resources to the areas with highest risks.
➢ Level 3 – Quantitative Risk Assessment (Deterministic)
This is the stage of assessment of risks associated with all credible hazards (scenarios) with potential to cause an undesirable outcome such as human injury, fatality or destruction of property. The four basic elements include:
i. Hazards identification utilising formal approach (Level 2, HAZOP etc.);
ii. Frequency Analysis. Based on past safety data (incidents / accidents); Identifying likely pathway of failures and quantifying the toxic / inflammable material release;
iii. Hazards analysis to quantify the consequences of various hazards scenarios (fire, explosion, BLEVE, toxic vapour release etc.). Establish minimum value for damage (e.g. IDLH, over pressure, radiation flux) to assess the impact on environment.
iv. Risk Quantification: Quantitative techniques are used considering effect / impact due to weather data, population data, and frequency of occurrences and likely hood of ignition / toxic release. Data are analysed considering likely damage (in terms of injury / fatality, property damage) each scenario is likely to cause.
QRA provides a means to determine the relative significance of a number of undesired
events, allowing analyst and the team to focus their risk reduction efforts where they will be
beneficial most.
CIF shall manufacture pesticides chemicals at the proposed site. Table inChapter 2 gives
the list of raw materials. Solid raw materials are stored in ware house while liquid and
gaseous raw materials are stored in tank farms and covered area. The list of bulk liquid
storages of raw materials is as given below:
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 115
Table 6.1: Liquid/Gaseous Bulk Storages
S. No. Material Storage Quantity Remarks 1 DMA (Dimethyl Amine 40%) 10 KL Storage tank
2 Caustic Lye 5 Kl Tank
3 Sulphuric Acid 5 Kl Tank
4 Carbon Disulphide 5 KL Tank
5 Hydrogen Peroxide 5 KL Tank
6.3 RISK SCREENING APPROACH
Proposed Plant: Risk screening of CIF proposed project was undertaken through data /
information provided by CIF. Data of major / bulk storages of raw materials, intermediates
and other chemicals were collected. MSDS of hazardous chemicals were studied vis a vis
their inventories and mode of storage. CIF plant will be using number of hazardous
chemicals and also producing pesticides chemicals – all hazardous in nature. The chemicals
stored in bulk (liquid or gaseous) and defined under MSHIC Rule will be considered for
detailed analysis.
Hazardous materials have been defined under MSIHC Rules (1989) - 2 (e) which means.
(i) Any chemical which satisfies any of the criteria laid down in Part I of Schedule I and is listed in Column 2 of Part II of this Schedule;
• Toxic Chemicals: Chemicals having the following values of acute toxicity and which owing to their physical and chemical properties, are capable of producing major accident hazards:
S. No
Toxicity Oral Toxicity
LD50 (mg/kg)
Dermal Toxicity
LD50 (mg/kg)
Inhalation Toxicity
LC50 (mg/l)
Remarks
1 Extremely Toxic >5 < 40 < 0.5
2 Highly Toxic >5 – 50 > 20 – 200 < 0.5 – 2.0
3 Toxic >50 - 200 > 200 - 1000
> 2 – 10
Flammable Chemicals:
(i) Flammable Gases; 20 0C and at standard pressure of 101.3 KPa are:
• Ignitable when in a mixture of 13% or less by volume with air, or;
• Have a flammable range with air of at least 12% points regardless of the lower flammable limits.
(ii) Extremely Flammable Liquids: chemicals which have a flash point lower than or equal to 23 0C and the boiling point less than 35 0C;
(iii) Very Highly Flammable Liquids: chemicals which have a flash point lower than or equal to 23 0C and the boiling point higher than 35 0C;
(iv) Highly Flammable Liquid: Chemicals, which have a flash point lower than or equal to 60 0C but higher than 23 0C.
(v) Flammable Liquids: chemicals, which have a flash point higher than 60 0C but lower than 90 0C.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 116
Explosives: Explosive means a solid or liquid or pyrotechnics substance (or a mixture of substances) or an article.
a) Which is in itself capable by chemical reaction of producing gas at such a temperature and pressure and at such a speed as to cause damage to surroundings;
b) Which is designed to produce an effect by heat, light, sound, gas or smoke or a combination of these as the result of non-detonative self-sustaining exothermic chemical reaction.
i. any chemical listed in Column 2 of Schedule 2;
ii. any chemical listed in Column 2 of Schedule 3;
Table 6.2: Hazardous Analysis Raw Materials Stored in Bulk
S. No
Material S. No & Threshold Quantity (TQ in Kg) as
per MSHIC Rules
Chemicals Hazards Potential Remarks
Schedule-1,
Part-II
Schedule-2, Part-I
Schedule-3,
Part-I
Hazards Toxic
1. Dimethyl Amine (40%) CAS No:124-40-3 (Pure DMA) Liquid with strong odour
--- Very hazardous in case of ingestion, of inhalation. Hazardous in case of skin contact (corrosive, irritant, permeator), of eye contact (irritant).
Acute toxicity Oral-(LD50): Mouse) Vapor (LC50): 11350 ppm 4 hour(s) (Rat) (Calculated value for the mixture).
Flammable. NFPA: Health: 3 Flammability: 4 Reactivity: 0
2. Sodium Hydroxide CAS No: 1310-730-2 UN No: 1823
571 Not flammable; Corrosive to metals and tissue. Hazardous.
ERPG-1: 0.5 ppm ERPG-2: 5.0 ppm ERPG-3: 50 ppm IDLH: ---- ppm
3. Sulphuric Acid CAS No: 7664-93-9 UN No: 1830
591 Flammability: Will not burn Health Hazard: Extremely hazardous - use full protection; Reactivity: Violent chemical change possible
ERPG-1: 2.0 mg/m3
ERPG-2: 10 mg/m3 ERPG-3: 30 mg/m3 IDLH: 15 mg/m3
4. Carbon Disulphide CAS No: 75-15-0
110 16 TQ-1: 10MT TQ-2: 200 MT
107 TQ-1: 20MT TQ-2:
200 MT
Colourless Flammable liquid; BP:46.3 0C
ORAL (LD50): Acute: 3188 mg/kg [Rat]. 2780 mg/kg [Mouse]. VAPOR (LC50): Acute: 12500 ppm 4 hour(s) [Rat].
Extremely hazardous in case of skin contact (irritant), of ingestion, of inhalation. Very hazardous in case of skin contact (permeator).
5. Hydrogen Peroxide (50%) (H2 O2) CAS No: 7732-18-5
318 Very hazardous in case of skin contact (irritant), of eye contact (irritant). Hazardous in case of skin contact (corrosive, permeator), of eye contact (corrosive),
ORAL (LD50): Acute: 6667mg/kg [Mouse]. DERMAL (LD50) Acute: 6667 mg/kg 4060 mg/kg [Rat]. VAPOR
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 117
S. No
Material S. No & Threshold Quantity (TQ in Kg) as
per MSHIC Rules
Chemicals Hazards Potential Remarks
Schedule-1,
Part-II
Schedule-2, Part-I
Schedule-3,
Part-I
Hazards Toxic
of ingestion, Slightly hazardous in case of inhalation (lung sensitizer). Liquid or spray mist may produce tissue damage particularly on mucous membranes of eyes, mouth and respiratory tract. Skin contact may
(LC50): Acute: 2000 mg/m 4 hours [Rat].
Table 6.3: Hazard Analysis - Products
S. No.
Material S. No. & Threshold Quantity (TQ in MT) as per MSHIC Rules
Hazards Potential Remarks
Schedule- 1, Part-II
Schedule-2, Part-I
Schedule-3, Part-I
Hazards Toxic DT->---mg/Kg; OT----mg/Kg; IT----mg/l; (Rats)
1. Thiram AG-98%; C6H12N2S4. CAS No:137-26-8 UN No: 3077
----
---- ---- Granular solid ColorLight brown OdorCaramel-like Thermal decomposition may produce: Carbon disulfide Oxides of carbon. Oxides of nitrogen. Oxides of sulfur.
DT->2400; OT-1080; IT-4.42; [T] (Rats)
May be irritating to respiratory system, skin and eyes. May cause skin sensitization. May be harmful if inhaled, swallowed, or absorbed through skin.
2. Ziram AG-85% CAS No:137-30-4
----
---- ---- Granular solid Color Light brown Odor Caramel-like Thermal decomposition may produce: Carbon disulfide Oxides of carbon. Oxides of nitrogen. Oxides of sulfur.
DT->2400; OT-1080; IT-4.42; [T] (Rats)
May be irritating to respiratory system, skin and eyes. May cause skin sensitization. May be harmful if inhaled, swallowed, or absorbed through skin.
TQ-I: Threshold Quantity (for application of rules 4, 5, 7 to 9 and 13 to 15)
TQ-II: Threshold Quantity (for application of rules 10 to 12)
Note:
1. Oral Toxicity (OT) in LD50 (mg/kg)
2. Dermal Toxicity (DT) in LD50 (mg/kg)
3. Inhalation Toxicity in LC50 (mg/l) [4 hrs.]
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 118
CIF two products are hazardous in nature as per MSIHC rules and limited data are available
for these. However, hazards potential (for damage) of products and other materials to plant
personnel, environment and off-site area is different for different materials. CIF will be storing
nearly 5 liquid raw materials (in bulk) and one gaseous material namely chlorine. Five of the
raw materials are listed in under “List of hazardous and Toxic Chemicals” category under
MSIHC Rules, 1989.The materials coming under hazardous category as specified by MSIHC
Rules, 1989 (including subsequent amendments) is given in Table 6.2 and Table 6.3 above.
All pesticides products are hazardous in nature and many of them are new compounds with
little data available. The products are produced as per market demand and packed and
stored in saleable packing.
6.4 HAZARDOUS MATERIALS STORAGE
The solid raw materials will be received in bags or drums and will be stored in chemicals go-
downs. The products (liquid or solid) will be packed in drums and stored in product go-downs
as per market demand. The bulk storages of liquid hazardous materials are given in the
Table 6.1.
The solid materials powder or granules spillage can result in polluting small area only. The
damage to personnel can be through ingress- dermal (if individual come in contact), oral (if
individual food gets infected through fugitive dust) or inhalation (fugitive dust). The main
route is fugitive dust which in covered area will move to short distance only. Some of the raw
materials are though stored in bulk (quantity) but in drums only.
The pesticide product will be both as liquid and solid. The product storage for liquid will be in
drums and ISO containers and for solid in bags depending upon client requirement.
However, in CIF case both Thiram and Ziram are solid / granular.
The risk is through liquid and gaseous materials (Chlorine) which are volatile/gaseous
material (toxic) and inflammable/explosive materials. The toxic vapours due to spillage of
such material can travel to some distance (as they are stored in covered go-downs) and
cause damage. The liquid products will be packed in drums (50 litres drums).
6.5 QRA APPROACH
Identification of hazards and likely scenarios (based on Level-1 and Level-2 activities) calls
for detailed analysis of each scenario for potential of damage, impact area (may vary with
weather conditions / wind direction) and safety system in place. Subsequently each incident
is classified according to relative risk classifications provided in Table below as Table 6.4:
Table 6.4: Risk Classification
Stage Description
High (> 10-2/yr.)
A failure which could reasonably be expected to occur within the expected life time of the plant.
Examples of high failure likelihood are process leaks or single instrument or valve failures or a human error which could result in releases of hazardous materials.
Moderate (10-2 --10-4/yr.)
A failure or sequence of failures which has a low probability of occurrence within the expected lifetime of the plant.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 119
Stage Description
Examples of moderate likelihood are dual instrument or valve failures, combination of instrument failures and human errors, or single failures of small process lines or fittings.
Low (<10-4)
A failure or series of failures which have a very low probability of occurrence within the expected lifetime of plant.
Examples of ‘low’ likelihood are multiple instruments or valve failures or multiple human errors, or single spontaneous failures of tanks or process vessels.
Minor Incidents Impact limited to the local area of the event with potent for ‘knock – on- events’
Serious Incident One that could cause:
❖ Any serious injury or fatality on/off site;
❖ Property damage of $ 1 million offsite or $ 5 million onsite.
Extensive Incident One that is five or more times worse than a serious incident.
Assigning a relative risk to each scenario provides a means of prioritising associated risk mitigation measures and planned actions.
6.6 THERMAL HAZARDS
In order to understand the damages produced by various scenarios, it is appropriate to
understand the physiological/physical effects of thermal radiation intensities. The thermal
radiation due to tank fire usually results in burn on the human body. Furthermore, inanimate
objects like equipment, piping, cables, etc. may also be affected and also need to be
evaluated for damages. Table 6.5 to Table 6.7 (below), respectively give tolerable intensities
of various objects and desirable escape time for thermal radiation.
Thermal hazards could be from fires or explosion. Fire releases energy slowly while
explosion release energy very rapidly (typically in micro seconds). Explosion is rapid
greenfield of gases resulting in rapidly moving shock wave. Explosion can be confined
(within a vessel or building) or unconfined (due to release of flammable gases).
BLEVE (boiling liquid expanding vapour explosion) occurs if a vessel containing a liquid at a
temperature above its atmospheric boiling point ruptures. The subsequent BLEVE is the
explosive vaporisation of large fraction of its vapour contents; possibly followed by
combustion or explosion of the vaporised cloud if it is combustible range.
Thermal hazards have been considered for various scenarios including:
• Fire in inflammable chemicals storage tanks.
Table 6.5: Effects due to Incident Radiation Intensity
Incident Radiation kW/m2
Damage Type
0.7 Equivalent to Solar Radiation
1.6 No discomfort on long duration
4.0 Sufficient to cause pain within 20 sec. Blistering of skin (first degree burn is likely).
9.5 Pain threshold reached after 8 sec. Second degree burn after 20 sec.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 120
12.5 Minimum energy required for piloted ignition of wood, melting of plastic tubing etc.
25
Minimum Energy required for piloted ignition of wood, melting, plastic tubing etc.
37.5 Sufficient to cause damage to process equipment.
62.0 Spontaneous ignition of wood.
Table 6.6: Thermal Radiation Impact to Human
Exposure Duration
Radiation Energy {1% lethality; kW/m2}
Radiation Energy for 2nd degree burns;
kW/m2
Radiation Energy for 1st degree burns;
kW/m2
10 sec 21.2 16 12.5
30 9.3 7.0 4.0
Table 6.7: Tolerable Intensities for Various Objects
Sl. No Objects Tolerable Intensities (kw/m2)
1 Drenched Tank 38
2 Special Buildings (No window, fire proof doors) 25
3 Normal Buildings 14
4 Vegetation 10-12
5 Escape Route 6 (up to 30 sec.)
6 Personnel in Emergencies 3 (up to 30 sec.)
7 Plastic Cables 2
8 Stationary Personnel 1.5
6.6.1 Damage due to Explosion
The explosion of a dust or gas (either as a deflagration or detonation) results in a reaction
front moving outwards from the ignition source preceded by a shock wave or pressure front.
After the combustible material is consumed the reaction front terminates but the pressure
wave continues its outward movement. Blast damage is based on the determination of the
peak overpressure resulting from the pressure wave impacting on the object or structure.
As a safety measure CIF is storing highly hazardous raw materials in isolated places with full
safety measures. Damage estimates based on overpressure are given in Table 6.8 below:
Table 6.8: Damage due to Overpressure
Sl. No Overpressure (psig / bar)
Damage
1. 0.04 Loud Noise / sonic boom glass failure
2. 0.15 Typical pressure for glass failure
3. 0.5 - 1 Large and small windows usually shattered
4. 0.7 Minor damage to house structure
5. 1 Partial demolition of houses, made uninhabitable.
6. 2.3 Lower limit of serious structure damage
7. 5 – 7 Nearly complete destruction of houses
8. 9 Loaded train box wagons completely demolished
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 121
Sl. No Overpressure (psig / bar)
Damage
9. 10 Probable total destruction of houses
10. 200 Limits of crater lip
In CIF case explosion not likely.
6.7 TOXIC RELEASE
Hazardous materials handled and stored in bulk in CIF complex are toxic gases i.e. Chlorine
and liquids (Above maintioned table). Some of these chemicals are stored in bulk (in tank
farm).
Damage criteria: For toxic release the damage criteria considered is IDLH concentration (if
data are available). In the absence of non-availability of IDLH, ‘Inhalation Toxicity (IT) data
for rats’ are considered. ‘IT’ data are used for the products as IDLH are not available for
these chemicals.
6.8 DATA LIMITATIONS
It is also observed that very little data or information (regarding physical properties required
for modelling in case of dilute chemicals (DMA-40%)) is available about the chemicals. In
such cases pure chemicals are considered for modelling.
6.9 LIKELY FAILURE SCENARIOS
Few likely failure scenarios have been selected after critical appraisal of raw materials and
storage inventories. Failure scenarios selected are as given below in Table 6.9.
Table 6.9: Different Failure Scenarios
S. No. Scenario Remark
Raw Materials
RM-1. DMA (Dimethyl Amine 40%) Thermal /Toxic Impact
RM-2. Carbon Disulphide Thermal /Toxic Impact
RM-3. Hydrogen Peroxide Toxic Impact
6.10 WEATHER EFFECT
The effect of ambient conditions on the impact of fire / heat radiation and GLC of hazardous /
toxic material can be beneficial as well as harmful. A high wind (turbulence) can dilute the
toxic material while stable environment can extend the reach of IDLH or IT (inhalation LC50
rats for products) concentration to long distance. Any inflammable gas / vapour release in
turbulent weather will soon dilute the hazardous gases below LEL and thus save the
disaster.
6.11 INCIDENTS IMPACTS
The identified failure scenarios (Table 6.10) have been analysed (Using ALOHA and
EFFECT Modules) for the impact zones considering damage due to thermal and toxic
impacts. Similar impacts are considered for Greenfield units. Each incident will have Impact
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 122
on the surrounding environment which in extreme case may cross plant boundary. The
impact zones for various scenarios are given in Table 6.10.
Table 6.10: Hazards Scenario Impact
Scenario No. Scenario Impact Zone (m) Remarks
Scenario Raw Material
RM-1. DMA (Dimethyl Amine 40%)
❖ <10
❖ <10
1st degree burn
Stability Class-D (IDLH) Template 1
RM-2. Carbon Disulphide ❖ <10
❖ <10
1st degree burn
Stability Class-D (IDLH) Template 1
RM-3. Hydrogen Peroxide ❖ <10 Stability Class-D (IDLH) (60 min.)
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 123
Templates of Scenario
Template 1. DMA Spillage-Toxic Impact Zone (Stability Class-D)
Template 2. Carbon Disulphide Spillage –Toxic Impact Zone; Stability Class-D
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 124
6.12 CONSEQUENTIAL IMPACTS
The consequential impacts from each incident scenario can be though thermal, over
pressure wave and toxic route. The damage can be on plant personnel (and neighbouring
residents in case incident crosses boundary), property and also loss in production.
6.13 THERMAL AND EXPLOSION HAZARDS
Incidents involving thermal hazards are mainly due to raw material fire (due to spillage). The
impact (1st degree burn) is limited to < 10 m (DMA and CS2 case) only (i.e. within plant
boundary). However, the consequences can go to worse if the incidents lead to domino
effect to other tanks.
6.14 TOXIC HAZARDS
Toxic hazards are mainly due to toxic chemicals leakage and its impact can cross the plant
boundary (if not controlled in time).
CIF is providing following emergency safety measures:
• Caustic drum shall be provided for any emergency.
• Alternatively, hood shall be provided that covers the CS2 vessels in emergency and necessary connections provided directly connecting to the scrubbing system.
• Emergency kit and two sets of breathing apparatus provided to meet any emergency.
6.15 OTHER HAZARDS
The other hazards in the plant include (but not limited to):
• Other toxic hazards due to acids / other toxic spillages (mainly limited to spillage area only.).
• Mechanical hazards due to machines / equipment.
• Hazards due to individual soft spots like walking casually and noticing a pit and falling or colliding/ stumbling or slipping (not noticing a wet place etc.).
6.16 OTHER TOXIC HAZARDS
Other hazardous chemicals including products their impact will be limited to spillage area.
The acid spillage if comes in contact with metal parts will produce hydrogen which is highly
flammable gas. Any person moving in area and getting splash will get the injury. In addition,
the spillage will cause pollution problem. The spillage is to be collected and neutralized for
toxic contents before disposal.
6.16.1 General Control Measures
Since some of the substances in use at CIF are hazardous with fire potential and also toxic
in nature, it is necessary to use appropriate control measures recommended for such
substances:
6.17 FLAMMABLE GAS FIRES
Fire control generally consists of directing, diluting and dispersing the inflammable gas/
vapor to prevent contact with persons, to prevent it from infiltrating structures if the leak is out
door, and to avoid its contact with ignition sources while, if possible, simultaneously stopping
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 125
the flow of gas. Water in the form of spray, applied from hoses or monitors nozzles or by
fixed water sprays system cools the burning vapours / gas.
6.18 PROCESS SAFETY SYSTEM TO BE DEVELOPED AT CIF
Process & Plant Safety:
Conducting Preliminary Safety Analysis (A1), Basic Safety Review (A2), Detailed Safety
Review (A3), Pre-Start-Up Safety Review (A4) & Pre-Start-Up Safety audit according to PPS
directive (details mentioned in following flow diagram)
• Every change in the process, procedure, equipment, etc. will be done through robust management of change (MOC) procedure
• Pre-Start up Safety Reviews for all modification
• Pressure testing of pipelines and replacement of fragile pipelines and tanks by prevention project
• Hazardous area classification
• Internal safety rounds for P&PS
• Control P&IDs, and Lock opened (LO)/ Lock closed (LC) procedures are in place
• TOPPS (Top Performance in Process & Plant Safety) training to all employees
• Root Cause Analysis of all incidents
• Pre-Start up Safety Reviews for all modification
Occupational Safety:
• Permit to Work procedure and Monthly monitoring of all filled permit for continual improvement
• Mobilized Near- Miss Reporting and award scheme
• HSE rounds: PMT (Plant Management Team) of one plant takes HSE round of another plant. Exchange of best practices among plants
• MSDS Management
• Tool Box talk with contractors
• Central Safety Committee
• Departmental Safety Committees
• HSE Coordinator and Monitor program: Shop floor employees’ participation in Safety activities
• Celebration of theme-based Safety days/ weeks at site
• Safety Induction program for new joiners (both company & contract employees)
Emergency Preparedness:
• On-Site Emergency Plan for the site
• Training on On-Site Emergency Action Plan
• Regular Site Level Mock drills and Plant Specific Fire Drills and Leak, spill drills
• Availability of First aiders, Fire Fighters and Rescue members in each shift
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 126
• Maintenance of Fire hydrant system, sprinkler system and portable fire extinguishers
• Periodic testing of fire hydrant and sprinkler systems
• Three Fire Tenders and Two Ambulances
Occupational Health:
• Pre-employment & Annual Medical Examination
• Quarterly/Periodical Physical Examinations
• Canteen Employees Examination
• Fork lift operators Examination
• Recall services & Follow-Up
• Return to work assessment
• Exit Examination
• Training on Counselling, Hearing Conservation Program, Hazardous Chemical Awareness Program, Shop floor training, First-aid (138Nos. Certified First Aiders), etc.
• Legal records: All medical records of employees to be maintained.
• Emergency Medical services: Ambulance services, First-aid boxes, Decontamination facility etc.
• Health Promotional Activities: Awareness on Medical issues, Ergonomics awareness programs, Stress management, De-addiction program, etc.
6.19 SAFETY SYSTEM FOR TOXIC MATERIAL HANDLING
Following Precaution Taken while Handling Toxic Materials
❖ Highly Toxic chemical is stored in storage room with lock and key.
❖ Inventory records are maintained.
❖ Toxic material is stored in well ventilation and out of sunlight
❖ It is stored away from incompatible chemicals.
❖ Keeping containers tightly & securely closed when not in use
❖ Toxic chemical charging is done inside the closed room in presence of shift in-charge.
❖ Local Ventilation system is provided to avoid exposure at work place.
❖ Vent gas is passing through scrubber system for absorption & reduction of pollution.
❖ Standby pump provision is available for LEV & scrubber system.
❖ Decontamination facility is provided
❖ Safety PPE’s is providing during charging.
❖ Breathing air provision is provided at toxic chemical handling area.
❖ Training to employees is providing for manual handling of toxic chemicals.
❖ First aid training also provided to concern employees.
❖ Antitoxic kit is maintaining inside OHC.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 127
❖ First aid kit provision is available at work place area.
❖ Eye wash/Safety shower stations are readily available nearby and are tested regularly
❖ To avoid fire and explosion nitrogen blanketing, earthing & bonding, electrical flame proof equipment’s, pressure rated equipment’ are provided.
❖ Suitable fire extinguisher and spill clean-up equipment are maintained.
❖ Dyke provision is available where liquid toxic chemicals are stored.
❖ Appropriate spill control equipment and procedures is available.
❖ MSDS is maintained inside the concern plant / department.
❖ Precautionary placard is displayed nearby the work place.
❖ Toxic chemicals sign board is displayed on container.
❖ Avoiding any welding, cutting, soldering or other hot work on an empty container of toxic chemicals.
❖ Good housekeeping is maintaining.
❖ Toxic gas detector also provided at workplace.
❖ Toxic chemical waste is collecting in separate pit and transferring to ETP for its treatment.
❖ Always ensuring that the waste container used is compatible with the waste material
❖ Ensuring that the waste container is properly and accurately labelled.
❖ Unauthorized person entry is restricted.
❖ Restricted for eating, drinking & smoking at work place.
❖ Employees are trained for emergency of toxic chemicals.
❖ Toxic chemical spill, leak drills are conducting for awareness, preparedness & response during an emergency.
❖ Work place area monitoring is to be carried out for ensuring exposure at workplace.
❖ Process is performed in closed conditions.
❖ Regular pressure testing for pipelines and equipment to ensure tightness
6.20 WORK PLACE MONITORING PLAN
Work zone monitoring is carried out by HSE department every month for gaseous pollutants
and dusts. Records are to be kept in standard Form as per Factories Rules. Location for
samplings shall be identified. Samples are analyzed for Air borne concentration of hazardous
chemicals in ppm.
The analyzed results are compared with the threshold limit values (TLV) of international
organizations. The monitoring program is based on the Action Level Concentration (ALC)
which is 50% of the TLV. If the analyzed concentration is < ALC, no regular monitoring is
required, only occasional checks (once in a year) to ensure the acceptability of the system.
If the analyzed concentration is > ALC < TLV then the monitoring is carried out at regular
interval (once in two months). In case analyzed concentration is > TLV then corrective
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 128
actions are decided by Plant Manager, General Manager - works and Engineering Manager
and they are implemented. After implementation again, monitoring is carried out.
The sampling for gaseous pollutants and air pollutants are done by Air sampling pump.
6.21 ARRANGEMENT FOR ENSURING HEALTH AND SAFETY OF WORKERS ENGAGED IN HANDLING OF TOXIC MATERIALS
All persons working in manufacturing units are surveyed by regular medical examinations.
Pre-employment Medical examinationto be carried out for all employees prior to employment
at well-known multispecialty hospital.
Check-ups& tests carried out as per Factory rules / SPCB guidelines.
6.22 SAFETY RECOMMENDATIONS
6.23 COMMONLY RECOMMENDED CONTROL MEASURES
A number of preventive control measures for hazardous occurrences have been analysed and discussed above. Some more salient points are enumerated below:
• All storage tanks in the tank farm should be dyked. Other operation and maintenance features shall be based on established best safety practices.
• Concentration detectors for hazardous chemical vapours (e.g. chemicals etc.) fire Smoke / heat detectors and fire alarm should be installed at all strategic locations in the plant.
• A schedule for preventive maintenance including health survey of all plant equipment should be adhered to as far as possible.
• Ensure the absence of ignition sources in storage area.
• Ensure placement of firefighing facilities, such as, carbon dioxide, dry chemical powder and foam type fire extinguishers in addition to fire hydrant system, at strategic locations. Spill control measures, such as, removal of all ignition sources from the spill area and ventilating the area as well as soaking the spilled material with paper, towel or mud and letting the volatile substance evaporate slowly in a safe area.
• Compulsory use of protective clothing, non-sparking tools and warning signs during critical operations and maintenance.
• Training / refresher courses on safety information’s / norms.
• Eyewash and showers should be put up at strategic places for use during emergencies.
A group of plant personnel should be trained in first aid, rescue, firefighting and emergency
control measures. These personnel will form core group/emergency squad who will fight the
emergency and also act as rescue and first aid team.
In order to ensure communication from isolated places/locations Walkie-Talkie be made
available to persons working in these areas. This will considerably improve the effectiveness
of emergency management.
There is no substitute for training-mock drills and these must be held at regular interval
keeping the following objectives in mind:
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 129
Real time mock-drill should be carried out for probable/likely hazardous situation (after the
plant is successfully commissioned).
Target to be set-up for various tasks and events during an emergency.
Weak links should be marked and corrective action taken to improve effectiveness during
emergency.
CIF team already understand the implication and hazards in fertiliser industry and has
implemented most of the measures in the sister organisation existing plants.
6.24 OCCUPATIONAL HEALTH AND SAFETY
Occupational Health and Safety (OHS) are of prime importance more so in hazardous
industries. Industries have various types of hazards and QRA is carried out to understand
the hazards potential from various incidents. Pre-emptive steps can be planned to
safeguards from likely causes. Some of the
Frequent causes of accidents
• Fire and explosion: explosives, flammable material
• Hazards from Toxic Materials
• Mechanical Hazards such as:
o Being struck by falling objects
o Caught in between machine parts
o Snapping of cables, ropes, chains, slings
o Handling heavy objects
• Electricity Hazards
o Electrocution
o Short circuits and consequential fire.
o Poor illumination etc.
• Other Hazards:
o Falls from height inside industrial units or on the ground
o Struck by moving objects; Slipping on wet surfaces
o Sharp objects
Oxygen deficiency in confined spaces; Lack of personal protective equipment (PPE), housekeeping practices, safety signs
• Consequential hazards due to extreme Temperatures;
• Consequential hazards due to vibration
• Consequential hazards due to radiation;
• Many more hazards.
Hazardous substances and wastes
• Heavy and toxic metals
• Lack of hazard communication (storage, labeling, material safety data sheets)
• Batteries, fire-fighting liquids
• Welding fumes
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 130
• Volatile organic compounds
• Inhalation in confined and enclosed spaces
Ergonomic and psychosocial hazards
• Many of the hazards are as result of working environment.
• Repetitive strain injuries, awkward postures, repetitive and monotonous work, excessive workload
• Long working hours, shift work, night work, temporary employment (Long working hours, shift work, night work, temporary employment, Mental stress, human relations) which results in less attention at work place and consequential incidents and accidents.
• Lack of education and training / awareness is another prime cause of accidents.
Considering above, QRA analysis and also the nature of activities at CIF the following steps for OHS activities have been suggested:
• Employee’s health check-up: pre-employment and periodic check-up during employment. The health check-up observations should be informed to employees.
• The health should include any impact due to hazards at work place including (but not limited to) due to noise, heat, illumination, dust, any other chemicals, metals being suspected in environment and going into body of workers either through inhalation, ingestion or through skin absorption and steps taken to avoid musculo-skeletal disorders (MSD), backache, pain in minor and major joints, fatigue etc.
• Training and refresher courses on safety to all employees.
• Employees should be made aware of the hazards in the plant and the preventive actions to be safe from such hazards.
Response to Injuries: Based on a survey of possible injuries, a procedure for response to injuries or exposure to hazardous substances should be established. All staff should have minimum training to such response and the procedure ought to include the following:
• Immediate first aid, such as eye splashing, cleansing of wounds and skin, and Bandage etc.
• Immediate reporting to a responsible designated person
• If possible, retention of the item and details of its source for identification of possible hazards.
• Medical surveillance
• Recording of the incident
• Investigation, determination and implementation of remedial action
6.25 EMERGENCY MANAGEMENT PLAN
Though CIF is not storing Chemicals more than Threshold limit as mentioned in MSIHC rules
and as such need not prepare EMP and submit it to Statutory Authorities. However, CIF
should develop an Emergency Management Plan (EMP) and regularly carry out Mock drills
to check the effectiveness of the EMP. For reference and review key features of standard
EMP are given below.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 131
6.26 ERGONOMIC AND PSYCHOSOCIAL HAZARDS
Many of the Hazards are as Result of Working Environment
Repetitive strain injuries, awkward postures, repetitive and monotonous work, excessive
workload
Long working hours, shift work, night work, temporary employment (Long working hours, shift
work, night work, temporary employment, Mental stress, human relations) which results in
less attention at work place and consequential incidents and accidents.
Lack of education and training / awareness is another prime cause of accidents.
Considering above, QRA analysis and also the nature of activities at CIF the following steps
for OHS activities have been suggested:
Employee’s health check-up: pre-employment and periodic check-up during employment.
The health check-up observations should be informed to employees.
The health should include any impact due to hazards at work place including (but not limited
to) due to noise, heat, illumination, dust, any other chemicals, metals being suspected in
environment and going into body of workers either through inhalation, ingestion or through
skin absorption and steps taken to avoid musculo-skeletal disorders (MSD), backache, pain
in minor and major joints, fatigue etc.
Training and refresher courses on safety to all employees,
Employees should be made aware of the hazards in the plant and the preventive actions to
be safe from such hazards.
Response to injuries: Based on a survey of possible injuries, a procedure for response to
injuries or exposure to hazardous substances should be established. All staff should have
minimum training to such response and the procedure ought to include the following:
o ̇Immediate first aid, such as eye splashing, cleansing of wounds and skin, and Bandage etc.
o Immediate reporting to a responsible designated person
o If possible, retention of the item and details of its source for identification of possible hazards.
o Medical surveillance
o Recording of the incident
o Investigation, determination and implementation of remedial action
6.26.1 Key Process Safety Measures
• Flameproof equipment’s and fittings are provided for handling of hazardous chemicals.
• Tanks and all pump motors are earthed.
• Road tanker earthing lines have been provided near the unloading pumps.
• Dykes have been provided for hazardous chemicals storage to contain leakages. Floors of the dyke area have impervious finish.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 132
• Housekeeping of the plant is as per prescribed norms. Floors, platforms, staircases, passages are kept free of any obstruction.
• All hazardous operations are explained to the workers. They are periodically trained on the hazardous processes.
• Dedicated supply of firewater is available in the plant.
• Only authorized persons are allowed inside the plant.
• All instrument and safety devices are checked and calibrated during installation. They are also calibrated, checked at a frequent interval. Calibration records are maintained.
• All electrical equipment’s are installed as per prescribed standards.
• All the equipment’s of the plant are periodically tested as per standard and results are documented. All equipment’s undergo preventive maintenance schedule.
• Hydrant system is pressured with a Jockey Pump.
• Flame arrestor is provided on each tank.
• Pressure gauge is provided on each tank.
In addition to fire hydrant system, nos. of fire extinguishers are also installed at different
locations within premises.
Retention basin is provided to collect the contaminated water used during firefighting.
6.27 TRANSPORTATION
Class A petroleum products (equivalent raw materials) will be received through road tanker and stored in underground storage tank as per petroleum Act & Rules.
Road tanker unloading procedure will be in place and will be implemented for safe unloading of road tanker.
Static earthing provision will be made for tanker unloading.
Earthed Flexible Steel hose will be used for Volatile inflammable organic compounds unloading from the road tanker.
Fixed pipelines with pumps will be provided for Volatile inflammable organic compounds transfer up to Day tanks/reactors.
Double mechanical seal type pumps will be installed.
NRV provision will be made on all pump discharge line.
Table 6.11: Transportation, Unloading and Handling Safety Measures
S. No. Activity Type of Possible Hazard
Mitigation Measures
1 Transportation of hazardous Chemicals like acids & Volatile inflammable organic compounds by road tanker
Leakage& Spillage Fire & explosion,
• Check the source of leakage point. • Do not touch damaged containers or spilled material unless wearing appropriate protective clothing. • Stop leak if you can do it without risk. • Use water spray to reduce vapors; do not put water directly on leak, spill area
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 133
S. No. Activity Type of Possible Hazard
Mitigation Measures
Toxic release
or inside container. • Keep combustibles (wood, paper, oil, etc.) away from spilled material. • Isolate the area • Isolate the container • Training will be provided to driver and cleaner regarding the safe driving, hazard of Flammable chemicals, emergency handling. • TREM card will be kept with TL. • Fire extinguishers will be kept with TL. • Flame arrestor will be provided to TL exhaust. • Instructions will be given not to stop road tanker in populated area. • Clear Hazard Identification symbol and emergency telephone number will be displayed as per HAZCHEM CODE. • Appropriate PPEs will be kept with TL.
2 Acids and Volatile inflammable organic compounds Road tanker unloading at project site.
Leakage& Spillage Fire,& explosion, Toxic release
• Check the source of leakage point. • Do not touch damaged containers or spilled material unless wearing appropriate protective clothing. • Stop leak if you can do it without risk. • Use water spray to reduce vapors; do not put water directly on leak, spill area or inside container. • Keep combustibles (wood, paper, oil, etc.) away from spilled material. • Isolate the area • Isolate the container • Check the source of leakage point. • Spray the water on leakage • Priority will be given to Tanker to immediately enter the storage premises at site and will not be kept waiting near the gate or the main road. • Security person will check License, TREM CARD, Fire extinguisher condition; Antidote Kit, required PPEs as per SOP laid down. • Store officer will take sample as per sampling SOP from sampling point. • After approval of QC department unloading procedure will be allowed be started. Following precautions will be
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 134
S. No. Activity Type of Possible Hazard
Mitigation Measures
adopted during unloading • Wheel stopper will be provided to TL at unloading platform. • Static earthing will be provided to road tanker. • Tanker unloading procedure will be followed according to check list and implemented. • Flexible SS hose connection will be done at TL outlet line. • The quantity remaining in the hose pipeline will be drained to a small underground storage tank, which will be subsequently transferred by nitrogen pressure to the main storage tank thus ensuring complete closed conditions for transfer from road tanker. • All TL valves will be closed in TL. • Only day time unloading will be permitted.
3 Hazardous chemicals fuels and acid & Volatile inflammable organic compounds Storage tank safety
Leakage& Spillage, Fire, Explosion Toxic release.
• Check the source of leakage point. • Do not touch damaged containers or spilled material unless wearing appropriate protective clothing. • Stop leak if you can do it without risk. • Use water spray to reduce vapors; do not put water directly on leak, spill area or inside container. • Keep combustibles (wood, paper, oil, etc.) away from spilled material. • Isolate the area • Isolate the container • Check the source of leakage point. • Spray the water on leakage • SS storage tank will be provided as per IS code. • Dyke wall will be provided to storage tank. • Level transmitter will be provided with low level high level auto cut-off provision. • Vent will be connected to water trap and vent of water trap will be provided with flame arrestor. • Water sprinkler system will be provided to storage tank. • Fire hydrant monitor with foam attachment facility will be provided. • Dumping / Drain vessel/alternate
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 135
S. No. Activity Type of Possible Hazard
Mitigation Measures
vessel will be provided to collect dyke wall spillage material. • FLP type pump will be provided. • Nitrogen blanketing will be provided to storage tank. • Double static earthing will be provided to storage tank. Double Jumper clip will be provided to all Solvent handling pipeline flanges.
4 Hazardous Chemicals and acid & Volatile inflammable organic compounds transfer from storage tank to Day tank.
Leakage& Spillage due to Line rupture, Flange Gasket failure, Fire, Explosion, Toxic release.
• Double mechanical seal type FLP type pump will be provided. • Double on / off switch will provide at tank farm and process area near day tank. Pump auto cut off with day tank high level will be provided. • Flame arrestor will be provided on day tank vent. • Over flow will be provided for additional safety and it will be connected to main storage tank. • NRV will be provided on pump discharge line. • Double Jumper clip will be provided to all Volatile inflammable organic compounds handling pipeline. Double static earthing will be provided to day tank.
5 Transportation of Chemicals transfer from Day tank to reactor.
Leakage, Spillage due to Line rupture, Flange Gasket failure, Fire, Explosion, Toxic release.
• Gravity transfer. • Total quantity of day tank material will be charged in to reactor at a time. • Static earthing will be provided to storage tank. • Double Jumpers will be provided to pipeline flanges.
6.28 EMERGENCY FACILITIES
Emergency Management Planning (EMP) should be developed considering the likely hazards in the plant and sincerely implemented. Mock drills for various scenarios should be carried out and results of the drills should be recorded. Weal links in the mock drills should be strengthened.
Objectives
The Emergency Management Plan (EMP) is developed to make the best possible use of the resources available at CIF and the nearby agencies to provide help/assistance in case of an emergency in the plant. The activities will include:
• Rescue the victims and give them the necessary medical attention in the shortest possible time.
• Safeguard another person (evacuate them to a safer place).
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 136
• Contain the incident and control it with minimum damage to human and life and property.
• Provide necessary information to families/relatives of affected persons, outside agencies including media and statutory bodies.
6.29 EMERGENCY MANAGEMENT PLAN [EMP]
An outline of EMP organizational set-up necessary for chain of commands during emergency situation in the plant is as given below. CIF should develop EMP in the organisation and send it statutory authorities for approval and integration in District Disaster Management Plan. A sample EMP is enclosed for reference.
President (Operations) of the CIF is the Chief Emergency Coordinator and he shall be the main guiding person directing the emergency operations. He shall be assisted by:
Chief Site Coordinator. GM (Production)
Coordinate and direct all the activities from Emergency site.
In absence of GM-Prodn, DGM (Prod. I/II) will act as Chief Site Coordinator.
Chief Maintenance Coordinator Manager-Maintenance
Coordinate all the maintenance activities from the Emergency Control Center.
In absence of Manager (Maint.), Asst. Manager will act as Chief Maintenance Coordinator.
Chief Service Coordinator Manager (HR)
Coordinate with local administration take care of transport, medical, canteen arrangements, and evacuation of people if required.
In absence of Manager (HR), Asst. Manager (P&A) will act as Chief Service Coordinator.
Chief Material Coordinator Manager (Material)
In absence of Manager (Material), Asst. Manager (Material) will act as Material Coordinator.
Operation Coordinator Manager (Prod.) is the Incident
Controller for Vehicle Control & Security
Personnel Security Officer
In absence of Security Officer, Security Supervisor will act for Vehicle Control & Security Personnel deployment.
Fire & Safety Controller Incharge (F&S)
In absence of In-charge (F & S), Supervisor (F & S) will act as Fire & Safety Controller and also for first aid.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 137
Two “Assembly Points” will be identified (based on wind direction and away from hazardous areas) and duly marked.
Chief Service Coordinator shall contact the following senior officers stationed at Gajraula.
Format for Telephone Numbers of the Authorities:
DISASTER MANAGEMENT
KEY PERSONNEL - OFFSITE EMERGENCY RESPONSE
OFFICERS PLACE OFFICE RES.
DIVISIONAL COMMISSIONER
COLLECTOR & DISTRICT MAGISTRATE
CITY MAGISTRATE
DY.I.G. OF POLICE
SUPDT.OF POLICE
POLICE CONTROL ROOM (CITY)
POLICE STATION (near by or Sikar)
DY CHIEF INSPECTOR OF FACTORIES
OFFICERS PLACE OFFICE RES.
UP STATE POLLUTION CONTROL BOARD
FIRE BRIGADE, Nearby or Sikar
HOME GUARD
NEAREST CIVIL HOSPITAL (CHIEF MEDICAL SUPTD)
6.30 RESPONSIBILITIES & ROLE OF KEY PERSONNEL
6.30.1 Over all In-charge-President (Operation)
On getting the information about emergency from GM (Prod.) rush to incident site/ECC. Assess the overall situation and provide guidance in critical decision-making.
6.30.2 Chief Site Coordinator- Manager (Production)
• On getting the information about emergency from Supervisor Plant, inform over all In-charge Plant (Operation).
• Rush to the emergency site to assess the situation and decide to:
o Declare emergency based on amount/extent of hazards and water/air analysis (toxic / flammable material release) and advise Incharge (F&S) for sounding emergency siren.
o Review if plant shutting down is required to contain / control the hazard.
o Review, evacuation from affected areas and sending the affected person to a safe place.
o Advise Incident Controller and other key personnel to take necessary action.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 138
o He will interact with Chief Service Coordinator and advise him on possible effects on areas inside and outside the factory to initiate Off- Site Emergency Response Plan.
o Remain in touch with Overall in-charge (P-O) and inform about the situation & actions being taken and seek his advice for the critical decisions.
6.30.3 Chief Maintenance Coordinator- GM (Maintenance)
• After getting information about emergency from manager concerned Plant. Inform all concerned personnel to be on alert.
• Rush to the ECC, assess the situation and facilitate Chief Site Coordinator-GM (Prod.), Maintenance support needed to tackle the emergency.
• Facilitate elect. isolation of the affected area, if required through Supervisor (E&I)
• Facilitate lighting arrangements at (a) affected locations and (b) Assembly points if required through Supervisor (E&I)
• Facilitate work-shop facilities with adequate manpower if required through Manager (Maintenance). Remain in touch with Chief Site Controller.
6.30.4 Chief Service Co-ordinator - Manager (HR)
• On getting information from the Medical Coordinator rush to the Emergency Control Centre.
• Assess the situation in consultation with Chief Site Coordinator and Incident Controller and ensure that casualties get adequate transport / medical help.
• Make arrangement to shift all the persons to the safest place if called for.
• Assess 'Law and Order' situation.
• Inform press, TV / Radio, local authorities on the severity of situation in close co-ordination with Chief Site Coordinator and in consultation with Over All In-charge -P (O).
• Inform the District Authority / local police station in case their help is required for evacuation of personnel / preserving law and order.
• Evacuation of adjoining areas and villages, if required.
• Remain in touch with over all In-charge - P (O) and seek his advice for the critical decisions.
6.30.5 Chief Material Co-ordinator- Manager (Materials)
• Rush to the emergency control center on receipt of the message from Chief Service Coordinator / on hearing the emergency siren and inform Supervisor. (Store) about the emergency.
• Get the stores opened for requirement of the Fire fighting/safety and other materials, which may be required during emergency.
• Assess the situation in consultation with Chief site coordinator & incident controller for any material requirement /help at the affected site.
• He will be responsible for the arrangements of trucks for movement of bulk material if required.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 139
• Remain in touch with Chief site coordinator, Incident controller, and Chief maintenance coordinator.
6.30.6 Incident Controller Concerned Plant -Manager Concerned Plant
• Rush to the site of emergency after getting information from Shift In-charge assesses the situation and immediately inform
o GM – Prod.
• Take over charge from shift in charge.
• Ensure that persons working in the area are safe and isolate source of toxic release if possible.
• Advise and assist In-charge (F & S) for providing water curtains to contain toxic release with in the plant battery.
• Remain in touch with Chief Site Controller and other concerned officers.
• Coordinate with Chief Maintenance / Chief Material coordinators for assistance required at site.
• Depending upon the severity of incident, ensure that adequate emergency services like Medical/ Laboratory/ Mechanical/ Electrical etc. are summoned.
• Preservation of evidence as far as possible without affecting the operation of emergency procedures to facilitate any subsequent inquiries into the causes and circumstances, which led to the emergency.
6.30.7 Shift In charge (Concerned Plant):
• Immediately proceed to the site of emergency and assess the situation:
• Emergency Control Room at 101/123 (with name and location of emergency)
• During odd hours/till arrival of Fire shift I/C should act as chief fire coordinator.
• Initiate the shutting down operations for controlling the hazard if unavoidable.
• Cordon off the area and do not allow any body to enter the affected area without respiratory protection (In case of toxic gas leakage).
• Direct rescue operations with the help of fire and safety staff.
• Open safety Almirah for the use of plant personnel.
• Have regard to the need for preserving evidence that could facilitate subsequent inquiry.
• Advise Supervisor of the plant to take roll call and account for missing personnel.
• Hand over charge of the operation to the Manager when he arrives at site.
• Ensure service agencies like Electrical, mechanical, instrumentation is mobilized to handle the emergencies.
6.30.8 Security Officer Vehicle Control and Security Personnel Deployment at the Locations
• Rush to the spot of emergency on getting information from Security Officer on duty and inform Manager (HR) about emergency.
• Arrange one emergency vehicle immediately for ECC.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 140
• Keep in touch with Chief Service Coordinator, Chief Site Coordinator and Incharge (F&S).
• He will act as a special rescue Coordinator at the time of evacuation of employees and others if required.
• Alerts complete staff under his control and make it available at a known point, as per the guidance of Chief Site Co-ordinator / Chief Service Coordinator.
• Anticipate and arrange vehicles required at emergency site in consultation with Incharge (F&S) and Chief Site Coordinator and Chief Service Coordinator.
• On request send vehicles for getting plant personnel / fire personnel required for emergency.
• Arrange vehicle in consultation with Medical Coordinator / Chief Service Coordinator for shifting injured to city hospital.
• During emergency arrange for opening of relevant gates/ barriers for easy movement of vehicles. Security Guards should be posted on these gates / barriers to prevent unauthorized entry.
• Arrange transport and temporary shelters for evacuated personnel and inform the relatives of the affected personnel if required.
6.30.9 Fire & Safety Controller- Incharge (F & S)
• Rush to the spot of emergency after getting information from ECC and inform to Supervisor. (F & S).
• Direct rescue operations under the guidance of Chief Site Coordinator/ Incident controller if required
• Ask additional help from C.S.O. for cordoning off the area and advise fire personnel for rescue / fire fighting if required
• Arrange to provide water curtains, water monitors, at affected locations if required.
• Organize and supervise fire-fighting operations if called or.
• Provide necessary respiratory equipment to plant personnel for emergency use.
• Advise Chief Site Coordinator to arrange additional help Mutual aid group / neighbouring industries if required.
• Give safety precautions to the personnel at rescue work.
6.30.10 Fire Control Room In-Charge
On receiving emergency message from the In-charge (F & S)/ on hearing siren Rush to ECC and take charge of Fire Control Centre from the Fire Operator / Fire Supervisor.
• Assess the situation and Call fire staff from fire barrack.
• Immediately rush fire crew to emergency spot.
• Inform Medical Centre for sending ambulance to emergency site.
6.30.11 Fire Supervisor should also ensure the following:
a. Supervisor to look for the wind direction and cordon off the area.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 141
b. Use water monitors/hydrants/water curtains in consultation with incident/Chief site controller.
c. Provide respiratory equipment’s to the plant personnel.
d. In case of toxic spillage at site, put foam (HAZMAT)/ sand on the spillage area.
e. Remain in touch with Incharge (F & S).
f. Chief Site Co-coordinator will instruct Fire Control Room In-charge for operation of “All Clear Siren” when the disaster is contained / controlled.
g. However, regular testing of siren & emergency buzzer plant control rooms for 2 minutes on every Monday at 13.00 hrs is being done. All clear siren will sound for 2 minutes with a continuous sound.
6.31 POST EMERGENCY RECOVERY
The post-emergency procedures discussed briefly below are designed to successfully manage the damage / losses of an emergency event. The focus of these procedures is to move the plant back into normal operating mode as quickly and efficiently as possible.
Immediately after the “ALL CLEAR” an emergency meeting will be held in emergency control centre to assess the loss both for men & materials, where in following will be present with attendance records, details of injured, out side situation and preparation of press release (if felt necessary)
• Overall In charge
• Chief Site Coordinator
• Chief Maintenance Coordinator
• Chief Service Coordinator
• Incident Controller
• Material Coordinator
• Security
• Fire & Safety Controller
6.32 ACCIDENT INVESTIGATION
a. As soon as possible after the emergency is over and plant operation has become normal, the investigation and analysis are to be carried out to determine the cause of the event.
b. Representatives from various disciplines will be members of the investigation and analysis team.
c. The areas of the events are to be sealed off so that tempering or alterations of the physical evidence are not likely to occur.
d. Key components are to be photographed and logged with time, place, direction etc.
e. Statements are to be taken from those who were involved with the operation or who witnessed the event.
6.33 DAMAGE ASSESSMENT
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 142
This phase of recovery establishes the quantum of replacement machinery considered necessary for bringing back plant to normal operation; property and personnel losses accounted and culminates in a list of necessary repair, replacement and construction work.
Insurance companies will be informed of the damage and requested to pay the compensation as per claim.
6.34 CLEAN-UP AND RESTORATION
This phase will only begin once the investigation is complete. Reporting documentations are to be prepared and forwarded to appropriate authorities. Repair, clean up and restoration work to begin.
6.35 CONCLUSION & RECOMMENDATIONS
The hazard analysis and risk assessment of few possible selected incident scenarios indicates that such incidents mostly are not limited to plant battery limits and have impact on adjoining plants. There are possibilities of domino effect and the secondary scenario not predictable can be worse than the primary one. Two scenarios (specifically toxic hazards scenarios) are crossing the CIF plant boundaries. The direction of impact will be in down wind direction (wind direction and speed vary with season).
Some of the recommendations for Tank farm storage system are as given below:
• Provision of flame detectors/ thermal sensors at strategic locations in the tank farm area.
• Auto water deluge system on each bulk storage tank for inflammable liquids. The system should automatically start taking signal from flame detectors or thermal relay.
• Fixed foam system with adequate capacity.
Toxic Hazards are due to Chlorine and all liquid products. Regular ‘Hazard Survey’ ensures the detection of leakage in the plant.
Chlorine leakage can have adverse impact in large area and also in areas outside the CIF battery limit. CIF should have provision for sucking and scrubbing Chlorine in alkali solution. In house ‘capability building’ to attend hazardous scenarios is to be taken up through mock drills. Real time exercise with controlled release of Chlorine
• to attend the leakage in cylinder
• to transfer leaky cylinder near scrubber and absorb chlorine in alkali solution
• To attend leaky cylinder with ‘Chlorine safety Kit’.
• Train staff in attending such scenarios.
Human Factors: CIF should have well equipped fire station and also safety department – safety practices. Human factors role in safety cannot be ignored. Odd hours working and over / long hours work can drain out individual. It shows in lack of efficiency and also the lack of apt attention the modern chemical complex demand. They are to be closely looked into and avoided.
‘Safety’ has unique features:
If no accident has happened so far probability of incident / accident occurring increases.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 143
‘No accident’ / good safety record develops complacency inertia/ over confidence in the team. This attitude gives rise to gaps / soft spots in the system giving chances to incidents / accidents.
Safety requires novelty. Routine training practices get stale with no positive results. Look for novel scheme of training/ safety practices to build up fresh impetus in safety. Involvement of employees with refreshed outlook for safety is to be achieved.
6.36 PUBLIC HEARING
Public hearing details for ‘M/s Central Insecticides and Fertilizers’ proposing a Greenfield Project for Manufacturing of Technical Grade Pesticides (fungicides) namely Thiram, Ziram (500TPA) at Plot No E-23A, SKS Industrial Area Reengus, District Sikar, Rajasthan: -
As per the District Collector Official letter no. Rev./2017/2687-89, Dated 14.07.2017 and Letter No. 2914 Dated 28.08.2017, with reference to the Regional Office letter dated 19.07.2017; Public Hearing was conducted on 29th August 2017 (Tuesday) at 11:00 a.m. in the Municipal Corporation Reengus, District Sikar Rajasthan.
Public hearing was organized in the presence of Shri Sukhbir Singh, CEO- Jila Parishad and Shri Vinay Katta-RO Regional Pollution Control Board Sikar Rajasthan.
List of local peoples and members present in the public hearing is also attached. Advertisement for the public hearing was given in local Hindi news paper “Kanchan Express” and English news papar “The Indian Express” publication dated 21st July 2017 and the Xerox copy of the same is also attached as Annexure-B.
This public hearing was conducted as per the as per the EIA Notification dated 14th September 2006 as amended till date.
Issues raised during the public hearing proceeding are given and compiled as follows –
S. No. Name of the Person
Question / Issue Answer
1. Shri. Hari Singh Baloda
He said that among the existing Industrial units of the SKS (Shree Khatu Shyamji) RIICO, nobody is following the Environmental Lows and due to this reason, all environmental attributes (Air, water soil noise) are beyond the environmental standards.
He also said that survival is very difficult due to existing pollution level and we do not believe that the project will fulfill their promises.
He also said that not any single industrial unit in the industrial area is following “Zero Liquid Discharge” pattern.
He also said that farmers are facing irrigation water problems
Project Management and Environmental Consultant (Mr. Yashwant Bordia) assured that all pollution control equipments (Scrubber, Bag Filter and other pollution control units) will be installed in the upcoming project.
Management also assured that periodical environmental monitoring shall be undertaken and rechecked by the members of Pollution Control Board.
Management also assured that a pollution model is already implemented for the assessment of pollution levels and we have already assessed that the proposed pollution levels will be negligible and all mitigation
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 144
in the region due to maximum water withdrawal by the industrial units.
He also said that there are eight (08) tube wells along with the river bank and the water is being supplied from there so that local people are unable to take sufficient water from there. Water level also increasing continuously so we are facing drinking water problem in the region.
He also requested to the members of Pollution Control Board to monitor the pollution levels in the region and said, if the pollution levels are observed within the prescribed standard limits than we have no issue with proposed upcoming CIF Industry project.
measures shall be followed in the proposed industrial unit.
Management also assured that water problem would be solved by the water supply from RIICO. Total 5KLD water will be taken from RIICO and out of that 2.5KLD water will be treated and recycled in the proposed unit.
Management also assured that we will follow the proposal of “Rain Water Harvesting System” to meet the water requirements in the proposed upcoming project for other 3/4 months.
2. Shri. Chhittar Singh
He said in the favor of proposed upcoming CIF Industry that we are in the support of the new industrial unit because we will get new job, business opportunities and basic infrastructure & facilities also will be increased.
He also said that we including other farmers have no issue and requested to the members of Pollution Control Board to monitor the pollution levels in the region, so the local people’s health will not get affected with any private loss except pollution issues.
He also said that we personally should maintain the clean environment and get involved in the same activities. He also suggests to not wasting the water unnecessarily.
Proposed Industry Management and Environmental Consultant (Mr. Yashwant Bordia) assured that the jobs will be given to the suitable candidates as per their academic qualification and experience. Job opportunities for local candidates will be more than 25% of total recruitments.
Proposed Industry Management and Environmental Consultant (Mr. Yashwant Bordia) assured that a pollution model is implemented for the assessment of pollution levels in future and we have already assessed that the proposed pollution levels will be negligible and all mitigation measures shall be followed in the proposed industrial unit.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 145
3. Shri. Ganesh Ram “Sarpanch”
He also said that the existing industrial units already promised to provide 10%, 20% and 25% employment opportunity but not fulfill their wordings.
He also said to support the proposed upcoming project that at least 25% jobs should be given to the local people and suggested to monitor the all environmental parameters and to concentrate on water related issues in the region.
He also requested to the proposed project management to participate and cooperate in the clean environment in nearby villages and to implement their Corporate Social Responsibilities (CSR) activities.
Management team members also assured to provide the employment to the local people. They also assured that all environmental parameters/pollution levels will be maintained within the prescribed limits and monitored and rechecked periodically by the members of Pollution Control Board.
Management also assured that water problem would be solved by the water supply from RIICO. Total 5KLD water will be taken from RIICO and out of that 2.5KLD water will be treated and recycled in the proposed unit.
Management also assured that we will follow the proposal of “Rain Water Harvesting System” to meet the water requirements in the proposed upcoming project for other 3/4 months.
4. Shri. Jadhav Ram Shri. Jadhav Ram said to support the proposed project that industry should be pollution free. Waste water disposal should be undertaken proper channel. Water should not be wasted. All air pollution control equipments should be installed to minimize the air pollution in the region.
He also said that pollution related complaints are observed frequently in the region due to other existing industrial units so the improved quality pollution control equipments should be installed in the industry. Industry should provide employment to the 25% local people.
Proposed Industry Management Team members also assured that all environmental guidelines shall be followed along with the installation of pollution control equipments (Scrubber, Bag Filter and other pollution control units) will be installed in the upcoming project. All environmental parameters will be maintained within the prescribed limits and monitored and rechecked periodically by the members of Pollution Control Board.
Project management also assured that the jobs will be given to the suitable candidates as per their academic qualification and experience. Job opportunities for local candidates will be more than 25% of total recruitments.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 146
5. Shri. K C Yadava
(Reporter-Rajasthan Patrika)
He said that he is not against the proposal for the industry but as experienced from previous accidents in the other industries like fire accidents no one learned and do not implementing the environmental health system and no industry is bothered about pollution impacts and mitigation. Waste disposal facilities are not available and survival has become difficult in the nearby villages, towns and cities due spreading of pollution.
He also said to follow the all environmental guidelines and to be bothered about the safety of industrial workers.
He also said that this is a chemical fertilizer company and it should be followed all environmental guidelines so the chemicals used in the manufacturing of Chemical Fertilizers could not adversely affect the human health by cancer and other lethal disease in the region.
He also said if our Govt. assured about the proper health/medical treatment facilities for industry workers shall be maintained than we have no objection with proposed upcoming industrial unit.
Management team members replied that all efforts shall be undertaken to the environmental health and safety of industrial workers.
Project management also assured that the chemicals used in the product/insecticides only affect the insects to protect the crops because the insects adversely affects the crop yields and will not adversely affect the human health and will help in increasing the industrialization and income of local people/farmers.
They also assured that all environmental parameters will be maintained within the prescribed limits and monitored and crosschecked periodically by the members of Pollution Control Board.
6. Shri. Mahaveer Prasad Bijarniyan
He also said that the proposed industrial unit is very essential for the better future of next generation.
He also said that the medicines we take for the treatment of common diseases are manufactured by the same chemicals and the proposed
Management team members thanks to Shri. Mahaveer Prasad Bijarniyan for his full support to the proposed project.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 147
industry will produce the same chemicals normally we used regular bases.
He also requested to the members of industry management to maintain all the environmental guidelines to keep all parameters well within prescribes limits, if they assured us about the same and Employment generation than we are with our full support for the project and have no issue with proposed upcoming project.
7. Shri. Suvalal Khichhar
He said that he has no issue with the proposed project if the industry will be setup according to the Environmental guidelines and existing industries which are not well equipped with appropriate pollution control equipments resulting pollution problems for local people. Industrial Waste should be disposed properly. Proper solid waste disposal site should be provided for all industrial units, because in the adverse situation stinky smell may spread over the region and may be caused of various human diseases.
Management team and environmental consultant (Mr. Yashwant Bordia) also assured that that all pollution control equipments (Scrubber, Bag Filter and other pollution control units) will be installed in the upcoming project. They also assured that all environmental parameters will be maintained within the prescribed limits and monitored and crosschecked periodically by the members of Pollution Control Board.
After “Public Hearing” Proceedings Mr. Vinay Katta address to the people present in the
meeting that the videography of all public hearing proceedings is in progress and any
Objection/Complaint/Suggestion may be given to us in written, which will be forwarded for
the necessary action. The details for the same are as given as follows;
S. No. Name of the Person Brief Detail
1. Shri. Hari Singh Baloda and other to not issue the Environmental Clearance
2. Shri. Surya Mandal Samaj Sewa Samiti
to not issue the Environmental Clearance
3. Shri. Vinit Kumar S/o Shri Satyanarayana
In favor to issue the Environmental Clearance
After that the project related information given by industry representative/ Mr. Yashwant
Bordia, which are as follows;
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 148
1. To fulfill the total water requirement of the proposed industry, 5KLD water will be
supplied by RIICO and out of the total 2.5KLD water will be treated and recycled.
There is a proposal of “Rain Water Harvesting System” to meet the water
requirements in the proposed upcoming project for other 3/4 months so the ground
water will be recharged properly.
2. To keep the environmental parameters well within the prescribed limits all pollution
control equipments will be installed in Close Circuit System.
3. No waste Water or Gas will be discharged outside of the proposed project premises.
4. Help will be taken to minimize the pollution levels in the proposed industry from
Pollution Control Board and other Organization working in the same field.
5. A Model for the local environmental conditions has been implemented to assess the
existing environmental parameters and found well within the prescribed limits.
6. Representative also told that efforts will be made to development the local
environment including education and employment will be undertaken on priority
bases.
Project related information also given by Project Proponent Shri Kaleem Ji, which are as follows; 1. Priority will be given to local people for the transportation of product of the
proposed project.
2. Chemical Seed treatment will be conducted in the proposed industry so the crop
yields will be increased and farmers will be benefited will help to improve Socio-
economically. This is the right step for this direction.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 149
CHAPTER 7 : SUMMARY AND CONCLUSION
7.1. PRELUDE
The present study was aimed at identifying the potential environmental impacts due to the various project activities, assessment of impact, mitigation measures, and at developing an environmental management and monitoring plans for proper mitigation of any adverse environmental impact. In this study, the various activities likely to take place during the construction and operation phases of the project have been analyzed in relation to the baseline condition of different environmental components. The mitigation measures proposed for the construction and operation stages have been proposed and the potential residual impacts discussed. The key points considered in this study are described in the following sections:
7.2. REGULATORY COMPLIANCE
The project is yet at its technical investigation stage. Prior to its implementation, it will be necessary to acquire all the necessary clearance from the Government of India, as per the applicable national regulations. Key clearances include obtaining No Objection Certificate from the Rajasthan State Pollution Control Board (RPCB) under The Water (Prevention and Control of Pollution) Act, 1974 and Rules, 1975; The Air (Prevention and Control of Pollution) Act, 1981 and Rules, 1982. In addition to that Manufacture, Storage and Import of Hazardous Chemicals (MSIHC) Rules, 1989 and amendments thereafter, Hazardous Waste (Management, Handling and Trans-Boundary Movement) Rules, 2008, Bio Medical Waste (Management & Handling) Rules, 1998 and amendments thereafter, Municipal Solid Waste (Management & Handling) Rules, 2000 and amendments thereafter will also be applicable to the industry.
7.3. BASELINE CONDITIONS
The monitoring of the existing environmental conditions of the proposed project site and of its close vicinity have been established with respect to physical, biological and human environment.
The air quality of the area meets the prescribed National Ambient Air Quality Standards applicable for the Residential & Rural Areas except the “PM” which is due to local phenomenon. The background noise levels were also found well within the standards as at present most of the area is not developed.
The ground water quality prevails in the study area were in good agreement with IS: 10500 permissible limits. Overall the surface water quality of canal, pond and minor is meeting the Class ‘C’, Class D of BDU Criteria of CPCB for its suitability for wild life and fisheries.
Ambient noise level of the study area is within the prescribed National Ambient Noise Quality Standard for respective residential, commercial and industrial category at all the monitored locations.
7.4. ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES
The project entails various impacts on the study area, some negative and some positive.
This chapter concludes on the findings that emerged from the environmental assessment study and summarizes the key points to be addressed to ensure the environmental sustainability of the project during the construction and operation phases.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 150
There is going to no adverse impact on water quality or water demand due to proposed project. Rather overall fresh water demand will get reduced from the present level due to treated effluent recycle.
The impact (incremental GLC) due to the new stacks were computed and all pollutants post project GLC will be well within NAAQ norms except PM which is already high due to natural and other commercial and traffic causes.
There will be no adverse impact on land or noise level due to proposed project.
CIF has taken adequate measures for EHS aspects for the proposed project. In addition, recommendations have been made to further strengthen the EHS measures, energy conservation and other EMP aspects.
7.5. RECOMMENDATIONS
Based on the environmental impact assessment conducted, the following recommendations are made:
▪ Since regulations are fast changing in India, the project proponent must keep himself or herself updated with respect to applicable laws and take appropriate actions in case the provisions in some regulations undergo change.
▪ The impacts envisaged due to construction activities will be for short limited period. Impact due to operational activities, systems of periodic auditing and reporting shall be adopted during the operation period to ensure that the system adheres to the EMP.
▪ The project proponent and its team of consultants and contractors are urged to develop a strategy for effective communication with local people. The construction team/ developer should effectively follow the suggestions made in the EMP and/ or any other environmental measures so as not to damage the environment of the project area.
▪ CSR activities should be taken up in association with district authorities.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 151
CHAPTER 8 : DISCLOSURE OF CONSULTANTS
Declaration by Experts Contributing To the EIA/EMP REPORT of Manufacturing of Technical
Grade Pesticides 500 TPA At Plot Number: E-23ASKS Industrial Area Reengus District Sikar
(Rajasthan) By “Central Insecticides & Fertilizers.” I, hereby, certify that I was a part of the
EIA team in the following capacity that developed the above EIA.
EIA Coordinator:
Name: P.K Srivastava
Signature
Period of involvement January 2016 to finalization of report
Contact Information: 011-30003200
Functional Area Experts
Functional Areas Name of the
Expert
Involvement (Period and Task**) Jan 2016 to finalization of report
Signature
Air Pollution Monitoring & Control
(AP)**** S K Jain
• Micro Meteorology and air pollution monitoring planning also quality check.
• Impact assessment, mitigation & environmental management plan preparation.
Air Quality Modeling and Prediction
(AQ)****
Sanjeev Sharma
• Analysis of collected baseline data
• Processing of micrometeorological data for using in model.
• Analysis of predicted impact due to the modelling result.
Water Pollution (WP)
S K Jain
• Water Quality monitoring network designing.
• Sampling of water samples (surface and ground water).
• Monitoring of water quality.
• Water Balance
• Identification & assessment of quantum of water pollution and its Mitigation measures.
• ETP Suggestion.
Noise and Vibration* Sanjeev Sharma
• Analysis of collected baseline data
• Processing of data for modelling purposed.
• Analysis of predicted impact due to the modelling result.
MANUFACTURING OF TECHNICAL GRADE PESTICIDES 500 TPA AT
PLOT NUMBER: E-23A SKS INDUSTRIAL AREA REENGUS DISTRICT
SIKAR, RAJASTHAN BY “CENTRAL INSECTICIDES & FERTILIZERS”
EQMS India Pvt. Ltd. Document No. EIA/CI&F/2017/1/R01 Issue No. 01 R 01 152
Functional Areas Name of the
Expert
Involvement (Period and Task**) Jan 2016 to finalization of report
Signature
Ecology and Bio-diversity
Conservation (EB)**
Ratnesh Kotiyal
• Conducted Ecological survey & preparation of status report.
• Application of taxonomy in resource inventory (Flora & Fauna)
• List of species animals and plants report.
• Identification & assessment of ecological impact due to proposed project and its Mitigation measures.
Solid and Hazardous Waste
Management (SHW) S K Jain
• Identification of hazardous and non-hazardous wastes.
• Reuse and recycling of solid wastes.
• Handling and disposal of Non- Hazardous solid waste & Hazardous waste.
Socio-Economics (SE)***
T G Ekande
• Baseline socio economic survey (Interviews, Questionnaires, focused group discussion)
• Evaluation of Socio economic development status of the area.
• Enterprise social commitment provisions.
Risk and Hazards (RH)
P K Srivastava
• Identification of hazards due to proposed project.
• Identification of hazardous substances in the proposed project.
• Preparation of risk assessment report and onsite emergency plan.
Hydrology, Ground Water & Water
Conservation (HG)
Mr. Yamesh Sharma
• Site visit, contribution to Baseline environment and contribution to EIA documentation
Land Use Mr. Anil Kumar • Site visit, contribution to Baseline
environment and contribution to EIA documentation (April-15 to Till Now))
Shweta: NV, Dr. Alok Singh: AQ, RH, EB. Anil Kumar: SE, Om Prakash: AP & AQ, Nisha Rani: HG Declaration by the Head of the Accredited Consultant Organization/Authorized Person
I, S.K. Jain, hereby confirm that the above-mentioned experts the EIA/EMP REPORT for
Manufacturingof Technical Grade Pesticides 500 TPA at Plot Number: E-23A SKS Industrial
Area Reengus District Sikar (Rajasthan) By “Central Insecticides & Fertilizers.” I also confirm
that the consultant organization shall be fully accountable for any mis-leading information
mentioned in this statement.
Name: S.K. Jain
Signature
Designation: Director, Technical
Name of the EIA Consultant organization EQMS India Pvt. Ltd.