Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

25
Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope

Transcript of Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

Page 1: Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

Nick Walker

Marc Ross

Akira Yamamoto

GDE PAC 15.11.11 Prague

TDR Plans and Scope

Page 2: Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

GDE Stated Prime Deliverables

1. An updated technical description of the ILC in sufficient detail to justify the associated VALUE estimate

2. Results from critical R&D programmes and test facilities, which either demonstrate or support the choice of key parameters in the machine design

3. One or more  models for a Project Implementation Plan, including scenarios for globally distributed mass-production of high-technology components as “in-kind” contributions

4. An updated and robust VALUE estimate and construction schedule consistent with the scope of the machine and the proposed Project Implementation Plan

15.11.2011 Nick Walker - PAC, Prague

Page 3: Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

Technical Volumes

15.11.2011

Reference Design Report

ILC Technical Progress Report (“interim report”)

TDR Part I:R&D

TDR Part II:BaselineReferenceReport

Technical Design Report

~250 pagesDeliverable 2

~300 pagesDeliverables 1,3 and 4

* end of 2012 – formal publication early 2013

2007 2011 2013*

AD&I

Nick Walker - PAC, Prague

Page 4: Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

Part I: Tech. Design Phase R&D

• Comprehensive report on TDP R&D programmes– where and how we spent the money

• Similar in scope to R&D sections in interim report– more technically detailed– more conclusive

• Report R&D results should support baseline (decisions) in Part II– But scope can be broader, i.e. R&D on alternative

concepts15.11.2011 Nick Walker - PAC, Prague

Page 5: Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

Part I: R&D - Outline

1. Introduction 5 pages

2. Superconducting RF Technology 75 pages

3. Beam Test Facilities 75 pages

4. Accelerator Systems R&D 50 pages

5. Post-TDR R&D 20 pages

6. Conclusions 10 pages

15.11.2011 Nick Walker - PAC, Prague

Page 6: Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

Part I: R&D - Outline

1. Introduction 5 pages

2. Superconducting RF Technology 75 pages

3. Beam Test Facilities 75 pages

4. Accelerator Systems R&D 50 pages

5. Post-TDR R&D 10 pages

6. Conclusions 10 pages

15.11.2011

2.1 Overview

2.2 Gradient R&D and yield evaluation

2.3 Cavity integration and S1-Global cryomodule R&D

2.4 Cryomodule, cryogenics (incl. S1-Gobal)

2.5 High power RF generation and distribution

2.6 ML integration including quadrupole R&D

2.7 Industrialisation technology and R&D

Nick Walker - PAC, Prague

Nicholas Walker
This needs to discussed and iterated.
Page 7: Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

Part I: R&D - Outline

1. Introduction 5 pages

2. Superconducting RF Technology 75 pages

3. Beam Test Facilities 75 pages

4. Accelerator Systems R&D 50 pages

5. Post-TDR R&D 10 pages

6. Conclusions 10 pages

15.11.2011

3.1 Overview

3.2 FLASH 9mA experiment

3.3 CesrTA and electron cloud R&D

3.4 ATF2 Final Focus experiment

Nick Walker - PAC, Prague

Page 8: Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

Part I: R&D - Outline

1. Introduction 5 pages

2. Superconducting RF Technology 75 pages

3. Beam Test Facilities 75 pages

4. Accelerator Systems R&D 50 pages

5. Post-TDR R&D 10 pages

6. Conclusions 10 pages

15.11.2011

4.1 Overview

4.2 Electron source

4.3 Positron source

4.4 Damping ring

4.5 BDS & MDI

4.6 Beam dynamics

Nick Walker - PAC, Prague

Page 9: Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

Part I: R&D - Outline

1. Introduction 5 pages

2. Superconducting RF Technology 75 pages

3. Beam Test Facilities 75 pages

4. Accelerator Systems R&D 50 pages

5. Post-TDR R&D 20 pages

6. Conclusions 10 pages

15.11.2011

(Under discussion)- Pushing cavity performance (G, Q0) – TeV upgrade

- SCRF beam test facilities- NML@FNAL, STF@KEK, FLASH@DESY

- RF power source and distribution R&D- ATF2 (KEK)- Positron source etc.

Nick Walker - PAC, Prague

Page 10: Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

Part II: ILC Baseline Design Report

• Relatively detailed description of the updated baseline design– on which the cost estimate is based

• Similar level of detail to RDR– But different structure – see later

• Supporting R&D results to be referenced to Part I.

• Design details reference to Technical Design Documentation (TDD) in ILC-EDMS– electronic version to contain hyperlinks– see later

15.11.2011 Nick Walker - PAC, Prague

Page 11: Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

Part II: ILC Baseline Design Report

1. Introduction and overview 5 pages

2. General parameters and layout 15 pages

3. SCRF Main Linacs 40 pages

4. Polarised electron source 15 pages

5. Positron source 20 pages

6. Damping Rings 30 pages

7. Ring to Main Linac (RTML) 20 pages

8. Beam Delivery System & MDI 30 pages

9. CFS and global systems 30 pages

10... see later

15.11.2011

Detailed section outline available here

Nick Walker - PAC, Prague

Page 12: Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

RDR vs TDR Part II

• RDR was divided into – Accelerator Systems (sources, DR, BDS etc.)

– Technical Groups (cryomodule, RF, magnets vacuum etc.)

• TDR Part II is Accelerator System orientated– Each sub-system will cover its own technical

systems– Better suited to TD Phase project structure– Acknowledge lack of RDR-like tech. groups

15.11.2011 Nick Walker - PAC, Prague

Page 13: Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

Part II Example Chapter

6 Damping Rings6.1 Top-level DR layout and parameters

6.2 Lattice description

6.3 Beam dynamics (e-cloud, FII and classical instabilities, LET)

6.4 Vacuum system design (including e-cloud mitigation, impedance etc)

6.6 Magnets and power supplies

6.7 Instrumentation and feedback systems

15.11.2011

Technical systems

Nick Walker - PAC, Prague

Page 14: Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

Special Cases: SCRF

3 SCRF Main Linacs3.1 Main linac layout and parameters

3.2 Cavity performance and production specification

3.3 Cavity integration (coupler, tuners,…)

3.4 Cryomodule design (including quad package)

3.5 Cryogenics

3.6 RF power and distribution systemsKCS

DRFS

RDR solution (back-up)

3.7 Low-level RF control

15.11.2011

Description of regional baseline variants

Nick Walker - PAC, Prague

Nicholas Walker
Need to discuss this with Akira, as it is different from his outline.
Page 15: Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

Special Cases: CFS

9 CFS9.1 Introduction

9.2 Asian Region Siting Studies

9.3 European Region Siting Studies

9.4 Asian Region Civil Design

9.5 Americas Region Civil Design

9.6 European Region Civil Design

9.7 Mechanical Design

9.8 Electrical Design

15.11.2011

No Americas siting study

Civil construction design now reflects regional design differences

Common mechanical and electrical design concepts

Nick Walker - PAC, Prague

Page 16: Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

Part II: ILC Baseline Design Report

10. TeV Energy and Luminosity 20 pages

Upgrade– integration of planned white paper

11. Cost and Schedule 20 pages

12. Project Implementation Planning >20 pages

– integration of stand-alone report (57 pages)– see presentation by E. Paterson

13. Post-TDR Engineering 20 pages– including technical risk assessment

14. Conclusions 10 pages

15.11.2011 Nick Walker - PAC, Prague

Page 17: Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

Technical Editorial Board

15.11.2011 Nick Walker - PAC, Prague

Hayano (KEK)

Page 18: Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

EDMS and Tech. Design Documentation

Important goal to consolidate all technical documentation in EDMS in a structured fashion

15.11.2011 Nick Walker - PAC, Prague

Page 19: Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

Web-based access to ILC WBS

• http://www.linearcollider.org/GDE/technical-design-documentation

• Read-only access– for convenience only– Direct use of EDMS still required for

• documentation update, sign-off, release• change control

• ILC-EDMS group populating EDMS WBS– as part of on-going baseline review

process

• Mandatory documents required– parameters– system description / interfaces– treaty points– etc.

• …

15.11.2011 Nick Walker - PAC, Prague

Page 20: Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

More Publications

15.11.2011

TDR Part I:R&D

TDR Part II:BaselineReferenceReport

Technical Design Report

~250 pages

~300 pages

Executive Summary

~50 pages pages

Executive summary- lighter weight, easier to read- possibly joint summary with

Physics & Detector publications- similar to RDR

Outreach Document

~25 pages pagesOutreach document- ILC Communicator project- Aimed at broader readership

- non-scientific- Example: ILC Passport

Nick Walker - PAC, Prague

Page 21: Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

Coordination with Physics & Detectors

• Time scale and scope– important to publish all documents as a set– as for RDR

• Look and feel– Same templates and layout themes should be

used

• Technical consistency– Obvious– Especially important for MDI

• Possible joint documents– Joint Executive Summary– Outreach document

• Primary coordination via respective TEBs– just starting

15.11.2011

TDR Part I:R&D

TDR Part II:BaselineReferenceReport

DBD Report Physics

Executive Summary

Outreach Document

Nick Walker - PAC, Prague

Page 22: Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

Tentative Schedule

15.11.2011

Korea GDE meeting24.04 – Parts I & II first drafts

US LC meeting (Arlington)24.10 – final Drafts

preparation

2011 2012

16 weeks

25 weeks

Executive Summary

Companion outreach document

Very aggressive schedule!In parallel:- cost estimation- TDD for EDMS

We like a challenge

Nick Walker - PAC, Prague

Page 23: Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

Meeting Cycles (WebEx)

• Established schedule: every Wednesday• New four week cycle:

– AD&I meeting– SCRF Technology– AD&I meeting– Free slot

• Additional Friday slot also available

15.11.2011

Consolidated Accelerator Systems and CFS/Global meetings (now focused on TDR work)

To be used for TDR TEB and Cost Management Team meetings

Nick Walker - PAC, Prague

Page 24: Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

2011 Preparation Work

• TEB kick-off meeting– editing assignments and agreed-upon workflow

• Finalise detailed outline– headings– estimated page count– section scope– authors

• Request feedback from authors– especially for schedule– Note: many authors have more than one writing assignment

• Consolidate/adjust writing schedule• Technical preparation

– Common workspace– LaTeX template(s)– …

15.11.2011 Nick Walker - PAC, Prague

Page 25: Nick Walker Marc Ross Akira Yamamoto GDE PAC 15.11.11 Prague TDR Plans and Scope.

Summary

• Preparation for TDR well underway– Now primary GDE focus (together with costing/industrialisation)

• 2+1 separate volumes– Executive Summary– Part I R&D– Part II Baseline Design & Cost

• Accompanying outreach document– broader non-scientific readership

• Preparation work remainder of this year, writing starts next year– of course earlier is better

• Coordination with Physics & Detector groups just starting• Very aggressive scope and schedule

– However we are building on the RDR and the Interim report

15.11.2011 Nick Walker - PAC, Prague