Case Studies of Technologies Implemented at Water Treatment Plants Presented by: Andrew L. Casolini Dal Bo, PE , LEED AP Brian M. Sibiga, PE Water Treatment Plants: Sustainable and Energy Efficient Improvements

Transcript of New Water Treatment Plants: Sustainable and Energy Efficient … · 2012. 6. 6. · Case Studies of...

Page 1: New Water Treatment Plants: Sustainable and Energy Efficient … · 2012. 6. 6. · Case Studies of Technologies Implemented at Water Treatment Plants. Presented by: Andrew L. Casolini

Case Studies of Technologies Implemented at Water Treatment PlantsPresented by: Andrew L. Casolini Dal Bo, PE , LEED AP Brian M. Sibiga, PE

Water Treatment Plants: Sustainable and Energy Efficient Improvements

Page 2: New Water Treatment Plants: Sustainable and Energy Efficient … · 2012. 6. 6. · Case Studies of Technologies Implemented at Water Treatment Plants. Presented by: Andrew L. Casolini

Case Study of Energy Efficient, Sustainable Improvements and Technologies Implemented at Water Treatment Plants

Page 3: New Water Treatment Plants: Sustainable and Energy Efficient … · 2012. 6. 6. · Case Studies of Technologies Implemented at Water Treatment Plants. Presented by: Andrew L. Casolini

Introduction and Acknowledgements

Presenters:

Andrew Casolini Dal Bo, PE LEED AP Brian Sibiga, PE

Client Acknowledgements: Town of Grand IslandNiagara County Water DistrictCity of Oswego

Page 4: New Water Treatment Plants: Sustainable and Energy Efficient … · 2012. 6. 6. · Case Studies of Technologies Implemented at Water Treatment Plants. Presented by: Andrew L. Casolini

Energy Efficient Equipment and Operational UpgradesModification to distribution and transmission system Pump station modification Pump and motorsVSDAutomated control systemsAutomatic data acquisition

Page 5: New Water Treatment Plants: Sustainable and Energy Efficient … · 2012. 6. 6. · Case Studies of Technologies Implemented at Water Treatment Plants. Presented by: Andrew L. Casolini

Energy Efficient Equipment and Operational Upgrades Photovoltaic’sGeothermal heat pumps Filter media Solid handling SCADA controlsChemical feed systems

Page 6: New Water Treatment Plants: Sustainable and Energy Efficient … · 2012. 6. 6. · Case Studies of Technologies Implemented at Water Treatment Plants. Presented by: Andrew L. Casolini

Energy Efficient Equipment and Operational Upgrades

Onsite hydro turbines Process modifications

Page 7: New Water Treatment Plants: Sustainable and Energy Efficient … · 2012. 6. 6. · Case Studies of Technologies Implemented at Water Treatment Plants. Presented by: Andrew L. Casolini

Implementation Options

Employee installationConventional design and public biddingDesign Build Energy Performance Contracting

Page 8: New Water Treatment Plants: Sustainable and Energy Efficient … · 2012. 6. 6. · Case Studies of Technologies Implemented at Water Treatment Plants. Presented by: Andrew L. Casolini

Operator Training

Technical skill sets Standard operating procedures Preventative maintenanceAsset management

Page 9: New Water Treatment Plants: Sustainable and Energy Efficient … · 2012. 6. 6. · Case Studies of Technologies Implemented at Water Treatment Plants. Presented by: Andrew L. Casolini

ROI

Annual energy cost prior to implementationAnnual energy costs savingsAnnual operational cost savingsMeasurement and Verification (M & V)

Page 10: New Water Treatment Plants: Sustainable and Energy Efficient … · 2012. 6. 6. · Case Studies of Technologies Implemented at Water Treatment Plants. Presented by: Andrew L. Casolini

Town of Grand Island

Location: Erie County, NYCapacity: 1.75 MGD daily avg; 2.5 MGD daily maxCustomers: approximately 20,000 Treatment: conventionalWater Source: Niagara River

Page 11: New Water Treatment Plants: Sustainable and Energy Efficient … · 2012. 6. 6. · Case Studies of Technologies Implemented at Water Treatment Plants. Presented by: Andrew L. Casolini

Grand Island Equipment and Operational Upgrades

VSDAutomated controlsAutomated data logging Energy controllers Transmission main improvements Tube settlers

Page 12: New Water Treatment Plants: Sustainable and Energy Efficient … · 2012. 6. 6. · Case Studies of Technologies Implemented at Water Treatment Plants. Presented by: Andrew L. Casolini

Grand Island Equipment and Operational Upgrades

Lighting upgradesWater meter replacementRemote water meter reading

Page 13: New Water Treatment Plants: Sustainable and Energy Efficient … · 2012. 6. 6. · Case Studies of Technologies Implemented at Water Treatment Plants. Presented by: Andrew L. Casolini

Implementation

Employee installationConventional design and public bid Energy Performance Contracting

Page 14: New Water Treatment Plants: Sustainable and Energy Efficient … · 2012. 6. 6. · Case Studies of Technologies Implemented at Water Treatment Plants. Presented by: Andrew L. Casolini

ROI for Energy Performance Contracting Prior to implementation:

Total billings = $3, 400, 000Electric and gas = $634, 000

Post implementation:Water revenue = Increased by $343, 868/yrElectric and gas savings = $87, 000/yrWater purchase savings = $200,000/yr

Total cost = $4,850,000

Grants = $330,000

Savings = $630,868

ROI = 7.7 years

Page 15: New Water Treatment Plants: Sustainable and Energy Efficient … · 2012. 6. 6. · Case Studies of Technologies Implemented at Water Treatment Plants. Presented by: Andrew L. Casolini

Niagara County Water District

Location: Niagara County, NYCapacity: 15 MGD daily avg; 35 MGD daily maxCustomers: approximately 150,000 Treatment: conventional with permits allowing

Direct FiltrationWater Source: Niagara River

Page 16: New Water Treatment Plants: Sustainable and Energy Efficient … · 2012. 6. 6. · Case Studies of Technologies Implemented at Water Treatment Plants. Presented by: Andrew L. Casolini

NCWD Equipment and Operational UpgradesVSD and motorAutomated controlsAutomated data logging Transmission main improvements Pump station upgradesBackwash pump stationChemical change out

Page 17: New Water Treatment Plants: Sustainable and Energy Efficient … · 2012. 6. 6. · Case Studies of Technologies Implemented at Water Treatment Plants. Presented by: Andrew L. Casolini

Implementation

Employee installationConventional design and public bid Energy demonstration project

Page 18: New Water Treatment Plants: Sustainable and Energy Efficient … · 2012. 6. 6. · Case Studies of Technologies Implemented at Water Treatment Plants. Presented by: Andrew L. Casolini

ROI for Conventional Design and Public Bid

Prior to implementation Electric = $982, 000/yr Post implementation Electric = $200, 000/yrConstruction Cost = $1, 450, 000Grants = $335, 000ROI = 5.5 years

Page 19: New Water Treatment Plants: Sustainable and Energy Efficient … · 2012. 6. 6. · Case Studies of Technologies Implemented at Water Treatment Plants. Presented by: Andrew L. Casolini

City of Oswego

Location: Oswego County, NYCapacity: 6 MGD daily avg; 17 MGD daily max Customers: approximately 18,000 Treatment: conventionalWater Source: Lake Ontario

Page 20: New Water Treatment Plants: Sustainable and Energy Efficient … · 2012. 6. 6. · Case Studies of Technologies Implemented at Water Treatment Plants. Presented by: Andrew L. Casolini

Oswego Equipment and Operational Upgrades

Rebuilding Finished water pumpsNew motors and VSDAutomated pump control SCADA system with remote telemetry improvements Filter valve actuatorsCoagulant feed system Lighting system controls

Page 21: New Water Treatment Plants: Sustainable and Energy Efficient … · 2012. 6. 6. · Case Studies of Technologies Implemented at Water Treatment Plants. Presented by: Andrew L. Casolini

Implementation

Energy Performance ContractingMunicipal Lease Energy Smart Grant Program

Page 22: New Water Treatment Plants: Sustainable and Energy Efficient … · 2012. 6. 6. · Case Studies of Technologies Implemented at Water Treatment Plants. Presented by: Andrew L. Casolini

ROI for Conventional Design and Public Bid

Prior to implementation: Electric = $694,378/yrOperation and Maintenance Savings = $58,528/yr Energy Savings = $95,892/yrGrants = $270,000Construction Cost = $2,423.918ROI = 13.94 years

Page 23: New Water Treatment Plants: Sustainable and Energy Efficient … · 2012. 6. 6. · Case Studies of Technologies Implemented at Water Treatment Plants. Presented by: Andrew L. Casolini

Q & A

Page 24: New Water Treatment Plants: Sustainable and Energy Efficient … · 2012. 6. 6. · Case Studies of Technologies Implemented at Water Treatment Plants. Presented by: Andrew L. Casolini

Thank You For more information, or to request a copy

of this presentation, contact: Andrew Casolini Dal Bo