New Summary Earth Work

23
KINGDOM OF SAUDI ARABIA Ministry of Transport PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3 ITEM NO : 20301 SUMMARY OF Roadway Excavation SL NO LOCATION TOTAL QTY 1 SUMMARY OF CUTTING -I RIGHT Side 544,946.82 2 SUMMARY OF CUTTING -I Left Side 422,663.99 3 Bridge 128+129.575 12,472.93 4 Bridge 172+600 16,750.00 5 Bridge 191+021 14,700.00 6 Additional Scope of Work for Section-1 17,725.91 DEDUCTION -2873 QUANTITY = 1,026,386.65 CONTRACTOR PROJECT MANAGER CONSULTANT RESIDENT EN QUANTITY SURVEYOR QUANTITY SU Contractor: Saudi Pan Kingdom (SAPAC) C (SAB

description

j

Transcript of New Summary Earth Work

Page 1: New Summary Earth Work

KINGDOM OF SAUDI ARABIA

Ministry of Transport

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

ITEM NO : 20301

SUMMARY OF Roadway Excavation

SL NO LOCATION TOTAL QTY REMARKS

1 SUMMARY OF CUTTING -I RIGHT Side 544,946.82

2 SUMMARY OF CUTTING -I Left Side 422,663.99

3 Bridge 128+129.575 12,472.93

4 Bridge 172+600 16,750.00

5 Bridge 191+021 14,700.00

6 Additional Scope of Work for Section-1 17,725.91

DEDUCTION -2873

QUANTITY = 1,026,386.65 Cu.m

CONTRACTOR

PROJECT MANAGER

CONSULTANT

RESIDENT ENGINEER

QUANTITY SURVEYOR QUANTITY SURVEYOR

Contractor: Saudi Pan Kingdom (SAPAC)

Consultant: Ital Consult (SAB)

Page 2: New Summary Earth Work

KINGDOM OF SAUDI ARABIA

Ministry of Transport

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

ITEM NO : 20601

SUMMARY OF Embankment

SL NO LOCATION TOTAL QTY REMARKS

1 SUMMARY OF FILLING-I RIGHT Side 139,965.23

2 SUMMARY OF FILLING-I Left Side 76,111.34

3 Bridge 128+129.575 480,331.55

6 Bridge 141+000 700,000.00

4 Bridge 172+600 498,917.00

5 Bridge 191+021 266,082.65

7 Additional Scope of Work for Section-1 4,161.65

8 DEDUCTION (26,386.65)

9 DEDUCTION (13,847.00)

QUANTITY = 2,125,335.77 Cu.m

CONTRACTOR

PROJECT MANAGER

CONSULTANT

RESIDENT ENGINEER

QUANTITY SURVEYOR QUANTITY SURVEYOR

Contractor: Saudi Pan Kingdom (SAPAC)

Consultant: Ital Consult (SAB)

Page 3: New Summary Earth Work

KINGDOM OF SAUDI ARABIA

Ministry of Transport

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

ITEM NO : 20601

SUMMARY OF Sub Grade

SL NO LOCATION TOTAL QTY REMARKS

1 SUMMARY OF Sub Grade-I Right Side 124,887.07 ###

2 SUMMARY OF Sub Grade-II Right Side 114,134.72 ###

3 SUMMARY OF Sub Grade-I ( LEFT Side) 142,623.09 ###

4 SUMMARY OF Sub Grade-11 ( LEFT Side) 130,711.65 ###

5 SUMMARY OF Sub Grade-SIDE SLOPE ( LEFT Side) 89,723.70 ###

6 SUMMARY OF Sub Grade-SIDE SLOPE ( RIGHT Side) 74,490.71 ###

7 Bridge 128+129.575 22,655.02 ###

8 Bridge 172+600 - ###

9 Bridge 191+021 31,279.39 ###

10 Additional Scope of Work for Section-1 11,040.79 ###

11 Box Culverts Deduction (428.48)

Agg. Base Course

QUANTITY = 741,117.66 Cu.mB.B.CB.W.C

###

###

###B.W.C

CONTRACTOR

PROJECT MANAGER

CONSULTANT

RESIDENT ENGINEER

QUANTITY SURVEYOR QUANTITY SURVEYOR

Contractor: Saudi Pan Kingdom (SAPAC)

Consultant: Ital Consult (SAB)

Page 4: New Summary Earth Work

KINGDOM OF SAUDI ARABIA

Ministry of Transport

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

ITEM NO : 3030101

SUMMARY OF AGGREGATE BASE COURSE GRADING

SL NO LOCATION TOTAL QTY REMARKS

1 SUMMARY OF AGGREGATE BASE COURSE GRADING - I Right Side 80,239.57 ###

2 SUMMARY OF AGGREGATE BASE COURSE GRADING - II Right Side 68,945.80 ###

3 SUMMARY OF AGGREGATE BASE COURSE GRADING - I ( LEFT Side) 82,522.05 ###

4 SUMMARY OF AGGREGATE BASE COURSE GRADING - II ( LEFT Side) 80,557.67 ###

5 Bridge 128+129.575 21,027.35 ###

6 Bridge 172+600 39,829.15 ###

7 Bridge 191+021 46,715.79 ###

8 Additional Scope of Work for Section-1 7,646.14 ###

9 Box Culverts Deduction (334.08)

QUANTITY = 427,149.44 Cu.m

###

###

CONTRACTOR

PROJECT MANAGER

CONSULTANT

RESIDENT ENGINEER

QUANTITY SURVEYOR QUANTITY SURVEYOR

Contractor: Saudi Pan Kingdom (SAPAC)

Consultant: Ital Consult (SAB)

Page 5: New Summary Earth Work

CONTRACTOR CONSULTANT

Page 6: New Summary Earth Work

KINGDOM OF SAUDI ARABIA

Ministry of Transport

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

ITEM NO : 4020102

SUMMARY OF Bituminous Prime Coat - Grade MC-I

SL NO LOCATION TOTAL QTY REMARKS

1 SUMMARY OF Bituminous Prime Coat - Grade MC-I Right Side 465,703.90 ###

2 SUMMARY OF MC - 01 ( LEFT Side) 551,300.43 ###

3 Bridge 128+129.575 71,777.96 ###

4 Bridge 172+600 119,105.66 ###

5 Bridge 191+021 147,367.49 ###

6 Additional Scope of Work for Section-1 25,079.90 ###

7 Box Culverts Deduction 1,210.87

QUANTITY = 1,381,546.21 Sq.m

###

###

CONTRACTOR

PROJECT MANAGER

CONSULTANT

RESIDENT ENGINEER

QUANTITY SURVEYOR QUANTITY SURVEYOR

Contractor: Saudi Pan Kingdom (SAPAC)

Consultant: Ital Consult (SAB)

Page 7: New Summary Earth Work

KINGDOM OF SAUDI ARABIA

Ministry of Transport

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

ITEM NO : 4050176

SUMMARY OF Bituminous Base Course ,Grade

SL NO LOCATION TOTAL QTY REMARKS

1 SUMMARY OF Bituminous Base Course ,Grade -l Right Side 46,133.39 ###

2 SUMMARY OF Bituminous Base Course ,Grade -ll Right Side 45,406.88 ###

3 SUMMARY OF BBC - 01 ( LEFT Side) 54,382.51 ###

4 SUMMARY OF BBC - 02 ( LEFT Side) 53,518.75 ###

5 Bridge 128+129.575 13,045.36 ###

6 Bridge 172+600 26,489.19 ###

7 Bridge 191+021 26,016.82 ###

8 Additional Scope of Work for Section-1 4,962.13 ###

9 Box Culverts Deduction 44.98

QUANTITY = 270,000.00 Cu.m

###

###

CONTRACTOR

CONTRACTOR

PROJECT MANAGER

CONSULTANT

RESIDENT ENGINEER

QUANTITY SURVEYOR QUANTITY SURVEYOR

Contractor: Saudi Pan Kingdom (SAPAC)

Consultant: Ital Consult (SAB)

Page 8: New Summary Earth Work

KINGDOM OF SAUDI ARABIA

Ministry of Transport

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

ITEM NO : 4050376

SUMMARY OF Bitumin Wearing Course, Grade

SL NO LOCATION TOTAL QTY REMARKS

1 SUMMARY OF Bitumin Wearing Course, Grade Right Side 22,526.10 ###

2 SUMMARY OF BWC ( LEFT Side) 26,522.57 ###

3 Bridge 128+129.575 2,638.09 ###

4 Bridge 172+600 7,820.22 ###

5 Bridge 191+021 6,237.09 ###

6 Additional Scope of Work for Section-1 1,255.93 ###

Quantities 67,000.00 Cu.m

######

CONTRACTOR

PROJECT MANAGER

CONSULTANT

RESIDENT ENGINEER

QUANTITY SURVEYOR QUANTITY SURVEYOR

Contractor: Saudi Pan Kingdom (SAPAC)

Consultant: Ital Consult (SAB)

Page 9: New Summary Earth Work

KINGDOM OF SAUDI ARABIA

Ministry of Transport

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

ITEM NO : 9030301

SUMMARY OF Retroreflectorized Thermoplastic White Traffic Lines

SL NO LOCATION TOTAL QTY REMARKS

1 SUMMARY OF Retroreflectorized Thermoplastic White Traffic Lines Right Side 3,645.00

2 SUMMARY OF White Line ( LEFT Side) 4,331.25

3 Bridge 128+129.575 12,884.25

4 Bridge 172+600 15,957.00

5 Bridge 191+021 20,263.00

Additional Scope of Work for Section-1 201.92

DONE QUANTITY OF White Line = 57,282.421 Sq.m

CONTRACTOR

PROJECT MANAGER

CONSULTANT

RESIDENT ENGINEER

QUANTITY SURVEYOR QUANTITY SURVEYOR

Contractor: Saudi Pan Kingdom (SAPAC)

Consultant: Ital Consult (SAB)

F11
Author: these all qty have no back up ,,,qty by eng
Page 10: New Summary Earth Work

KINGDOM OF SAUDI ARABIA

Ministry of Transport

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

ITEM NO : 9030302

SUMMARY OF Retroreflectorized Thermoplastic Yellow Traffic Lines

SL NO LOCATION TOTAL QTY REMARKS

1 SUMMARY OF Retroreflectorized Thermoplastic Yellow Traffic Lines Right side 14,580.00

2 SUMMARY OF Yellow Line ( LEFT Side) 17,325.00

3 Bridge 128+129.575 5,982.46

4 Bridge 172+600 16,999.00

5 Bridge 191+021 4,124.82

6 Additional Scope of Work for Section-1 2,357.17

DONE QUANTITY OF Yellow Line = 61,368.45 Sq.m

CONTRACTOR

PROJECT MANAGER

CONSULTANT

RESIDENT ENGINEER

QUANTITY SURVEYOR QUANTITY SURVEYOR

Contractor: Saudi Pan Kingdom (SAPAC)

Consultant: Ital Consult (SAB)

Page 11: New Summary Earth Work

KINGDOM OF SAUDI ARABIA

Ministry of Transport

PROJECT: CONVERSION OF JEDDAH - JIZAN ROAD TO EXPRESSWAY 80 KM LENGTH) PART - 3

ITEM NO : 9030701

SUMMARY OF SUMMARY OF Cat Eyes

SL NO LOCATION TOTAL QTY REMARKS

1 SUMMARY OF Cat Eyes (Right Side) 8121

2 SUMMARY OF Cat Eyes ( LEFT Side) 9,646

3 Bridge 128+129.575 1,708

4 Bridge 172+600 2,916

5 Bridge 191+021 2,732

6 Additional Scope of Work for Section-1 377

DONE QUANTITY OF Cat Eyes = 25,500 No.

CONTRACTOR

PROJECT MANAGER

CONSULTANT

RESIDENT ENGINEER

QUANTITY SURVEYOR QUANTITY SURVEYOR

Contractor: Saudi Pan Kingdom (SAPAC)

Consultant: Ital Consult (SAB)

Page 12: New Summary Earth Work

Summary of Section-1 Quantities

SL NO Description QTY Unit Ammount

1 Cutting 17,725.91 5.00 88,629.55

2 Embankment 4,161.65 7.00 29,131.55

3 SubGrade 11,040.79 12.00 132,489.48

4 A.B.C 7,646.14 43.00 328,784.02

5 Mc-1 25,079.90 1.00 25,079.90

6 B.B.C 4,962.13 214.00 1,061,895.82

7 B.W.C 1,255.93 429.00 538,793.97

8 White line 201.92 20.00 4,038.40

9 Yellow line 2,357.17 20.00 47,143.40

10 Cat Eyes 376.92 22.00 8,292.24

Total Ammount 2,264,278.33