New Southern Nevada Airport Airspace Design, Standard Instrument Arrival Procedures, and Standard...

18
New Southern Nevada New Southern Nevada Airport Airport Airspace Design, Standard Instrument Airspace Design, Standard Instrument Arrival Procedures, and Standard Arrival Procedures, and Standard Instrument Departures Instrument Departures Briefing for Federal Land Managers Briefing for Federal Land Managers September 2005 September 2005 Mike Loghides, Airport Program Mike Loghides, Airport Program Administrator Administrator Clark County Department of Aviation Clark County Department of Aviation [email protected] [email protected]

Transcript of New Southern Nevada Airport Airspace Design, Standard Instrument Arrival Procedures, and Standard...

Page 1: New Southern Nevada Airport Airspace Design, Standard Instrument Arrival Procedures, and Standard Instrument Departures Briefing for Federal Land Managers.

New Southern Nevada AirportNew Southern Nevada Airport

Airspace Design, Standard Instrument Arrival Airspace Design, Standard Instrument Arrival Procedures, and Standard Instrument DeparturesProcedures, and Standard Instrument Departures

Briefing for Federal Land ManagersBriefing for Federal Land ManagersSeptember 2005September 2005

Mike Loghides, Airport Program AdministratorMike Loghides, Airport Program AdministratorClark County Department of AviationClark County Department of Aviation

[email protected]@mccarran.com

Page 2: New Southern Nevada Airport Airspace Design, Standard Instrument Arrival Procedures, and Standard Instrument Departures Briefing for Federal Land Managers.

IntroductionIntroduction

• Project Background

• Study Objective

• Scope of Work

• Stakeholder Participation

• Preliminary Design Alternatives for EIS

Page 3: New Southern Nevada Airport Airspace Design, Standard Instrument Arrival Procedures, and Standard Instrument Departures Briefing for Federal Land Managers.

Clark County Project TeamClark County Project Team• Clark County Department of Aviation

– Mike Loghides [[email protected]; (702) 261-5750]

• Ricondo & Associates– Tom Cornell [[email protected]; (415) 547-1930]

– John Bergener [[email protected]; (702) 265-3442]

• ASRC Aerospace– Robb Varani [[email protected]; (763) 786-9582]

– Shaun Meehan [[email protected] (763) 786-3827]

Page 4: New Southern Nevada Airport Airspace Design, Standard Instrument Arrival Procedures, and Standard Instrument Departures Briefing for Federal Land Managers.

Project BackgroundProject Background• Determination of need for additional airport• Selection of new site• Land availability• Airspace feasibility assessment• Conceptual planning• Airport layout plan• Utility planning• Airspace design• Environmental impact statement• Design and construction• Other planning and feasibility studies

Page 5: New Southern Nevada Airport Airspace Design, Standard Instrument Arrival Procedures, and Standard Instrument Departures Briefing for Federal Land Managers.
Page 6: New Southern Nevada Airport Airspace Design, Standard Instrument Arrival Procedures, and Standard Instrument Departures Briefing for Federal Land Managers.

Preliminary Airport Preliminary Airport Conceptual DesignConceptual Design

Page 7: New Southern Nevada Airport Airspace Design, Standard Instrument Arrival Procedures, and Standard Instrument Departures Briefing for Federal Land Managers.

Objectives of StudyObjectives of Study

• Develop airspace and procedures through cooperation with potential stakeholders

• Identify airspace interactions between facilities

• Identify existing and future air traffic constraints

• Establish airspace assumptions for analysis in the EIS

Page 8: New Southern Nevada Airport Airspace Design, Standard Instrument Arrival Procedures, and Standard Instrument Departures Briefing for Federal Land Managers.

Airspace Simulation ModelingAirspace Simulation Modeling

• Potential airspace designs will be modeled using the Total Airport and Airspace Modeler (TAAM); TAAM can provide:– Visual verification of SIDS, STARS, and airspace and procedures

interface– Capacity and delay comparisons between airspace design alternatives

• It is important to note that TAAM– is not a 3D SID or STAR builder– is not a human-in-the-loop simulation– is not a design tool

• Potential follow-on modeling with NASA Future Flight

Page 9: New Southern Nevada Airport Airspace Design, Standard Instrument Arrival Procedures, and Standard Instrument Departures Briefing for Federal Land Managers.

Stakeholder ParticipationStakeholder Participation• FAA

– Western Pacific Regional Office (AT, AFS, AVN, ANI)– Airport District Office – Flight Standards District Office – LAS TRACON and ATCT– Los Angeles ARTCC

• Military– Regional liaison– Branches of military utilizing airspace in the vicinity including Nellis AFB and R-2508 Complex

• Industry– Airlines– NBAA– AOPA– Manufacturers (avionics and aircraft)– RTCA Working Group

• Resource agencies including BLM and NPS• CCDOA Team

Page 10: New Southern Nevada Airport Airspace Design, Standard Instrument Arrival Procedures, and Standard Instrument Departures Briefing for Federal Land Managers.

Work Completed to DateWork Completed to Date

• Data collection and acquisition of SOP’s and LOA’s

• Creation of existing conditions base map• Initial stakeholder coordination• Preliminary arrival and departure corridor

development through a series of working group and stakeholder meetings

• Airspace conceptual designs for EIS process

Page 11: New Southern Nevada Airport Airspace Design, Standard Instrument Arrival Procedures, and Standard Instrument Departures Briefing for Federal Land Managers.

Assumptions for Airspace Assumptions for Airspace EnvironmentEnvironment

• Mojave Preserve restrictions • TACAN to be installed at airport• New RADAR(s) to be implemented• Precision instrument landing approaches to each

runway• Use of RNAV capabilities• Airspace realignments with ZLA, L30, and LSV

(new sectors, control positions, new delegated terminal airspace)

Page 12: New Southern Nevada Airport Airspace Design, Standard Instrument Arrival Procedures, and Standard Instrument Departures Briefing for Federal Land Managers.

1B-1: Land 19R & 25L/Depart 19L & 25R1B-1: Land 19R & 25L/Depart 19L & 25R

Page 13: New Southern Nevada Airport Airspace Design, Standard Instrument Arrival Procedures, and Standard Instrument Departures Briefing for Federal Land Managers.

1B-1: Land 19R & 25L/Depart 19L & 25R1B-1: Land 19R & 25L/Depart 19L & 25R

Page 14: New Southern Nevada Airport Airspace Design, Standard Instrument Arrival Procedures, and Standard Instrument Departures Briefing for Federal Land Managers.

1B-2: Land 01 L/R; Depart 07L1B-2: Land 01 L/R; Depart 07L

Page 15: New Southern Nevada Airport Airspace Design, Standard Instrument Arrival Procedures, and Standard Instrument Departures Briefing for Federal Land Managers.

1B-3: Depart 01 L/R; Land 01L & 25L1B-3: Depart 01 L/R; Land 01L & 25L

Page 16: New Southern Nevada Airport Airspace Design, Standard Instrument Arrival Procedures, and Standard Instrument Departures Briefing for Federal Land Managers.

1B-4 & 6: Land 07 L/R or 19 L/R; Depart 07 L/R1B-4 & 6: Land 07 L/R or 19 L/R; Depart 07 L/R

Page 17: New Southern Nevada Airport Airspace Design, Standard Instrument Arrival Procedures, and Standard Instrument Departures Briefing for Federal Land Managers.

1B-5: Land & Depart 19 L/R1B-5: Land & Depart 19 L/R

Page 18: New Southern Nevada Airport Airspace Design, Standard Instrument Arrival Procedures, and Standard Instrument Departures Briefing for Federal Land Managers.

Next StepsNext Steps• Airspace modeling (TAAM)• TERPS analysis• Development of preliminary SIDs, STARs,

and approaches• NAVAID coverage assessment• RADAR coverage analysis• Airspace conceptual design