Newland Developers Pty Ltd
Level 1 Inspection and Testing, Stage 62A, Warralily Armstrong Creek Development
GEOTABTF08569AE-BN
16 December 2014
This page has been left intentionally blank
ii
Coffey Geotechnics Pty Ltd ABN: 93 056 929 483
Table of contents
1. Introduction .................................................................................................................................. 1
2. Project Summary ......................................................................................................................... 1
3. Specification/work instructions .................................................................................................... 1
4. Fill Material .................................................................................................................................. 2
5. Earthworks ................................................................................................................................... 2
5.1. Subgrade assessment ...................................................................................................... 2
5.2. Fill construction ................................................................................................................. 2
6. Survey data and fill thickness ...................................................................................................... 2
6.1. North Eastern Fill Pad ....................................................................................................... 3
6.2. North Western Fill Pad ...................................................................................................... 3
6.3. South Eastern Fill Pad ...................................................................................................... 3
7. Testing and results ...................................................................................................................... 3
8. Exclusions ................................................................................................................................... 3
9. Statement of compliance ............................................................................................................. 4
Figures
Figure 1- Field Density Test Locations
Figure 2 - Summary of Field Density Test Results
Figure 3 – Field Photos
Appendices
Appendix A - Laboratory Results (7 Pages)
Appendix B – Survey SMS-7278-003
Appendix C – Extract from specification by SMEC, ref 0557esb-24
Level 1 Inspection and Testing, Stage 62A, Warralily Armstrong Creek Development
Coffey GEOTABTF08569AE-BN 16 December 2014
1
1. Introduction
This report presents the results of the Level 1 Inspection and Testing for fill placement within Stage
62A of Warralily Estate Armstrong Creek Development.
The works were commissioned by Martin O’Hanlon of Newland Developers Pty Ltd (Newland).
2. Project Summary
We understand that Newland requires fill placement within Stage 62A of the Warralily Armstrong Creek Development in the areas as shown in Figure 1, to be constructed under Level 1 Inspection and Testing undertaken by a Geotechnical Inspection and Testing Authority (GITA).
Level 1 Inspection and Testing, as defined in AS3798-2007 “Guidelines on Earthworks for Commercial and Residential Development,” provides for full time inspection of the construction of controlled fill and field and laboratory testing in accordance with AS1289 “Methods of Testing Soils for Engineering Purposes”.
The Level 1 Inspection was undertaken by geotechnical professionals from Coffey for a total of 6 working days over 5 periods between 6 June 2014, 11 and 12 June 2014, 16 June 2014, 30 September 2014 and 11 December 2014.
The earthworks contractor for the project was Winslow. Coffey Testing undertook the compaction control testing in their NATA accredited laboratories, as part of the Level 1 Inspection and Testing process.
This report is applicable to fill placed by Winslow within Stage 62A of the Warralily Development in the areas shown in Figure 1. The filling area encompasses Three fill pads as listed below:
North Eastern Fill Pad - Inclusive of the area within lots 6234 to 6245;
North Western Fill Pad - Inclusive of the area within lots 6259 to 6262;
South Eastern Fill Pad - Inclusive of the area within lots 6247 and 6248.
3. Specification/work instructions
The specification for the project was prepared by SMEC Australia Pty Ltd (SMEC) for Armstrong
Creek Development Corporation Pty Ltd under reference number 0557ESB-24. Extract of the
specifications were provided to Coffey in an email sent by Shane McGlynn from SMEC on 5 October
2012. The extract of the specified requirements is provided in Appendix D and a short summary is
provided below:
All filling in excess of 300mm depth within the building envelope of allotments shall be
undertaken to specifications satisfying the requirements of AS 3798-1996 “Guidelines on
Earthworks for Commercial and Residential Development”.
All such filling works shall be undertaken with supervision to the standard detailed as “Level 1
Inspection and Testing” in AS 3798-2007, such that the supervisor will issue a notice detailing
that the works comply with the specifications and drawings.
Level 1 Inspection and Testing, Stage 62A, Warralily Armstrong Creek Development
Coffey GEOTABTF08569AE-BN 16 December 2014
2
Material to be used for fill construction shall satisfy the requirements of AS 3798-2007
Fill to be compacted in near horizontal layers not exceeding 250mm loose thickness
Compaction to achieve a dry density ratio of at least 95% Standard; and
Moisture content of the fill material is to be within ±3% of the Standard Optimum Moisture
Content (SOMC).
4. Fill Material
Fill used for the construction of stage 62A comprised of locally sourced clay from other stages from
the Armstrong Creek Development.
5. Earthworks
The earthworks for this project included stripping of topsoil, proof rolling the subgrade and placement
and compaction of fill to construct engineered fill platforms.
5.1. Subgrade assessment
Due to the segmented nature of the fill areas as shown in Figure 1, the subgrade assessment was undertaken by Coffey progressively between 5 June 2014 and 11 December 2014, following the removal of topsoil and before any fill was placed. In these areas the subgrade comprised natural clay. No soft spots were observed during the subgrade proof rolling.
5.2. Fill construction
Fill material was placed generally in loose layers varying in thickness from 200mm to 250mm.
Compacted layers were approximately 150mm to 200mm thick.
Locally sourced fill from other stages of the Armstrong Creek Development was trucked in and spread
with a bulldozer. A water cart and a pad foot roller were present onsite during works for conditioning
and compacting.
Coffey’s Level 1 Inspector was on site on a full time basis during the placement, compaction and
testing of the fill on the dates noted in Section 1 of this report. Coffey was not present on site over
prolonged periods between the commencement and the completion of the earthworks. Coffey
understands that Winslow did not place any fill within the three construction areas during the period
when Coffey was absent from the site.
6. Survey data and fill thickness
Winslow’s appointed surveyor Survey Management Solutions (SMS) conducted a survey of the
subgrade level on the pads following the topsoil removal. SMS’s survey plan is provided in Appendix
C of this report under reference number 059E-62A-WC-002.
Level 1 Inspection and Testing, Stage 62A, Warralily Armstrong Creek Development
Coffey GEOTABTF08569AE-BN 16 December 2014
3
6.1. North Eastern Fill Pad
The North Eastern Pad fill thickness ranged from 140mm up to 530mm in the footpath areas. This pad was filled in up to three layers averaging 170mm each.
6.2. North Western Fill Pad
The North Western Fill Pad Thickness ranged from 260mm to 400mm. This Pad was filled in two layers averaging layer thickness of 200mm each.
6.3. South Eastern Fill Pad
Excluding a small portion of fill on a footpath boundary on lots 6246 and 6247, the fill area of earthworks on this pad was confined to the controlled backfill of two trenches. One trench was excavated between lots 6247 and 6248 to remove an old drain. Another trench was a boxed out section excavated on lot 6249 for utility works. The fill thicknesses on the Southern Pad in these areas ranged as follow:
- Boundary (Lots 6246-6247) - 140mm to 270mm, placed in 1 layer;
- Trench 1 (Lots 6247-6248) - 1000mm, placed in 6 Layers averaging 180mm;
- Trench 2 (Lot 6249) - 130mm to 640mm, placed in 3 Layers averaging 210mm.
7. Testing and results
Field density testing was undertaken progressively on the compacted fill. Testing was undertaken
under Type 1 Earthworks (large scale operations) as defined in Table 8.1 of the AS 3798-2007.
Frequency 1 test per material type per layer per 2500m2 or 1 test per 500m
3 or 3 tests per lot.
The field density testing was conducted by Coffey Testing and Ground Science and all laboratory
testing was performed in their NATA accredited laboratories. A Hilf compaction test was performed for
each field density test.
A total of fifteen (15) field density tests were performed during the earthworks. Two (2) of the fifteen
(15) tests did not meet the specified criteria and these areas were subsequently re-worked and re-
tested. The remaining tests results met the specified dry density ratio criteria of no less than 95%
Standard and moisture variation of ±3% of the Optimum Moisture Content (OMC).
A summary of the test results obtained from the field density testing within Stage 62A fill platforms is
provided in a table presented as Figure 2. The laboratory test reports of the field density tests are
presented in Appendix A.
8. Exclusions
Excluded areas include trenches that were excavated and backfilled on site for the installation of underground services such as sewers, electrical conduits, water mains etc. Any footpaths in the front of the lots that were excavated and the adjacent areas filled during and after the Level 1 GITA
Level 1 Inspection and Testing, Stage 62A, Warralily Armstrong Creek Development
Coffey GEOTABTF08569AE-BN 16 December 2014
4
services conducted by Coffey. Uncontrolled fill and topsoil may have been placed as part of the landscaping of the site following the completion of the engineered fill construction.
Coffey was not involved in monitoring and testing these works and as such are not included in the Level 1 report.
9. Statement of compliance
Coffey personnel have provided Level 1 Inspection and Testing services during the construction of the three (3) engineered fill areas within Stage 62A as shown in Figure 1. A geotechnical professional from Coffey (Level 1 Inspector) was on site on a full time basis during subgrade preparation and fill placement, and observed the construction techniques adopted.
Based on observations made by Coffey’s Level 1 Inspector and the results of field and laboratory
tests, Coffey consider that the engineered fill areas within Stage 62A constructed by Winslow to the
levels indicated in Section 5, as far as we have been able to determine, has been placed in general
accordance with the intent of the specification.
Figures
Figure 1- Field Density Test Locations
Figure 2 - Summary of Field Density Test Results
Figure 3 – Field Photos
drawn
approved
date
scale
original size
client:
project:
title:
project no: figure no: A4
#2
#1,5
#3
#4
#6
#7
#8
#9
#12
#13
#10
#11
LEGEND
Approximate Location of
Layer 2 tests
Approximate Location of
Layer 3 tests
Approximate Location of
Layer 4 tests
North Eastern Pad
Approximate Location of
Layer 1 tests
Approximate Location of
Layer 6 tests
North Western Pad
South Eastern Pad /
Trench backfill
NEWLAND DEVELOPERS PTY. LTD.
Stage 62A
WARRALILY ARMSTRONG CREEK DEVELOPMENT
FIELD DENSITY TEST LOCATION PLAN
FIGURE 1 GEOTABTF08569AE-BN
NTS
12/12/2014
SS
II
#14 #15
Trench 1
Trench 2
FIGURE #2 - SUMMARY OF FIELD DENSITY TEST RESULTS AT STAGE 62A
Project #: GEOTABTF08569AE Client Newland Developer Specified requirements
Project name: Warralily Armstrong Creek Development Contractor Winslow Density Ratio ≥ 95% of Max Dry Density
Location: Marshall, VIC Engineer SMEC Moisture content within ± 3% of OMC
1 Friday, 6 June 2014 6244 2 1.78 16.5 93 86 2.5 Fail
2 Friday, 6 June 2014 6239 1 2.04 14.5 104 89 2 Pass
3 Friday, 6 June 2014 6260 1 1.99 11.5 99.5 90 1.5 Pass
4 Friday, 6 June 2014 6261 2 2.02 12 102 64.5 1 Pass
5 1 Wednesday, 11 June 2014 6244 2 1.94 16 101.5 78 4.5 Fail
6 Wednesday, 11 June 2014 6235 1 1.98 17.5 100 94.5 1 Pass
7 Wednesday, 11 June 2014 6235 2 1.95 16.5 97 88.5 2 Pass
8 5 Thursday, 12 June 2014 6241 2 1.96 16.5 97 97.5 0.5 Pass
9 Thursday, 12 June 2014 6244 2 1.9 17 100 85 3 Pass
10 Friday, 12 September 2014 6348 2 2.02 18 98.5 97 -0.5 Pass
11 Friday, 12 September 2014 6348 4 2.12 17.5 99.5 97.5 -0.5 Pass
12 Tuesday, 16 September 2014 6248 6 2.01 17 95.5 101 0 Pass
13 Tuesday, 30 September 2014 6234 3 1.96 20 95.5 100.5 0 Pass
14 Thursday, 11 December 2014 6249 3 1.934 20.5 95.5 100 0 Pass
15 Thursday, 11 December 2014 6249 1 2.004 20.5 98 105 1 Pass
5
DateLocation \ Lot
(#)
HILF
Densit
Ratio
(%)
Moisture
Ratio
(%)
Moisture
Variation
of OMC
(%)
Pass
/
Fail
Retest
8
Retest
of Test
(#)
Test
(#)Layer
Field Wet
Density
(t/m3)
Field
Moisture
Content
(%)
16 December 2014 Figure 2 GEOTABTF08569AE-BN
drawn
approved
date
scale
original size
client:
project:
title:
project no: figure no: A4
NEWLAND DEVELOPERS PTY. LTD.
Stage 62A
WARRALILY ARMSTRONG CREEK DEVELOPMENT
FIELD PHOTOS
FIGURE 3 1/3 GEOTABTF08569AE-BN
NTS
12/12/2014
SS
II
2 June 2014
6 June 2014 12 September 2014 12 September 2014
drawn
approved
date
scale
original size
client:
project:
title:
project no: figure no: A4
NEWLAND DEVELOPERS PTY. LTD.
Stage 62A
WARRALILY ARMSTRONG CREEK DEVELOPMENT
FIELD PHOTOS
FIGURE 3 2/3 GEOTABTF08569AE-BN
NTS
12/12/2014
SS
II
16 September 2014
30 September 2014
30 September 2014
30 September 2014
drawn
approved
date
scale
original size
client:
project:
title:
project no: figure no: A4
NEWLAND DEVELOPERS PTY. LTD.
Stage 62A
WARRALILY ARMSTRONG CREEK DEVELOPMENT
FIELD PHOTOS
FIGURE 3 3/3 GEOTABTF08569AE-BN
NTS
12/12/2014
SS
II
11 December 2014
11 December 2014
Appendix A - Laboratory Results (7 Pages)
Sample DetailsLocation: Mt Duneed
Client Request ID:
Specification Requirements: MINIMUM HILF DENSITY RATIO of 95% of Standard Compaction; ±3% of OMC (specified by client)
Field Test procedures: AS 1289.5.8.1
Laboratory Test procedures: AS 1289.2.1.1, AS 1289.5.7.1
Sampling Method: AS1289.1.2.1 Clause 6.4 (b)
Source: On Site
Material: Silty Clay
Sample DataSample ID ABTM14S-01550
Field Sample ID Test 1
Date Tested 6/06/2014
Time Tested 12:00
Location Lot 6244
Layer 2
Soil Description Silty Clay
Field and Laboratory DataDepth of Test (mm) 250
AS Sieve Size (mm) 19.0
Oversize Wet (%) 0
Field Moisture Content (%) 16.5
Field Wet Density (t/m³) 1.78
Field Dry Density (t/m³) 1.53
Peak Converted Wet Density* (t/m³) 1.92
Optimum Moisture Content (%) 19.0
Compactive Effort Standard
Moisture Ratio (%) 86.0
Moisture Variation (%) 2.5 dry
Hilf Density Ratio (%) 93.0legend * adjusted for oversize material .
Sample DataABTM14S-01551
Test 2
6/06/2014
12:15
Lot 6239
Layer 1
Silty Clay
Field and Laboratory Data250
19.0
0
14.5
2.04
1.78
1.96
16.5
Standard
89.0
2.0 dry
104.0.
Sample DataABTM14S-01552
Test 3
6/06/2014
13:45
Lot 6260
Layer 1
Silty Clay
Field and Laboratory Data175
19.0
0
11.5
1.99
1.78
2.00
13.0
Standard
90.0
1.5 dry
99.5.
Sample DataSample ID ABTM14S-01553
Field Sample ID Test 4
Date Tested 6/06/2014
Time Tested 15:30
Location Lot 6261
Layer 2
Soil Description Silty Clay
Field and Laboratory DataDepth of Test (mm) 175
AS Sieve Size (mm) 19.0
Oversize Wet (%) 0
Field Moisture Content (%) 12.0
Field Wet Density (t/m³) 2.02
Field Dry Density (t/m³) 1.80
Peak Converted Wet Density* (t/m³) 1.98
Optimum Moisture Content (%) 13.0
Compactive Effort Standard
Moisture Ratio (%) 94.5
Moisture Variation (%) 1.0 dry
Hilf Density Ratio (%) 102.0legend * adjusted for oversize material .
Accredited for compliance with ISO/IEC 17025. The results of the tests, calibrations and/ormeasurements included in this document are traceableto Australian/national standards.
18/06/2014
HILF Density Ratio Report
Report No: HDR:ABTM14W00352Issue No: 1
Client:
Date of Issue:
NATA Accredited Laboratory Number:431
Approved Signatory: Mitchell Hindmarsh
(Senior Geotechnician)Project Name: GEOTABTF08569AE - Warralily - Stage 62A
ABN 92 114 364 046
Abbotsford, Melbourne Laboratory
Coffey Testing Pty Ltd3G Marine ParadeAbbotsford VIC 3067
Phone: +61 3 8413 6900Fax: +61 3 8413 6999
Project No.: INFOABTM00195AAPrincipal:
Lot No.: TRN:
P.O. Box 40Kew VIC 3101
Coffey Geotechnics Pty Ltd (Abbotsford)
Page 1 of 1Form No: 18996, Report No: HDR:ABTM14W00352 © 2000-2013 QESTLab by SpectraQEST.com
Comments
Sample DetailsLocation: Mt Duneed
Client Request ID:
Specification Requirements: MINIMUM HILF DENSITY RATIO of 95% of Standard Compaction; ±3% of OMC (specified by client)
Field Test procedures: AS 1289.5.8.1
Laboratory Test procedures: AS 1289.2.1.1, AS 1289.5.7.1
Sampling Method: AS1289.1.2.1 Clause 6.4 (b)
Source: On Site
Material: Silty Clay
Sample DataSample ID ABTM14S-01561
Field Sample ID Test 5
Date Tested 11/06/2014
Time Tested 09:45
Location Lot 6244
Layer 2
Retest of No 1
Soil Description Silty Clay
Field and Laboratory DataDepth of Test (mm) 250
AS Sieve Size (mm) 19.0
Oversize Wet (%) 0
Field Moisture Content (%) 16.0
Field Wet Density (t/m³) 1.94
Field Dry Density (t/m³) 1.67
Peak Converted Wet Density* (t/m³) 1.91
Optimum Moisture Content (%) 20.5
Compactive Effort Standard
Moisture Ratio (%) 78.0
Moisture Variation (%) 4.5 dry
Hilf Density Ratio (%) 101.5legend * adjusted for oversize material .
Sample DataABTM14S-01562
Test 6
11/06/2014
11:30
Lot 6235
Layer 1
Silty Clay
Field and Laboratory Data150
19.0
0
17.5
1.98
1.68
1.98
18.5
Standard
94.5
1.0 dry
100.0.
Sample DataSample ID ABTM14S-01563
Field Sample ID Test 7
Date Tested 11/06/2014
Time Tested 14:00
Location Lot 6235
Layer 2
Soil Description Silty Clay
Field and Laboratory DataDepth of Test (mm) 150
AS Sieve Size (mm) 19.0
Oversize Wet (%) 0
Field Moisture Content (%) 16.5
Field Wet Density (t/m³) 1.90
Field Dry Density (t/m³) 1.63
Peak Converted Wet Density* (t/m³) 1.95
Optimum Moisture Content (%) 18.5
Compactive Effort Standard
Moisture Ratio (%) 88.5
Moisture Variation (%) 2.0 dry
Hilf Density Ratio (%) 97.0legend * adjusted for oversize material .
Accredited for compliance with ISO/IEC 17025. The results of the tests, calibrations and/ormeasurements included in this document are traceableto Australian/national standards.
18/06/2014
HILF Density Ratio Report
Report No: HDR:ABTM14W00356Issue No: 1
Client:
Date of Issue:
NATA Accredited Laboratory Number:431
Approved Signatory: Mitchell Hindmarsh
(Senior Geotechnician)Project Name: GEOTABTF08569AE - Warralily - Stage 62A
ABN 92 114 364 046
Abbotsford, Melbourne Laboratory
Coffey Testing Pty Ltd3G Marine ParadeAbbotsford VIC 3067
Phone: +61 3 8413 6900Fax: +61 3 8413 6999
Project No.: INFOABTM00195AAPrincipal:
Lot No.: TRN:
P.O. Box 40Kew VIC 3101
Coffey Geotechnics Pty Ltd (Abbotsford)
Page 1 of 1Form No: 18996, Report No: HDR:ABTM14W00356 © 2000-2013 QESTLab by SpectraQEST.com
Comments
Sample DetailsLocation: Mt Duneed
Client Request ID:
Specification Requirements: MINIMUM HILF DENSITY RATIO of 95% of Standard Compaction; ±3% of OMC (specified by client)
Field Test procedures: AS 1289.5.8.1
Laboratory Test procedures: AS 1289.5.7.1, AS 1289.2.1.1
Sampling Method: AS1289.1.2.1 Clause 6.4 (b)
Source: On Site
Material: Silty Clay
Sample DataSample ID ABTM14S-01569
Field Sample ID Test 8
Date Tested 12/06/2014
Time Tested 10:30
Location Stage 62A
Lot 2641
Layer 2
Soil Description Silty Clay
Field and Laboratory DataDepth of Test (mm) 150
AS Sieve Size (mm) 19.0
Oversize Wet (%) 0
Field Moisture Content (%) 16.5
Field Wet Density (t/m³) 1.96
Field Dry Density (t/m³) 1.68
Peak Converted Wet Density* (t/m³) 2.03
Optimum Moisture Content (%) 17.0
Compactive Effort Standard
Moisture Ratio (%) 97.5
Moisture Variation (%) 0.5 dry
Hilf Density Ratio (%) 97.0legend * adjusted for oversize material .
Sample DataSample ID ABTM14S-01570
Field Sample ID Test 9
Date Tested 12/06/2014
Time Tested 11:30
Location Stage 62A
Lot 6244
Layer 2
Retest of No 5
Soil Description Silty Clay
Field and Laboratory DataDepth of Test (mm) 200
AS Sieve Size (mm) 19.0
Oversize Wet (%) 0
Field Moisture Content (%) 17.0
Field Wet Density (t/m³) 1.90
Field Dry Density (t/m³) 1.63
Peak Converted Wet Density* (t/m³) 1.91
Optimum Moisture Content (%) 20.0
Compactive Effort Standard
Moisture Ratio (%) 85.0
Moisture Variation (%) 3.0 dry
Hilf Density Ratio (%) 100.0legend * adjusted for oversize material .
Accredited for compliance with ISO/IEC 17025. The results of the tests, calibrations and/ormeasurements included in this document are traceableto Australian/national standards.
18/06/2014
HILF Density Ratio Report
Report No: HDR:ABTM14W00359Issue No: 1
Client:
Date of Issue:
NATA Accredited Laboratory Number:431
Approved Signatory: Mitchell Hindmarsh
(Senior Geotechnician)Project Name: GEOTABTF08569AE - Warralily - Stage 62A
ABN 92 114 364 046
Abbotsford, Melbourne Laboratory
Coffey Testing Pty Ltd3G Marine ParadeAbbotsford VIC 3067
Phone: +61 3 8413 6900Fax: +61 3 8413 6999
Project No.: INFOABTM00195AAPrincipal:
Lot No.: TRN:
P.O. Box 40Kew VIC 3101
Coffey Geotechnics Pty Ltd (Abbotsford)
Page 1 of 1Form No: 18996, Report No: HDR:ABTM14W00359 © 2000-2013 QESTLab by SpectraQEST.com
Comments
Sample DetailsLocation: Mt Duneed
Client Request ID:
Specification Requirements: MINIMUM HILF DENSITY RATIO OF 95% of Standard Compaction + or -3% OMC (as advised byclient)
Field Test procedures: AS 1289.5.8.1
Laboratory Test procedures: AS 1289.5.7.1, AS 1289.2.1.1
Sampling Method: AS1289.1.2.1 Clause 6.4 (b)
Source: On Site
Material: Silty Clay
Sample DataSample ID ABTM14S-02545
Field Sample ID Test 10
Date Tested 12/09/2014
Time Tested 14:00
Location Lot 6348
Trench Backfill
Layer 2
Soil Description Silty Clay
Field and Laboratory DataDepth of Test (mm) 175
Field Moisture Content (%) 18.0
Field Wet Density (t/m³) 2.07
Field Dry Density (t/m³) 1.75
Peak Converted Wet Density* (t/m³) 2.10
Optimum Moisture Content (%) 18.5
Compactive Effort Standard
Moisture Ratio (%) 97.0
Moisture Variation (%) 0.5 dry
Hilf Density Ratio (%) 98.5legend * adjusted for oversize material .
Sample DataSample ID ABTM14S-02546
Field Sample ID Test 11
Date Tested 12/09/2014
Time Tested 14:15
Location Lot 6348
Trench Backfill
Layer 4
Soil Description Silty Clay
Field and Laboratory DataDepth of Test (mm) 175
Field Moisture Content (%) 17.5
Field Wet Density (t/m³) 2.12
Field Dry Density (t/m³) 1.81
Peak Converted Wet Density* (t/m³) 2.13
Optimum Moisture Content (%) 17.5
Compactive Effort Standard
Moisture Ratio (%) 97.5
Moisture Variation (%) 0.5 dry
Hilf Density Ratio (%) 99.5legend * adjusted for oversize material .
Accredited for compliance with ISO/IEC 17025. The results of the tests, calibrations and/ormeasurements included in this document are traceableto Australian/national standards.
15/09/2014
HILF Density Ratio Report
Report No: HDR:ABTM14W00562Issue No: 1
Client:
Date of Issue:
NATA Accredited Laboratory Number:431
Approved Signatory: Mitchell Hindmarsh
(Senior Geotechnician)Project Name: GEOTABTF08569AE - Warralily - Stage 62A
ABN 92 114 364 046
Abbotsford, Melbourne Laboratory
Coffey Testing Pty Ltd3G Marine ParadeAbbotsford VIC 3067
Phone: +61 3 8413 6900Fax: +61 3 8413 6999
Project No.: INFOABTM00195AAPrincipal:
Lot No.: TRN:
P.O. Box 40Kew VIC 3101
Coffey Geotechnics Pty Ltd (Abbotsford)
Page 1 of 1Form No: 18996, Report No: HDR:ABTM14W00562 © 2000-2013 QESTLab by SpectraQEST.com
Comments
Sample DetailsLocation: Mt Duneed
Client Request ID:
Specification Requirements: MINIMUM HILF DENSITY RATIO OF 95% of Standard Compaction + or -3% OMC (as advised byclient)
Field Test procedures: AS 1289.5.8.1
Laboratory Test procedures: AS 1289.2.1.1, AS 1289.5.7.1
Sampling Method: AS1289.1.2.1 Clause 6.4 (b)
Source: On Site
Material: Silty Clay
Sample DataSample ID ABTM14S-02555
Field Sample ID Test 12
Date Tested 16/09/2014
Time Tested 09:30
Location Lot 6248
West Trench Backfill
10m East Rocky Point Road
Layer 6
Soil Description Silty Clay
Field and Laboratory DataDepth of Test (mm) 175
Field Moisture Content (%) 17.0
Field Wet Density (t/m³) 2.01
Field Dry Density (t/m³) 1.72
Peak Converted Wet Density* (t/m³) 2.11
Optimum Moisture Content (%) 17.0
Compactive Effort Standard
Moisture Ratio (%) 101.0
Moisture Variation (%) 0.0
Hilf Density Ratio (%) 95.5legend * adjusted for oversize material .
Accredited for compliance with ISO/IEC 17025. The results of the tests, calibrations and/ormeasurements included in this document are traceableto Australian/national standards.
25/09/2014
HILF Density Ratio Report
Report No: HDR:ABTM14W00566Issue No: 2
Client:
Date of Issue:
NATA Accredited Laboratory Number:431
Approved Signatory: Shaun Price
(Laboratory Manager)
This report replaces all previous issues of report no 'HDR:ABTM14W00566'.
Project Name: GEOTABTF08569AE - Warralily - Stage 62A
ABN 92 114 364 046
Abbotsford, Melbourne Laboratory
Coffey Testing Pty Ltd3G Marine ParadeAbbotsford VIC 3067
Phone: +61 3 8413 6900Fax: +61 3 8413 6999
Project No.: INFOABTM00195AAPrincipal:
Lot No.: TRN:
Preliminary Report Issued - Issue No.:1
P.O. Box 40Kew VIC 3101
Coffey Geotechnics Pty Ltd (Abbotsford)
Page 1 of 1Form No: 18996, Report No: HDR:ABTM14W00566 © 2000-2013 QESTLab by SpectraQEST.com
Comments
Sample DetailsLocation: Mt Duneed
Client Request ID:
Specification Requirements: MINIMUM HILF DENSITY RATIO OF 95% of Standard Compaction + or -3% OMC (as advised byclient)
Field Test procedures: AS 1289.5.8.1
Laboratory Test procedures: AS 1289.5.7.1, AS 1289.2.1.1
Sampling Method: AS1289.1.2.1 Clause 6.4 (b)
Source: On Site
Material: Silty Clay
Sample DataSample ID ABTM14S-02718
Field Sample ID Test 13
Date Tested 30/09/2014
Time Tested 11:20
Location Lot 6234
Layer 3
Soil Description Silty Clay
Field and Laboratory DataDepth of Test (mm) 175
Field Moisture Content (%) 20.0
Field Wet Density (t/m³) 1.96
Field Dry Density (t/m³) 1.63
Peak Converted Wet Density* (t/m³) 2.06
Optimum Moisture Content (%) 20.0
Compactive Effort Standard
Moisture Ratio (%) 100.5
Moisture Variation (%) 0.0
Hilf Density Ratio (%) 95.5legend * adjusted for oversize material .
Accredited for compliance with ISO/IEC 17025. The results of the tests, calibrations and/ormeasurements included in this document are traceableto Australian/national standards.
1/10/2014
HILF Density Ratio Report
Report No: HDR:ABTM14W00618Issue No: 1
Client:
Date of Issue:
NATA Accredited Laboratory Number:431
Approved Signatory: Mitchell Hindmarsh
(Senior Geotechnician)Project Name: GEOTABTF08569AE - Warralily - Stage 62A
ABN 92 114 364 046
Abbotsford, Melbourne Laboratory
Coffey Testing Pty Ltd3G Marine ParadeAbbotsford VIC 3067
Phone: +61 3 8413 6900Fax: +61 3 8413 6999
Project No.: INFOABTM00195AAPrincipal:
Lot No.: TRN:
P.O. Box 40Kew VIC 3101
Coffey Geotechnics Pty Ltd (Abbotsford)
Page 1 of 1Form No: 18996, Report No: HDR:ABTM14W00618 © 2000-2013 QESTLab by SpectraQEST.com
Comments
Appendix B – Survey 0595E-62A-WC-002-REV 2
Appendix C – Extract from specification by SMEC, ref 0557esb-24
This page has been left intentionally blank