Next Generation Trns•port Current Development Update

33
Next Generation Trns•port Next Generation Trns•port Current Development Update Current Development Update Presented by Ian Baldwin, Info Tech, Inc. October 2006

description

Next Generation Trns•port Current Development Update. Presented by Ian Baldwin, Info Tech, Inc. October 2006. Topics. NGT Preconstruction Progress NGT Infrastructure Progress Michigan Materials Prework Development Approach Customer Involvement Preparing for Additional Phases. - PowerPoint PPT Presentation

Transcript of Next Generation Trns•port Current Development Update

Page 1: Next Generation Trns•port Current Development Update

Next Generation Trns•portNext Generation Trns•portCurrent Development Update Current Development Update

Presented by

Ian Baldwin, Info Tech, Inc.

October 2006

Page 2: Next Generation Trns•port Current Development Update

TopicsTopics

• NGT Preconstruction Progress• NGT Infrastructure Progress• Michigan Materials Prework• Development Approach• Customer Involvement• Preparing for Additional Phases

Page 3: Next Generation Trns•port Current Development Update

NGT Preconstruction ProgressNGT Preconstruction Progress

Page 4: Next Generation Trns•port Current Development Update

OverviewOverview

• Focus on Preconstruction Business• Capture big picture view of changes

– Not everything in NGT is represented here

• View through sprint 15 (end of September)

Page 5: Next Generation Trns•port Current Development Update

Preconstruction Functions – CurrentPreconstruction Functions – Current

Page 6: Next Generation Trns•port Current Development Update

Preconstruction ProjectPreconstruction Project

• What Is In NGT– All of Project functions except handful of

fields– Most of alternate and funding functionality

• What Is Left– Sections (Key Area Not Started)– Category Improvements

Page 7: Next Generation Trns•port Current Development Update

Preconstruction ProposalPreconstruction Proposal

• What Is In NGT– All of Proposal functions except handful of fields– Cost + Time throughout tracking and business

logic

• What Is Left– Cost + Time Portions of some reports– Addenda (Key area not started)

• Actively working on user stories to define requirements• Process will likely change from C/S, hopefully for the

better with user feedback

Page 8: Next Generation Trns•port Current Development Update

Preconstruction LettingPreconstruction Letting

• What Is In NGT– Most of bid letting – Most of bid management

• What Is Left– Award/Reject statuses– Planholder billing– Address Labels– Final bid validations and calculations

Page 9: Next Generation Trns•port Current Development Update

Preconstruction Business AspectsPreconstruction Business Aspects

• What Is In NGT– Interface to Expedite– Proposal Level Reports– Basic Agency Options

• What Is Left– All other Trns•port interfaces out of C/S– Bid Lettings Summary Reports– Funding Reports– Detail Estimate Reports– Remaining Agency Options

Page 10: Next Generation Trns•port Current Development Update

NGT Infrastructure ProgressNGT Infrastructure Progress

Page 11: Next Generation Trns•port Current Development Update

OverviewOverview

• Focus on Infrastructure – all of NGT will be impacted

• Capture big picture view of changes– Not everything in NGT is represented here

• Try to balance needs of now and still look forward– Don’t have detailed future requirements so… – Don’t paint ourselves into a corner when we get

there

Page 12: Next Generation Trns•port Current Development Update

Infrastructure – CurrentInfrastructure – Current

Page 13: Next Generation Trns•port Current Development Update

CustomizationCustomization

• What Is In NGT– Field Validation– Report Tool – Active Reports– Filtering and Sorting– Page Customization

• What Is Left– Custom Processes/Plug-ins Framework

(Key area not started)– Attachments (Key area not started)

Page 14: Next Generation Trns•port Current Development Update

Reference DataReference Data

• What Is In NGT– Most Vendor Tables– Reference Items– Special Provisions– Reference Funds

• What Is Left– Vendor Affiliates– Individual Code Tables

Page 15: Next Generation Trns•port Current Development Update

SecuritySecurity

• What Is In NGT– Login– Access Rights to nearly all existing pages– User and Role Maintenance

• What Is Left– Control Groups (Key area not started)– Simplifying Role Maintenance– Complete Active Directory Support– Auditing/Logging (Key area not started)

• Determining requirements for auditing – maybe handled outside of NGT

Page 16: Next Generation Trns•port Current Development Update

Packaging/DeliveryPackaging/Delivery

• What Is In NGT– Install as part of build environment– Incremental migration and documentation

• What Is Left– Remaining functions migration and

documentation

Page 17: Next Generation Trns•port Current Development Update

Michigan Materials Pre-workMichigan Materials Pre-work

Page 18: Next Generation Trns•port Current Development Update

Materials Prework Overview Materials Prework Overview

• Incorporated as part of NGT• Funded by Michigan DOT

– Involved in User Story Creation, end of sprint review

• Already addressing scope from the larger Materials proposal

• Will be in a much better position to start the Materials phase when it happens

• Another method to get involved– Jump start a particular area of interest– Get involved on the ground floor

Page 19: Next Generation Trns•port Current Development Update

Progress on Materials Prework Progress on Materials Prework

• Reference Materials• Sources and Facilities• Pre-tested Stock and transactions• Certified Materials and Basis of Acceptance

– Shipments– Validations– Verifications of Quantity

Page 20: Next Generation Trns•port Current Development Update

Development ApproachDevelopment Approach

Page 21: Next Generation Trns•port Current Development Update

Development Approach RevisitedDevelopment Approach Revisited

• PES/LAS C/S as Baseline• Look for opportunities of improvement• Where practical, don’t carry over

functionality that isn’t used, or could be obsolete

• All data in C/S will have a home in NGT

Page 22: Next Generation Trns•port Current Development Update

Practical Examples of Redesigns Practical Examples of Redesigns

• Letting/Proposal Relationship– Easier to move proposal

• Fund Packages– More flexible– Can emulate what was done in C/S– Should simplify payment algorithms

• In Progress: “Person” within NGT– Staff Code Table– User Table– Vendor Officer

Page 23: Next Generation Trns•port Current Development Update

Testing FrameworkTesting Framework

• Drives the whole process• Safety net to try new things• Acceptance Test• User Interface Tests• Installation Tests

Page 24: Next Generation Trns•port Current Development Update

Why Do My End Users Care?Why Do My End Users Care?

• High quality • Easier to deliver updates• Customization opportunities that could

simplify their tasks• An opportunity to more closely align

NGT with agency business practices

Page 25: Next Generation Trns•port Current Development Update

Customer InvolvementCustomer Involvement

Page 26: Next Generation Trns•port Current Development Update

Collaborative Involvement Collaborative Involvement

• Trns•port Task Force– Owners of product backlog – content and priority– Sign-off at end of Sprint

• Technical Review Team– Forming for Preconstruction

• Proposal thru Award TAG– Review detailed progress– Feed requirements for potential new backlog

items– Sounding board for approaches in redesigning

certain areas

Page 27: Next Generation Trns•port Current Development Update

NGT Forum NGT Forum

• Agencies Involved– 23 Total Agencies have posted– Kudos to Nebraska

• Averaging About 1 New Topic per Week• Added Helpful Tips FAQ Forum• Added Civil Rights• E-mail notification functions

– Notification for new topics in a given area– Notification for replies to a specific topic

Page 28: Next Generation Trns•port Current Development Update

NGT Preview Site NGT Preview Site

• Encourage Agency Use• Performance Improvements

– Based on less data– Programmatic Improvements

• Data Available– User List Maintained between sprints– Researching keeping data between sprints

• Merge Entered Data with Migrated Data

Page 29: Next Generation Trns•port Current Development Update

NGT Pre-ReleaseNGT Pre-Release

• Development approach provides monthly production release

• Validate elements not on preview site– Installation– Migration– Configuration– Customization

• Contact Jim Johnson of the TTF if your agency is interested in a pre-release

Page 30: Next Generation Trns•port Current Development Update

Get InvolvedGet Involved

• NGT Forum– Get your opinion heard

• NGT Preview Site– Stress it, break it– See if it works for you

• Volunteer– TAGs– TRTs– Early Release Agency

Page 31: Next Generation Trns•port Current Development Update

Preparing for Additional PhasesPreparing for Additional Phases

Page 32: Next Generation Trns•port Current Development Update

Additional Phases for NGTAdditional Phases for NGT

• CRLMS projected to start in Q1• Business Manager for each phase• Ramping up additional NGT resources• Development team preparing to

support multiple NGT phases with updates to tools and processes

• Ensure strategic unification goals

Page 33: Next Generation Trns•port Current Development Update