NIT NO.: PNMM/PC161/E/001 CORRIGENDUM -4.0 …pdilin.com/pdf/Corrigendum-IV-Technical-452018.pdf ·...
Transcript of NIT NO.: PNMM/PC161/E/001 CORRIGENDUM -4.0 …pdilin.com/pdf/Corrigendum-IV-Technical-452018.pdf ·...
S. No
1.
2.
3.
4.
5.
6.
Part / Sec
Part II : TechnicSection - 4.0,
Part II : TechnicSection - 2.0, Part II : Section & Part II : Section - 4.0,
Part II : Section - 4.0, Part II : Section & Part II : Section - 5.1 , Part II : TechnicSection - 3.0, & Part II : TechnicSection - 9.0
COR
P
cal 3
cal 3
Technical - 3.0,
Technical
5 & 1
Technical 2
Technical - 4.0,
Technical
5 & 6
cal
cal
13 & 3
WTP ,D
RRIGENDUM
Page Cla
3 of 28 2.1
3 of 6 2.0
5 of 34
&
17 of 28
1.1. & 3.2
20 of 28 3.3
5 of 28
&
6 of 8
3.1,& 5.0
13 of 34, 32 of 34
&
3 of 32
1.1.Sco 6.0 TwoRecSpa & 2.0 PAR
DM & CPU PNIT NO.: P
M -4.0 TECHN
ause No. D
L
T3#
.1
(14)
OtwwaC&CcotoinW
- 7 (b) Mh
, 1
W R&F
.4.2 Static ope,
Spareso Years commended ares
SPARE RTS FOR
Spaatp
Tspid&2
PLANT; HURPNMM/PC16NICAL( PRO
Description
amella clarifier
Treated Water Qua#
One (1) no. neutrawo compartmentwith integral pipe
ccessories commCPU regenerati& Capacity: Capaciompartment shallo hold waste waten 24 HWPTP+DM+CPUMixed Bed : Cycle
ours Water Pre Treatme
Retention Time &
lash mixer : 5 MinSupply of manda
arts for two yeand commissionttached elsewheackage,
Two years normapares required
dentified by t&
.1 to 2.11
RL GORAKHP61/E/001 OCESS), DAT
AM
ality : SDI <
alizing Pit in ts complete e, valves &
mon for DM & on waste.
ty of each l besufficient er generated
Hrs. For
time :68
ent Plant:
: 1 Mins
ns atory (spare r operation) ing spares ere in bid
al operation are to be
he bidder.
PUR
TE:04.05.201
MENDMENT TYPE M/D/A/C
A Lamequ Bid
A SD
C Regshaacc
M Cyc
C Venthe Howflas
C WeSecMabidd BidRecto tparour
18
A
mella Clarifier /uivalent to be cons
der to submit PTRI at WPT outlet no
generated effluenall be transferrecordingly Neutralis
cle time shall be 7
ndor to provide air design
wever, Minimum sh mixer shall be 1e understand thction-9 (clause 2ndatory Spares ader within the Lum
der needs to scommended Sparthe Mandatory Sprt of quoted Lumr understanding.
Amendment
/ HRSCC/ Tubsidered.
R of the same aloot to be considere
t only from DM aned to Neutralisasation Pit shall be
72 hours
adequate retentio
Hydraulic Reten1 min. hat spare Parts 2.1 to 2.11) arend the same shal
mp SumPrice.
submit the Sepres (2 Years Sparpares" and same
mp Sum Price". P
be Settler or
ng with Bid. ed
nd CPU Plants ation Pit and
designed.
n time as per
ntion Time for
as listed in e referred as l be quoted by
arate List of res) in addition e shall not be Please confirm
7.
8.
9.
10.
11.
12.
Part II : Section - 2.0
Part II : TechnicSection - 2.0, Part II : Section - 2.0 Part II : Section - 4.0
Part II : Section & Part II : Section - 4.0 Part II : TechnicSection - 2.0 & Part II : TechnicSection - 4.0
COR
Technical 2
cal 3
Technical 4
Technical 3
Technical - 2.0
Technical
2 & 5
cal
cal
4 & 5
WTP ,D
RRIGENDUM
TWOP(MASPA
2 of 6 1.1
3 of 6 1.2
4 of 6 2.0
3 of 28 2.1
2 of 6
&
5 of 28
1.1 &3.1
4 of 6
&
5 of 28
2.0 &3.1
DM & CPU PNIT NO.: P
M -4.0 TECHN
WO YEARS ERATION ANDATORY ARES ): R
T
TIr
TC
Tfeb
RT&WIn
TT&W(1GT
PLANT; HURPNMM/PC16NICAL( PRO
Raw Water
Temperature : Amb
Turbine Condensron as Fe : 0.2 Treated WaterColloidal Silica as SThe raw water shaed to flash mixere mixed with Alum
Raw Water: Turbidity : & Water Pre Treatmenlet Turbidity : 100
Treated Water QuaTurbidity : <1 NTU& Water Pre Treatme11) Dual Media Fi
Guaranteed EffluenTurbidity : <2 NTU
RL GORAKHP61/E/001 OCESS), DAT
bient
ate Quality:
r Quality: SiO2 : BDL all be directly rwhere it will m/FeCl3,
50 NTU
ent Plant: 0 NTU
ality:
ent Plant - lters nt
PUR
TE:04.05.201
M Fol UtiliMin/ RawDM ProcProcTurbSteaTurb
C Iron
C Remreq
C Alu
C Des
C Tur
18
lowing shall be op
ty Facilities: Tempe/Nor/Max/design)
w Water : -/AmbienWater: -/25/-/70
cess Condensate (Acess Condensate (Ubine Condensate ( Aam/Turbine Condebine Condensate ( On mentioned as Fe
moval of Colloidaluired. m/FeCl3 can be u
sign turbidity shal
rbidity Guarantee
perating / design p
erature (Deg C)
nt/47/-
Ammonia Plant): - /Urea Plant): - / 50 /Ammonia Plant): 40nsate (Urea Plant) O&U): - / 50 / - / 80e is 0.2 mg/l.
l Silica in WTP pla
used as floculant
l be 100NTU
values shall be <2
parameters:
/ 47 / - / 85 / 70 / 120 0/ 46.1 / 50 / 70 : - / 50 / - / 85
0
ant is not
2 NTU
13.
14.
15.
16.
17.
18.
19.
20.
Part II : TechnicSection - 4.0 & PID No : PC161
Part II : TechnicSection - 4.0 & PID No : PC161
Process FlowWater Pre TreDwg No 7112/7/7113-00& Part II : Section - 4.0 Process FlowCondensate Po
Piping and InstrDiagram DM Water PlantDwg No : PC16Piping and InstrDiagram DM Water PlantDwg No : PC16Part II : TechnicSection - 4.0
Part II : Section & Part II : Section - 4.0
COR
cal
1-7316-0027
2
cal
1-7316-0027
2
w Diagram eatment Plant
: PC161-046
Technical
7
w Diagram olishing Unit
rumentation
t 61-7113-0024
rumentation
t 61-7113-0024
cal 1
Technical - 4.0
Technical
1
WTP ,D
RRIGENDUM
21 of 28 3.4
21 of 28 3.4
7 of 28
ProDiaPrePla (11Filte
12 of 28 3.2 (2)Filtr
12 of 28 3.2 (2)Filtr&4. UPum
DM & CPU PNIT NO.: P
M -4.0 TECHN
TCT&CT
TA(2&A(3
ocess Flow gram (Water
e Treatment nt)
) Dual Media ers
N6&N(7
C
CL
S
DM Plant: Ultra ration
NP
DM Plant: Ultra ration
UF Feed mps
F&NC
PLANT; HURPNMM/PC16NICAL( PRO
Turbine CondensaCartridge Filter FeTwo (2) & Cartridge Filter FeThree (3) nos. Turbine CondensaActivated Carbon F2)
& Activated Carbon F3) nos.
Number of Dual Me+2,
& No. of Dual Media 7W+1S)
Condensate Off-Sp
Chemical Dosing aine
SMBS and Antisca
No. of Skids : Two(Permeate Flowrate
eed Flowrate : 18& Numbers : Three (2Capacity : 120 m3/
RL GORAKHP61/E/001 OCESS), DAT
ate Unit: (2) eed Pumps :
eed pumps :
te Unit: (3) Filters: Two
Filter :Three
edia Filters :
Filters: 8
pec to ETP
at SAC outlet
alant Dosing
(2) e : 160 m3/hr
80m3/hr
2W+1S) /hr
PUR
TE:04.05.201
C Car
C Act
C No.
C ConCliebatt
C No befo
M SM
A UF per
C Totwor
18
rtridge Filter Feed
ivated Carbon Filt
. of Dual Media Fi
ndensate Off Speent pipeline. Biddtery limit.
chemical dosingore degasser
BS dosing is not
Skid shall be 2Wrmeate flow shall b
al UF Feed florking will be 240 m
d Pumps shall be T
ters shall be Thre
lters shall be 8 (
ec shall be routeder will make al
g is required af
required at UF ou
+1S and each stbe 120 m3/hr.
ow with Two(2) m3/hr
Three
ee
(7W+1S)
ed to ETP By l provision till
fter SAC and
utlet
tream
nos. pumps
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
Part II : TechnicSection - 4.0 Part II : TechnicSection - 2.0,
Part II : TechnicSection - 2.0,
Part II : TechnicSection - 2.0,
Part II : TechnicSection - 3.0,
Part II : TechnicSection - 3.0
Part II : TechnicSection - 4.0
Part II : TechnicSection - 4.0 Part II : TechnicSection - 4.0 Part II : TechnicSection - 4.0
Part II : TechnicSection - 4.0 Part II : TechnicSection - 4.0 Part II : TechnicSection - 4.0
COR
cal 1
cal 3
cal 6
cal 6
cal 5
cal 5&6
cal 3
cal 6
cal 7
cal 9o
cal 1
cal 1
cal 1
WTP ,D
RRIGENDUM
12 of 28 2.a)
3 of 6, 1.3
6 of 6 3.1.
6 of 6 2.3.
5 of 34 iv &
5 of 34 & 6 of 34
1.1.& x) a
3 of 28 B
6 of 28 6
7 of 28 9
9 of 28&6 of 8
16&
12 of 28 2
19 of 28 7.a
19 of 28 7.b
DM & CPU PNIT NO.: P
M -4.0 TECHN
) M
P
.7 La
.6 T
& v A
.1.n)
and g)
A
DP
C
S
&5.0 Cta
U
C
Tca
PLANT; HURPNMM/PC16NICAL( PRO
MWCO for UF
Process condensa
ist of laboratory innd equipments
Total Silica at MB o
ACF backwash pu
Auto valves
Design Capacity– Plant
Chemical house
Sludge sump
Capacity of Fire waank
UF skid capacity
Capacity of SAC ex
Turbine condensatapacity
RL GORAKHP61/E/001 OCESS), DAT
te quality
nstruments
outlet
mps
DM Water
ater storage
xchanger
te plant MB
PUR
TE:04.05.201
M MW
M In PAmPlacon
M apalabofor
M VenoutPla
C ACconby F
C All opefor
C 240
A 30 stor
C slud
C cap410
C Outeac
C BidDM
C Mixconeac
18
WCO for UF shall b
Process condensamonia B/L and thnt should be d
ntaminant and quaart from lab inoratory ,bidder shday to day operat
ndor to guaranteelet of MB in Cont. F backwash pum
nsidered if not reqFeed Pumps by Bauto valves abov
erated butterfly vadrain valves on ve
0 m3/hr net output
daysto be consrage area in chemdge sump is Singl
pacity of Fire Wa00 m3
tput capacity at Uch stream der to fix capacity
M / CPU Plant xed bed is comndensate and turch mixed bed shal
be 10 KD
ate quality, two vahe other for Urea designed on higality as per Flow sstruments providhall provide all lation of WPT/DM p
e Total Silica (asndensate Polishi
mps and blowersquired and the samBidder. ve 150 NB to be alves (Leakage clessels.
t is required at UF
idered for designmical house. le compartment
ater Storage Tank
UF plant shall be
y as per the Plan
mmon for both rbine condensatell be for 300 m3/h
alues - one for B/L However,
gher value of scheme. ded in main
ab instruments plants.
s SiO2) at the ng Plant/ DM
s may not be me is replaced
pneumatically lass V) except
F outlet.
n of chemical
kshall be 2 x
120 M3/hr of
nt capacities of
the process e. Capacity of r
34.
35.
36.
37.
38.
39.
40.
Part II : TechnicSection - 4.0
Part II : TechnicSection - 4.0
Part II : TechnicSection - 4.0
Part II : TechnicSection - 4.0
Dwg. No. PC16Rev. 0
Part II : TechnicSection - 2.0
General
COR
cal 1&2
cal 2
cal 2
cal 2
61-7318-0028 1
cal 5
WTP ,D
RRIGENDUM
18 of 28 & 22 of 28
3.3 & 3.4
21 of 28 3.4
25 of 28 5.1
25 of 28 5.2
1 of 1
5 of 6 2.1
DM & CPU PNIT NO.: P
M -4.0 TECHN
- 3.a
- 3.a
G
(2, 3) Tnpfil
M123b4pM 12d3st4psoP
Td
D(G
PLANT; HURPNMM/PC16NICAL( PRO
Grade of Activated
Turbine condenso. of cartridge filteump and activatelters
MOC of tanks ) Anion Hot water) Acid dilution tan) Acid dilution taned) ) Acid tank for neuit
MOC of piping
) Acidic water ) Alkali (sodium hilute ) Alkali (Sodium htrong ) Waste effluent frlant vessel & chemolution tank
Piping MOC
Treated water qualrinking water plan
DM Plant - ChemicGuarantees)
RL GORAKHP61/E/001 OCESS), DAT
d carbon
ate unit - er feed d carbon
r tank k (Cation) k (Mixed
utralization
ydroxide)
hydroxide)
rom DM mical
lity at nt outlet
cal dosages
PUR
TE:04.05.201
M ActPro
C cartfiltecomcon
M MO
M MO
A Pipfrom
C In cGuaload
C RegalonBidPMdosBidin th
18
ivated carbon socess and turbine
tridge filter feeders shall be threemmon for both prndensate.
OC of MSRL/ CS F
OC of MSRL/ CS F
ing MOC upto SAm SAC shall beMS
case of variation inarantee Deviationd variation.
generation reactng with resin curvalong with minimC/Owner reserv
sage. der has to mandheir technical bid
hall be of deoilcondensate.
pump and acte (2W+1S).Three rocess condensat
FRP lined to be co
FRP lined to be co
AC shall be SS 30SRL.
n Raw Water quan will apply on ove
tion stoichiometve to be submitte
mum chemical conves the right to
datory submit the
ing grade for
ivated carbon MB units are
te and turbine
onsidered.
onsidered.
4 and further
lity, erall chemical
ric equations d in Technical sumption/m3
o assess the
above details
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
General
Part II : TechnicSection - 4.0
Part II : Technic4.0 & PFD
Part II : Technic4.0 Process Flow D
General
Part II : Technic4.0 Part II : Technic2.0
Part II : Technic2.0 Part II : Technic2.0 Part II : TechnicSection - 3.0
Part II : TechnicSection - 3.0
Part II : TechnicSection - 2.0
COR
cal 5
cal, Section- 7&P73
cal, Section- 1
Diagram P73
cal, Section- 4
cal, Section- 3
cal, Section- 3
cal, Section- 6
cal 1
cal 2
cal 5
WTP ,D
RRIGENDUM
57/1510
7 of 28 & PC161-7112/7/7113-0046
3.1
12 of 28
PC161-7112/7/7113-0045
4 of 6
3 of 6
3 of 6
6 of 6
16 of 34
27 of 34
5 of 6 3.1.
DM & CPU PNIT NO.: P
M -4.0 TECHN
C
Sch
(11) N
3.2 (2) NS
Au
F
2.0 T
1.2 TA
1.3 PA
2.3 Tco
1.1.6.1 GseCn
4.0 M
.6 Sp
PLANT; HURPNMM/PC16NICAL( PRO
ClO2 system
tilling chamber / Ihamber
Number of working
Number and Capackid
Air Blower for DMFnits
ire Fighting Syste
reated water qual
urbinecondensateAmmonia, Urea an
Process CondensaAmmonia and Urea
otal silica in Polisondensate
General scope ofervices–
Construction/Erecto:1.28 Hazop stud
Mechanical mainte
Scope w.r.t Inteiping between
RL GORAKHP61/E/001 OCESS), DAT
nlet
g DMF
city of UF
F and MB
em
lity
e quality nd O&U
ate quality a hed
f Work and
tion clause dy
enance
erconnecting O&U and
PUR
TE:04.05.201
C ClOchlochlo
A Stillchloacc
C Duanos
C UF per
A BidDM
C Fireent
C 1. pcor
C Silicconcon
C MeO
M Guain P
C Extbe c
C Hydcon Quabidd
C Ple002
18
O2 dosing Systeorination. Capaciorination shall be ling chamber orination of raw wceptable. al media filters shs.(7working+1Stan
Skid shall be rmeate flow shall bder to consider se
MF and MB units
e fighting systemire plant is in clienpH value of 6.5-8rrection (if requireca as SiO2 <0.ndensate qualitynsidered as ReactOH max 20 ppm i
arantee of Total sPolished condensaernal agency / Econsidered by Bid
dra, Fork lifts, Crantractor scope.
antity shall be asder ase refer the
23/24/25/26/27/28
em shall be for ity of ClO2 genemin 5 kg. or inlet chambwater before the
hall be 8 ndby)
2W+1S and be 120 m3/hr. eparate air blower
m & Fire protectiont’s scope of supp8.5 shall be maintd) by bidder. .02 ppm as inley Ammonia plative Silica. in inlet of CPU
silica shall be SiOate.
Examiner for Hazodder.
anes etc will be in
s per requirement
P&ID no PC168/29
pre & post erator for pre
ber for pre-flash mixer is
each stream
rs(1W+1S) for
on system for ply. tained, with pH
et for Turbine ant shall be
O2 < 0.01 ppm
op study is to
n the supply of
t of successful
61-7112/7113-
54.
55.
56.
57.
58. 59.
60.
61.
Part-II TechnicaPC161-G-101-P
Process flow diaPC161-7112/71
Part II : TechnicSection - 4.0
Part II : TechnicSection - 12.0
General Part II : TechnicSection - 2.0,
Part II : TechnicSection - 2.0,
Part II : TechnicSection - 2.0,
COR
al P-II/1.0
5
agram 13-046
1
cal 2
cal 6
cal
cal
cal
WTP ,D
RRIGENDUM
5 of 6 3.1.
1 of 1
28 of 28 7.0
6 of 20 5.6
2 of 6
2 of 6
3 of 6
DM & CPU PNIT NO.: P
M -4.0 TECHN
fa
.7 Cla
Pwfirco
Cplimdvab
It CpsuinfoO
1.1 R
1.1 RwBT
1.2 TC
PLANT; HURPNMM/PC16NICAL( PRO
acilities under Bidd
Chemical lababoratory requirem
Process flow diagrw.r.t fire water tankre water pumponnecting pipes.
Cooling water rovided at the Imit by clienistributionof plaarious distributione done by Contrashall be the res
Construction corovide uitableaccommod
ncluding necessaor their labour andO & M power costRaw water Quality
Raw water Qualitywater quality avaiBattery Limit of Treatment plant (W
Turbine CondensaConductivity
RL GORAKHP61/E/001 OCESS), DAT
der’s scope
-Minimum ment
ram - Scope k & Nozzles, ps & inter
shall be SBL battery
nt. Further ant air to n points shall ctor. ponsibility of ntractor to
dation ary facilities d staff.
y - Feed raw ilable in the
Water Pre WTP)
te Quality –
PUR
TE:04.05.201
C Apalaboday
C fire in thP&I002
C Ple
C LanLanandis b
C AppM Bid
ana
Rev
M TherawPLAactuper
C Conto b
18
art from lab inoratory,bidder shy to day operation
water pumps &he scope of ClienID. Please refer th23
ase refer the P&I
nd for labour colond For temporaryd area for offices)basis
proximate 10 Rs/ der to consider th
alysis report enclo
vised Raw water quality.pdf
e DM plant shall w water analysisANT capacity outpual input water qrformance test. nductivity in the tuboiler feed water d
nstruments providall provide lab in of WPT/DM planinter connecting
nt which is alreadyhe P&ID no PC16
ID no PC161-711
ny shall be arrangy facility (store fa) shall be provide
kwh he latest / revised osed.
be designed bass given in NIT put shall be assesquality available a
urbine condensatedosing chemicals.
ded in main nstruments for ts. pipes shall be y shown in the 61-7112/7113-
2/7113-0023
ged by bidder. abrication yard d as is where
raw water
sed on design however DM
ssed based on at the time of
e shall be due
62.
63.
64.
65.
66.
67.
68.
69.
70.
71.
Part II : TechnicSection - 2.0, Part II : TechnicSection - 2.0,
Part II : TechnicSection - 2.0, Part II : TechnicSection - 4.0
Part II : TechnicSection - 3.0,
Part II : TechnicSection - 3.0, Part II : TechnicSection - 4.0, Process Flow DPC161-7112/7/7Part II : TechnicSection - 3.0,
Part II : TechnicSection - 3.0,
COR
cal
cal
cal
cal
cal
cal
cal
Diagram 7113-0046
cal 2
cal 2
WTP ,D
RRIGENDUM
3 of 6
5 of 6
5 of 6
7 of 28
21 of 34
4 of 34
12 of 28
21 of 34 4.0
22 of 34 4.0
DM & CPU PNIT NO.: P
M -4.0 TECHN
1.3 P
2.2 PD
2.3 PC
1.0 T
1.1.1 TPC
1.1.1 FC
2 U
VT
It opmin CdinopreuM
T/fofch
PLANT; HURPNMM/PC16NICAL( PRO
Process Condens
Polished water QuDM Plant
Polished water QCPU
Turbine condensat
Turbine CondensaPlant : QuantityCarbon filter.
ire water stoCapacity UF Capacity
Vendor scope – FirTank & filter water
may also be meperation of WPTlants during the
months is expecntermittent.
Contractor to planeployment
ntermittent peration of WPTlant during first equirement of Area plant contract
Mechanical Maint
Top up/ replacemefilters media, & ref vessels, acid/alhemicals shall als
RL GORAKHP61/E/001 OCESS), DAT
ate Quality
ality From
Quality From
te Quantity
ate Polishing of activated
rage Tank
re water tank
entioned that TP and DM e initial 12 cted to be
n manpower considering
TP and DM year as per
Ammoniaand tor. tenance
ent of resin’s epair of lining lkali & other so be in the
PUR
TE:04.05.201
C In pcon
M Silic0.0
M Siliccon
C turb300
C Act
C Firecum
C UF per
C Firesco
A Thereqthe
R
A Supfor durtriaPre3 m
18
process condensnsidered. ca in DM water s1 PPM
ca in Polishednsidered as less th
bine condensate 0 m3/hour
ivated Carbon Filt
e water storage tm Skid shall be 2W
rmeate flow shall be water Tank & filtope e month wise Puirement scheduir manpower depl
UTILITIES REQUIRED.pdf
pply of all chemicthe Operation a
ring start-up, pre-cl runs and perform
eliminary Acceptanmonths during O&
ate no silica and
hall be considere
d waterfrom Chan0.01 ppm.
shall be (1W+1S
ters shall be Thre
ank capacity sha
+1S and each stbe 120 m3/hr. ter water tank sha
Process water le is enclosed. Boyment according
cals and consumaand Maintenancecommissioning, comance guarantee nce Test of comp
&M period shall be
d iron is to be
d as less than
CPUshall be
S) of capacity
ee
all be 2X 4100
tream
all be in bidder
& DM water Bidder to plan gly.
ables required e of the plant ommissioning, test runs upto
plete system + e in the scope
72.
73.
74.
75.
76.
77.
General
Part II : TechnicSection - 2.0,
Part II : Technic4.0,
General
General
General
COR
cal 3
cal, Section - 4
WTP ,D
RRIGENDUM
3 of 6 1.2
4 of 28 2.2
DM & CPU PNIT NO.: P
M -4.0 TECHN
sc
T
& 1.3 C
G
C
WC
B
PLANT; HURPNMM/PC16NICAL( PRO
cope of contracto
Termination points
Condensate influen
General - Turndow
CLO2 SYSTEM
WPTP -Consumption (Gua
B.L Pressure of ut
RL GORAKHP61/E/001 OCESS), DAT
r.
s
nt quality
wn
Chemical arantees)
ilities
PUR
TE:04.05.201
of sandrefe It iscomin bDMcomher
M Tie Conown Bidsha
C Oil
M Minbidd
C CLOForDos
BidconPMdos Bidin th
M Folpre0.5 1) C2)S3) P
18
supply of the Vend Treated water erred for considera
s further clarified tmmissioning of 1 sbidders scope. Th
M water reqmmissioning of onrewith.
in points/Coorndensate Polishiner at package ba
der to provide tall be finalised durcontent to be con
nimum Turndown der’s scope shall
O2 System: For Rr Drinking water 1 sing Pump: (1W+der to sub
nsumption/m3 figC/Owner reserv
sages.
der has to mandheir technical bid lowing utilities ssure indicated bkg/cm2):
Cooling water makService water PumPolished/DM wate
dor. The month wrequirement scheation of chemical
that chemical constream till PAC ofhe month wise proquirement schne stream to PA
rdinates for WTng Plantshall be
attery limit.
their layout.Furthring detailed enginnsidered as free o
ratio for the Plantbe 50 %
Raw water 5 kg/hr kg/hr (1W+1S)
1S) for each bmit minimumgures in their tves the right to
datory submit the shall be made elow at Vendor’s
ke up pump : 6.5mp 6.0 kg/cm2g er transfer pump 6
wise DM water edule may be consumption.
sumption after f plant shall be ocess water & edule from C is enclosed
TP, DM and e provided by
her, the same neering il.
t under
(1W+1S)
m chemical technical bid.
o assess the
above details
available at battery limit (±
kg/cm2g
6.5 kg/cm2g
78.
79.
General
Part II : TechnicSection - 7.0,
COR
cal
WTP ,D
RRIGENDUM
5
DM & CPU PNIT NO.: P
M -4.0 TECHN
1.4 SG
PLANT; HURPNMM/PC16NICAL( PRO
Sustained LoaGuarantee
RL GORAKHP61/E/001 OCESS), DAT
ad Test
PUR
TE:04.05.201
4) Kg/5) 7.0 Howfiguof mut
C ForonlyFolconA) 1) F2) F3) D4) F5) L6)C B) D1)D2)D3) U4)R C) C Pro1) A Tur1) C
M Durdemmin95%
18
Drinking water p/cm2g. Drinking water pKg/cm2g.
wever, availabilityures at battery limany variation betually agreed. r calculation of gy continuous runnlowing continuou
nsidered WTP
Flash mixer &FlocFilter feed pump DM Plant feed pumFeCL3 Dosing pumLime Solution DosCLO2 Dilution pum
DM Plant Degasser water traDegasser Blower UF Feed pump Regeneration Wate
CPU ocess CondensateACF Feed pump
rbine CondensateCartridge filter feering the Sustainemonstrate that thenimum of 7 days % of the rated cap
pump for plant di
ump for Townsh
y of above utilitiesmit shall be finalizeeyond the, the s
uaranteed powerning motor shall beus running driv
culator
mp mp sing Pump mp
ansfer pump
er pump
e :
: ed pump d Load Test the
e WPT,DM & CPUat an aggregate
pacity.
istribution: 7.0
ip distribution:
s with pressure ed and in case ame shall be
r consumption e considered. ves shall be
contractor will U operate for a output of min.
80.
81.
LEGEND
M: MOD
General
Part II : TechnicSection - 2.0
D:
DIFICATION, A
COR
cal
A: ADDITION, D
WTP ,D
RRIGENDUM
5 of 6
D: DELETION,
DM & CPU PNIT NO.: P
M -4.0 TECHN
2.2 PD
C: CLARIFICA
PLANT; HURPNMM/PC16NICAL( PRO
Polished Water QDM Plant / CPU (G
ATION
RL GORAKHP61/E/001 OCESS), DAT
Quality From Guarantee)
PUR
TE:04.05.201
C ForshaTurnorcon
M Tot
18
r Stream #1 of Wall mean the opern down capacity rms on manual ntrol system) al Iron content as
WTP & DMW, Ceration of Streamand as per guamode (excluding
s Fe shall be <0.0
Commissioning m or Plant at arantee quality g PLC based
01 mg/kg
NTPC Energy Technology Research Alliance (NETRA) GREEN CHEMISTRY LABORATORY
NTPC Energy Technology Research Alliance (NETRA) E-3, Ecotech-II, Udyog Vihar, Greater NOIDA(U.P.)-201306 Page No. 1 of 2
INTER-OFFICE MEMORANDUM
From: To:
Our ref.: Your ref.:
Date: Date:
Kind Attention: Sh.
Dr. R. Das
Copy to: 1. Office copy.
NOTE: Kindly return the duly filled feedback form to us.
NTPC Energy Technology Research Alliance (NETRA) GREEN CHEMISTRY LABORATORY
NTPC Energy Technology Research Alliance (NETRA) E-3, Ecotech-II, Udyog Vihar, Greater NOIDA(U.P.)-201306 Page No. 2 of 2
WATER ANALYSIS REPORT
(A) Brief Description:
(B) Analysis result:
SOURCE: PDIL Expressed as Parameter 1193/1 1193/2 1193/3
Temperature oC 28 28 28pH at 27 deg.C * 7.8 7.7 7.6Turbidity NTU 9 14 8Conductivity at 27 deg.C μs/cm 430 450 385Dissolved Oxygen at 27 oC ppm O2 6.5 5.8 6.2Total Dissolved Solids (TDS) mg/litre 314 318 280Total Suspended Solids (TSS) mg/litre 11 18 10P- alkalinity ppm CaCO3 0 0 0 M- alkalinity ppm CaCO3 156 140 122 Total hardness ppm CaCO3 196 170 160 Calcium hardness ppm CaCO3 100 90 70 Magnesium hardness ppm CaCO3 96 80 90 Sodium ppm Na 16 27 20Potassium ppm K 2 5 4Iron - Total ppm Fe 0.05 0.05 0.05Chloride ppm Cl 18 30 30Sulphate ppm SO4 48 40 35 Nitrate Ppm NO3 0.5 6.0 1.0 Reactive silica ppm SiO2 7 11 9 Colloidal Silica ppm SiO2 5 9 5 Zinc ppm Zn 0.02 0.03 0.02 Manganese Ppm Mn 0.01 0.01 0.01
TEST METHOD : IS-3025; Ion Chromatography & AAS
Dr. R. Das /
GREEN CHEMISTRY LABORATORY
1. Testing was done as per relevant methods mentioned. The results are related only to the item tested and as on received basis. The report shall not be reproduced except in full, without the written approval of NETRA (NTPC).
2. Any anomalies / discrepancies in the test report should be brought to our notice within 05 days from the date of issue of test report as samples (if remain) will be disposed off there -after.
UTILITIES REQUIRED AS PER TABLE SCHEDULE
NOTE: 1) Fire water shall be made available by vendor from end of 14th month.
SR. NO.
UTILITY UNIT M14 M15 M16 M17 M18 M19 M20 M21 M22 M23 M24 M25 M26 M27
1 DM Water
m3/hr 25 30 30 30 30 162 162 200 220 330 330 330 330 330
2 Process Water
m3/hr 25 25 25 25 25 560 560 710 570 570 800 800 800 800
3
Fire
Water
m3/hr
NOTE‐1 NOTE‐1 NOTE‐1 NOTE‐1 NOTE‐1 NOTE‐1 NOTE‐1 NOTE‐1 NOTE‐1 NOTE‐1 NOTE‐1 NOTE‐1 NOTE‐1 NOTE‐1
4 Potable
Water
m3/hr 30 30 30 30 30 30 30 30 30 30 30 30 30 30
WTP ,DM & CPU PLANT; HURL GORAKHPUR
NIT NO.: PNMM/PC161/E/001 CORRIGENDUM -4.0 TECHNICAL( ELECTRICAL), DATE:04.05.2018
Page 1 of 2
SL. NO
REFERENCE OF BIDDING DOCUMENT AMENDMENT TYPE AMENDMENT
Part/Sec. Page No. Clause No. Description as per NIT/Amendment M/D/A/C
PC161-G001-P-II/Sec.-5.3 rev. 0 04 of 80 1.3 The minimum scope…. C Air pressurization & ventilation system is not required in
cable cellar/gallery of substation.
PC161-G001-P-II/Sec.-5.3 rev. 0 11 of 80 5.1.e) All outdoor lighting … from outdoor lighting bus M All outdoor lighting … from outdoor lighting bus. Aviation
light shall be provided if required as per ICAO regulation.
PC161-G001-P-II/Sec.-5.3 rev. 0 11 of 80 5.2 DC Power…..220 V DC Distribution Board to
be located in the Sub-Station. C
DC Power…..220 V DC Distribution Board to be located in the Sub-Station. For DC battery backup time refer Cl. No. 9.6 b) of doc. no. PC161-G001-P-II/Sec.-5.3 rev. 0 and for ACUPS power (provided by owner) battery backup time is also for 1hour.
PC161-G001-P-II/Sec.-5.3 rev. 0
14 &15 of 80
7.3,7.4 & 7.5
Protective relays shall be of latest version….. part of protective device. C
Protective relays shall be of latest version….. numerical relay having serial port for monitoring. Energy management is in owner’s scope however numerical relay shall have communication on IEC-61850 protocol in redundant mode and meter shall have communication on MODBUS protocol.
PC161-G001-P-II/Sec.-5.3 rev. 0 17 of 80 7.8 Bare minimum protection for power
distribution… C DC supply supervision relay (80) shall be provided in the Switchgear with provision for annunciation locally at switchboard.
PC161-G001-P-II/Sec.-5.3 rev. 0
21 of 80 9.3.1.d &
9.3.3(ii)
LV Switchboard above 1600 Ampere… complete 415V switch boards shall be IP-54. Low voltage switchboards… protection shall be IP 52.
C For IP protection Cl. No. 9.3.1 (d) shall prevail.
PC161-G001-P-II/Sec.-5.3 rev. 0
21 of 80 9.3.5.b 240V single front, non-draw out type Emergency LSDB for power supply to Emergency lighting fixtures. C
240V single front, non-draw out type Emergency LSDB for power supply to Emergency lighting fixtures. LSDB (N) shall be fed from MLDB (bidder’s scope) & LSDB (E) shall be fed from EMLDB (bidder’s scope).
PC161-G001-P-II/Sec.-5.3 rev. 0
24 of 80 9.3.3.x) Motor rated below 75 KW rating… draw-out type in all the switchboards.
M Motor rated below 75 KW rating… draw-out type in all the switchboards. Power feeders of rating 250 Amp. & below shall be fed from SFU (refer PDS 404) and power feeders rating
WTP ,DM & CPU PLANT; HURL GORAKHPUR
NIT NO.: PNMM/PC161/E/001 CORRIGENDUM -4.0 TECHNICAL( ELECTRICAL), DATE:04.05.2018
Page 2 of 2
SL. NO
REFERENCE OF BIDDING DOCUMENT AMENDMENT TYPE AMENDMENT
Part/Sec. Page No. Clause No. Description as per NIT/Amendment M/D/A/C
above 250 AMP to 630 AMP shall be provided with MCCB, ACB power feeder shall be provided above 630 AMP.
LEGEND:
M: MODIFICATION, A: ADDITION, D: DELETION, C: CLARIFICATION
WTP ,DM & CPU PLANT; HURL GORAKHPUR
NIT NO.: PNMM/PC161/E/001 CORRIGENDUM -4.0 TECHNICAL( INSTRUMENTATION), DATE:04.05.2018
Page 1 of 3
SL. NO
REFERENCE OF BIDDING DOCUMENT AMENDMENT TYPE AMENDMENT
Part/Sec. Page No. Clause No. Description as per NIT/Amendment M/D/A/C
PC161-E001-P-II/5.4 46 of 75 8.1
Pt.d PLC control system C All the closed loop shall be redundant
PC161-E001-P-II/5.4 61 of 75 12
2 Nos. of Level measurement of two different principle shall be provided for
storage tank level measurementC For each storage 2 Nos. of Level measurement of two
different principles shall be provided.
PC161-E001-P-
II/5.4 3 of 75 1.0 Common PLC system for Water treatment package plant.
C Common PLC has been considered for WTP package and bidder to ensure segregation of individual plant level signals at AI/AO/DI/DO card level so as to ensure the reliability of the system
PC161-E001-P-II/5.4 63 of 75 Annexu
re-1 Instruments Accuracies M Accuracy for the instruments shall be % of reading and
shall be supplied with wet calibration certification.
PC161-E001-P-II/5.4
54 of 75 Instrumentation cable trays C For instrumentation FRP perforated cable trays/cable ducts shall be provided as per NIT.
PC161-G-101-P-II/11.0
Instrument vendor list M Additional vendor list enclosed to be consider by the bidders
LEGEND:
M: MODIFICATION, A: ADDITION, D: DELETION, C: CLARIFICATION
WTP ,DM & CPU PLANT; HURL GORAKHPUR
NIT NO.: PNMM/PC161/E/001 CORRIGENDUM -4.0 TECHNICAL( INSTRUMENTATION), DATE:04.05.2018
Page 2 of 3
Sl. No.
IINSTRUMENTATION ITEM PDIL BIDDER’S REPLY
1 SILICA ANALYSERS FORBES MARSHALL 2 CHLORINE ANALYSER AWA
B&C ELECTRONICS SRL 3 MOISTURE ANALYSERS SERVOMAX
MICHELL INSTRUMENTS LTD TELEDYNE ANALYTICAL INSTRUMENTS
4 GAS DETECTION SYSTEM MSA DETCON INC DETECTOR ELECTRONICS CORP (KIDDE) NET SAFETY MONITORING INC
5 FIRE ALARM SYSTEM TYCO FIRE SECURITY INDIA PVT LTD EDWARD INTERNATIONAL
6 PC / SERVERS HP 7 FLOW ELEMENT: ORIFICE/ VENTURI/ FLOW NOZZLE STAR MECH CONTROLS INIDA PVT LTD
EUREKA INDUSTRIAL EQUIPMENTS P LTD 8 PITOT TUBE/ ANNUBAR MINCO INDIA
STAR MECH CONTROLS INIDA PVT LTD THERMO FISHER SCIENTIFIC
9 ROTAMETERS KROHNE MARSHALL PVT. LTD. YOKOGAWA TOKYO KEISO CO. LTD. ROTA YOKOGAWA GMBH & CO. KG ASA SPA HEIRICH
10 MASS FLOW METER (CORIOLIS TYPE) DANIEL MEASURMENTS 11 VORTEX METER BOPP & REUTHER MESSTECHNIK GMBH 12 MAGNETIC FLOW METER KROHNE MARSHALL PVT. LTD.
E&H 13 PRESSURE & D/P TRANSMITTERS HONEYWELL AUTOMATION INDIA LIMITED
YOKOGAWA LIMITED 14 ULTRASONIC FLOWMETERS DANIEL MEASURMENT
WTP ,DM & CPU PLANT; HURL GORAKHPUR
NIT NO.: PNMM/PC161/E/001 CORRIGENDUM -4.0 TECHNICAL( INSTRUMENTATION), DATE:04.05.2018
Page 3 of 3
15 GWR MAGNETROL 16 TANK LEVEL INSTRUMENTS ROSEMOUNT TANK RADAR 17 SPECIAL LEVEL SWITCHES (VIBRATION FORK/RF
ADMITTANCE) MAGNETROL
18 TEMPERATURE ELEMENTS (THERMOCOUPLE, RTD) PYRO ELECTRIC INSTRUMENTS GOA PVT. LTD.
TEMPSENS INSTRUMENTS (I) PVT. LTD. GENERAL INSTRUMENTS CONSORTIUM GOA INSTRUMENTS INDUSTRIES LTD
19 RADIATION PYROMETER LUMA.SENSE 20 ELECTRIC ACTUATOR LIMITORQUE 21 SMART POSITIONER FLOWSERVE
FISHER 22 SS TUBES RATNAMANI
HEAVY METAL AND TUBES 23 TUBE FITTINGS (FOR CONTROL VALVES, ANALYSERS,
SAMPLING SYSTEM) COMFIT HYDRO PNEUMATIC ASTEC FLUID CONTROLS
24 INSTRUMENT VALVE MANIFOLD COMFIT 25 INSTRUMENT MINIATURE VALVES COMFIT
26 INSTRUMENTS COMPENSATION, POWER AND CONTROL CABLE
CORDS CABLES
WTP ,DM & CPU PLANT; HURL GORAKHPUR
NIT NO.: PNMM/PC161/E/001 CORRIGENDUM -4.0 TECHNICAL(STATIC), DATE:04.05.2018
Page 1 of 1
SL. NO
REFERENCE OF BIDDING DOCUMENT AMENDMENT TYPE AMENDMENT
Part/Sec. Page No. Clause No. Description as per NIT/Amendment M/D/A/C
1 PC161-G-101-P-II/5.2.1 Rev P, 5 of 44, 1.15
Nitrogen filling : All process equipments shall be supplied with Nitrogen filled. In case of equipment assembled and welded at site, it shall be filled with N2 after testing at site. Dry Nitrogen shall be filled at a pressure of 0.5 Kg/cm2g and equipment shall be fitted with a pressure gauge and valve.
M
All static equipments shall be supplied with Nitrogen filled. In case of static equipment assembled and welded at site, it shall be filled with N2 after testing at site. Dry Nitrogen shall be filled at a pressure of 0.5 Kg/cm2g and equipment shall be fitted with a pressure gauge and valve.
3
PC161-G-101-P-II/5.2.1 Rev P
12 of 44 2.2.16 PWHT requirement: Equipment under Caustic, amine, hydrogen, Lethal & sour (Wet H2s) service shall essentially be PWHT with 100 % radiography. The hardness of the parent weld, weld & HAZ shall be Limited to 200 BHN in such cases
M The clause shall be considered revised as follows: Equipment under Caustic service shall essentially be PWHT with 100 % radiography. The hardness of the parent weld, weld & HAZ shall be Limited to 200 BHN.
4 PC161-G-101-P-II/5.2.1 Rev P
20 of 44 3.6.1 Rubber lining thickness : The type of rubber (i.e. Natural, Butyl, Nitrile, Ebonite, and Hypalon etc.), its minimum Thickness shall be 5 mm & hardness shall be decided as per design code/specification
M The clause shall be considered revised as follows: The type of rubber (i.e. Natural, Butyl, Nitrile, Ebonite, and Hypalon etc.), its minimum Thickness shall be 4.5 mm & hardness shall be decided as per design code/specification.
LEGEND: M: MODIFICATION, A: ADDITION, D: DELETION, C: CLARIFICATION
WTP ,DM & CPU PLANT; HURL GORAKHPUR
NIT NO.: PNMM/PC161/E/001 CORRIGENDUM -4.0 TECHNICAL( PIPING), DATE:04.05.2018
Page 1 of 1
SL. NO
REFERENCE OF BIDDING DOCUMENT AMENDMENT TYPE AMENDMENT
Part/Sec. Page No. Clause No. Description as per NIT/Amendment M/D/A/C
1 P-II/ Sec.5.2.3
(Design philosophy-
Piping) PMS/VMS A
Following Pipe classes are attached : a) B24RL for CS rubber lined,
Equivalent BIS specification shall also be acceptable.
b) B24P for CPVC
2 P-II/ Sec.5.2.3
(Design philosophy-
Piping) PMS/VMS A
CS FRP lined piping material specification : Material specification shall be as per pipe class B24RL except rubber lining. Specification for FRP lining shall be as per manufacturer std, which shall be provided at bidding stage.
LEGEND:
M: MODIFICATION, A: ADDITION, D: DELETION, C: CLARIFICATION
Class: B24P
PROJECT NO. PC160/161/EM250PIPING MATERIAL SPECIFICATION
SERVICEETP
TEMPERATURE LIMITS (Deg.C)
RATING ASME150# FF
CORROSION ALLOWANCE
NONE
MATERIAL STRESS RELIEFCPVC
ITEM NOTES SIZE (NPS) SCH/ RAT END DESCRIPTION COMM CODE
PROJECTS & DEVELOPMENT INDIA LIMITED
SPCL
R2
BC TABLE
REV
Ref.SI Ref.SI
DOC. NO. : PC160/161/EM250 -PDS-600REV.:P
CLIENT :M/S.HURL.
LOCATION :GORAKHPUR(INDIA) .PROJECT :AMMONIA /UREA FERTILIZER PROJECT(OSBL.)
PIPEPIPE 2 - 3 PESCH 80 CPVC,ASTM F441,MF.STD/ASTM F441,PLASTIC PIPE PP552QC00
PIPE 4 - 6 PESCH 80 CPVC,ASTM F441,MF.STD/ASTM F441,PLASTIC PIPE PP552QC00
PIPE 8 - 10 PESCH 80 CPVC,ASTM F441,MF.STD/ASTM F441,PLASTIC PIPE PP552QC00
PIPE 12 - 12 PESCH 80 CPVC,ASTM F441,MF.STD/ASTM F441,PLASTIC PIPE PP552QC00
PIPE 1/2 - 3/4 PESCH 80 CPVC,ASTM F441,MF.STD/ASTM F441,PLASTIC PIPE PP552QC00
PIPE 1 - 11/2 PESCH 80 CPVC,ASTM F441,MF.STD/ASTM F441,PLASTIC PIPE PP552QC00
FLANGEFLANGE 1/2 - 12 FF 150# CPVC,ASTM F441,MF.STD/ASTM F441,SCH80 FL551QC01
BLIND FLANGEBLIND FLANGE 1/2 - 12 FF 150# CPVC,ASTM F441,MF.STD/ASTM F441, BF551QC01
GASKETGASKET 1/2 - 12 3.0 MM THK FF 150# EPDM,MF.STD./ASME B16.21,FULL FACE GS788PA01
STUD & NUTSSTUD & 2NUTS HVY
HEX
- TYPE AB7,, SNFS00000
FITTING (BW)BRANCH WELD WITH
RP
1/2 - 12 PE CPVC,ASTM F441,MF.STD/ASTM F441, WB55JQC00
FITTINGREDUCER CONC. 1/2 - 12 PE CPVC,ASTM F441,MF.STD/ASTM F441, RC55JQC00
REDUCER ECC. 1/2 - 12 PE CPVC,ASTM F441,MF.STD/ASTM F441, RE55JQC00
TEE 1/2 - 12 PE CPVC,ASTM F441,MF.STD/ASTM F441, TE55JQC00
UNION (GJ) 1/2 - 12 PE CPVC,ASTM F441,MF.STD/ASTM F441, UN55JQC00
VALVESGATE VALVE 8 - 12 FF 150# CPVC BODY W/ PP PLUG & EPDM SEATS,GAV500C, GAV500C
CHECK VALVE 1/2 - 12 SOCW 150# CPVC BODY,CHV500C, CHV500C
BALL VALVE 1/2 - 2 SOCW 150# CPVC BODY WITH CPVC BALL,BAV500C, BAV500C
BALL VALVE 3 - 6 FF 150# CPVC BODY WITH CPVC BALL,BAV501C, BAV501C
:
GAV500C :FLANGED GATE VALVE ; 150# ;CPVC BODY(ASTM F441);POLY PROPYLENE PLUG; EPDM SEALS ;TAPERED CYLINDRICAL PLUG DESIGN; BOLTED BONNET; FLAT FACE; FLANGE DIMENSION AS PER ASME B16.1 .
CHV500C :SOCKET WELD CHECK VALVE ; 150# ; H OR V ; UNION OR BOLTED COVER ; BALL TYPE CPVC BODY(ASTM F441);TRIM AS PER BODY MATERIAL ; SOCKET WELD ENDS AS PER ASME B16.11 MANUFACTURER’S STANDARD CONSTRUCTION .
BAV500C :SOCKET WELD BALL VALVE ; 150# ; FLOATING BALL;FULL PORT ;WRENCH OPERATED ; CPVC BODY(ASTM F441);CPVC BALL;VITON O RING SEALS; SOCKET WELD ENDS AS PER ASME B16.11 MANUFACTURER’S STANDARD CONSTRUCTION .
BAV501C : FLANGED BALL VALVE ; 150# ; FLOATING BALL;FULL PORT ;WRENCH OPERATED ; CPVC BODY(ASTM F441);CPVC BALL;VITON O RING SEALS; FLAT FACE; FLANGE DIMENSION AS PER ASME B16.1 ;MANUFACTURER’S STANDARD CONSTRUCTION .
Class: B24RL
PROJECT NO. PC160..162/EM250PIPING MATERIAL SPECIFICATION
SERVICEEFFLUENT,WASTE H2O,CHLORINATED H2O
TEMPERATURE LIMITS (Deg.C)
RATING ASME150# FF
CORROSION ALLOWANCE
NONE
MATERIAL STRESS RELIEFCSRL
ITEM NOTES SIZE (NPS) SCH/ RAT END DESCRIPTION COMM CODE
PROJECTS & DEVELOPMENT INDIA LIMITED
SPCL
R1
BC TABLE
REV
Ref.SI Ref.SI
DOC. NO. : PC161..162/EM250 -PDS-600REV.:0
CLIENT :M/S.HURL.
LOCATION :GORAKHPUR ,BARAUNI,SINDRI (INDIA) .PROJECT :AMMONIA /UREA FERTILIZER PROJECT(OSBL.)
PIPEPIPE 1 - 11/4 PESCH XS CS,SMLS,API 5L GR.B,NATURAL RBR LND,ASME B36.10,3MM THK LING PPX721300
PIPE 11/2 - 11/2 PESCH XS CS,SMLS,API 5L GR.B,NATURAL RBR LND,ASME B36.10,3MM THK LING PPX721300
PIPE 2 - 21/2 BESCHSTD CS,SMLS,API 5L GR.B,NATURAL RBR LND,ASME B36.10,3MM THK LING PPX711300
PIPE 3 - 4 BESCHSTD CS,SMLS,API 5L GR.B,NATURAL RBR LND,ASME B36.10,3MM THK LING PPX711300
PIPE 5 - 6 BESCHSTD CS,SMLS,API 5L GR.B,NATURAL RBR LND,ASME B36.10,3MM THK LING PPX711300
PIPE 8 - 10 BESCH 20 CS,ERW,API 5L GR.B,NATURAL RBR LND,ASME B36.10,3MM THK LING PP2A11300
PIPE 12 - 12 BESCH 20 CS,ERW,API 5L GR.B,NATURAL RBR LND,ASME B36.10,3MM THK LING PP2A11300
FLANGEFLANGE 1 - 2 SO-FF 150# CS,ASTM A105,NATURAL RBR LND,ASME B16.5,3MM THK LING FLX650801
W.N.FLANGE 1 - 12 WN-FF 150# CS,ASTM A105,NATURAL RBR LND,ASME B16.5,3MM THK LING WNX6M0801
SPECL BLIND 1 - 12 FF 150# CS PLT,ASTM A516 GR.60,NATURAL RBR LND,ASME B16.48,3MM THK LING SPX81PO01
BLIND FLANGEBLIND FLANGE 1 - 12 FF 150# CS,ASTM A105,NATURAL RBR LND,ASME B16.5,3MM THK LING BFX610801
GASKETGASKET 1 - 12 FLAT 150# GASKET,SOFT RUBBER,ASME B16.21,3MM THK. GSW190401
STUD & NUTSSTUD & 2NUTS HVY
HEX
- ASTM A193 GR.B7/ASTM A194 GR.2H,, SNDE00000
FITTING (BW)CAP 1 - 12 BW CS,ASTM A234 WPB-SMLS,NATURAL RBR LND,ASME B16.9,3MM THK LING CPX910900
ELBOW 1 - 6 BW CS,ASTM A234 WPB-SMLS,NATURAL RBR LND,ASME B16.9,3MM THK LING ELX910900
ELBOW 8 - 12 BW CS,ASTM A234 WPB-WLDD,NATURAL RBR LND,ASME B16.9,3MM THK LING EL3A10900
REDUCER CONC. 1 - 6 BW CS,ASTM A234 WPB-SMLS,NATURAL RBR LND,ASME B16.9,3MM THK LING RCX910900
REDUCER CONC. 8 - 12 BW CS,ASTM A234 WPB-WLDD,NATURAL RBR LND,ASME B16.9,3MM THK LING RC3A10900
REDUCER ECC. 1 - 6 BW CS,ASTM A234 WPB-SMLS,NATURAL RBR LND,ASME B16.9,3MM THK LING REX910900
REDUCER ECC. 8 - 12 BW CS,ASTM A234 WPB-WLDD,NATURAL RBR LND,ASME B16.9,3MM THK LING RE3A10900
TEE 1 - 6 BW CS,ASTM A234 WPB-SMLS,NATURAL RBR LND,ASME B16.9,3MM THK LING TEX910900
TEE 8 - 12 BW CS,ASTM A234 WPB-WLDD,NATURAL RBR LND,ASME B16.9,3MM THK LING TE3A10900
VALVESGATE VALVE 2 - 12 FLG 150# SS BODY ASTM A351 GR CF8,GAV510, GAV510
GLOBE VALVE 2 - 12 FLG 150# SS BODY ASTM A351 GR CF8,GLV510, GLV510
CHECK VALVE 2 - 12 FLG 150# CS BODY ASTM A216 GR.WCB RUBBER LINED,CHV210D, CHV210D
BALL VALVE 2 - 12 FLG 150# SS BODY ASTM A351 GR CF8M,BAV510, BAV510
BUTTERFLY VALVE 2 - 12 FF 150# CS BODY ASTM A216 GR.WCB RUBBER LINED,BUV203,LUG TYPE BUV203
:
PROJECT NO. PC160/161/EM250 DOC. NO. : PC160/161/EM250 -PDS-600 REV.:0
PROJECTS & DEVELOPMENT INDIA LTD
PC161..162/EM250-PDS-600 0
DOCUMENT NO REV
BRANCH TABLE : TABLE-R1 APPLICABLE PIPING MATERIAL SPECIFICATIONS: B24RL. PRESSURE RATING <= 300#
<-----------------B R A N C H S I Z E------------> 3 1 1 2 1 1 M Q 1 Q M 2 M 3 4 6 8 0 2
M 3Q 1 T 1Q 1M E T 2 E E T 2M 3 E E E T 4 E E E E T 6 E E E E E T 8 E E E E E E T 10 E E P P E E E T 12 E E P P P E E E T
A-
E TE REDUCING TEEP WB BRANCH WELD WITH RPT TE EQUAL TEE
PC160/161/EM250 -PDS-600
2.
A216 GR.WCB RUBBER LINED
DCHV 210D
GRAFOIL/GRAPHITE
GRAFOIL