NJFuture Redevelopment Forum 13 Infrastructure Strickland
-
Upload
new-jersey-future -
Category
Documents
-
view
218 -
download
0
Transcript of NJFuture Redevelopment Forum 13 Infrastructure Strickland
The Future of
Infrastructure Investments
Carter Strickland
Commissioner, NYC Department of Environmental Protection
March 1, 2013
2
Climate Change
Rockaway Beach
3
Major Citywide Impacts
4
Historic Wetlands
5
Hurricane Sandy Flooding Area
6
• $15.3B (66%) of capital commitments for 2002-2012 were driven by mandates
• Mandates account for only 21% of the $6.6B 2013-2016 Capital Plan
2002-2016 Capital Expenditures and Debt Service Impact
Costs
$0
$1,000
$2,000
$3,000
$4,000
2002 2003 2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016
$ i
n M
illi
on
s
Fiscal Year
Commitments Expenditures Net Debt Service
7
North River
Jamaica
Newtown Creek
Wards Island
Bowery Bay
26th Ward
Coney Island
Hunts Point
Oakwood BeachOwls Head
Tallman IslandManhattan PS
Croton Filtration Plant
U/V Facility
0
100
200
300
400
500
600
700
800
900
1000
2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017
kW
h (
in m
illio
ns)
Fiscal Year
DEP Electricity Consumption
• Between 2012-2017, electricity use is expected to increase by 289 million kWh (44%)
• Most of the increase will come from the new Croton Filtration Plant and U/V Disinfection
Facility
289 million
kWh
Revised: 1/31/13
8
Sustainable Infrastructure Version 1.0
9
Utility of the Future
10
Grey Investments
Newtown Creek WWTP Paerdegat Basin CSO Facility
More than $10 billion in wastewater investments since 2002
• $5 billion – Newtown Creek Wastewater Treatment Plant upgrade
• $437 million – Paerdegat Basin CSO Facility
• $500 million – Hunts Point Wastewater Treatment Plant upgrade and
nutrient removal
• $100 million – Nitrogen control upgrades at 26th Ward, Coney
Island, and Rockaway wastewater treatment plants
11
Green Infrastructure
11
Blue RoofGreen Roof
Bioswale Porous Pavement
12
Annual C
SO
Volu
me (
mill
ions o
f gallo
ns)
21,698
17,896
21,753 19,808 -1,701
-1,514
-586
-1,945
-
5,000
10,000
15,000
20,000
25,000
30,000
Cost-EffectiveGrey
Investments(Built &
Planned)
Reduced Flow GreenInfrastructure
(10% Capture)
OptimizeExisting System
Green Strategy Cost-EffectiveGrey
Investments(Built &
Planned)
Potential Tanks,Tunnels, &Expansions
Grey Strategy
-5,666 built/under construction
-2,602 planned -2,547 planned
-5,666 built/under construction
GREEN STRATEGY GREY STRATEGY
2045 BASELINE - PROJECTIONFROM 2007 FACILITY PLANS
The Green Strategy Approach Performs Better
13
$2.9 $2.9
$1.5
$0.9
$0.03
$3.9
$-
$1.0
$2.0
$3.0
$4.0
$5.0
$6.0
$7.0
$8.0
Green Strategy Grey Strategy
Potential Tanks, Tunnels, & Expansions Optimize Existing System
Green Infrastructure - Private Investment Green Infrastructure - Public Investment
Reduced Flow Cost-Effective Grey Investments
$6.8
$5.3
$2.4
The Green Strategy Costs Less
14
Long Term Control Plans
Public Schools
(DOE)
Parks & Playgrounds
(DPR)
Planned Right-of-Way
Projects (DOT)
Community Gardens
(DPR)
Multi-Family Residential
Housing (NYCHA)
14
15
Right of Way Bioswale
16
Performance of Bioswale System
Rainfall (in.) Mean Median
Below 1” 73% 85%
1”-2” 25% 21%
Above 2” 14% 12%
Total 59% 60%
Percent Capture of 10 Bioswales
• Percent of rainfall captured by 10 bioswales over 185 rain events.
• Bioswales performed best during storms with less than one inch of rain.
17
Area-Wide Approach
18
Green Infrastructure Grant Program
19
Schoolyards to Playgrounds
Before After
20
For more information visit www.nyc.gov/dep
Follow us on facebook at www.facebook.com/nycwater