NFX Schedule Delay Analysis 21DEC11.ppt [Read-Only] · Critical Remaining Work Mlestone PT230000234...
5
2 © M+W Group M+W U.S., Inc. NFX Delay Analysis Report Critical Status: • >25D Delay • Overall duration affected Caution Status: • >5D Delay • <25D Delay Controlled Status: • On Schedule LE Controll LE • On Sc
Transcript of NFX Schedule Delay Analysis 21DEC11.ppt [Read-Only] · Critical Remaining Work Mlestone PT230000234...
2 © M+W GroupM+W U.S., Inc.
NFX Delay Analysis Report
Critical Status:• >25D Delay
• Overall duration affected
Caution Status:• >5D Delay
• <25D Delay
Controlled Status:• On ScheduleSAMPLESAMPLESAMPLEControlled Status:SAMPLEControlled Status:SAMPLE•SAMPLE• On ScheduleSAMPLEOn Schedule
3 © M+W GroupM+W U.S., Inc.
Mechanical Trestle Piping
SAMPLESAMPLE
4 © M+W GroupM+W U.S., Inc.
P6 Summary – Pipe Trestle Delay Impact
SAMPLE
5 © M+W GroupM+W U.S., Inc.
P6 Summary – Pipe Trestle Delay Impact
SAMPLESAMPLE
6 © M+W GroupM+W U.S., Inc.
Waffle Slab Schedule
SAMPLE