members.iinet.net.aumembers.iinet.net.au/~niftycad/files/n_pascoe.doc · Web viewNifty Copper Mine...

22
EMPLOYMENT RESUME NEVILLE PASCOE MARRIED - 2 CHILDREN OUTLINE: - Started Draughting in 1967 Has been with Western Mining since June 1981 on both contract and staff Project Section Leader on Mt Charlotte Crushing Plant Long Shaft CNGC Wash Plant Hill 50 Treatment Plant KNO CIP Plant KNO Foster Shaft KMA CIP Plant VJV Headframe VJV Treatment Plant St Ives Gold Plant Hill 50 Gold Plant Emu Gold Plant Nifty Copper Project MicroStation CAD Section Leader & CAD Support since 1990 Developed Standard WMC Command Menus WMC Digitizer Menus WMC Standard Barmenu Side Bar Menus Cell Libraries User Commands MDL Applications Customized Systems WES CAD Guidelines & Procedures WMC CAD Engineering Standard ST43 WMC Best Practices & Guide Lines relating to the use of CAD Training MicroStation 1 MicroStation 2 MicroStation 3d MicroStation 3d Advanced PDS Equipment Modeling Train the Trainer Paradox Database Basic Word 6 Basic Excel 5 Resume – Neville Pascoe Printed - 31-08-22 Page 1 of 22

Transcript of members.iinet.net.aumembers.iinet.net.au/~niftycad/files/n_pascoe.doc · Web viewNifty Copper Mine...

Page 1: members.iinet.net.aumembers.iinet.net.au/~niftycad/files/n_pascoe.doc · Web viewNifty Copper Mine - Preliminary Layout & Design - MicroStation - Power Station Layouts Plant Earthworks

EMPLOYMENT RESUMENEVILLE PASCOEMARRIED - 2 CHILDREN

OUTLINE: -

Started Draughting in 1967Has been with Western Mining since June 1981 on both contract and staffProject Section Leader on Mt Charlotte Crushing Plant

Long ShaftCNGC Wash PlantHill 50 Treatment PlantKNO CIP PlantKNO Foster ShaftKMA CIP PlantVJV HeadframeVJV Treatment PlantSt Ives Gold PlantHill 50 Gold PlantEmu Gold PlantNifty Copper Project

MicroStation CAD Section Leader & CAD Support since 1990

Developed Standard WMC Command MenusWMC Digitizer MenusWMC Standard BarmenuSide Bar MenusCell LibrariesUser CommandsMDL ApplicationsCustomized SystemsWES CAD Guidelines & ProceduresWMC CAD Engineering Standard ST43WMC Best Practices & Guide Lines relating to the use of CAD

Training MicroStation 1MicroStation 2MicroStation 3dMicroStation 3d AdvancedPDS Equipment ModelingTrain the TrainerParadox DatabaseBasic Word 6Basic Excel 5Trouble Shooting & Supporting PC SystemsConstruction SimulationC Programming – BasicC Programming - Intermediate

Trained WES Staff and Contract Staff in MicroStation

Resume – Neville Pascoe Printed - 06-05-23 Page 1 of 10

Page 2: members.iinet.net.aumembers.iinet.net.au/~niftycad/files/n_pascoe.doc · Web viewNifty Copper Mine - Preliminary Layout & Design - MicroStation - Power Station Layouts Plant Earthworks

PERSONAL PROFILE

Neville began his career in drafting in 1967 and since then has gained a broad range of experience across a number of industries. He is competent Designer in the following disciplines:- Layouts & Conceptual Design, P&ID’s & PEFS, Civil, Mechanical, Structural – Concrete & Steel, Piping, Tankage and has experience with Electrical Schematics & Instrument Loop Diagrams

Since 1981, he has worked for the Western Mining Corporation initially as Senior Design Draftsperson, progressing to CAD Support Officer for Projects and Engineering. During that period Neville was Project Lead Draftsperson for St Ives Gold Plant with a drafting team of 15 in all disciplines and Project Lead Draftsperson for Hill 50 Gold Mine, Checkers Plant with a drafting team of 12 in all disciplines.

As CAD Support Officer, Neville has customized the use of MicroStation to suit WMC Engineering Drafting and established CAD drafting standards in engineering for WMC. He has given MicroStation CAD training and support to Adelaide, Kalgoorlie Nickel Smelter, Kwinana Nickel Refinery, Kambalda, Leinster and Mt Keith personnel and when required provided support and direction to external consultants providing services to Projects and Engineering.

Neville is a competent user of Jacobus Technology’s Viewer and Construction Simulation Packages and has trained engineers and construction planners in its use.

Since leaving Western Mining Corporation he has established his own business providing CAD Support and draughting services. He has also become a user of AutoCAD R14 and can configure and customize AutoCAD menus and lisp and script files.

CAD SUPPORT

April ’97 Commenced trading as Nifty CAD Support Centre – Providing Consultant CAD Support Services

Current Clients for CAD Support include: - Metplant Engineering ServicesWMC Kwinana Nickel RefineryWMC Kalgoorlie Nickel SmelterLycopodium Pty Ltd

GHD Engineering

Provide Support for following software: - MicroStation on DOS, Win95, WinNT 3.51 & NT4AutoCAD R14 – menus, lisp, script filesMicrosoft Office 97 Applications

Resume – Neville Pascoe Printed - 06-05-23 Page 2 of 10

Page 3: members.iinet.net.aumembers.iinet.net.au/~niftycad/files/n_pascoe.doc · Web viewNifty Copper Mine - Preliminary Layout & Design - MicroStation - Power Station Layouts Plant Earthworks

SEPTEMBER 98 -- PRESENTCLOUGH ENGINEERING GROUP

Mechanical Designer - CONTRACT – BSP Industries Pty Ltd

SMRC Waste Plant Prepare construction drawings for 350,000 tpa feed for waste recycling AutoCAD R14 plant. Structural, Mechanical, arrangements & details

Cape Lambert Jetty Upgrade Construction arrangements for erection jigs & welding platforms.AutoCAD R14 Crane lift arrangements & erection skid frames for conveyor installation

Cairn Energy – India Structural Arrangement & details for Compressor building pipe & service Frameworks racks, site drainage

Cairn Energy – India Structural Arrangement & details for offshore platform, heli-deck safety AutoCAD R14 nets & solar panels

SMRC Waste Plant Prepare tender proposal for 350,000 tpa feed for waste recycling plant. MicroStation 2D Structural, Mechanical, Piping, Earthworks & Roadworks drawings.

KNPC - New Oil Pier Prepare tender proposal drawings for 2.5km pier & berthing facilities with 48m bridge spans for pipe rack & road access.

KNPC Coke Calcining Plant Material handling layouts to existing Coke shipping facilities to upgarde to Coke Calcining, stacking & reclaiming to 80 000t storage building, infrastructure building layouts

Jimblebar Iron Ore Project Mechanical/Civil/Structural Layout drawings for new installation of AutoCAD R14 upgrade to crushing & screening plant

AUGUST 98 – SEPTEMBER 98METPLANT ENGINEERING SERVICES PTY LTD

Mechanical Designer - CONTRACT – Direct

Bogoso Gold Project Mechanical/Civil/Structural/Piping design drawings for new carbon - MicroStation 2D safety screen to upgrade & replace existing carbon safety screen

MAY 98 – AUGUST 98MINENCO –KAISER/BECHTEL JOINT VENTURE

Mechanical Designer - CONTRACT – BSP Industries Pty Ltd

Hindalco Alumina Complex Smelter plant layouts, Potline Building layouts, Paste Plant & Anode India Handling, Rodding Shop layout and Casthouse layouts plus Admin & - MicroStation 2D & 3D Services buildings and materials handling layouts

FEBRUARY 98 – APRIL 98FLUOR DANIEL ENGINEERING

Structural Designer - CONTRACT – Tekton Resources

HI – Yandi Project Civil/Structural design drawings for YCV05/YCV06 conveyor transfer- MicroStation 2D

Resume – Neville Pascoe Printed - 06-05-23 Page 3 of 10

Page 4: members.iinet.net.aumembers.iinet.net.au/~niftycad/files/n_pascoe.doc · Web viewNifty Copper Mine - Preliminary Layout & Design - MicroStation - Power Station Layouts Plant Earthworks

DECEMBER 97 – JANUARY 98BHP ENGINEERING PORT HEDLAND

PDS Drafter - CONTRACT – Technical Resources

HBI – DRI Plant 3D snapshots with PDS Design Review to locate & label piping - PDS Design Review 3D sections in MicroStation to detail pipe supports for the Hot Briquette - MicroStation 3D Iron, Direct Reduced Iron Project

NOVEMBER 97 – DECEMBER 97GHD ENGINEERING PTY LTD

CAD Training –CONTRACT -DIRECT

MicroStation 2D Provide Basic MicroStation Training to 10 Staff & Contract Personnel

APRIL 97 – DECEMBER 97JR ENGINEERING PTY LTD

Senior Design Draughtsman –CONTRACT -DIRECT

Western Metals Zinc NL Pillara Project- MicroStation 2D Preliminary Plant Layout-AutoCAD R13 Plant Layout

Concentrate Storage BuildingFeed & Tripper Conveyors

Gold Ridge Mining Plant Layouts- AutoCAD R13 Leach Tank Platform

Heavy Mineral Separation BuildingGold Room Layout

NOVEMBER 94 – APRIL 97WESTERN MINING CORPORATION - PROJECTS AND ENGINEERING

MicroStation CAD SupportMicroStation CAD Network AdministratorPDS Equipment ModelingJSpace Viewer & Plant Space ModelerJSpace Construction Simulation & StatusingBeta Test & Evaluation of JSpace P&ID and ODBC DatabaseBeta Test TeamMate & TeamMate95 with ODBCBeta Test & Evaluate MicroDocs Link with MicroStation and DocsOpenDeveloped WMC CAD Engineering Standard ST43 with consultation of WMC’s Major Engineering OperationsDeveloped MicroStation Productivity tools, User Commands, Basic Macro’s, modified MDL ApplicationsDeveloped Best Practices and Guide Lines for the Production of CAD DrawingsLiased with WMC Engineering Consultants, Setup WMC WorkspaceProvided On Site Training to Consultants with the WMC Standards and WMC BarmenuQA & QC Checked Consultant produced MicroStation Design files conform to WMC ST43Provided Visual Presentations to WMC’s Engineering Alliance PartnersResponsible for transferring CAD files Between P&E, Consultants, & WMC OperationsProvided Back Up support to PDS AdministratorMember of the Drawing Office Management Team

JUNE 81 - NOVEMBER 94WMC ENGINEERING SERVICES PTY. LIMITED

Resume – Neville Pascoe Printed - 06-05-23 Page 4 of 10

Page 5: members.iinet.net.aumembers.iinet.net.au/~niftycad/files/n_pascoe.doc · Web viewNifty Copper Mine - Preliminary Layout & Design - MicroStation - Power Station Layouts Plant Earthworks

Senior Design Draughtsman - STAFF

Mt Keith Project - Plant Layouts- MicroStation - Grinding Circuit Layout - MicroStation 3d Model

Flotation Layout - MicroStation 3d ModelOverland Conveying - MicroStation 3d ModelCAD Support for Project EngineeringCAD Support – on site for “As Building”

Nifty Copper Mine - Preliminary Layout & Design- MicroStation - Power Station Layouts

Plant Earthworks & Drainage

Kwinana Nickel Refinery - Larox Filter Installation - MicroStation 3D Model

Resume – Neville Pascoe Printed - 06-05-23 Page 5 of 10

Page 6: members.iinet.net.aumembers.iinet.net.au/~niftycad/files/n_pascoe.doc · Web viewNifty Copper Mine - Preliminary Layout & Design - MicroStation - Power Station Layouts Plant Earthworks

Hill 50 Gold Plant - Preliminary Layouts and DesignInstallation of Roxon Jaw Crusher12,000 T Live Stockpile and Reclaim Tunnel and ConveyorsGrinding Circuit -Sag Mill & Ball MillCIL CircuitReagents HandlingTails Dams and Water Recovery DamsSlurry and Chemical Pump InstallationsSlurry, Chemical & Process PipingPower Station Installation - Earthworks & Foundations

Fuel Storage & Transfer PipingControl Room Layout & Ancillaries

St Ives Gold Plant - Preliminary Layouts and DesignInstallation of 60" Gyratorary Crusher12,000 T Live Stockpile and Reclaim Tunnel and ConveyorsGrinding 'ABC' Circuit -Sag Mill, 2 Ball Mills and CrusherCIL CircuitReagents HandlingTails Treatment and Water Recovery Belt FiltersTails Dams and Water Recovery DamsSlurry and Chemical Pump InstallationsSlurry, Chemical & Process Piping

Senior Design Draughtsman - CONTRACT - DIRECT

Emu Gold Plant- Gold Process Plant - Grinding Plant Supervise Refurbish of Secondhand Mill

at Mitchell Cotts EngineeringInstall New Hydraulic Lube SystemGrinding & Screening Layouts & DetailsSlurry & Service Piping

CIL Tanks Layouts & DetailsCIL Slurry & Service PipingTrash Screen LayoutsReagents Storage & HandlingPower Station LayoutsFuel & Fire Suppression Piping

Vatukoula Joint Venture - CIL Tank Installation - Preliminary Layouts and DesignExisting Plant Upgrade Earthworks & Drainage

FoundationsStructural & Mechanical Arrangement

Phillip Shaft - Headframe & Winder LayoutsHeadframe Design - Shaft Sinking & ProductionSurface Ore Handling

Kalgoorlie Mining Associates -- CIP Plant - Plant Layouts & Design

Desorption Building DesignDesorption Building DetailsDesorption Building Piping & Iso’sProcess & Service PipingReagents Handling Plant

Hill 50 Gold Mine -- Morning Star Shaft - New Crushing, Screening & Conveying Circuit

Resume – Neville Pascoe Printed - 06-05-23 Page 6 of 10

Page 7: members.iinet.net.aumembers.iinet.net.au/~niftycad/files/n_pascoe.doc · Web viewNifty Copper Mine - Preliminary Layout & Design - MicroStation - Power Station Layouts Plant Earthworks

Plant Layouts'Sink-On' Winder InstallationWinder Brake Upgrade - Conversion to Hydraulic

Olympic Dam Project -- Whenan Shaft - Headframe Modifications

Surface Ore Handling - ProposalCopper Smelting Options - Plant LayoutsGold & Uranium Plant - Upgrade Plant Layouts

Kambalda Nickel Operations -- No 1 Crushing Plant - Preliminary Layouts & design

New Conveyors & Mod's. to ExistingVibrating Feeder Installation

- CIP Plant - Piping Modifications - Pilot Plant Installation

- Foster Shaft - Headframe Arrangement - Design & DetailSurface LayoutSurface Ore HandlingHeadframe Modifications - Fixed Guides to Rope Guides

MARCH 81 - JUNE 81ALCOA OF AUSTRALIA - PINJARRA

Senior Design Draughtsman - CONTRACT - BSP

Workshop Layouts & ExtensionsProcess PipingLake Water Piping P & I D

FEB 79 - MARCH 81WMC ENGINEERING SERVICES PTY. LIMITED

Senior Design Draughtsman - CONTRACT - DIRECT

Kambalda Nickel Operations -- CIP Plant - Plant Layout & Details

Earthworks, Roadwork’s & DrainageTank Area FoundationsDerrick Screen InstallationSupport Structure, Platforms & WalkwaysElution Building Piping & Iso’s

Resume – Neville Pascoe Printed - 06-05-23 Page 7 of 10

Page 8: members.iinet.net.aumembers.iinet.net.au/~niftycad/files/n_pascoe.doc · Web viewNifty Copper Mine - Preliminary Layout & Design - MicroStation - Power Station Layouts Plant Earthworks

Hill 50 Gold Mine- Water Tank Hill - New Skip & Cage

-Morning Star Shaft - Winder Building ExtensionRefurbish Headframe

- Treatment Plant - Thickener Earthworks & InstallationBrowns Tanks & Circuit TanksFilter Build & Tank Area CivilsCrushing & Screening Plant CivilsProcess & Service PipingRefurbish Existing ConveyorsRefurbish Existing Crushing & Screening Buildings

Central Norseman Gold Corporation- New Wash Plant - Plant Layout & Details

Road Hopper, Apron Feeder, Jaw Crusher, Conveyors, Wash Trommel, Flotation Cells, Pumping & Piping

- Fine Ore Bin Upgrade - New Super Structure & Conveyor Mod's.Gold Circuit Upgrade

Kalgoorlie Research Plant Plant Earthworks, Roads & DrainageChemical Area CivilsPipe Supports, Platforms & Walkways

SEPT 78 - FEB 79BSP INTERNAL DRAWING OFFICE

Senior Design Draughtsman - CONTRACT

Redbank Power Station Checking Detail & Workshop Drawings

FEB 77 - FEB 79WMC ENGINEERING SERVICES PTY. LIMITED

Senior Design Draughtsman - CONTRACT -BSP

Kambalda Nickel Operations- Long Shaft - Headframe Modifications

Skip DumpingOre & Mullock Bin SupportsSkip Changing

- Mt Charlotte - Crushing & Screening Plant LayoutsSymons Crusher Installation & CivilsConveyors, Screens, Belt Feeders, Dust Collection, Service Piping

Kalgoorlie Nickel Smelter-Smelter Expansion - Structural Design & Details

Service PipingChain ConveyorsReagents & Cons Storage Bins

OCT 76 - FEB 77BSP INTERNAL DRAWING OFFICE

Senior Design Draughtsman - CONTRACT

Resume – Neville Pascoe Printed - 06-05-23 Page 8 of 10

Page 9: members.iinet.net.aumembers.iinet.net.au/~niftycad/files/n_pascoe.doc · Web viewNifty Copper Mine - Preliminary Layout & Design - MicroStation - Power Station Layouts Plant Earthworks

Whiteman Brick Conveyor Design & Detail Drawings

JULY 76 - OCT 76RON JOHNSON PTY LTD

Senior Detail Draughtsman - CONTRACT – DIRECT

Preparing Workshop Drawings for Industrial & Commercial Buildings and Government Buildings

MAR 74 - JULY 76SELTRUST ENGINEERING AUSTRALIA PTY. LTD

Senior Design Draughtsman - CONTRACT - DIRECT

Agnew Mining Company Plant Layouts, Earthworks, Roads & DrainageCrushing Plant Installation (Crusher, Apron Feeder & Conveyors)Haulage Headframe & Winder Arrangement & Details

Spargoville Mining Underground Ore Haulage SystemSkips & CagesSurface Layouts

NOV 73 - MAR 74PERTH DRAFTING COMPANY PTY LTD

Senior Detail Draughtsman - CONTRACT - DIRECT

Preparing Workshop Detail Drawings -CBH Grain Terminal Conveyors, Industrial & Commercial Buildings

SEPT 73 - NOV 73MINENCO ENGINEERING PTY LTD

Senior Design Draughtsman - CONTRACT - BSP

Port Hedland Facilities Dust Collection LayoutsNew Conveying System

JAN 73 - SEPT 73AUSTRALIAN SELECTION PTY. LTD - (SELTRUST AUSTRALIA)

Senior Design Draughtsman - CONTRACT - BSP

Agnew Mining Company - Nickel Process Plant - Plant Layouts

Service BuildingsWorkshop Layouts

OCT 72 - JAN 73MOBIL AUSTRALIA

Design Draughtsman - CONTRACT - BSP

Service Station Site Layouts & DetailsCountry Fuel Depot Site Layout & DetailsTank Farm Layouts

Resume – Neville Pascoe Printed - 06-05-23 Page 9 of 10

Page 10: members.iinet.net.aumembers.iinet.net.au/~niftycad/files/n_pascoe.doc · Web viewNifty Copper Mine - Preliminary Layout & Design - MicroStation - Power Station Layouts Plant Earthworks

Piping Installations, Modifications & Additions

SEPT 72 - OCT 72JANDAKOT WOOL SCOURERS

Design Draughtsman - CONTRACT - BSP

Jandakot Wool Store Earthworks, Roads, Car Parks & Drainage

AUG 72 - SEPT 72WESTERN MINERAL SANDS - CAPEL

Design Draughtsman - CONTRACT - BSP

Capel Treatment Plant Detail 20m Heavy Mineral Launder Tower

JULY 72 - AUG 72J F THOMPSON

Design Draughtsman - CONTRACT - BSP

Modifications to Tank Detail DrawingsQuantities Take-Off for Price Inquiry

MAY 71 JAN 72The STRUCTURAL ENGINEERING COMPANY of WA PTY LTD

Detail Draughtsman - STAFF

Hamersley Iron Paraburdoo Construction Site Supervision of Installation of Secondary & Tertiary Crushers, Scalping & Fines Screens, Vibrating Feeders, Conveyors & Take Up and Transfer Towers

MAY 67 JAN 71The STRUCTURAL ENGINEERING COMPANY of WA PTY LTD

Detail Draughtsman - STAFF

Preparing Workshop Detail Drawings of Commercial & Industrial Buildings, Portal Framed & Trussed Buildings, 100 ft Barge for Cape Lambert, Conveyors, Take Up & Transfer Towers for Hamersley Iron Paraburdoo, 3 months workshop training.

Resume – Neville Pascoe Printed - 06-05-23 Page 10 of 10