Nfpa 58 2011 Compliance Package

download Nfpa 58 2011 Compliance Package

of 29

Transcript of Nfpa 58 2011 Compliance Package

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    1/29

    resents

    NFPA 58 Emergency ShutdownCom liance 2011

    www.transtechenergy.com

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    2/29

    2 pec a zes n a e ange o - as o u ons- ang ng rom

    Simple Modifications to Turn Key Construction Projects

    Pressure Relief Valve Upgrades

    Supply Terminals

    Tank Evacuation Systems

    Methanol Injector Systems

    Vapor Distribution Systems

    T2E Buys and Sells Used ASME Bulk Storage Tanks &

    4k to 90k Tank Relocation

    Various LP-Gas Equipment

    Visit our website at: www.transtechenergy.com

    www.transtechenergy.com2

    Contact us at: 1(888)206-4563 or [email protected]

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    3/29

    Company Overview

    T2E is a nationwide service rovider for

    NFPA 58 2011 upgrades

    Over 1,500 tank upgrades since Oct 05

    Awarded nationwide contract for Amerigas

    Preferred contractor for Surburban Pro ane

    Service many large multi-location

    corporations throughout the US

    www.transtechenergy.com3

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    4/29

    NFPA 58: Liquefied Petroleum GasCode, 2001 Edition:

    ,

    Petroleum Gas Code is the industrys mosttrusted source for safety requirements.

    Major changes in the new 2001 NFPA 58 raise thes an ar or - as sa e y o a new eve .

    make high volume propane storage safer.

    www.transtechenergy.com4

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    5/29

    NFPA 58- 2011 Upgrades

    General Purpose of 5.7.7.2 (2004 edit.)

    . . .

    Why Tank Opening Valve Changes?

    Ability to Stop Outward Flow of Product From

    the Tank

    Ability to Close Valves from a Remote Location

    Ability to Close Valves by Thermal Actuation

    www.transtechenergy.com5

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    6/29

    2011 Liquid Bulk Plant Valves

    www.transtechenergy.com6

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    7/29

    NFPA 58- 2011 U rades 5.7.7.2 ASME Containers 4000 gallon wc shall be equipped:

    erv ce ns a a ons

    Since 2001

    e ore w ou

    ISVs (2011)

    e ore

    w/ ISVsVapor Inlet A,B, or C Not Req. Not Req.

    Vapor Out et B or C Not Req. Not Req.

    Liquid Inlet D or E D,E,F, or G RT

    Liquid Outlet E E or H RT

    A-Valve close to Backflow check

    B-Valve close to Excess Flow Valve (EFV)

    C-Internal Valve (IV) or EFV

    D-Valve close to Backflow checkE-IV w/ remote and automatic thermal closure (RT)

    F-Emergency Shutoff Valve (ESV) w/ RT close to existing Valve/EFV combo

    - ac ow c ec c ose o ex s ng a ve com o

    H-Emergency Shutoff Valve (ESV) w/ RT close to existing Valve/EFV combo

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    8/29

    Liquid Inlet Only Lines

    Existing Installation

    Excess flow valve in tank

    with shutoff valve in

    piping.

    Install G200 back check

    valve as close as

    valve.

    Replace excess flow

    Install N550 ESV as close

    as practical to shutoff

    www.transtechenergy.com8

    .

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    9/29

    Liquid Inlet and Outlet Only Lines

    Existing Installation Excess flow valve in tank

    with shutoff valve in.

    Retrofit Options ep ace excess ow

    valve in tank withinternal valve.

    Install N550 ESV as

    close as practical toshutoff valve.

    www.transtechenergy.com9

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    10/29

    Examples

    Liquid Outlet

    www.transtechenergy.com10

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    11/29

    Examples

    Liquid Fill and Vapor Transfer

    AFTER

    www.transtechenergy.com11

    BEF RE

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    12/29

    Examples

    Liquid Fill and Vapor Transfer

    www.transtechenergy.com12

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    13/29

    Example - Vapor Distribution System

    www.transtechenergy.com13

    BEFORE

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    14/29

    Example - Vapor Distribution SystemBEFORE

    www.transtechenergy.com14

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    15/29

    Example - Vapor Distribution System

    www.transtechenergy.com15

    BEFORE

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    16/29

    Example - Vapor Distribution System

    AFTER

    www.transtechenergy.com16

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    17/29

    AFTER

    www.transtechenergy.com17

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    18/29

    AFTER

    www.transtechenergy.com18

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    19/29

    Pneumatic Diagram

    www.transtechenergy.com19

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    20/29

    Scope of Work

    Install neumatic actuated emer enc shutoff valves

    (ESVs) in all liquid openings and/or vapor openings ofeach tank.

    Step 1: Flare down (IVs Only)

    Step 2: Dismantle key areas

    ep : ns a new s s or s

    Install Pressure Relief Valves

    ep: ns a pneuma cs an ea es p p ng

    www.transtechenergy.com20

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    21/29

    Issues to Consider in Retrofit

    Include Vapor Lines???

    Not Re uired b NFPA 58

    Required in Texas Check Your State Requirements

    Why leave your gate open on your security fence?

    Highly recommended

    Relief Valves

    (Standard industry recommendation: 10 yr change out)

    Shutoff Valves / Filler Valves Bobtail and Transport Bulkheads

    New Pi in

    www.transtechenergy.com 21

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    22/29

    BEFORE

    www.transtechenergy.com 22

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    23/29

    AFTER

    www.transtechenergy.com 23

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    24/29

    www.transtechenergy.com 24

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    25/29

    www.transtechenergy.com

    25

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    26/29

    www.transtechenergy.com

    26

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    27/29

    Benefits - 2011 Upgrades

    to prevent tank failure when exposed to fire

    www.transtechenergy.com

    27

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    28/29

    Benefits - 2011 Upgrades

    automatically or manually.

    Limits the extent of LPG than can be released to

    the atmosphere.

    Should there be ignition/fire:

    on ro a e y m ng e amoun o ue . Size of fire should be small with minimum exposure

    to EEs, fire fighters and the public.

    www.transtechenergy.com

    28

  • 7/26/2019 Nfpa 58 2011 Compliance Package

    29/29

    Compliance Inspection

    Free Plant 2011 Review:

    Submit digital photos of your tanks and valves to

    have one of our engineers review your 2011

    compliance status.

    free cost estimate to do the 2011 upgrades.

    For more information speak with one our 2011experts at 888-206-4563.

    www.transtechenergy.com

    29