Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern. Monthly Progress Report – SEPTEMBER 2014 INDEX S. No DESCRIPTION P.No . 1 INDEX MAP 2 2 EXECUTIVE SUMMARY 3-5 3 PROJECT BACKGROUND 6 4 CONTRACT DATA 7-8 5 SALIENT FEATURES OF THE PROJECT 9 6 SUBMISSION OF RELEVANT MANUAL & DOCUMENTS BY CONCESSIONAIRE 10 7 STATUS OF PERMITS 11 8 TECHNICAL MAN POWER- INDEPENDENT ENGINEER 12 9 TECHNICAL MAN POWER- CONCESSIONAIRE 13 10 TECHNICAL MAN POWER- SUB CONTRACTOR 14-17 11 PRE CONSTRUCTION ACTIVITIES 18-19 12 DETAILS OF CORRESPONDENCE FROM IE 20-27 13 STATUS OF PLANT & MACHINERY 28 14 STATUS OF DRAWING (Structures/Highways) 29-39 15 CONSTRUCTION PROGRAMME BY THE CONCESSIONAIRE, S-CURVE 40 16 PROJECT WORK PROGRESS 41-42 17 DETAILS STATUS OF STRUCTURE 43-52 18 BAR CHART 53-55 19 E EMERGENCY SERVICE 56 20 QUALITY ASSURANCE & QUALITY CONTROL 57-66 21 SAFETY AND ROAD MAINTENANCE 67-68 22 WEATHER REPORT 69 Page | 1

Transcript of nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan...

Page 1: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

INDEXS.No

DESCRIPTION P.No. 1 INDEX MAP 2

2 EXECUTIVE SUMMARY 3-5

3 PROJECT BACKGROUND 6

4 CONTRACT DATA 7-8

5 SALIENT FEATURES OF THE PROJECT 9

6 SUBMISSION OF RELEVANT MANUAL & DOCUMENTS BY CONCESSIONAIRE

10

7 STATUS OF PERMITS 11

8 TECHNICAL MAN POWER- INDEPENDENT ENGINEER 12

9 TECHNICAL MAN POWER- CONCESSIONAIRE 13

10 TECHNICAL MAN POWER- SUB CONTRACTOR 14-17

11 PRE CONSTRUCTION ACTIVITIES 18-19

12 DETAILS OF CORRESPONDENCE FROM IE 20-27

13 STATUS OF PLANT & MACHINERY 28

14 STATUS OF DRAWING (Structures/Highways) 29-39

15 CONSTRUCTION PROGRAMME BY THE CONCESSIONAIRE, S-CURVE

40

16 PROJECT WORK PROGRESS 41-42

17 DETAILS STATUS OF STRUCTURE 43-52

18 BAR CHART 53-55

19 E

EMERGENCY SERVICE 5620 QUALITY ASSURANCE & QUALITY CONTROL 57-6621 SAFETY AND ROAD MAINTENANCE 67-6822 WEATHER REPORT 69

23 PHOTOGRAPHS 70-71

Page | 1

Page 2: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

Page | 2

Page 3: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014EXECUTIVE SUMMARY

BACKGROUND:

Ministry of Road Transport and Highways (MORT&H) has embarked on a staged up gradation programme of various National Highway. The widening is necessary to develop National Highway corridors where traffic intensity has increased significantly and there is requirement of augmentation of capacity for safe and efficient movement of traffic. MORT&H has authorized National Highway Authority of India (NHAI) to implement the development projects for six laning of Barwa Adda to Panagarh section of National Highway No.-2 in the state Jharkhand and West Bengal by way of Public-Private Partnership (PPP) mode.

The project corridor on NH-2, a part of Golden Quadrilateral is passing through plains of Gangetic region of landlocked states of Bihar & Jharkhand and connects the National Capital with Kolkata traversing almost 1465 km, passing through the states of west Bengal, Bihar, Jharkhand, Uttar Pradesh, Haryana & Delhi. Apart from cutting across several other NFs it traverses through major towns of Durgapur-Asansol, Dhanbad, Aurangabad, Varanasi, Allahabad, Kanpur, Agra, Faridabad, thereby catering to traffic with East West spectrum within the country.

The project road of NH-2 starts from Barwa-Adda in Dhanbad district in the State of Jharkhand Km 398.240 and ends at Panagarh in Bardhaman district of West Bengal km 521.120. Total length of stretch is 122.88 km passes through Barwaadda, Ponrki, Bhitiya, Kaladih, Amarpur, Govindpur Bajar, Fakirdih,Phufwadih, Gopalganj, Nirsa, Belchahri in the district of Dhanbad in Jharkhand State and Salanpur, Niyamatpur, Asansol, Bogra Chatti, Palas danga, Raniganj More, Mangalpur, Andal More, Kada Road, Durgapur, Muchipara, Rajbandh Chati, Panagarh in the district of Bardhman in West Bengal.

NHAI have awarded the task of Feasibility and Detailed engineering for improvement of this section of NH-2 to M/s ICT, India.

NHAI has awarded the work of “Design, Build, Finance, Operate and Transfer of Km. 398.240 to Km. 521.120 including a bypass of length 8.120 Km. and service road of length 149.09 at selected locations to M/s Barwa Adda Expressway Ltd. (Mumbai).

NHAI has awarded the Independent Consultancy for the project to M/s SA Infrastructure Consultants Pvt. Ltd. in association with Sugam Technocarts Pvt. Ltd.

Page | 3

Page 4: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

The Project Road

The concessionaire has divided the entire project road length into the following 3 Sections:

Sections Chainage

From

Chainage

To

Total Length(Km)

Sub-Contractor

Section-I 398.240 441.565 43.325 M/s APCO Infratech Ltd.Section-II 441.565 471.150 29.585 M/s APCO Infratech Ltd.Section-III 471.150 521.120 49.970 M/s Oriental Structural

Engineers Pvt. Ltd

Project Milestones

Page | 4

Mile

stone

DescriptionScheduled

Time PeriodCurrent Status

1

Construction of Project Highway shall have commenced.

(Expended not less than 10% of the total capital cost set forth in Financial Package)

27th September 2014 ( 180th day from Appointed

Date)

Six months completed

2

Construction of all bridges shall have commenced.

(Expended not less than 25% of the total capital cost set forth in Financial Package)

31st March 2015 (365th day from Appointed Date)

-

3

Construction of all Project Facilities shall have commenced.

(Expended not less than 75% of the total capital cost set forth in Financial Package)

30th March 2016 (730th day from Appointed Date)

-

4 The scheduled Six Laning Date

26th September 2016 (910th day from Appointed

Date)

-

Page 5: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

CONDITION PRECEDENT

S. N.

Compliance Responsible

Authority

Execution date

Current Status

1

ROW Handing Over NHAI 28/03/201416/05/201427/05/201406/06/201410/06/201414/06/201401/07/201410/07/201421/08/201423/8/201426/9/2014

NHAI has handed over EROW of

534.80 Ha +12.286 Ha + 5.076 Ha

+4.456 Ha+10.816Ha+

4.138 ha = 571.572 Ha + 4.801 +1.612 Ha +1.962

Ha+1.962Ha+2.923Ha= 584.832Ha

79.94 %2 Permission of Environment

Protection & Conservation of Site

NHAI - Received.

3 Escrow Agreement BDU Nov 01, 2013

Executed

4 Substitution Agreement BDU Nov 01, 2013

Executed

5 Performance Security to Client BDU Oct 29,

2013Submitted

6 Delivery of Financial Model to Client BDU Nov 01,

2013Executed

7 Delivery of Warranties from All Consortium Member to

clientBDU

Apr 23, 2013

Executed

8 Delivery to the client a legal opinion from the legal

counsel of the ConcessionaireBDU

Apr 30, 2013

Executed

9

Appointment of Independent Engineer

NHAI

19.02.2014 M/s S.A. Infrastructure

Consultants Pvt. Ltd. in association

with Sugam Technocrats Pvt.

Ltd.

10State Support Agreement

NHAI

Jharkhand-13.04.2010

West Bengal –

13.04.2010

Available for both the States.

11 Approval from Railway Authorities in form of GAD for

construction of ROBNHAI

08.06.201209.09.2011

GADs for both the ROB’s have been

approved.

Page | 5

Page 6: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

PROJECT DETAILS :-

The Project Road is 122.88 KM Long consisting of 1-Bypass of Length 8.120 Km for Congested Area at Panagarh including structures as under:-

A. HIGHWAYS:-(a) Total Length of Existing Carriage Way = 121.990 Km.(b) Total No. of lane = 2*3 lane(c) Total length of Service Road = 149.09 Km.(d) Width of Service Road = 7m

(c) Bypass Details:- . Panagarh Bypass = 8.120km

B. STRUCTURES:-

(a) Major Bridges = 3 Nos.

(b) Minor Bridges = 20 Nos. (11 New & 9 Widening)

(c) Grade Separator = 12 Nos.

(d) ROBs = 2 Nos.

(e) VUPs and PUPs = 20/11 Nos.

(f) Box Culverts /Hume Pipe/Slab Culverts = 202 Nos.

(g) Over Pass/ Under Pass = 2/2 Nos

Page | 6

Page 7: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

CONTRACT DATA

CONCESSIONAIRE:

Name of Project : Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Employer : National Highways Authority of India

Concessionaire : Barwa Adda Expressway Limited,Plot No. C-22, G Block, Bandra

KurlaComplex, Mumbai-400051

Project Developer : IL&FS Transportation Networks Limited

Construction Contractor : M/s Apco Infratech Pvt. Ltd. & M/s Oriental Structural Engineers

Pvt.Ltd.

Date of Agreement : May 08, 2013

Development Period : From 08/05/2013 to 31/03/2014

Financial closure : 01/11/2013

Appointed Date : 01/04/2014

Project Cost/ Premium : Rs. 1665 Crore Premium of Rs. 42 Crore on

appointed date and shall be increased by 5% as compared to the immediately preceding year.

Construction Period : 910 days.

Scheduled Date of Project Completion : 26/09/2016

Concession Period : 20 Years Including 30 months of Construction Period.

Page | 7

Page 8: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014Performance Security : Rs. 107.19 Crore

INDEPENDENT CONSULTANT/ENGINEER:

Engineer (Consultants) : M/s SA Infrastructure Consultants Pvt. Ltd in Association with Sugam Technocrats Pvt.Ltd.

Head Office Address : C/o S.A. Infra Structure Consultants Pvt. Ltd.101-102, CS-1 Gyandkhand-II, Indrapuram, Ghaziadad – (UP) 201014. Ph.No.: 0120-2607756, [email protected]

Office Address : Plot No.16/14, Bengal Ambuja, City Center, Durgapur, Dist:- Burdwan (W B), Pin-713216

Phone No.: [email protected]

Date of Agreement : 19.01.2014

Commencement date : 19.02.2014

Contract Period : 36 months

Scope of Consultancy : Independent Engineer

Page | 8

Page 9: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

SALIENT FEATURES OF THE PROJECT :-THE PROJECT ROADThe Project road comprises off from 398.240 to Km.521.120 Km of existing road of NH-2. The Salient Features of the project are as under:-

S.No. Description Quantity

1 Length of Project 122.88 KM

2 (a) By Pass – Total Length – 8.120 Km (b) Existing

Carriageway Length – 121.990 Km.

3 Width of carriageway 2*12.25=24.50M

4 Service Road 149.09 Km.

5 Width of service road 7 M6 ROB’s 2 Nos at Km 443+710 & Km 520+373

7 Grade Separator12 Nos. at km.398+811,407+538,408+326,456+312,464+185,475+670,476+050,496+609,501+996,504+287,506+200,515+983

8 Major Bridges - (3 No’s) MJB 3 Nos. at Km.464+674,517+095,518+829

9 Minor Bridges – (20 No’s)

MNB 11 Nos. at Km. 405+330,409+876,415+120,429+973,437+047,450+140,461+652,464+903,468+620,497+840,509+953, Widening 9 Nos. at Km. 445+596,462+895,463+091,463+710,471+006,485+002,492+871,495+735,507+503

10 Vehicular Under Passes

VUP 20 Nos. at Km. 403+440,411+374,413+886,421+400,428+208,433+563,447+771,451+153,460+036,467+115,469,750,473+340,479+109,486+427,489+702,491+451,494+430,509+559,518+221,519+349

11 Pedestrian UnderpassesPUP 11 Nos. at Km. 398+495,399+230,407+400,409+088,417+953,424+400,476+430,504+555,510+700,512+920,514+900

12 Box /HP/Slab Culverts 202 Nos.

13 BUS Lay Byes LHS 20 Nos.RHS 20 Nos.

14 Truck Lay Byes LHS 10 Nos.RHS 04 Nos.

Page | 9

Page 10: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

15 Toll Plaza 2 Nos. at Km. 438+500,507+000.

16 Truck Parking Places 2 Nos. at Km. 398+250 to Km 398+750 & Km 441+800 to Km 442+300.

Submission of Relevant Manual & Documents by Concessionaire:-

SI. No

Description Remarks

1 QAP Received

2 Work Methodology Received

3 Work Schedule Received

4 EMP Not received

5 Material Report of Borrow areas Received

6 Quarry location Received

7 Safety Manual Not received

Page | 10

Page 11: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

Status of Permits:-

Page | 11

SI . No

Descriptions Applied Date

1 Permits for extraction of boulder from quarry from Additional District Magistrate (ADM) Mines 15.06.2012

2 Permit for installation of crusher from village Panchayat and State/Central Pollution Control Board

25.11.2013

3 License for explosives from the office of Explosive controller 09.02.2013

4

NOC consent/Clearance required from village panchayat & State/Central Pollution Control Board/Dept.

Vill Panchayat - 25.11.13West Bengal Pollution Control

Board - 20.12.13

5 Clearance required from village panchayat & State/Central Pollution Control Board

Vill Panchayat - 25.11.13West Bengal Pollution Control

Board - 20.12.13

6 Permission required from village panchayat and ADM mines for Government & private land Vill. Panchayat - 25.11.13

7 Permission from Forest Department and other applicable agencies

Dhanbad (Jh) - 08.11.11Burdwan (WB) - 23.09.13,

25.09.13, 30.09.13,30.09.13, 03.10.13

Page 12: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

List of Technical Man Power of I.E.:-

Technical Manpower- Independent EngineerPROFESSIONAL STAFF Sl.

Name Designation Date of Joining

1 Mr. Vinod Prasad Jaiswal Team Leader cum Sr. Highway Engineer

 

2 Mr. A. N. Dhodapakar Sr. Bridge Design Engineer 06.03.20143 Mr. Manoj Kumar Jaiswal Resident cum Highway Engineer I 19.02.20144 Mr. Saroj Kumar Singh Resident cum Highway Engineer II 20.03.20145 Mr. Yogendra Prasad Highway Design Engineer I 02.06.20146 Nityanand Kumar Highway Design Engineer I 19.02.20147 Mr. R.K.Rai Bridge / Structural Engineer 19.02.20148 Mr. Kedar Paswan Sr. Pavement Specialist 19.05.20149 Mr. Vijay Kumar Singh Sr. Quality cum Material Expert 19.02.201410

Mr. Satyendu Sinha Traffic & Transportation Expert 20.5.2014

11

Mr. R. S. Sharma Road Safety Expert

12

Mr. Upendra Kumar Singh Financial Expert 13.05.2014

13

Mr. Rajeshwar Kumar Singh Legal Expert 22.05.2014

SUB PROFESSIONAL STAFF 1 Mr. Binash Ranjan Das Survey Engineer I 2 TBN Survey Engineer II3 Mr. Nitai Satapathy Survey Engineer III 26.03.20144 Mr. Santosh Sharma Survey Engineer IV 28.03.20145 Mr. Lalmani Pratap Singh Asst. Highway Engineer I 13.08.20146 Mr. Amit Kumar Basu Asst. Highway Engineer II 03.03.20147 Mr. Ajoy Banerjee Asst. Highway Engineer III 07.04.20148 Mr. Sachin Kumar Asst. Highway Engineer IV 08.04.20149 Mr. Aniruddha Chatterjee CADD Expert I 15.05.201410

TBN CADD Expert II

11

TBN Environmental Engineer

12

TBN Asst. Bridge Engineer I

13

Mr. Hasan Faraz Asst. Bridge Engineer II 09.08.2014

14

Mr. Kumar Kaushal Asst. Bridge Engineer III 26.03.2014

15

Mr. Inderpal Singh Asst. Bridge Engineer IV

16

Mr. Rakesh Kumar Chakarborthy

Asst. Quality cum Material Engineer I

13.08.2014

17

Mr. Asim Kumar Mahapatra Asst. Quality cum Material Engineer II 03.03.2014

Page | 12

Page 13: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 201418

Mr. Anup Mahadani Asst. Quality cum Material Engineer III 07.04.2014

19

Mr. Tuna Behera Asst. Quality cum Material Engineer IV 28.04.2014

20

TBN Electrical Engineer I  

21

TBN Electrical Engineer II  

22

TBN HTMS / Toll Expert I  

23

TBN HTMS / Toll Expert II  

24

TBN Quantity Surveyor I  

25

TBN Quantity Surveyor II  

26

Mr. R.K.Singh Horticulture cum Landscaping Expert I  

27

TBN Horticulture cum Landscaping Expert II  

List of Tech. Man Power of Concessionaire:-Sl. No.

Name Designation Remarks

Concessionaire – Durgapur (Km. 398.240 to Km. 521.120)

1. Mr. V.P.KATTI PROJECT DIRECTOR2. Mr. Anil Kumar Mishra Sr. Planning Engineer3. Mr. Vimlesh Kumar Sr. Quantity Surveyor4. Mr. Piyush Jain Assistant Planning5. Mr. Kaushal Mehta Finance and Accounts6. Mr. Abdesh Jha Administration7. Mr. I. Nagaraju Q.A./Q.C. Head8. Mr. Bipad Bhaanjan Ghosh Sr. Surveyor/CAD9. Mr. Vikram Dutta L.A. Officer10. Mr. Amit Garg L.A. Officer11. Mr. S.P.Singh Utility Shifting (Electrical) 12. Mr. U C Srivastav Sr. Manager – O & M

Tolling13. Mr. Praveen Jindal Manager - Tolling14. Mr. Abhishek Anand Trainee (Highway)15. Mr. Krishnendu Technician

Concessionaire – I Dhanbad (Km. 398.240 to Km. 441.565)

16. Mr. Sanjiban Dutta Section In-Charge17. Mr. Santosh Kumar Highway/Bridge Engineer18. Mr. Naresh Chandra Sao Assistant Bridge Engineer19. Mr. Umesh Sharma Assistant Material

Page | 13

Page 14: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014Engineer

20. Mr. Uttam Kumar Gayan Assistant Surveyor21. Mr. Raj Kumar Ghosh Lab Technician

Concessionaire – II Asansol (Km. 398.465 to Km. 471.150)

22. Mr. Malay Dutta Section In-Charge23. Mr. Pramod Kumar Pandey Assistant Highway

Engineer24. Mr. Himanshu Bushan

PandaBridge Engineer

25. Mr. Suresh R Assistant Bridge Engineer26. Mr. Pravin Kumar Sharma Assistant Material

Engineer27. Mr. Manoj Kumar Yadav Assistant Surveyor28. Mr. Somnath Chatterjee Lab Technician

Concessionaire – III Durgapur (Km. 471.150 to Km. 521.120)

29. Mr. Zulfequar Ahmed Bridge Engineer30. Mr. Rajesh Kumar Assistant Highway

Engineer31. Mr. Aman Sachdeva Assistant Bridge Engineer32. Mr. Jyoti Prakash Lab Technician

List of Tech. Man Power of the Sub-Contractor :-

(APCO Infratech Limited) – Section ISl. No. Name Designation RemarksSr. Project Manager

1. Mr. Satpal Singh Sr. General ManagerHighway

2. Mr. Umesh Chand Singh AGM Highway3. Mr. Sanjiv Kumar Sr. Manager4. Mr. Neeraj Pandey Jr. Engineer

Structure5. Mr. Amitabh Kumar Sr. Engineer6. Mr. Jai Prakesh Tiwari Sr. Project Engineer7. Mr. Abhishek Pratap Singh DET8. Mr. Ajit Kumar Yadav Engineer9. Mr. Raju Kumar Singh Sr. Foreman

Planning & Billing10. Mr. Krishan Murari Varma Sr. Engineer - Billing11. Mr. Krishan Chand Document Controller12. Mr. Vanu Pratap Gupta GET13. Mr. Jatin Sharma Billing Engineer

Quali1ty Control Engineers14. Mr. Sarad Kumar Singh Asst. Engineer15. Mr. Natwar Batra Jr. Engineer

Page | 14

Page 15: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 201416. Mr. Pravin Kumar Singh GET17. Mr. Sashi Bhusan Kumar Lab Technician18. Mr. Shayam Prakash Das Lab Technician19. Mr. Pankaj Kumar Lab Technician

Surveyor20. Mr. Praveen K Srivastav Sr. Supervisor21. Mr. Sarya Pratap Kunwar Sr. Supervisor22. Mr. Uttam Kumar Verma Sr. Supervisor23. Mr. Ashish Kumar Mishra Asst. Supervisor

Mechanical Engineer24. Mr. B. Anjaneyulu Manager25. Mr. Mahamad Rashid Sr. Engineer-Plant26. Mr. Umesh Bisht Mechanical Engineer27. Mr. Rajat Singh GET28. Mr. Brajesh Kumar Sharma Data Entry Operator

Civil Supervisor29. Mr. Bineshwar Singh Supervisor30. Mr. Pradip Kumar Singh Supervisor31. Mr. Dharmendra Singh Civil Supervisor32. Mr. Ranjeet Singh Supervisor33. Mr. Shahrukh Khan Supervisor34. Mr. Babu Kumar Singh Supervisor – (Borrow Area)35. Mr. Digvijay Singh Civil Supervisor

Store36. Mr. Pradip Kumar Mishra Sr. Store Officer37. Mr. Munna Kumar Singh Store Officer

Admin & Accounts38. Mr. Partha Majumber Dy. Manager39. Mr. S.R. Srivastav Sr. Manager ( (P & A)40. Mr. Rajneesh Kumar Accountant41. Mr. Raj Kumar Sharma Officer42. Mr. Ram Mahajon Supervisor (Admin)43. Mr. Indra Bhusan Kumar Manager

IT Dept.44. Mr. Bipin Kumar Sharma IT Executive

(APCO Infratech Limited) – Section IISl. No. Name Designation Remarks Project Manager

1. Mr. Manish Mishra Project ManagerHighway

2. Mr. R. P.Chowdhury Manager3. Mr. Mukesh Kumar Singh Engineer4. Mr. Chandra Prakash Singh Supervisor

Structure5. Mr. Jagadish Srivastava Manager6. Mr. Suresah Prasad Singh Manager7. Mr. Yogesh Chandra Jr. Engineer8. Mr. Jitendra Kumar Singh Jr. Engineer9. Mr. Rajindar Kumar Asst. Engineer10. Mr. Amresh Singh Asst. Engineer11. Mr. Satosh Kumar Srivastav Supervisor

Planning & Billing12. Mr. Bijay Kumar Sahoo Engineer

Quality Control Engineers13. Mr. Suman Sanyal Manager14. Mr. Chandan Singh Jr. Engineer

Page | 15

Page 16: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 201415. Mr. Md. Shakil Sr. Lab Technician16. Mr. Raj Kamal Tiwari Lab Technician

Surveyor17. Mr. Ashutosh Kumar Singh Sr. Surveyor18. Mr. Santosh Kumar Tripathi Sr. Surveyor19. Mr. Sunil Kumar Yadav Surveyor20 Mr. Atul Kumar Asst. Surveyor21. Mr. Sandip Mishra Asst. Surveyor

Mechanical & Mining Engineer22. Mr. Kishan Mahon Kushwaha Manager23. Mr. Gautam Kumar Paul Asst. Manager24. Mr. P Bhaskar Reddy Engineer25. Mr. Jitendra Kumar Manager - Mining

Store26. Mr. P. P. Rajan Manager27. Mr. Sanu Lal Verma Sr. Store Keeper28. Mr. Atul Kumar Debey Officer Store29. Mr. Shailendra Kumar Singh Operator

Admin & Accounts30. Mr. Anil Kumar Singh Manager – Admin31. Mr. Sailendra Pattanayak Dy. Manager – Admin32. Mr. M. Srinivasa Rao Dy. Manager – Accounts33. Mr. Arun Kumar Singh Executive Admin34. Mr. Gagan Kumar Gandhi Accountant35. Mr. Chinmay Nayak Officer Admin36. Mr. Pravat Kumar Rout Accounts officer

Safety37. Mr. Manoj Kumar Giri Safety Officer

(Oriental Structural Engineers Pvt. Ltd.) – Section III

Sl. No. Name Designation RemarksChief Project Manager

1. Mr. V. K. Chauhan Chief Project ManagerHighway

2. Mr. N. K. Singh Sr. Project Manager3. Mr. Praveen Srivastava Project Manager4. Mr. Shio Kr. Singh Sr. Project Manager5. Mr. Krishna Kumar Singh Sr. Project Manager6. Mr. Arindam Das Project Engineer7. Mr. Arijit Mittal Sr. Manager8. Mr. S. S. Negi Dy. Manager9. Mr. Chandra Mani Kishore Sr. Engineer10. Mr. B. Shankar Rao Sr. Engineer11. Mr. Abhinav Singh Sr. Engineer12. Mr. Avimunyu Pal Dy. Manager13. Mr. Suresh Kushwh Asst. Manager14. Mr. Ummed Singh Asst. Manager15. Mr. U.K.Jha Jr. Officer16. Mr. Saurabh Kumar Sr. Supervisor17. Mr. K.K. Jha Sr. Supervisor18. Mr. Manor Gautam Supervisor19. Mr. Vinod Kumar Sharma Sr. Supervisor20. Mr. Sanjay Kumar Bharti Sr. Supervisor21. Mr. Shivaji Suryanvanshi Sr. Supervisor22. Mr. Jitendra Kumar Yadav Supervisor23. Mr. Pravesh Kumar Yadav Supervisor

Page | 16

Page 17: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014Structure

24. Mr. Rajeev Naryal Sr. Project Manager25. Mr. Surendra Chhabra Project Manager26. Mr. Ramavatar Sharma Dy. Project Manager27. Mr. Ashok Kumar Singh Dy. Project Manager28. Mr. S. N. Mondal Dy. Project Manager29. Mr. Chandan Rikhi Project Engineer30. Mr. Pawan Kumar Project Engineer31. Mr. Manish Kumar Singh Sr. Engineer32. Mr. Shivram Mishra Sr. Engineer33. Mr. Shiv Prakash Mourya Asst. Engineer34. Mr. G. Haribabu Asst. Engineer35. Mr. Arjun Kumar Jr. Engineer36. Mr. Vijay Kr. Rai Jr. Engineer37. Mr. Ambrish Kr. Rai Jr. Engineer38. Mr. Rajeev Kumar Foreman39. Mr. Ugrasen Singh Asst. Manager40. Mr. Durga Prasad Gautam Officer41. Mr. Amit Kumar Singh Asst. Officer42. Mr. Krishna Kumar Tripathi Supervisor43. Mr. Baidhnath Upadhyay Supervisor

Planning & Billing44. Mr. Sumanta Chakraborty Jt. GM45. Mr. Faishal Rizwan Siddqui Sr. CAD Engineer46. Mr. Pawan Kumar Asst. Engineer (Design)47. Mr. Avijit Mahanto Asst. Manager48. Mr. Brijesh Kumar Mishra Officer49. Mr. Abhist Narayan Singh GET

Quality Control Engineers50. Mr. Anil Kumar Project Manager51. Mr. Hari Singh Dy. Manager52. Mr. Mukesh Kumar Singh Asst. Engineer53. Mr. Sanjay Kumar Paul Asst. Engineer54. Mr. Ravish Kumar GET55. Mr. Manik Kumar Jha Sr. Lab Technician56. Mr. Sunil Kumar Jha Lab Technician57. Mr. Jay Prakash Lab Technician58. Mr. Vinod Kumar Ray Lab Technician59. Mr. Rajendra Pratap Singh Lab Assistant

Surveyor60. Mr. Janmejay Rai Project Engineer61. Mr. Vijay Kumar Sr. Surveyor62. Mr. Santosh Kumar Pradhan Surveyor63. Mr. Hardev Singh Surveyor64. Mr. Ravindra Tiwari Surveyor65. Mr. Biswanath Mondal Surveyor66. Mr. Ashok Kumar Singh Asst. Surveyor

Mechanical & Mining Engineer67. Mr. B.B. Singh Project Manager (P&M)68. Mr. J. S. Virdhi Project Manager (Crusher)69. Mr. Man Mohan Sharma Jt. AGM70. Mr. L. K. Sharma AGM71. Mr. D. P. Singh Sr. Engineer72. Mr. Sailesh Kr. Dixit Asst. Engineer73. Mr. Hazari Lal Prasad Foreman (elect.)74. Mr. Ram Raj Yadav Foreman (Plant)75. Mr. Salil Das Gupta Dy. Manager76. Mr. S N. Mishra Dy. Manager (Production)

Page | 17

Page 18: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 201477. Mr. Arun Kumar Singh DEO78. Mr. Kaladharan Supervisor

Safety/HSE79. Mr. Jadav Akhtar Officer80. Mr. Manoj Kumar Singh Officer

Store81. Mr. Shubrata Ghoshal Manager82. Mr. R. Bhattachrarya Asst. Manager83. Mr. B.D.Tiwari Asst. Manager84. Mr. Veer Singh Asst. Manager85. Mr. Sabir Khan Manager86. Mr. Dependra Kulshresta Officer87. Mr. Bipadtaran Singha Sr. Officer88. Mr. Surendra Pratap Sharma Officer89. Mr. Moti Upadhyay Sr. Supervisor90. Mr. Jay Chand Jha Supervisor91. Mr. Vishwajit Singh Supervisor92. Mr. Chandan Singh Supervisor

HR/Admin93. Mr. Sandipan Dev Ray Jt. GM94. Mr. Shailesh Sharma Manager95. Mr. Sachin Kumar Dy. Manager96. Mr. Anubhav Pandey Dy. Manager97. Mr. Ujjaval Kumar Officer (Liaison)98. Mr. Rajesh Tiwari Asst. Officer99. Mr. Ajit Kumar Asst. Officer

Accounts100. Mr. Dipak Kr. Dutta Jt. AGM101. Mr. N. K. Srivastava Manager102. Mr. Devendra Saptsishi Manager103. Mr. Manas Kumar Mohanty Asst. Manager

PRE CONSTRUCTION ACTIVITIES :- SUB HEAD

STATUS OF LAND ACQUISITIONS:-

Description Jharkhand

West Bengal Total Remarks

Length 43.16 km 79.72 km 122.880 km

Total land required

259.00 Ha 472.56 Ha 731.56 Ha

Handed over 185.00 Ha 399.809 Ha 584.809Ha 79.94%

To be handed over

74.00 Ha 72.751 Ha 146.751 Ha 20.06%

STATUS OF UTILITIES SHIFTING:-Page | 18

Page 19: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

S. N. Activity Unit Total

Attended till this month

BalanceRemarks

1 Tree Cutting

Nos. 26670 12685 13985 52.44% balance

2 Electric Poles

Nos. 7194 62 7132 Work in progress (JSEB , DPL &WBSEDCL)

3 Electric Towers

Nos. 12 Nil 12

4 Water Pipe lines

RM 82379 Nil 82379 Work in progress

5Gas Pipe Lines (GEECL)

RM 52100 Nil 52100

6Petroleum Pipe line

RM 837 Nil 837

STATUS OF ENCUMBRANCES:-

SI. N.

Descriptions

Side

Units

(affected

length)

Total

Attended till this

month

Balance Remarks

1. Pucca Buildings

LHS

RHS

M

M

971

944

Nil

Nil

971

944

2. Semi Pucca Buildings

LHS

RHS

M

M

991

1033

Nil

Nil

991

1033

Page | 19

Page 20: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 20143. Kachha

BuildingsLHS

RHS

M

M

409

381

Nil

Nil

409

381

4. Religious Structures

LHS

RHS

M

M

41

43

Nil

Nil

41

43

DETAILS OF CORRESPONDENCE FROM IE’s OFFICE-DURGAPUR

(SEPTEMBER, 2014) Correspondence with PD, NHAI PIU-Durgapur:

1. OUTGOING CORRESPONDENCE

Sl. No. Ref.No. from SAICPL Date Subject

1 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/310

01.09.2014 Discrepancy in L.A. proposal

2 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/311

01.09.2014 Submission of weekly status reports for tree felling

3 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/313

01.09.2014

Repair and Maintenance of entrusted highways stretches

Page | 20

Page 21: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

4 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/316

03.09.2014 High Mast Light installed at Mouza-Mangalpur

5 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/319

03.09.2014 Monthly Accident Report.

6 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/320

04.09.2014

Redressal of grievances of Shri Subrata Roy, Asansol, West Bengal

7 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/322

04.09.2014

IPC-02 for Electrical Utility Shifting pertaining to JSEB/JUVNL

8 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/325

04.09.2014 Project Specific Website

9 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/327

06.09.2014

Exploring the possibilities on installing Solar Panels on Toll Plazas

10 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/328

06.09.2014 Inspection report of Independent Engineer

11 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/329

08.09.2014

Installation / Maintenance of Traffic Signals from Andl More to Muchipara More on NH-2

12 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/333

08.09.2014 Submission of weekly status reports for tree felling

13 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/340

09.09.2014 Condition of NH-2

14 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/341

09.09.2014

Expediting the maintenance work to improve the poor conditions of NH-2 and strengthening safety measures on NH-2 (Dhuburdih to Muchipara)

15 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/346

10.09.2014

Exploring the possibilities on installing Solar Panels on Toll Plazas

16 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/348

10.09.2014

Representation from Citizen safety and security forum

17 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/349

12.09.2014

Permission for construction of Railway siding as well as service Road in NHAI land at Panagarh Industrial Park at Panagarh, Burdwan

18 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/352

12.09.2014 Maintenance of NH-2

19 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/355

15.09.2014

Repair & Maintenance of entrusted highways stretches.

20 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/357

15.09.2014

Regarding submission of weekly status report for tree felling.

21 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/358

15.09.2014

Fixing of 2 Nos. signed board 200 m away both side from Kalla More

22 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/363

16.09.2014

Complaint against deteriorating condition of NH-2 between Panagarh to Duburdih

23 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/366

16.09.2014

Assessment of availability of space for installation of Telecom Infrastructure at Toll Plaza sites.

24 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/371

19.09.2014

Request for allotment of one no. 2 BHK flat at NHAI PIU Campus (Dhanbad)

25 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/373

19.09.2014 Procurement of steel

26 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/375

20.09.2014

Estimate for rerouting of high pressure Gas pipeline of Durgapur Projects Limited at DVC More

Page | 21

Page 22: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

27 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/376

22.09.2014

Training for PMIS & Project Specific Website on 26th & 27th September 2014

28 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/379

22.09.2014 Submission of weekly status of tree felling

29 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/385

25.09.2014

Representation from Citizen safety and security forum

30 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/392

29.09.2014 Submission of weekly status report for tree felling

31 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/398

30.09.2014 MPR-7 for the month of AUGUST 2014

2. INCOMING CORRESPONDENCE

SL REF. NO. DATE SUBJECT1 12024/1/2001/PIU(DUP)/2290 01.09.201

4Note in Connection with visit of Black spot on National Highways -2 in the districts of Hoogly, Burdwan and Asansol-Durgapur commissinerate in 25.07.2014 along with Project Director, PIU, Durgapur & DIG Traffic, W.B.

2 15018/1/2013/PIU(DUP)/2291 01.09.2014

High Mast light installed at Mouza - Mangalpur

3 15018/1/2013/PIU(DUP)/2292 01.09.2014

Shifting of raising main along NH-2 under RCFA Pt-II W/S scheme

4 15018/1/2013/PIU(DUP)/2324 03.09.2014

Redreassal of grievance of Shri Subrata Roy, Asansole, West Bengal

5 15018/1/2013/PIU(DUP)/2348 04.09.2014

Expediting the maintenance work to improve the poor conditions of NH-2 and strengthening safety measures on NH-2 (Dhuburdih to Muchipara)

6 15018/1/2013/PIU(DUP)/2349 05.09.2014

Representation from citizen safety & security Forum.

7 15018/1/2013/PIU(DUP)/2360 05.09.2014

Damage of rural U/G Bogra Tele. Exchange under GM telecom, Asansol towards Chanda, Nigha, Sripur areas and collapsed of telephone services

8 15018/1/2013/PIU(DUP)/2362 05.09.2014

Condition of NH-2

9 15017/1/2008/PIU(DUP)/6-lane/ 2402

11.09.2014

Maintenance of NH-2

10 15018/1/2013/PIU(DUP)/2416 12.09.2014

Complaint against deteriorating condition of NH-2 between Panagarh to Duburdih

11 15018/1/2013/PIU(DUP)/2417 12.09.2014

Petition of Sh. Nikhil Kumar Agarwal, Nirsha, District Dhanbad, Jharkhand

12 15018/1/2013/PIU(DUP)/2418 12.09.2014

Re-presentation from M/s Citized Safety & Security Fourm

13 15018/1/2013/PIU(DUP)/2439 15.09.2014

Procurement of Steel

14 15018/1/2013/PIU(DUP)/2441 15.09.2014

Assessment of availability of space for installation of Telecom Infrastructure at Toll Plaza sites

15 15018/1/2013/PIU(DUP)/2457 16.09.2014

DW&SD water pipe line of Jharkhand state from Km. 405+350 to Km. 456+700

16 15018/1/2013/PIU(DUP)/2487 18.09.2014

Stock for felling tree from Barwa Adda to Panagarh on NH-2

Page | 22

Page 23: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 201417 15018/1/2013/PIU(DUP)/2488 18.09.201

4Stock for felling tree from Barwa Adda to Panagarh on NH-2

18 15018/1/2013/PIU(DUP)/2493 18.09.2014

A mass petition dated 05.09.2014

19 15018/1/2013/PIU(DUP)/2504 18.09.2014

Stock for felling tree from Barwa Adda to Panagarh on NH-2

20 15018/1/2013/PIU(DUP)/2503 18.09.2014

Estimate for rerouting of High Pressure Gas pipeline of Durgapur Project Limited at DVC More.

21 12017/1/2001/PIU(DUP)/2522 22.09.2014

Training for PMIS & Project Specific Website on 26th & 27th September 2014

22 15017/1/2008/PIU(DUP)/6-lane/ 2544

23.09.2014

Electrical Utility Shifting pertaining to JSEB/JUVNL./ Regarding Return of Measurement Book

23 15017/1/2008/PIU(DUP)/6-lane/ 2550

23.06.2014

Proposal for realignment along Govindpur town with restricted ROW.

24 12017/1/2001/PIU(DUP)/2522 22.09.2014

Regarding training for PMIS & Project Specific Website on 26th & 27th September 2014.

25 15018/1/2013/PIU(DUP)/2564 24.09.2014

Provision of proper instruction between "Ongoing Panagarh Bye Pass (NH-2) and Existing Panagarh Illambazar Road starting from Darjelling more on NH-2

26 15018/1/2003/PIU(DUP)/2634 30.09.2014

Maintenance of Road surface (NH-2) of ROB at Panagarh

27 15018/1/2013/PIU(DUP)/2603 29.09.2014

Minutes of meeting held between NHAI & IOCL (HMRB-Pipelines), Mourigram on 21.02.2002 at HMRBPL, HQ Mourigram

28 15018/1/2013/PIU(DUP)/2635 30.09.2014

Report on External safety audit of IOCL's HMRB (Haldia Mourigram Rajbandh) and HB (Haldia - Barauni) product pipelines

29 15018/1/2013/PIU(DUP)/2636 30.09.2014

Shifting of underground facilities.

Correspondence with Concessionaire:1. OUTGOING CORRESPONDENCE

Sl. No. Ref.No. from SAICPL Date Subject

1 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/312

01.09.2014

Minutes of Meeting of the Monitoring Committee to monitor the implementation of the provisions of the notification on Fly Ash Utilization

2 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/314

02.09.2014

Note in Connection with visit of Black spots on National Highways -2 in the districts of Hooghly, Burdwan and Asansol-Durgapur Commissionerate in 25.07.2014 along with Project Director, PIU, Durgapur & DIG, Traffic, W.B.

3 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/315

02.09.2014

Shifting of raising main along NH2 under RCFA Pt-II W/S Scheme

4 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/317

03.09.2014

Review of GFC drawing of existing Minor Bridge to be widen

Page | 23

Page 24: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

5 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/318

03.09.2014

Review of GFC drawing of Grade Separators at Km. 501+985 & Km. 515+983

6 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/321

04.09.2014 Non-remittence of TCS amount

7 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/323

04.09.2014

Review of overpass cross section and GAD at Km. 499+320

8 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/324

04.09.2014 Review of TCS drasings

9 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/326

05.09.2014

Safety arrangement at Km. 496+749 (Box Culvert)

10 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/330

08.09.2014 Photographs of projects

11 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/331

08.09.2014 Review of GAD of Minor Bridge

12 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/332

08.09.2014 Review of GAD of Grade Separator

13 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/334

08.09.2014 Condition of NH-2

14 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/335

08.09.2014 Review of drawing of VUPs & PUPs

15 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/336

08.09.2014

Review of drawings of Major Bridge at Km. 518+834

16 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/337

08.09.2014 Review of Box Culvert

17 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/338

09.09.2014

Repair of Pot hole and patches on NH-2 in different places under Asansol-Durgapur Police Commissionerate

18 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/339

09.09.2014

Damage of Total U/G of programme Tele. Exchange under GM Telecom Asansol towards Chanda, Nigha, Sripur areas and collapsed to telephone services

19 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/342

09.09.2014 Review of OGL test report

20 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/343

09.09.2014 Approval of Borrow area test reports (B.A.-4)

21 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/344

09.09.2014 Review of Drawing of retaining wall & Head Wall

22 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/345

09.09.2014

Review of drawings of Overpass at Km. 499.320 & Existing underpass at km. 500.110 & 503.983

23 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/347

10.09.2014 Procurement of steel

24 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/350

12.09.2014

Review of GFC drawing of existing Minor Bridge at Km. 492+871

25 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/351

12.09.2014

Source approval for Bitumen Emulsion and Modified Bitumen

26 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/353

12.09.2014 Review of GFC drawings of TCS

27 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/354

12.09.2014

Review of the GFC drawings of Box culvert, Head wall (6.5m height), VUP & PUP

Page | 24

Page 25: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

28 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/356

15.09.2014 Review of Working drawing of pipe culverts

29 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/360

16.09.2014

Review of drawings of Grade Separator at Km. 496+609

30 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/361

16.09.2014

Demurrage claim for Cable damage at Bye pass near Soain Village, Panagarh.

31 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/362

16.09.2014

Review of RE Wall and RE panel - Design and Drawing

32 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/364

16.09.2014 Source approval for Modified Bitumen

33 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/365

16.09.2014 Inproper Safety Arrangements on site

34 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/367

18.09.2014 Proucrement of steel

35 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/368

18.09.2014

Extension of Performance Security Bank Guarantee

36 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/369

18.09.2014 Review of working drawing for Pipe Culvert

37 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/370

19.08.2014

Distressed road condition on NH-2 at Kajora, Singaran on RHS & Kajora to Gopalmath

38 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/372

19.09.2014

Review of design and drawings of Major Bridge at Km. 518+834

39 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/374

19.09.2014

Re-confirmatory traffic survey and pavement design

40 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/377

22.09.2014

Review of Plan & Profile from 507+000 to Km. 513.000

41 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/378

22.09.2014

Review of Plan & Profile of Panagarh Bypass from Km. 513+000 to Km. 521.120

42 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/380

22.09.2014

Review of design and drawing for Grade Separator at Km. 496+609

43 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/381

24.09.2014

Review of GFC drawing of Typical details of Retailing Wall for different heights

44 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/382

24.09.2014

Review the GFC drawings for Grade Separator at Km. 496+609

45 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/383

25.09.2014

Third party test report of Saltora Quarry proposed to be used for Bituminous and concrete works for the project stretch from Km 471+150 to Km 521+120-source approval

46 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/384

25.09.2014 Independent Laboratory testing agency approval

47 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/386

26.09.2014 Source approval of cement

48 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/387

26.09.2014

Source approval for provrement of NP4 RCC Hume Pipe

49 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/388

26.09.2014 Approval of Wet Mix Macadam mix design

50 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/389

26.09.2014 Site Inspection on 29.09.2014

Page | 25

Page 26: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

51 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/390

27.09.2014 Source approval for Pre-stressing item

52 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/391

27.09.2014 Source approval for RE Wall Agency’s

53 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/393

30.09.2014

Provision of proper insterection between "Ongoing Panagarh Bye Pass (NH-2) and Existing Panagarh Illambazar Road starting from Darjelling more on NH-2.

54 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/394

30.09.2014

Review of Plan & Profile from Km. 503.000 to 507.000

55 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/395

30.09.2014

Review of Plan & Profile from Km. 398.240 to 407.000

56 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/396

30.09.2014 Review of typical Cross section

57 SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/397

30.09.2014

Review of the plan and profile GFC drawings from 507.000 to Km. 521.000

2. INCOMING CORRESPONDECE

Sl No

Ref.No. Date Subject

1 BAEL/PRJ/TEC/IEO/0269 01.09.2014 Reconstruction of Culverts in Package -III2 BAEL/PRJ/TEC/IEO/0270 01.09.2014 Submission of OGL test report 3 BAEL/PRJ/TEC/IEO/0271 01.09.2014 Length of Truck parking and Truck lay bays4 BAEL/PRJ/TEC/IEO/0272 01.09.2014 Review of plan and profile from Km. 508.000 to

512.0005 BAEL/PRJ/TEC/IEO/0273 01.09.2014 Submission of weekly Traffic Census report6 BAEL/PRJ/TEC/IEO/0274 01.09.2014 Submission of revised (R2) Plan and Profile

drawing from Km. 465.000 to 466.0007 BAEL/PRJ/TEC/IEO/0276 02.09.2014 Additional C.D. structures8 BAEL/PRJ/TEC/IEO/0275 02.09.2014 Overpass cross section and GAD at Km.

499+3209 BAEL/PRJ/TEC/IEO/0277 03.09.2014 Submission of weekly accident report

10 BAEL/PRJ/TEC/IEO/0278 03.09.2014 Submission of monthly accident report11 BAEL/PRJ/TEC/IEO/0279 03.09.2014 Maintenance of the Project Highway12 BAEL/PRJ/TEC/IEO/0280 04.09.2014 Submission of revised Plan and Profile along with

traffic movement plan13 BAEL/PRJ/TEC/IEO/0281 04.09.2014 Repair of traffic signals14 BAEL/PRJ/TEC/IEO/0282 04.09.2014 Detailed design of RCC drain, drain drawings and

drain profile (Km. 470.000 to Km. 494.000)15 BAEL/PRJ/TEC/IEO/0283 05.09.2014 Procurement of Steel16 BAEL/PRJ/TEC/IEO/0284 06.09.2014 Submission of Monthly Fee Statement - Schedule

- M17 BAEL/PRJ/TEC/IEO/0285 06.09.2014 DW&SD water pipe line of Jharkhand state from

Km. 405+350 to Km. 456+70018 BAEL/PRJ/TEC/IEO/0286 09.09.2014 Compliance to your observation on the TCS

drawings submitted by us19 BAEL/PRJ/TEC/IEO/0287 09.09.2014 Source approval for RE Wall Agency profile20 BAEL/PRJ/TEC/IEO/0288 09.09.2014 Utility Ducts21 BAEL/PRJ/TEC/IEO/0289 09.09.2014 Source approval for pre-stressing items22 BAEL/PRJ/TEC/IEO/0290 09.09.2014 Source approval for Bitumen Emulsion and

modified bitumen23 BAEL/PRJ/TEC/IEO/0291 09.09.2014 Fixing of Signed Board 200m away both side

from Kalla More24 BAEL/PRJ/TEC/IEO/0292 09.09.2014 Photographs of Projects.

Page | 26

Page 27: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 201425 BAEL/PRJ/TEC/IEO/0294 09.09.2014 Submission of Working drawing for Pipe Culverts26 BAEL/PRJ/TEC/IEO/0295 10.09.2014 Review of RE Wall and RE Panel-design &

drawing27 BAEL/PRJ/TEC/IEO/0296 10.09.2014 Submission of GFC drawings28 BAEL/PRJ/TEC/IEO/0297 10.09.2014 Submission of design for shear check and

revised reinforcement drawings for PUP at Km. 407+400 & Box culvert at Km. 496+749

29 BAEL/PRJ/TEC/IEO/0293 09.09.2014 Submission of GFC drawings of TCS30 BAEL/PRJ/TEC/IEO/0298 11.09.2014 Submission of working drawing for pipe culverts

at Km. 414+746.31 BAEL/PRJ/TEC/IEO/0299 11.09.2014 Submission of progress report no. 05 for the

month of August 201432 BAEL/PRJ/TEC/IEO/0300 11.09.2014 Submission of weekly accident report33 BAEL/PRJ/TEC/IEO/0301 11.09.2014 Submission of weekly traffic census report34 BAEL/PRJ/TEC/IEO/0302 12.09.2014 Submission of drawings of traffic movement

plan.35 BAEL/PRJ/TEC/IEO/0303 12.09.2014 Observation in the submitted design and

drawings of Major Bridge at Km. 518+834

36 BAEL/PRJ/TEC/IEO/0304 13.09.2014 DW&SD water pipe line of Jharkhand state from Km. 405+350 to Km. 456+700

37 BAEL/PRJ/TEC/IEO/0305 12.09.2014 Procurement of Steel.38 BAEL/PRJ/TEC/IEO/0307 15.09.2014 Submission of Detailed drawings and Design &

Analysis of Major Bridge at Km. 464+665

39 BAEL/PRJ/TEC/IEO/0306 13.09.2014 Submission of proposed centre line coordinates from Ch. 506+890 to Ch. 415+000

40 BAEL/PRJ/TEC/IEO/0309 15.09.2014 Submission of weekly traffic census report41 BAEL/PRJ/TEC/IEO/0310 16.09.2014 Submission of working drawings of Pipe Culverts

for Km. 418+023 & Km. 439+709

42 BAEL/PRJ/TEC/IEO/0308 15.09.2014 Submission of drawings and Design and analysis (Pile foundation for pier) of Major Bridge at Km. 517+122

43 BAEL/PRJ/TEC/IEO/0311 16.09.2014 Submission of weekly accident report44 BAEL/PRJ/TEC/IEO/0312 16.09.2014 Compliance of plan & profile drawing from Km.

513+000 to 521+12045 BAEL/PRJ/TEC/IEO/0313 16.09.2014 Representation from Citizen Safety & Security

Forum46 BAEL/PRJ/TEC/IEO/0314 16.09.2014 Submission of miscellaneous drawings for the

captioned project

47 BAEL/PRJ/TEC/IEO/0315 18.09.2014 Submission of Typical design and drawing of RE Wall for approval

48 BAEL/PRJ/TEC/IEO/0316 18.09.2014 Procurement of Reinforcement steel49 BAEL/PRJ/TEC/IEO/0317 18.09.2014 Re-confirmatory traffic survey and Pavement

design50 BAEL/PRJ/TEC/IEO/0319 19.09.2014 Reconfirmation of uniformity of strata at

overpass51 BAEL/PRJ/TEC/IEO/0318 18.09.2014 Review of RE Wall and RE Panel-design &

drawing52 BAEL/PRJ/TEC/IEO/0320 20.09.2014 Submission of detailed structural drawings at Km

506+200 & Km 504+6295

53 BAEL/PRJ/TEC/IEO/0321 20.09.2014 Re-confirmatory traffic survey and Pavement design

54 BAEL/PRJ/TEC/IEO/0322 22.09.2014 Submission of Design and analysis of Grade Separator at Km. 506+200 & Km. 504+295

55 BAEL/PRJ/TEC/IEO/0323 22.09.2014 Submission of Weekly Traffic Census Report.56 BAEL/PRJ/TEC/IEO/0324 22.09.2014 Submission of Borrow Area Test Report (B.A-5)

Page | 27

Page 28: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 201457 BAEL/PRJ/TEC/IEO/0325 23.09.2014 Submission of the GFC drawings for Grade

Separator at KM 496+609

58 BAEL/PRJ/TEC/IEO/0326 23.09.2014 Submission of the GFC Drawings for Typical details of Retaining Wall for different heights

59 BAEL/PRJ/TEC/IEO/0327 24.09.2014 Submission of weekly accident report60 BAEL/PRJ/TEC/IEO/0328 24.09.2014 Source approval for HDPE sheeting pipe61 BAEL/PRJ/TEC/IEO/0329 24.09.2014 Submission of detailed drawings and design and

analysis of Grade Separator at Km. 464+185

62 BAEL/PRJ/TEC/IEO/0330 24.09.2014 Execute the construction work for widening of box culvert at km 506+185 as per the reviewed drawing

63 BAEL/PRJ/TEC/IEO/0331 24.09.2014 Submission of detailed drawings and design and analysis of VUPs & PUPs

64 BAEL/PRJ/TEC/IEO/0332 25.09.2014 Concrete mix design M15(PCC) for concrete works for the project stretch from Km. 398.240 to Km. 441.565

65 BAEL/PRJ/TEC/IEO/0333 25.09.2014 Concrete mix design M25 (RCC) for concrete works for the project stretch from Km. 398+240 to Km. 441+565

66 BAEL/PRJ/TEC/IEO/0334 26.09.2014 Submission of Borrow Area Test Reports (B.A.-11 & 13) for embankment

67 BAEL/PRJ/TEC/IEO/0335 26.09.2014 Submission of the Plan & Profile GFC drawings from Km. 507+000 to Km. 521.120

68 BAEL/PRJ/TEC/IEO/0336 26.09.2014 Proposed diversion plan of Grade Separator at Km. 496+609 construction

69 BAEL/PRJ/TEC/IEO/0337 29.09.2014 Submission of revised working drawing for Box Culvert at Km 403+335

70 BAEL/PRJ/TEC/IEO/0338 29.09.2014 Submission of OGL Test Reports71 BAEL/PRJ/TEC/IEO/0339 29.09.2014 Concrete Mix Design M 20 (PCC/RCC) for

concrete works for the project stretch from km 398+240 to km 441+565

72 BAEL/PRJ/TEC/IEO/0340 29.09.2014 Re-Submission of GSB Mix Design73 BAEL/PRJ/TEC/IEO/0341 29.09.2014 Submission of working drawing for Box Culvert at

Km 448+025 & Km 450+880

STATUS OF PLANTS AND MACHINERY:-The details of major plants and equipment deployed are mentioned

below;

A. PLANTS

SI.No.

Description of Items

Unit

Total

Remarks

1. Crusher Plant Nos.

31. Installation completed (300 TPH)2. Ready for calibration (300 TPH)3. Installation in progress (300 TPH)

2. WMM Plant Nos.

3 1. Ready for Calibration (200 TPH), 2. Ready for Calibration. (200 TPH), 3. Installation in progress (300 TPH)

3. Batching plant Nos.

3 1. Installation/calibration completed (60 cum/ hr)2. Commenced : Roof of cement

Page | 28

Page 29: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014godown in progress (60 cum/hr). 3. Installation in progress (30 cum/hr.)

4. Hot mix Plant Nos.

3 1. Commissioning in progress No.(200TPH)2. Commissioning in progress 200 TPH)3. Installation in progress (160 TPH)

5. Weight Bridge Nos.

5 1. Commissioned = 2 Nos.2. Commissioned - 1 no. and

installation in progress – 1 No. (Each 100 MT Capacity)

3. Installation in progress – 1 No.

B.MACHINERY1. Dozer Nos. 32. Excavator(1-1.2 cu.m bucket) Nos. 83. Motar Grader (135-195HP) Nos. 74. Vibr. Soil Compactor(8-10 t) Nos. 125. Tendam Roller Nos. 26. PTR No 17. Front Wheel Loader (3.0 cu.m) Nos. 58. Tipper (10T/25T) Nos. 429. Water tanker (10kl) No 4

10. JCB loader Nos. 611. Hydra Crane (14 MT) Nos. 612. Air Compressor No. 213. Diesel Tanker No. 214. DG (25-750KVA) Nos. 2415. Transit Mixture Nos. 1016. Broomer No. 117. Trailer No. 2

C.SURVEY EQUIPMENTS1. Total station Nos. 62. Auto level Nos. 16

STATUS OF DESIGN AND DRAWING:-

Sl No.

Chainage No. as per Drawin

g

Name of Structure

Description Status

398.240 to

521.120

Plan and Profile

Km. 398.240 to 407.000Km. 407.000 to 503.000Km 503.000 to 507.000Km507.000 to 521.120

Commented (from km 398.240 to km 407.000 & km.503.000 to km 507.000)

Reviewed and GFC issued (from km 507+000 to km 521.120.)

Under review from km 407.000 to km.503.000

Page | 29

Page 30: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

398.240 to

521.120

TCS 62 No TCS submitted 43 No. TCS Reviewed

398.240 to

521.120

Pavement Design

Design submitted Commented and under review

(Fresh traffic survey and Axle load survey done by BAEL and report awaited)

1 464+674 MAJOR BRIDGE

GAD Submitted Under review

2 517+095 GAD & Design Submitted

3 518+829 GAD & Design Submitted Reviewed

4 398+811

Grade Separato

r

GAD & Design(only super structure) Submitted

Under review

5 407+538

GAD Submitted Under review

6 408+326

GAD & Design(only super structure) Submitted

Under review

7 456+312

GAD & Design(only super structure) Submitted

Under review

8 464+185

GAD Submitted Under review

9 475+670

GAD & Design(only super structure) Submitted

Under review

10 476+050

GAD Submitted Under review

11 496+609

GAD & Design Submitted reviewed

12 501+996

GAD & Design Submitted reviewed

13 504+287

GAD & Design(only super structure) Submitted

Under review

14 506+200

GAD & Design(only super structure) Submitted

Under review

15 515+983

GAD & Design Submitted reviewed

16 405+330 MINOR BRIDGE (NEW)

GAD Submitted Under review

17 409+876 GAD Submitted Under review

18 415+120 GAD Submitted Under review

19 429+973 GAD Submitted Under review

20 437+047 GAD Submitted Under review

21 450+140 GAD Submitted Under review

22 461+652 GAD Submitted Under review

Page | 30

Page 31: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 201423 464+903 GAD Submitted Under review

24 468+620

25 497+840 GAD Submitted Under review

26 509+953 GAD Submitted Under review

27 445+596 MINOR BRIDGE

(WIDENING)

GAD & Reinforcement Details Reviewed

28 462+895 GAD & Reinforcement Details Reviewed

29 463+091 GAD & Reinforcement Details Reviewed

30 463+710 GAD & Reinforcement Details Reviewed

31 471+006 GAD & Reinforcement Details Reviewed

32 485+002 GAD & Reinforcement Details Reviewed

33 492+871 GAD & Reinforcement Details Reviewed

34 495+735 GAD & Reinforcement Details Reviewed

35 507+503 GAD & Reinforcement Details Reviewed

36 520+373 ROB Design Submitted GADs for both the ROBs have been approved

I no design and drawing approved by railway(km

520.373)37 443+710

38 403+440 VEHICULAR UNDERPASS

GAD & Reinforcement Details Reviewed

39 411+374 GAD & Reinforcement Details Reviewed

40 413+886 GAD & Reinforcement Details Reviewed

41 421+400 GAD & Reinforcement Details Reviewed

42 428+208 GAD & Reinforcement Details Reviewed

43 433+563 GAD & Reinforcement Details Reviewed

44 447+771 GAD submitted Under review

45 451+153 GAD submitted Under review

46 460+036 GAD & Reinforcement Details Reviewed

47 467+115 GAD & Reinforcement Details Reviewed

48 469+750 Not submitted

49 473+340 GAD & Reinforcement Details Reviewed

50 479+109 GAD submitted Under review

51 486+427 GAD & Reinforcement Details Reviewed

Page | 31

Page 32: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 201452 489+702 GAD & Reinforcement Details reviewed

53 491+451 GAD & Reinforcement Details Reviewed

54 494+430 GAD & Reinforcement Details Reviewed

55 509+559 GAD & Reinforcement Details Reviewed

56 518+221 GAD & Reinforcement Details submitted

Reviewed

57 519+349 GAD & Reinforcement Details submitted

reviewed

58 398+495 PEDESTRIAN

UNDERPASS

GAD & Reinforcement Details Reviewed

59 399+230 GAD & Reinforcement Details Reviewed

60 407+400 GAD & Reinforcement Details submitted

reviewed

61 409+088 GAD & Reinforcement Details Reviewed

62 417+953 GAD & Reinforcement Details Reviewed

63 424+400 GAD & Reinforcement Details Reviewed

64 476+430 GAD & Reinforcement Details Reviewed

65 504+555 GAD & Reinforcement Details Reviewed

66 510+700 GAD & Reinforcement Details Reviewed

67 512+920 GAD & Reinforcement Details Reviewed

68 514+900 GAD & Reinforcement Details Reviewed

69 398+519 BOX CULVERT

GAD & Design submitted Reviewed

70 398+782 GAD & Design submitted Reviewed

71 403+335 GAD & Design submitted Reviewed

72 407+212 GAD & Design submitted Reviewed

73 407+422 GAD & Design submitted Reviewed

74 407+657 GAD & Design submitted Reviewed

75 408+867 GAD & Design submitted Reviewed

76 409+060 GAD & Design submitted Reviewed

77 409+366 GAD & Design submitted Reviewed

78 411+332 GAD & Design submitted Reviewed

79 411+391 GAD & Design submitted Reviewed

Page | 32

Page 33: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 201480 413+926 GAD & Design submitted Reviewed

81 415+216 GAD & Design submitted Reviewed

GAD & Design submitted Reviewed

82 417+933 GAD & Design submitted Reviewed

83 421+327 GAD & Design submitted Reviewed

84 421+497 GAD & Design submitted Reviewed

85 424+467 GAD & Design submitted Reviewed

86 427+882 GAD & Design submitted Reviewed

87 428+025 GAD & Design submitted Reviewed

88 443+615 GAD & Design submitted Reviewed

89 443+931 GAD & Design submitted Reviewed

90 444+047 GAD & Design submitted Reviewed

91 448+029 GAD & Design submitted Reviewed

92 450+883 GAD & Design submitted Reviewed

93 451+334 GAD & Design submitted Reviewed

94 456+131 GAD & Design submitted Reviewed

95 456+175 GAD & Design submitted Reviewed

96 456+355 GAD & Design submitted Reviewed

97 461+940 GAD & Design submitted Reviewed

98 467+300 GAD & Design submitted Reviewed

99 470+025 GAD & Design submitted Reviewed

100

475+615 GAD & Design submitted Reviewed

101

486+816 GAD & Design submitted Reviewed

102

489+549 GAD & Design submitted Reviewed

103

489+860 GAD & Design submitted Reviewed

104

494+593 GAD & Design submitted Reviewed

105

496+719 GAD & Design submitted Reviewed

106

496+749 GAD & Design submitted Reviewed

107

502+182 GAD & Design submitted Reviewed

Page | 33

Page 34: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014108

502+372 GAD & Design submitted Reviewed

109

502+538 GAD & Design submitted Reviewed

110

505+934 GAD & Design submitted Reviewed

111

506+169 GAD & Design submitted Reviewed

112

509+255 GAD & Design submitted Reviewed

113

512+635 GAD & Design submitted Reviewed

114

512+997 GAD & Design submitted Reviewed

115

515+180 GAD & Design submitted Reviewed

116

516+290 GAD & Design submitted Reviewed

117

518+180 GAD & Design submitted Reviewed

118

519+690 GAD & Design submitted Reviewed

119

399+140 PIPE CULVERT

GAD Reviewed

120

400+070 GAD Reviewed

121

400+450 GAD Reviewed

122

401+625 GAD Reviewed

123

404+115 GAD Reviewed

124

405+204 GAD Reviewed

125

405+777 GAD Reviewed

126

408+207 GAD Reviewed

127

409+125 GAD Reviewed

128

409+707 GAD Reviewed

129

410+140 GAD Reviewed

130

410+760 GAD Reviewed

131

414+040 GAD Reviewed

132

414+240 GAD Reviewed

133

414+750 GAD Reviewed

134

418+107 GAD Reviewed

135

418+748 GAD Reviewed

136

420+178 GAD Reviewed

Page | 34

Page 35: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014137

425+330 GAD Reviewed

138

425+900 GAD Reviewed

139

426+935 GAD Reviewed

140

429+325 GAD Reviewed

141

429+449 GAD Reviewed

142

430+200 GAD Reviewed

143

431+110 GAD Reviewed

144

433+265 GAD Reviewed

145

433+600 GAD Reviewed

146

434+231 GAD Reviewed

147

435+200 GAD Reviewed

148

435+750 GAD Reviewed

149

435+915 GAD Reviewed

150

436+127 GAD Reviewed

151

436+655 GAD Reviewed

152

438+313 GAD Reviewed

153

438+605 GAD Reviewed

154

438+860 GAD Reviewed

155

438+966 GAD Reviewed

156

439+370 GAD Reviewed

157

439+710 GAD Reviewed

158

440+015 GAD Reviewed

159

440+095 GAD Reviewed

160

440+660 GAD Reviewed

161

440+850 GAD Reviewed

162

441+010 GAD Reviewed

163

444+420 GAD Reviewed

164

444+595 GAD Reviewed

165

444+897 GAD Reviewed

Page | 35

Page 36: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014GAD Reviewed

166

446+015 GAD Reviewed

167

447+048 GAD Reviewed

168

448+397 GAD Reviewed

169

449+080 GAD Reviewed

170

450+505 GAD Reviewed

171

450+690 GAD Reviewed

172

450+970 GAD Reviewed

173

451+070 GAD Reviewed

174

452+452 GAD Reviewed

175

452+350 GAD Reviewed

176

453+453 GAD Reviewed

177

453+940 GAD Reviewed

178

454+740 GAD Reviewed

179

456+460 GAD Reviewed

180

457+530 GAD Reviewed

181

459+750 GAD Reviewed

182

460+000 GAD Reviewed

183

460+120 GAD Reviewed

184

460+410 GAD Reviewed

185

460+495 GAD Reviewed

186

460+652 GAD Reviewed

187

460+775 GAD Reviewed

188

461+505 GAD Reviewed

189

462+175 GAD Reviewed

190

462+300 GAD Reviewed

191

462+360 GAD Reviewed

192

462+735 GAD Reviewed

193

463+015 GAD Reviewed

Page | 36

Page 37: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014194

463+345 GAD Reviewed

195

463+530 GAD Reviewed

196

467+040 GAD Reviewed

197

473+415 GAD Reviewed

198

473+980 GAD Reviewed

199

476+446 GAD Reviewed

200

477+500 GAD Reviewed

201

478+570 GAD Reviewed

202

478+611 GAD Reviewed

203

478+990 GAD Reviewed

204

479+325 GAD Reviewed

205

485+790 GAD Reviewed

206

486+075 GAD Reviewed

207

511+920 GAD Reviewed

208

406+115

SLAB CULVERT

GAD & design submitted Reviewed

209

406+475

GAD & design submitted Reviewed

210

409+525

GAD & design submitted Reviewed

211

411+755

GAD & design submitted Reviewed

212

412+325

GAD & design submitted Reviewed

213

412.616

GAD & design submitted Reviewed

214

412+836

GAD & design submitted Reviewed

215

413+356

GAD & design submitted Reviewed

216

413+555

GAD & design submitted Reviewed

217

415+830

GAD & design submitted Reviewed

218

416+283

GAD & design submitted Reviewed

219

416+985

GAD & design submitted Reviewed

220

420+790

GAD & design submitted Reviewed

221

422+485

GAD & design submitted Reviewed

Page | 37

Page 38: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014222

422+645 GAD & design submitted Reviewed

223

423+026 GAD & design submitted Reviewed

224

423+592 GAD & design submitted Reviewed

225

423+986 GAD & design submitted Reviewed

226

432+316 GAD & design submitted Reviewed

227

432+749 GAD & design submitted Reviewed

228

432+989 GAD & design submitted Reviewed

229

439+900 GAD & design submitted Reviewed

230

441+850 GAD & design submitted Reviewed

231

442+567 GAD & design submitted Reviewed

232

442+745 GAD & design submitted Reviewed

233

444+675 GAD & design submitted Reviewed

234

446+410 GAD & design submitted Reviewed

235

446+655 GAD & design submitted Reviewed

236

449+421 GAD & design submitted Reviewed

237

449+821 GAD & design submitted Reviewed

238

452+685 GAD & design submitted Reviewed

239

453+580 GAD & design submitted Reviewed

240

455+705 GAD & design submitted Reviewed

241

457+130 GAD & design submitted Reviewed

242

457+260 GAD & design submitted Reviewed

243

465+060 GAD & design submitted Reviewed

244

465+087 GAD & design submitted Reviewed

245

465+525 GAD & design submitted Reviewed

246

465+765 GAD & design submitted Reviewed

247

468+375 GAD & design submitted Reviewed

248

469+220 GAD & design submitted Reviewed

249

472+225 GAD & design submitted Reviewed

GAD & design submitted Reviewed

Page | 38

Page 39: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014250

474+862 GAD & design submitted Reviewed

251

481+930 GAD & design submitted Reviewed

252

484+030 GAD & design submitted Reviewed

253

487+904 GAD & design submitted Reviewed

254

488+660 GAD & design submitted Reviewed

255

489+128 GAD & design submitted Reviewed

256

491+970 GAD & design submitted Reviewed

257

493+834 GAD & design submitted Reviewed

258

495+445 GAD & design submitted Reviewed

259

497+040 GAD & design submitted Reviewed

260

497+367 GAD & design submitted Reviewed

261

499+890 GAD & design submitted Reviewed

262

500+278 GAD & design submitted Reviewed

263

501+260 GAD & design submitted Reviewed

264

501+562 GAD & design submitted Reviewed

265

502+863 GAD & design submitted Reviewed

266

503+456 GAD & design submitted Reviewed

267

505+226 GAD & design submitted Reviewed

268

505+700 GAD & design submitted Reviewed

269

506+723 GAD & design submitted Reviewed

270

507+738 GAD & design submitted Reviewed

271

512+383 GAD & design submitted Reviewed

Page | 39

Page 40: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

PROJECT WORK PROGRESS :-Road Works Progress:-

Linear Progress (Road Works)Main Carriageway

Activity Description

Unit Total Length/Qt

y

Completed % progress

Main Carriageway Six laneC & G Km.

Ha122.88306.53

6.2119.23

5.05%6.27%

Embankment Km.cum

122.881897473

-11405.9

Work in progress0.60%

Sub-Grade Km.cum

122.881544213

-

GSB/ CT sub baseGSBCT sub-base

Km.cumcum

122.88881086291830

-

WMM /CT Base WMMCT Base

Km.cumcum

122.88192599120889

-

AG Layer Km.cum

42.93187020

-

DBM Km.cum

122.88250351

-

BC Km.cum

122.88152516

-

Service RoadActivity

DescriptionUnit Total

Length/Qty

Completed % progress

C & G Km.Ha

149.09141.97

4.703.29

3.15%2.32%

Page | 40

Page 41: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014Embankment Km.

cum149.09655085

-4622.40

Work in progress0.71%

Sub-Grade Km.cum

149.09644416

-

CT Sub base Km.cum

149.09290445

-

CT Base Km.cum

149.0973124

-

AG Layer Km.cum

149.09103876

-

BC Km.cum

149.0940192

-

Structure Work Progress:-

Type of structures

Total Completed

In progres

s

Not yet started

ROB 2 - 1 1

Major bridge 3 - 1 2

Minor bridge 20 - 1 19

Grade Separator 12 - 4 8

Over pass 2 - - 2

Under pass 2 - - 2

Vehicular underpass

20 - 2 18

Pedestrian Underpass

11 - - 11

Box culverts / Slab culverts

114 - 8 106

Pipe culverts 88 1 13 74

Total 274 1 30 243

Page | 41

Page 42: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

DETAIL STATUS OF STRUCTURE :-

Sl No.

Chainage No. as per Drawin

g

Name of Structure Status Remarks

1 464+674

MAJOR BRIDGE

NYS.  

2 517+095 NYS.  

3 518+829 Work in progress  

4 398+811

Grade Separato

r

NYS.  

5 407+538 NYS.  

6 408+326 NYS.  

7 456+312 NYS.  

8 464+185 NYS.  

9 475+670 NYS.  

10 476+050 NYS.  

11 496+609 Work in progress  

12 501+996 Work in progress  

13 504+287 NYS.  

14 506+200 Work in progress  

15 515+983 Work in progress  

16 405+330 MINOR BRIDGE (NEW)

NYS. New 3 Lane Bridge on LHS

17 409+876 NYS. New 3 Lane Bridge on LHS

Page | 42

Page 43: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

18 415+120 NYS. New 3 Lane Bridge on LHS

19 429+973 NYS. New 3 Lane Bridge on LHS

20 437+047 NYS. New 3 Lane Bridge on LHS

21 450+140 NYS. New 3 Lane Bridge on LHS

22 461+652 NYS. New 3 Lane Bridge on LHS

23 464+903 NYS. New 3 Lane Bridge on RHS

24 468+620 NYS. New 3 Lane Bridge on LHS

25 497+840 NYS. New 3 Lane Bridge on LHS

26 509+953 Work in progress New 3 Lane Bridge on LHS & Existing LHS Replaced by New 2 Lane Bridge

27 445+596

MINOR BRIDGE

(WIDENING)

NYS. GAD & Reinforcement details approved

28 462+895 NYS. Widening on both Side

29 463+091 NYS. Widening on both Side

30 463+710 NYS. Widening on both Side

31 471+006 NYS. Widening on both Side

32 485+002 NYS. Widening on both Side

33 492+871 NYS. Widening on both Side

34 495+735 NYS. Widening on both Side

35 507+503 NYS. Widening on both Side

36 520+373 ROB Work in progress (Test

pile). GADs for both the ROBs have been approved37 443+710 NYS.

38 403+440

VEHICULAR UNDERPAS

S

NYS.  

39 411+374 NYS.  

40 413+886 NYS.  

41 421+400 NYS.  

42 428+208 NYS.  

43 433+563 NYS.  

44 447+771 NYS.  

45 451+153 NYS.  

46 460+036 NYS.  

Page | 43

Page 44: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

47 467+115 NYS.  

48 469+750 NYS.

49 473+340 NYS.  

50 479+109 NYS.  

51 486+427 NYS.  

52 489+702 NYS.  

53 491+451 NYS.  

54 494+430 NYS.  

55 509+559 NYS.  

56 518+221 Work in progress  

57 519+349 Work in progress  

58 398+495

PEDESTRIAN

UNDERPASS

NYS.  

59 399+230 NYS.  

60 407+400 NYS.  

61 409+088 NYS.  

62 417+953 NYS.  

63 424+400 NYS.  

64 476+430 NYS.  

65 504+555 NYS.  

66 510+700 NYS.  

67 512+920 NYS.  

68 514+900 NYS.  

69 398+519

BOX CULVERT

NYS. Reconstruction

70 398+782 NYS. Reconstruction

71 403+335 Work in progress Reconstruction

72 407+212 NYS. Reconstruction

73 407+422 NYS. Reconstruction

74 407+657 NYS. Left side widening & Right side Reconstruction

75 408+867 NYS. Reconstruction

Page | 44

Page 45: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

76 409+060 NYS. Reconstruction

77 409+366 NYS. Reconstruction

78 411+332 NYS. Reconstruction

79 411+391 NYS. Reconstruction

80 413+926 NYS.Retained with widening but change to Reconstruction

81 415+216 NYS. Existing Retained (RHS) New slab (LHS)

82 417+933 NYS. Reconstruction

83 421+327 NYS. Reconstruction

84 421+497 NYS. Reconstruction

85 424+467 NYS. Reconstruction

86 427+882 NYS. Reconstruction

87 428+025 NYS. Reconstruction

88 443+615 NYS. Reconstruction

89 443+931 NYS. Reconstruction

90 444+047 NYS. Reconstruction

91 448+029 NYS. Retained with widening but change to Reconstruction

92 450+883 NYS. Reconstruction

93 451+334 NYS. Reconstruction

94 456+131 NYS. Retained with widening but change to Reconstruction

95 456+175 NYS. Retained with widening but change to Reconstruction

96 456+355 NYS. Retained with widening but change to Reconstruction

97 461+940 NYS. Retained with widening but change to Reconstruction

98 467+300 NYS. Reconstruction

99 470+025 NYS. Reconstruction

100 475+615 NYS. Reconstruction

101 486+816 NYS. Reconstruction

102 489+549 NYS. Reconstruction

103 489+860 NYS. Reconstruction

Page | 45

Page 46: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014104 494+593 NYS. Reconstruction

105 496+719 Work in progress Reconstruction

106 496+749 NYS. Reconstruction

107 502+182 NYS. Reconstruction

108 502+372 NYS. Reconstruction

109 502+538 NYS. Reconstruction

110 505+934 NYS. Left side widening & Right side

Reconstruction111 506+173 Work in progress Left side widening & Right side

Reconstruction112 509+255 NYS. Reconstruction

113 512+635 NYS. Reconstruction

114 512+997 Work in progress Reconstruction

115 515+180 NYS. New

116 516+290 NYS. New

117 518+180 Work in Progress New

118 519+690 Work in progress New

119 399+140

PIPE CULVERT

NYS. Retained with widening

120 400+070 NYS. Retained with widening

121 400+450 In progress Retained with widening

122 401+625 NYS. Retained with widening

123 404+115 NYS. Retained with widening

124 405+204 Work in progress Retained with widening

125 405+777 NYS. Retained with widening

126 408+207 NYS. Retained with widening

127 409+125 NYS. Retained with widening

128 409+707 NYS. Existing Retained (RHS) New Pipe

(LHS)129 410+140 NYS. Retained with widening

130 410+760 NYS. Retained with widening

131 414+040 NYS. Retained with widening

132 414+240 NYS. Retained with widening

Page | 46

Page 47: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014133 414+750 Work in progress Retained with widening

134 418+107 NYS. Retained with widening

135 418+748 NYS. Retained with widening

136 420+178 NYS. Retained with widening

137 425+330 NYS. Retained with widening

138 425+900 NYS. Retained with widening

139 426+935 NYS. Retained with widening

140 429+325 NYS. Retained with widening

141 429+449 NYS. Retained with widening

142 430+200 NYS. Retained with widening

143 431+110 NYS. Retained with widening

144 433+265 NYS. Retained with widening

145 433+600 NYS. Retained with widening

146 434+231 NYS. Retained with widening

147 435+200 NYS. Retained with widening

148 435+750 NYS. Retained with widening

149 435+915 NYS. Retained with widening

150 436+127 NYS. Retained with widening

151 436+655 NYS. Retained with widening

152 438+313 NYS. Retained with widening

153 438+605 NYS. Retained with widening

154 438+860 NYS. Retained with widening

155 438+966 NYS. Retained with widening

156 439+370 NYS. Retained with widening

157 439+710 Work in progress Retained with widening

158 440+015 Work in progress Retained with widening

159 440+095 Work in progress Retained with widening

160 440+660 NYS. Retained with widening

161 440+850 NYS. Retained with widening

Page | 47

Page 48: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014162 441+010 NYS. Retained with widening

163 444+420 NYS. Retained with widening

164 444+595 NYS. Retained with widening

165

444+897 In progrss Retained with widening

166 446+015 In progress Retained with widening

167 447+048 NYS. Retained with widening

168 448+397 NYS. Retained with widening

169 449+080 NYS. Retained with widening

170 450+505 Work in progress Retained with widening

171 450+690 NYS. Retained with widening

172 450+970 NYS. Retained with widening

173 451+070 NYS. Retained with widening

174 452+452 NYS. Retained with widening

175 452+350 In progress Retained with widening

176 453+453 NYS. Retained with widening

177 453+940 NYS. Retained with widening

178 454+740 NYS. Retained with widening

179 456+460 NYS. Retained with widening

180 457+530 NYS. Retained with widening

181 459+750 NYS. Retained with widening

182 460+000 NYS. Retained with widening

183 460+120 NYS. Retained with widening

184 460+410 NYS. Retained with widening

185 460+495 NYS. Retained with widening

186 460+652 NYS. Retained with widening

187 460+775 NYS. Retained with widening

188 461+505 NYS. Existing Retained (RHS) New Pipe

(LHS)189 462+175 NYS. Retained with widening

Page | 48

Page 49: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014190 462+300 NYS. Retained with widening

191 462+360 NYS. Retained with widening

192 462+735 NYS. Retained with widening

193 463+015 NYS. Retained with widening

194 463+345 NYS. Retained with widening

195 463+530 NYS. Retained with widening

196 467+040 NYS. Retained with widening

197 473+415 Completed Retained with widening

198 473+980 NYS. Retained with widening

199 476+446 NYS. Retained with widening

200 477+500 In progress Retained with widening

201 478+570 Work in progress Retained with widening

202 478+611 NYS. Retained with widening

203 478+990 In progress Retained with widening

204 479+325 NYS. Retained with widening

205 485+790 NYS. Retained with widening

206 486+075 NYS. Retained with widening

207 511+920 NYS. Retained with widening

208

406+115

SLAB CULVERT NYS. Retained with widening

209

406+475 NYS. Retained with widening

210

409+525 NYS. Retained with widening

211

411+755 NYS. Retained with widening

212

412+325 NYS. Retained with widening

213

412.616 NYS. Retained with widening

214

412+836 NYS. Retained with widening

215

413+356 NYS. Retained with widening

216

413+555 NYS. Retained with widening

217

415+830

NYS. Retained with widening

Page | 49

Page 50: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014218

416+283 NYS. Retained with widening

219

416+985 NYS. Retained with widening

220

420+790 NYS. Retained with widening

221

422+485 NYS. Retained with widening

222 422+645 NYS. Retained with widening

223 423+026 NYS. Retained with widening

224 423+592 NYS. Retained with widening

225 423+986 NYS. Retained with widening

226 432+316 NYS. Retained with widening

227 432+749 NYS. Retained with widening

228 432+989 NYS. Retained with widening

229 439+900 NYS. Retained with widening

230 441+850 NYS. Retained with widening

231 442+567 NYS. Retained with widening

232 442+745 NYS. Retained with widening

233 444+675 NYS. Retained with widening

234 446+410 NYS. Retained with widening

235 446+655 NYS. Retained with widening

236 449+421 NYS. Retained with widening

237 449+821 NYS. Retained with widening

238 452+685 NYS. Retained with widening

239 453+580 NYS. Retained with widening

240 455+705 NYS. Retained with widening

241 457+130 NYS. Retained with widening

242 457+260 NYS. Retained with widening

243 465+060 NYS. Retained with widening

244 465+087 NYS. Retained with widening

245 465+525 NYS. Retained with widening

Page | 50

Page 51: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014246 465+765 NYS. Retained with widening

247 468+375 NYS. Retained with widening

248 469+220 NYS. Retained with widening

249

472+225 NYS. Retained with widening

250 474+862 Work in progress Retained with widening

251 481+930 NYS. Retained with widening

252 484+030 NYS. Retained with widening

253 487+904 NYS. Retained with widening

254 488+660 NYS. Retained with widening

255 489+128 Work in progress Retained with widening

256 491+970 NYS. Retained with widening

257 493+834 NYS. Retained with widening

258 495+445 NYS. Retained with widening

259 497+040 NYS. Retained with widening

260 497+367 NYS. Retained with widening

261 499+890 NYS. Retained with widening

262 500+278 NYS. Retained with widening

263 501+260 NYS. Retained with widening

264 501+562 NYS. Retained with widening

265 502+863 NYS. Retained with widening

266 503+456 NYS. Retained with widening

267 505+226 NYS. Retained with widening

268 505+700 NYS. Retained with widening

269 506+723 NYS. Retained with widening

270 507+738 NYS. Retained with widening

271 512+383 NYS. Retained with widening

272 438+500 Toll Plaza

NYS.  273 507+000 NYS.  

Page | 51

Page 52: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014NYS- Not Yet Started

Page | 52

Page 53: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

EMERGENCY SERVICES :-

SI. N.

Description Vehicle No

Location

Contact No

1 Control Room - Durgapur 8170006300

2 Highway Petrol (Jharkhand) WB37C-5168

Km.438.500

Toll Plaza

8229800282

3 Highway Ambulance(Jharkhand)

JH10R-2600

Km.438.500

Toll Plaza

8229800281

4 Highway Crane(Jharkhand) WB41E-8714

Km.438.500

Toll Plaza

9525953313

5 Highway Pertol (West Bengal)

A/F Km.499.270

DVC More

8170040455

6 Highway Petrol(Asansol) A/F Km 456.300

-

7 Highway Ambulance(West Bengal)

JH10Z-5503

Km.499.270

DVC More

8170040456

8 Highway Crane (West Bengal)

WB41E-9761

Km.467.450

Chanda More

9800104401

Page | 53

Page 54: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

Quality Assurance & Quality Control :-

Site Laboratory in Dhanbad camp, Asansol Camp and Raniganj Camp has been established and Panagarh has partially established.

Sl. No. Description of material & source

STATUS

I CEMENTa. Ultratech OPC 53 Grde- Rawan Approvedb. The India Cement (OPC 43 Grade)-

VadapalliApproved

c. Ambuja Cement Ltd. (OPC-43) - Howrah ApprovedII REINFORCEMENT Approveda. SAIL – Durgapur Approvedb. Tata Tiscon – Bokaro Approvedc. M/s RINL-Vizag Approvedd. M/s Tata Steel(Prestressing) Approvede. M/s Usha Martin (Prestressing) ApprovedIII HUME PIPESa. Hindustan Concrete pipe Industry – Ranchi Reviewb. Greenfield Industries – Makarampur Reviewc. Agarwal Construction – Bolpur Reviewd. Bankura Agro Engineering ApprovedIV BORROW AREASa Borrow Area-2 at km 519+300 LHS(Sec-III) Approvedb Borrow Area-5 at Km 518+100 LHS(Sec-III) Approvedc Borrow area-3 @km.519+500LHS(Sec-III) Approvedd Borrow area-10 @km 516+000LHS(Sec-III) Approvede Borrow area 1, 2 & 4 sec-I Approvedf Borrow area 1, 3, 4 & 5 sec-II ReviewV Aggregatesa Sand Quarry-Ajay River Approvedb Sand Quarry Ajay River (Near Gaurandi) Approvedc Sand Quarry Damodar River Approvedd Sand Quarry Barakar River Approvede Stone Quarry-Maliara Approvedf Stone Quarry -Maheshpur Approvedg Stone Quarry -Jangalpur Approvedh Stone Quarry -SaltoraVI Watera 476+300 LHS-Casting yard Approvedb 477+800 LHS- ECL water pipe line Approvedc 417+700 RHS-APCO camp 1 Approvedd 451+150 RHS- APCO camp-2 Approved

VII Admixture & Curing Compound Approveda M/s Fosroc Approvedb M/s. CICO Technologiest Ltd. Approvedc M/s. Rheoplast Technology(P)-Faridabad Approved

VIII Bearinga M/s. Sanfield India Ltd.-Bhopal Approvedb M/s. Dynamic prestress (India)Ltd.-Nasik ApprovedIX Expansion Jointsa M/s.Sanfield India Ltd. ApprovedX Emulsiom

Page | 54

Page 55: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014a M/s. HINCOI-Haldia Approvedb SAPCO Bitumen Company Ltd - Howrah ApprovedXI Bitumena SAPCO Bitumen Company Ltd - Howrah Approved

XII RE wall Agency’sa M/s. Suchi Geosyntheties Pvt. Ltd. Approvedb M/s. Techfab India Approvedc M/s. STRATA Geosystems(India) Pvt. Ltd. Approvedd M/s. Geosys India Infrastructures Pvt. Ltd Approvede M/s. Earthcon Systems (India) Pvt. Ltd. Approved

XIII Independent Laboratory Agency’sa M/s. Suntech-,Ranchi Approvedb M/s. Omega Consultant services,Kolkata Approvedc M/s. Spectro Shyam labs Pvt.Ltd.

(Calibration of equipment),DelhiApproved

d M/s. Vison Lab –Environment Test (Hydrabad)

Approved

e M/s Essjay Technomeasures Pvt. Ltd.-Howrah

Approved

f M/s Envirotech East(P) Ltd.- Environment Test (Hydrabad)

Approved

XIV WMMa WMM Mix design – Package III Approved

XV Presterssing Materiala Dynamic Prestress India Pvt. Ltd. Approved

Page | 55

Page 56: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

CALIBRATION STATUS OF LABORATORY EQUIPMENT AND PLANTS AS ON 30.09.2014

Sl.N

Name of the Equipment/ Instrument

Identification No.

Frequency of

calibration

Actual date of

calibration

Due date of

Calibration

Details of calibrating

agency

Package - I

1 Proving Ring 25 KN (CBR)

SL No. :25kN . 52012 2 Years 07.05.2014 07.05.2016

Young engg. & calibration services pvt ltd

2 Proving Ring 50 KN (MARSHALL)

SL No. :50kN . 11224 2 Years 07.05.2014 07.05.2016

Young engg. & calibration services pvt ltd

 SAND POURING CYLINDER CALIBRATION

         

3 CYLINDER 100mm dia 01 2 Months 08.09.14 07.11.14 Lab in 417+700R/S

4 CYLINDER 150mm dia 02 2 Months 08.09.14 07.11.14 Lab in 417+700R/S

5 CYLINDER 200mm dia 03 2 Months 08.09.14 07.11.14 Lab in 417+700R/S

6 RAPID MOISTURE METER 02 Quaterly 10.09.14 09.11.14 Lab in 417+700R/S

7 Compression Testing Machine (CTM) (10 KN )

Sr.No.14-15/972 yearly 20.09.14 19.09.15

The Testwel Instruments

Company

8 Compression Testing Machine (CTM) (1 KN )

Sr.No.14-15/971 yearly 20.09.14 19.09.15

The Testwel Instruments

Company

9 Hot Air Oven (00 to 4000C)

14-15/303 to 304 yearly 20.09.14 19.09.15

The Testwel Instruments

Company

10 Water bath Range (00C To 1000C ) 14-15/354 yearly 20.09.14 19.09.15

The Testwel Instruments

Company

11 CBR Testing Appratus 14-15/357 yearly 20.09.14 19.09.15The Testwel Instruments

Company

12 Proctor Moulds (small) Sr.No.(3) yearly 26.08.2014 25.08.2015The Testwel Instruments

Company

13 Proctor Moulds (Large) Sr.No.(1&2) yearly 26.08.2014 25.08.2015The Testwel Instruments

Company

14 CBR Testing Appratus 14-15/357 yearly 20.09.14 19.09.15The Testwel Instruments

Company

15 Bitumen Extraction Apparatus 14-15/1015 yearly 20.09.14 19.09.15

The Testwel Instruments

Company

16 Penetrometer   yearly 26.08.2014 25.08.2015The Testwel Instruments

Company

17 Softening Point 14-15/015 yearly 20.09.14 19.09.15The Testwel Instruments

Company

18 Saybolt Furol Apparatus Sr.No.14-15/1017 yearly 20.09.14 19.09.15

The Testwel Instruments

Company

19 Weighing Scale Range (35Kgs )

Sr.No.14-15/975 yearly 26.08.2014 25.08.2015

The Testwel Instruments

Company

20 Weighing Scale Range (20Kgs ) 14-15/013 yearly 20.09.14 19.09.15

The Testwel Instruments

Company

21 Weighing Scale Range (100Kgs ) 14-15/014 yearly 20.09.14 19.09.15

The Testwel Instruments

Company

22 Weighing Scale Range (600 gm) 14-15/018 yearly 20.09.14 19.09.15

The Testwel Instruments

Company

Page | 56

Page 57: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

Sl.N

Name of the Equipment/ Instrument

Identification No.

Frequency of

calibration

Actual date of

calibration

Due date of

Calibration

Details of calibrating

agency

  PLANTS          23

Batching Plant Euro Tech 60m3/h 03 Month 13.08.2014 12.11.2014 Lab in

417+700R/S

Package - II

1 Compression Testing Machine (CTM) 1314617 12 Months 20.01.2014 19.01.2015

TEST WELL INSTRUMENTS

COMPANY

2 Proving Ring 25 KN (CBR) C-12276 26 MONTHS 16.01.2014 15.03.2016

NCCBM BALLABHGHAR

H

3 Proving Ring 50 KN (Marshall Test)) C-12456 26 MONTHS 28.04.2014 27.06.2016

NCCBM BALLABHGHAR

H

4 Proving Ring 2 KN (Direct Shear Test)) C-12457 26 MONTHS 28.04.2014 27.06.2016

NCCBM BALLABHGHAR

H5 Stop Watch

BCL/BSW/113894 12 Months 08.10.2013 07.10.2014 BCL/113894

6Hot Air Oven (00 to 4000C)

13-14/609 12 Months 20.01.2014 19.01.2015TEST WELL

INSTRUMENTS COMPANY

7 Water bath Range (00C To 1100C )

14-15/810 12 Months 28.04.2014 27.04.2015TEST WELL

INSTRUMENTS COMPANY

8 Vicat Apparatus 13-14/619 12 Months 20.01.2014 19.01.2015TEST WELL

INSTRUMENTS COMPANY

9 Slump Cone Range (100x200x300mm) 1 to 5

13-14/636 TO 638 12 Months 20.01.2014 19.01.2015

TEST WELL INSTRUMENTS

COMPANY

10 AIV Apparatus 13-14/630 12 Months 20.01.2014 19.01.2015TEST WELL

INSTRUMENTS COMPANY

11 FI & EI Apparatus 13-14/623 12 Months 20.01.2014 19.01.2015TEST WELL

INSTRUMENTS COMPANY

12 Vibrating Machine (Cement Motor) 13-14/625 12 Months 20.01.2014 19.01.2015

TEST WELL INSTRUMENTS

COMPANY

13 Vibration Table 13-14/624 12 Months 20.01.2014 19.01.2015TEST WELL

INSTRUMENTS COMPANY

14 Digital Thermo Meter 13-14/721 12 Months 20.01.2014 19.01.2015TEST WELL

INSTRUMENTS COMPANY

15 Thermo Hygro Meter CTH-288 12 Months 27.04.2014 26.04.2015BAGSON

Calibration Lab Pvt.Ltd.

  Soil          

16 Measuring jar 100 ML. 1314/725 TO 734 12 Months 20.01.2014 19.01.2015

TEST WELL INSTRUMENTS

COMPANY

17 Measuring jar 500 ML 1314/723 TO 724 12 Months 20.01.2014 19.01.2015

TEST WELL INSTRUMENTS

COMPANY 18 Measuring jar 1314/723 TO

72512 Months 20.01.2014 19.01.2015 TEST WELL

INSTRUMENTS Page | 57

Page 58: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

Sl.N

Name of the Equipment/ Instrument

Identification No.

Frequency of

calibration

Actual date of

calibration

Due date of

Calibration

Details of calibrating

agency

COMPANY

19 Proctor Moulds 14-15/796 to 798 12 Months 27.04.2014 26.04.2015

BAGSON Calibration Lab

Pvt.Ltd.

20 CBR Moulds 13-14/699 TO 720 12 Months 20.01.2014 19.01.2015

TEST WELL INSTRUMENTS

COMPANY   PLANTS          

21 Batching Plant (SCHWING STETTER)

12-ETX2502 3 Months 17.06.2014 16.09.2014 Jointly conducted

  Bitumen          

22 Bitumen Extraction Apparatus 14-15/790 12 Months 28.04.2014 27.04.2015

BAGSON Calibration Lab

Pvt.Ltd.

23 Penetrometer 14-15/787 12 Months 28.04.2014 27.04.2015BAGSON

Calibration Lab Pvt.Ltd.

24 Softening Point 14-15/791 12 Months 28.04.2014 27.04.2015BAGSON

Calibration Lab Pvt.Ltd.

25 Ductility 14-15/788 12 Months 28.04.2014 27.04.2015BAGSON

Calibration Lab Pvt.Ltd.

26 Saybolt Furol Apparatus 14-15/892 12 Months 28.04.2014 27.04.2015BAGSON

Calibration Lab Pvt.Ltd.

 SAND POURING CYLINDER CALIBRATION

         

27 CYLINDER 100 MM 13-14/634 TO 635 12 months 20.01.2014 19.01.2015

TEST WELL INSTRUMENTS

COMPANY

28 CYLINDER 200 MM 13-14/631 12 months 20.01.2014 19.01.2015TEST WELL

INSTRUMENTS COMPANY

  RAPID MOISTURE METER          

29 MOISTURE METER 1314722 12 months 20.01.2014 19.01.2015TEST WELL

INSTRUMENTS COMPANY

30 MOISTURE METER 14-15/795 12 months 28.04.2014 27.04.2015TEST WELL

INSTRUMENTS COMPANY

  CONCRETE CUBE MOULD          

31 Concrete Cube Mould (150X150X150 MM)

13-14/639 TO 683 12 months 20.01.2014 19.01.2015

TEST WELL INSTRUMENTS

COMPANY

32Cement Motor Cube Mould (70.6X70.6X70.6 MM)

13-14/684 TO 695 12 months 20.01.2014 19.01.2015

TEST WELL INSTRUMENTS

COMPANY   WEIGHTS & MEASURES          

33 Weighing Scale Range (35Kgs ) 13-14/627 12 months 20.01.2014 19.01.2015

BAGSON Calibration Lab

Pvt. Ltd.

34 Weighing Scale Range (35Kgs ) 13-14/628 12 months 20.01.2014 19.01.2015

BAGSON Calibration Lab

Pvt. Ltd.

35 Weighing Scale Range (20Kgs ) 1314/626 12 months 20.01.2014

19.01.2015

BAGSON Calibration Lab

Pvt. Ltd.

36 Weighing Scale Range (600Grams) AX/2013/15353 12 months 20.01.2014

19.01.2015

BAGSON Calibration Lab

Pvt. Ltd.

37 Vernier callipers Range ( 0 to 150MM ) 14-15/804 12 months 28.04.2014 27.04.2015

BAGSON Calibration Lab

Pvt. Ltd.  IS SIEVE          

  IS Sieve 450mm Dia Range          

Page | 58

Page 59: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

Sl.N

Name of the Equipment/ Instrument

Identification No.

Frequency of

calibration

Actual date of

calibration

Due date of

Calibration

Details of calibrating

agency

38 80.00M Eq, No./IS Sieve (450mm Dia.)/1 12 months 14.07.2014 13.07.2015 APCO- Package-

2 Lab39 75.00MM Eq, No./IS Sieve

(450mm Dia.)/2 12 months 14.07.2014 13.07.2015 APCO- Package-2 Lab

40 63.00MM Eq, No./IS Sieve (450mm Dia.)/3 12 months 14.07.2014 13.07.2015 APCO- Package-

2 Lab41 53.00MM Eq, No./IS Sieve

(450mm Dia.)/4 12 months 14.07.2014 13.07.2015 APCO- Package-2 Lab

42 50.00MM Eq, No./IS Sieve (450mm Dia.)/5 12 months 14.07.2014 13.07.2015 APCO- Package-

2 Lab43 45.00MM Eq, No./IS Sieve

(450mm Dia.)/6 12 months 14.07.2014 13.07.2015 APCO- Package-2 Lab

44 40.00MM Eq, No./IS Sieve (450mm Dia.)/7 12 months 14.07.2014 13.07.2015 APCO- Package-

2 Lab45 37.50MM Eq, No./IS Sieve

(450mm Dia.)/8 12 months 14.07.2014 13.07.2015 APCO- Package-2 Lab

46 31.50MM Eq, No./IS Sieve (450mm Dia.)/9 12 months 14.07.2014 13.07.2015 APCO- Package-

2 Lab47 26.50MM Eq, No./IS Sieve

(450mm Dia.)/10 12 months 14.07.2014 13.07.2015 APCO- Package-2 Lab

48 25.00MM Eq, No./IS Sieve (450mm Dia.)/11 12 months 14.07.2014 13.07.2015 APCO- Package-

2 Lab49 22.40MM Eq, No./IS Sieve

(450mm Dia.)/12 12 months 14.07.2014 13.07.2015 APCO- Package-2 Lab

50 20.00MM Eq, No./IS Sieve (450mm Dia.)/13 12 months 14.07.2014 13.07.2015 APCO- Package-

2 Lab51 19.00MM Eq, No./IS Sieve

(450mm Dia.)/14 12 months 14.07.2014 13.07.2015 APCO- Package-2 Lab

52 16.00MM Eq, No./IS Sieve (450mm Dia.)/15 12 months 14.07.2014 13.07.2015 APCO- Package-

2 Lab53 14.00MM Eq, No./IS Sieve

(450mm Dia.)/16 12 months 14.07.2014 13.07.2015 APCO- Package-2 Lab

54 13.20MM Eq, No./IS Sieve (450mm Dia.)/17 12 months 14.07.2014 13.07.2015 APCO- Package-

2 Lab55 12.50MM Eq, No./IS Sieve

(450mm Dia.)/18 12 months 14.07.2014 13.07.2015 APCO- Package-2 Lab

56 11.20MM Eq, No./IS Sieve (450mm Dia.)/19 12 months 14.07.2014 13.07.2015 APCO- Package-

2 Lab57 10.00MM Eq, No./IS Sieve

(450mm Dia.)/20 12 months 14.07.2014 13.07.2015 APCO- Package-2 Lab

58 9.50MM Eq, No./IS Sieve (450mm Dia.)/21 12 months 14.07.2014 13.07.2015 APCO- Package-

2 Lab59 6.30MM Eq, No./IS Sieve

(450mm Dia.)/22 12 months 14.07.2014 13.07.2015 APCO- Package-2 Lab

60 4.75MM Eq, No./IS Sieve (450mm Dia.)/23 12 months 14.07.2014 13.07.2015 APCO- Package-

2 LabPackage - III

1 Compression Testing Machine (CTM)

071118, CAT 317E-DG 12 months 10.06.2014 09.06.2015 AIMIL

2 Compression Testing Machine (CTM)

S061042, AIM317E AN2 12 months 10.06.2014 09.06.2015 AIMIL

3 Proving Ring 50 KN (CBR) 1147/UAB998 12 months 20.06.2014 09.06.2015 Spectro Lab

4 Plunger Type Gauge(0-25mm) JO 6 12 months 20.06.2014 09.06.2015 Spectro Lab

5 Plunger Type Gauge(0-25mm) JO8 A 12 months 20.06.2014 09.06.2015 Spectro Lab

  PLANTS          

6 Batching Plant at Raniganj Schwing Stater (CB 30) 3 months 31.08.2014 30.11.2014  

7 Batching Plant at Panagarh camp BHAI 3 months 09.08.2014 08.11.2014  

 SAND POURING CYLINDER CALIBRATION

         

8 CYLINDER PC-1 (100mm) 2 Month 28.08.2014 27.10.2014 ORIENTAL- Package-3 Lab

9 CYLINDER PC-1 (200mm) 2 Month 01.09.2014 31.11.2014 ORIENTAL- Package-3 Lab

Page | 59

Page 60: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

Sl.N

Name of the Equipment/ Instrument

Identification No.

Frequency of

calibration

Actual date of

calibration

Due date of

Calibration

Details of calibrating

agency

10 CYLINDER PC-1 (200mm) 2 Month 28.09.2014 27.11.2014 ORIENTAL- Package-3 Lab

Details of QC Tests conducted during the month (01st September 2014 to 30th

September 2014)

S. N. DESCRIPTION

Description of tests as

per BIS/ Agreement provisions

Frequency of tests as per MoRTH/C.A.

No. of tests conducted up to previous month

No. of tests conducted this

month

Total no. of tests

conducted up to this month

pass Fail

Total

Pass

Fail

Total

Pass

Fail

Total

1.0 Earth Work1.1 OGL/

EGLGrain size analysis

As required 605 - 605 89 - 89 694 - 694

1.2 MDD & OMC As required 611 - 611 89 - 89 700 - 7001.3 Atterberg limit As required 609 - 609 89 - 89 698 - 6981.4 FSI As required 609 - 609 89 - 89 698 - 6981.5 CBR As required 86 89 175 91 16 107 177 105 2821.6 Field density

of original ground

1st test per 1000 m2

141 83 224 4 - 4 145 83 228

1.7 Borrow area

used for embank

ment and sub grade

Grain size analysis

2nd test per 3000 m3

288 - 288 52 - 52 340 - 340

1.8 MDD & OMC 2nd test per 3000 m3

287 - 287 52 - 52 339 - 339

1.9 Atterberg limit 2nd test per 3000 m3

256 - 256 61 - 61 317 - 317

1.10 FSI 2nd test per 3000 m3

276 - 276 53 - 53 329 - 329

1.11 CBR 1st test per 3000 m3

54 4 58 19 3 22 73 7 80

1.12 Deleterious Content Test

As required - - - - - - - - -

1.13 NMC 1st test per 250 m3

45 - 45 - - - 45 - 45

1.14 Embankment

Field density of Compacted layers

1st Test per 1000 m2

151 15 166 4 - 4 155 15 170

1.15 Sub Grade

Field density of Compacted layers

1st Test per 500 m2

2 - 2 - - - 2 - 2

1.16 Earthen Shoulde

rs

Field density of Compacted layers

1st Test per 500 m2

9 - 9 - - - 9 - 9

2.0 Concrete2.1 Sand Sieve Analysis As required 94 - 94 32 - 32 126 - 1262.2 Specific

gravity and water absorption

As required 5 - 5 2 - 2 7 - 7

2.3 Aggregate

Sieve Analysis As required 72 - 72 42 - 42 114 - 1142.4 Flakiness &

Elongation Index

As required 24 - 24 14 - 14 38 - 38

2.5 Los Angels Abrasion Value / AIV

As required 24 - 24 14 - 14 38 - 38

2.6 Specific gravity and water

As required 9 - 9 9 - 9 9 - 9

Page | 60

Page 61: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014absorption

2.7 Cement Fineness

Once per Every Lot

4 - 4 9  - 9 13  - 132.8 Consistency 4 - 4 10  - 10 14  - 142.9 Initial & Final

setting 4 - 4 10  - 10 14  - 142.10 Soundness

Test 4 - 4 9  - 9 13  - 132.11 Specific

Gravity 1 - 1 - -  - 1 -  12.12 Compressive

Strength 3 days

4 -  4 9 -  9 13 -  13

2.13 Compressive Strength 7 days

4 -  9 -  9 13 -  13 9

2.14 Compressive Strength 28 days

4 -  4 4 -  4 8 -  8

3.0 NP4 Spun Pipe3.1 600 mm dia Every lot 1 1 - - - 1 13.2 900 mm dia Every Lot - - - - - - - - -3.3 1000 mm dia Every Lot 5 - 5 - - - 5 - 53.4 1200 mm dia Every Lot - - - - - - - - -

4.0 Independent Laboratory Testing4.1 Steel Tensile

StrengthTwo test per

upto 100 tonnes and three test per above 100 tonnes

5 - 5 10 - 10 15 - 15

4.2 0.2% proof stress

5 - 5 10 - 10 15 - 15

4.3 Elongation 5 - 5 10 - 10 15 - 154.4 Bend Test 5 - 5 10 - 10 15 - 154.5 Re-Bend Test 5 - 5 10 - 10 15 - 154.6 Mass per

meter run5 - 5 10 - 10 15 - 15

4.7 Stone Quarry

Water absorption

Once every source

5 - 5 - - - 5 - 5

4.8 Deleterious material (%)

4 - 4 - - - 4 - 4

4.9 a. Light Weight Pieces

2 - 2 - - - 2 - 2

4.10 b. Material finar than 75 micron

2 - 2 - - - 2 - 2

4.11 Alkali aggregate reactivity

1 - 1 - - - 1 - 1

4.12 a. Reduction in Alkalinity of 1.0 N NaOH

3 - 3 - - - 3 - 3

4.13 b. Silica Dissolved

4 - 4 - - - 4 - 4

4.14 Soundness (% by weight loss after 5 cycles)

1 - 1 - - - 1 - 1

4.15 a.Sodium Sulphata

3 - 3 - - - 3 - 3

4.16 b. Magnesium Sulphate

3 - 3 - - - 3 - 3

4.17 Petrography 5 - 5 - - - 5 - 5

4.18 Cement Fineness 4 - 4 3 - 3 7 - 74.19 Consistency 4 - 4 3 - 3 7 - 74.20 Initial & Final

Setting4 - 4 3 - 3 7 - 7

Page | 61

Page 62: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 20144.21 Soundness

Test4 - 4 3 - 3 7 - 7

4.22 Chemical Properties

- - - - - - -

4.23 Compressive strength 3 days

4 - 4 3 - 3 7 - 7

4.24 Compressive strength 7days

3 - 3 4 - 4 7 - 7

4.25 Compressive strength 28 days

- - - 4 - 4 4 - 4

4.26 Admixture

Physical properties

Every lot - - - 1 - 1 1 - 1

5.0 Mix Design5.1 RCC

M30Compressive Strength 7 days

As required 3 - 3 - - - 3 - 3

5.2 RCC M30 (Pump)

Compressive Strength 7 days

As required 2 - 2 - - - 2 - 2

5.3 RCC M35

Compressive Strength 7 days

As required 7 6 13 - - - 7 6 13

5.4 PCC M15

Compressive Strength 7 days

As required 4 - 4 - - - 4 - 4

5.5 PCC M20

Compressive Strength 7 days

As required 1 - 1 3 - 3 4 - 4

5.6 RCC M25

Compressive Strength 7 days

As required 1 - 1 3 - 3 4 - 4

5.7 RCC M40

Compressive Strength 7 days

As required 4 4 8 2 - 2 6 4 10

5.8 RCC M40

Compressive Strength 28 days

As required 5 4 9 - - - 5 4 9

5.9 RCC M45

Compressive Strength 7 days

As required - - - - 2 2 - 2 2

5.10 PCC M15

Compressive Strength 28 days

As required - - - 5 - 5 5 - 5

5.11 PCC M20

Compressive Strength 28 days

As required - - - 2 - 2 2 - 2

5.12 RCC M25

Compressive Strength 28 days

As required - - - 2 - 2 2 - 2

5.13 RCC M30

Compressive Strength 28 days

As required - - - 2 - 2 2 - 2

5.14 RCC M35

Compressive Strength 28 days

As required - - - 2 8 10 2 8 10

5.15 RCC M35 (Pump)

Compressive Strength 7 days

As required 1 2 3 - - - 1 2 3

6.0 Cast-in-situ Conceate Cubes6.1 PCC Compressive 23 - 23 26 - 26 49 - 49

Page | 62

Page 63: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014M15 Strength 7

daysAs required6.2 PCC

M20Compressive Strength 7 days

31 - 31 17 - 17 48 - 48

6.3 RCC M25

Compressive Strength 7 days

7 - 7 13 - 13 20 - 20

6.4 RCC M30

Compressive Strength 7 days

14 - 14 17 - 17 31 - 31

6.5 RCC M35

Compressive Strength 7 days

4 - 4 10 - 10 14 - 14

6.6 PCC M15

Compressive Strength 28 days

31 - 31 18 - 18 49 - 49

6.7 PCC M20

Compressive Strength 28 days

8 - 8 28 - 28 36 - 36

6.8 PCC M35

Compressive Strength 28 days

3 - 3 13 - 13 16 - 16

5.9 RCC M30

Compressive Strength 28 days

17 - 17 66 - 66 83 - 83

6.10 RCC M25

Compressive Strength 28 days

9 - 9 9 - 9 18 - 18.

7.0 Granular Sub-Base7.1 GSB Sieve Analysis 1 Test per

200m32 - 2 2 - 2 4 - 4

7.2 MDD & OMC As required 2 - 2 - - - 2 - 27.3 Atterberg

limits1 Test per 200m3

- - - 2 - 2 2 - 2

7.4 Field density of compacted layers

1 Test per 500m2

- - - 6 - 6 6 - 6

8.0 Wet Mix Macadam8.1

WMM

Flakiness & Elongation Index

1 Test per 200m3

2 - 2 2 - 2 4 - 4

8.2 AIV 1 Test per 200m3

2 - 2 2 - 2 4 - 4

8.3 Specific gravity and water absorption

As required 4 - 4 4 - 4 8 - 8

8.4 Sieve Analysis 1 Test per 100m3

18 - 18 18 - 18 36 - 36

8.5 MDD & OMC As required 2 - 2 2 - 2 4 - 48.6 Atterberg

Limits1 Test per 100m3

2 - 2 2 - 2 4 - 4

9.0 Cementation Base9.1 CTB Sieve Analysis As required 14  - 14 - -  - 14  - 149.2 MDD & OMC As required 5  - 5 3  - 3 8  - 89.3 Atterberg

Limits As required 2 -  2 - -  - 2 -  29.4 10% Fines

Value As required 2  - 2 2 -  2 4  - 410.0 Cementation SubBase10.1 CTSB MDD & OMC As required -  - - 3  - 3 3  - 310.2 10% Fines As required -  - - 2 -  2 2  - 2

Page | 63

Page 64: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014Value

11.0 Bitumen works11.1 Bitumen Specific

gravity 1 test per lot -  - - 1  - 1 1  - 111.2 Penetration 2 test per lot -  - - 1 -  1 1  - 111.3 Softening

point 2 test per lot -  - - 1  - 1 1  - 111.4 Ductility test 2 test per lot -  - - 1 -  1 1  - 1

Safety and Road Maintenance :-

Safety:-

The overall safety measures during construction at site were inspected / reviewed. The concessionaire has provided the safety arrangement as per the provisions of concession agreement are lagging and the concessionaire are being reminded regularly to improve safety measures at work site.

The concessionaire was requested to ensure safety measures by keeping a separate safety team headed by a qualified safety officer for monitoring day to day safety arrangement all along the project corridor by providing highway traffic management system.

Concessionaire was also advised to ensure the safety of workers by providing PPE (personal protective equipments) to the workers/ labor during execution.

Advance marking sign regarding portion of any of the highways damaged/closed or diversion or any other information which needs to be advised to the road users should be prepared in advance and kept ready to enable immediate necessary action in the matter to be able to ensure hassle free flow of traffic on existing highway. At Km 413.000, Km. 446.000, Km. 452.000 and Km 474.000, Km 502.000, km 507.000, km 497.000 & km 516.000 proper safety arrangements required.

Unauthorized median opening should be immediate closed and median opening signage should be provided at authorized median opening locations.

Concessionaire has requested to please make proper safety arrangement during cutting of trees, logging and transportation.

Page | 64

Page 65: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014 Signage, Retro Reflective Tapes, Warning Sign should be provided at construction zone portions and also arrangement of traffic during construction and maintenance shall confirm to the requirements of IRC SP: 55, clause 112 of MORT&H Specification and provisions of concession agreement.

Maintenance:-

The Maintenance of existing highway is being done by concessionaire. Repairing of pot holes work is in progress. Several correspondences have been made requesting to speed up the progress of repairing work. Notice has been served to the concessionaire vide IE’s letter no-SAICPL-Sugam/Barwa-Adda_panagarh/IE/NH-2/180 dated 10/07 2014 for immediate repairing failing action will be taken as per the relevant clauses of MCA. Reminder Notice has been served on 10th day after issuing the notice vide IE’s letter No. SAICPL-Sugam/Barwa-Adda-Panagarh/IE/NH-2/2014/205 dated 19/07/2014. Inspite of the notices being served, the concessionaire fails to complete the work within the stipulated date.

The conditions of existing highway at some locations are poor. Especially at Muchipara & Airforce to Darjiling more locations should be taken up immediately.

All cross drainage structure works must be inspected immediately and ensure that there is no debris/ or dismantled material/ any other obstruction to the water way and water flows freely. Concessionaire has not taken any action in this regard still now. Hence, once again advised to the concessionaire to take up the work immediately.

Cleaning of side drains along with service road/ main carriageway is being started, advised to the concessionaire to expedite the cleaning work and ensure that rain water should not be stagnant on main carriageway as well as service road.

Trimming of over growth of plants and shrubs in median portion activity started, and advised to complete the trimming activity as early as possible.

Maintenance of existing shoulder of project highway has to be taken up immediately.

Page | 65

Page 66: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

WEATHER REPORT :-

DATE

Section -I Section -II Section – IIIDhanbad Asansol Durgapur

Temperature Rain Fall

Temperature Rain Fall

Temperature Rain Fall0C 0C 0C

Max Min (mm) Max Min (mm) Max Min (mm)01-September-14 32.2 26.4 30.6 32.2 25.5 10.0 33.0 28.0 8.602- September -14

32.4 26.9 3.8 30.0 25.5 17.6 33.0 26.0 12.403- September -14

34.6 27.6 NIL 32.3 25.7 7.0 31.0 28.0 NIL04- September -14

34.0 28.0 NIL 35.9 26.4 NIL 32.0 28.0 NIL05- September -14

33.8 27.8 NIL 37.3 26.9 NIL 33.0 28.0 3.406- September -14

34.2 27.3 3.6 34.0 26.4 3.8 32.0 28.0 0.507- September -14

33.2 27.5 8.2 33.5 26.4 11.6 31.0 29.0 3.608- September -14

33.4 26.5 12.4 33.7 26.0 6.6 33.0 30.0 NIL09- September -14

33.8 27.2 NIL 37.3 26.3 NIL 33.0 30.0 NIL10- September -14

33.6 28.1 NIL 37.1 26.6 NIL 32.0 30.0 35.811- September -14

34.0 27.5 NIL 37.2 26.7 NIL 33. 30.0 NIL12- September -14

34.2 28.0 NIL 37.9 27.4 NIL 32.0 30.0 NIL13- September -14

33.2 28.4 16.6 34.5 26.2 17.2 31.0 27.0 6.814- September -14

34.6 29.1 NIL 37.9 26.4 21.6 33.0 29.0 1.015- September -14

35.2 29.4 NIL 37.2 26.5 NIL 33.0 31.0 NIL16- September -14

34.8 30.0 NIL 37.9 26.0 2.2 33.0 29.0 4.617- September -14

35.0 29.4 NIL 37.2 26.4 NIL 33.0 29.0 3.018- September - 35.2 29.1 NIL 37.1 26.9 8.2 33.0 29.0 3.0

Page | 66

Page 67: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 20141419- September -14

34.6 28.2 28.4 35.7 26.5 5.0 33.0 30.0 NIL20- September -14

32.4 27.4 75.2 31.5 26.4 46.4 30.0 30.0 5.221- September -14

30.2 27.6 49.6 32.2 26.5 52.2 33.0 28.0 24.822- September -14

31.6 28.1 NIL 33.4 25.3 NIL 33.0 32.0 NIL23- September -14

32.0 24.0 15.6 36.4 24.9 26.0 32.0 31.0 6.624- September -14

32.8 24.5 NIL 30.8 26.1 NIL 33.0 28.0 NIL25- September -14

33.0 23.6 NIL 36.7 25.5 NIL 33.0 30.0 NIL26- September -14

32.8 24.0 NIL 37.2 23.9 NIL 34.0 30.0 NIL27- September -14

34.2 24.4 NIL 37.5 24.4 NIL 32.0 31.0 NIL28- September -14

35.0 26.2 NIL 38.1 24.2 NIL 33.0 31.0 NIL29- September -14

36.2 27.2 NIL 39.1 25.4 NIL 34.0 30.0 NIL30- September -14

35.8 28.8 NIL 36.9 24.4 NIL 31.0 27.0 NIL

Site Photographs :-

Excavation for diversion at km 373

Page | 67

Page 68: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

C & G work at km 472

Box culvert at 518+177

Page | 68

Page 69: nhai.org.innhai.org.in/spw/IEReport/MPR-FOR THE MONTH OF SEPTEMBER... · Web viewMr. Faishal Rizwan Siddqui Sr. CAD Engineer 46. Mr. Pawan Kumar Asst. Engineer (Design) 47. Mr. Avijit

Independent Engineer services for Six-Laning of Barwa-Adda-Panagarh Section of NH-2 from km 398.240 to km 521.120 including Panagarh Bypass in the States of Jharkhand and West Bengal under NHDP Phase V on Toll on DBFOT Pattern.

Monthly Progress Report – SEPTEMBER 2014

Page | 69