    GMR action plans - W

    GMR # Start date Deadline

    1 01/01/2013 15/12/2013

    2 01/01/2013 30/09/2013

    3 01/01/2013 15/10/2013

    4 01/01/2013 30/10/2013

    5 01/01/2013 30/10/2013

    8 01/01/2013 15/10/2013

    9 01/01/2013 5/10/2013

    10 01/01/2013 5/10/2013

    11 01/01/2013 30/09/2013

  • 8/13/2019 NLU GMR Action Plan

    2/14

    13 01/01/2013 15/12/2013

    15 01/01/2013 15/12/2013

    22 01/01/2013 30/09/2013

    23 01/01/2013 30/09/2013

    25 01/01/2013 15/10/2013

    27 01/01/2013 30/09/2013

    28 01/01/2013 30/10/2103

    29 01/01/2013 15/10/2013

    30 01/01/2013 31/12/2013

    36 01/01/2013 15/11/2013

    37 01/01/2013 15/10/2013

    38 01/01/2013 15/10/2013

    40 01/01/2013 31/12/2013

    42 01/01/2013 31/12/2013

    43 01/01/2013 30/12/2013

  • 8/13/2019 NLU GMR Action Plan

    3/14

    45 01/01/2013 30/12/2013

  • 8/13/2019 NLU GMR Action Plan

    4/14

    F Cluster: NOUAKCHOTT

    Action

    Every BU must have an established H&S Committee in place that meets monthly and documents

    minutes/actions

    BU must have a "Permit to Work" system for all high risk activities (eg - confined space/earthworks/hot work)

    Risk Assessment/Job Safety Analysis must be completed for all job functions and all key operational processes

    BU's must have an emergency response plan in place (fire/explosion/chemical spillage)

    All accidents, incidents, near misses, etc... must be documented at shift hand over

    Toolbox talks/safety briefings take place at the start of each shift cycle

    Minimum 3 container separation between lashers and operated stack

    All lashers must work in pairs

    Safety Induction training/briefing is conducted for all staff, visitors and sub contractors on initial entry to the

    facility

  • 8/13/2019 NLU GMR Action Plan

    5/14

    BU's handling IMDG cargo have at least 1 person available who is IMDG certified

    Each operational shift must have at least 1 person on duty who is certified in lifting and rigging

    PPE is required to be worn by everybody entering operational areas (appropriate head gear, footwear, and

    high visibility vest)

    Fall arrest gear is available, workforce trained, and in use.

    Life vest/FPD are required and in use for all waterside exposed work areas

    Seat belts must be worn at all times when operating any vehicle inside an APM Terminals facility

    All equipment has a "Lock Out Tag Out " system in place

    All loose lifting gear must be inspected before and after use

    All lifting equipment must be regularly load tested in accordance with manufacturers guidelines

    Speed limiting devices installed and in-use in all CHE's for max 30 Km/H (lower can apply)

    Air cage(s) are in place and used for the inflation of newly assembled wheels and tires up to size 1200-24

    Fire protection systems must be properly maintained and inspected regularly

    Operational areas are clearly marked (e.g. Signage, lane markings, high visibility paint, etc)

    All personnel working on foot in operational areas have physical barrier protection in place (e.g Jersey

    Barriers)

    All access to/from operational areas must take place in vehicles/shuttle bus etc

  • 8/13/2019 NLU GMR Action Plan

    6/14

    All working areas have proper lighting for night operations - minimum 50 lux for operational areas

  • 8/13/2019 NLU GMR Action Plan

    7/14

    Responsible Status

    Ismaila Not completed

    Youssef Not completed

    James Not completed

    Sidat Not completed

    Youssef Not completed

    Abdourahman Not completed

    Moussa Not completed

    Moussa Not completed

    Youssef Not completed

  • 8/13/2019 NLU GMR Action Plan

    8/14

    Ismaila Not completed

    Ismaila Not completed

    Youssef Not completed

    santosh Not completed

    Moussa Not completed

    Youssef Not completed

    James Not completed

    Sidat Not completed

    Sidat Not completed

    James Not completed

    Abdourahman Not completed

    Youssef Not completed

    James Not completed

    Sidat Not completed

    Youssef Not completed

  • 8/13/2019 NLU GMR Action Plan

    9/14

    Ismaila Not completed

  • 8/13/2019 NLU GMR Action Plan

    10/14

    Comments

  • 8/13/2019 NLU GMR Action Plan

    11/14

  • 8/13/2019 NLU GMR Action Plan

    12/14

  • 8/13/2019 NLU GMR Action Plan

    13/14

  • 8/13/2019 NLU GMR Action Plan

    14/14

    TECH INFO