National Mission for Clean Ganga (NMCG) Ministry of Water Resources, River Development & Ganga Rejuvenation, Govt. of India NMCG 82 MLD STP PROJECT AT HARIDWAR UNDER HYBRID ANNUITY BASED PPP MODE (68 MLD STP AT JAGJEETPUR AND 14 MLD STP AT SARAI SITE) (LOA File Number: 3284/Le-6/677 dated 03.02.2017) Monthly Report of Project Engineer February 2018 STC Executing Agency Funding Agency Project Engineer Concessionaire Uttarakhand Pay Jal Nigam, Haridwar, pin -249408 National Mission for Clean Ganga, Development & Ganga,Rejuvenation, National Mission for Clean Ganga, First Floor, Major Dhyanchand National Stadium,New Delhi-110002 Shah technical Consultants Pvt. Ltd., 6B, Nirmal Niwas, Vishnu Garden, Kankhal, Haridwar, PIN - 249408 HNB Engineers Pvt. Ltd, Near Govt. I.T.I.College, Jagjeetpur Road, Hanumantpuram, Kankhal Haridwar- Uttarakhand. e- mail: [email protected]Web: www.hnbc.in

Transcript of (NMCG) Ministry of Water Resources, River Development & Ganga … · 2018-11-17 · National...

Page 1: (NMCG) Ministry of Water Resources, River Development & Ganga … · 2018-11-17 · National Mission for Clean Ganga (NMCG) Ministry of Water Resources, River Development & Ganga

National Mission for Clean Ganga

(NMCG)

Ministry of Water Resources, River

Development & Ganga Rejuvenation,

Govt. of India

NMCG 82 MLD STP PROJECT AT HARIDWAR UNDER HYBRID ANNUITY BASED PPP

MODE (68 MLD STP AT JAGJEETPUR AND 14 MLD STP AT SARAI SITE) (LOA File Number: 3284/Le-6/677 dated 03.02.2017)

Monthly Report

of

Project Engineer

February – 2018

STC

Executing Agency Funding Agency Project Engineer Concessionaire

Uttarakhand Pay Jal Nigam,

Haridwar, pin -249408

National Mission for Clean Ganga, Development & Ganga,Rejuvenation,

National Mission for Clean Ganga, First Floor, Major Dhyanchand National Stadium,New Delhi-110002

Shah technical Consultants Pvt.

Ltd., 6B, Nirmal Niwas, Vishnu

Garden, Kankhal, Haridwar, PIN -

249408

HNB Engineers Pvt. Ltd, Near Govt.

I.T.I.College, Jagjeetpur Road,

Hanumantpuram, Kankhal Haridwar-

Uttarakhand. e-

mail: [email protected]: www.hnbc.in

Page 2: (NMCG) Ministry of Water Resources, River Development & Ganga … · 2018-11-17 · National Mission for Clean Ganga (NMCG) Ministry of Water Resources, River Development & Ganga

STC Shah Technical Consultants Private Limited 82 MLD STP Project at Haridwar, Under Hybrid Annuity Based PPP Mode

Page 2 of 8

Monthly Progress Report by the Project Engineer for 82 MLD STP Project, Haridwar for the Month of Feb. 2018

Brief Report INTRODUCTION:

Namami Gange is a flagship program of the Central Government for abetment of pollution in River Ganga by treating the domestic waste in urban areas.

National Mission for Clean Ganga (NMCG) is implementing this program all along the urban areas situated at River Ganga.

Name of Project : NMCG 82 MLD STP Project at Haridwar, under Hybrid Annuity based PPP Mode

Process of STP : SBR (Sequencing Batch Reactor) Process.

Client : National Mission for Clean Ganga (NMCG), New Delhi

Execution Agency : Uttrakhand Pay Jal Nigam

Concessionaire : HNB Engineers (Haridwar) Pvt. Ltd.

LOA : 3284/Le-6/677 dated 03.08.2017

Cost of Project (Capex) : Rs. 140.70 Crs.

Consultant : Shah Technical Consultants (P) Ltd. as ‘Project Engineer’

Description of Work : Construction of 68 MLD STP at Jagjeetpur & 14 MLD STP at Sarai area at Haridwar.

Effective Date : 19.02.2018

Construction Period : 21 Months

Date of Completion : 18.11.2019

O&M Period : 15 Yrs. After COD.

Population of Haridwar : 2011 census - 2,30,681+76,916 (Satellite Towns) = 3,07,597. Projected Population 2018 – 6,36,880.

Projected Population 2033 – 9,30,840. Projected Population 2048 – 12,01,540.

Haridwar town is divided into ‘7’ Zones, out of which zone ‘A’ to ‘E’ are covered under 68 MLD STP- Jagjeetpur and Zone ‘F’ is covered under 14

MLD STP-Sarai, whereas Zone 7th

‘G’ is included in this project being separate industrial area.

Mobilization of site including staff and equipment machinery etc. was completed upto award actual date of start i.e. 19.02.2018. Since then following progress

has been achieved upto March’2018;

1. 68 MLD STP site at Jagjeetpur – After SBC test and Contour survey, work in following units started:

a. CCT : Excavation Started

b. Sludge Thickener (2 Unit.) : Excavation Started

c. SBR (6 Unit.) : Site Layout & Contour Survey under progress

d. Site office setup : Complete.

Page 3: (NMCG) Ministry of Water Resources, River Development & Ganga … · 2018-11-17 · National Mission for Clean Ganga (NMCG) Ministry of Water Resources, River Development & Ganga

STC Shah Technical Consultants Private Limited 82 MLD STP Project at Haridwar, Under Hybrid Annuity Based PPP Mode

Page 3 of 8

2. 14 MLD STP at Sarai - After SBC test and Contour survey, work in following units started:

a. CCT : Excavation Started

b. Sludge Thickener : Excavation Started

c. SBR (3 Unit.) : Site Layout & Contour Survey under progress

d. Centrifuge Platform, Sludge Sump & Polydozing Tank : Site Layout under progress

e. Air Blower Room + Admin Building : Site Layout under progress

f. Site office setup : Complete.

From payment and monitoring point of view, the project stages are divided into ‘4’ Milestone;

With respect to 1st milestone, overall 36% worth of works has been completed up till March’2018. The pictorial views of physical progress are shown in

photographs attached.

1st Milestone 2

nd Milestone 3

rd Milestone 4

th & Final Milestone

19th

Feb. 2018 to 18th

July 2018

(5 months)

19th

July 2018 to 18th

Dec.

2018 (5 months)

19th

Dec. 2018 to 18th

May

2019 (5 months)

19th

may 2019 to 18th

Nov.

2018 (6 months)

Page 4: (NMCG) Ministry of Water Resources, River Development & Ganga … · 2018-11-17 · National Mission for Clean Ganga (NMCG) Ministry of Water Resources, River Development & Ganga

STC Shah Technical Consultants Private Limited 82 MLD STP Project at Haridwar, Under Hybrid Annuity Based PPP Mode

Page 4 of 8

82 MLD STP Project (Haridwar) under NMCG Physical and Financial Status Report

Sl. No.

Sanctioned

Amount

( Rs in Cr)

Description of Works Physical Status

Evaluation of

Physical work

for 1st

Milestone

till 18.07.2018

( Rs in Cr)

Evaluation of

Achieved work

for 1st

Milestone

till 28.02.2018

( Rs in Cr)

Overall % of

financial work

till 28.02.2018

( Rs in Cr)

Item Proposed Qty Status

82 MLD STP Project

1

99.3

(Total Contract

Amount

Rs 141.7 Cr)

Stage-1. Civil

Works

-Construction of

68 MLD STP at

Jagjeetpur,

Haridwar

1 Unit

Date of Start of Project is 19.02.2018. Scheduled to be

completed by 18.11.2019.

Approval of BEP (Process & Hydraulic Design and Lay Out &

Flow Diagram) – 100% Done.

Approval of Design & Drawings for Civil Works - 90% Done.

Approval of GAD, Data Sheets for Electro-Mechanical Works

– Submitted for Scrutiny and approval

Chlorine Contact Tank (CCT) – Excavation works under

progress

Sludge Thickener (2 Unit) - excavation progress

SBR Unit (6 Nos.) – Site Layout work under progress.

Work is in progress.

27.93

(28.1% of

Contract Amount

i.e. 99.3Cr.)

2.80

(10% of 1st

Milestone

Amount i.e. 27.93

Cr.)

2.83%

Stage – II

Electricals and

Mechanical works

at STP

1 Unit

2

41.4

(Total Contract

Amount

Rs 141.7 Cr)

Stage-1. Civil

Works -

Construction of 68

MLD STP at

Jagjeetpur,

Haridwar

Stage – II

Electricals and

Mechanical works

at STP

1 Unit

1 Unit

Date of Start of Project is 19.02.2018. Scheduled to be

completed by 18.11.2019.

Approval of BEP (Process & Hydraulic Design and Lay Out &

Flow Diagram) – 100% Done.

Approval of Design & Drawings for Civil Works - 90% Done.

Approval of GAD, Data Sheets for Electro-Mechanical Works

– 25 % Done.

Chlorine Contact Tank (CCT) – Excavation works under

progress

Sludge Thickener (2 Unit) - Excavation works under progress

SBR Unit (3 Nos.) – Site layout works under progress.

Centrifuge Platform, Sludge Sump & Polydozing Tank – Site

layout works under progress

Air Blower Room + Admin Building – Site layout works

under progress

Work is in progress.

12.99

(31.4% of

Contract Amount

i.e. 41.4 Cr.)

1.30

(10% of 1st

Milestone

Amount i.e. 12.99

Cr.).)

3.17%

TOTAL (82 MLD STP Project) - - 40.92 4.10 2.93%

10% (for 1st

Milestone till

March’18)

(Overall Progress

Till March’18)

Page 5: (NMCG) Ministry of Water Resources, River Development & Ganga … · 2018-11-17 · National Mission for Clean Ganga (NMCG) Ministry of Water Resources, River Development & Ganga

STC Shah Technical Consultants Private Limited 82 MLD STP Project at Haridwar, Under Hybrid Annuity Based PPP Mode

Page 5 of 8

Physical Status of 68 MLD STP AT JAGJEETPUR

Sl.

No. Description L/Dia. Width SWD FB Qty Status of Drawing Physical Status

1 Inlet Chamber 4900 4550 2500 500 1 Drawing Approved

2 Mechanical Fine Screen Channel 6500 1300 1000 500 2 Drawing Approved

3 Manual Fine Screen Channel 6500 1550 1000 500 1 Drawing Approved

4 Grit Chamber 7750 7750 1000 500 2 Drawing Approved

5 Grit Bypass Channel 8150 1550 1000 500 1 Drawing Approved

6 Parshall Flume 8400 Throat

width 600 500 1 Drawing Approved

7 Distribution Chamber 8000 3500 2500 500 1 Drawing Approved

8 Sequential Batch Reactor (SBR) 27600 48200 5500 500 6 Drawing Approved Site Layout work under progress.

9 Chlorine Contact Tank 24900 18000 3750 500 1 Drawing Approved Excavation works under progress.

10 Sludge Thickener No.1 ( on CCT

side ) /Distribution Chamber Drawing Approved Excavation works under progress.

11 Sludge Thickener No.2 ( on

boundary wall side) 15500 dia.

3000 500 2 Drawing Approved

12 Centrifuge Feed Sludge Sump 7050 4300 3000 500 1 Drawing Approved

13 Polymer Dosing Tank 2000 2000 3000 500 2 Drawing Approved

14 Centrifuge Feed Pump House 12260 5500 4000 HT Nil 1 Drawing Approved

15 Centrifuge House 9420 5500 4000 HT

1 Drawing Approved

16 Centrare Sump 5700 4300 2000 500 1 Drawing Approved

17 Workshop Room 55.25Sq.m

3200 HT

2 (First

Floor ) Drawing Approved

18 Tool Room

Drawing Approved

19 DG Platform 16888 7230 0

1 Drawing Approved

20 Air Blower Room 34968 6000 6400 HT

1 Drawing Approved

21 Chlorinator Room & Tonner Yard 55 Sqm. 3700 HT 1 Drawing Approved

22 Admin Building, Conference &

Lab. (First Floor) 150Sqm. 3150 HT 1 Drawing Approved

23 Security Cabin 3500 3000 3000 HT 1 Drawing Approved

24 HT Substation Platform 6862 10550 0 1 Drawing Approved

Page 6: (NMCG) Ministry of Water Resources, River Development & Ganga … · 2018-11-17 · National Mission for Clean Ganga (NMCG) Ministry of Water Resources, River Development & Ganga

STC Shah Technical Consultants Private Limited 82 MLD STP Project at Haridwar, Under Hybrid Annuity Based PPP Mode

Page 6 of 8

Physical Status of 14 MLD STP AT SARAI

Sl.

No. Description L/Dia Width SWD FB Qty Status of Drawing Physical Status

1 Inlet Chamber 2300 2000 2500 500 1 Drawing Approved

2 Mechanical Fine Screen Channel 4500 900 600 500 1 Drawing Approved

3 Manual Fine Screen Channel 4500 1050 600 500 1 Drawing Approved

4 Grit Chamber 5000 5000 900 500 1 Drawing Approved

5 Grit Bypass Channel 5400 900 400 500 1 Drawing Approved

6 Parshall Flume 7700 450 Throat 500 1 Drawing Approved

7 Sequential Batch Reactor (SBR) 33100 16600 5500 500 3 Drawing Approved Site Layout work under progress.

8 Chlorine Contact Tank 20800 11200 3000 500 1 Drawing Approved Excavation work under progress.

9 Sludge Thickener 10500 dia. 3000 500 1 Drawing Approved excavation works under progress

10 Sludge Thickener (outer wall) 11.00 dia

Drawing Approved excavation works under progress

11

Centrifuge Feed Sludge Sump 4000 2000 3000 500 1 Drawing Approved

Centrifuge House/Platform

Drawing Approved Site Layout work under progress.

Centrifuge Feed Pump House

Drawing Approved

12 Polymer Dosing Tank 1530 1530 3000 500 2 Drawing Approved

13 Centrare Sump 4000 2000 2000 500 1 Drawing Approved

14 Sludge Drying Bed 11000 3100 300 300.00 5 Drawing Approved

sludge Storage Platform 11000 4350 3000 500.00 1 Drawing Approved

15 Workshop 6035 3950 6400 HT

1 Drawing Approved

16 Tool Room 6035 3950 6400 HT

1 Drawing Approved

17 DG Platform 10000 4000 -

1 Drawing Approved

18 Air Blower Room 11355 6500 6400 HT

1 Drawing Approved Site Layout work under progress.

19 Admin Building, Conference &

Lab. (First Floor) 150 Sqm. 3000 HT

1 Drawing Approved Site Layout work under progress.

20 Centrifuge Feed Pump Sump 7500 5050 4000 HT

1 Drawing Approved

21 Centrifuge House 5200 4880 4000 HT

1 Drawing Approved

22 Chlorinator Room & Chlorine

Storage 55 Sqm. 3700 HT 1 Drawing Approved

23 Security Cabin 3500 3000 3000 HT 1 Drawing Approved

24 HT Substation Platform 10000 5000 - 1 Drawing Approved

Page 7: (NMCG) Ministry of Water Resources, River Development & Ganga … · 2018-11-17 · National Mission for Clean Ganga (NMCG) Ministry of Water Resources, River Development & Ganga

STC Shah Technical Consultants Private Limited 82 MLD STP Project at Haridwar, Under Hybrid Annuity Based PPP Mode

Page 7 of 8

68 MLD STP Site at Jagjeetpur

Page 8: (NMCG) Ministry of Water Resources, River Development & Ganga … · 2018-11-17 · National Mission for Clean Ganga (NMCG) Ministry of Water Resources, River Development & Ganga

STC Shah Technical Consultants Private Limited 82 MLD STP Project at Haridwar, Under Hybrid Annuity Based PPP Mode

Page 8 of 8