New Southern Nevada AirportNew Southern Nevada Airport
Airspace Design, Standard Instrument Arrival Airspace Design, Standard Instrument Arrival Procedures, and Standard Instrument DeparturesProcedures, and Standard Instrument Departures
Briefing for Federal Land ManagersBriefing for Federal Land ManagersSeptember 2005September 2005
Mike Loghides, Airport Program AdministratorMike Loghides, Airport Program AdministratorClark County Department of AviationClark County Department of Aviation
[email protected]@mccarran.com
IntroductionIntroduction
• Project Background
• Study Objective
• Scope of Work
• Stakeholder Participation
• Preliminary Design Alternatives for EIS
Clark County Project TeamClark County Project Team• Clark County Department of Aviation
– Mike Loghides [[email protected]; (702) 261-5750]
• Ricondo & Associates– Tom Cornell [[email protected]; (415) 547-1930]
– John Bergener [[email protected]; (702) 265-3442]
• ASRC Aerospace– Robb Varani [[email protected]; (763) 786-9582]
– Shaun Meehan [[email protected] (763) 786-3827]
Project BackgroundProject Background• Determination of need for additional airport• Selection of new site• Land availability• Airspace feasibility assessment• Conceptual planning• Airport layout plan• Utility planning• Airspace design• Environmental impact statement• Design and construction• Other planning and feasibility studies
Preliminary Airport Preliminary Airport Conceptual DesignConceptual Design
Objectives of StudyObjectives of Study
• Develop airspace and procedures through cooperation with potential stakeholders
• Identify airspace interactions between facilities
• Identify existing and future air traffic constraints
• Establish airspace assumptions for analysis in the EIS
Airspace Simulation ModelingAirspace Simulation Modeling
• Potential airspace designs will be modeled using the Total Airport and Airspace Modeler (TAAM); TAAM can provide:– Visual verification of SIDS, STARS, and airspace and procedures
interface– Capacity and delay comparisons between airspace design alternatives
• It is important to note that TAAM– is not a 3D SID or STAR builder– is not a human-in-the-loop simulation– is not a design tool
• Potential follow-on modeling with NASA Future Flight
Stakeholder ParticipationStakeholder Participation• FAA
– Western Pacific Regional Office (AT, AFS, AVN, ANI)– Airport District Office – Flight Standards District Office – LAS TRACON and ATCT– Los Angeles ARTCC
• Military– Regional liaison– Branches of military utilizing airspace in the vicinity including Nellis AFB and R-2508 Complex
• Industry– Airlines– NBAA– AOPA– Manufacturers (avionics and aircraft)– RTCA Working Group
• Resource agencies including BLM and NPS• CCDOA Team
Work Completed to DateWork Completed to Date
• Data collection and acquisition of SOP’s and LOA’s
• Creation of existing conditions base map• Initial stakeholder coordination• Preliminary arrival and departure corridor
development through a series of working group and stakeholder meetings
• Airspace conceptual designs for EIS process
Assumptions for Airspace Assumptions for Airspace EnvironmentEnvironment
• Mojave Preserve restrictions • TACAN to be installed at airport• New RADAR(s) to be implemented• Precision instrument landing approaches to each
runway• Use of RNAV capabilities• Airspace realignments with ZLA, L30, and LSV
(new sectors, control positions, new delegated terminal airspace)
1B-1: Land 19R & 25L/Depart 19L & 25R1B-1: Land 19R & 25L/Depart 19L & 25R
1B-1: Land 19R & 25L/Depart 19L & 25R1B-1: Land 19R & 25L/Depart 19L & 25R
1B-2: Land 01 L/R; Depart 07L1B-2: Land 01 L/R; Depart 07L
1B-3: Depart 01 L/R; Land 01L & 25L1B-3: Depart 01 L/R; Land 01L & 25L
1B-4 & 6: Land 07 L/R or 19 L/R; Depart 07 L/R1B-4 & 6: Land 07 L/R or 19 L/R; Depart 07 L/R
1B-5: Land & Depart 19 L/R1B-5: Land & Depart 19 L/R
Next StepsNext Steps• Airspace modeling (TAAM)• TERPS analysis• Development of preliminary SIDs, STARs,
and approaches• NAVAID coverage assessment• RADAR coverage analysis• Airspace conceptual design