MAY 9, 2015
Demolition Update
New Trenton Central High School Project UpdateCommunity Presentation
May 9, 2015
MAY 9, 2015
Demolition Status• Design completed and all required approvals from DCA have
been secured• SDA has responded to all DEP comments regarding EO 215
and formal approval is anticipated within the next week• Contract for Demolition/Remediation has been awarded• Construction Notice to Proceed has been issued• Remediation activities have commenced in Wings B, C, E,
and F• Salvage activities are ongoing• Work is being phased by building part in order to allow
actual demolition construction work to proceed prior to completion of overall abatement
MAY 9, 2015
Demolition Phasing Plan
Wing Abatement Start Abatement Finish Demo Start Demo Finish
E April 13, 2015 (A) May 7, 2015 June 7, 2015 July 15, 2015
F April 17, 2015 (A) May 7, 2015 June 7, 2015 July 15, 2015
D April 17, 2015 July 23, 2015 August 18, 2015 Ocotber 15, 2015
B May 4, 2015 (A) July 8, 2015 August 8, 2015 October 9, 2015
C May 6, 2015 (A) August 27, 2015 September 25, 2015 November 19, 2015
A April 17, 2015 September 17, 2015 October 25, 2015 March 18, 2016
MAY 9, 2015
Key Demolition Activities and Dates• Award Demolition Contract – (Completed)• Issue Abatement/Demolition NTP – 4/9/15 (Completed)• Initiate Remediation Activities – 4/30/15 (Initiated)• Initiate Demolition Construction Activities – June 7, 2015• Complete Demolition Construction – 4/8/16• Post-Demo/Contract Close-Out – 5/6/16
MAY 9, 2015
Salvage and Reuse of Existing Building Elements
New Trenton Central High School Project UpdateCommunity Presentation
May 9, 2015
MAY 9, 2015
Salvage and ReuseConsideration is currently being given to the potential to salvage elements from the old Trenton Central High School building for potential reuse in the new one.Considerations regarding potential for reuse include:• Cost, complexity, and time for removal• Potential for reuse and associated cost• Potential benefit of reuse
MAY 9, 2015
ENTIRE COLUMN(S) OR COLUMN CAPITAL AND BASE TO BE USED FOR INTERPRETIVE DISPLAY TO APPRECIATE SCALE AND DETAIL
MAY 9, 2015
EXTERIOR BRASS LAMP POST LIGHT FIXTURES TO BE RE-PURPOSED FOR EXTERIOR OR INTERIOR ACCENT LIGHTING
MAY 9, 2015
Design Update
New Trenton Central High School Project UpdateCommunity Presentation
May 9, 2015
MAY 9, 2015
Design StatusThe following key activities related to planning and design of the new TCHS facility are currently underway:• SDA has completed development of schematic design documents,
including schematic site and floor plans, detailed room layouts, and educational specifications. District approval was received on 4/20/15 and DOE approval is anticipated by the end of May.
• Conceptual building elevations are being developed for review with project stakeholders in anticipation of formal presentation to TBOE on 5/26/15.
• SDA is proceeding with development of Bridging Documents to support Design-Builder procurement. Materials and systems reviews with the District have been substantially completed with some limited follow-up required, most notably Technology and Security.
MAY 9, 2015
Key Design Activities and DatesThe following key dates related to planning and design of the new TCHS facility have been proposed:• Complete Program/Concept Phase – 12/24/14 (Complete)• Schematic Design Submission – 4/8/15 (Complete)• District Schematic Approval – 4/20/15 (Complete)• DOE Schematic Approval - 5/18/15• OSC Submission - 7/20/15• Complete Bridging Documents - 9/14/15• Advertise Design-Build Procurement - 9/22/15
MAY 9, 2015
Program Update
New Trenton Central High School Project UpdateCommunity Presentation
May 9, 2015
MAY 9, 2015
TCHS Program SummaryA target program for the new Trenton Central High School facility has been developed and submitted to the New Jersey Department of Education for approval. The proposed program, which includes additional capacity to support District initiatives to educate more special needs students within the District, has an educational capacity of 1,923 students with a maximum capacity of 2,262 students.
MAY 9, 2015
TCHS Program SummarySmall Learning Community Organization
The proposed program for the new TCHS facility is organized around five small learning communities (SLCs) which will educate approximately 385 students each: Hotel, Restaurant, Tourism and Business School (HRTB) School of Communications (COMM) Science, Technology, Engineering, Mathematics Academy
(STEM) Academy of Visual and Performing Arts (VPA) Health Science and Medical Arts Academy (HSMA)
MAY 9, 2015
TCHS Program SummaryEach SLC includes the following: 10 Classrooms (7 General Classrooms, 3 Self-Contained
Special Education Classrooms) 2 Science Labs 1 Art/Project Lab 5 Specialized Labs (Including Career Technical Education
(CTE) Labs) A Learning Resource Center Administrative and Support Areas
MAY 9, 2015
TCHS Program SummarySLCs include facilities to support new and existing CTE programs including the following: Culinary Arts Cosmetology Photographic and Video/Film Technology Digital Arts Drafting and Design Technology Precision Production Trades (Robotics) Hospitality Administration & Management Sales, Distribution, and Marketing Certified Nursing Assistant Sports Medicine Construction Trades (General Carpentry) Electrical Technology Automotive Technology (DOE Approval pending)
MAY 9, 2015
TCHS Program SummaryPE/Athletic Facilities
In addition to a new Main Gymnasium, PE/Athletic facilities include the following: Auxiliary Gym Swimming Pool Dance Studio Cardio/Fitness Center Weight Room and Training Area Health and Driver Education Classrooms and Labs
MAY 9, 2015
TCHS Program SummaryOther Shared Core Facilities
Other facilities shared by all SLCs include: Cafeteria Media Center Auditorium Large Group Instruction Room to support cross-curricular
and other instruction for multiple classes 2 ROTC Classrooms and Support Facilities
MAY 9, 2015
TCHS Program SummaryStudent Services
Facilities to support School Based Student Services include: Child Study Team Registration Center Nurse Daycare Center Parent/Community Room
MAY 9, 2015
TCHS Program SummarySpecial Education Facilities
In addition to self-contained special education classrooms, the following facilities have been included in order to support District initiatives to educate more special needs students within the District: 2 Life Skills Labs 1 Business Practicum Lab
MAY 9, 2015
TCHS Program SummaryAdministrative/Support Facilities
In addition to these facilities, the program includes various administrative/support facilities including Main Office and administrative/support facilities in each SLC
Outdoor Learning AreasIn addition to existing outdoor PE/Athletic facilities, an outdoor Student Commons/Dining Area adjoining Cafeteria, an outdoor Reading Area adjoining Media Center, and an outdoor Amphitheater adjoining VPA have been proposed
MAY 9, 2015
Schematic Design Update
New Trenton Central High School Project UpdateCommunity Presentation
May 9, 2015
MAY 9, 2015
Building Exterior Design
New Trenton Central High School Project UpdateCommunity Presentation
May 9, 2015
MAY 9, 2015
Building Exterior Design ConsiderationsConsiderations regarding selection of exterior building materials and systems include:• SDA Materials and Systems Standards• Performance• Durability• Ease of Operation and Maintenance• Relative costAesthetic considerations for the exterior design include:• Context – Physical, cultural, and historical• Input from Project Stakeholders
MAY 9, 2015
Building Exterior Design ConceptsThree conceptual options have been developed for consideration by project stakeholders• Options are conceptual in nature• Options are not intended to be an “ala carte” menu• At this stage, Options should not be interpreted too literally
but, rather, are intended to suggest a direction in which to take the design of the new TCHS
• Selected Option will be developed and refined over the next few months
MAY 9, 2015
Building Exterior Design ConceptsOption No. 1• Use of more traditional/
classical design elements, including some drawn from old TCHS
• Columns and Loggia• Entrance Portal• Tower element (could
include clock)• Traditional red brick, white
windows, ornamentation
MAY 9, 2015
Option No. 2• More modern vocabulary• Clean straight lines• Expression of structure• Less (or no) red brick,
introduction of other colors and materials
• “Modern” windows and other glazing elements
Building Exterior Design Concepts
MAY 9, 2015
Option No. 3• Use of non-traditional
design elements• Expressionism over
Functionalism• Metaphorical rather than
literal• Multivalence – “loaded”
design elements which are open to personal reinterpretation
Building Exterior Design Concepts
MAY 9, 2015
Construction Phase Update
New Trenton Central High School Project UpdateCommunity Presentation
May 9, 2015
MAY 9, 2015
Key Construction Activities and DatesThe following key dates related to construction of the new TCHS facility have been proposed:• Advertise Design-Build Procurement - 9/22/15• Design-Builder Initial NTP (Design) – 3/17/16• Design-Builder Initial Construction NTP – 12/29/16*• District School Occupancy – Fall 2019* - Based on SDA schedule criteria, may be sooner