NGN_PREAT_Tracker of Kadapa Site
-
Upload
loddipalli-srihari -
Category
Documents
-
view
77 -
download
2
Transcript of NGN_PREAT_Tracker of Kadapa Site
AT Tracker Date : 04-08-2010
S.No. Site name
Scope & Installed Infra Tests SS test TMG Lan Router Remarks
SS TMG
1 2 1 12 9 26 24 19 18 9 7 17 15
2 Rajahmundry 1 1 12 10 26 19 19 13 9 8 17 14 AT ongoing
3 GUNTUR 1 1 12 5 26 19 19 16 9 8 17 15
4 Tirupathi (AT) 1 12 0 26 NA 19 18 9 8 17 15
5 Vizag(AT) 1 12 0 26 NA 19 15 9 8 17 15
6 1 12 9 26 NA 19 16 9 8 17 15
7 Elluru(AT) 1 12 10 26 NA 19 18 9 8 17 15
8 Kurnool (AT) 1 12 12 26 NA 19 10 9 7 17 159 Nalgonda (Pre-AT) 1 12 0 26 NA 19 14 9 8 17 15 Need to offer AT from BSNL.
10 1 12 0 26 NA 19 15 9 8 17 15 Need to offer AT from BSNL.11 Warangal 1 12 0 26 NA 19 0 9 0 17 012 Khammam 1 12 0 26 NA 19 0 9 0 17 013 Vizianagram 1 12 0 26 NA 19 0 9 0 17 014 Sangareddy 1 12 0 26 NA 19 0 9 0 17 015 Srikakulam 1 12 0 26 NA 19 0 9 0 17 016 Nellore 1 12 0 26 NA 19 0 9 0 17 017 Cuddapah(PRE-AT) 1 12 0 26 NA 19 6 9 7 17 818 Mehbobnagar 1 12 0 26 NA 19 0 9 0 17 0
Total # of tests
# of tests completed
Total # of tests
# of tests completed
Total # of tests
# of tests completed
Total # of tests
# of tests completed
Total # of tests
# of tests completed
Telephone BhavanHyderabad
Some test are partially pass.SS2 AT ongoing.
Some of the test are partialy pass need to clear the requirement of BSNL.
AT Completed successfully.Need to clear some pending point.
At started on 21-06-2010.AT Completed 90%
KarimNagar(AT)
Need to clear now only 3 TMG pending points.AT completed successfully.Some Test are NA and need relaxation letter from T&D jabalpur.
At started on 29-06-2010.AT Completed 80%
Ananthpur(Pre-AT)
Infrastructure Test
TEST DESIRIPTION
1EI- AT-7010
(Digital E 10B)
2As per approved layout plan
3Lighting and Power outlets
4
Check of earthing systems
Check of Fire Detection System EI Protection - Fire
5A.C. Plant EI Building ACT 002, T0003
6Engine Alternator As per EA test schedule
7
As per T & D test schedule
Location, Alignment & Rigidity (LAR) As per Approved plan
8Cable laying & Terminations Visual check as per cable list
9Voltage drop test
10
QA certification of all equipment FTR for imported equipments.
11Check of Documentation As per P.O.
12General Check points Visual Check
Sl. No
TEST PROCEDURE / REFERENCE
Raised floor and False ceiling or Antistatic flooring (as provided)
Layout & floor Plan with Trunking and Dimensioning diagram
Earth resistance value should be < 0.5 ohm
Power Plant & Batteries & Inverter/UPS (If provided)
Voltage drop < 1V from Battery point to system
DDF: LAR cable laying and check of protective devices & earthing
Visual check as per DDF LAY OUT
Infrastructure Test
REMARKS
PASS Separate room for IP-TAX
Pass
PASS Pass
PASS Pass
Pass Pass
PASS Pass
PASS Pass
NA Pass
PASS Partially Pass
On Progress Pass
PASS Pass
NA
PASS Pass
PASS Pass
PASS
PASS
Telephone Bhavan,Hyderabad Status
(Pass/Fail)
Rajmundry Telephone Exchange (Pass/Fail)
Common Earthing for Telephone Bhavan
Common Atternator is proved by BSNL
Only inverter is installed and Ated at site.
Pass
12 E1 faulty, 1 GE cable faulty
Infrastructure Test
REMARKS REMARKS
Separate room for IP-TAX
Pass
Pass
Pass
Pass
Pass
N/A
AT sir is aking referance document Pass
Guntur Telephone Exchange
we are using common earth Bar of BSNL
AT sir asking need to check in EMS
Common Atternator is proved by BSNL
NA
NA
need some clarification on this issue.
Karimnagar REMARKS Vizag
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass Inverter need to install
Pass
Pass
Pass
Pass Need to submit FTR
Pass
Pass
Pass
REMARKS Elluru REMARKS
Pass Existing room only
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Partially Pass
Pass
Pass
Common Atternator is proved by BSNL
Installation team not done Earthing for E1 cables. At asking do the earthing
Kurnool REMARKS Khammam
PASSED ON 29-07-10 pass
passPASSED ON 29-07-10 pass
PASSED ON 29-07-10 pass
PASSED ON 29-07-10 pass
PASSED ON 29-07-10 pass
PASSED ON 29-07-10 pass
PASSED ON 29-07-10 pass
PASSED ON 29-07-10
PASSED ON 29-07-10 pass
PASSED ON 29-07-10 pass
PASSED ON 29-07-10 pass
PASSED ON 29-07-10 pass
PASSED ON 29-07-10 pass
PASSED ON 29-07-10 pass
PASSED ON 29-07-10 pass
Remarks
Passed on 6-Oct-2010
Passed on 6-Oct-2010
Passed on 6-Oct-2010
Passed on 6-Oct-2010
Passed on 6-Oct-2010
Passed on 6-Oct-2010
Passed on 6-Oct-2010
Passed on 6-Oct-2010
Passed on 6-Oct-2010 Dimentionig letter need to
submit
Existing used Passed on 6-Oct-2010
Existing used Passed on 6-Oct-2010
Existing used Passed on 6-Oct-2010
Existing used Passed on 6-Oct-2010
AT sir said need labling with big letters Passed on 6-
Oct-2010
Soft Switch Test
TEST DESIRIPTION
Power ON Test
Checking Software version
System backup and restore
Basic call Test
Signaling/Protocol: Check that SS supports
Sl. No
1.
2.
3. Physical & Software verification of capacity (Trunk and Signaling links)
4.
5. Interoperability Test: Check the Interoperability with other types of network
6. 1. Configuration of SS&/IP signaling links.2. Configuration of TDM/IP Trunk groups.3. Call set up and Release.4. “A” Number modification- Prefix/suffix digits/deletion of digits/depending on incoming trunk group
5. “B” Number modification – Prefix/suffix digits/deletion of digits/depending on the incoming trunk group.
6. SCTP coupling setup between the Signaling gateway and soft switch device and SCTP data transmission function.
7. M3UA connection function between the signaling gateway and soft switch device.
8. Addition of carrier access code in case of no CLI received.
7. 1. SS7 ISUP/MTP/SCCP/INAP
2. SIP and SIP -T3. H.2484. SCTP5. M3UA6. M2UA7. SDP8. Codecs –G.711, G723, G.729
Tones and Announcements
Number Analysis and Routing
Operational Features
Maintenance Features
Billing Test
8.
a. Check the support of tone functionality.Check the support of interworking with Announcement Server on H.248 for the purpose of providing announcements.
9. 1. Check that there is no charging on the non metered calls (eg. 197)
2. Check the Day and time based routing.3. Check the CLI dependent routing.4. Check the Least Cost Routing.5. Check the Calling line category based routing6. Check the Load sharing on alternate routes for the same destination by percentage and time segment.
7. Check that capability to redirect the call to an announcement service at congestion, wrong number, change in area code etc.
10. 1. Directed call on a particular trunk.2. Number barring on number in black list.3. Long Duration call Supervision.
4. NMS feature for Dynamic Load Handling.
11.
1. Check the status of resource.2. Detection and automatic report of resource state changes.
3. Check SCTP coupling link status.4. Check the status of IP networks.
12.
1. Recording of CDRs for different call scenarios, including intra/inter switch calls/NLD/ILD calls/Number translated/number modified calls/successful/unsuccessful calls.
11. Counter resetting facility using super password
Check the
Check the System access managementCheck the Equipment diagnosis capability.
Retrieval and its backup
Calendar management
2. Check that SS is able to provide transfer of billing information over TCP/IP links to the billing centre using FTP for file transfer.
3. Check that the transfer of CDR files is programmable for the time of the day and the frequency at which CDR shall be downloaded to the billing centre. Also check the integrity of CDR file downloaded to the Billing Mediation Device.
4. Check that it is possible to take the billing information on Optic/Magnetic media locally.
5. It is possible to interrogate and check the status of billing file generated.
6. Check that 50%, 75% and 90% of capacity of billing file, alarm of suitable category is generated.
7. CDR data is available in duplicated hard disks.
8. Check that CDR can be obtained in CSV format for further processing.
9. Check that charge band implementation is done as per BSNL network
10. Check that counters can be used for each outgoing and incoming TG.
13. Check the Operation and Maintenance of SS is possible through local craft terminal as well as remotely located NMS.
14. (i) Network Interface administration(ii) Traffic Administration(iii) Charging Administration(iv) System control operation.
15. 16. 17. Log Function:(O&M log, Alarm log, system status change
log):
18.
Charge Monitoring
Lawful Interception
Traffic Measurement Test
(i) Automatic Congestion Control (ACC) (ii) CAPS control in case of overload situation.
Alarm Function Test
Redundancy Test:First the call is established then check redundancy.
19.
20.
1. Check that it is possible to monitor(intercept) the call based on calling number, called number or initial digits of these numbers.
2. Check that Call related data for such calls is stored in a separate file(write protected) to be retrieved by authorized personnel or transferred to an external equipment as per requirement.
21. It shall be possible through a single Man-Machine Command to obtain a list and the total number of equipment of a particular type (e.g. trunks etc.) in a particular state (e.g. in-service, blocked etc.).
22. 1. Check the Measurement for the individual media gateway .
2. Check the Traffic measurement in time segment.3. Check the Trunk group management.4. Check the Destination code measurement.
23. The Softswitch shall support the following "Automatic traffic controls for network management"
24. Loop-back testing of signalling and voice paths for CCS7 and IP shall be supported.
25. 1. Check the Main control module alarm2. Check the Alarm Report and classes/categories of alarms.
3. Communication connection alarm.4. Alarms on system fault/Network faults – up to card level.
5. System Resource alarm- Audio & Visual Alarm.
6. Network connection alarm.7. Alarms on CDR/Billing systems.
26.
REMARKS
Pass Pass
Pass Pass
Pass partially pass
Pass Pass
Partially Pass Partially Pass
Pass PASSPass PASSPass PASSPass PASSPass PASS
Pass PASS
Pass PASS
Pass PASS
Pass Pending
Pass PASSPass PASS
Pass PASSPass PASSPass PASSPass PASSPass PendingPass PASSPass PASS
Rajmundry Telephone Exchange (Pass/Fail)
Guntur Telephone Exchange
Physically & in software I shown to AT person and he want letter about truks and signaling links
No E1' povided by BSNL till now from PLMN
pass
PASS
PASS
passPASS
partially pass
pending
PASS
pass PASSpass Pendingpass PASSpass Pending
passPASS
Pass
passed on 30-Aug-2010 PASS
PASSpass PASSpass PASS
paending
Pending
pending NA
Pass PASS
PASSpass PASS
pass PASSPass PASS
Pending
Pending
Passed on 31-Aug-2010
Passed on 31-Aug-2010
I shown for 100,108,139 calls but AT person is asking about need to check with meetering and non metering details
I kept for so many times but it is disconneting by SS need to check it
AT person want to observer by their BSNL people in NMS
pass
Pending
Pending
PassPassed on 6-sep-2010 Pending
passPased on 08-Sep-2010 Pending
passPased on 08-Sep-2010 Pending
passPending
passPending
Pending
passPending
Pass
Pased on 08-Sep-2010 Pending
Pass
Pending
pass Pendingpass Pendingpass Pendingpass PASSpass PASSpass Pendingpass PASS
passPASS
pass PASS
pass
PASS
AT person want billing from their billing center for IP tax calls
Passed on 31-Aug-2010
Passed on 31-Aug-2010
Passed on 31-Aug-2010
pass
NA NA
progress
progress
pass
PASS
pass Pending
passPending
pass Pendingpass PASSpass PASS
passPending
pass PendingPending
pass PendingPending
pending NA
pass PASS
passPASS
pass PASS
passPending
passPending
pass Pendingpending Pending
Partially pass
Pass
need to configure in BSNL SSTP side
Passed on 31-Aug-2010
REMARKS
PLMN is pending
SIP-T IS PENDING
Again checked this test and Passed on 23-06-2010
Checked for software version It was pass and need to upgrade with new version
AT sir is asking about how many licenses issed from zte to bsnl
Automatic backup done (26-06-2010)
MTP/SCCP/INAP IS PENDING
Billing center not ready so we cannot perform.
Billing center not ready so we cannot perform.
Chennai LIG not ready
NA
ROUTER 2 is not working
Trunk GateWay TestS.No. TEST ITEM
Power ON Test Pass
Checking Software version Partially Pass
Pass
Hardware and Configuration Test Pass
Pass
Pass
Pass
Check the NMS administration NA
2 Pass
Synchronization Test Pass
Telephone Bhavan,Hyderabad Status
(Pass/Fail)1.
2.
3. Physical & Software verification of capacity (Trunk and Signaling links)
4.
1. Redundancies test-
First the call is established then check redundancy. All the cards (MIPI, CMPAND C-HUB) should be in hot active stand by mode. Rack power should also be in 1+1 mode.
2. Check the Power fail and restore
3. Check the Local craft Terminal function 5.
Interoperability Test: Check the Interoperability with other types of network(PSTN/PLMN/IP network).
7.
Pass
Pass
Pass
Pass
Backup and Restore TestPass
Diagnose Test Partly PassPass
Partly Pass
MML TestPass
Pass
Pass
Pass
7. 1. Clock synchronization test
2. NTP clock reference synchronization.
3. Hold over if external reference clock fails.
4. Check that clock board support master-standby function.
8.
9. 1. Check the capability to Diagnose the system
2. Check the capability to Diagnose the boards.
10.
1. Check that commands and responses are in English.
2. Check that MML provides facilities for inputting the parameters for a command in any sequence and the optional parameters need to be inputted only when they are required.
3. Check that command errors detected by the TMGW is indicated by the output of error messages.
Pass
Partly done/Pass
PassPass
Partly done/Pass
Log Function: Pass
Pass
Basic call Test Pass
Pass
Not Done
NA
Not Done
10.
4. Check that MML provide the facilities for editing, canceling and stopping, the completion of commands.
11. Control the support of following protocols:
1. Bearer control within the IP network : RTP/UDP/IP.
2. Softswitch- H.2483. TMGW shall provide the support of SCTP in addition to TCP and UDP.
12. (O&M log, Alarm log, system status change log): Retrieval and its backup
13. 1. Auto-change over to the redundant STM-1 interface in case of failure of active STM-1.
2. Call set up and Release.(including Voice call to fax call, voice call to modem call, voice call to ISDN data call and vice versa)
3. Support of load sharing and active/standby configuration for the signaling route.
4. Check that it supports all supplementary services.
14PassPassNA
Pass
Pass
15 Operational Features pass
pass
Partly Pass
pass
NA
16 Maintenance Features
Pass
Pass
NA
NA
Signaling/Protocols: Check that TMGW supports
1. H.2482. SCTP association3. Codecs – It shall support G.711, G.729, T.38, G.726(Optional) and G.723(Optional).
4. RTP
1. DTMF detection and generation.
2. Loop testing on E1s/STM1s: soft and hand loop.
3. Long Duration call Supervision.
4. NMS feature for Dynamic Load Handling.
1. Check the status of resource.
2. Detection and automatic report of resource state changes.
3. Check the Signaling point, signaling links and signaling status.
4. Check SCTP coupling link status.
16
NA
Pass
17 Statistics TestPartially Pass
Partially Pass
Partially Pass
Partially Pass
Partially Pass
18 Alarm Function Test
Pass
Pass
Pass
Pass
Partially Pass
5. Check the status of TDM network such as SS7 links.
6. Check the status of IP networks.
1. Check the Statistics on the resource utilization on the IP side.
2. Check the Statistics on the bandwidth utilization of a gateway port.
3. Check the Statistics on the CPU occupation of the system.
4. Check the Statistics on public resource occupation
1. Check the Main control module alarm
2. Check the Alarm Report and classes/categories of alarms.
3. Communication connection alarm.
4. Alarms on system fault/Network faults – up to card level.5. System Resource alarm- Audio & Visual Alarm.
19 Announcement Server Test
Pass
Redundancy Test Pass
PassPassPass
Pass
Signaling and Protocols: Pass
Pass
Pass
Pass
Pass
Pass
Pass
a. 1. Control Module Redundancy
2. Disk redundancy3. Power Supply redundancy4. Network Link (Fast Ethernet Link)
b. 1. Check that it supports H.248 for communication with Soft Switch.
2. Check that it supports RTP and RTCP.
c. Play the announcements and check that
1. AS supports messages of min 30 seconds length.
2. The No. of messages supported are at least 32.
3. Check that AS supports multi-language announcements.
REMARK
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Partly done
Pass
Rajmundry Telephone Exchange
Need to submit version letter
need to submit the capacity related letter
Pass
Pass
Pass
Pass
Pass
PassPass
Ready for AT. Pass
Pass
Pass
Pass
Pass
Pass
Pass
PassPass
passPass
Pass
pending
Ready for AT.
progress
pending
Pass
BSNL need a letter noted that the MSG can support SCTP protocol and can be used as SG
Need collect the supplementry services.
passpassNA
pass
pass
pass
pass
progress
passPass
pass
pass
NA
NA
BSNL want to know How to check generation?
NA
Pass
progress
progress
progress
progress
progress
pass
pass
pass
pass
pass
BSNL wants to check on live traffic.
passpass
passpasspass
passpass
pass
pass
pass
pass
pass
pass
REMARKS
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Partly done
PASS
Guntur Telephone Exchange
Connected with PSTN need to connect with PLMN and ip network
Pass
Not Done
Pass
Pass
PassPass
Pass
Pass
Pass
Pass
Pass
Pass
Pass
Partly done/Pass
PASSPASS
In ProgressPass
Pass
BSNL not provided any E1's Till now
NOT DONE
Partly done/Pass
N/A
Not Done
Basic voice call finished for IAD-IAD,IAD-PSTN,PSTN-PSTN, ISDN vice versa. Need to do for modem call
Passed on 4-sep-2010 but for some tones need to change the regional tones
Partly done/PasspassN/A
pass
pass
Pass
Hand loop : need to check 4 E1's ( 4E1's are faulty)
In Progress
In Progress
passed on 6-09-2010PASSPASS
PASS
PASS
N/A
N/A
call released after 2 hours but in test case it is 24 hour long call, I discussed with Parvez TSD he told me we need to check metering in PC server,zhang is configuaring required parameters
N/A
PASS
PASS
PASS
PASS
PASS
PASSPASS
PASS
PASS
PASS
PASS
I shown in the OMC console but Alarm box is not generating any voice it generating only beeps and he check the cleared alarms in alarm box
I shown in the OMC console but Alarm box is not generating any voice it generating only beeps and he check the cleared alarms in alarm box
I shown in the OMC console but Alarm box is not generating any voice it generating only beeps and he check the cleared alarms in alarm box
I shown in the OMC console but Alarm box is not generating any voice it generating only beeps and he check the cleared alarms in alarm boxI shown in the OMC console but Alarm box is not generating any voice it generating only beeps and he check the cleared alarms in alarm box
Passed on 26-Aug-2010 Not DonePassed on 26-Aug-2010
Passed on 26-Aug-2010Passed on 26-Aug-2010Passed on 26-Aug-2010
Passed on 26-Aug-2010Passed on 26-Aug-2010
Passed on 26-Aug-2010
Passed on 26-Aug-2010
Passed on 26-Aug-2010
Passed on 26-Aug-2010
Passed on 26-Aug-2010
Passed on 26-Aug-2010 As per BSNL requirement we test 10 Anouncements with diffent scenarios and
AT person is asking need to test more tones but those are not loaded in AS. (1. This number is
chnaged please concern telephone directory or 197 2.This number is changed please dail 1585)
REMARKSKarimNagar REMARKS Vizag
Pass Pass
Pass
Pass Pass
Pass
PassPass
PassPass Pass
Pass Pass
Pass Pass
Partialy Pass
Pass
Pass
Pass( Need to provide matching
table)
Need to be Confirmed from the Chennai NMS end
PSTN to IP is passed
PSTN-PLMN is pending
Tested for PSTN need to test PLMN as E1 need to add at
MSC end
Pass Pass
NA NA
Pass Pass
Pass Pass
PassPass
Pass Pass
Pass Pass
Pass Pass
PassPass
Pass
Pass
Pass
Pass
During this test we had found the MEUIM board FAULTY.
Pass
Pass
Pass RTP packets to be captu PassPass Pass
Pass Pass (Only UDP is provided)Pass Pass
Pass Pass
Not Done
Not Completed
Partially Passed
NA
NA
Need STM-1 from BSNL
Fax call is pending because here fax mechine is not
available.
Will be tested tommorow
Need ISDN no from BSNL
Conference call need to be tested
Pass Pass
NA NA
Pass
Pass
Pass Pass
Pass Not Completed
Pass(Two electrical E1 are faulty) In progress
Only one two tested
Not Completed
Pass
Pass Pass
Pass Pass
Pass NA
NA NA
T.38 G.729(optional) is
pending
Soft loop testing is passed hard loop
testing in progress
NA NA
Pass Pass
Not DoneNot Completed
Not Completed
Not Completed
Not Completed
Not Completed
Pass Passed
Pass Passed
Pass Passed
Pass Passed
Pass Partial Passed
BSNL wants to check this test with
announcement server
working on it.
Not Done
REMARKS Tirupathi REMARKS
Pass on 21-07-2010
passPass on 21-07-2010
passPass on 21-07-2010
passPass on 21-07-2010
passPass on 21-07-2010
passPass on 28-07-10
passPass on 28-07-10
passPass on 28-07-10
pass
passPLMN is pending
partially passpass
BSNL wants how the trunks are created in SS
No PLMN connectivity so pending only for PLMN.
pass
pass
pass
pass
passpass
Pass on 28-07-10
passPass on 28-07-10
passPass on 28-07-10
pass
passPass on 28-07-10
passPass on 28-07-10
pass
Auto back is coming only for particular time
but BSNL wants for different times
Pass on 28-07-10
pass
pass
passpass
pass Need to submit SCTP Supporting letter28-07-2010 pass28-07-2010
passPass
STM is not throughed
Not done
partially pass
NA
Pass
not possible no exchange is having the active standby
provisionFax call from one Pstn it is done the other Pstn is not routed towards to the IP TAX.
Modem vcall and data call how to do it?
passpassNA
pass
passpass
pass
Pass
partially pass After 6 hrs call is getting cut.
PassPassed on 28-07-10 passPassed on 28-07-10
passPassed on 28-07-10
pass
pass
pass
need to capture packets from router
Soft Loop is passed and Hard loop is tested
for 5 DTB cards.
The call is releasing after 2 or 3 hours.
passPassed on 28-07-10
Pass
pass Need to give output reports.
pass
pass
pass
passpass
Passed on 28-07-10
passPassed on 28-07-10
passPassed on 28-07-10
passPassed on 28-07-10
pass
pass
It can be conducted when the traffic has
started.
Not done
Connected AS not ready sonow not possible to show
this test
Elluru REMARKS KURNOOL
Pass
Passed on 29-07-10
Pass Passed on 30-Jul-2010
Pass
Passed on 29-07-10
Pass
Pass Passed on 30-Jul-2010
Pass Passed on 30-Jul-2010
Pass Passed on 30-Jul-2010
Pass Passed on 30-Jul-2010
Pass Passed on 30-Jul-2010
Pass Passed on 30-Jul-2010Pass Passed on 30-Jul-2010
Voltage drop test done it was pass (passed on 30-Jul-2010)
Passed on 29-07-10
AT sir asking letter for confirmation (Passed on 30-Jul-2010)
Completed(No Power Redundancy for TG server)
Passed on 29-07-10
Pass Passed on 30-Jul-2010
Pass Passed on 30-Jul-2010
Pass Passed on 30-Jul-2010
Pass Passed on 30-Jul-2010
Pass Passsed on 30-07-10Pass Passed on 30-Jul-2010
Pass
Pass Passed on 30-Jul-2010
Pass Passed on 30-Jul-2010
Pass Passed on 30-Jul-2010 Passed on 30-07-10
Pass Passed on 30-Jul-2010 Passed on 30-07-10
Pass Passed on 30-Jul-2010 Passed on 30-07-10
Passed on 31-07-10
Passed on 31-07-10
Passed on 31-07-10
Passed on 2-Aug-2010 Automatic backup in progress
Passed on 30-Jul-2010 SDTB/2 board is showing HW error
Partial Completed on 29-07-10
Partial Completed on 29-07-10
Pass Passed on 30-Jul-2010
pass
Pass Passed on 6-Aug-2010pass Passed on 31-Jul-2010
Pass Passed on 3-Aug-2010pass Passed on 31-Jul-2010
pass Passed on 31-Jul-2010 Partial Passed on 30
pass
Pass
NA
Pass
Passed on 6-Aug-2010 ISDN call is progress
Pass Passed on 31-Jul-2010NA
Pass Passed on 6-Aug-2010
Pass Passed on 31-Jul-2010
Pass Passed on 6-Aug-2010
pass
pass
Pass Passed on 6-Aug-2010Pass Passed on 2-Aug-2010
Pass Passed on 2-Aug-2010 Passed on 30-07-10
Pass Passed on 2-Aug-2010 Passed on 30-07-10
N/A Passed on 2-Aug-2010
N/A
N/A
Pass Passed on 2-Aug-2010 Patial Passed on 30-
Partially Pass Pending (for want of clarification)
Partially PassPending (for want of clarification)
Partially PassPending (for want of clarification)
Partially PassPending (for want of clarification)
Partially Pass Pending (for want of clarification)
Pass Passed on 2-Aug-2010
Pass Passed on 2-Aug-2010 Partial Passed on 30
Pass Passed on 2-Aug-2010 Partial Passed on 30-07-10
Pass Passed on 2-Aug-2010 Passed on 30-07-10
Pass Passed on 2-Aug-2010 Passed on 30-07-10
Pass Passed on 2-Aug-2010
NA
NA N/A (NOT OFFERED)
NA N/A (NOT OFFERED) NA N/A (NOT OFFERED)
NA N/A (NOT OFFERED)
NA
NAN/A (NOT OFFERED)
NA N/A (NOT OFFERED)
Pass
Pass Completed
Pass Completed
AS not available at site.So play the annocement according to AT requirement.
Pending (4 Messages shown)
REMARKS Khammam REMARKS
Pass
Passed on 6-Oct-2010
Pass
Passed on 6-Oct-2010
Pass
Passed on 6-Oct-2010
PassPassed on 6-Oct-2010
PassPassed on 6-Oct-2010
Pass
Passed on 6-Oct-2010
PassPassed on 6-Oct-2010
PassPassed on 6-Oct-2010
Pass
PassPass
AT sir asking the version matching table from circle office
Pass
Pass
Pass
Pass
Passsed on 30-07-10 PassPass
Pass
Pass
Pass
Pass
Pass
Pass
Physical OMP card is ok,but in diagnose test OMP card shows fault
Physical OMP card is ok,but in diagnose test OMP card shows fault
in diagnose test EUIM card shows fault
in diagnose test EUIM card shows fault
output Is not showing.
Pass
output Is not showing.
pass
Passpass
Passpass
pass
pass
Pass
NA
Pass
AT sir asked Differet users to be created other than ADMIN.
AT sir asked Differet users to be created other than ADMIN.
PassNA
Pass
Pass
Pass
pass
pass
PassPass
Pass
Pass
N/AN/A
N/AN/A
N/AN/A
N/A
Pass
Partially Pass
Partially Pass
Partially Pass
Partially Pass
Partially PassPass
Pass
Partial Passed on 30-07-10 Pass
Passed on 30-07-10 Pass
Passed on 30-07-10 Pass
Pass
Reachable for Slave Board only ,not a Master Board.
Reachable for Slave Board only ,not a Master Board.
realtime history alarms not getting in client pc and alarm codes calrification
realtime history alarms not getting in client pc and alarm codes calrification
NA
NANANA
NANA
NA
NA
Pass
Pass
Pass
AS not available at site.So play the annocement according to AT requirement.
KADAPA(PRE-AT) Remarks
Completed
Completed
Completed
Completed
Completed
Completed
Completed
CompletedNeed clock from BSNL side(2Mbps)
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Need to Perform
Completed
STM is not yet connected.
ISDN call test is completed Need fax & modem equipments
N/A
Need to Perform
CompletedN/A
Completed
Completed
Need configure in Bsnl end
Completed
Need to perform
Not tested
Completed
Completed
N/A
N/A
N/A
Completed
Not Tested,Need to Perform
Completed
Completed
Completed
Completed
Completed
CompletedCompletedCompleted
Not tested
Not tested
Not tested
Not tested
Completed
Completed
LAN Switch Generic TestsSl No Test Item Remarks
1 Hardware check Pass
2 Check for redundancy power module NA
a. Power Supply NA
b. Hard disk NA
c. Processor NA
3
a. Record boot procedure pass
pass
4 Pass
Pass
Pass
Pass
5 Check of File System Management Pass
6 Pass
7 Check for backup and restore. Not donepass
Telephone Bhavan,Hyderab
ad Status(Pass/Fail)
Rajm
PassPass
Pass
Pass
Software conformity to be checked by showing the software version using the console commands
Partially Pass ( Need Version Letter)
b. Check for additional software and updation of patches.
Check for proper working of all interfaces.
A. Console
B. Telnet
C. LAN Ports
Check for connected networks and redundancy, if any.
8 NA
9 Test on VLAN pass Pass
Extension of alarms by LED and by message to NOC.
Progress
Prog
REMARKS
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
Completed
KADAPA(Pre-AT)
Completed
Need confiuration in NOC
Router Generic TestsSl No. Test Item Guidelines
1 Hardware Conformity
2 Router connectivity From console :Remote connectivityPrivilege mode
3 Verify Hostname 4 View IOS version
5 Verify modules 6 View connections 7 IP address viewing
8 Link status Error/traffic
9 Configuration
10 Route information
11 Remote IP Reachability
12 View Neighbors
13 MPLS functionality enable
14 Redundancy Check
15 Check of all interfaces
Check of Hardware Conformity as per BOM
· LAN IP· WAN IP· up/down
· Start-up configuration
· Running configuration
· Configure one port
· Final Configuration
· Whole routing table
· Protocol wise
· interface
16 MPLS QoS Levels Check
17 Check of Alarms
Router Generic Tests
Remarks
Pass
Pass Completed
Pass Completed
Pass Completed
Pass Completed
Pass
Completed
Pass Completed
Pass Completed
Pass Completed
Pass Completed
pass CompletedCompleted
Patialy PassCompleted
Completed
Completed
Completed
passCompleted
Not DoneCompleted
Pass Completed
Pass N/A
NA N/A
Not Done CompletedPass Completed
Telephone Bhavan,Hyderabad Status
(Pass/Fail)
Kadapa(Pre-AT
Need
NA N/APass Completed
LETTERS TO BE SUBMITTEDTest No. test SS1/SS2
Checking Software version partially pass
partially pass
Maintenance Featurespass
Test No. test MSG2 Checking Software version Partially Pass
3Pass
11 Partly done/Pass
ROUTER/LAN SWITCH
9Configuration
3
NOT DONE/Stated as not applicableMSG
Check the NMS administration NA
13 NA
14 NA
15 NA
16 NA
NA
NA
SOFTSWITCH
2.
3.
Physical & Software verification of capacity (Trunk and Signaling links)
11.
Physical & Software verification of capacity (Trunk and Signaling links)
3. TMGW shall provide the support of SCTP in addition to TCP and UDP.
· Final Configuration
Software conformity to be checked by showing the software version using the console commands
Partially Pass ( Need Version Letter)
5.
3. Support of load sharing and active/standby configuration for the signaling route.
2. SCTP association4. NMS feature for Dynamic Load Handling.
3. Check the Signaling point, signaling links and signaling status.
4. Check SCTP coupling link status.5. Check the status of TDM network such as SS7 links.
10 NA
24 NAROUTER/LAN SWITCH
10 Route information 8 Link status
Error/traffic
13 MPLS functionality enable 16 MPLS QoS Levels Check 8 NA
4. NMS feature for Dynamic Load Handling.
Loop-back testing of signalling and voice paths for CCS7 and IP shall be supported.
· Protocol wise· up/down
· interface
Extension of alarms by LED and by message to NOC.
LETTERS TO BE SUBMITTEDREMARK
Need to submit the letter
need the letter
Need to submit version letter
ROUTER/LAN SWITCH
NOT DONE/Stated as not applicable
Software version of the equiepement installed. OS of Servers and routers, Applicatios software,Database are to be supplied. The licenses of OS, database are to be arranged in the name of BSNL.
PENDING. Calculation sheet is to be supplied supporting the test case.
H.248 path is OK. Check no of SPC cards required to handle a given TG,
need to submit the capacity related letter
BSNL need a letter noted that the MSG can support SCTP
protocol and can be used as SG
need to submit the planning document
Not Done by protocol wise no output is coming.
pass
NA as per IP engineer it is NANA as per IP engineer it is NA
as per IP engineer it is NA
We can show the traffic but if error is there on the board we can not show it.