GMR action plans - W
GMR # Start date Deadline
1 01/01/2013 15/12/2013
2 01/01/2013 30/09/2013
3 01/01/2013 15/10/2013
4 01/01/2013 30/10/2013
5 01/01/2013 30/10/2013
8 01/01/2013 15/10/2013
9 01/01/2013 5/10/2013
10 01/01/2013 5/10/2013
11 01/01/2013 30/09/2013
-
8/13/2019 NLU GMR Action Plan
2/14
13 01/01/2013 15/12/2013
15 01/01/2013 15/12/2013
22 01/01/2013 30/09/2013
23 01/01/2013 30/09/2013
25 01/01/2013 15/10/2013
27 01/01/2013 30/09/2013
28 01/01/2013 30/10/2103
29 01/01/2013 15/10/2013
30 01/01/2013 31/12/2013
36 01/01/2013 15/11/2013
37 01/01/2013 15/10/2013
38 01/01/2013 15/10/2013
40 01/01/2013 31/12/2013
42 01/01/2013 31/12/2013
43 01/01/2013 30/12/2013
-
8/13/2019 NLU GMR Action Plan
3/14
45 01/01/2013 30/12/2013
-
8/13/2019 NLU GMR Action Plan
4/14
F Cluster: NOUAKCHOTT
Action
Every BU must have an established H&S Committee in place that meets monthly and documents
minutes/actions
BU must have a "Permit to Work" system for all high risk activities (eg - confined space/earthworks/hot work)
Risk Assessment/Job Safety Analysis must be completed for all job functions and all key operational processes
BU's must have an emergency response plan in place (fire/explosion/chemical spillage)
All accidents, incidents, near misses, etc... must be documented at shift hand over
Toolbox talks/safety briefings take place at the start of each shift cycle
Minimum 3 container separation between lashers and operated stack
All lashers must work in pairs
Safety Induction training/briefing is conducted for all staff, visitors and sub contractors on initial entry to the
facility
-
8/13/2019 NLU GMR Action Plan
5/14
BU's handling IMDG cargo have at least 1 person available who is IMDG certified
Each operational shift must have at least 1 person on duty who is certified in lifting and rigging
PPE is required to be worn by everybody entering operational areas (appropriate head gear, footwear, and
high visibility vest)
Fall arrest gear is available, workforce trained, and in use.
Life vest/FPD are required and in use for all waterside exposed work areas
Seat belts must be worn at all times when operating any vehicle inside an APM Terminals facility
All equipment has a "Lock Out Tag Out " system in place
All loose lifting gear must be inspected before and after use
All lifting equipment must be regularly load tested in accordance with manufacturers guidelines
Speed limiting devices installed and in-use in all CHE's for max 30 Km/H (lower can apply)
Air cage(s) are in place and used for the inflation of newly assembled wheels and tires up to size 1200-24
Fire protection systems must be properly maintained and inspected regularly
Operational areas are clearly marked (e.g. Signage, lane markings, high visibility paint, etc)
All personnel working on foot in operational areas have physical barrier protection in place (e.g Jersey
Barriers)
All access to/from operational areas must take place in vehicles/shuttle bus etc
-
8/13/2019 NLU GMR Action Plan
6/14
All working areas have proper lighting for night operations - minimum 50 lux for operational areas
-
8/13/2019 NLU GMR Action Plan
7/14
Responsible Status
Ismaila Not completed
Youssef Not completed
James Not completed
Sidat Not completed
Youssef Not completed
Abdourahman Not completed
Moussa Not completed
Moussa Not completed
Youssef Not completed
-
8/13/2019 NLU GMR Action Plan
8/14
Ismaila Not completed
Ismaila Not completed
Youssef Not completed
santosh Not completed
Moussa Not completed
Youssef Not completed
James Not completed
Sidat Not completed
Sidat Not completed
James Not completed
Abdourahman Not completed
Youssef Not completed
James Not completed
Sidat Not completed
Youssef Not completed
-
8/13/2019 NLU GMR Action Plan
9/14
Ismaila Not completed
-
8/13/2019 NLU GMR Action Plan
10/14
Comments
-
8/13/2019 NLU GMR Action Plan
11/14
-
8/13/2019 NLU GMR Action Plan
12/14
-
8/13/2019 NLU GMR Action Plan
13/14
-
8/13/2019 NLU GMR Action Plan
14/14
TECH INFO