Nexus Workgroup Read V alidation Scenarios
-
Upload
ciaran-landry -
Category
Documents
-
view
27 -
download
1
description
Transcript of Nexus Workgroup Read V alidation Scenarios
Nexus WorkgroupRead Validation Scenarios
4th December 2013
Background
• Read Validation rules and tolerances developed during the Settlement BRD
• Concern raised at 30th October workgroup that the tolerances may not be appropriate for Class 4 sites as a ‘flat profile’ is used (AQ / 365 x no. of days in period).
• Workgroup agreed the principle of read validation was correct but would like to examine the tolerances further
• The following slides provide a list of various scenarios considered by Xoserve during analysis of the AQ requirements to validate the principles & tolerances described in the BRD
Scenarios
1. AQ = 1 – Reason: the site has not been consuming gas for over 9 months– Consequence: read will fail validation – Outcome: AQ Correction process used to re-calculate the AQ
then re-submit the read
2. AQ is significantly higher or lower than sites predicted consumption– Reason: change in plant or site previously ‘mothballed’– Consequence: read may fail validation– Outcome: AQ Correction process used to re-calculate the AQ
then re-submit the read
Scenarios cont.
3. Site Isolated– AQ would carry over until 9 months consumption was available
during the non-isolated period therefore read would not fail
4. Vacant site– AQ would reduce as reads are loaded with zero/low consumption
over a period– If read fails due to the AQ being low, the AQ Correction process to
be used to amend AQ
5. Round The Clock value incorrect/not populated– Read would fail due to out of tolerance– Re-submit read with correct ‘Round the Clock’ (TTZ) count
Scenarios cont.
6. Change of Class – Class 4 to 2– SOQ is used to validate the reads, Shipper nominates the SOQ
7. Change of Class – Class 2 to 4– Daily reads previously loaded for site and AQ reviewed monthly.
Reads should therefore pass the validations based on AQ