SL.NO. Equipment ID TAG NO. Main Euipment
1 FT-7000 Air Co
2 MOVP-7000 Air System
3 PT-7000 Air System
4 PT-7003 Air System
5 AE-3001-CO GTG
6 AE-3001-NOX GTG
7 AE-3001-SO2 GTG
8 AT 8100 N2 PLANT
9 AT 8101 N2 PLANT
10 Hydraulic unit PS-1 ARM HYDRAULIC UNIT
11 Hydraulic unit PS-2 ARM HYDRAULIC UNIT
12 PT-1085 BOG Suction Drum
13 PT-1401 BOG Suction Drum
14 PV 1085 BOG suction drum
15 PV 1103 BOG suction drum
16 TT-1401 BOG Suction Drum
17 DPT-1453 BOG-A
18 TV 1412 BOG-A
19 PSHH 1451 BOG-A
20 PSLL 1452 BOG-A
21 PSLL 1455 BOG-A
22 PSLL 1456 BOG-A
23 PSLL 1457 BOG-A
24 PSLL 1458 BOG-A25 PT-1450 BOG-A
26 PT-1451 BOG-A
27 PT-1452 BOG-A
28 PT-1453 BOG-A
29 PT-1455 BOG-A
30 TT-1450 BOG-A
31 TT-1451A BOG-A
32 TT-1451B BOG-A
33 TT-1452 BOG-A
34 TT-1453A BOG-A
35 TT-1453B BOG-A
36 TT-1455 BOG-A
37 DPT-1463 BOG-B
38 TV 1422 BOG-B
39 PSHH 1461 BOG-B
40 PSLL 1462 BOG-B
41 PSLL 1465 BOG-B
42 PSLL 1466 BOG-B
43 PSLL 1467 BOG-B
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 2/464
44 PSLL 1468 BOG-B
45 PT-1460 BOG-B
46 PT-1461 BOG-B
47 PT-1462 BOG-B
48 PT-1463 BOG-B
49 PT-1465 BOG-B
50 TT-1460 BOG-B
51 TT-1461A BOG-B52 TT-1461B BOG-B
53 TT-1462 BOG-B
54 TT-1463A BOG-B
55 TT-1463B BOG-B
56 TT-1465 BOG-B
57 DPT-1473 BOG-C
58 TV 1432 BOG-C
59 PSHH 1471 BOG-C
60 PSLL 1477 BOG-C
61 PSLL 1472 BOG-C
62PSLL 1475 BOG-C
63 PSLL 1476 BOG-C
64 PSLL 1478 BOG-C
65 PT-1470 BOG-C
66 PT-1471 BOG-C
67 PT-1472 BOG-C
68 PT-1473 BOG-C
69 PT-1475 BOG-C
70 TT-1470 BOG-C
71 TT-1471A BOG-C
72 TT-1471B BOG-C
73 TT-1472 BOG-C
74 TT-1473A BOG-C
75 TT-1473B BOG-C
76 TT-1475 BOG-C
77 Camera-1 CCTV SYSTEM
78 Camera-2 CCTV SYSTEM
79 Camera-3 CCTV SYSTEM
80 Camera-4 CCTV SYSTEM
81 Camera-5 CCTV SYSTEM
82 Camera-6 CCTV SYSTEM
83 Camera-7 CCTV SYSTEM
84 Camera-8 CCTV SYSTEM
85Camera-9 CCTV SYSTEM
86 Camera-10 CCTV SYSTEM
87 Camera-11 CCTV SYSTEM
88 TV 1401 De-superheater
89 MOVP-1444 DE-SUPERHEATER BOG
90 MOVP-1450 DE-SUPERHEATER BOG
91 MOVP-1460 DE-SUPERHEATER BOG
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 3/464
92 MOVP-1470 DE-SUPERHEATER BOG
93 LT-1910 DRAIN DRUM
94 LT-1920 DRAIN DRUM
95 TT-3005 E-340 A HW OUTLET
96 TT-3009 E-340 A/B/C HW OUTLET
97 TT-3006 E-340 B HW OUTLET
98 TT-3007 E-340 C HW OUTLET99 TT-3002 E-340A
100 TT-3003 E-340B
101 TT-3004 E-340C
102 MOVP-12001 ESD
103 PT-10250 Fire control system
104 PT-10251 Fire control system
105 FSD-1001 FIRE DETECTOR
106 FSD-1002 FIRE DETECTOR
107 FSD-101 FIRE DETECTOR
108 FSD-102 FIRE DETECTOR
109 FSD-103 FIRE DETECTOR110 FSD-104 FIRE DETECTOR
111 FSD-1101 FIRE DETECTOR
112 FSD-1102 FIRE DETECTOR
113 FSD-1103 FIRE DETECTOR
114 FSD-1201 FIRE DETECTOR
115 FSD-1202 FIRE DETECTOR
116 FSD-1203 FIRE DETECTOR
117 FSD-1301 FIRE DETECTOR
118 FSD-201 FIRE DETECTOR
119 FSD-301 FIRE DETECTOR
120
FSD-302 FIRE DETECTOR121 FSD-303 FIRE DETECTOR
122 FSD-304 FIRE DETECTOR
123 FSD-401 FIRE DETECTOR
124 FSD-402 FIRE DETECTOR
125 FSD-403 FIRE DETECTOR
126 FSD-404 FIRE DETECTOR
127 FSD-501 FIRE DETECTOR
128 FSD-502 FIRE DETECTOR
129 FSD-503 FIRE DETECTOR
130 FSD-601 FIRE DETECTOR
131 FSD-602 FIRE DETECTOR
132 FSD-603 FIRE DETECTOR133 FSD-604 FIRE DETECTOR
134 FSD-605 FIRE DETECTOR
135 FSD-606 FIRE DETECTOR
136 FSD-701 FIRE DETECTOR
137 FSD-702 FIRE DETECTOR
138 FSD-801 FIRE DETECTOR
139 FSD-901 FIRE DETECTOR
140 FSD-902 FIRE DETECTOR
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 4/464
141 PSH 101 FIRE HYDRANT SYSTEM
142 PSH 102 FIRE HYDRANT SYSTEM
143 PSH 11 FIRE HYDRANT SYSTEM
144 PSH 111 FIRE HYDRANT SYSTEM
145 PSH 12 FIRE HYDRANT SYSTEM
146 PSH 121 FIRE HYDRANT SYSTEM
147 PSH 122 FIRE HYDRANT SYSTEM
148 PSH 123 FIRE HYDRANT SYSTEM149 PSH 150 FIRE HYDRANT SYSTEM
150 PSH 160 FIRE HYDRANT SYSTEM
151 PSH 161 FIRE HYDRANT SYSTEM
152 PSH 21 FIRE HYDRANT SYSTEM
153 PSH 22A FIRE HYDRANT SYSTEM
154 PSH 22B FIRE HYDRANT SYSTEM
155 PSH 31 FIRE HYDRANT SYSTEM
156 PSH 41 FIRE HYDRANT SYSTEM
157 PSH 51 FIRE HYDRANT SYSTEM
158 PSH 52 FIRE HYDRANT SYSTEM
159PSH 61 FIRE HYDRANT SYSTEM
160 PSH 62 FIRE HYDRANT SYSTEM
161 PSH 71 FIRE HYDRANT SYSTEM
162 PSH 81 FIRE HYDRANT SYSTEM
163 PSH 82A FIRE HYDRANT SYSTEM
164 PSH 82B FIRE HYDRANT SYSTEM
165 PSL 10300 FIRE PUMP HOUSE
166 PSL 10301 FIRE PUMP HOUSE
167 PSL 10302 FIRE PUMP HOUSE
168 PSL 10303 FIRE PUMP HOUSE
169 PSL 10304 FIRE PUMP HOUSE
170 PSL 10305 FIRE PUMP HOUSE
171 PV 10251 FIRE PUMP HOUSE
172 PAL 9106 Flare Stack
173 TT-9001A Flare Stack
174 TT-9001B Flare Stack
175 TT-9001C Flare Stack
176 MOVP-2100 Fuel Gas System
177 MOVP-2201A Fuel Gas System
178 MOVP-2201B Fuel Gas System
179 PSHH 2004 Fuel Gas System
180 PSHH 2201 Fuel Gas System181 PT-1860 Fuel Gas System
182 PT-2001 Fuel Gas System
183 PT-2100 Fuel Gas System
184 PT-2200 Fuel Gas System
185 TT-1860 Fuel Gas System
186 TT-2001 Fuel Gas System
187 TT-2002 Fuel Gas System
188 TT-2100 Fuel Gas System
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 5/464
189 TT-3010 G-301A EXHAUST
190 TT-3011 G-301A EXHAUST
191 TT-3020 G-301B EXHAUST
192 TT-3021 G-301B EXHAUST
193 TT-3030 G-301C EXHAUST
194 TT-3031 G-301C EXHAUST
195 PT-1350 Gas chromatogram
196 PT-1352 Gas chromatogram197 PT-1354 Gas chromatogram
198 PT-1356 Gas chromatogram
199 TT-1355 Gas chromatogram
200 TT-1357 Gas chromatogram
201 GSD-1001 GAS DETECTOR
202 GSD-1002 GAS DETECTOR
203 GSD-1003 GAS DETECTOR
204 GSD-1004 GAS DETECTOR
205 GSD-1005 GAS DETECTOR
206 GSD-1006 GAS DETECTOR
207GSD-1007 GAS DETECTOR
208 GSD-1008 GAS DETECTOR
209 GSD-101 GAS DETECTOR
210 GSD-102 GAS DETECTOR
211 GSD-103 GAS DETECTOR
212 GSD-104 GAS DETECTOR
213 GSD-106 GAS DETECTOR
214 GSD-107 GAS DETECTOR
215 GSD-108 GAS DETECTOR
216 GSD-109 GAS DETECTOR
217 GSD-110 GAS DETECTOR
218 GSD-1101 GAS DETECTOR
219 GSD-1102 GAS DETECTOR
220 GSD-1103 GAS DETECTOR
221 GSD-1104 GAS DETECTOR
222 GSD-1105 GAS DETECTOR
223 GSD-1106 GAS DETECTOR
224 GSD-1107 GAS DETECTOR
225 GSD-1108 GAS DETECTOR
226 GSD-1109 GAS DETECTOR
227 GSD-111 GAS DETECTOR
228 GSD-1110 GAS DETECTOR
229 GSD-112 GAS DETECTOR
230GSD-1201 GAS DETECTOR
231 GSD-1202 GAS DETECTOR
232 GSD-1203 GAS DETECTOR
233 GSD-1204 GAS DETECTOR
234 GSD-1205 GAS DETECTOR
235 GSD-1206 GAS DETECTOR
236 GSD-1207 GAS DETECTOR
237 GSD-1208 GAS DETECTOR
238 GSD-1209 GAS DETECTOR
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 6/464
239 GSD-1210 GAS DETECTOR
240 GSD-1211 GAS DETECTOR
241 GSD-1212 GAS DETECTOR
242 GSD-1213 GAS DETECTOR
243 GSD-1214 GAS DETECTOR
244 GSD-1401 GAS DETECTOR
245 GSD-1402 GAS DETECTOR
246 GSD-1403 GAS DETECTOR247 GSD-1501 GAS DETECTOR
248 GSD-1502 GAS DETECTOR
249 GSD-201 GAS DETECTOR
250 GSD-202 GAS DETECTOR
251 GSD-203 GAS DETECTOR
252 GSD-204 GAS DETECTOR
253 GSD-206 GAS DETECTOR
254 GSD-301 GAS DETECTOR
255 GSD-302 GAS DETECTOR
256 GSD-303 GAS DETECTOR
257GSD-304 GAS DETECTOR
258 GSD-305 GAS DETECTOR
259 GSD-306 GAS DETECTOR
260 GSD-307 GAS DETECTOR
261 GSD-308 GAS DETECTOR
262 GSD-401 GAS DETECTOR
263 GSD-402 GAS DETECTOR
264 GSD-403 GAS DETECTOR
265 GSD-404 GAS DETECTOR
266 GSD-405 GAS DETECTOR
267 GSD-406 GAS DETECTOR
268 GSD-407 GAS DETECTOR
269 GSD-408 GAS DETECTOR
270 GSD-501 GAS DETECTOR
271 GSD-502 GAS DETECTOR
272 GSD-503 GAS DETECTOR
273 GSD-504 GAS DETECTOR
274 GSD-505 GAS DETECTOR
275 GSD-506 GAS DETECTOR
276 GSD-601 GAS DETECTOR
277 GSD-602 GAS DETECTOR
278 GSD-603 GAS DETECTOR
279 GSD-604 GAS DETECTOR
280GSD-605 GAS DETECTOR
281 GSD-606 GAS DETECTOR
282 GSD-607 GAS DETECTOR
283 GSD-608 GAS DETECTOR
284 GSD-609 GAS DETECTOR
285 GSD-610 GAS DETECTOR
286 GSD-611 GAS DETECTOR
287 GSD-701 GAS DETECTOR
288 GSD-702 GAS DETECTOR
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 7/464
289 GSD-703 GAS DETECTOR
290 GSD-704 GAS DETECTOR
291 GSD-705 GAS DETECTOR
292 GSD-801 GAS DETECTOR
293 GSD-802 GAS DETECTOR
294 GSD-803 GAS DETECTOR
295 GSD-804 GAS DETECTOR
296 GSD-901 GAS DETECTOR297 GSD-902 GAS DETECTOR
298 GSD-903 GAS DETECTOR
299 GSD-904 GAS DETECTOR
300 FT-3015 GTG-A
301 GD-1, GTG-A GTG-A
302 GD-2, GTG-A GTG-A
303 GD-3, GTG-A GTG-A
304 GD-4, GTG-A GTG-A
305 GD-7, GTG-A GTG-A
306 GD-8, GTG-A GTG-A
307TV 3005 GTG-A
308 YD-5, GTG A GTG-A
309 YD-6, GTG A GTG-A
310 YD-7, GTG A GTG-A
311 YD-8, GTG A GTG-A
312 TD-1, GTG A GTG-A
313 FT-3025 GTG-B
314 GD-1, GTG-B GTG-B
315GD-2, GTG-B GTG-B
316 GD-3, GTG-B GTG-B
317 GD-4, GTG-B GTG-B
318 GD-7, GTG-B GTG-B
319 GD-8, GTG-B GTG-B
320 TV 3006 GTG-B
321 YD-5, GTG B GTG-B
322 YD-6, GTG B GTG-B
323 YD-7, GTG B GTG-B
324YD-8, GTG B GTG-B
325 TD-1, GTG B GTG-B
326 FT-3035 GTG-C
327 GD-1, GTG-C GTG-C
328 GD-2, GTG-C GTG-C
329 GD-3, GTG-C GTG-C
330 GD-4, GTG-C GTG-C
331 GD-7, GTG-C GTG-C
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 8/464
332 GD-8, GTG-C GTG-C
333 TV 3007 GTG-C
334 YD-5, GTG C GTG-C
335 YD-6, GTG C GTG-C
336 YD-7, GTG C GTG-C
337 YD-8, GTG C GTG-C
338 TD-1, GTG C GTG-C
339 FT-3001 Hot Water Loop
340 FT-3005 Hot Water Loop
341 FT-3006 Hot Water Loop
342 FT-3007 Hot Water Loop
343 FV 3001 Hot Water Loop
344 MOVP-3005 Hot Water Loop
345 MOVP-3006 Hot Water Loop
346 MOVP-3007 Hot Water Loop
347 MOVP-1500 HP PUMP
348 PSHH 1501 HP PUMP
349 PSL 1502 HP PUMP
350 PT-1500 HP Pump Discarege
351 TT-1501 HP-Pump
352PS-1 Control room
HVAC 1HVAC-MCR
353PS-1 Control room
HVAC 2HVAC-MCR
354 PS-2 Control roomHVAC 1
HVAC-MCR
355PS-2 Control room
HVAC 2HVAC-MCR
356 LT-6001 IW AND PW PLANT
357 MOVP-6001 IW AND PW PLANT
358 MOVP-6301 IW AND PW PLANT
359 MOVP-6302 IW AND PW PLANT
360 MOVP-6303 IW AND PW PLANT
361 MOVP-6304 IW AND PW PLANT
362 MOVP-6305 IW AND PW PLANT
363 MOVP-6306 IW AND PW PLANT
364 MOVP-6307 IW AND PW PLANT
365 MOVP-6308 IW AND PW PLANT
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 9/464
366 MOVP-6309 IW AND PW PLANT
367 MOVP-6310 IW AND PW PLANT
368 PSL 12013 JETTY
369 PSLL 12012 JETTY
370 AT 1801 Metering Station
371 MOVP-1800 Metering Station
372 MOVP-1810 Metering Station
373 MOVP-1820 Metering Station
374 MOVP-1830 Metering Station
375 MOVP-1860 Metering Station
376 PDT-1810 Metering Station
377 PDT-1820 Metering Station
378 PDT-1830 Metering Station
379 PT 1810 Metering Station
380 PT 1820 Metering Station
381 PT 1830 Metering Station
382 TT 1810 Metering Station
383 TT 1820 Metering Station
384 TT 1830 Metering Station
385 PT-1800 METERING-SENDOUT
386 PT-1851 METERING-U-114 GAS SAMPLER
387 FT-8000 N2 PLANT
388 FT-8104 N2 PLANT
389 FT-8108 N2 PLANT
390 FT-8112 N2 PLANT
391 FT-8115 N2 PLANT392 FT-8151 N2 PLANT
393 FV 8104 N2 PLANT
394 FV 8108 N2 PLANT
395 LT-8101 N2 PLANT
396 LT-8102 N2 PLANT
397 LT-8103 N2 PLANT
398 LV 8101 N2 PLANT
399 MOVP-8100A N2 PLANT
400 MOVP-8100B N2 PLANT
401 MOVP-8101A N2 PLANT
402 MOVP-8101B N2 PLANT
403 MOVP-8102A N2 PLANT
404 MOVP-8102B N2 PLANT
405 MOVP-8103 N2 PLANT
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 10/464
406 MOVP-8104 N2 PLANT
407 MOVP-8105 N2 PLANT
408 MOVP-8112 N2 PLANT
409 PDT-8106 N2 PLANT
410 PT-8000 N2 PLANT
411 PT-8101 N2 PLANT
412 PT-8102A N2 PLANT
413 PT-8102B N2 PLANT
414 PT-8104 N2 PLANT
415 PT-8107 N2 PLANT
416 PT-8108 N2 PLANT
417 PT-8110 N2 PLANT
418 PT-8112 N2 PLANT
419 PT-8113 N2 PLANT
420 PT-8114 N2 PLANT
421 PT-8115 N2 PLANT
422 PV 8113 N2 PLANT423 PV 8115 N2 PLANT
424 TT-8100 N2 PLANT
425 TT-8102 N2 PLANT
426 TT-8102A N2 PLANT
427 TT-8102B N2 PLANT
428 TT-8103A N2 PLANT
429 TT-8104 N2 PLANT
430 TT-8105 N2 PLANT
431 TT-8106 N2 PLANT
432 TT-8107 N2 PLANT
433 TT-8108 N2 PLANT
434 TT-8109 N2 PLANT
435 TT-8110 N2 PLANT
436 TT-8111 N2 PLANT
437 TT-8112 N2 PLANT
438 TT-8114 N2 PLANT
439 TT-8115 N2 PLANT
440 TT-8117 N2 PLANT
441 FT-1121 P-101A
442 FV-1121 P-101A
443 FV-1161 P-101A
444 MOVP-1122 P-101A
445 PT-1121 P-101A
446 PT-1124 P-101A
447 TT-1121 P-101A
448 FT-1131 P-101B
449 FV-1131 P-101B
450 FV-1171 P-101B
451 MOVP-1132 P-101B
452 PT-1131 P-101B
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 11/464
453 PT-1134 P-101B
454 TT-1131 P-101B
455 FT-1141 P-101C
456 FV-1141 P-101C
457 FV-1181 P-101C
458 MOVP-1142 P-101C
459 PT-1141 P-101C460 PT-1144 P-101C
461 TT-1141 P-101C
462 FT-1151 P-101D
463 FV-1151 P-101D
464 FV-1191 P-101D
465 MOVP-1152 P-101D
466 PT-1151 P-101D
467 PT-1154 P-101D
468 TT-1151 P-101D
469 FT-1221 P-102A
470 FV-1221 P-102A471 FV-1261 P-102A
472 MOVP-1222 P-102A
473 PT-1221 P-102A
474 PT-1224 P-102A
475 TT-1221 P-102A
476 FT-1231 P-102B
477 FV-1231 P-102B
478 FV-1271 P-102B
479 MOVP-1232 P-102B
480 PT-1231 P-102B481 PT-1234 P-102B
482 TT-1231 P-102B
483 FT-1241 P-102C
484 FV-1241 P-102C
485 FV-1281 P-102C
486 MOVP-1242 P-102C
487 PT-1241 P-102C
488 PT-1244 P-102C
489 TT-1241 P-102C
490 FT-1251 P-102D
491 FV-1251 P-102D
492 FV-1291 P-102D
493 MOVP-1252 P-102D
494 PT-1251 P-102D
495 PT-1254 P-102D
496 TT-1251 P-102D
497 FT-1510 P-104A
498 FV-1510 P-104A
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 12/464
499 FV-1511 P-104A
500 PT-1510 P-104A
501 PT-1512 P-104A
502 TT-1510 P-104A
503 TT-1511 P-104A
504 TT-1512 P-104A
505 FT-1520 P-104B
506 FV-1520 P-104B507 FV-1521 P-104B
508 PT-1520 P-104B
509 PT-1522 P-104B
510 TT-1520 P-104B
511 TT-1521 P-104B
512 TT-1522 P-104B
513 FT-1530 P-104C
514 FV-1530 P-104C
515 FV-1531 P-104C
516 PT-1530 P-104C
517PT-1532 P-104C
518 TT-1530 P-104C
519 TT-1531 P-104C
520 TT-1532 P-104C
521 FT-1540 P-104D
522 FV-1540 P-104D
523 FV-1541 P-104D
524 PT-1540 P-104D
525 PT-1542 P-104D
526 TT-1540 P-104D
527 TT-1541 P-104D
528 TT-1542 P-104D
529 FT-1550 P-104E
530 FV--1550 P-104E
531 FV-1551 P-104E
532 PT-1550 P-104E
533 PT-1552 P-104E
534 TT-1550 P-104E
535 TT-1551 P-104E
536 TT-1552 P-104E
537 TT-3001 P-303 A DISCHARGE
538 PT-6000 P-601A/B
539 MOVP-1004 Re-Circulation Line
540 MOVP-1005 Re-Circulation Line
541 MOVP-1014 Re-Circulation Line
542 MOVP-1015 Re-Circulation Line
543 MOVP-1018 Re-Circulation Line
544 FT-1440A RECONDENSER
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 13/464
545 FT-1441 RECONDENSER
546 FV 1440 B RECONDENSER
547 FV 1440A RECONDENSER
548 LT-1401 RECONDENSER
549 LT-1402 RECONDENSER
550 LT-1403 RECONDENSER
551 LT-1440 RECONDENSER552 LT-1441 RECONDENSER
553 LT-1442 RECONDENSER
554 MOVP-1441 RECONDENSER
555 MOVP-1442 RECONDENSER
556 MOVP-1443 RECONDENSER
557 PT-1441 RECONDENSER
558 PT-1442 RECONDENSER
559 PT-1444 RECONDENSER
560 PV 1442 RECONDENSER
561 PV 1444A RECONDENSER
562 PV 1444B RECONDENSER
563 PV 1444C RECONDENSER
564 TT-1404 RECONDENSER
565 TT-1440 RECONDENSER
566 TT-1441 RECONDENSER
567 TT-1442 RECONDENSER
568 TT-1444 RECONDENSER
569 FT-1301 Return Gas To Ship
570 MOVP-1301 Return Gas To Ship
571 MOVP-1302 Return Gas To Ship
572 MOVP-1303 Return Gas To Ship
573 MOVP-1304 Return Gas To Ship
574 MOVP-1310 Return Gas To Ship
575 MOVP-1320 Return Gas To Ship
576 MOVP-1330 Return Gas To Ship
577 PT-1301 Return Gas To Ship
578 PT-1302 Return Gas To Ship
579 PT-1303 Return Gas To Ship
580 PV 1302 Return Gas To Ship
581 TT-1301 Return Gas To Ship
582 TT-1302 Return Gas To Ship
583 TT-1303 Return Gas To Ship
584 TV 1302 Return Gas To Ship
585 BT-1771A SCV-A
586 BT-1772A SCV-A
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 14/464
587 FT-1700 SCV-A
588 FT-1771A SCV-A
589 FV 1700 SCV-A
590 FV 1778 A SCV-A
591 FV1791 A SCV-A
592 FV1792 A SCV-A
593 LT-1771A SCV-A594 LT-1772A SCV-A
595 MOVP-1701 SCV-A
596 MOVP-1702 SCV-A
597 MOVP-1703 SCV-A
598 PT-1700 SCV-A
599 PT-1771A SCV-A
600 PT-1775A SCV-A
601 PT-1781A SCV-A
602 PT-1784A SCV-A
603 PT-1790A SCV-A
604 PT-1791A SCV-A
605 PT-1795A SCV-A
606 TT-1700 SCV-A
607 TT-1702 SCV-A
608 TT-1771A SCV-A
609 TT-1772A SCV-A
610 TT-1773A SCV-A
611 TT-1774A SCV-A
612 TT-1775A SCV-A
613 TT-1778A SCV-A
614 V1771 A SCV-A
615 V1772 A SCV-A
616 V1773 A SCV-A
617 V1774 A SCV-A
618 V1775 A SCV-A
619 V1776 A SCV-A
620 V1777 A SCV-A
621 AT1781A SCV-A
622 BT-1771B SCV-B
623 BT-1772B SCV-B
624 FT-1710 SCV-B
625 FT-1771B SCV-B
626 FV 1710 SCV-B
627 FV 1778 B SCV-B
628 FV1791 B SCV-B
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 15/464
629 FV1792 B SCV-B
630 LT-1771B SCV-B
631 LT-1772B SCV-B
632 MOVP-1711 SCV-B
633 MOVP-1712 SCV-B
634 MOVP-1713 SCV-B
635 PT-1710 SCV-B
636 PT-1771B SCV-B
637 PT-1775B SCV-B
638 PT-1781B SCV-B
639 PT-1784B SCV-B
640 PT-1790B SCV-B
641 PT-1791B SCV-B
642 PT-1795B SCV-B
643 TT-1710 SCV-B
644 TT-1712 SCV-B
645 TT-1771B SCV-B646 TT-1772B SCV-B
647 TT-1773B SCV-B
648 TT-1774B SCV-B
649 TT-1775B SCV-B
650 TT-1778B SCV-B
651 V1771 B SCV-B
652 V1772 B SCV-B
653 V1773 B SCV-B
654 V1774 B SCV-B
655 V1775 B SCV-B
656 V1776 B SCV-B
657 V1777 B SCV-B
658 AT1781B SCV-B
659 MOVG-1800 SENDOUT LINE
660 PAL 1802 SENDOUT LINE
661 PSHH 1801A SENDOUT LINE
662 PSHH 1801B SENDOUT LINE
663 PSHH 1801C SENDOUT LINE664 TSD-101 SPILL DETECTOR
665 TSD-102 SPILL DETECTOR
666 TSD-103 SPILL DETECTOR
667 TSD-104 SPILL DETECTOR
668 TSD-105 SPILL DETECTOR
669 TSD-1201 SPILL DETECTOR
670 TSD-1202 SPILL DETECTOR
671 TSD-1203 SPILL DETECTOR
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 16/464
672 TSD-1204 SPILL DETECTOR
673 TSD-1205 SPILL DETECTOR
674 TSD-1206 SPILL DETECTOR
675 TSD-1207 SPILL DETECTOR
676 TSD-1208 SPILL DETECTOR
677 TSD-1209 SPILL DETECTOR
678 TSD-1210 SPILL DETECTOR
679 TSD-1211 SPILL DETECTOR680 TSD-1212 SPILL DETECTOR
681 TSD-201 SPILL DETECTOR
682 TSD-202 SPILL DETECTOR
683 TSD-203 SPILL DETECTOR
684 TSD-301 SPILL DETECTOR
685 TSD-302 SPILL DETECTOR
686 TSD-303 SPILL DETECTOR
687 TSD-304 SPILL DETECTOR
688 TSD-401 SPILL DETECTOR
689 TSD-402 SPILL DETECTOR
690TSD-403 SPILL DETECTOR
691 TSD-404 SPILL DETECTOR
692 TSD-501 SPILL DETECTOR
693 TSD-502 SPILL DETECTOR
694 TSD-801 SPILL DETECTOR
695 TSD-802 SPILL DETECTOR
696 TSD-803 SPILL DETECTOR
697 FT-1610 STV-A
698 FT-1611 STV-A
699 FT-1612 STV-A
700 FV-1610 STV-A
701 HIC-3613 STV-A
702 LT-3612 STV-A
703 MOVP-1611 STV-A
704 MOVP-1612 STV-A
705 MOVP-1613 STV-A
706 PSHH-3612 STV-A
707 PT-1610 STV-A
708 PT-1615 STV-A
709 PT-3618 STV-A
710 TT-1610 STV-A
711 TT-1611A STV-A712 TT-1611B STV-A
713 TT-1612 STV-A
714 TT-1613 STV-A
715 TT-1616 STV-A
716 TT-1617 STV-A
717 FT-1620 STV-B
718 FT-1621 STV-B
719 FT-1622 STV-B
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 17/464
720 FV-1620 STV-B
721 HIC-3623 STV-B
722 LT-3622 STV-B
723 MOVP-1621 STV-B
724 MOVP-1622 STV-B
725 MOVP-1623 STV-B
726 PSHH-3622 STV-B
727 PT-1620 STV-B
728 PT-1625 STV-B
729 PT-3628 STV-B
730 TT-1620 STV-B
731 TT-1621A STV-B
732 TT-1621B STV-B
733 TT-1622 STV-B
734 TT-1623 STV-B
735 TT-1626 STV-B
736 TT-1627 STV-B737 FT-1630 STV-C
738 FT-1631 STV-C
739 FT-1632 STV-C
740 FV-1630 STV-C
741 HIC-3633 STV-C
742 LT-3632 STV-C
743 MOVP-1631 STV-C
744 MOVP-1632 STV-C
745 MOVP-1633 STV-C
746 PSHH-3632 STV-C
747 PT-1630 STV-C
748 PT-1635 STV-C
749 PT-3638 STV-C
750 TT-1630 STV-C
751 TT-1631A STV-C
752 TT-1631B STV-C
753 TT-1632 STV-C
754 TT-1633 STV-C
755 TT-1636 STV-C
756 TT-1637 STV-C
757 FT-1640 STV-D758 FT-1641 STV-D
759 FT-1642 STV-D
760 FV-1640 STV-D
761 HIC-3643 STV-D
762 LT-3642 STV-D
763 MOVP-1641 STV-D
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 18/464
764 MOVP-1642 STV-D
765 MOVP-1643 STV-D
766 PSHH-3642 STV-D
767 PT-1640 STV-D
768 PT-1645 STV-D
769 PT-3648 STV-D
770 TT-1640 STV-D
771 TT-1641A STV-D
772 TT-1641B STV-D
773 TT-1642 STV-D
774 TT-1643 STV-D
775 TT-1646 STV-D
776 TT-1647 STV-D
777 FT-1650 STV-E
778 FT-1651 STV-E
779 FT-1652 STV-E
780 FV-1650 STV-E
781 HIC-3653 STV-E782 LT-3652 STV-E
783 MOVP-1651 STV-E
784 MOVP-1652 STV-E
785 MOVP-1653 STV-E
786 PSHH-3652 STV-E
787 PT-1650 STV-E
788 PT-1655 STV-E
789 PT-3658 STV-E
790TT-1650 STV-E
791 TT-1651A STV-E
792 TT-1651B STV-E
793 TT-1652 STV-E
794 TT-1653 STV-E
795 TT-1656 STV-E
796 TT-1657 STV-E
797 FT-1660 STV-F
798 FT-1661 STV-F
799 FT-1662 STV-F
800 FV-1660 STV-F
801 HIC-3663 STV-F
802 LT-3662 STV-F
803 MOVP-1661 STV-F
804 MOVP-1662 STV-F
805 MOVP-1663 STV-F
806 PSHH-3662 STV-F
807 PT-1660 STV-F
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 19/464
808 PT-1665 STV-F
809 PT-3668 STV-F
810 TT-1660 STV-F
811 TT-1661A STV-F
812 TT-1661B STV-F
813 TT-1662 STV-F
814 TT-1663 STV-F
815 TT-1666 STV-F816 TT-1667 STV-F
817 FT-1670 STV-G
818 FT-1671 STV-G
819 FT-1672 STV-G
820 FV-1670 STV-G
821 HIC-3673 STV-G
822 LT-3672 STV-G
823 MOVP-1671 STV-G
824 MOVP-1672 STV-G
825 MOVP-1673 STV-G
826 PSHH-3672 STV-G
827 PT-1670 STV-G
828 PT-1675 STV-G
829 PT-3678 STV-G
830 TT-1670 STV-G
831 TT-1671A STV-G
832 TT-1671B STV-G
833 TT-1672 STV-G
834 TT-1673 STV-G
835 TT-1676 STV-G
836 TT-1677 STV-G
837 FT-1101 T-101
838 HIC-1103 T-101
839 HIC-1104 T-101
840 HIC-1108 T-101
841 MOVP-1101 T-101
842 MOVP-1102 T-101
843 MOVP-1105 T-101
844 MOVP-1106 T-101
845 MOVP-1108 T-101
846 MOVP-1109 T-101
847 MOVP-1120 T-101
848 PT-1101 T-101
849 PT-1102 T-101
850 PT-1103 T-101
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 20/464
851 PT-1190 T-101
852 PV 1102 T-101
853 HIC-1203 T-102
854 HIC-1204 T-102
855 HIC-1208 T-102
856 MOVP-1201 T-102
857 MOVP-1202 T-102
858 MOVP-1205 T-102
859 MOVP-1206 T-102
860 MOVP-1208 T-102
861 MOVP-1209 T-102
862 MOVP-1220 T-102
863 PT-1201 T-102
864 PT-1202 T-102
865 PT-1203 T-102
866 LT-3001 T-301
867 LT-3005 T-310
868 TT-1851 U-114 GAS SAMPLER
869 MOVP-1001 ULA-A
870 MOVP-1008 ULA-A
871 PS-Perc ULA A ULA-A
872 PMS system checking ULA-A
873 LCP checking ULA-A
874 TT-1031 ULA-A
875 MOVP-1002 ULA-B
876 MOVP-1009 ULA-B
877 PS-Perc ULA B ULA-B
878 PMS system checking ULA-B
879 LCP checking ULA-B
880 TT-1032 ULA-B
881 MOVP-1003 ULA-C
882 MOVP-1010 ULA-C
883 PS-Perc ULA C ULA-C884 PMS system checking ULA-C
885 LCP checking ULA-C
886 TT-1033 ULA-C
887 PMS system checking ULA-NG
888 LCP checking ULA-NG
889 PS-Perc ULA-NG ULA-NG
890 HIC 1017 Unloading Line
891 HIC 1019 Unloading Line
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 21/464
892 PT-1006 Unloading Line
893 FT-1001 V-101
894 LT-1001 V-101
895 MOVP-1006 V-101
896 PT-1008 V-101
897 PV 1008 V-101
898 TT-1006 V-101899 PT-1910 V-902
900 TT-1910 V-902
901 PT-1920 V-903
902 TT-1920 V-903
903 TE-13003 SPILL DETECTOR
904 TE-13004 SPILL DETECTOR
905 TE-13005 SPILL DETECTOR
906 TE-13006 SPILL DETECTOR
907 TE-13007 SPILL DETECTOR
908 TE-13008 SPILL DETECTOR
909 TE-13009 SPILL DETECTOR
910 TE-13010 SPILL DETECTOR
911 TE-13011 SPILL DETECTOR
912 GSD-13001 GAS DETECTOR
913 GSD-13002 GAS DETECTOR
914 GSD-13003 GAS DETECTOR
915 GSD-13004 GAS DETECTOR
916 GSD-13005 GAS DETECTOR
917 GSD-13006 GAS DETECTOR
918 GSD-13007 GAS DETECTOR
919 PSHH-13005 TTLF
920 PT-13003 TTLF
921 PT-13004 TTLF922 TT-13001 TTLF
923 TT-13002 TTLF
924 FV-13001 TTLF
925 HCV-13003 TTLF
926 MOVP-13001 TTLF
927 MOVP-13002 TTLF
928 MOVP-13003 TTLF
929 LSH-13001 TTLF
930 FSD-UV-IR-1 FIRE DETECTOR
931 FSD-UV-IR-2 FIRE DETECTOR
932 Camera-12 CCTV SYSTEM
933 Camera-13 CCTV SYSTEM
934 Camera-14 CCTV SYSTEM
935 Camera-15 CCTV SYSTEM
936 Camera-16 CCTV SYSTEM
937 Camera-17 CCTV SYSTEM
938 Camera-18 CCTV SYSTEM
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 22/464
939 Camera-19 CCTV SYSTEM
940 FSDE-301 FIRE DETECTOR
941 FSDE-302 FIRE DETECTOR
942 FSDE-303 FIRE DETECTOR
943 FSDE-304 FIRE DETECTOR
944 FSDE-401 FIRE DETECTOR
945 FSDE-402 FIRE DETECTOR
946 FSDE-403 FIRE DETECTOR947 FSDE-404 FIRE DETECTOR
948 FSDE-602 FIRE DETECTOR
949 FSDE-603 FIRE DETECTOR
950 FSDE-604 FIRE DETECTOR
951 FSDE-605 FIRE DETECTOR
952 FSDE-606 FIRE DETECTOR
953 FSDE-701 FIRE DETECTOR
954 FSDE-702 FIRE DETECTOR
955 FSDE-901 FIRE DETECTOR
956 FSDE-1001 FIRE DETECTOR
957 FSDE-1002
FIRE DETECTOR958 FSDE-1003 FIRE DETECTOR
959 FSDE-1004 FIRE DETECTOR
960 FSDE-1101 FIRE DETECTOR
961 FSDE-1102 FIRE DETECTOR
962 FSDE-1202 FIRE DETECTOR
963 FSDE-1203 FIRE DETECTOR
964 FSD-10300 FIRE DETECTOR
965 FSD-10301 FIRE DETECTOR
966 FSD-10302 FIRE DETECTOR
967 FSD-10303 FIRE DETECTOR
968 GSDE-301 GAS DETECTOR
969 GSDE-302 GAS DETECTOR
970 GSDE-303 GAS DETECTOR
971 GSDE-304 GAS DETECTOR
972 GSDE-305 GAS DETECTOR
973 GSDE-306 GAS DETECTOR
974 GSDE-307 GAS DETECTOR
975 GSDE-308 GAS DETECTOR
976 GSDE-401 GAS DETECTOR
977 GSDE-402 GAS DETECTOR
978 GSDE-403 GAS DETECTOR
979 GSDE-404 GAS DETECTOR
980 GSDE-405
GAS DETECTOR981 GSDE-406 GAS DETECTOR
982 GSDE-407 GAS DETECTOR
983 GSDE-408 GAS DETECTOR
984 GSDE-606 GAS DETECTOR
985 GSDE-607 GAS DETECTOR
986 GSDE-608 GAS DETECTOR
987 GSDE-609 GAS DETECTOR
988 GSDE-610 GAS DETECTOR
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 23/464
989 GSDE-611 GAS DETECTOR
990 GSDE-701 GAS DETECTOR
991 GSDE-702 GAS DETECTOR
992 GSDE-703 GAS DETECTOR
993 GSDE-704 GAS DETECTOR
994 GSDE-705 GAS DETECTOR
995 GSDE-901 GAS DETECTOR
996 GSDE-902 GAS DETECTOR997 GSDE-1001 GAS DETECTOR
998 GSDE-1002 GAS DETECTOR
999 GSDE-1003 GAS DETECTOR
1000 GSDE-1004 GAS DETECTOR
1001 GSDE-1005 GAS DETECTOR
1002 GSDE-1006 GAS DETECTOR
1003 GSDE-1007 GAS DETECTOR
1004 GSDE-1008 GAS DETECTOR
1005 GSDE-1009 GAS DETECTOR
1006 GSDE-1010 GAS DETECTOR
1007 GSDE-1101
GAS DETECTOR1008 GSDE-1102 GAS DETECTOR
1009 GSDE-1103 GAS DETECTOR
1010 GSDE-1104 GAS DETECTOR
1011 GSDE-1105 GAS DETECTOR
1012 GSDE-1106 GAS DETECTOR
1013 GSDE-1107 GAS DETECTOR
1014 GSDE-1108 GAS DETECTOR
1015 GSDE-1109 GAS DETECTOR
1016 GSDE-1110 GAS DETECTOR
1017 GSDE-1205 GAS DETECTOR
1018 GSDE-1206 GAS DETECTOR
1019 GSDE-1207 GAS DETECTOR
1020 GSDE-1208 GAS DETECTOR
1021 GSDE-1209 GAS DETECTOR
1022 GSDE-1210 GAS DETECTOR
1023 GSDE-1211 GAS DETECTOR
1024 GSDE-1212 GAS DETECTOR
1025 GSDE-1213 GAS DETECTOR
1026 GSDE-1214 GAS DETECTOR
1027 TSDE-301 SPILL DETECTOR
1028 TSDE-302 SPILL DETECTOR
1029 TSDE-303 SPILL DETECTOR
1030 TSDE-304
SPILL DETECTOR1031 TSDE-401 SPILL DETECTOR
1032 TSDE-402 SPILL DETECTOR
1033 TSDE-403 SPILL DETECTOR
1034 TSDE-404 SPILL DETECTOR
1035 TSDE-701 SPILL DETECTOR
1036 TSDE-702 SPILL DETECTOR
1037 TSDE-1001 SPILL DETECTOR
1038 TSDE-1002 SPILL DETECTOR
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 24/464
1039 TSDE-1003 SPILL DETECTOR
1040 TSDE-1004 SPILL DETECTOR
1041 TSDE-1101 SPILL DETECTOR
1042 TSDE-1102 SPILL DETECTOR
1043 TSDE-1103 SPILL DETECTOR
1044 TSDE-1104 SPILL DETECTOR
1045 TSDE-1203 SPILL DETECTOR
1046 TSDE-1204 SPILL DETECTOR1047 TSDE-1205 SPILL DETECTOR
1048 TSDE-1206 SPILL DETECTOR
1049 TSDE-1207 SPILL DETECTOR
1050 TSDE-1208 SPILL DETECTOR
1051 TSDE-1209 SPILL DETECTOR
1052 TSDE-1210 SPILL DETECTOR
1053 TSDE-1211 SPILL DETECTOR
1054 TSDE-1212 SPILL DETECTOR
1055 PSHE-31 FIRE HYDRANT SYSTEM
1056 PSHE-41 FIRE HYDRANT SYSTEM
1057 PSHE-62
FIRE HYDRANT SYSTEM1058 PSHE-71 FIRE HYDRANT SYSTEM
1059 PSHE-101 FIRE HYDRANT SYSTEM
1060 PSHE-102 FIRE HYDRANT SYSTEM
1061 PSHE-111 FIRE HYDRANT SYSTEM
1062 PSHE-112 FIRE HYDRANT SYSTEM
1063 PSHE-122 FIRE HYDRANT SYSTEM
1064 PSHE-123 FIRE HYDRANT SYSTEM
1065 PSHE-160 FIRE HYDRANT SYSTEM
1066 PSHE-161 FIRE HYDRANT SYSTEM
1067 PSHE-162 FIRE HYDRANT SYSTEM
1068 PSHE-163 FIRE HYDRANT SYSTEM
1069 FTE-3015 GTG-D
1070 GD-1, GTG-D GTG-D
1071 GD-2, GTG-D GTG-D
1072 GD-3, GTG-D GTG-D
1073 GD-4, GTG-D GTG-D
1074 GD-9, GTG-D GTG-D
1075 GD-10, GTG-D GTG-D
1076 GD-6, GTG-D GTG-D
1077 GD-11, GTG-D GTG-D
1078 TVE-3005 GTG-D
1079 YD-5, GTG D GTG-D
1080 YD-6, GTG D GTG-D
1081 TD-1, GTG D GTG-D
1082 FTE-3025 GTG-E
1083 GD-1, GTG-E GTG-E
1084 GD-2, GTG-E GTG-E
1085 GD-3, GTG-E GTG-E
1086 GD-4, GTG-E GTG-E
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 25/464
1087 GD-9, GTG-E GTG-E
1088 GD-10, GTG-E GTG-E
1089 GD-6, GTG-E GTG-E
1090 GD-11, GTG-E GTG-E
1091 TVE-3006 GTG-E
1092 YD-5, GTG E GTG-E
1093 YD-6, GTG E GTG-E
1094 TD-1, GTG E GTG-E
1095 FT-E1121 P-103A
1096 FV-E 1121 P-103A
1097 FV-E 1161 P-103A
1098 MOVP-E1122 P-103A
1099 PT-E1121 P-103A
1100 PT-E1124 P-103A
1101 TT-E1121 P-103A
1102 FT-E1131 P-103B
1103 FV-E 1131 P-103B
1104 FV-E 1171 P-103B
1105 MOVP-E1132 P-103B
1106 PT-E1131 P-103B
1107 PT-E1134 P-103B
1108 TT-E1131 P-103B
1109 FT-E1141 P-103C
1110 FV-E 1141 P-103C
1111 FV-E 1181 P-103C
1112 MOVP-E1142 P-103C
1113 PT-E1141 P-103C
1114 PT-E1144 P-103C
1115 TT-E1141 P-103C
1116 FT-E1151 P-103D
1117 FV-E 1151 P-103D
1118 FV-E 1191 P-103D
1119 MOVP-E1152 P-103D
1120 PT-E1151 P-103D
1121 PT-E1154 P-103D
1122 TT-E1151 P-103D
1123
FT-E1221 P-106A1124 FV-E 1221 P-106A
1125 FV-E 1261 P-106A
1126 MOVP-E1222 P-106A
1127 PT-E1221 P-106A
1128 PT-E1224 P-106A
1129 TT-E1221 P-106A
1130 FT-E1231 P-106B
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 26/464
1131 FV-E 1231 P-106B
1132 FV-E 1271 P-106B
1133 MOVP-E1232 P-106B
1134 PT-E1231 P-106B
1135 PT-E1234 P-106B
1136 TT-E1231 P-106B
1137 FT-E1241 P-106C1138 FV-E 1241 P-106C
1139 FV-E 1281 P-106C
1140 MOVP-E1242 P-106C
1141 PT-E1241 P-106C
1142 PT-E1244 P-106C
1143 TT-E1241 P-106C
1144 FT-E1251 P-106D
1145 FV-E 1251 P-106D
1146 FV-E 1291 P-106D
1147 MOVP-E1252 P-106D
1148 PT-E1251 P-106D
1149 PT-E1254 P-106D
1150 TT-E1251 P-106D
1151 FT-E1510 P-105A
1152 FV-E 1510 P-105A
1153 FV-E 1511 P-105A
1154 PT-E1510 P-105A
1155 PT-E1512 P-105A
1156 TT-E1510 P-105A
1157 TT-E1511 P-105A
1158 TT-E1512 P-105A
1159 FT-E1520 P-105B
1160 FV-E 1520 P-105B
1161 FV-E 1521 P-105B
1162 PT-E1520 P-105B
1163 PT-E1522 P-105B
1164 TT-E1520 P-105B
1165 TT-E1521 P-105B
1166 TT-E1522 P-105B
1167 FT-E1530 P-105C
1168 FV-E 1530 P-105C
1169 FV-E 1531 P-105C
1170 PT-E1530 P-105C1171 PT-E1532 P-105C
1172 TT-E1530 P-105C
1173 TT-E1531 P-105C
1174 TT-E1532 P-105C
1175 FT-E1540 P-105D
1176 FV-E 1540 P-105D
1177 FV-E 1541 P-105D
1178 PT-E1540 P-105D
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 27/464
1179 PT-E1542 P-105D
1180 TT-E1540 P-105D
1181 TT-E1541 P-105D
1182 TT-E1542 P-105D
1183 FT-E1550 P-105E
1184 FV-E-E1550 P-105E
1185 FV-E 1551 P-105E
1186 PT-E1550 P-105E1187 PT-E1552 P-105E
1188 TT-E1550 P-105E
1189 TT-E1551 P-105E
1190 TT-E1552 P-105E
1191 FT-E1610 STVE-A
1192 FT-E1611 STVE-A
1193 FT-E1612 STVE-A
1194 FV-E1610 STVE-A
1195 HIC-E3613 STVE-A
1196 LT-E3612 STVE-A
1197 MOVP-E1611 STVE-A
1198 MOVP-E1612 STVE-A
1199 MOVP-E1613 STVE-A
1200 PSHH-E3612 STVE-A
1201 PT-E1610 STVE-A
1202 PT-E1615 STVE-A
1203 PT-E3618 STVE-A
1204 TT-E1610 STVE-A
1205 TT-E1611A STVE-A
1206 TT-E1611B STVE-A
1207 TT-E1612 STVE-A
1208 TT-E1613 STVE-A
1209 TT-E1616 STVE-A
1210 TT-E1617 STVE-A
1211 TT-E1618 STVE-A
1212 FT-E1620 STVE-B
1213 FT-E1621 STVE-B
1214 FT-E1622 STVE-B
1215 FV-E1620 STVE-B
1216 HIC-E3623 STVE-B
1217 LT-E3622 STVE-B
1218 MOVP-E1621 STVE-B
1219 MOVP-E1622 STVE-B
1220 MOVP-E1623 STVE-B
1221 PSHH-E3622 STVE-B
1222 PT-E1620 STVE-B
1223 PT-E1625 STVE-B
1224 PT-E3628 STVE-B
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 28/464
1225 TT-E1620 STVE-B
1226 TT-E1621A STVE-B
1227 TT-E1621B STVE-B
1228 TT-E1622 STVE-B
1229 TT-E1623 STVE-B
1230 TT-E1626 STVE-B
1231 TT-E1627 STVE-B
1232 TT-E1628 STVE-B1233 FT-E1630 STVE-C
1234 FT-E1631 STVE-C
1235 FT-E1632 STVE-C
1236 FV-E1630 STVE-C
1237 HIC-E3633 STVE-C
1238 LT-E3632 STVE-C
1239 MOVP-E1631 STVE-C
1240 MOVP-E1632 STVE-C
1241 MOVP-E1633 STVE-C
1242 PSHH-E3632 STVE-C
1243 PT-E1630 STVE-C
1244 PT-E1635 STVE-C
1245 PT-E3638 STVE-C
1246 TT-E1630 STVE-C
1247 TT-E1631A STVE-C
1248 TT-E1631B STVE-C
1249 TT-E1632 STVE-C
1250 TT-E1633 STVE-C
1251 TT-E1636 STVE-C
1252 TT-E1637 STVE-C
1253 TT-E1638 STVE-C
1254 FT-E1640 STVE-D
1255 FT-E1641 STVE-D
1256 FT-E1642 STVE-D
1257 FV-E1640 STVE-D
1258 HIC-E3643 STVE-D
1259 LT-E3642 STVE-D
1260 MOVP-E1641 STVE-D
1261 MOVP-E1642 STVE-D
1262 MOVP-E1643 STVE-D
1263 PSHH-E3642 STVE-D
1264 PT-E1640 STVE-D
1265 PT-E1645 STVE-D
1266 PT-E3648 STVE-D
1267 TT-E1640 STVE-D
1268 TT-E1641A STVE-D
1269 TT-E1641B STVE-D
1270 TT-E1642 STVE-D
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 29/464
1271 TT-E1643 STVE-D
1272 TT-E1646 STVE-D
1273 TT-E1647 STVE-D
1274 TT-E1648 STVE-D
1275 FT-E1650 STVE-E
1276 FT-E1651 STVE-E
1277 FT-E1652 STVE-E
1278 FV-E1650 STVE-E1279 HIC-E3653 STVE-E
1280 LT-E3652 STVE-E
1281 MOVP-E1651 STVE-E
1282 MOVP-E1652 STVE-E
1283 MOVP-E1653 STVE-E
1284 PSHH-E3652 STVE-E
1285 PT-E1650 STVE-E
1286 PT-E1655 STVE-E
1287 PT-E3658 STVE-E1288 TT-E1650 STVE-E
1289 TT-E1651A STVE-E
1290 TT-E1651B STVE-E
1291 TT-E1652 STVE-E
1292 TT-E1653 STVE-E
1293 TT-E1656 STVE-E
1294 TT-E1657 STVE-E
1295 TT-E1658 STVE-E
1296 FT-E1660 STVE-F
1297 FT-E1661 STVE-F
1298 FT-E1662 STVE-F
1299 FV-E1660 STVE-F
1300 HIC-E3663 STVE-F
1301 LT-E3662 STVE-F
1302 MOVP-E1661 STVE-F
1303 MOVP-E1662 STVE-F
1304 MOVP-E1663 STVE-F
1305 PSHH-E3662 STVE-F
1306 PT-E1660 STVE-F
1307 PT-E1665 STVE-F
1308 PT-E3668 STVE-F1309 TT-E1660 STVE-F
1310 TT-E1661A STVE-F
1311 TT-E1661B STVE-F
1312 TT-E1662 STVE-F
1313 TT-E1663 STVE-F
1314 TT-E1666 STVE-F
1315 TT-E1667 STVE-F
1316 TT-E1668 STVE-F
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 30/464
1317 FT-E1670 STVE-G
1318 FT-E1671 STVE-G
1319 FT-E1672 STVE-G
1320 FV-E1670 STVE-G
1321 HIC-E3673 STVE-G
1322 LT-E3672 STVE-G
1323 MOVP-E1671 STVE-G
1324 MOVP-E1672 STVE-G
1325 MOVP-E1673 STVE-G
1326 PSHH-E3672 STVE-G
1327 PT-E1670 STVE-G
1328 PT-E1675 STVE-G
1329 PT-E3678 STVE-G
1330 TT-E1670 STVE-G
1331 TT-E1671A STVE-G
1332 TT-E1671B STVE-G
1333 TT-E1672 STVE-G1334 TT-E1673 STVE-G
1335 TT-E1676 STVE-G
1336 TT-E1677 STVE-G
1337 TT-E1678 STVE-G
1338 FT-E1101 T-103
1339 HIC-E1103 T-103
1340 HIC-E1104 T-103
1341 HIC-E1108 T-103
1342 MOVP-E1101 T-103
1343 MOVP-E1102 T-103
1344 MOVP-E1105 T-103
1345 MOVP-E1106 T-103
1346 MOVP-E1108 T-103
1347 MOVP-E1109 T-103
1348 MOVP-E1120 T-103
1349 PT-E1101 T-103
1350 PT-E1102 T-103
1351 PT-E1103 T-1031352 PT-E1190 T-103
1353 PV-E1102 T-103
1354 HIC-E1203 T-106
1355 HIC-E1204 T-106
1356 HIC-E1208 T-106
1357 MOVP-E1201 T-106
1358 MOVP-E1202 T-106
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 31/464
1359 MOVP-E1205 T-106
1360 MOVP-E1206 T-106
1361 MOVP-E1208 T-106
1362 MOVP-E1209 T-106
1363 MOVP-E1220 T-106
1364 PT-E1201 T-106
1365 PT-E1202 T-106
1366 PT-E1203 T-106
1367 TT-E1683 E-109 NG OUTLET
1368 FT-E1682 E-109 GLYCOL WATER INLET(BOTTOM)
1369 PT-E1685 E-109 SHELL SIDE
1370 TT-E1687 E-109 GW OUTLET
1371 TT-E1681A E-109 GW SHELL TOP SIDE
1372 TT-E1681B E-109 GW SHELL BOTTOM SIDE
1373 PT-E1680 E-109 NG OUTLET1374 TT-E1682 E-109 NG OUTLET
1375 TT-E1688 E-109 NG OUTLET
1376 TT-E1680 E-109 NG OUTLET
1377 FT-E1680 E-109 NG OUTLET
1378 FT-E3041 E-340D OPEN LOOP HW OUTLET
1379 TT-E3045 E-340D HW OUTLET
1380 TT-E3046 E-340D OPEN LOOP HW OUTLET
1381 FT-E3042 E-340E OPEN LOOP HW OUTLET
1382 TT-E3047 E-340E HW OUTLET
1383 TT-E3048 E-340E OPEN LOOP HW OUTLET
1384 PT-E3049 V-305
1385 LT-E3012 V-305
1386 TT-E3050 E-340E HW OUTLET
1387 MOVP-E3011 HW LOOP FOR E-109
1388 MOVP-E3012 HW LOOP FOR E-109
1389 MOVP-E3013 HW LOOP FOR E-109
1390 MOVP-E1681 E-109
1391 MOVP-E1682 E-109
1392 MOVP-E1683 E-109
1393 HIC-E3013 HW LOOP FOR E-109
1394 FV-E1680 E-109
1395 HIC-E3683 E-109
1396 PSHH-E3682 E-109
1397 PSHH-E3046 HW LOOP FOR E-109
1398 LT-E3688 E-109
1399 TT-E3651 ATMOSPHERIC
1400 TT-E3652 ATMOSPHERIC
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 32/464
1401 PT-E1800 NG SEND OUT
1402 PT-E1805 NG SEND OUT
1403 FT-E3015 GTG-D
1404 PT-E3010 GTG-D
1405 PT-E3301D GTG-D
1406 TT-E3010 GTG-D
1407 TT-E3011 GTG-D
1408 FT-E3025 GTG-E1409 PT-E3020 GTG-E
1410 TT-E3020 GTG-E
1411 TT-E3021 GTG-E
1412 PT-E3301E GTG-E
1413 FT-E1700 SCVE-A
1414 FT-E1771A SCVE-A
1415 FV-E 1700 SCVE-A
1416 FV-E 1778 A SCVE-A
1417 LT-E1771A SCVE-A
1418 LT-E1772A SCVE-A
1419 MOVP-E1701 SCVE-A
1420 MOVP-E1702 SCVE-A
1421 MOVP-E1703 SCVE-A
1422 PT-E1700 SCVE-A
1423 PT-E1771A SCVE-A
1424 PT-E1775A SCVE-A
1425 PT-E1781A SCVE-A
1426 PT-E1784A SCVE-A
1427 PT-E1790A SCVE-A
1428 PT-E1791A SCVE-A1429 PT-E1795A SCVE-A
1430 TT-E1700 SCVE-A
1431 TT-E1702 SCVE-A
1432 TT-E1771A SCVE-A
1433 TT-E1772A SCVE-A
1434 TT-E1773A SCVE-A
1435 TT-E1774A SCVE-A
1436 TT-E1775A SCVE-A
1437 TT-E1778A SCVE-A
1438 V-E1771 A SCVE-A
1439 V-E1772 A SCVE-A
1440 V-E1773 A SCVE-A
1441 V-E1774 A SCVE-A
1442 V-E1775 A SCVE-A
1443 V-E1776 A SCVE-A
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 33/464
1444 V-E1777 A SCVE-A
1445 AT-E1781A SCVE-A
1446 FT-E1710 SCVE-B
1447 FT-E1771B SCVE-B
1448 FV-E 1710 SCVE-B
1449 FV-E 1778 B SCVE-B
1450 LT-E1771B SCVE-B1451 LT-E1772B SCVE-B
1452 MOVP-E1711 SCVE-B
1453 MOVP-E1712 SCVE-B
1454 MOVP-E1713 SCVE-B
1455 PT-E1710 SCVE-B
1456 PT-E1771B SCVE-B
1457 PT-E1775B SCVE-B
1458 PT-E1781B SCVE-B
1459 PT-E1784B SCVE-B
1460 PT-E1790B SCVE-B
1461 PT-E1791B SCVE-B
1462 PT-E1795B SCVE-B
1463 TT-E1710 SCVE-B
1464 TT-E1712 SCVE-B
1465 TT-E1771B SCVE-B
1466 TT-E1772B SCVE-B
1467 TT-E1773B SCVE-B
1468 TT-E1774B SCVE-B
1469 TT-E1775B SCVE-B
1470 TT-E1778B SCVE-B
1471 V-E1771 B SCVE-B
1472 V-E1772 B SCVE-B
1473 V-E1773 B SCVE-B
1474 V-E1774 B SCVE-B
1475 V-E1775 B SCVE-B
1476 V-E1776 B SCVE-B
1477 V-E1777 B SCVE-B
1478 AT-E1781B SCVE-B
1479 AT-E1801 PH-II Metering Station
1480 MOVP-E1810 PH-II Metering Station
1481 MOVP-E1820 PH-II Metering Station
1482 MOVP-E1830 PH-II Metering Station
1483 MOVP-E1860 PH-II Metering Station
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 34/464
1484 PDT-E1810 PH-II Metering Station
1485 PDT-E1820 PH-II Metering Station
1486 PDT-E1830 PH-II Metering Station
1487 PT-E1810 PH-II Metering Station
1488 PT-E1820 PH-II Metering Station
1489 PT-E1830 PH-II Metering Station
1490 TT-E1810 PH-II Metering Station
1491 TT-E1820 PH-II Metering Station1492 TT-E1830 PH-II Metering Station
1493 MOVG-E1800 SENDOUT LINE
1494 PAL-E1802 SENDOUT LINE
1495 PSHH-E1801A SENDOUT LINE
1496 PSHH-E1801B SENDOUT LINE
1497 PSHH-E1801C SENDOUT LINE
1498 AT-1871 GSPL Metering Station
1499 PT-1870 GSPL Metering Station
1500 TT-1870 GSPL Metering Station
1501 TT-1104 T-101 NG under suspended deck
1502TT-1105 T-101 NG above suspended deck
1503 TT-2250 E-201 Tubesheet Overtemperature
1504 TT-2251AE-201 Element High-High
Overtemperature
1505 TT-2251BE-201 Element High-High
Overtemperature
1506 TT-3651 Atmospheric Temperature
1507 TT-3652 Atmospheric Temperature
1508 TV-E3682 E-350 HW Outlet
1509 TV-E3691 Chilled water supply to E-351
1510 FT-E1002 Unloading line recirculation flow
1511 FT-E3613 E-351 GW Outlet1512 FT-E3614 P-308A/B CHW Discharge
1513 FT-E7103 New Cooling Tower Water
1514 LT-E8120 Liquid Nitrogen Tank
1515 LT-E3005 T-330
1516 LT-E3006 T-330
1517 LT-E3012 V-305
1518 LT-E3683 V-304
1519 LT-E3686 T-303
1520 PSHH-E1501 HP Pump LNG Inlet Pressure
1521 PSL-E1502 HP Pump LNG Inlet Pressure
1522 PT-E1500 HP pump discharge header pressure
1523 PT-E1801 U-103 metering
1524 PT-E1851 U-115 sampling unit pressure
1525 PT-E1860 U-103A Metering prover run Pressure
1526 PT-E3691 V-306
1527 PT-E7103 New Cooling Tower Water
1528 PT-E8120 Liquid Nitrogen Tank
1529 TT-E1204 T-104 NG under suspended deck
1530 TT-E1205 T-104 NG above suspended deck
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 35/464
1531 TT-E1501 P-105 LNG sunction drain
1532 TT-E1851 U-115 Sampling Unit NG
1533 TT-E7103 New Cooling Tower Water
1534 TT-E1104 T-103 NG above suspended deck
1535 TT-E1105 T-103 NG above suspended deck
1536 FCVE-7051A New Air Dryer-A
1537 PDSE-7051A New Air Dryer-A1538 FTE-7051A New Air Dryer-A
1539 FWV-01A New Air Dryer-A
1540 FWV-02A New Air Dryer-A
1541 FWV-03A New Air Dryer-A
1542 TTE-7051A New Air Dryer-A
1543 TTE-7052A New Air Dryer-A
1544 TTE-7053A New Air Dryer-A
1545 FCVE-7051B New Air Dryer-B
1546 PDSE-7051B New Air Dryer-B
1547 FTE-7051B New Air Dryer-B
1548 FWV-01 New Air Dryer-B
1549 FWV-02 New Air Dryer-B
1550 FWV-03 New Air Dryer-B
1551 TTE-7051B New Air Dryer-B
1552 TTE-7052B New Air Dryer-B
1553 TTE-7053B New Air Dryer-B
1554 GSD-1870A GAS DETECTOR
1555 GSD-1870B GAS DETECTOR
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 36/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 37/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 38/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 39/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 40/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 41/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 42/464
PM plan Description ACTIVITY PM Cycle UnitOrder
Type
Calibration of FT-7000 Calibration Yes 48 Month PM 05
Preventive Maintenance of MOVP-7000 PreventiveMaintenance
Yes 12 Month PM 01
Calibration of PT-7000 Calibration Yes 48 Month PM 05
Calibration of PT-7003 Calibration Yes 24 Month PM 05
Calibration of AE-3001-CO Calibration Yes 4 Month PM 05
Calibration of AE-3001-NOX Calibration Yes 4 Month PM 05
Calibration of AE-3001-SO2 Calibration Yes 4 Month PM 05
Calibration of AT 8100 Calibration Yes 4 Month PM 05
Calibration of AT 8101 Calibration Yes 4 Month PM 05
Calibration of Hydraulic unit PS-1 Calibration Yes 6 Month PM 05
Calibration of Hydraulic unit PS-2 Calibration Yes 6 Month PM 05
Calibration of PT-1085 Calibration Yes 24 Month PM 05
Calibration of PT-1401 Calibration Yes 48 Month PM 05
Calibration of PV 1085 Calibration Yes 12 Month PM 05
Calibration of PV 1103 Calibration Yes 12 Month PM 05
Calibration of TT-1401 Calibration Yes 24 Month PM 05
Calibration of DPT 1453 Calibration Yes 48 Month PM 05
Calibration of HIC 1412 Calibration Yes 12 Month PM 05
Calibration of PSHH 1451 Calibration Yes 6 Month PM 05
Calibration of PSLL 1452 Calibration Yes 6 Month PM 05
Calibration of PSLL 1455 Calibration Yes 6 Month PM 05
Calibration of PSLL 1456 Calibration Yes 6 Month PM 05
Calibration of PSLL 1457 Calibration Yes 6 Month PM 05
Calibration of PSLL 1458 Calibration Yes 6 Month PM 05Calibration of PT-1450 Calibration Yes 48 Month PM 05
Calibration of PT-1451 Calibration Yes 24 Month PM 05
Calibration of PT-1452 Calibration Yes 24 Month PM 05
Calibration of PT-1453 Calibration Yes 48 Month PM 05
Calibration of PT-1455 Calibration Yes 24 Month PM 05
Calibration of TT-1450 Calibration Yes 24 Month PM 05
Calibration of TT-1451A Calibration Yes 24 Month PM 05
Calibration of TT-1451B Calibration Yes 24 Month PM 05
Calibration of TT-1452 Calibration Yes 24 Month PM 05
Calibration of TT-1453A Calibration Yes 24 Month PM 05
Calibration of TT-1453B Calibration Yes 24 Month PM 05
Calibration of TT-1455 Calibration Yes 24 Month PM 05
Calibration of DPT 1463 Calibration Yes 48 Month PM 05
Calibration of HIC 1422 Calibration Yes 12 Month PM 05
Calibration of PSHH 1461 Calibration Yes 6 Month PM 05
Calibration of PSLL 1462 Calibration Yes 6 Month PM 05
Calibration of PSLL 1465 Calibration Yes 6 Month PM 05
Calibration of PSLL 1466 Calibration Yes 6 Month PM 05
Calibration of PSLL 1467 Calibration Yes 6 Month PM 05
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 43/464
Calibration of PSLL 1468 Calibration Yes 6 Month PM 05
Calibration of PT-1460 Calibration Yes 48 Month PM 05
Calibration of PT-1461 Calibration Yes 24 Month PM 05
Calibration of PT-1462 Calibration Yes 24 Month PM 05
Calibration of PT-1463 Calibration Yes 48 Month PM 05
Calibration of PT-1465 Calibration Yes 24 Month PM 05
Calibration of TT-1460 Calibration Yes 24 Month PM 05
Calibration of TT-1461A Calibration Yes 24 Month PM 05
Calibration of TT-1461B Calibration Yes 24 Month PM 05
Calibration of TT-1462 Calibration Yes 24 Month PM 05
Calibration of TT-1463A Calibration Yes 24 Month PM 05
Calibration of TT-1463B Calibration Yes 24 Month PM 05
Calibration of TT-1465 Calibration Yes 24 Month PM 05
Calibration of DPT 1473 Calibration Yes 48 Month PM 05
Calibration of HIC 1432 Calibration Yes 12 Month PM 05
Calibration of PSHH 1471 Calibration Yes 6 Month PM 05
Calibration of PSLL 1477 Calibration Yes 6 Month PM 05
Calibration of PSLL 1472 Calibration Yes 6 Month PM 05
Calibration of PSLL 1475 Calibration Yes 6 Month PM 05Calibration of PSLL 1476 Calibration Yes 6 Month PM 05
Calibration of PSLL 1478 Calibration Yes 6 Month PM 05
Calibration of PT-1470 Calibration Yes 48 Month PM 05
Calibration of PT-1471 Calibration Yes 24 Month PM 05
Calibration of PT-1472 Calibration Yes 24 Month PM 05
Calibration of PT-1473 Calibration Yes 48 Month PM 05
Calibration of PT-1475 Calibration Yes 24 Month PM 05
Calibration of TT-1470 Calibration Yes 24 Month PM 05
Calibration of TT-1471A Calibration Yes 24 Month PM 05
Calibration of TT-1471B Calibration Yes 24 Month PM 05
Calibration of TT-1472 Calibration Yes 24 Month PM 05
Calibration of TT-1473A Calibration Yes 24 Month PM 05
Calibration of TT-1473B Calibration Yes 24 Month PM 05
Calibration of TT-1475 Calibration Yes 24 Month PM 05
Preventive Maintenance of Camera-1 Checking Yes 6 Month PM 01
Preventive Maintenance of Camera-10 Checking Yes 6 Month PM 01
Preventive Maintenance of Camera-11 Checking Yes 6 Month PM 01
Preventive Maintenance of Camera-2 Checking Yes 6 Month PM 01
Preventive Maintenance of Camera-3 Checking Yes 6 Month PM 01
Preventive Maintenance of Camera-4 Checking Yes 6 Month PM 01
Preventive Maintenance of Camera-5 Checking Yes 6 Month PM 01
Preventive Maintenance of Camera-6 Checking Yes 6 Month PM 01
Preventive Maintenance of Camera-7 Checking Yes 6 Month PM 01Preventive Maintenance of Camera-8 Checking Yes 6 Month PM 01
Preventive Maintenance of Camera-9 Checking Yes 6 Month PM 01
Calibration of TV 1401 Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-1444Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1450Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1460Preventive
MaintenanceYes 12 Month PM 01
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 44/464
Preventive Maintenance of MOVP-1470Preventive
MaintenanceYes 12 Month PM 01
Calibration of LT-1910 Calibration Yes 24 Month PM 05
Calibration of LT-1920 Calibration Yes 24 Month PM 05
Calibration of TT-3005 Calibration Yes 24 Month PM 05
Calibration of TT-3009 Calibration Yes 24 Month PM 05
Calibration of TT-3006 Calibration Yes 24 Month PM 05
Calibration of TT-3007 Calibration Yes 24 Month PM 05Calibration of TT-3002 Calibration Yes 24 Month PM 05
Calibration of TT-3003 Calibration Yes 24 Month PM 05
Calibration of TT-3004 Calibration Yes 24 Month PM 05
Preventive Maintenance of MOVP-12001Preventive
MaintenanceYes 12 Month PM 01
Calibration of PT-10250 Calibration Yes 48 Month PM 05
Calibration of PT-10251 Calibration Yes 24 Month PM 05
Preventive Maintenanc of FSD-1001 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-1002 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-101 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-102 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-103 Checking Yes 4 Month PM 01Preventive Maintenanc of FSD-104 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-1101 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-1102 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-1103 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-1201 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-1202 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-1203 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-1301 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-201 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-301 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-302 Checking Yes 4 Month PM 01Preventive Maintenanc of FSD-303 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-304 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-401 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-402 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-403 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-404 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-501 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-502 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-503 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-601 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-602 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-603 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-604 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-605 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-606 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-701 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-702 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-801 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-901 Checking Yes 4 Month PM 01
Preventive Maintenanc of FSD-902 Checking Yes 4 Month PM 01
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 45/464
Calibration of PSH 101 Calibration Yes 6 Month PM 05
Calibration of PSH 102 Calibration Yes 6 Month PM 05
Calibration of PSH 11 Calibration Yes 6 Month PM 05
Calibration of PSH 111 Calibration Yes 6 Month PM 05
Calibration of PSH 12 Calibration Yes 6 Month PM 05
Calibration of PSH 121 Calibration Yes 6 Month PM 05
Calibration of PSH 122 Calibration Yes 6 Month PM 05
Calibration of PSH 123 Calibration Yes 6 Month PM 05
Calibration of PSH 150 Calibration Yes 6 Month PM 05
Calibration of PSH 160 Calibration Yes 6 Month PM 05
Calibration of PSH 161 Calibration Yes 6 Month PM 05
Calibration of PSH 21 Calibration Yes 6 Month PM 05
Calibration of PSH 22A Calibration Yes 6 Month PM 05
Calibration of PSH 22B Calibration Yes 6 Month PM 05
Calibration of PSH 31 Calibration Yes 6 Month PM 05
Calibration of PSH 41 Calibration Yes 6 Month PM 05
Calibration of PSH 51 Calibration Yes 6 Month PM 05
Calibration of PSH 52 Calibration Yes 6 Month PM 05
Calibration of PSH 61 Calibration Yes 6 Month PM 05Calibration of PSH 62 Calibration Yes 6 Month PM 05
Calibration of PSH 71 Calibration Yes 6 Month PM 05
Calibration of PSH 81 Calibration Yes 6 Month PM 05
Calibration of PSH 82A Calibration Yes 6 Month PM 05
Calibration of PSH 82B Calibration Yes 6 Month PM 05
Calibration of PSL 10300 Calibration Yes 6 Month PM 05
Calibration of PSL 10301 Calibration Yes 6 Month PM 05
Calibration of PSL 10302 Calibration Yes 6 Month PM 05
Calibration of PSL 10303 Calibration Yes 6 Month PM 05
Calibration of PSL 10304 Calibration Yes 6 Month PM 05
Calibration of PSL 10305 Calibration Yes 6 Month PM 05
Calibration of PV 10251 Calibration Yes 12 Month PM 05
Calibration of PAL 1906 Calibration Yes 6 Month PM 05
Calibration of TT-9001A Calibration Yes 24 Month PM 05
Calibration of TT-9001B Calibration Yes 24 Month PM 05
Calibration of TT-9001C Calibration Yes 24 Month PM 05
Preventive Maintenance of MOVP-2100Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-2201APreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-2201BPreventive
MaintenanceYes 12 Month PM 01
Calibration of PSHH 2004 Calibration Yes 6 Month PM 05
Calibration of PSHH 2201 Calibration Yes 6 Month PM 05Calibration of PT-1860 Calibration Yes 24 Month PM 05
Calibration of PT-2001 Calibration Yes 48 Month PM 05
Calibration of PT-2100 Calibration Yes 24 Month PM 05
Calibration of PT-2200 Calibration Yes 24 Month PM 05
Calibration of TT-1860 Calibration Yes 24 Month PM 05
Calibration of TT-2001 Calibration Yes 24 Month PM 05
Calibration of TT-2002 Calibration Yes 24 Month PM 05
Calibration of TT-2100 Calibration Yes 24 Month PM 05
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 46/464
Calibration of TT-3010 Calibration Yes 24 Month PM 05
Calibration of TT-3011 Calibration Yes 24 Month PM 05
Calibration of TT-3020 Calibration Yes 24 Month PM 05
Calibration of TT-3021 Calibration Yes 24 Month PM 05
Calibration of TT-3030 Calibration Yes 24 Month PM 05
Calibration of TT-3031 Calibration Yes 24 Month PM 05
Calibration of PT-1350 Calibration Yes 48 Month PM 05
Calibration of PT-1352 Calibration Yes 48 Month PM 05
Calibration of PT-1354 Calibration Yes 48 Month PM 05
Calibration of PT-1356 Calibration Yes 48 Month PM 05
Calibration of TT-1355 Calibration Yes 24 Month PM 05
Calibration of TT-1357 Calibration Yes 24 Month PM 05
Calibration of GSD-1001 Calibration Yes 4 Month PM 05
Calibration of Calibration of GSD-1002 Calibration Yes 4 Month PM 05
Calibration of Calibration of GSD-1003 Calibration Yes 4 Month PM 05
Calibration of Calibration of GSD-1004 Calibration Yes 4 Month PM 05
Calibration of Calibration of GSD-1005 Calibration Yes 4 Month PM 05
Calibration of Calibration of GSD-1006 Calibration Yes 4 Month PM 05
Calibration of Calibration of GSD-1007 Calibration Yes 4 Month PM 05Calibration of GSD-1008 Calibration Yes 4 Month PM 05
Calibration of GSD-101 Calibration Yes 4 Month PM 05
Calibration of GSD-102 Calibration Yes 4 Month PM 05
Calibration of GSD-103 Calibration Yes 4 Month PM 05
Calibration of GSD-104 Calibration Yes 4 Month PM 05
Calibration of GSD-106 Calibration Yes 4 Month PM 05
Calibration of GSD-107 Calibration Yes 4 Month PM 05
Calibration of GSD-108 Calibration Yes 4 Month PM 05
Calibration of GSD-109 Calibration Yes 4 Month PM 05
Calibration of GSD-110 Calibration Yes 4 Month PM 05
Calibration of GSD-1101 Calibration Yes 4 Month PM 05
Calibration of GSD-1102 Calibration Yes 4 Month PM 05
Calibration of GSD-1103 Calibration Yes 4 Month PM 05
Calibration of GSD-1104 Calibration Yes 4 Month PM 05
Calibration of GSD-1105 Calibration Yes 4 Month PM 05
Calibration of GSD-1106 Calibration Yes 4 Month PM 05
Calibration of GSD-1107 Calibration Yes 4 Month PM 05
Calibration of GSD-1108 Calibration Yes 4 Month PM 05
Calibration of GSD-1109 Calibration Yes 4 Month PM 05
Calibration of GSD-111 Calibration Yes 4 Month PM 05
Calibration of GSD-1110 Calibration Yes 4 Month PM 05
Calibration of GSD-112 Calibration Yes 4 Month PM 05
Calibration of GSD-1201 Calibration Yes 4 Month PM 05Calibration of GSD-1202 Calibration Yes 4 Month PM 05
Calibration of GSD-1203 Calibration Yes 4 Month PM 05
Calibration of GSD-1204 Calibration Yes 4 Month PM 05
Calibration of GSD-1205 Calibration Yes 4 Month PM 05
Calibration of GSD-1206 Calibration Yes 4 Month PM 05
Calibration of GSD-1207 Calibration Yes 4 Month PM 05
Calibration of GSD-1208 Calibration Yes 4 Month PM 05
Calibration of GSD-1209 Calibration Yes 4 Month PM 05
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 47/464
Calibration of GSD-1210 Calibration Yes 4 Month PM 05
Calibration of GSD-1211 Calibration Yes 4 Month PM 05
Calibration of GSD-1212 Calibration Yes 4 Month PM 05
Calibration of GSD-1213 Calibration Yes 4 Month PM 05
Calibration of GSD-1214 Calibration Yes 4 Month PM 05
Calibration of GSD-1401 Calibration Yes 4 Month PM 05
Calibration of GSD-1402 Calibration Yes 4 Month PM 05
Calibration of GSD-1403 Calibration Yes 4 Month PM 05
Calibration of GSD-1501 Calibration Yes 4 Month PM 05
Calibration of GSD-1502 Calibration Yes 4 Month PM 05
Calibration of GSD-201 Calibration Yes 4 Month PM 05
Calibration of GSD-202 Calibration Yes 4 Month PM 05
Calibration of GSD-203 Calibration Yes 4 Month PM 05
Calibration of GSD-204 Calibration Yes 4 Month PM 05
Calibration of GSD-206 Calibration Yes 4 Month PM 05
Calibration of GSD-301 Calibration Yes 4 Month PM 05
Calibration of GSD-302 Calibration Yes 4 Month PM 05
Calibration of GSD-303 Calibration Yes 4 Month PM 05
Calibration of GSD-304 Calibration Yes 4 Month PM 05Calibration of GSD-305 Calibration Yes 4 Month PM 05
Calibration of GSD-306 Calibration Yes 4 Month PM 05
Calibration of GSD-307 Calibration Yes 4 Month PM 05
Calibration of GSD-308 Calibration Yes 4 Month PM 05
Calibration of GSD-401 Calibration Yes 4 Month PM 05
Calibration of GSD-402 Calibration Yes 4 Month PM 05
Calibration of GSD-403 Calibration Yes 4 Month PM 05
Calibration of GSD-404 Calibration Yes 4 Month PM 05
Calibration of GSD-405 Calibration Yes 4 Month PM 05
Calibration of GSD-406 Calibration Yes 4 Month PM 05
Calibration of GSD-407 Calibration Yes 4 Month PM 05
Calibration of GSD-408 Calibration Yes 4 Month PM 05
Calibration of GSD-501 Calibration Yes 4 Month PM 05
Calibration of GSD-502 Calibration Yes 4 Month PM 05
Calibration of GSD-503 Calibration Yes 4 Month PM 05
Calibration of GSD-504 Calibration Yes 4 Month PM 05
Calibration of GSD-505 Calibration Yes 4 Month PM 05
Calibration of GSD-506 Calibration Yes 4 Month PM 05
Calibration of GSD-601 Calibration Yes 4 Month PM 05
Calibration of GSD-602 Calibration Yes 4 Month PM 05
Calibration of GSD-603 Calibration Yes 4 Month PM 05
Calibration of GSD-604 Calibration Yes 4 Month PM 05
Calibration of GSD-605 Calibration Yes 4 Month PM 05Calibration of GSD-606 Calibration Yes 4 Month PM 05
Calibration of GSD-607 Calibration Yes 4 Month PM 05
Calibration of GSD-608 Calibration Yes 4 Month PM 05
Calibration of GSD-609 Calibration Yes 4 Month PM 05
Calibration of GSD-610 Calibration Yes 4 Month PM 05
Calibration of GSD-611 Calibration Yes 4 Month PM 05
Calibration of GSD-701 Calibration Yes 4 Month PM 05
Calibration of GSD-702 Calibration Yes 4 Month PM 05
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 48/464
Calibration of GSD-703 Calibration Yes 4 Month PM 05
Calibration of GSD-704 Calibration Yes 4 Month PM 05
Calibration of GSD-705 Calibration Yes 4 Month PM 05
Calibration of GSD-801 Calibration Yes 4 Month PM 05
Calibration of GSD-802 Calibration Yes 4 Month PM 05
Calibration of GSD-803 Calibration Yes 4 Month PM 05
Calibration of GSD-804 Calibration Yes 4 Month PM 05
Calibration of GSD-901 Calibration Yes 4 Month PM 05
Calibration of GSD-902 Calibration Yes 4 Month PM 05
Calibration of GSD-903 Calibration Yes 4 Month PM 05
Calibration of GSD-904 Calibration Yes 4 Month PM 05
Calibration of FT-3015 Calibration Yes 48 Month PM 05
Calibration of GD-1, GTG-A Calibration Yes 4 Month PM 05
Calibration of GD-2, GTG-A Calibration Yes 4 Month PM 05
Calibration of GD-3, GTG-A Calibration Yes 4 Month PM 05
Calibration of GD-4, GTG-A Calibration Yes 4 Month PM 05
Calibration of GD-7, GTG-A Calibration Yes 4 Month PM 05
Calibration of GD-8, GTG-A Calibration Yes 4 Month PM 05
Calibration of TV 3005 Calibration Yes 12 Month PM 05Preventive Maintenance of YD-5, GTG A
Preventive
MaintenanceYes 4 Month PM 01
Preventive Maintenance of YD-6, GTG APreventive
MaintenanceYes 4 Month PM 01
Preventive Maintenance of YD-7, GTG APreventive
MaintenanceYes 4 Month PM 01
Preventive Maintenance of YD-8, GTG APreventive
MaintenanceYes 4 Month PM 01
Preventive Maintenance of TD-1, GTG APreventive
MaintenanceYes 4 Month PM 01
Calibration of FT-3025 Calibration Yes 48 Month PM 05
Calibration of GD-1, GTG-B Calibration Yes 4 Month PM 05
Calibration of GD-2, GTG-B Calibration Yes 4 Month PM 05Calibration of GD-3, GTG-B Calibration Yes 4 Month PM 05
Calibration of GD-4, GTG-B Calibration Yes 4 Month PM 05
Calibration of GD-7, GTG-B Calibration Yes 4 Month PM 05
Calibration of GD-8, GTG-B Calibration Yes 4 Month PM 05
Calibration of TV 3006 Calibration Yes 12 Month PM 05
Preventive Maintenance of YD-5, GTG BPreventive
MaintenanceYes 4 Month PM 01
Preventive Maintenance of YD-6, GTG BPreventive
MaintenanceYes 4 Month PM 01
Preventive Maintenance of YD-7, GTG BPreventive
MaintenanceYes 4 Month PM 01
Preventive Maintenance of YD-8, GTG B
Preventive
Maintenance Yes 4 Month PM 01
Preventive Maintenance of TD-1, GTG BPreventive
MaintenanceYes 4 Month PM 01
Calibration of FT-3035 Calibration Yes 48 Month PM 05
Calibration of GD-1, GTG-C Calibration Yes 4 Month PM 05
Calibration of GD-2, GTG-C Calibration Yes 4 Month PM 05
Calibration of GD-3, GTG-C Calibration Yes 4 Month PM 05
Calibration of GD-4, GTG-C Calibration Yes 4 Month PM 05
Calibration of GD-7, GTG-C Calibration Yes 4 Month PM 05
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 49/464
Calibration of GD-8, GTG-C Calibration Yes 4 Month PM 05
Calibration of TV 3007 Calibration Yes 12 Month PM 05
Preventive Maintenance of YD-5, GTG CPreventive
MaintenanceYes 4 Month PM 01
Preventive Maintenance of YD-6, GTG CPreventive
MaintenanceYes 4 Month PM 01
Preventive Maintenance of YD-7, GTG CPreventive
MaintenanceYes 4 Month PM 01
Preventive Maintenance of YD-8, GTG C PreventiveMaintenance
Yes 4 Month PM 01
Preventive Maintenance of TD-1, GTG CPreventive
MaintenanceYes 4 Month PM 01
Calibration of FT-3001 Calibration Yes 24 Month PM 05
Calibration of FT-3005 Calibration Yes 48 Month PM 05
Calibration of FT-3006 Calibration Yes 24 Month PM 05
Calibration of FT-3007 Calibration Yes 24 Month PM 05
Calibration of FV 3001 Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-3005Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-3006Preventive
Maintenance
Yes 12 Month PM 01
Preventive Maintenance of MOVP-3007Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1500Preventive
MaintenanceYes 12 Month PM 01
Calibration of PSHH 1501 Calibration Yes 6 Month PM 05
Calibration of PSL 1502 Calibration Yes 6 Month PM 05
Calibration of PT-1500 Calibration Yes 24 Month PM 05
Calibration of TT-1501 Calibration Yes 24 Month PM 05
Calibration of PS-1 Control room HVAC 1 Calibration Yes 6 Month PM 05
Calibration of PS-1 Control room HVAC 2 Calibration Yes 6 Month PM 05
Calibration of PS-2 Control room HVAC 1 Calibration Yes 6 Month PM 05
Calibration of PS-2 Control room HVAC 2 Calibration Yes 6 Month PM 05
Calibration of LT-6001 Calibration Yes 24 Month PM 05
Preventive Maintenance of MOVP-6001Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-6301Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-6302Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-6303Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-6304Preventive
Maintenance Yes 12 Month PM 01
Preventive Maintenance of MOVP-6305Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-6306Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-6307Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-6308Preventive
MaintenanceYes 12 Month PM 01
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 50/464
Preventive Maintenance of MOVP-6309Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-6310Preventive
MaintenanceYes 12 Month PM 01
Calibration of PSL 12013 Calibration Yes 6 Month PM 05
Calibration of PSLL 12012 Calibration Yes 6 Month PM 05
Calibration of AT 1801 Calibration Yes 1 Month PM 05
Preventive Maintenance of MOVP-1800Preventive
Maintenance Yes 12 Month PM 01
Preventive Maintenance of MOVP-1810Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1820Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1830Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1860Preventive
MaintenanceYes 12 Month PM 01
Calibration of PDT-1810 Calibration Yes 48 Month PM 05
Calibration of PDT-1820 Calibration Yes 48 Month PM 05
Calibration of PDT-1830 Calibration Yes 48 Month PM 05
Calibration of PT 1810 Calibration Yes 1 Month PM 05
Calibration of PT 1820 Calibration Yes 1 Month PM 05
Calibration of PT 1830 Calibration Yes 1 Month PM 05
Calibration of TT 1810 Calibration Yes 1 Month PM 05
Calibration of TT 1820 Calibration Yes 1 Month PM 05
Calibration of TT 1830 Calibration Yes 1 Month PM 05
Calibration of PT-1800 Calibration Yes 24 Month PM 05
Calibration of PT-1851 Calibration Yes 48 Month PM 05
Calibration of FT-8000 Calibration Yes 48 Month PM 05
Calibration of FT-8104 Calibration Yes 48 Month PM 05
Calibration of FT-8108 Calibration Yes 48 Month PM 05
Calibration of FT-8112 Calibration Yes 24 Month PM 05
Calibration of FT-8115 Calibration Yes 48 Month PM 05Calibration of FT-8151 Calibration Yes 24 Month PM 05
Calibration of FV 8104 Calibration Yes 12 Month PM 05
Calibration of FV 8108 Calibration Yes 12 Month PM 05
Calibration of LT-8101 Calibration Yes 24 Month PM 05
Calibration of LT-8102 Calibration Yes 48 Month PM 05
Calibration of LT-8103 Calibration Yes 24 Month PM 05
Calibration of LV 8101 Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-8100APreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-8100BPreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-8101A PreventiveMaintenance
Yes 12 Month PM 01
Preventive Maintenance of MOVP-8101BPreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-8102APreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-8102BPreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-8103Preventive
MaintenanceYes 12 Month PM 01
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 51/464
Preventive Maintenance of MOVP-8104Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-8105Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-8112Preventive
MaintenanceYes 12 Month PM 01
Calibration of PDT-8106 Calibration Yes 24 Month PM 05
Calibration of PT-8000 Calibration Yes 48 Month PM 05
Calibration of PT-8101 Calibration Yes 24 Month PM 05
Calibration of PT-8102A Calibration Yes 48 Month PM 05
Calibration of PT-8102B Calibration Yes 48 Month PM 05
Calibration of PT-8104 Calibration Yes 48 Month PM 05
Calibration of PT-8107 Calibration Yes 48 Month PM 05
Calibration of PT-8108 Calibration Yes 48 Month PM 05
Calibration of PT-8110 Calibration Yes 24 Month PM 05
Calibration of PT-8112 Calibration Yes 24 Month PM 05
Calibration of PT-8113 Calibration Yes 48 Month PM 05
Calibration of PT-8114 Calibration Yes 24 Month PM 05
Calibration of PT-8115 Calibration Yes 48 Month PM 05
Calibration of PV-8113 Calibration Yes 12 Month PM 05Calibration of PV-8115 Calibration Yes 12 Month PM 05
Calibration of TT-8100 Calibration Yes 24 Month PM 05
Calibration of TT-8102 Calibration Yes 24 Month PM 05
Calibration of TT-8102A Calibration Yes 24 Month PM 05
Calibration of TT-8102B Calibration Yes 24 Month PM 05
Calibration of TT-8103A Calibration Yes 24 Month PM 05
Calibration of TT-8104 Calibration Yes 24 Month PM 05
Calibration of TT-8105 Calibration Yes 24 Month PM 05
Calibration of TT-8106 Calibration Yes 24 Month PM 05
Calibration of TT-8107 Calibration Yes 24 Month PM 05
Calibration of TT-8108 Calibration Yes 24 Month PM 05
Calibration of TT-8109 Calibration Yes 24 Month PM 05
Calibration of TT-8110 Calibration Yes 24 Month PM 05
Calibration of TT-8111 Calibration Yes 24 Month PM 05
Calibration of TT-8112 Calibration Yes 24 Month PM 05
Calibration of TT-8114 Calibration Yes 24 Month PM 05
Calibration of TT-8115 Calibration Yes 24 Month PM 05
Calibration of TT-8117 Calibration Yes 24 Month PM 05
Calibration of FT-1121 Calibration Yes 24 Month PM 05
Calibration of FV-1121 Calibration Yes 12 Month PM 05
Calibration of FV-1161 Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-1122Preventive
Maintenance
Yes 12 Month PM 01
Calibration of PT-1121 Calibration Yes 48 Month PM 05
Calibration of PT-1124 Calibration Yes 48 Month PM 05
Calibration of TT-1121 Calibration Yes 24 Month PM 05
Calibration of FT-1131 Calibration Yes 24 Month PM 05
Calibration of FV-1131 Calibration Yes 12 Month PM 05
Calibration of FV-1171 Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-1132Preventive
MaintenanceYes 12 Month PM 01
Calibration of PT-1131 Calibration Yes 48 Month PM 05
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 52/464
Calibration of PT-1134 Calibration Yes 48 Month PM 05
Calibration of TT-1131 Calibration Yes 24 Month PM 05
Calibration of FT-1141 Calibration Yes 24 Month PM 05
Calibration of FV-1141 Calibration Yes 12 Month PM 05
Calibration of FV-1181 Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-1142Preventive
MaintenanceYes 12 Month PM 01
Calibration of PT-1141 Calibration Yes 48 Month PM 05Calibration of PT-1144 Calibration Yes 48 Month PM 05
Calibration of TT-1141 Calibration Yes 24 Month PM 05
Calibration of FT-1151 Calibration Yes 24 Month PM 05
Calibration of FV-1151 Calibration Yes 12 Month PM 05
Calibration of FV-1191 Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-1152Preventive
MaintenanceYes 12 Month PM 01
Calibration of PT-1151 Calibration Yes 48 Month PM 05
Calibration of PT-1154 Calibration Yes 48 Month PM 05
Calibration of TT-1151 Calibration Yes 24 Month PM 05
Calibration of FT-1221 Calibration Yes 24 Month PM 05
Calibration of FV-1221 Calibration Yes 12 Month PM 05Calibration of FV-1261 Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-1222Preventive
MaintenanceYes 12 Month PM 01
Calibration of PT-1221 Calibration Yes 48 Month PM 05
Calibration of PT-1224 Calibration Yes 48 Month PM 05
Calibration of TT-1221 Calibration Yes 24 Month PM 05
Calibration of FT-1231 Calibration Yes 24 Month PM 05
Calibration of FV-1231 Calibration Yes 12 Month PM 05
Calibration of FV-1271 Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-1232Preventive
MaintenanceYes 12 Month PM 01
Calibration of PT-1231 Calibration Yes 48 Month PM 05Calibration of PT-1234 Calibration Yes 48 Month PM 05
Calibration of TT-1231 Calibration Yes 24 Month PM 05
Calibration of FT-1241 Calibration Yes 24 Month PM 05
Calibration of FV-1241 Calibration Yes 12 Month PM 05
Calibration of FV-1281 Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-1242Preventive
MaintenanceYes 12 Month PM 01
Calibration of PT-1241 Calibration Yes 48 Month PM 05
Calibration of PT-1244 Calibration Yes 48 Month PM 05
Calibration of TT-1241 Calibration Yes 24 Month PM 05
Calibration of FT-1251 Calibration Yes 24 Month PM 05
Calibration of FV-1251 Calibration Yes 12 Month PM 05
Calibration of FV-1291 Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-1252Preventive
MaintenanceYes 12 Month PM 01
Calibration of PT-1251 Calibration Yes 48 Month PM 05
Calibration of PT-1254 Calibration Yes 48 Month PM 05
Calibration of TT-1251 Calibration Yes 24 Month PM 05
Calibration of FT-1510 Calibration Yes 24 Month PM 05
Calibration of FV-1510 Calibration Yes 12 Month PM 05
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 53/464
Calibration of FV-1511 Calibration Yes 12 Month PM 05
Calibration of PT-1510 Calibration Yes 48 Month PM 05
Calibration of PT-1512 Calibration Yes 48 Month PM 05
Calibration of TT-1510 Calibration Yes 24 Month PM 05
Calibration of TT-1511 Calibration Yes 24 Month PM 05
Calibration of TT-1512 Calibration Yes 24 Month PM 05
Calibration of FT-1520 Calibration Yes 24 Month PM 05
Calibration of FV-1520 Calibration Yes 12 Month PM 05
Calibration of FV-1521 Calibration Yes 12 Month PM 05
Calibration of PT-1520 Calibration Yes 48 Month PM 05
Calibration of PT-1522 Calibration Yes 48 Month PM 05
Calibration of TT-1520 Calibration Yes 24 Month PM 05
Calibration of TT-1521 Calibration Yes 24 Month PM 05
Calibration of TT-1522 Calibration Yes 24 Month PM 05
Calibration of FT-1530 Calibration Yes 24 Month PM 05
Calibration of FV-1530 Calibration Yes 12 Month PM 05
Calibration of FV-1531 Calibration Yes 12 Month PM 05
Calibration of PT-1530 Calibration Yes 48 Month PM 05
Calibration of PT-1532 Calibration Yes 48 Month PM 05Calibration of TT-1530 Calibration Yes 24 Month PM 05
Calibration of TT-1531 Calibration Yes 24 Month PM 05
Calibration of TT-1532 Calibration Yes 24 Month PM 05
Calibration of FT-1540 Calibration Yes 24 Month PM 05
Calibration of FV-1540 Calibration Yes 12 Month PM 05
Calibration of FV-1541 Calibration Yes 12 Month PM 05
Calibration of PT-1540 Calibration Yes 48 Month PM 05
Calibration of PT-1542 Calibration Yes 48 Month PM 05
Calibration of TT-1540 Calibration Yes 24 Month PM 05
Calibration of TT-1541 Calibration Yes 24 Month PM 05
Calibration of TT-1542 Calibration Yes 24 Month PM 05
Calibration of FT-1550 Calibration Yes 24 Month PM 05
Calibration of FV-1550 Calibration Yes 12 Month PM 05
Calibration of FV-1551 Calibration Yes 12 Month PM 05
Calibration of PT-1550 Calibration Yes 48 Month PM 05
Calibration of PT-1552 Calibration Yes 48 Month PM 05
Calibration of TT-1550 Calibration Yes 24 Month PM 05
Calibration of TT-1551 Calibration Yes 24 Month PM 05
Calibration of TT-1552 Calibration Yes 24 Month PM 05
Calibration of TT-3001 Calibration Yes 24 Month PM 05
Calibration of PT-6000 Calibration Yes 24 Month PM 05
Preventive Maintenance of MOVP-1004Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1005Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1014Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1015Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1018Preventive
MaintenanceYes 12 Month PM 01
Calibration of FT-1440APreventive
MaintenanceYes 24 Month PM 05
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 54/464
Calibration of FT-1441Preventive
MaintenanceYes 24 Month PM 05
Calibration of FV-1440 B Calibration Yes 12 Month PM 05
Calibration of FV-1440A Calibration Yes 12 Month PM 05
Calibration of Calibration of LT-1401 Calibration Yes 48 Month PM 05
Calibration of Calibration of LT-1402 Calibration Yes 24 Month PM 05
Calibration of Calibration of LT-1403 Calibration Yes 48 Month PM 05
Calibration of LT-1440 Calibration Yes 24 Month PM 05Calibration of LT-1441 Calibration Yes 24 Month PM 05
Calibration of LT-1442 Calibration Yes 24 Month PM 05
Preventive Maintenance of MOVP-1441Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1442Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1443Preventive
MaintenanceYes 12 Month PM 01
Calibration of PT-1441 Calibration Yes 48 Month PM 05
Calibration of PT-1442 Calibration Yes 24 Month PM 05
Calibration of PT-1444 Calibration Yes 48 Month PM 05
Calibration of PV-1442 Calibration Yes 12 Month PM 05
Calibration of PV-1444A Calibration Yes 12 Month PM 05
Calibration of PV-1444B Calibration Yes 12 Month PM 05
Calibration of PV-1444C Calibration Yes 12 Month PM 05
Calibration of TT-1404 Calibration Yes 24 Month PM 05
Calibration of TT-1440 Calibration Yes 24 Month PM 05
Calibration of TT-1441 Calibration Yes 24 Month PM 05
Calibration of TT-1442 Calibration Yes 24 Month PM 05
Calibration of TT-1444 Calibration Yes 24 Month PM 05
Calibration of FT-1301 Checking Yes 48 Month PM 05
Preventive Maintenance of MOVP-1301Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1302 PreventiveMaintenance Yes 12 Month PM 01
Preventive Maintenance of MOVP-1303Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1304Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1310Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1320Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1330Preventive
MaintenanceYes 12 Month PM 01
Calibration of PT-1301 Calibration Yes 48 Month PM 05
Calibration of PT-1302 Calibration Yes 48 Month PM 05
Calibration of PT-1303 Calibration Yes 24 Month PM 05
Calibration of PV-1302 Calibration Yes 12 Month PM 05
Calibration of TT-1301 Calibration Yes 24 Month PM 05
Calibration of TT-1302 Calibration Yes 24 Month PM 05
Calibration of TT-1303 Calibration Yes 24 Month PM 05
Calibration of TV 1302 Calibration Yes 12 Month PM 05
Preventive checking of BT-1771A Checking Yes 12 Month PM 01
Preventive checking of BT-1772A Checking Yes 12 Month PM 01
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 55/464
Preventive Maintenanc of FT-1700Preventive
MaintenanceYes 12 Month PM 01
Calibration of FT-1771A Calibration Yes 48 Month PM 05
Calibration of FV 1700 Calibration Yes 12 Month PM 05
Calibration of FV 1778 A Calibration Yes 12 Month PM 05
Calibration of FV1791 A Calibration Yes 12 Month PM 05
Calibration of FV1792 A Calibration Yes 12 Month PM 05
Calibration of LT-1771A Calibration Yes 12 Month PM 05Calibration of LT-1772A Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-1701Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1702Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1703Preventive
MaintenanceYes 12 Month PM 01
Calibration of PT-1700 Calibration Yes 48 Month PM 05
Calibration of PT-1771A Calibration Yes 24 Month PM 05
Calibration of PT-1775A Calibration Yes 24 Month PM 05
Calibration of PT-1781A Calibration Yes 24 Month PM 05
Calibration of PT-1784A Calibration Yes 24 Month PM 05
Calibration of PT-1790A Calibration Yes 24 Month PM 05
Calibration of PT-1791A Calibration Yes 24 Month PM 05
Calibration of PT-1795A Calibration Yes 24 Month PM 05
Calibration of TT-1700 Calibration Yes 24 Month PM 05
Calibration of TT-1702 Calibration Yes 24 Month PM 05
Calibration of TT-1771A Calibration Yes 24 Month PM 05
Calibration of TT-1772A Calibration Yes 24 Month PM 05
Calibration of TT-1773A Calibration Yes 24 Month PM 05
Calibration of TT-1774A Calibration Yes 24 Month PM 05
Calibration of TT-1775A Calibration Yes 24 Month PM 05
Calibration of TT-1778A Calibration Yes 24 Month PM 05
Preventive Maintenance of V1771 A PreventiveMaintenance
Yes 12 Month PM 01
Preventive Maintenance of V1772 APreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of V1773 APreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of V1774 APreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of V1775 APreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of V1776 APreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of V1777 APreventive
MaintenanceYes 12 Month PM 01
Calibration of AT1781A Calibration Yes 4 Month PM 05
Preventive checking of BT-1771B Checking Yes 12 Month PM 01
Preventive checking of BT-1772B Checking Yes 12 Month PM 01
Preventive Maintenanc of FT-1710Preventive
MaintenanceYes 12 Month PM 01
Calibration of FT-1771B Calibration Yes 48 Month PM 05
Calibration of FV 1701 Calibration Yes 12 Month PM 05
Calibration of FV 1778 B Calibration Yes 12 Month PM 05
Calibration of FV1791 B Calibration Yes 12 Month PM 05
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 56/464
Calibration of FV1792 B Calibration Yes 12 Month PM 05
Calibration of LT-1771B Calibration Yes 12 Month PM 05
Calibration of LT-1772B Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-1711Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1712Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1713Preventive
Maintenance Yes 12 Month PM 01
Calibration of PT-1710 Calibration Yes 48 Month PM 05
Calibration of PT-1771B Calibration Yes 24 Month PM 05
Calibration of PT-1775B Calibration Yes 24 Month PM 05
Calibration of PT-1781B Calibration Yes 24 Month PM 05
Calibration of PT-1784B Calibration Yes 24 Month PM 05
Calibration of PT-1790B Calibration Yes 24 Month PM 05
Calibration of PT-1791B Calibration Yes 24 Month PM 05
Calibration of PT-1795B Calibration Yes 24 Month PM 05
Calibration of TT-1710 Calibration Yes 24 Month PM 05
Calibration of TT-1712 Calibration Yes 24 Month PM 05
Calibration of TT-1771B Calibration Yes 24 Month PM 05Calibration of TT-1772B Calibration Yes 24 Month PM 05
Calibration of TT-1773B Calibration Yes 24 Month PM 05
Calibration of TT-1774B Calibration Yes 24 Month PM 05
Calibration of TT-1775B Calibration Yes 24 Month PM 05
Calibration of TT-1778B Calibration Yes 24 Month PM 05
Preventive Maintenance of V1771 BPreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of V1772 BPreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of V1773 BPreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of V1774 B
Preventive
Maintenance Yes 12 Month PM 01
Preventive Maintenance of V1775 BPreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of V1776 BPreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of V1777 BPreventive
MaintenanceYes 12 Month PM 01
Calibration of AT1781B Calibration Yes 4 Month PM 05
Calibration of MOVG-1800 Calibration Yes 12 Month PM 05
Calibration of PAL 1802 Calibration Yes 6 Month PM 05
Calibration of PSHH 1801A Calibration Yes 6 Month PM 05
Calibration of PSHH 1801B Calibration Yes 6 Month PM 05
Calibration of PSHH 1801C Calibration Yes 6 Month PM 05Calibration of TSD-101 Calibration Yes 4 Month PM 05
Calibration of TSD-102 Calibration Yes 4 Month PM 05
Calibration of TSD-103 Calibration Yes 4 Month PM 05
Calibration of TSD-104 Calibration Yes 4 Month PM 05
Calibration of TSD-105 Calibration Yes 4 Month PM 05
Calibration of TSD-1201 Calibration Yes 4 Month PM 05
Calibration of TSD-1202 Calibration Yes 4 Month PM 05
Calibration of TSD-1203 Calibration Yes 4 Month PM 05
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 57/464
Calibration of TSD-1204 Calibration Yes 4 Month PM 05
Calibration of TSD-1205 Calibration Yes 4 Month PM 05
Calibration of TSD-1206 Calibration Yes 4 Month PM 05
Calibration of TSD-1207 Calibration Yes 4 Month PM 05
Calibration of TSD-1208 Calibration Yes 4 Month PM 05
Calibration of TSD-1209 Calibration Yes 4 Month PM 05
Calibration of TSD-1210 Calibration Yes 4 Month PM 05
Calibration of TSD-1211 Calibration Yes 4 Month PM 05
Calibration of TSD-1212 Calibration Yes 4 Month PM 05
Calibration of TSD-201 Calibration Yes 4 Month PM 05
Calibration of TSD-202 Calibration Yes 4 Month PM 05
Calibration of TSD-203 Calibration Yes 4 Month PM 05
Calibration of TSD-301 Calibration Yes 4 Month PM 05
Calibration of TSD-302 Calibration Yes 4 Month PM 05
Calibration of TSD-303 Calibration Yes 4 Month PM 05
Calibration of TSD-304 Calibration Yes 4 Month PM 05
Calibration of TSD-401 Calibration Yes 4 Month PM 05
Calibration of TSD-402 Calibration Yes 4 Month PM 05
Calibration of TSD-403 Calibration Yes 4 Month PM 05Calibration of TSD-404 Calibration Yes 4 Month PM 05
Calibration of TSD-501 Calibration Yes 4 Month PM 05
Calibration of TSD-502 Calibration Yes 4 Month PM 05
Calibration of TSD-801 Calibration Yes 4 Month PM 05
Calibration of TSD-802 Calibration Yes 4 Month PM 05
Calibration of TSD-803 Calibration Yes 4 Month PM 05
Calibration of FT-1610 Calibration Yes 24 Month PM 05
Calibration of FT-1611 Calibration Yes 24 Month PM 05
Calibration of FT-1612 Calibration Yes 24 Month PM 05
Calibration of FV-1610 Calibration Yes 12 Month PM 05
Calibration of HIC 3613 Calibration Yes 12 Month PM 05
Calibration of LT-3612 Calibration Yes 24 Month PM 05
Preventive Maintenance of MOVP-1611Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1612Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1613Preventive
MaintenanceYes 12 Month PM 01
Calibration of PSHH 3612 Calibration Yes 6 Month PM 05
Calibration of PT-1610 Calibration Yes 48 Month PM 05
Calibration of PT-1615 Calibration Yes 24 Month PM 05
Calibration of PT-3618 Calibration Yes 48 Month PM 05
Calibration of TT-1610 Calibration Yes 24 Month PM 05
Calibration of TT-1611A Calibration Yes 24 Month PM 05Calibration of TT-1611B Calibration Yes 24 Month PM 05
Calibration of TT-1612 Calibration Yes 24 Month PM 05
Calibration of TT-1613 Calibration Yes 24 Month PM 05
Calibration of TT-1616 Calibration Yes 24 Month PM 05
Calibration of TT-1617 Calibration Yes 24 Month PM 05
Calibration of FT-1620 Calibration Yes 24 Month PM 05
Calibration of FT-1621 Calibration Yes 24 Month PM 05
Calibration of FT-1622 Calibration Yes 24 Month PM 05
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 58/464
Calibration of FV-1620 Calibration Yes 12 Month PM 05
Calibration of HIC 3623 Calibration Yes 12 Month PM 05
Calibration of LT-3622 Calibration Yes 24 Month PM 05
Preventive Maintenance of MOVP-1621Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1622Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1623Preventive
Maintenance Yes 12 Month PM 01
Calibration of PSHH 3622 Calibration Yes 6 Month PM 05
Calibration of PT-1620 Calibration Yes 48 Month PM 05
Calibration of PT-1625 Calibration Yes 24 Month PM 05
Calibration of PT-3628 Calibration Yes 48 Month PM 05
Calibration of TT-1620 Calibration Yes 24 Month PM 05
Calibration of TT-1621A Calibration Yes 24 Month PM 05
Calibration of TT-1621B Calibration Yes 24 Month PM 05
Calibration of TT-1622 Calibration Yes 24 Month PM 05
Calibration of TT-1623 Calibration Yes 24 Month PM 05
Calibration of TT-1626 Calibration Yes 24 Month PM 05
Calibration of TT-1627 Calibration Yes 24 Month PM 05Calibration of FT-1630 Calibration Yes 24 Month PM 05
Calibration of FT-1631 Calibration Yes 24 Month PM 05
Calibration of FT-1632 Calibration Yes 24 Month PM 05
Calibration of FV-1630 Calibration Yes 12 Month PM 05
Calibration of HIC 3633 Calibration Yes 12 Month PM 05
Calibration of LT-3632 Calibration Yes 24 Month PM 05
Preventive Maintenance of MOVP-1631Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1632Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1633Preventive
MaintenanceYes 12 Month PM 01
Calibration of PSHH 3632 Calibration Yes 6 Month PM 05
Calibration of PT-1630 Calibration Yes 48 Month PM 05
Calibration of PT-1635 Calibration Yes 24 Month PM 05
Calibration of PT-3638 Calibration Yes 48 Month PM 05
Calibration of TT-1630 Calibration Yes 24 Month PM 05
Calibration of TT-1631A Calibration Yes 24 Month PM 05
Calibration of TT-1631B Calibration Yes 24 Month PM 05
Calibration of TT-1632 Calibration Yes 24 Month PM 05
Calibration of TT-1633 Calibration Yes 24 Month PM 05
Calibration of TT-1636 Calibration Yes 24 Month PM 05
Calibration of TT-1637 Calibration Yes 24 Month PM 05
Calibration of FT-1640 Calibration Yes 24 Month PM 05Calibration of FT-1641 Calibration Yes 24 Month PM 05
Calibration of FT-1642 Calibration Yes 24 Month PM 05
Calibration of FV-1640 Calibration Yes 12 Month PM 05
Calibration of HIC 3643 Calibration Yes 12 Month PM 05
Calibration of LT-3642 Calibration Yes 24 Month PM 05
Preventive Maintenance of MOVP-1641Preventive
MaintenanceYes 12 Month PM 01
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 59/464
Preventive Maintenance of MOVP-1642Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1643Preventive
MaintenanceYes 12 Month PM 01
Calibration of PSHH 3642 Calibration Yes 6 Month PM 05
Calibration of PT-1640 Calibration Yes 48 Month PM 05
Calibration of PT-1645 Calibration Yes 24 Month PM 05
Calibration of PT-3648 Calibration Yes 48 Month PM 05
Calibration of TT-1640 Calibration Yes 24 Month PM 05
Calibration of TT-1641A Calibration Yes 24 Month PM 05
Calibration of TT-1641B Calibration Yes 24 Month PM 05
Calibration of TT-1642 Calibration Yes 24 Month PM 05
Calibration of TT-1643 Calibration Yes 24 Month PM 05
Calibration of TT-1646 Calibration Yes 24 Month PM 05
Calibration of TT-1647 Calibration Yes 24 Month PM 05
Calibration of FT-1650 Calibration Yes 24 Month PM 05
Calibration of FT-1651 Calibration Yes 24 Month PM 05
Calibration of FT-1652 Calibration Yes 24 Month PM 05
Calibration of FV-1650 Calibration Yes 12 Month PM 05
Calibration of HIC 3653 Calibration Yes 12 Month PM 05Calibration of LT-3652 Calibration Yes 24 Month PM 05
Preventive Maintenance of MOVP-1651Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1652Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1653Preventive
MaintenanceYes 12 Month PM 01
Calibration of PSHH 3652 Calibration Yes 6 Month PM 05
Calibration of PT-1650 Calibration Yes 48 Month PM 05
Calibration of PT-1655 Calibration Yes 24 Month PM 05
Calibration of PT-3658 Calibration Yes 48 Month PM 05
Calibration of TT-1650 Calibration Yes 24 Month PM 05Calibration of TT-1651A Calibration Yes 24 Month PM 05
Calibration of TT-1651B Calibration Yes 24 Month PM 05
Calibration of TT-1652 Calibration Yes 24 Month PM 05
Calibration of TT-1653 Calibration Yes 24 Month PM 05
Calibration of TT-1656 Calibration Yes 24 Month PM 05
Calibration of TT-1657 Calibration Yes 24 Month PM 05
Calibration of FT-1660 Calibration Yes 24 Month PM 05
Calibration of FT-1661 Calibration Yes 24 Month PM 05
Calibration of FT-1662 Calibration Yes 24 Month PM 05
Calibration of FV-1660 Calibration Yes 12 Month PM 05
Calibration of HIC 3663 Calibration Yes 12 Month PM 05
Calibration of LT-3662 Calibration Yes 24 Month PM 05
Preventive Maintenance of MOVP-1661Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1662Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1663Preventive
MaintenanceYes 12 Month PM 01
Calibration of PSHH 3662 Calibration Yes 6 Month PM 05
Calibration of PT-1660 Calibration Yes 48 Month PM 05
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 60/464
Calibration of PT-1665 Calibration Yes 24 Month PM 05
Calibration of PT-3668 Calibration Yes 48 Month PM 05
Calibration of TT-1660 Calibration Yes 24 Month PM 05
Calibration of TT-1661A Calibration Yes 24 Month PM 05
Calibration of TT-1661B Calibration Yes 24 Month PM 05
Calibration of TT-1662 Calibration Yes 24 Month PM 05
Calibration of TT-1663 Calibration Yes 24 Month PM 05
Calibration of TT-1666 Calibration Yes 24 Month PM 05
Calibration of TT-1667 Calibration Yes 24 Month PM 05
Calibration of FT-1670 Calibration Yes 24 Month PM 05
Calibration of FT-1671 Calibration Yes 24 Month PM 05
Calibration of FT-1672 Calibration Yes 24 Month PM 05
Calibration of FV-1670 Calibration Yes 12 Month PM 05
Calibration of HIC 3673 Calibration Yes 12 Month PM 05
Calibration of LT-3672 Calibration Yes 24 Month PM 05
Preventive Maintenance of MOVP-1671Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1672Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1673 PreventiveMaintenance
Yes 12 Month PM 01
Calibration of PSHH 3672 Calibration Yes 6 Month PM 05
Calibration of PT-1670 Calibration Yes 48 Month PM 05
Calibration of PT-1675 Calibration Yes 24 Month PM 05
Calibration of PT-3678 Calibration Yes 48 Month PM 05
Calibration of TT-1670 Calibration Yes 24 Month PM 05
Calibration of TT-1671A Calibration Yes 24 Month PM 05
Calibration of TT-1671B Calibration Yes 24 Month PM 05
Calibration of TT-1672 Calibration Yes 24 Month PM 05
Calibration of TT-1673 Calibration Yes 24 Month PM 05
Calibration of TT-1676 Calibration Yes 24 Month PM 05
Calibration of TT-1677 Calibration Yes 24 Month PM 05
Calibration of FT-1101 Calibration Yes 48 Month PM 05
Calibration of HIC 1103 Calibration Yes 12 Month PM 05
Calibration of HIC 1104 Calibration Yes 12 Month PM 05
Calibration of HIC 1108 Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-1101Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1102Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1105Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1106Preventive
Maintenance
Yes 12 Month PM 01
Preventive Maintenance of MOVP-1108Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1109Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1120Preventive
MaintenanceYes 12 Month PM 01
Calibration of PT-1101 Calibration Yes 48 Month PM 05
Calibration of PT-1102 Calibration Yes 24 Month PM 05
Calibration of PT-1103 Calibration Yes 24 Month PM 05
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 61/464
Calibration of PT-1190 Calibration Yes 48 Month PM 05
Calibration of PV 1102 Calibration Yes 12 Month PM 05
Calibration of HIC 1203 Calibration Yes 12 Month PM 05
Calibration of HIC 1204 Calibration Yes 12 Month PM 05
Calibration of HIC 1208 Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-1201Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1202 PreventiveMaintenance
Yes 12 Month PM 01
Preventive Maintenance of MOVP-1205Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1206Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1208Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1209Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1220Preventive
MaintenanceYes 12 Month PM 01
Calibration of PT-1201 Calibration Yes 48 Month PM 05
Calibration of PT-1202 Calibration Yes 48 Month PM 05
Calibration of PT-1203 Calibration Yes 24 Month PM 05
Calibration of LT-3001 Calibration Yes 24 Month PM 05
Calibration of LT-3005 Calibration Yes 24 Month PM 05
Calibration of TT-1851 Calibration Yes 24 Month PM 05
Preventive Maintenance of MOVP-1001Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1008Preventive
MaintenanceYes 12 Month PM 01
Calibration of Perc ULA A Calibration Yes 6 Month PM 05
Yes 12 Month
Yes 12 Month
Calibration of TT-1031 Calibration Yes 24 Month PM 05
Preventive Maintenance of MOVP-1002Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1009Preventive
MaintenanceYes 12 Month PM 01
Calibration of Perc ULA B Calibration Yes 6 Month PM 05
Yes 12 Month
Yes 12 Month
Calibration of TT-1032 Calibration Yes 24 Month PM 05
Preventive Maintenance of MOVP-1003Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-1010Preventive
MaintenanceYes 12 Month PM 01
Calibration of Perc ULA C Calibration Yes 6 Month PM 05Yes 12 Month
Yes 12 Month
Calibration of TT-1033 Calibration Yes 24 Month PM 05
Yes 12 Month
Yes 12 Month
Calibration of Perc ULA-NG Calibration Yes 6 Month PM 05
Calibration of HIC 1017 Calibration Yes 12 Month PM 05
Calibration of HIC 1019 Calibration Yes 12 Month PM 05
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 62/464
Calibration of PT-1006 Calibration Yes 48 Month PM 05
Preventive Checking of FT-1001 Checking Yes 12 Month PM 01
Calibration of LT-1001 Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-1006Preventive
MaintenanceYes 12 Month PM 01
Calibration of PT-1008 Calibration Yes 48 Month PM 05
Calibration of PV 1008 Calibration Yes 12 Month PM 05
Calibration of TT-1006 Calibration Yes 24 Month PM 05Calibration of PT-1910 Calibration Yes 24 Month PM 05
Calibration of TT-1910 Calibration Yes 24 Month PM 05
Calibration of PT-1920 Calibration Yes 24 Month PM 05
Calibration of TT-1920 Calibration Yes 24 Month PM 05
Calibration of TSD TE-13003 Calibration Yes 4 Month PM 05
Calibration of TSD TE-13004 Calibration Yes 4 Month PM 05
Calibration of TSD TE-13005 Calibration Yes 4 Month PM 05
Calibration of TSD TE-13006 Calibration Yes 4 Month PM 05
Calibration of TSD TE-13007 Calibration Yes 4 Month PM 05
Calibration of TSD TE-13008 Calibration Yes 4 Month PM 05
Calibration of TSD TE-13009 Calibration Yes 4 Month PM 05
Calibration of TSD TE-130010 Calibration Yes 4 Month PM 05
Calibration of TSD TE-130011 Calibration Yes 4 Month PM 05
Calibration of GSD-13001 Calibration Yes 4 Month PM 05
Calibration of GSD-13002 Calibration Yes 4 Month PM 05
Calibration of GSD-13003 Calibration Yes 4 Month PM 05
Calibration of GSD-13004 Calibration Yes 4 Month PM 05
Calibration of GSD-13005 Calibration Yes 4 Month PM 05
Calibration of GSD-13006 Calibration Yes 4 Month PM 05
Calibration of GSD-13007 Calibration Yes 4 Month PM 05
Calibration of Pressure switch13005 Calibration Yes 6 Month PM 05
Calibration of PT-13003 Calibration Yes 24 Month PM 05
Calibration of PT-13004 Calibration Yes 24 Month PM 05Calibration of TT-13001 Calibration Yes 24 Month PM 05
Calibration of TT-13002 Calibration Yes 24 Month PM 05
Calibration of FV-13001 Calibration Yes 12 Month PM 05
Calibration of HCV-13003 Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-13001Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-13002Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-13003Preventive
MaintenanceYes 12 Month PM 01
Calibration of LS13001 Calibration Yes 12 Month PM 05
Preventive Maintenance of FSD-UV-IR-1 Checking Yes 4 Month PM 01
Preventive Maintenance of FSD-UV-IR-2 Checking Yes 4 Month PM 01
Preventive Maintenance of Camera-1 Checking Yes 6 Month PM 01
Preventive Maintenance of Camera-10 Checking Yes 6 Month PM 01
Preventive Maintenance of Camera-11 Checking Yes 6 Month PM 01
Preventive Maintenance of Camera-2 Checking Yes 6 Month PM 01
Preventive Maintenance of Camera-3 Checking Yes 6 Month PM 01
Preventive Maintenance of Camera-4 Checking Yes 6 Month PM 01
Preventive Maintenance of Camera-5 Checking Yes 6 Month PM 01
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 63/464
Preventive Maintenance of Camera-6 Checking Yes 6 Month PM 01
Preventive Maint.of FSDE-301 Checking Yes 4 Month PM 01
Preventive Maint.of FSDE-302 Checking Yes 4 Month PM 01
Preventive Maint.of FSDE-303 Checking Yes 4 Month PM 01
Preventive Maint.of FSDE-304 Checking Yes 4 Month PM 01
Preventive Maint.of FSDE-401 Checking Yes 4 Month PM 01
Preventive Maint.of FSDE-402 Checking Yes 4 Month PM 01
Preventive Maint.of FSDE-403 Checking Yes 4 Month PM 01Preventive Maint.of FSDE-404 Checking Yes 4 Month PM 01
Preventive Maint.of FSDE-602 Checking Yes 4 Month PM 01
Preventive Maint.of FSDE-603 Checking Yes 4 Month PM 01
Preventive Maint.of FSDE-604 Checking Yes 4 Month PM 01
Preventive Maint.of FSDE-605 Checking Yes 4 Month PM 01
Preventive Maint.of FSDE-606 Checking Yes 4 Month PM 01
Preventive Maint.of FSDE-701 Checking Yes 4 Month PM 01
Preventive Maint.of FSDE-702 Checking Yes 4 Month PM 01
Preventive Maint.of FSDE-901 Checking Yes 4 Month PM 01
Preventive Maint.of FSDE-1001 Checking Yes 4 Month PM 01
Preventive Maint.of FSDE-1002
Checking Yes 4 Month PM 01Preventive Maint.of FSDE-1003 Checking Yes 4 Month PM 01
Preventive Maint.of FSDE-1004 Checking Yes 4 Month PM 01
Preventive Maint.of FSDE-1101 Checking Yes 4 Month PM 01
Preventive Maint.of FSDE-1102 Checking Yes 4 Month PM 01
Preventive Maint.of FSDE-1202 Checking Yes 4 Month PM 01
Preventive Maint.of FSDE-1203 Checking Yes 4 Month PM 01
Preventive Maint.of FSD-10300 Checking Yes 4 Month PM 01
Preventive Maint.of FSD-10301 Checking Yes 4 Month PM 01
Preventive Maint.of FSD-10302 Checking Yes 4 Month PM 01
Preventive Maint.of FSD-10303 Checking Yes 4 Month PM 01
Calibration of GSDE-301 Calibration Yes 4 Month PM 05
Calibration of GSDE-302 Calibration Yes 4 Month PM 05
Calibration of GSDE-303 Calibration Yes 4 Month PM 05
Calibration of GSDE-304 Calibration Yes 4 Month PM 05
Calibration of GSDE-305 Calibration Yes 4 Month PM 05
Calibration of GSDE-306 Calibration Yes 4 Month PM 05
Calibration of GSDE-307 Calibration Yes 4 Month PM 05
Calibration of GSDE-308 Calibration Yes 4 Month PM 05
Calibration of GSDE-401 Calibration Yes 4 Month PM 05
Calibration of GSDE-402 Calibration Yes 4 Month PM 05
Calibration of GSDE-403 Calibration Yes 4 Month PM 05
Calibration of GSDE-404 Calibration Yes 4 Month PM 05
Calibration of GSDE-405
Calibration Yes 4 Month PM 05Calibration of GSDE-406 Calibration Yes 4 Month PM 05
Calibration of GSDE-407 Calibration Yes 4 Month PM 05
Calibration of GSDE-408 Calibration Yes 4 Month PM 05
Calibration of GSDE-606 Calibration Yes 4 Month PM 05
Calibration of GSDE-607 Calibration Yes 4 Month PM 05
Calibration of GSDE-608 Calibration Yes 4 Month PM 05
Calibration of GSDE-609 Calibration Yes 4 Month PM 05
Calibration of GSDE-610 Calibration Yes 4 Month PM 05
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 64/464
Calibration of GSDE-611 Calibration Yes 4 Month PM 05
Calibration of GSDE-701 Calibration Yes 4 Month PM 05
Calibration of GSDE-702 Calibration Yes 4 Month PM 05
Calibration of GSDE-703 Calibration Yes 4 Month PM 05
Calibration of GSDE-704 Calibration Yes 4 Month PM 05
Calibration of GSDE-705 Calibration Yes 4 Month PM 05
Calibration of GSDE-901 Calibration Yes 4 Month PM 05
Calibration of GSDE-902 Calibration Yes 4 Month PM 05Calibration of GSDE-1001 Calibration Yes 4 Month PM 05
Calibration of GSDE-1002 Calibration Yes 4 Month PM 05
Calibration of GSDE-1003 Calibration Yes 4 Month PM 05
Calibration of GSDE-1004 Calibration Yes 4 Month PM 05
Calibration of GSDE-1005 Calibration Yes 4 Month PM 05
Calibration of GSDE-1006 Calibration Yes 4 Month PM 05
Calibration of GSDE-1007 Calibration Yes 4 Month PM 05
Calibration of GSDE-1008 Calibration Yes 4 Month PM 05
Calibration of GSDE-1009 Calibration Yes 4 Month PM 05
Calibration of GSDE-1010 Calibration Yes 4 Month PM 05
Calibration of GSDE-1101
Calibration Yes 4 Month PM 05Calibration of GSDE-1102 Calibration Yes 4 Month PM 05
Calibration of GSDE-1103 Calibration Yes 4 Month PM 05
Calibration of GSDE-1104 Calibration Yes 4 Month PM 05
Calibration of GSDE-1105 Calibration Yes 4 Month PM 05
Calibration of GSDE-1106 Calibration Yes 4 Month PM 05
Calibration of GSDE-1107 Calibration Yes 4 Month PM 05
Calibration of GSDE-1108 Calibration Yes 4 Month PM 05
Calibration of GSDE-1109 Calibration Yes 4 Month PM 05
Calibration of GSDE-1110 Calibration Yes 4 Month PM 05
Calibration of GSDE-1205 Calibration Yes 4 Month PM 05
Calibration of GSDE-1206 Calibration Yes 4 Month PM 05
Calibration of GSDE-1207 Calibration Yes 4 Month PM 05
Calibration of GSDE-1208 Calibration Yes 4 Month PM 05
Calibration of GSDE-1209 Calibration Yes 4 Month PM 05
Calibration of GSDE-1210 Calibration Yes 4 Month PM 05
Calibration of GSDE-1211 Calibration Yes 4 Month PM 05
Calibration of GSDE-1212 Calibration Yes 4 Month PM 05
Calibration of GSDE-1213 Calibration Yes 4 Month PM 05
Calibration of GSDE-1214 Calibration Yes 4 Month PM 05
Calibration of TSDE-301 Calibration Yes 4 Month PM 05
Calibration of TSDE-302 Calibration Yes 4 Month PM 05
Calibration of TSDE-303 Calibration Yes 4 Month PM 05
Calibration of TSDE-304
Calibration Yes 4 Month PM 05Calibration of TSDE-401 Calibration Yes 4 Month PM 05
Calibration of TSDE-402 Calibration Yes 4 Month PM 05
Calibration of TSDE-403 Calibration Yes 4 Month PM 05
Calibration of TSDE-404 Calibration Yes 4 Month PM 05
Calibration of TSDE-701 Calibration Yes 4 Month PM 05
Calibration of TSDE-702 Calibration Yes 4 Month PM 05
Calibration of TSDE-1001 Calibration Yes 4 Month PM 05
Calibration of TSDE-1002 Calibration Yes 4 Month PM 05
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 65/464
Calibration of TSDE-1003 Calibration Yes 4 Month PM 05
Calibration of TSDE-1004 Calibration Yes 4 Month PM 05
Calibration of TSDE-1101 Calibration Yes 4 Month PM 05
Calibration of TSDE-1102 Calibration Yes 4 Month PM 05
Calibration of TSDE-1103 Calibration Yes 4 Month PM 05
Calibration of TSDE-1104 Calibration Yes 4 Month PM 05
Calibration of TSDE-1203 Calibration Yes 4 Month PM 05
Calibration of TSDE-1204 Calibration Yes 4 Month PM 05Calibration of TSDE-1205 Calibration Yes 4 Month PM 05
Calibration of TSDE-1206 Calibration Yes 4 Month PM 05
Calibration of TSDE-1207 Calibration Yes 4 Month PM 05
Calibration of TSDE-1208 Calibration Yes 4 Month PM 05
Calibration of TSDE-1209 Calibration Yes 4 Month PM 05
Calibration of TSDE-1210 Calibration Yes 4 Month PM 05
Calibration of TSDE-1211 Calibration Yes 4 Month PM 05
Calibration of TSDE-1212 Calibration Yes 4 Month PM 05
Calibration of PSHE-31 Calibration Yes 6 Month PM 05
Calibration of PSHE-41 Calibration Yes 6 Month PM 05
Calibration of PSHE-62
Calibration Yes 6 Month PM 05Calibration of PSHE-71 Calibration Yes 6 Month PM 05
Calibration of PSHE-101 Calibration Yes 6 Month PM 05
Calibration of PSHE-102 Calibration Yes 6 Month PM 05
Calibration of PSHE-111 Calibration Yes 6 Month PM 05
Calibration of PSHE-112 Calibration Yes 6 Month PM 05
Calibration of PSHE-122 Calibration Yes 6 Month PM 05
Calibration of PSHE-123 Calibration Yes 6 Month PM 05
Calibration of PSHE-160 Calibration Yes 6 Month PM 05
Calibration of PSHE-161 Calibration Yes 6 Month PM 05
Calibration of PSHE-162 Calibration Yes 6 Month PM 05
Calibration of PSHE-163 Calibration Yes 6 Month PM 05
Calibration of FTE-3015 Calibration Yes 48 Month PM 05
Calibration of GD-1, GTG-D Calibration Yes 4 Month PM 05
Calibration of GD-2, GTG-D Calibration Yes 4 Month PM 05
Calibration of GD-3, GTG-D Calibration Yes 4 Month PM 05
Calibration of GD-4, GTG-D Calibration Yes 4 Month PM 05
Calibration of GD-9, GTG-D Calibration Yes 4 Month PM 05
Calibration of GD-10, GTG-D Calibration Yes 4 Month PM 05
Calibration of GD-6, GTG-D Calibration Yes 4 Month PM 05
Calibration of GD-11, GTG-D Calibration Yes 4 Month PM 05
Calibration of TVE-3005 Calibration Yes 12 Month PM 05
Preventive MAintenAnce of YA-5, GTG DPreventive
MaintenanceYes 4 Month PM 01
Preventive MAintenAnce of YA-6, GTG DPreventive
MaintenanceYes 4 Month PM 01
Preventive MAintenAnce of TA-1, GTG DPreventive
MaintenanceYes 4 Month PM 01
Calibration of FTE-3025 Calibration Yes 48 Month PM 05
Calibration of GD-1, GTG-E Calibration Yes 4 Month PM 05
Calibration of GD-2, GTG-E Calibration Yes 4 Month PM 05
Calibration of GD-3, GTG-E Calibration Yes 4 Month PM 05
Calibration of GD-4, GTG-E Calibration Yes 4 Month PM 05
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 66/464
Calibration of GD-7, GTG-E Calibration Yes 4 Month PM 05
Calibration of GD-8, GTG-E Calibration Yes 4 Month PM 05
Calibration of GD-7, GTG-E Calibration Yes 4 Month PM 05
Calibration of GD-8, GTG-E Calibration Yes 4 Month PM 05
Calibration of TV 3005 Calibration Yes 12 Month PM 05
Preventive Maintenance of YD-5, GTG EPreventive
MaintenanceYes 4 Month PM 01
Preventive Maintenance of YD-6, GTG E PreventiveMaintenance
Yes 4 Month PM 01
Preventive Maintenance of TD-1, GTG EPreventive
MaintenanceYes 4 Month PM 01
Calibration of FT-E1121 Calibration Yes 24 Month PM 05
Calibration of FV-E 1121 Calibration Yes 12 Month PM 05
Calibration of FV-E 1161 Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-E1122Preventive
MaintenanceYes 12 Month PM 01
Calibration of PT-E1121 Calibration Yes 48 Month PM 05
Calibration of PT-E1124 Calibration Yes 48 Month PM 05
Calibration of TT-E1121 Calibration Yes 24 Month PM 05
Calibration of FT-E1131 Calibration Yes 24 Month PM 05
Calibration of FV-E 1131 Calibration Yes 12 Month PM 05
Calibration of FV-E 1171 Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-E1132Preventive
MaintenanceYes 12 Month PM 01
Calibration of PT-E1131 Calibration Yes 48 Month PM 05
Calibration of PT-E1134 Calibration Yes 48 Month PM 05
Calibration of TT-E1131 Calibration Yes 24 Month PM 05
Calibration of FT-E1141 Calibration Yes 24 Month PM 05
Calibration of FV-E 1141 Calibration Yes 12 Month PM 05
Calibration of FV-E 1181 Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-E1142Preventive
MaintenanceYes 12 Month PM 01
Calibration of PT-E1141 Calibration Yes 48 Month PM 05
Calibration of PT-E1144 Calibration Yes 48 Month PM 05
Calibration of TT-E1141 Calibration Yes 24 Month PM 05
Calibration of FT-E1151 Calibration Yes 24 Month PM 05
Calibration of FV-E 1151 Calibration Yes 12 Month PM 05
Calibration of FV-E 1191 Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-E1152Preventive
MaintenanceYes 12 Month PM 01
Calibration of PT-E1151 Calibration Yes 48 Month PM 05
Calibration of PT-E1154 Calibration Yes 48 Month PM 05
Calibration of TT-E1151 Calibration Yes 24 Month PM 05
Calibration of FT-E1221 Calibration Yes 24 Month PM 05Calibration of FV-E 1221 Calibration Yes 12 Month PM 05
Calibration of FV-E 1261 Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-E1222Preventive
MaintenanceYes 12 Month PM 01
Calibration of PT-E1221 Calibration Yes 48 Month PM 05
Calibration of PT-E1224 Calibration Yes 48 Month PM 05
Calibration of TT-E1221 Calibration Yes 24 Month PM 05
Calibration of FT-E1231 Calibration Yes 24 Month PM 05
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 67/464
Calibration of FV-E 1231 Calibration Yes 12 Month PM 05
Calibration of FV-E 1271 Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-E1232Preventive
MaintenanceYes 12 Month PM 01
Calibration of PT-E1231 Calibration Yes 48 Month PM 05
Calibration of PT-E1234 Calibration Yes 48 Month PM 05
Calibration of TT-E1231 Calibration Yes 24 Month PM 05
Calibration of FT-E1241 Calibration Yes 24 Month PM 05Calibration of FV-E 1241 Calibration Yes 12 Month PM 05
Calibration of FV-E 1281 Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-E1242Preventive
MaintenanceYes 12 Month PM 01
Calibration of PT-E1241 Calibration Yes 48 Month PM 05
Calibration of PT-E1244 Calibration Yes 48 Month PM 05
Calibration of TT-E1241 Calibration Yes 24 Month PM 05
Calibration of FT-E1251 Calibration Yes 24 Month PM 05
Calibration of FV-E 1251 Calibration Yes 12 Month PM 05
Calibration of FV-E 1291 Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-E1252Preventive
Maintenance
Yes 12 Month PM 01
Calibration of PT-E1251 Calibration Yes 48 Month PM 05
Calibration of PT-E1254 Calibration Yes 48 Month PM 05
Calibration of TT-E1251 Calibration Yes 24 Month PM 05
Calibration of FT-E1510 Calibration Yes 24 Month PM 05
Calibration of FV-E 1510 Calibration Yes 12 Month PM 05
Calibration of FV-E 1511 Calibration Yes 12 Month PM 05
Calibration of PT-E1510 Calibration Yes 48 Month PM 05
Calibration of PT-E1512 Calibration Yes 48 Month PM 05
Calibration of TT-E1510 Calibration Yes 24 Month PM 05
Calibration of TT-E1511 Calibration Yes 24 Month PM 05
Calibration of TT-E1512 Calibration Yes 24 Month PM 05
Calibration of FT-E1520 Calibration Yes 24 Month PM 05
Calibration of FV-E 1520 Calibration Yes 12 Month PM 05
Calibration of FV-E 1521 Calibration Yes 12 Month PM 05
Calibration of PT-E1520 Calibration Yes 48 Month PM 05
Calibration of PT-E1522 Calibration Yes 48 Month PM 05
Calibration of TT-E1520 Calibration Yes 24 Month PM 05
Calibration of TT-E1521 Calibration Yes 24 Month PM 05
Calibration of TT-E1522 Calibration Yes 24 Month PM 05
Calibration of FT-E1530 Calibration Yes 24 Month PM 05
Calibration of FV-E 1530 Calibration Yes 12 Month PM 05
Calibration of FV-E 1531 Calibration Yes 12 Month PM 05
Calibration of PT-E1530 Calibration Yes 48 Month PM 05Calibration of PT-E1532 Calibration Yes 48 Month PM 05
Calibration of TT-E1530 Calibration Yes 24 Month PM 05
Calibration of TT-E1531 Calibration Yes 24 Month PM 05
Calibration of TT-E1532 Calibration Yes 24 Month PM 05
Calibration of FT-E1540 Calibration Yes 24 Month PM 05
Calibration of FV-E 1540 Calibration Yes 12 Month PM 05
Calibration of FV-E 1541 Calibration Yes 12 Month PM 05
Calibration of PT-E1540 Calibration Yes 48 Month PM 05
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 68/464
Calibration of PT-E1542 Calibration Yes 48 Month PM 05
Calibration of TT-E1540 Calibration Yes 24 Month PM 05
Calibration of TT-E1541 Calibration Yes 24 Month PM 05
Calibration of TT-E1542 Calibration Yes 24 Month PM 05
Calibration of FT-E1550 Calibration Yes 24 Month PM 05
Calibration of FV-E 1550 Calibration Yes 12 Month PM 05
Calibration of FV-E 1551 Calibration Yes 12 Month PM 05
Calibration of PT-E1550 Calibration Yes 48 Month PM 05
Calibration of PT-E1552 Calibration Yes 48 Month PM 05
Calibration of TT-E1550 Calibration Yes 24 Month PM 05
Calibration of TT-E1551 Calibration Yes 24 Month PM 05
Calibration of TT-E1552 Calibration Yes 24 Month PM 05
Calibration of FT-E1610 Calibration Yes 24 Month PM 05
Calibration of FT-E1611 Calibration Yes 24 Month PM 05
Calibration of FT-E1612 Calibration Yes 24 Month PM 05
Calibration of FV-E1610 Calibration Yes 12 Month PM 05
Calibration of HIC-E3613 Calibration Yes 12 Month PM 05
Calibration of LT-E3612 Calibration Yes 24 Month PM 05
Preventive Maintenance of MOVP-E1611Preventive
Maintenance Yes 12 Month PM 01
Preventive Maintenance of MOVP-E1612Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1613Preventive
MaintenanceYes 12 Month PM 01
Calibration of PSHH-E3612 Calibration Yes 6 Month PM 05
Calibration of PT-E1610 Calibration Yes 48 Month PM 05
Calibration of PT-E1615 Calibration Yes 24 Month PM 05
Calibration of PT-E3618 Calibration Yes 48 Month PM 05
Calibration of TT-E1610 Calibration Yes 24 Month PM 05
Calibration of TT-E1611A Calibration Yes 24 Month PM 05
Calibration of TT-E1611B Calibration Yes 24 Month PM 05
Calibration of TT-E1612 Calibration Yes 24 Month PM 05
Calibration of TT-E1613 Calibration Yes 24 Month PM 05
Calibration of TT-E1616 Calibration Yes 24 Month PM 05
Calibration of TT-E1617 Calibration Yes 24 Month PM 05
Calibration of TT-E1618 Calibration Yes 24 Month PM 05
Calibration of FT-E1620 Calibration Yes 24 Month PM 05
Calibration of FT-E1621 Calibration Yes 24 Month PM 05
Calibration of FT-E1622 Calibration Yes 24 Month PM 05
Calibration of FV-E1620 Calibration Yes 12 Month PM 05
Calibration of HIC-E3623 Calibration Yes 12 Month PM 05
Calibration of LT-E3622 Calibration Yes 24 Month PM 05
Preventive Maintenance of MOVP-E1621 PreventiveMaintenance
Yes 12 Month PM 01
Preventive Maintenance of MOVP-E1622Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1623Preventive
MaintenanceYes 12 Month PM 01
Calibration of PSHH-E3622 Calibration Yes 6 Month PM 05
Calibration of PT-E1620 Calibration Yes 48 Month PM 05
Calibration of PT-E1625 Calibration Yes 24 Month PM 05
Calibration of PT-E3628 Calibration Yes 48 Month PM 05
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 69/464
Calibration of TT-E1620 Calibration Yes 24 Month PM 05
Calibration of TT-E1621A Calibration Yes 24 Month PM 05
Calibration of TT-E1621B Calibration Yes 24 Month PM 05
Calibration of TT-E1622 Calibration Yes 24 Month PM 05
Calibration of TT-E1623 Calibration Yes 24 Month PM 05
Calibration of TT-E1626 Calibration Yes 24 Month PM 05
Calibration of TT-E1627 Calibration Yes 24 Month PM 05
Calibration of TT-E1628 Calibration Yes 24 Month PM 05
Calibration of FT-E1630 Calibration Yes 24 Month PM 05
Calibration of FT-E1631 Calibration Yes 24 Month PM 05
Calibration of FT-E1632 Calibration Yes 24 Month PM 05
Calibration of FV-E1630 Calibration Yes 12 Month PM 05
Calibration of HIC-E3633 Calibration Yes 12 Month PM 05
Calibration of LT-E3632 Calibration Yes 24 Month PM 05
Preventive Maintenance of MOVP-E1631Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1632Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1633Preventive
Maintenance
Yes 12 Month PM 01
Calibration of PSHH-E3632 Calibration Yes 6 Month PM 05
Calibration of PT-E1630 Calibration Yes 48 Month PM 05
Calibration of PT-E1635 Calibration Yes 24 Month PM 05
Calibration of PT-E3638 Calibration Yes 48 Month PM 05
Calibration of TT-E1630 Calibration Yes 24 Month PM 05
Calibration of TT-E1631A Calibration Yes 24 Month PM 05
Calibration of TT-E1631B Calibration Yes 24 Month PM 05
Calibration of TT-E1632 Calibration Yes 24 Month PM 05
Calibration of TT-E1633 Calibration Yes 24 Month PM 05
Calibration of TT-E1636 Calibration Yes 24 Month PM 05
Calibration of TT-E1637 Calibration Yes 24 Month PM 05
Calibration of TT-E1638 Calibration Yes 24 Month PM 05
Calibration of FT-E1640 Calibration Yes 24 Month PM 05
Calibration of FT-E1641 Calibration Yes 24 Month PM 05
Calibration of FT-E1642 Calibration Yes 24 Month PM 05
Calibration of FV-E1640 Calibration Yes 12 Month PM 05
Calibration of HIC-E3643 Calibration Yes 12 Month PM 05
Calibration of LT-E3642 Calibration Yes 24 Month PM 05
Preventive Maintenance of MOVP-E1641Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1642Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1643Preventive
MaintenanceYes 12 Month PM 01
Calibration of PSHH-E3642 Calibration Yes 6 Month PM 05
Calibration of PT-E1640 Calibration Yes 48 Month PM 05
Calibration of PT-E1645 Calibration Yes 24 Month PM 05
Calibration of PT-E3648 Calibration Yes 48 Month PM 05
Calibration of TT-E1640 Calibration Yes 24 Month PM 05
Calibration of TT-E1641A Calibration Yes 24 Month PM 05
Calibration of TT-E1641B Calibration Yes 24 Month PM 05
Calibration of TT-E1642 Calibration Yes 24 Month PM 05
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 70/464
Calibration of TT-E1643 Calibration Yes 24 Month PM 05
Calibration of TT-E1646 Calibration Yes 24 Month PM 05
Calibration of TT-E1647 Calibration Yes 24 Month PM 05
Calibration of TT-E1648 Calibration Yes 24 Month PM 05
Calibration of FT-E1650 Calibration Yes 24 Month PM 05
Calibration of FT-E1651 Calibration Yes 24 Month PM 05
Calibration of FT-E1652 Calibration Yes 24 Month PM 05
Calibration of FV-E1650 Calibration Yes 12 Month PM 05
Calibration of HIC-E3653 Calibration Yes 12 Month PM 05
Calibration of LT-E3652 Calibration Yes 24 Month PM 05
Preventive Maintenance of MOVP-E1651Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1652Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1653Preventive
MaintenanceYes 12 Month PM 01
Calibration of PSHH-E3652 Calibration Yes 6 Month PM 05
Calibration of PT-E1650 Calibration Yes 48 Month PM 05
Calibration of PT-E1655 Calibration Yes 24 Month PM 05
Calibration of PT-E3658 Calibration Yes 48 Month PM 05Calibration of TT-E1650 Calibration Yes 24 Month PM 05
Calibration of TT-E1651A Calibration Yes 24 Month PM 05
Calibration of TT-E1651B Calibration Yes 24 Month PM 05
Calibration of TT-E1652 Calibration Yes 24 Month PM 05
Calibration of TT-E1653 Calibration Yes 24 Month PM 05
Calibration of TT-E1656 Calibration Yes 24 Month PM 05
Calibration of TT-E1657 Calibration Yes 24 Month PM 05
Calibration of TT-E1658 Calibration Yes 24 Month PM 05
Calibration of FT-E1660 Calibration Yes 24 Month PM 05
Calibration of FT-E1661 Calibration Yes 24 Month PM 05
Calibration of FT-E1662 Calibration Yes 24 Month PM 05
Calibration of FV-E1660 Calibration Yes 12 Month PM 05
Calibration of HIC-E3663 Calibration Yes 12 Month PM 05
Calibration of LT-E3662 Calibration Yes 24 Month PM 05
Preventive Maintenance of MOVP-E1661Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1662Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1663Preventive
MaintenanceYes 12 Month PM 01
Calibration of PSHH-E3662 Calibration Yes 6 Month PM 05
Calibration of PT-E1660 Calibration Yes 48 Month PM 05
Calibration of PT-E1665 Calibration Yes 24 Month PM 05
Calibration of PT-E3668 Calibration Yes 48 Month PM 05Calibration of TT-E1660 Calibration Yes 24 Month PM 05
Calibration of TT-E1661A Calibration Yes 24 Month PM 05
Calibration of TT-E1661B Calibration Yes 24 Month PM 05
Calibration of TT-E1662 Calibration Yes 24 Month PM 05
Calibration of TT-E1663 Calibration Yes 24 Month PM 05
Calibration of TT-E1666 Calibration Yes 24 Month PM 05
Calibration of TT-E1667 Calibration Yes 24 Month PM 05
Calibration of TT-E1668 Calibration Yes 24 Month PM 05
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 71/464
Calibration of FT-E1670 Calibration Yes 24 Month PM 05
Calibration of FT-E1671 Calibration Yes 24 Month PM 05
Calibration of FT-E1672 Calibration Yes 24 Month PM 05
Calibration of FV-E1670 Calibration Yes 12 Month PM 05
Calibration of HIC-E3673 Calibration Yes 12 Month PM 05
Calibration of LT-E3672 Calibration Yes 24 Month PM 05
Preventive Maintenance of MOVP-E1671Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1672Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1673Preventive
MaintenanceYes 12 Month PM 01
Calibration of PSHH-E3672 Calibration Yes 6 Month PM 05
Calibration of PT-E1670 Calibration Yes 48 Month PM 05
Calibration of PT-E1675 Calibration Yes 24 Month PM 05
Calibration of PT-E3678 Calibration Yes 48 Month PM 05
Calibration of TT-E1670 Calibration Yes 24 Month PM 05
Calibration of TT-E1671A Calibration Yes 24 Month PM 05
Calibration of TT-E1671B Calibration Yes 24 Month PM 05
Calibration of TT-E1672 Calibration Yes 24 Month PM 05Calibration of TT-E1673 Calibration Yes 24 Month PM 05
Calibration of TT-E1676 Calibration Yes 24 Month PM 05
Calibration of TT-E1677 Calibration Yes 24 Month PM 05
Calibration of TT-E1678 Calibration Yes 24 Month PM 05
Calibration of FT-E1101 Calibration Yes 48 Month PM 05
Calibration of HIC-E1103 Calibration Yes 12 Month PM 05
Calibration of HIC-E1104 Calibration Yes 12 Month PM 05
Calibration of HIC-E1108 Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-E1101Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1102Preventive
Maintenance
Yes 12 Month PM 01
Preventive Maintenance of MOVP-E1105Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1106Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1108Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1109Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1120Preventive
MaintenanceYes 12 Month PM 01
Calibration of PT-E1101 Calibration Yes 48 Month PM 05
Calibration of PT-E1102 Calibration Yes 24 Month PM 05
Calibration of PT-E1103 Calibration Yes 24 Month PM 05Calibration of PT-E1190 Calibration Yes 48 Month PM 05
Calibration of PV-E1102 Calibration Yes 12 Month PM 05
Calibration of HIC-E1203 Calibration Yes 12 Month PM 05
Calibration of HIC-E1204 Calibration Yes 12 Month PM 05
Calibration of HIC-E1208 Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-E1201Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1202Preventive
MaintenanceYes 12 Month PM 01
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 72/464
Preventive Maintenance of MOVP-E1205Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1206Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1208Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1209Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1220 PreventiveMaintenance
Yes 12 Month PM 01
Calibration of PT-E1201 Calibration Yes 48 Month PM 05
Calibration of PT-E1202 Calibration Yes 24 Month PM 05
Calibration of PT-E1203 Calibration Yes 24 Month PM 05
Calibration of TT-E1683 Calibration Yes 24 Month PM 05
Calibration of FT-E1682 Calibration Yes 48 Month PM 05
Calibration of PT-E1685 Calibration Yes 24 Month PM 05
Calibration of TT-E1687 Calibration Yes 24 Month PM 05
Calibration of TT-E1681A Calibration Yes 24 Month PM 05
Calibration of TT-E1681B Calibration Yes 24 Month PM 05
Calibration of PT-E1680 Calibration Yes 48 Month PM 05Calibration of TT-E1682 Calibration Yes 24 Month PM 05
Calibration of TT-E1688 Calibration Yes 24 Month PM 05
Calibration of TT-E1680 Calibration Yes 24 Month PM 05
Calibration of FT-E1680 Calibration Yes 24 Month PM 05
Calibration of FT-E3041 Calibration Yes 24 Month PM 05
Calibration of TT-E3045 Calibration Yes 24 Month PM 05
Calibration of TT-E3046 Calibration Yes 24 Month PM 05
Calibration of FT-E3042 Calibration Yes 24 Month PM 05
Calibration of TT-E3047 Calibration Yes 24 Month PM 05
Calibration of TT-E3048 Calibration Yes 24 Month PM 05
Calibration of PT-E3049 Calibration Yes 48 Month PM 05
Calibration of LT-E3012 Calibration Yes 24 Month PM 05
Calibration of TT-E3050 Calibration Yes 24 Month PM 05
Preventive Maintenance of MOVP-E3011Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E3012Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E3013Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1681Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1682Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1683
Preventive
Maintenance Yes 12 Month PM 01
Calibration of HIC-E3013 Calibration Yes 12 Month PM 05
Calibration of FV-E1680 Calibration Yes 12 Month PM 05
Calibration of HIC-E3683 Calibration Yes 12 Month PM 05
Calibration of PSHH-E3682 Calibration Yes 6 Month PM 05
Calibration of PSHH-E3046 Calibration Yes 6 Month PM 05
Calibration of LT-E3688 Calibration Yes 24 PM 05
Calibration of TT-E3651 Calibration Yes 24 Month PM 05
Calibration of TT-E3652 Calibration Yes 24 Month PM 05
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 73/464
Calibration of PT-E1800 Calibration Yes 48 Month PM 05
Calibration of PT-E1805 Calibration Yes 48 Month PM 05
FT-E3015 Calibration Yes 48 Month PM 05
PT-E3010 Calibration Yes 48 Month PM 05
PT-E3301D Calibration Yes 48 Month PM 05
TT-E3010 Calibration Yes 24 Month PM 05
TT-E3011 Calibration Yes 24 Month PM 05
FT-E3025 Calibration Yes 48 Month PM 05
PT-E3020 Calibration Yes 48 Month PM 05
TT-E3020 Calibration Yes 24 Month PM 05
TT-E3021 Calibration Yes 24 Month PM 05
PT-E3301E Calibration Yes 48 Month PM 05
Preventive Maintenanc of FT-E1700Preventive
MaintenanceYes 12 Month PM 01
Calibration of FT-E1771A Calibration Yes 48 Month PM 05
Calibration of FV-E1700 Calibration Yes 12 Month PM 05
Calibration of FV-E1778 A Calibration Yes 12 Month PM 05
Calibration of LT-E1771A Calibration Yes 12 Month PM 05
Calibration of LT-E1772A Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-E1701Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1702Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1703Preventive
MaintenanceYes 12 Month PM 01
Calibration of PT-E1700 Calibration Yes 48 Month PM 05
Calibration of PT-E1771A Calibration Yes 24 Month PM 05
Calibration of PT-E1775A Calibration Yes 48 Month PM 05
Calibration of PT-E1781A Calibration Yes 24 Month PM 05
Calibration of PT-E1784A Calibration Yes 48 Month PM 05
Calibration of PT-E1790A Calibration Yes 48 Month PM 05
Calibration of PT-E1791A Calibration Yes 24 Month PM 05Calibration of PT-E1795A Calibration Yes 48 Month PM 05
Calibration of TT-E1700 Calibration Yes 24 Month PM 05
Calibration of TT-E1702 Calibration Yes 24 Month PM 05
Calibration of TT-E1771A Calibration Yes 24 Month PM 05
Calibration of TT-E1772A Calibration Yes 24 Month PM 05
Calibration of TT-E1773A Calibration Yes 24 Month PM 05
Calibration of TT-E1774A Calibration Yes 24 Month PM 05
Calibration of TT-E1775A Calibration Yes 24 Month PM 05
Calibration of TT-E1778A Calibration Yes 24 Month PM 05
Preventive Maintenance of V-E1771 APreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of V-E1772 A PreventiveMaintenance
Yes 12 Month PM 01
Preventive Maintenance of V-E1773 APreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of V-E1774 APreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of V-E1775 APreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of V-E1776 APreventive
MaintenanceYes 12 Month PM 01
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 74/464
Preventive Maintenance of V-E1777 APreventive
MaintenanceYes 12 Month PM 01
Calibration of AT-E1781A Calibration Yes 4 Month PM 05
Calibration of FT-E1710 Calibration Yes 12 Month PM 05
Calibration of FT-E1771B Calibration Yes 48 Month PM 05
Calibration of FV-E1701 Calibration Yes 12 Month PM 05
Calibration of FV-E1778 B Calibration Yes 12 Month PM 05
Calibration of LT-E1771B Calibration Yes 12 Month PM 05Calibration of LT-E1772B Calibration Yes 12 Month PM 05
Preventive Maintenance of MOVP-E1711Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1712Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1713Preventive
MaintenanceYes 12 Month PM 01
Calibration of PT-E1710 Calibration Yes 48 Month PM 05
Calibration of PT-E1771B Calibration Yes 24 Month PM 05
Calibration of PT-E1775B Calibration Yes 48 Month PM 05
Calibration of PT-E1781B Calibration Yes 24 Month PM 05
Calibration of PT-E1784B Calibration Yes 48 Month PM 05
Calibration of PT-E1790B Calibration Yes 48 Month PM 05
Calibration of PT-E1791B Calibration Yes 24 Month PM 05
Calibration of PT-E1795B Calibration Yes 48 Month PM 05
Calibration of TT-E1710 Calibration Yes 24 Month PM 05
Calibration of TT-E1712 Calibration Yes 24 Month PM 05
Calibration of TT-E1771B Calibration Yes 24 Month PM 05
Calibration of TT-E1772B Calibration Yes 24 Month PM 05
Calibration of TT-E1773B Calibration Yes 24 Month PM 05
Calibration of TT-E1774B Calibration Yes 24 Month PM 05
Calibration of TT-E1775B Calibration Yes 24 Month PM 05
Calibration of TT-E1778B Calibration Yes 24 Month PM 05
Preventive Maintenance of V-E1771 B PreventiveMaintenance
Yes 12 Month PM 01
Preventive Maintenance of V-E1772 BPreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of V-E1773 BPreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of V-E1774 BPreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of V-E1775 BPreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of V-E1776 BPreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of V-E1777 BPreventive
MaintenanceYes 12 Month PM 01
Calibration of AT-E1781B Calibration Yes 4 Month PM 05
Calibration of AT-E1801 Calibration Yes 1 Month PM 05
Preventive Maintenance of MOVP-E1810Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1820Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1830Preventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of MOVP-E1860Preventive
MaintenanceYes 12 Month PM 01
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 75/464
Calibration of PDT-E1810 Calibration Yes 48 Month PM 05
Calibration of PDT-E1820 Calibration Yes 48 Month PM 05
Calibration of PDT-E1830 Calibration Yes 48 Month PM 05
Calibration of PT-E1810 Calibration Yes 1 Month PM 05
Calibration of PT-E1820 Calibration Yes 1 Month PM 05
Calibration of PT-E1830 Calibration Yes 1 Month PM 05
Calibration of TT-E1810 Calibration Yes 1 Month PM 05
Calibration of TT-E1820 Calibration Yes 1 Month PM 05
Calibration of TT-E1830 Calibration Yes 1 Month PM 05
Calibration of MOVG-E1800 Calibration Yes 12 Month PM 05
Calibration of PAL-E1802 Calibration Yes 6 Month PM 05
Calibration of PSHH-E1801A Calibration Yes 6 Month PM 05
Calibration of PSHH-E1801B Calibration Yes 6 Month PM 05
Calibration of PSHH-E1801C Calibration Yes 6 Month PM 05
Calibration of AT 1871 Calibration Yes 1 Month PM 05
Calibration of PT-1870 Calibration Yes 1 Month PM 05
Calibration of TT-1870 Calibration Yes 1 Month PM 05
Temperature Transmitter Calibration Yes 24 Month PM 05
Temperature Transmitter Calibration Yes 24 Month PM 05Temperature Transmitter Calibration Yes 24 Month PM 05
Temperature Transmitter Calibration Yes 24 Month PM 05
Temperature Transmitter Calibration Yes 24 Month PM 05
Temperature Transmitter Calibration Yes 24 Month PM 05
Temperature Transmitter Calibration Yes 24 Month PM 05
Control Valve-Globe Valve-3 wayPreventive
MaintenanceYes 12 Month PM 01
Control Valve-Globe Valve-3 wayPreventive
MaintenanceYes 12 Month PM 01
DP Type Flow Transmitter Calibration Yes 48 Month PM 05
DP Type Flow Transmitter Calibration Yes 24 Month PM 05DP Type Flow Transmitter Calibration Yes 24 Month PM 05
DP Type Flow Transmitter Calibration Yes 24 Month PM 05
Level Transmitter (Electronic) Calibration Yes 24 Month PM 05
Level Transmitter (Electronic) Calibration Yes 24 Month PM 05
Level Transmitter (Electronic) Calibration Yes 24 Month PM 05
Level Transmitter (Electronic) Calibration Yes 24 Month PM 05
Level Transmitter (Electronic) Calibration Yes 24 Month PM 05
Level Transmitter (Electronic) Calibration Yes 24 Month PM 05
Pressure Switch Calibration Yes 6 Month PM 05
Pressure Switch Calibration Yes 6 Month PM 05
Pressure Transmitter Calibration Yes 24 Month PM 05
Pressure Transmitter Calibration Yes 24 Month PM 05
Pressure Transmitter Calibration Yes 24 Month PM 05
Pressure Transmitter Calibration Yes 24 Month PM 05
Pressure Transmitter Calibration Yes 24 Month PM 05
Pressure Transmitter Calibration Yes 24 Month PM 05
Pressure Transmitter Calibration Yes 24 Month PM 05
Temperature Transmitter Calibration Yes 24 Month PM 05
Temperature Transmitter Calibration Yes 24 Month PM 05
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 76/464
Temperature Transmitter Calibration Yes 24 Month PM 05
Temperature Transmitter Calibration Yes 24 Month PM 05
Temperature Transmitter Calibration Yes 24 Month PM 05
Temperature Transmitter Calibration Yes 24 Month PM 05
Temperature Transmitter Calibration Yes 24 Month PM 05
Preventive Maintenance of FCVE-7051APreventive
MaintenanceYes 12 Month PM 01
Pressure Switch Calibration Yes 6 Month PM 05DP Type Flow Transmitter Calibration Yes 24 Month PM 05
Preventive Maintenance of FWV-01APreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of FWV-02APreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of FWV-03APreventive
MaintenanceYes 12 Month PM 01
Temperature Transmitter Calibration Yes 24 Month PM 05
Temperature Transmitter Calibration Yes 24 Month PM 05
Temperature Transmitter Calibration Yes 24 Month PM 05
Preventive Maintenance of FCVE-7051BPreventive
MaintenanceYes 12 Month PM 01
Pressure Switch Calibration Yes 6 Month PM 05
DP Type Flow Transmitter Calibration Yes 24 Month PM 05
Preventive Maintenance of FWV-01BPreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of FWV-02BPreventive
MaintenanceYes 12 Month PM 01
Preventive Maintenance of FWV-03BPreventive
MaintenanceYes 12 Month PM 01
Temperature Transmitter Calibration Yes 24 Month PM 05
Temperature Transmitter Calibration Yes 24 Month PM 05
Temperature Transmitter Calibration Yes 24 Month PM 05
Calibration of GSD-1870A Calibration Yes 4 Month PM 05
Calibration of GSD-1870B Calibration Yes 4 Month PM 05
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 77/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 78/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 79/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 80/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 81/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 82/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 83/464
1
Task List
No.SOPNO.
Calibration
Format
Function of
Transmitter
Preventive Maintenance
Format
Month of
Calibration/Jan
SOP14 FRM_02 I 12
FRM_11 SOP16 FRM_11 T FRM_11 9
SOP13 FRM_02 I 9
SOP13 FRM_02 T 9
FRM_12 I 2
FRM_12 I 2
FRM_12 T 2
FRM_12 I 6
FRM_12 T 6
SOP10 FRM_04 T 10
SOP10 FRM_04 I 10
SOP13 FRM_02 C 8
SOP13 FRM_02 I 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
SOP15 FRM_01 C 8
SOP14 FRM_02 I 4
FRM_11 SOP16 FRM_11 FRM_11 4
SOP10 FRM_04 4
SOP10 FRM_04 4
SOP10 FRM_04 4
SOP10 FRM_04 4
SOP10 FRM_04 4
SOP10 FRM_04 4SOP13 FRM_02 I 4
SOP13 FRM_02 T 4
SOP13 FRM_02 T 4
SOP13 FRM_02 I 4
SOP13 FRM_02 T 4
SOP15 FRM_01 I 4
SOP15 FRM_01 I 4
SOP15 FRM_01 T 4
SOP15 FRM_01 I 4
SOP15 FRM_01 T 4
SOP15 FRM_01 T 4
SOP15 FRM_01 I 4
SOP14 FRM_02 I 7
FRM_11 SOP16 FRM_11 FRM_11 7
SOP10 FRM_04 7 Y
SOP10 FRM_04 7 Y
SOP10 FRM_04 7 Y
SOP10 FRM_04 7 Y
SOP10 FRM_04 7 Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 84/464
SOP10 FRM_04 7 Y
SOP13 FRM_02 I 7
SOP13 FRM_02 T 7
SOP13 FRM_02 T 7
SOP13 FRM_02 I 7
SOP13 FRM_02 T 7
SOP15 FRM_01 I 7
SOP15 FRM_01 I 7
SOP15 FRM_01 T 7
SOP15 FRM_01 I 7
SOP15 FRM_01 T 7
SOP15 FRM_01 T 7
SOP15 FRM_01 I 7
SOP14 FRM_02 I 5
FRM_11 SOP16 FRM_11 FRM_11 5
SOP10 FRM_04 5
SOP10 FRM_04 5
SOP10 FRM_04 5
SOP10 FRM_04 5SOP10 FRM_04 5
SOP10 FRM_04 5
SOP13 FRM_02 I 5
SOP13 FRM_02 T 5
SOP13 FRM_02 T 5
SOP13 FRM_02 I 5
SOP13 FRM_02 T 5
SOP15 FRM_01 I 5
SOP15 FRM_01 I 5
SOP15 FRM_01 T 5
SOP15 FRM_01 I 5
SOP15 FRM_01 T 5
SOP15 FRM_01 T 5
SOP15 FRM_01 I 5
SOP28 6
SOP28 6
SOP28 6
SOP28 6
SOP28 6
SOP28 6
SOP28 6
SOP28 6
SOP28 6SOP28 6
SOP28 6
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 85/464
FRM_11 SOP16 FRM_11 FRM_11 8
SOP14 FRM_02 T 10
SOP14 FRM_02 T 10
SOP15 FRM_01 C 10
SOP15 FRM_01 I 10
SOP15 FRM_01 C 10
SOP15 FRM_01 C 10SOP15 FRM_01 T 10
SOP15 FRM_01 T 10
SOP15 FRM_01 T 10
FRM_11 SOP16 FRM_11 FRM_11 2
SOP13 FRM_02 I 10
SOP13 FRM_02 C 10
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 YSOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 YSOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 86/464
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
FRM_11 SOP16 FRM_11 FRM_11 9
SOP10 FRM_04 12
SOP15 FRM_01 I 1 Y
SOP15 FRM_01 I 1 Y
SOP15 FRM_01 I 1 Y
FRM_11 SOP16 FRM_11 FRM_11 9
FRM_11 SOP16 FRM_11 FRM_11 9
FRM_11 SOP16 FRM_11 FRM_11 9
SOP10 FRM_04 12
SOP10 FRM_04 12SOP13 FRM_02 C 9
SOP13 FRM_02 I 9
SOP13 FRM_02 C 9
SOP13 FRM_02 T 9
SOP15 FRM_01 C 9
SOP15 FRM_01 C 9
SOP15 FRM_01 T 9
SOP15 FRM_01 C 9
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 87/464
SOP15 FRM_01 I 10
SOP15 FRM_01 T 10
SOP15 FRM_01 I 10
SOP15 FRM_01 T 10
SOP15 FRM_01 I 10
SOP15 FRM_01 T 10
SOP13 FRM_02 I 1 Y
SOP13 FRM_02 I 1 Y
SOP13 FRM_02 I 1 Y
SOP13 FRM_02 I 1 Y
SOP15 FRM_01 I 1 Y
SOP15 FRM_01 I 1 Y
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 88/464
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 89/464
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP14 FRM_02 I 10
SOP26 FRM_05 1 Y
SOP26 FRM_05 1 Y
SOP26 FRM_05 1 Y
SOP26 FRM_05 1 Y
SOP26 FRM_05 1 Y
SOP26 FRM_05 1 Y
FRM_11 SOP16 FRM_11 FRM_11 10SOP27 FRM_05 1 Y
SOP27 FRM_05 1 Y
SOP27 FRM_05 1 Y
SOP27 FRM_05 1 Y
1 Y
SOP14 FRM_02 I 10
SOP26 FRM_05 2
SOP26 FRM_05 2SOP26 FRM_05 2
SOP26 FRM_05 2
SOP26 FRM_05 2
SOP26 FRM_05 2
FRM_11 SOP16 FRM_11 FRM_11 10
SOP27 FRM_05 2
SOP27 FRM_05 2
SOP27 FRM_05 2
SOP27 FRM_05 2
2
SOP14 FRM_02 I 10
SOP26 FRM_05 3
SOP26 FRM_05 3
SOP26 FRM_05 3
SOP26 FRM_05 3
SOP26 FRM_05 3
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 90/464
SOP26 FRM_05 3
FRM_11 SOP16 FRM_11 FRM_11 10
SOP27 FRM_05 3
SOP27 FRM_05 3
SOP27 FRM_05 3
SOP27 FRM_05 3
3
SOP14 FRM_02 C 10
SOP14 FRM_02 I 10
SOP14 FRM_02 T 10
SOP14 FRM_02 T 10
FRM_11 SOP16 FRM_11 FRM_11 10
FRM_11 SOP16 FRM_11 FRM_11 10
FRM_11 SOP16 FRM_11 FRM_11 10
FRM_11 SOP16 FRM_11 FRM_11 10
FRM_11 SOP16 FRM_11 FRM_11 9
SOP10 FRM_04 9
SOP10 FRM_04 9
SOP13 FRM_02 C 9
SOP15 FRM_01 I 9
SOP10 FRM_04 2
SOP10 FRM_04 2
SOP10 FRM_04 2
SOP10 FRM_04 2
SOP14 FRM_02 T 2
FRM_11 SOP16 FRM_11 FRM_11 2
FRM_11 SOP16 FRM_11 FRM_11 2
FRM_11 SOP16 FRM_11 FRM_11 2
FRM_11 SOP16 FRM_11 FRM_11 2
FRM_11 SOP16 FRM_11 FRM_11 2
FRM_11 SOP16 FRM_11 FRM_11 2
FRM_11 SOP16 FRM_11 FRM_11 2
FRM_11 SOP16 FRM_11 FRM_11 2
FRM_11 SOP16 FRM_11 FRM_11 2
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 91/464
FRM_11 SOP16 FRM_11 FRM_11 2
FRM_11 SOP16 FRM_11 FRM_11 2
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP21 FRM_03 1 Y
FRM_11 SOP16 FRM_11 9
FRM_11 SOP16 FRM_11 9
FRM_11 SOP16 FRM_11 9
FRM_11 SOP16 FRM_11 9
FRM_11 SOP16 FRM_11 9
SOP14 FRM_02 I 11
SOP14 FRM_02 I 11
SOP14 FRM_02 I 11
SOP20 FRM_02 1 Y
SOP20 FRM_02 1 Y
SOP20 FRM_02 1 Y
SOP19 FRM_01 1 Y
SOP19 FRM_01 1 Y
SOP19 FRM_01 1 Y
SOP13 FRM_02 C 9
SOP13 FRM_02 I 9
SOP14 FRM_02 I 6
SOP14 FRM_02 I 6
SOP14 FRM_02 I 6
SOP14 FRM_02 T 6
SOP14 FRM_02 I 6SOP14 FRM_02 T 6
FRM_11 SOP16 FRM_11 FRM_11 6
FRM_11 SOP16 FRM_11 FRM_11 6
SOP14 FRM_02 T 6
SOP14 FRM_02 I 6
SOP14 FRM_02 T 6
FRM_11 SOP16 FRM_11 FRM_11 6
FRM_11 SOP16 FRM_11 FRM_11 6
FRM_11 SOP16 FRM_11 FRM_11 6
FRM_11 SOP16 FRM_11 FRM_11 6
FRM_11 SOP16 FRM_11 FRM_11 6
FRM_11 SOP16 FRM_11 FRM_11 6
FRM_11 SOP16 FRM_11 FRM_11 6
FRM_11 SOP16 FRM_11 FRM_11 6
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 92/464
FRM_11 SOP16 FRM_11 FRM_11 6
FRM_11 SOP16 FRM_11 FRM_11 6
FRM_11 SOP16 FRM_11 FRM_11 6
SOP14 FRM_02 T 6
SOP13 FRM_02 I 9
SOP13 FRM_02 T 9
SOP13 FRM_02 I 9
SOP13 FRM_02 I 9
SOP13 FRM_02 I 9
SOP13 FRM_02 I 9
SOP13 FRM_02 I 9
SOP13 FRM_02 T 9
SOP13 FRM_02 T 9
SOP13 FRM_02 I 9
SOP13 FRM_02 T 9
SOP13 FRM_02 I 9
FRM_11 SOP16 FRM_11 FRM_11 9FRM_11 SOP16 FRM_11 FRM_11 9
SOP15 FRM_01 T 9
SOP15 FRM_01 I 9
SOP15 FRM_01 T 9
SOP15 FRM_01 T 9
SOP15 FRM_01 I 9
SOP15 FRM_01 T 9
SOP15 FRM_01 I 9
SOP15 FRM_01 T 9
SOP15 FRM_01 I 9
SOP15 FRM_01 T 9
SOP15 FRM_01 T 9
SOP15 FRM_01 I 9
SOP15 FRM_01 T 9
SOP15 FRM_01 T 9
SOP15 FRM_01 T 9
SOP15 FRM_01 I 9
SOP15 FRM_01 T 9
SOP14 FRM_02 C 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 FRM_11 2
SOP13 FRM_02 I 2
SOP13 FRM_02 I 2
SOP15 FRM_01 I 2
SOP14 FRM_02 C 2
FRM_11 SOP16 FRM_11 I 2
FRM_11 SOP16 FRM_11 I 2
FRM_11 SOP16 FRM_11 FRM_11 2
SOP13 FRM_02 I 2
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 93/464
SOP13 FRM_02 I 2
SOP15 FRM_01 I 2
SOP14 FRM_02 C 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 FRM_11 2
SOP13 FRM_02 I 2SOP13 FRM_02 I 2
SOP15 FRM_01 I 2
SOP14 FRM_02 C 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 FRM_11 2
SOP13 FRM_02 I 2
SOP13 FRM_02 I 2
SOP15 FRM_01 I 2
SOP14 FRM_02 C 2
FRM_11 SOP16 FRM_11 2FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 FRM_11 2
SOP13 FRM_02 I 2
SOP13 FRM_02 I 2
SOP15 FRM_01 I 2
SOP14 FRM_02 C 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 FRM_11 2
SOP13 FRM_02 I 2SOP13 FRM_02 I 2
SOP15 FRM_01 I 2
SOP14 FRM_02 C 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 FRM_11 2
SOP13 FRM_02 I 2
SOP13 FRM_02 I 2
SOP15 FRM_01 I 2
SOP14 FRM_02 C 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 FRM_11 2
SOP13 FRM_02 I 2
SOP13 FRM_02 I 2
SOP15 FRM_01 I 2
SOP14 FRM_02 C 4
FRM_11 SOP16 FRM_11 4
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 94/464
FRM_11 SOP16 FRM_11 4
SOP13 FRM_02 I 4
SOP13 FRM_02 I 4
SOP15 FRM_01 T 4
SOP15 FRM_01 I 4
SOP15 FRM_01 I 4
SOP14 FRM_02 C 4
FRM_11 SOP16 FRM_11 4
FRM_11 SOP16 FRM_11 4
SOP13 FRM_02 I 4
SOP13 FRM_02 I 4
SOP15 FRM_01 T 4
SOP15 FRM_01 I 4
SOP15 FRM_01 I 4
SOP14 FRM_02 C 4
FRM_11 SOP16 FRM_11 4
FRM_11 SOP16 FRM_11 4
SOP13 FRM_02 I 4
SOP13 FRM_02 I 4SOP15 FRM_01 T 4
SOP15 FRM_01 I 4
SOP15 FRM_01 I 4
SOP14 FRM_02 C 4
FRM_11 SOP16 FRM_11 4
FRM_11 SOP16 FRM_11 4
SOP13 FRM_02 I 4
SOP13 FRM_02 I 4
SOP15 FRM_01 T 4
SOP15 FRM_01 I 4
SOP15 FRM_01 I 4
SOP14 FRM_02 C 5
FRM_11 SOP16 FRM_11 5
FRM_11 SOP16 FRM_11 5
SOP13 FRM_02 I 5
SOP13 FRM_02 I 5
SOP15 FRM_01 T 5
SOP15 FRM_01 I 5
SOP15 FRM_01 I 5
SOP15 FRM_01 I 10
SOP13 FRM_02 T 4
FRM_11 SOP16 FRM_11 FRM_11 3
FRM_11 SOP16 FRM_11 FRM_11 3
FRM_11 SOP16 FRM_11 FRM_11 3
FRM_11 SOP16 FRM_11 FRM_11 3
FRM_11 SOP16 FRM_11 FRM_11 3
SOP14 FRM_02 C 8
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 95/464
SOP14 FRM_02 C 8
FRM_11 SOP16 FRM_11 8
FRM_11 SOP16 FRM_11 8
SOP14 FRM_02 I 8
SOP14 FRM_02 T 8
SOP14 FRM_02 I 8
SOP14 FRM_02 C 8SOP14 FRM_02 T 8
SOP14 FRM_02 T 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
SOP13 FRM_02 I 8
SOP13 FRM_02 C 8
SOP13 FRM_02 I 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
SOP15 FRM_01 I 8
SOP15 FRM_01 I 8
SOP15 FRM_01 I 8
SOP15 FRM_01 I 8
SOP15 FRM_01 I 8
SOP14 FRM_02 I 12
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 1 Y
SOP13 FRM_02 I 1 Y
SOP13 FRM_02 I 1 Y
SOP13 FRM_02 T 1
FRM_11 SOP16 FRM_11 FRM_11 1 Y
SOP15 FRM_01 I 1 Y
SOP15 FRM_01 C 1
SOP15 FRM_01 T 1
FRM_11 SOP16 FRM_11 FRM_11 1 Y
7
7
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 96/464
SOP14 FRM_02 7
SOP14 FRM_02 I 7
FRM_11 SOP16 FRM_11 7
FRM_11 SOP16 FRM_11 FRM_11 7
FRM_11 SOP16 FRM_11 FRM_11 7
FRM_11 SOP16 FRM_11 FRM_11 7
77
FRM_11 SOP16 FRM_11 FRM_11 7
FRM_11 SOP16 FRM_11 FRM_11 7
FRM_11 SOP16 FRM_11 FRM_11 7
SOP13 FRM_02 I 7
SOP13 FRM_02 T 7
SOP13 FRM_02 T 7
SOP13 FRM_02 T 7
SOP13 FRM_02 T 7
SOP13 FRM_02 T 7
SOP13 FRM_02 T 7
SOP13 FRM_02 T 7
SOP15 FRM_01 I 7
SOP15 FRM_01 T 7
SOP15 FRM_01 T 7
SOP15 FRM_01 I 7
SOP15 FRM_01 I 7
SOP15 FRM_01 I 7
SOP15 FRM_01 T 7
SOP15 FRM_01 T 7
FRM_11 SOP16 FRM_11 FRM_11 7
FRM_11 SOP16 FRM_11 FRM_11 7
FRM_11 SOP16 FRM_11 FRM_11 7
FRM_11 SOP16 FRM_11 FRM_11 7
FRM_11 SOP16 FRM_11 FRM_11 7
FRM_11 SOP16 FRM_11 FRM_11 7
FRM_11 SOP16 FRM_11 FRM_11 7
FRM_12 3
8
8
SOP14 FRM_02 8
SOP14 FRM_02 I 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 97/464
FRM_11 SOP16 FRM_11 FRM_11 8
8
8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
SOP13 FRM_02 I 8
SOP13 FRM_02 T 8
SOP13 FRM_02 T 8
SOP13 FRM_02 T 8
SOP13 FRM_02 T 8
SOP13 FRM_02 T 8
SOP13 FRM_02 T 8
SOP13 FRM_02 T 8
SOP15 FRM_01 I 8
SOP15 FRM_01 T 8
SOP15 FRM_01 T 8SOP15 FRM_01 I 8
SOP15 FRM_01 I 8
SOP15 FRM_01 I 8
SOP15 FRM_01 T 8
SOP15 FRM_01 T 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_12 4
SOP10 FRM_04 2
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 98/464
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP14 FRM_02 C 8
SOP14 FRM_02 T 8
SOP14 FRM_02 T 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
SOP14 FRM_02 T 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
SOP10 FRM_04 8
SOP13 FRM_02 I 8
SOP13 FRM_02 T 8
SOP13 FRM_02 I 8
SOP15 FRM_01 C 8
SOP15 FRM_01 C 8SOP15 FRM_01 C 8
SOP15 FRM_01 T 8
SOP15 FRM_01 I 8
SOP15 FRM_01 C 8
SOP15 FRM_01 T 8
SOP14 FRM_02 C 5
SOP14 FRM_02 T 5
SOP14 FRM_02 T 5
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 99/464
FRM_11 SOP16 FRM_11 FRM_11 5
FRM_11 SOP16 FRM_11 FRM_11 5
SOP14 FRM_02 T 5
FRM_11 SOP16 FRM_11 FRM_11 5
FRM_11 SOP16 FRM_11 FRM_11 5
FRM_11 SOP16 FRM_11 FRM_11 5
SOP10 FRM_04 5
SOP13 FRM_02 I 5
SOP13 FRM_02 T 5
SOP13 FRM_02 I 5
SOP15 FRM_01 C 5
SOP15 FRM_01 C 5
SOP15 FRM_01 C 5
SOP15 FRM_01 T 5
SOP15 FRM_01 I 5
SOP15 FRM_01 C 5
SOP15 FRM_01 T 5SOP14 FRM_02 C 7
SOP14 FRM_02 T 7
SOP14 FRM_02 T 7
FRM_11 SOP16 FRM_11 FRM_11 7
FRM_11 SOP16 FRM_11 FRM_11 7
SOP14 FRM_02 T 7
FRM_11 SOP16 FRM_11 FRM_11 7
FRM_11 SOP16 FRM_11 FRM_11 7
FRM_11 SOP16 FRM_11 FRM_11 7
SOP10 FRM_04 7 Y
SOP13 FRM_02 I 7
SOP13 FRM_02 T 7
SOP13 FRM_02 I 7
SOP15 FRM_01 C 7
SOP15 FRM_01 C 7
SOP15 FRM_01 C 7
SOP15 FRM_01 T 7
SOP15 FRM_01 I 7
SOP15 FRM_01 C 7
SOP15 FRM_01 T 7
SOP14 FRM_02 C 3SOP14 FRM_02 T 3
SOP14 FRM_02 T 3
FRM_11 SOP16 FRM_11 FRM_11 3
FRM_11 SOP16 FRM_11 FRM_11 3
SOP14 FRM_02 T 3
FRM_11 SOP16 FRM_11 FRM_11 3
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 100/464
FRM_11 SOP16 FRM_11 FRM_11 3
FRM_11 SOP16 FRM_11 FRM_11 3
SOP10 FRM_04 3
SOP13 FRM_02 I 3
SOP13 FRM_02 T 3
SOP13 FRM_02 I 3
SOP15 FRM_01 C 3
SOP15 FRM_01 C 3
SOP15 FRM_01 C 3
SOP15 FRM_01 T 3
SOP15 FRM_01 I 3
SOP15 FRM_01 C 3
SOP15 FRM_01 T 3
SOP14 FRM_02 C 4
SOP14 FRM_02 T 4
SOP14 FRM_02 T 4
FRM_11 SOP16 FRM_11 FRM_11 4
FRM_11 SOP16 FRM_11 FRM_11 4SOP14 FRM_02 T 4
FRM_11 SOP16 FRM_11 FRM_11 4
FRM_11 SOP16 FRM_11 FRM_11 4
FRM_11 SOP16 FRM_11 FRM_11 4
SOP10 FRM_04 4
SOP13 FRM_02 I 4
SOP13 FRM_02 T 4
SOP13 FRM_02 I 4
SOP15 FRM_01 C 4SOP15 FRM_01 C 4
SOP15 FRM_01 C 4
SOP15 FRM_01 T 4
SOP15 FRM_01 I 4
SOP15 FRM_01 C 4
SOP15 FRM_01 T 4
SOP14 FRM_02 C 6
SOP14 FRM_02 T 6
SOP14 FRM_02 T 6
FRM_11 SOP16 FRM_11 FRM_11 6
FRM_11 SOP16 FRM_11 FRM_11 6
SOP14 FRM_02 T 6
FRM_11 SOP16 FRM_11 FRM_11 6
FRM_11 SOP16 FRM_11 FRM_11 6
FRM_11 SOP16 FRM_11 FRM_11 6
SOP10 FRM_04 6
SOP13 FRM_02 I 6
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 101/464
SOP13 FRM_02 T 6
SOP13 FRM_02 I 6
SOP15 FRM_01 C 6
SOP15 FRM_01 C 6
SOP15 FRM_01 C 6
SOP15 FRM_01 T 6
SOP15 FRM_01 I 6
SOP15 FRM_01 C 6
SOP15 FRM_01 T 6
SOP14 FRM_02 C 8
SOP14 FRM_02 T 8
SOP14 FRM_02 T 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
SOP14 FRM_02 T 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
SOP10 FRM_04 8
SOP13 FRM_02 I 8
SOP13 FRM_02 T 8
SOP13 FRM_02 I 8
SOP15 FRM_01 C 8
SOP15 FRM_01 C 8
SOP15 FRM_01 C 8
SOP15 FRM_01 T 8
SOP15 FRM_01 I 8
SOP15 FRM_01 C 8
SOP15 FRM_01 T 8
SOP14 FRM_02 I 1
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 1 Y
SOP13 FRM_02 I 1
SOP13 FRM_02 T 1
SOP13 FRM_02 T 1
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 102/464
SOP13 FRM_02 I 1
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 5
FRM_11 SOP16 FRM_11 FRM_11 5
FRM_11 SOP16 FRM_11 FRM_11 5
FRM_11 SOP16 FRM_11 FRM_11 5
FRM_11 SOP16 FRM_11 FRM_11 5
FRM_11 SOP16 FRM_11 FRM_11 5
FRM_11 SOP16 FRM_11 FRM_11 5
FRM_11 SOP16 FRM_11 FRM_11 5
FRM_11 SOP16 FRM_11 FRM_11 5
FRM_11 SOP16 FRM_11 FRM_11 5
SOP13 FRM_02 I 5
SOP13 FRM_02 I 5
SOP13 FRM_02 T 5
SOP14 FRM_02 T 10
SOP14 FRM_02 T 10
SOP15 FRM_01 I 9
FRM_11 SOP16 FRM_11 FRM_11 3
FRM_11 SOP16 FRM_11 FRM_11 3
SOP10 FRM_04 10
10
10
SOP15 FRM_01 I 10
FRM_11 SOP16 FRM_11 FRM_11 3
FRM_11 SOP16 FRM_11 FRM_11 3
SOP10 FRM_04 11
11
11
SOP15 FRM_01 I 11
FRM_11 SOP16 FRM_11 FRM_11 3
FRM_11 SOP16 FRM_11 FRM_11 3
SOP10 FRM_04 1212
12
SOP15 FRM_01 I 12
10
10
SOP10 FRM_04 10
FRM_11 SOP16 FRM_11 FRM_11 3
FRM_11 SOP16 FRM_11 FRM_11 3
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 103/464
SOP13 FRM_02 I 3
3
3
FRM_11 SOP16 FRM_11 FRM_11 3
SOP13 FRM_02 I 1
FRM_11 SOP16 FRM_11 FRM_11 1 Y
SOP15 FRM_01 I 1SOP13 FRM_02 T 9
SOP15 FRM_01 I 9
SOP13 FRM_02 T 9
SOP15 FRM_01 I 9
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP09 FRM_05 3
SOP10 FRM_04 10
SOP13 FRM_02 T 10
SOP13 FRM_02 T 10SOP15 FRM_01 I 10
SOP15 FRM_01 I 10
FRM_11 SOP16 FRM_11 FRM_11 10
FRM_11 SOP16 FRM_11 FRM_11 10
FRM_11 SOP16 FRM_11 FRM_11 10
FRM_11 SOP16 FRM_11 FRM_11 10
FRM_11 SOP16 FRM_11 FRM_11 10
10
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP28 6
SOP28 6
SOP28 6
SOP28 6
SOP28 6
SOP28 6
SOP28 6
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 104/464
SOP28 6
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 YSOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP29 FRM_05 1 Y
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 105/464
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP09 FRM_05 2
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 106/464
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP15 FRM_05 4
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP14 FRM_02 I 10
SOP26 FRM_05 1 Y
SOP26 FRM_05 1 Y
SOP26 FRM_05 1 Y
SOP26 FRM_05 1 Y
SOP26 FRM_05 1 Y
SOP26 FRM_05 1 Y
SOP26 FRM_05 1 Y
SOP26 FRM_05 1 Y
FRM_11 SOP16 FRM_11 FRM_11 10
SOP27 FRM_05 1 Y
SOP27 FRM_05 1 Y
1 Y
SOP14 FRM_02 I 10
SOP26 FRM_05 1 Y
SOP26 FRM_05 1 Y
SOP26 FRM_05 1 Y
SOP26 FRM_05 1 Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 107/464
SOP26 FRM_05 1 Y
SOP26 FRM_05 1 Y
SOP26 FRM_05 1 Y
SOP26 FRM_05 1 Y
FRM_11 SOP16 FRM_11 FRM_11 10
SOP27 FRM_05 1 Y
SOP27 FRM_05 1 Y
1 Y
SOP14 FRM_02 C 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 FRM_11 2
SOP13 FRM_02 I 2
SOP13 FRM_02 I 2
SOP15 FRM_01 I 2
SOP14 FRM_02 C 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 FRM_11 2
SOP13 FRM_02 I 2
SOP13 FRM_02 I 2
SOP15 FRM_01 I 2
SOP14 FRM_02 C 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 FRM_11 2
SOP13 FRM_02 I 2
SOP13 FRM_02 I 2
SOP15 FRM_01 I 2
SOP14 FRM_02 C 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 FRM_11 2
SOP13 FRM_02 I 2
SOP13 FRM_02 I 2
SOP15 FRM_01 I 2
SOP14 FRM_02 C 2FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 FRM_11 2
SOP13 FRM_02 I 2
SOP13 FRM_02 I 2
SOP15 FRM_01 I 2
SOP14 FRM_02 C 2
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 108/464
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 FRM_11 2
SOP13 FRM_02 I 2
SOP13 FRM_02 I 2
SOP15 FRM_01 I 2
SOP14 FRM_02 C 2FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 FRM_11 2
SOP13 FRM_02 I 2
SOP13 FRM_02 I 2
SOP15 FRM_01 I 2
SOP14 FRM_02 C 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 FRM_11 2
SOP13 FRM_02 I 2
SOP13 FRM_02 I 2
SOP15 FRM_01 I 2
SOP14 FRM_02 C 4
FRM_11 SOP16 FRM_11 4
FRM_11 SOP16 FRM_11 4
SOP13 FRM_02 I 4
SOP13 FRM_02 I 4
SOP15 FRM_01 T 4
SOP15 FRM_01 I 4
SOP15 FRM_01 I 4
SOP14 FRM_02 C 4
FRM_11 SOP16 FRM_11 4
FRM_11 SOP16 FRM_11 4
SOP13 FRM_02 I 4
SOP13 FRM_02 I 4
SOP15 FRM_01 T 4
SOP15 FRM_01 I 4
SOP15 FRM_01 I 4
SOP14 FRM_02 C 4
FRM_11 SOP16 FRM_11 4
FRM_11 SOP16 FRM_11 4
SOP13 FRM_02 I 4SOP13 FRM_02 I 4
SOP15 FRM_01 T 4
SOP15 FRM_01 I 4
SOP15 FRM_01 I 4
SOP14 FRM_02 C 4
FRM_11 SOP16 FRM_11 4
FRM_11 SOP16 FRM_11 4
SOP13 FRM_02 I 4
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 109/464
SOP13 FRM_02 I 4
SOP15 FRM_01 T 4
SOP15 FRM_01 I 4
SOP15 FRM_01 I 4
SOP14 FRM_02 C 5
FRM_11 SOP16 FRM_11 5
FRM_11 SOP16 FRM_11 5
SOP13 FRM_02 I 5
SOP13 FRM_02 I 5
SOP15 FRM_01 T 5
SOP15 FRM_01 I 5
SOP15 FRM_01 I 5
SOP14 FRM_02 C 8
SOP14 FRM_02 T 8
SOP14 FRM_02 T 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
SOP14 FRM_02 T 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
SOP10 FRM_04 8
SOP13 FRM_02 I 8
SOP13 FRM_02 T 8
SOP13 FRM_02 I 8
SOP15 FRM_01 C 8
SOP15 FRM_01 C 8
SOP15 FRM_01 C 8
SOP15 FRM_01 T 8
SOP15 FRM_01 I 8
SOP15 FRM_01 C 8
SOP15 FRM_01 T 8
SOP15 FRM_01 I 8
SOP14 FRM_02 C 5
SOP14 FRM_02 T 5
SOP14 FRM_02 T 5
FRM_11 SOP16 FRM_11 FRM_11 5
FRM_11 SOP16 FRM_11 FRM_11 5
SOP14 FRM_02 T 5
FRM_11 SOP16 FRM_11 FRM_11 5
FRM_11 SOP16 FRM_11 FRM_11 5
FRM_11 SOP16 FRM_11 FRM_11 5
SOP10 FRM_04 5
SOP13 FRM_02 I 5
SOP13 FRM_02 T 5
SOP13 FRM_02 I 5
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 110/464
SOP15 FRM_01 C 5
SOP15 FRM_01 C 5
SOP15 FRM_01 C 5
SOP15 FRM_01 T 5
SOP15 FRM_01 I 5
SOP15 FRM_01 C 5
SOP15 FRM_01 T 5
SOP15 FRM_01 I 5
SOP14 FRM_02 C 7
SOP14 FRM_02 T 7
SOP14 FRM_02 T 7
FRM_11 SOP16 FRM_11 FRM_11 7
FRM_11 SOP16 FRM_11 FRM_11 7
SOP14 FRM_02 T 7
FRM_11 SOP16 FRM_11 FRM_11 7
FRM_11 SOP16 FRM_11 FRM_11 7
FRM_11 SOP16 FRM_11 FRM_11 7
SOP10 FRM_04 7 Y
SOP13 FRM_02 I 7
SOP13 FRM_02 T 7
SOP13 FRM_02 I 7
SOP15 FRM_01 C 7
SOP15 FRM_01 C 7
SOP15 FRM_01 C 7
SOP15 FRM_01 T 7
SOP15 FRM_01 I 7
SOP15 FRM_01 C 7
SOP15 FRM_01 T 7
SOP15 FRM_01 I 7
SOP14 FRM_02 C 3
SOP14 FRM_02 T 3
SOP14 FRM_02 T 3
FRM_11 SOP16 FRM_11 FRM_11 3
FRM_11 SOP16 FRM_11 FRM_11 3
SOP14 FRM_02 T 3
FRM_11 SOP16 FRM_11 FRM_11 3
FRM_11 SOP16 FRM_11 FRM_11 3
FRM_11 SOP16 FRM_11 FRM_11 3
SOP10 FRM_04 3
SOP13 FRM_02 I 3
SOP13 FRM_02 T 3
SOP13 FRM_02 I 3
SOP15 FRM_01 C 3
SOP15 FRM_01 C 3
SOP15 FRM_01 C 3
SOP15 FRM_01 T 3
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 111/464
SOP15 FRM_01 I 3
SOP15 FRM_01 C 3
SOP15 FRM_01 T 3
SOP15 FRM_01 I 3
SOP14 FRM_02 C 4
SOP14 FRM_02 T 4
SOP14 FRM_02 T 4
FRM_11 SOP16 FRM_11 FRM_11 4
FRM_11 SOP16 FRM_11 FRM_11 4
SOP14 FRM_02 T 4
FRM_11 SOP16 FRM_11 FRM_11 4
FRM_11 SOP16 FRM_11 FRM_11 4
FRM_11 SOP16 FRM_11 FRM_11 4
SOP10 FRM_04 4
SOP13 FRM_02 I 4
SOP13 FRM_02 T 4
SOP13 FRM_02 I 4SOP15 FRM_01 C 4
SOP15 FRM_01 C 4
SOP15 FRM_01 C 4
SOP15 FRM_01 T 4
SOP15 FRM_01 I 4
SOP15 FRM_01 C 4
SOP15 FRM_01 T 4
SOP15 FRM_01 I 4
SOP14 FRM_02 C 6
SOP14 FRM_02 T 6
SOP14 FRM_02 T 6
FRM_11 SOP16 FRM_11 FRM_11 6
FRM_11 SOP16 FRM_11 FRM_11 6
SOP14 FRM_02 T 6
FRM_11 SOP16 FRM_11 FRM_11 6
FRM_11 SOP16 FRM_11 FRM_11 6
FRM_11 SOP16 FRM_11 FRM_11 6
SOP10 FRM_04 6
SOP13 FRM_02 I 6
SOP13 FRM_02 T 6
SOP13 FRM_02 I 6SOP15 FRM_01 C 6
SOP15 FRM_01 C 6
SOP15 FRM_01 C 6
SOP15 FRM_01 T 6
SOP15 FRM_01 I 6
SOP15 FRM_01 C 6
SOP15 FRM_01 T 6
SOP15 FRM_01 I 6
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 112/464
SOP14 FRM_02 C 8
SOP14 FRM_02 T 8
SOP14 FRM_02 T 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
SOP14 FRM_02 T 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
SOP10 FRM_04 8
SOP13 FRM_02 I 8
SOP13 FRM_02 T 8
SOP13 FRM_02 I 8
SOP15 FRM_01 C 8
SOP15 FRM_01 C 8
SOP15 FRM_01 C 8
SOP15 FRM_01 T 8SOP15 FRM_01 I 8
SOP15 FRM_01 C 8
SOP15 FRM_01 T 8
SOP15 FRM_01 I 8
SOP14 FRM_02 I 1
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 1 Y
SOP13 FRM_02 I 1
SOP13 FRM_02 T 1
SOP13 FRM_02 T 1SOP13 FRM_02 I 1
FRM_11 SOP16 FRM_11 FRM_11 1 Y
FRM_11 SOP16 FRM_11 FRM_11 5
FRM_11 SOP16 FRM_11 FRM_11 5
FRM_11 SOP16 FRM_11 FRM_11 5
FRM_11 SOP16 FRM_11 FRM_11 5
FRM_11 SOP16 FRM_11 FRM_11 5
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 113/464
FRM_11 SOP16 FRM_11 FRM_11 5
FRM_11 SOP16 FRM_11 FRM_11 5
FRM_11 SOP16 FRM_11 FRM_11 5
FRM_11 SOP16 FRM_11 FRM_11 5
FRM_11 SOP16 FRM_11 FRM_11 5
SOP13 FRM_02 I 5
SOP13 FRM_02 T 5
SOP13 FRM_02 T 5
SOP15 FRM_01 I 9
SOP14 FRM_02 I 9
SOP13 FRM_02 T 9
SOP15 FRM_01 T 9
SOP15 FRM_01 I 9
SOP15 FRM_01 I 9
SOP13 FRM_02 I 9SOP15 FRM_01 T 9
SOP15 FRM_01 I 9
SOP15 FRM_01 I 9
SOP14 FRM_02 C 9
SOP14 FRM_02 T 9
SOP15 FRM_01 T 9
SOP15 FRM_01 I 9
SOP14 FRM_02 T 9
SOP15 FRM_01 T 9
SOP15 FRM_01 I 9
SOP13 FRM_02 I 9
SOP14 FRM_02 T 9
SOP15 FRM_01 I 9
FRM_11 SOP16 FRM_11 FRM_11 9
FRM_11 SOP16 FRM_11 FRM_11 9
FRM_11 SOP16 FRM_11 FRM_11 9
FRM_11 SOP16 FRM_11 FRM_11 9
FRM_11 SOP16 FRM_11 FRM_11 9
FRM_11 SOP16 FRM_11 FRM_11 9
FRM_11 SOP16 FRM_11 FRM_11 9
FRM_11 SOP16 FRM_11 FRM_11 9
FRM_11 SOP16 FRM_11 FRM_11 9
SOP10 FRM_04 9
SOP10 FRM_04 9
SOP14 FRM_02 T 9
SOP15 FRM_01 I 9
SOP15 FRM_01 I 9
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 114/464
SOP13 FRM_02 I 9
SOP13 FRM_02 I 9
SOP14 FRM_02 I 9
SOP13 FRM_02 I 9
SOP13 FRM_02 I 9
SOP15 FRM_01 I 9
SOP15 FRM_01 T 9
SOP14 FRM_02 I 9
SOP13 FRM_02 I 9
SOP15 FRM_01 I 9
SOP15 FRM_01 T 9
SOP13 FRM_02 I 9
SOP14 FRM_02 7
SOP14 FRM_02 I 7
FRM_11 SOP16 FRM_11 7
FRM_11 SOP16 FRM_11 FRM_11 7
7
7
FRM_11 SOP16 FRM_11 FRM_11 7
FRM_11 SOP16 FRM_11 FRM_11 7
FRM_11 SOP16 FRM_11 FRM_11 7
SOP13 FRM_02 I 7
SOP13 FRM_02 T 7
SOP13 FRM_02 I 7
SOP13 FRM_02 T 7
SOP13 FRM_02 I 7
SOP13 FRM_02 I 7
SOP13 FRM_02 T 7SOP13 FRM_02 I 7
SOP15 FRM_01 I 7
SOP15 FRM_01 T 7
SOP15 FRM_01 T 7
SOP15 FRM_01 T 7
SOP15 FRM_01 T 7
SOP15 FRM_01 T 7
SOP15 FRM_01 I 7
SOP15 FRM_01 I 7
FRM_11 SOP16 FRM_11 FRM_11 7
FRM_11 SOP16 FRM_11 FRM_11 7
FRM_11 SOP16 FRM_11 FRM_11 7
FRM_11 SOP16 FRM_11 FRM_11 7
FRM_11 SOP16 FRM_11 FRM_11 7
FRM_11 SOP16 FRM_11 FRM_11 7
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 115/464
FRM_11 SOP16 FRM_11 FRM_11 7
FRM_12 3
SOP14 FRM_02 8
SOP14 FRM_02 I 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
88
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
SOP13 FRM_02 I 8
SOP13 FRM_02 T 8
SOP13 FRM_02 I 8
SOP13 FRM_02 T 8
SOP13 FRM_02 I 8
SOP13 FRM_02 I 8
SOP13 FRM_02 T 8
SOP13 FRM_02 I 8
SOP15 FRM_01 T 8
SOP15 FRM_01 T 8
SOP15 FRM_01 T 8
SOP15 FRM_01 T 8
SOP15 FRM_01 T 8
SOP15 FRM_01 T 8
SOP15 FRM_01 I 8
SOP15 FRM_01 I 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_11 SOP16 FRM_11 FRM_11 8
FRM_12 4
SOP21 FRM_03 1 Y
FRM_11 SOP16 FRM_11 9
FRM_11 SOP16 FRM_11 9
FRM_11 SOP16 FRM_11 9
FRM_11 SOP16 FRM_11 9
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 116/464
SOP14 FRM_02 I 11
SOP14 FRM_02 I 11
SOP14 FRM_02 I 11
SOP23 FRM_02 1 Y
SOP23 FRM_02 1 Y
SOP23 FRM_02 1 Y
SOP22 FRM_01 1 Y
SOP22 FRM_01 1 Y
SOP22 FRM_01 1 Y
SOP10 FRM_04 2
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP10 FRM_04 12
SOP21 FRM_03 1 Y
SOP20 FRM_02 1 Y
SOP19 FRM_01 1 Y
SOP15 FRM_01 10
SOP15 FRM_01 10SOP15 FRM_01 5
SOP15 FRM_01 5
SOP15 FRM_01 5
SOP15 FRM_01 1 Y
SOP15 FRM_01 1 Y
FRM_11 SOP16 FRM_11 4
FRM_11 SOP16 FRM_11 4
SOP14 FRM_02 1 Y
SOP14 FRM_02 4SOP14 FRM_02 4
SOP14 FRM_02 9
SOP14 FRM_02 4
SOP14 FRM_02 4
SOP14 FRM_02 4
SOP14 FRM_02 4
SOP14 FRM_02 4
SOP14 FRM_02 4
SOP10 FRM_04 4
SOP10 FRM_04 4
SOP13 FRM_02 2
SOP13 FRM_02 2
SOP13 FRM_02 3
SOP13 FRM_02 3
SOP13 FRM_02 3
SOP13 FRM_02 4
SOP13 FRM_02 9
SOP15 FRM_01 10
SOP15 FRM_01 10
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 117/464
SOP15 FRM_01 7
SOP15 FRM_01 7
SOP15 FRM_01 7
SOP15 FRM_01 7
SOP15 FRM_01 7
FRM_11 SOP16 FRM_11 1 Y
SOP10 FRM_04 1 YSOP14 FRM_02 1 Y
FRM_11 SOP16 FRM_11 1 Y
FRM_11 SOP16 FRM_11 1 Y
FRM_11 SOP16 FRM_11 1 Y
SOP15 FRM_01 1 Y
SOP15 FRM_01 1 Y
SOP15 FRM_01 1 Y
FRM_11 SOP16 FRM_11 2
SOP10 FRM_04 2
SOP14 FRM_02 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 2
FRM_11 SOP16 FRM_11 2
SOP15 FRM_01 2
SOP15 FRM_01 2
SOP15 FRM_01 2
SOP09 FRM_05 3
SOP09 FRM_05 3
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 118/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 119/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 120/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 121/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 122/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 123/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 124/464
2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun
Y
Y
Y
Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y YY
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
2013 20
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 125/464
Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y YY Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y YY Y Y
Y Y Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 126/464
Y
Y
Y
Y
Y
Y
YY
Y
Y
Y Y
Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 127/464
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y YY Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y
Y Y Y
Y
Y
Y
Y Y Y
Y Y YY
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 128/464
Y
Y
Y
Y
Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 129/464
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 130/464
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y
Y Y Y Y Y
Y Y Y Y YY Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 131/464
Y Y Y Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y Y Y
Y
Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 132/464
Y Y
Y Y
Y Y Y
Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y
Y
Y
Y
Y
Y
YY
Y Y
Y Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 133/464
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 134/464
Y Y
Y
Y Y
Y Y
Y Y
Y YY Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y YY Y
Y Y
Y Y
Y Y
Y
Y Y
Y Y
Y Y
Y YY Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 135/464
Y Y
Y Y
Y Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 136/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 137/464
Y
Y
Y
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 138/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y Y
Y Y
Y Y
Y Y
Y Y
Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 139/464
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 140/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 141/464
Y Y
Y Y
Y Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 142/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 143/464
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 144/464
Y Y
Y Y
Y Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y Y Y Y
Y Y Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 145/464
Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y YY Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 146/464
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y YY Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 147/464
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 148/464
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 149/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 150/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 151/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 152/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 153/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 154/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y Y Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 155/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 156/464
Y Y
Y Y Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 157/464
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y
YY
Y
Y
Y Y
Y Y
Y YY Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 158/464
Y
Y
Y
Y
Y
Y
Y Y
Y
Y
Y
Y Y
Y Y Y
Y
Y Y
Y Y
Y Y
Y
Y
Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 159/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 160/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 161/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 162/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 163/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 164/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 165/464
19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35
Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov
Y Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y
Y Y Y
Y
Y Y
Y Y
Y
Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
14 2015
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 166/464
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y Y Y
Y Y Y
Y Y YY Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 167/464
Y Y
Y
Y
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 168/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y YY
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 169/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y YY Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y YY Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 170/464
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y YY Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y YY Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 171/464
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 172/464
Y Y Y Y Y
Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y
Y Y Y
Y
Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 173/464
Y
Y
Y Y
Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y
Y
Y
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 174/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y YY Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 175/464
Y
Y
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 176/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 177/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 178/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 179/464
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y Y
Y
Y
Y
Y
YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 180/464
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y Y
Y Y Y
Y Y Y
Y Y YY Y Y
Y Y Y
Y Y Y
Y Y Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 181/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
YY
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 182/464
Y
Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
YY
Y
Y
Y
Y Y Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 183/464
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 184/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 185/464
Y
Y
Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y Y
Y Y Y Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 186/464
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 187/464
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 188/464
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 189/464
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 190/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 191/464
Y
Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 192/464
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y Y
Y
Y
Y
Y
Y
Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 193/464
Y
Y
Y
Y
Y
Y Y Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 194/464
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 195/464
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y
Y Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 196/464
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 197/464
Y Y Y Y
Y Y Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y YY Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 198/464
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 199/464
Y
Y
Y
Y
Y
Y
Y Y YY
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y Y Y
Y Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 200/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 201/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 202/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 203/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 204/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 205/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 206/464
36 37 38 39 40 41 42 43 44 45 46 47 48 1 2 3 4 5
Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y
Y Y Y
Y
Y
Y
Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y YY
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
2016
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 207/464
Y Y Y
Y
Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y YY Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y YY Y Y
Y Y Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 208/464
Y
Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y YY Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y YY Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 209/464
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y YY Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 210/464
Y
Y
Y
Y
Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 211/464
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 212/464
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
YY Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 213/464
Y Y Y Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y
Y
Y
Y
Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 214/464
Y Y
Y Y
Y Y Y
Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y
Y
Y
Y
Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 215/464
Y
Y
Y
YY
Y
Y Y
Y Y
Y Y
Y
Y
Y
Y Y
Y Y
Y Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 216/464
Y
Y
Y Y
Y Y
Y Y
YY
Y
Y Y
Y Y
Y Y
Y
Y
Y
Y YY Y
Y Y
Y
Y
Y
Y Y
Y Y
Y Y
YY
Y
Y Y
Y Y
Y Y
Y
Y
Y
Y Y
Y Y
Y Y
Y
Y
Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 217/464
Y Y
Y
Y
Y
Y
Y Y
Y Y
Y
Y
Y
Y
Y Y
Y Y
Y
YY
Y
Y Y
Y Y
Y
Y
Y
Y
Y Y
Y Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 218/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y Y
Y
Y
Y Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 219/464
Y
Y
Y
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 220/464
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y Y
Y Y
Y
Y
Y
YY Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 221/464
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y YY Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y Y Y
Y Y Y
Y Y Y
Y Y YY Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 222/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 223/464
Y Y
Y Y
Y Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 224/464
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 225/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 226/464
Y Y
Y Y
Y Y
Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y Y Y Y Y
Y Y Y Y Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 227/464
Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y YY Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 228/464
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y YY Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 229/464
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 230/464
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 231/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 232/464
Y Y
Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 233/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 234/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 235/464
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 236/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y Y Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 237/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 238/464
Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y YY Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 239/464
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y
Y YY Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 240/464
Y Y
Y Y YY
Y Y
Y Y
Y Y
Y
Y
Y
Y Y
Y Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 241/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 242/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 243/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 244/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 245/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 246/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 247/464
6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22
Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct
Y
Y Y
Y
Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y
Y Y Y
Y
Y
Y Y
Y Y
Y
Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y
Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
20182017
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 248/464
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y YY Y Y
Y Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 249/464
Y Y
Y
Y
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 250/464
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y YY Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y
Y Y Y
Y Y
Y Y
Y Y
Y Y Y
Y Y YY
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 251/464
Y
Y
Y
Y
Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 252/464
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 253/464
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y
Y Y Y Y Y
Y Y Y Y YY Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 254/464
Y Y Y Y
Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y
Y Y Y
Y
Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 255/464
Y
Y
Y Y Y
Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y
Y
Y
Y
Y
Y
YY
Y Y
Y Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 256/464
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y YY Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 257/464
Y
Y
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 258/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 259/464
Y
Y Y
Y Y
Y
Y
Y
YY
Y
Y Y
Y Y
Y Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 260/464
Y Y
Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 261/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
YY
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y Y Y
Y Y Y
Y Y Y
Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 262/464
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y
Y
Y
Y Y
Y Y
Y
Y Y
Y Y
Y Y
Y Y Y
Y
Y
YY
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 263/464
Y
Y
Y
Y
Y
Y Y
Y
Y
Y
Y Y
Y Y
Y
Y Y
Y Y
Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 264/464
Y
Y
Y Y Y
Y
Y
Y
Y
Y
Y Y Y
Y
Y
Y
Y Y
Y Y
Y
Y Y
Y Y
Y Y
Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 265/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y
Y Y
Y Y
Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 266/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y Y
Y Y
Y
Y
Y Y
Y
Y
Y
Y
Y Y YY
Y
Y Y
Y Y
Y Y Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 267/464
Y
Y
Y
Y
Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y Y
Y Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 268/464
Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y YY Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 269/464
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y YY Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 270/464
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y
Y Y Y
Y Y YY Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 271/464
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
YY
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 272/464
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 273/464
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y
Y Y
Y Y
Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 274/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y
Y Y
Y Y
Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 275/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y
Y Y
Y Y
Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 276/464
Y
Y
Y
Y Y
Y Y
Y
Y Y
Y Y
Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 277/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y
Y Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 278/464
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 279/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 280/464
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y
Y
Y
Y
YY
Y
Y Y Y
Y Y Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 281/464
Y
Y
Y
Y
Y
Y
Y Y Y
Y
Y
Y
Y
Y Y Y
Y
Y
Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 282/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 283/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 284/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 285/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 286/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 287/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 288/464
23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr
Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y
Y Y Y
Y
Y
Y
Y
Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
2019
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 289/464
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y Y Y
Y Y Y
Y Y YY Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y YY Y Y
Y Y Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 290/464
Y
Y
Y
Y
Y
YY
Y
Y
Y Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 291/464
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y YY Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y
Y Y Y
Y
Y
Y
Y Y Y
Y Y YY
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 292/464
Y
Y
Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y YY Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y YY Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 293/464
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y YY Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y YY Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 294/464
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 295/464
Y Y Y Y Y
Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y Y Y
Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 296/464
Y Y
Y Y
Y Y Y
Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y
Y
Y
Y
Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 297/464
Y
Y
Y
Y
Y
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y
Y
Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 298/464
Y
Y Y
Y Y
Y Y
Y
Y Y
Y Y
Y Y
Y
Y YY Y
Y Y
Y
Y Y
Y Y
Y Y
Y
Y Y
Y Y
Y Y
Y
Y Y
Y Y
Y Y
Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 299/464
Y Y
Y
Y
Y Y
Y Y
Y
Y
Y Y
Y Y
Y
Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 300/464
Y
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y Y
Y
Y
Y Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 301/464
Y
Y
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 302/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y YY Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 303/464
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y YY Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 304/464
Y
Y
Y
Y
Y
Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
YY
Y
Y Y
Y Y
Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 305/464
Y Y
Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y YY
Y Y
Y Y
Y Y
Y Y Y
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 306/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 307/464
Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y Y
Y
Y
Y
Y Y
Y Y
Y Y Y
Y Y
Y Y
Y
Y Y
Y Y
Y Y YY Y
Y Y
Y
Y
Y
Y Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 308/464
Y
Y Y
Y Y
Y Y
Y
Y Y
Y
Y
Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 309/464
Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 310/464
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y YY Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y YY Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 311/464
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y Y Y
Y Y Y
Y Y Y
Y Y YY Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 312/464
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y
Y Y Y Y
Y Y Y Y
Y Y Y Y
Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y
Y
Y
YY Y
Y Y
Y Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 313/464
Y Y
Y Y
Y Y
Y
Y
Y
YY Y
Y Y
Y Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
YY
Y
Y
Y
Y
Y Y
Y Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 314/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y
Y
Y
Y
Y
Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 315/464
Y
Y
Y
Y
Y
Y Y Y
Y
Y
Y
Y Y
Y Y
Y
Y Y
Y Y
Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 316/464
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y
Y Y
Y Y
Y Y
Y Y Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 317/464
Y
Y
Y
Y
Y
Y Y Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
YY
Y Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 318/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y Y Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 319/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 320/464
Y
Y
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 321/464
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y
Y Y Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 322/464
Y Y
Y Y YY
Y Y
Y Y
Y Y
Y
Y
Y
Y Y
Y Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y Y Y
Y Y Y Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 323/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 324/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 325/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 326/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 327/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 328/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 329/464
41 42 43 44 45 46 47 48
May Jun Jul Aug Sep Oct Nov Dec
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
2020
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 330/464
Y
Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 331/464
Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 332/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y Y
Y
Y
Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 333/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 334/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 335/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 336/464
Y Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 337/464
Y Y
Y Y
Y Y Y Y Y Y Y Y
Y
Y
Y
Y
Y
Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 338/464
Y
Y
Y
YY
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 339/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 340/464
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 341/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 342/464
Y
Y
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 343/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 344/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 345/464
Y
Y
Y
Y
Y
Y Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 346/464
Y
Y
Y
Y
Y
Y
Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 347/464
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 348/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y
Y
Y YY
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 349/464
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 350/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 351/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 352/464
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y YY Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 353/464
Y Y
Y Y
Y Y
Y Y
Y
Y Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 354/464
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 355/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 356/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 357/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 358/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 359/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 360/464
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 361/464
Y
Y
Y
Y
Y
Y
YY
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y
Y Y Y Y Y Y Y Y
Y
Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 362/464
Y
Y
Y
Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y
Y Y
Y Y
Y Y
Y Y
Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y
Y Y Y Y Y Y Y Y
Y
Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 363/464
Y
Y
Y Y
Y Y
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 364/464
LIST OF INSTRUMENTS WITHOUT PM ACTIVITY
ALL BELOW LISTED INSTRUMENT ARE ATTENDED ON
SL.NO. Equipment ID TAG NO.
1 FI-1450
2 FI-1451
3 FI-1452
4 FI-1453
5 FI-1460
6 FI-1461
7 FI-1462
8 FI-1463
9 FI-1470
10 FI-1471
11 FI-1472
12 FI-147313 FI-1910
14 FI-1911
15 FI-1920
16 FI-1921
17 FI-1122
18 FI-1132
19 FI-1142
20 FI-1152
21 FI-1222
22 FI-1232
23 FI-1242
24 FI-1252
25 FI-1511
26 FI-1512
27 FI-1521
28 FI-1522
29 FI-1531
30 FI-1532
31 FI-1541
32 FI-1542
33 FI-155134 FI-1552
35 FI-E1122
36 FI-E1132
37 FI-E1142
38 FI-E1152
39 FI-E1222
40 FI-E1232
41 FI-E1242
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 365/464
42 FI-E1252
43 FI-E1511
44 FI-E1512
45 FI-E1521
46 FI-E1522
47 FI-E1531
48FI-E1532
49 FI-E1541
50 FI-E1542
51 FI-E1551
52 FI-E1552
53 LSHH-1002
54 LSL-1510
55 LSL-1520
56 LSL-1530
57 LSL-1540
58 LSL-1550
59 FI -1102
60 FI -1202
61 DPI -6301
62 FT -6301
63 LG -4000
64 FI -6301
65 LG -3600
66 LG -3611A
67 LG -3611B
68 LG -3621A
69LG -3621B
70 LG -3631A
71 LG -3631B
72 LG -3641A
73 LG -3641B
74 LG -3651A
75 LG -3651B
76 LG -3661A
77 LG -3661B
78 LG -3671A
79 LG -3671B
80 LG -3003
81 LG -9001
82 LIT-4000
83 LSHHH-1104
84 LSHHH-1204
85 LSH-1911
86 LSH-1921
87 LSLL-3002
88 LSH-6301
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 366/464
89 LSL-6302
90 LSL-6303
91 LSH-6304
92 LSH-6305
93 LSL-6306
94 LSL-6002
95LSHH-7001
96 LSHH-7002
97 LT -3001
98 LT -3005
99 LT -9001
100 LT -1001
101 LT -1403
102 LT -1910
103 LT -1920
104 PDG-1001
105 PDG-1002
106 PDG-1003
107 PDG-1410
108 PDG-1420
109 PDG-1430
110 PDG-1511
111 PDG-1521
112 PDG-1531
113 PDG-1541
114 PDG-1551
115 PDG -2100
116PDG-3010
117 PDG-3020
118 PDG-3030
119 PG -1001
120 PG -1002
121 PG -1003
122 PG -12011
123 PG -1303
124 PG -1005
125 PG -1009
126 PG -1010A
127 PG -1010B
128 PG -1301
129 PG -1302
130 PG -1100
131 PG -1104
132 PG -1105
133 PG -1106
134 PG -1107
135 PG -1108
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 367/464
136 PG -1109
137 PG -1122
138 PG -1123
139 PG -1125
140 PG -1132
141 PG -1133
142PG -1135
143 PG -1142
144 PG -1143
145 PG -1145
146 PG -1152
147 PG -1153
148 PG -1155
149 PG -1200
150 PG -1204
151 PG -1205
152 PG -1206
153 PG -1207
154 PG -1208
155 PG -1209
156 PG -1222
157 PG -1223
158 PG -1225
159 PG -1232
160 PG -1233
161 PG -1235
162 PG -1242
163PG -1243
164 PG -1245
165 PG -1252
166 PG -1253
167 PG -1255
168 PG -1085
169 PG -1501
170 PG -1404A
171 PG -1404B
172 PG -1304
173 PG -1402
174 PG -1403
175 PG -1404A
176 PG -1404B
177 PG -1443
178 PG -1446
179 PG -1510
180 PG -1513
181 PG -1514
182 PG -1520
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 368/464
183 PG -1523
184 PG -1524
185 PG -1530
186 PG -1533
187 PG -1534
188 PG -1540
189PG -1543
190 PG -1544
191 PG -1550
192 PG -1553
193 PG -1554
194 PG -1701
195 PG -1702
196 PG -1711
197 PG -1712
198 PG -1611
199 PG -1612
200 PG -1614
201 PG -1621
202 PG -1622
203 PG -1624
204 PG -1631
205 PG -1632
206 PG -1634
207 PG -1641
208 PG -1642
209 PG -1644
210PG -1651
211 PG -1652
212 PG -1654
213 PG -1661
214 PG -1662
215 PG -1664
216 PG -1671
217 PG -1672
218 PG -1674
219 PG -1804
220 PG -1910
221 PG -1910A
222 PG -1910B
223 PG -1911
224 PG -1912
225 PG -1910A
226 PG -1910B
227 PG -1920A
228 PG -1920B
229 PG -1920
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 369/464
230 PG -1920A
231 PG -1920B
232 PG -1921
233 PG -1922
234 PG -2002
235 PG -2003
236PG -2202
237 PG -2205
238 PG -1613
239 PG -3611
240 PG -3612
241 PG -3613
242 PG -3614
243 PG -3615
244 PG -3616
245 PG -3617
246 PG -1623
247 PG -3621
248 PG -3622
249 PG -3625
250 PG -1633
251 PG -3631
252 PG -3632
253 PG -3635
254 PG -1643
255 PG -3641
256 PG -3642
257PG -3645
258 PG -1653
259 PG -3651
260 PG -3652
261 PG -3655
262 PG -1663
263 PG -3661
264 PG -3662
265 PG -3665
266 PG -1673
267 PG -3671
268 PG -3672
269 PG -3675
270 PG -11010
271 PG -11011
272 PG -3001A
273 PG -3001B
274 PG -3002
275 PG -3003
276 PG -3005
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 370/464
277 PG -3011
278 PG -3012
279 PG -3015
280 PG -3025
281 PG -3035
282 PG -4001A
283PG -4001B
284 PG -4002
285 PG -4003
286 PG -6001
287 PG -6002
288 PG -6003
289 PG -6004
290 PG -6005
291 PG -6006
292 PG -6305
293 PG -6306
294 PG -6307
295 PG -1012
296 PG -6007
297 PG -6008
298 PG -6009
299 PG -6010
300 PG -6011
301 PG -7004
302 PG -7005
303 PG -7006
304PG -7007
305 PG -1011
306 PG -1015
307 PG -7008
308 PG -7009
309 PG -7010
310 PG -7011
311 PG -7012
312 PG -8002
313 PG -1010
314 PG -1014
315 PG -8003
316 PG -9002
317 PG -9101
318 PG -9102
319 PG -9103
320 PG -9104
321 PG -9105
322 PG -TEST1
323 PG -TEST2
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 371/464
324 PG -TEST3
325 PG -TEST4
326 PG -TEST5
327 PG -TEST6
328 PG -TEST7
329 PG -TEST8
330PG -TEST9
331 PSLL-7001
332 PT -1071
333 PT -1072
334 FI-1001-1
335 FI-1103
336 FI-1403
337 FI-1911
338 FI-1921
339 FI-3001
340 FI-3003
341 FI-3005-2
342 FI-6001
343 FI-9000
344 FI-3002
345 FI-3004
346 LTD-1101
347 LTD-1201
348 TG -1001
349 TG -1002
350 TG -1003
351TG -1005
352 TG -1007
353 TG -1034
354 TG -1035
355 TG -1301
356 TG -1302
357 TG -1071
358 TG -1072
359 TG -1122
360 TG -1132
361 TG -1142
362 TG -1152
363 TG -1222
364 TG -1232
365 TG -1242
366 TG -1252
367 TG -1402
368 TG -1445
369 TG -1513
370 TG -1514
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 372/464
371 TG -1523
372 TG -1524
373 TG -1533
374 TG -1534
375 TG -1543
376 TG -1544
377TG -1553
378 TG -1554
379 TG -1702
380 TG -1704
381 TG -1712
382 TG -1714
383 TG -1613
384 TG -1614
385 TG -1615
386 TG -1623
387 TG -1624
388 TG -1625
389 TG -1633
390 TG -1634
391 TG -1635
392 TG -1643
393 TG -1644
394 TG -1645
395 TG -1653
396 TG -1654
397 TG -1655
398TG -1663
399 TG -1664
400 TG -1665
401 TG -1673
402 TG -1674
403 TG -1675
404 TG -2003
405 TG -2201
406 TG -2202
407 TG -3611
408 TG -3616A
409 TG -3616B
410 TG -3616C
411 TG -3616D
412 TG -3616E
413 TG -3616F
414 TG -3616G
415 TG -3616H
416 TG -3616I
417 TG -3616J
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 373/464
418 TG -3616K
419 TG -3616L
420 TG -3616M
421 TG -3616N
422 TG -3616O
423 TG -3616P
424TG -3621
425 TG -3626A
426 TG -3626B
427 TG -3626C
428 TG -3626D
429 TG -3626E
430 TG -3626F
431 TG -3626G
432 TG -3626H
433 TG -3626I
434 TG -3626J
435 TG -3626K
436 TG -3626L
437 TG -3626M
438 TG -3626N
439 TG -3626O
440 TG -3626P
441 TG -3631
442 TG -3636A
443 TG -3636B
444 TG -3636C
445TG -3636D
446 TG -3636E
447 TG -3636F
448 TG -3636G
449 TG -3636H
450 TG -3636I
451 TG -3636J
452 TG -3636K
453 TG -3636L
454 TG -3636M
455 TG -3636N
456 TG -3636O
457 TG -3636P
458 TG -3641
459 TG -3646A
460 TG -3646B
461 TG -3646C
462 TG -3646D
463 TG -3646E
464 TG -3646F
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 374/464
465 TG -3646G
466 TG -3646H
467 TG -3646I
468 TG -3646J
469 TG -3646K
470 TG -3646L
471TG -3646M
472 TG -3646N
473 TG -3646O
474 TG -3646P
475 TG -3651
476 TG -3656A
477 TG -3656B
478 TG -3656C
479 TG -3656D
480 TG -3656E
481 TG -3656F
482 TG -3656G
483 TG -3656H
484 TG -3656I
485 TG -3656J
486 TG -3656K
487 TG -3656L
488 TG -3656M
489 TG -3656N
490 TG -3656O
491 TG -3656P
492TG -3661
493 TG -3666A
494 TG -3666B
495 TG -3666C
496 TG -3666D
497 TG -3666E
498 TG -3666F
499 TG -3666G
500 TG -3666H
501 TG -3666I
502 TG -3666J
503 TG -3666K
504 TG -3666L
505 TG -3666M
506 TG -3666N
507 TG -3666O
508 TG -3666P
509 TG -3671
510 TG -3676A
511 TG -3676B
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 375/464
512 TG -3676C
513 TG -3676D
514 TG -3676E
515 TG -3676F
516 TG -3676G
517 TG -3676H
518TG -3676I
519 TG -3676J
520 TG -3676K
521 TG -3676L
522 TG -3676M
523 TG -3676N
524 TG -3676O
525 TG -3676P
526 TG -3001
527 TG -3002
528 TG -3005
529 TG -3006
530 TG -3007
531 TG -3012
532 TG -3013
533 TG -3014
534 TG -3015
535 TG -3022
536 TG -3023
537 TG -3024
538 TG -3025
539TG -3032
540 TG -3033
541 TG -3034
542 TG -3035
543 TG -1074
544 TI -1771A
545 TI -1771B
546 TT -1010A
547 TT -1010B
548 TT -1011A
549 TT -1011B
550 TT -1012A
551 TT -1012B
552 TT -1013A
553 TT -1013B
554 TT -1014A
555 TT -1014B
556 TT -1015A
557 TT -1015B
558 TT -1016A
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 376/464
559 TT -1016B
560 TT -1017A
561 TT -1017B
562 TT -1018A
563 TT -1018B
564 TT -1019A
565TT -1019B
566 TT -1020A
567 TT -1020B
568 TT -1021A
569 TT -1021B
570 TT -1022A
571 TT -1022B
572 TT -1023A
573 TT -1023B
574 TT -1024A
575 TT -1024B
576 TT -1025A
577 TT -1025B
578 TT -1026A
579 TT -1026B
580 TT -1027A
581 TT -1027B
582 TT -1028A
583 TT -1028B
584 TT -1029A
585 TT -1029B
586TT -1030A
587 TT -1030B
588 TT -1031A
589 TT -1031B
590 TT -1032A
591 TT -1032B
592 TT -1040A
593 TT -1040B
594 TT -1041A
595 TT -1041B
596 TT -1042A
597 TT -1042B
598 TT -1051A
599 TT -1051B
600 TT -1052A
601 TT -1052B
602 TT -1053A
603 TT -1053B
604 TT -1054A
605 TT -1054B
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 377/464
606 TT -1061A
607 TT -1061B
608 TT -1062A
609 TT -1062B
610 TT -1063A
611 TT -1063B
612TT -1064A
613 TT -1064B
614 TT -1106A
615 TT -1106B
616 TT -1106C
617 TT -1106D
618 TT -1106E
619 TT -1106F
620 TT -1107A
621 TT -1107B
622 TT -1107C
623 TT -1107D
624 TT -1108A
625 TT -1108B
626 TT -1108C
627 TT -1108D
628 TT -1108E
629 TT -1108F
630 TT -1108G
631 TT -1108H
632 TT -1108I
633TT -1108J
634 TT -1108K
635 TT -1108L
636 TT -1202
637 TT -1203
638 TT -1204
639 TT -1205
640 TT -1206A
641 TT -1206B
642 TT -1206C
643 TT -1206D
644 TT -1206E
645 TT -1206F
646 TT -1207A
647 TT -1207B
648 TT -1207C
649 TT -1207D
650 TT -1208A
651 TT -1208B
652 TT -1208C
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 378/464
653 TT -1208D
654 TT -1208E
655 TT -1208F
656 TT -1208G
657 TT -1208H
658 TT -1208I
659TT -1208J
660 TT -1208K
661 TT -1208L
662 TT -3615A
663 TT -3615B
664 TT -3615C
665 TT -3615D
666 TT -3615E
667 TT -3615F
668 TT -3615G
669 TT -3615H
670 TT -3625A
671 TT -3625B
672 TT -3625C
673 TT -3625D
674 TT -3625E
675 TT -3625F
676 TT -3625G
677 TT -3625H
678 TT -3635A
679 TT -3635B
680TT -3635C
681 TT -3635D
682 TT -3635E
683 TT -3635F
684 TT -3635G
685 TT -3635H
686 TT -3645A
687 TT -3645B
688 TT -3645C
689 TT -3645D
690 TT -3645E
691 TT -3645F
692 TT -3645G
693 TT -3645H
694 TT -3655A
695 TT -3655B
696 TT -3655C
697 TT -3655D
698 TT -3655E
699 TT -3655F
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 379/464
700 TT -3655G
701 TT -3655H
702 TT -3665A
703 TT -3665B
704 TT -3665C
705 TT -3665D
706TT -3665E
707 TT -3665F
708 TT -3665G
709 TT -3665H
710 TT -3675A
711 TT -3675B
712 TT -3675C
713 TT -3675D
714 TT -3675E
715 TT -3675F
716 TT -3675G
717 TT -3675H
718 VSH-3615A
719 VSH-3615B
720 VSH-3615C
721 VSH-3615D
722 VSH-3615E
723 VSH-3615F
724 VSH-3615G
725 VSH-3615H
726 VSH-3615I
727VSH-3615J
728 VSH-3615K
729 VSH-3615L
730 VSH-3615M
731 VSH-3615N
732 VSH-3615O
733 VSH-3615P
734 VSH-3625A
735 VSH-3625B
736 VSH-3625C
737 VSH-3625D
738 VSH-3625E
739 VSH-3625F
740 VSH-3625G
741 VSH-3625H
742 VSH-3625I
743 VSH-3625J
744 VSH-3625K
745 VSH-3625L
746 VSH-3625M
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 380/464
747 VSH-3625N
748 VSH-3625O
749 VSH-3625P
750 VSH-3635A
751 VSH-3635B
752 VSH-3635C
753VSH-3635D
754 VSH-3635E
755 VSH-3635F
756 VSH-3635G
757 VSH-3635H
758 VSH-3635I
759 VSH-3635J
760 VSH-3635K
761 VSH-3635L
762 VSH-3635M
763 VSH-3635N
764 VSH-3635O
765 VSH-3635P
766 VSH-3645A
767 VSH-3645B
768 VSH-3645C
769 VSH-3645D
770 VSH-3645E
771 VSH-3645F
772 VSH-3645G
773 VSH-3645H
774VSH-3645I
775 VSH-3645J
776 VSH-3645K
777 VSH-3645L
778 VSH-3645M
779 VSH-3645N
780 VSH-3645O
781 VSH-3645P
782 VSH-3655A
783 VSH-3655B
784 VSH-3655C
785 VSH-3655D
786 VSH-3655E
787 VSH-3655F
788 VSH-3655G
789 VSH-3655H
790 VSH-3655I
791 VSH-3655J
792 VSH-3655K
793 VSH-3655L
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 381/464
794 VSH-3655M
795 VSH-3655N
796 VSH-3655O
797 VSH-3655P
798 VSH-3665A
799 VSH-3665B
800VSH-3665C
801 VSH-3665D
802 VSH-3665E
803 VSH-3665F
804 VSH-3665G
805 VSH-3665H
806 VSH-3665I
807 VSH-3665J
808 VSH-3665K
809 VSH-3665L
810 VSH-3665M
811 VSH-3665N
812 VSH-3665O
813 VSH-3665P
814 VSH-3675A
815 VSH-3675B
816 VSH-3675C
817 VSH-3675D
818 VSH-3675E
819 VSH-3675F
820 VSH-3675G
821VSH-3675H
822 VSH-3675I
823 VSH-3675J
824 VSH-3675K
825 VSH-3675L
826 VSH-3675M
827 VSH-3675N
828 VSH-3675O
829 VSH-3675P
830 FT-1101
831 FT-1201
832 FT-1301
833 FT-1440A
834 FT-1442
835 FT-8000
836 FT-E1101
837 FI-E1851
838 LG-E3016
839 LG-E3015
840 LG-E3017
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 382/464
841 LG-E7101
842 LG-E7103
843 LG-E8121
844 LG-E3011
845 LG-E3611A
846 LG-E3611B
847LG-E3621A
848 LG-E3621B
849 LG-E3631A
850 LG-E3631B
851 LG-E3641A
852 LG-E3641B
853 LG-E3651A
854 LG-E3651B
855 LG-E3661A
856 LG-E3661B
857 LG-E3671A
858 LG-E3671B
859 LG-E3685
860 LG-E3687A
861 LG-E3687B
862 LI-E3681
863 LI-E3683
864 LI-E3682
865 LIT-E1102
866 LIT-E1103
867 LS-123A
868LS-123B
869 LS-123B
870 LSHHH-E1104
871 LSHHH-E1204
872 LS-123A
873 LSL-E1510
874 LSL-E1520
875 LSL-E1530
876 LSL-E1540
877 LSL-E1550
878 LSHL-E3684
879 LSHL-E7102
880 LSHL-E7104
881 LSL-E1912
882 LSL-E1922
883 LT -E6050
884 LT-E3681
885 MT-E7010
886 PG -E6008
887 PG -E7009
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 383/464
888 PG -E7012
889 PG -E8003
890 PG-E1085
891 PG-E1100
892 PG-E1104
893 PG-E1105
894PG-E1106
895 PG-E1107
896 PG-E1108
897 PG-E1109
898 PG-E1122
899 PG-E1123
900 PG-E1125
901 PG-E1132
902 PG-E1133
903 PG-E1135
904 PG-E1142
905 PG-E1143
906 PG-E1145
907 PG-E1152
908 PG-E1153
909 PG-E1155
910 PG-E1200
911 PG-E1204
912 PG-E1205
913 PG-E1206
914 PG-E1207
915PG-E1208
916 PG-E1209
917 PG-E1222
918 PG-E1223
919 PG-E1225
920 PG-E1232
921 PG-E1233
922 PG-E1235
923 PG-E1242
924 PG-E1243
925 PG-E1245
926 PG-E1252
927 PG-E1253
928 PG-E1255
929 PG-E1501
930 PG-E1510
931 PG-E1513
932 PG-E1514
933 PG-E1520
934 PG-E1523
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 384/464
935 PG-E1524
936 PG-E1530
937 PG-E1533
938 PG-E1534
939 PG-E1540
940 PG-E1543
941PG-E1544
942 PG-E1550
943 PG-E1553
944 PG-E1554
945 PG-E1611
946 PG-E1612
947 PG-E1613
948 PG-E1614
949 PG-E1621
950 PG-E1622
951 PG-E1623
952 PG-E1624
953 PG-E1631
954 PG-E1632
955 PG-E1633
956 PG-E1634
957 PG-E1641
958 PG-E1642
959 PG-E1643
960 PG-E1644
961 PG-E1651
962PG-E1652
963 PG-E1653
964 PG-E1654
965 PG-E1661
966 PG-E1662
967 PG-E1663
968 PG-E1664
969 PG-E1671
970 PG-E1672
971 PG-E1673
972 PG-E1674
973 PG-E1681
974 PG-E1682
975 PG-E1684
976 PG-E1701
977 PG-E1702
978 PG-E1711
979 PG-E1712
980 PG-E1804
981 PG-E1811A
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 385/464
982 PG-E1811B
983 PG-E1811C
984 PG-E1852
985 PG-E1853
986 PG-E3011
987 PG-E3012
988PG-E3015
989 PG-E3025
990 PG-E3041
991 PG-E3042
992 PG-E3043
993 PG-E3044
994 PG-E3045
995 PG-E3047
996 PG-E3048
997 PG-E3050
998 PG-E3611
999 PG-E3612
1000 PG-E3615
1001 PG-E3621
1002 PG-E3622
1003 PG-E3625
1004 PG-E3631
1005 PG-E3632
1006 PG-E3635
1007 PG-E3641
1008 PG-E3642
1009PG-E3645
1010 PG-E3650
1011 PG-E3651
1012 PG-E3652
1013 PG-E3655
1014 PG-E3661
1015 PG-E3662
1016 PG-E3665
1017 PG-E3671
1018 PG-E3672
1019 PG-E3675
1020 PG-E3681
1021 PG-E3683
1022 PG-E3684
1023 PG-E3685
1024 PG-E3686
1025 PG-E3687
1026 PG-E3688
1027 PG-E3689
1028 PG-E3690
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 386/464
1029 PG-E3691
1030 PG-E3692
1031 PG-E3693
1032 PG-E1860
1033 PG-E7101
1034 PG-E7102
1035PG-E7104
1036 PG-E7105
1037 PG-E7106
1038 PG-E7107
1039 PG -E6050
1040 PG -E6051
1041 PG -E6055
1042 PG-E8121
1043 DPG-E3690
1044 DPG-E3691
1045 FI-E1102
1046 FI-E1202
1047 PDG-E1511
1048 PDG-E1521
1049 PDG-E1531
1050 PDG-E1541
1051 PDG-E1551
1052 PDG-E3010
1053 PDG-E3020
1054 PS -E3051
1055 PSHH-E1108
1056PSHH-E1208
1057 FI-E1103
1058 FI-E3683
1059 FI-E6050
1060 FI-E3005
1061 FI-E3006
1062 LTD-E1101
1063 LTD-E1201
1064 TG -E1074
1065 TG-E1122
1066 TG-E1132
1067 TG-E1142
1068 TG-E1152
1069 TG-E1222
1070 TG-E1232
1071 TG-E1242
1072 TG-E1252
1073 TG-E1513
1074 TG-E1514
1075 TG-E1523
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 387/464
1076 TG-E1524
1077 TG-E1533
1078 TG-E1534
1079 TG-E1543
1080 TG-E1544
1081 TG-E1553
1082TG-E1554
1083 TG-E1613
1084 TG-E1614
1085 TG-E1615
1086 TG-E1623
1087 TG-E1624
1088 TG-E1625
1089 TG-E1633
1090 TG-E1634
1091 TG-E1635
1092 TG-E1643
1093 TG-E1644
1094 TG-E1645
1095 TG-E1653
1096 TG-E1654
1097 TG-E1655
1098 TG-E1663
1099 TG-E1664
1100 TG-E1665
1101 TG-E1673
1102 TG-E1674
1103TG-E1675
1104 TG-E1683
1105 TG-E1684
1106 TG-E1685
1107 TG-E1702
1108 TG-E1712
1109 TG-E3012
1110 TG-E3013
1111 TG-E3014
1112 TG-E3022
1113 TG-E3023
1114 TG-E3024
1115 TG-E3041
1116 TG-E3042
1117 TG-E3043
1118 TG-E3044
1119 TG-E3049
1120 TG-E3611
1121 TG-E3616A
1122 TG-E3616B
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 388/464
1123 TG-E3616C
1124 TG-E3616D
1125 TG-E3616E
1126 TG-E3616F
1127 TG-E3616G
1128 TG-E3616H
1129TG-E3616I
1130 TG-E3616J
1131 TG-E3616K
1132 TG-E3616L
1133 TG-E3616M
1134 TG-E3616N
1135 TG-E3616O
1136 TG-E3616P
1137 TG-E3621
1138 TG-E3626A
1139 TG-E3626B
1140 TG-E3626C
1141 TG-E3626D
1142 TG-E3626E
1143 TG-E3626F
1144 TG-E3626G
1145 TG-E3626H
1146 TG-E3626I
1147 TG-E3626J
1148 TG-E3626K
1149 TG-E3626L
1150TG-E3626M
1151 TG-E3626N
1152 TG-E3626O
1153 TG-E3626P
1154 TG-E3631
1155 TG-E3636A
1156 TG-E3636B
1157 TG-E3636C
1158 TG-E3636D
1159 TG-E3636E
1160 TG-E3636F
1161 TG-E3636G
1162 TG-E3636H
1163 TG-E3636I
1164 TG-E3636J
1165 TG-E3636K
1166 TG-E3636L
1167 TG-E3636M
1168 TG-E3636N
1169 TG-E3636O
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 389/464
1170 TG-E3636P
1171 TG-E3641
1172 TG-E3646A
1173 TG-E3646B
1174 TG-E3646C
1175 TG-E3646D
1176TG-E3646E
1177 TG-E3646F
1178 TG-E3646G
1179 TG-E3646H
1180 TG-E3646I
1181 TG-E3646J
1182 TG-E3646K
1183 TG-E3646L
1184 TG-E3646M
1185 TG-E3646N
1186 TG-E3646O
1187 TG-E3646P
1188 TG-E3651
1189 TG-E3656A
1190 TG-E3656B
1191 TG-E3656C
1192 TG-E3656D
1193 TG-E3656E
1194 TG-E3656F
1195 TG-E3656G
1196 TG-E3656H
1197TG-E3656I
1198 TG-E3656J
1199 TG-E3656K
1200 TG-E3656L
1201 TG-E3656M
1202 TG-E3656N
1203 TG-E3656O
1204 TG-E3656P
1205 TG-E3661
1206 TG-E3666A
1207 TG-E3666B
1208 TG-E3666C
1209 TG-E3666D
1210 TG-E3666E
1211 TG-E3666F
1212 TG-E3666G
1213 TG-E3666H
1214 TG-E3666I
1215 TG-E3666J
1216 TG-E3666K
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 390/464
1217 TG-E3666L
1218 TG-E3666M
1219 TG-E3666N
1220 TG-E3666O
1221 TG-E3666P
1222 TG-E3671
1223TG-E3676A
1224 TG-E3676B
1225 TG-E3676C
1226 TG-E3676D
1227 TG-E3676E
1228 TG-E3676F
1229 TG-E3676G
1230 TG-E3676H
1231 TG-E3676I
1232 TG-E3676J
1233 TG-E3676K
1234 TG-E3676L
1235 TG-E3676M
1236 TG-E3676N
1237 TG-E3676O
1238 TG-E3676P
1239 TG-E3682
1240 TG-E3683
1241 TG-E3684
1242 TG-E3685
1243 TG-E3687
1244TG-E3692
1245 TG-E3693
1246 TG-E3694
1247 TG-E3695
1248 TG-E1810
1249 TG-E1820
1250 TG-E1830
1251 TG-E7101
1252 TG-E7102
1253 TG-E7104
1254 TG-E7105
1255 TG-E7106
1256 TG-E7107
1257 TT -1110A
1258 TT -1110B
1259 TT -1112A
1260 TT -1112B
1261 TT -1114A
1262 TT -1114B
1263 TT -1116A
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 391/464
1264 TT -1116B
1265 TT -1118A
1266 TT -1118B
1267 TT -1120A
1268 TT -1120B
1269 TT -1210A
1270TT -1210B
1271 TT -1212A
1272 TT -1212B
1273 TT -1214A
1274 TT -1214B
1275 TT -1216A
1276 TT -1216B
1277 TT -1218A
1278 TT -1218B
1279 TT -1220A
1280 TT -1220B
1281 TT-1069A
1282 TT-1069B
1283 TT-1079A
1284 TT-1079B
1285 TT-1080A
1286 TT-1080B
1287 TT-1081A
1288 TT-1081B
1289 TT-1082A
1290 TT-1082B
1291TT-1083A
1292 TT-1083B
1293 TT-1084A
1294 TT-1084B
1295 TT-1085A
1296 TT-1085B
1297 TT-1086A
1298 TT-1086B
1299 TT-1087A
1300 TT-1087B
1301 TT-1088A
1302 TT-1088B
1303 TT-1089A
1304 TT-1089B
1305 TT-1090A
1306 TT-1090B
1307 TT-1091A
1308 TT-1091B
1309 TT-1092A
1310 TT-1092B
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 392/464
1311 TT-1093A
1312 TT-1093B
1313 TT-1094A
1314 TT-1094B
1315 TT-1095A
1316 TT-1095B
1317TT-1096A
1318 TT-1096B
1319 TT-1097A
1320 TT-1097B
1321 TT-1098A
1322 TT-1098B
1323 TT-1099A
1324 TT-1099B
1325 TT-E1104
1326 TT-E1106A
1327 TT-E1106B
1328 TT-E1106C
1329 TT-E1106D
1330 TT-E1106E
1331 TT-E1106F
1332 TT-E1107A
1333 TT-E1107B
1334 TT-E1107C
1335 TT-E1107D
1336 TT-E1108A
1337 TT-E1108B
1338TT-E1108C
1339 TT-E1108D
1340 TT-E1108E
1341 TT-E1108F
1342 TT-E1108G
1343 TT-E1108H
1344 TT-E1108I
1345 TT-E1108J
1346 TT-E1108K
1347 TT-E1108L
1348 TT-E1110A
1349 TT-E1110B
1350 TT-E1112A
1351 TT-E1112B
1352 TT-E1114A
1353 TT-E1114B
1354 TT-E1116A
1355 TT-E1116B
1356 TT-E1118A
1357 TT-E1118B
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 393/464
1358 TT-E1120A
1359 TT-E1120B
1360 TT-E1206A
1361 TT-E1206B
1362 TT-E1206C
1363 TT-E1206D
1364TT-E1206E
1365 TT-E1206F
1366 TT-E1207A
1367 TT-E1207B
1368 TT-E1207C
1369 TT-E1207D
1370 TT-E1208A
1371 TT-E1208B
1372 TT-E1208C
1373 TT-E1208D
1374 TT-E1208E
1375 TT-E1208F
1376 TT-E1208G
1377 TT-E1208H
1378 TT-E1208I
1379 TT-E1208J
1380 TT-E1208K
1381 TT-E1208L
1382 TT-E1210A
1383 TT-E1210B
1384 TT-E1212A
1385TT-E1212B
1386 TT-E1214A
1387 TT-E1214B
1388 TT-E1216A
1389 TT-E1216B
1390 TT-E1218A
1391 TT-E1218B
1392 TT-E1220A
1393 TT-E1220B
1394 TT-E3615A
1395 TT-E3615B
1396 TT-E3615C
1397 TT-E3615D
1398 TT-E3615E
1399 TT-E3615F
1400 TT-E3615G
1401 TT-E3615H
1402 TT-E3625A
1403 TT-E3625B
1404 TT-E3625C
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 394/464
1405 TT-E3625D
1406 TT-E3625E
1407 TT-E3625F
1408 TT-E3625G
1409 TT-E3625H
1410 TT-E3635A
1411TT-E3635B
1412 TT-E3635C
1413 TT-E3635D
1414 TT-E3635E
1415 TT-E3635F
1416 TT-E3635G
1417 TT-E3635H
1418 TT-E3645A
1419 TT-E3645B
1420 TT-E3645C
1421 TT-E3645D
1422 TT-E3645E
1423 TT-E3645F
1424 TT-E3645G
1425 TT-E3645H
1426 TT-E3655A
1427 TT-E3655B
1428 TT-E3655C
1429 TT-E3655D
1430 TT-E3655E
1431 TT-E3655F
1432TT-E3655G
1433 TT-E3655H
1434 TT-E3665A
1435 TT-E3665B
1436 TT-E3665C
1437 TT-E3665D
1438 TT-E3665E
1439 TT-E3665F
1440 TT-E3665G
1441 TT-E3665H
1442 TT-E3675A
1443 TT-E3675B
1444 TT-E3675C
1445 TT-E3675D
1446 TT-E3675E
1447 TT-E3675F
1448 TT-E3675G
1449 TT-E3675H
1450 VSH-E3615A
1451 VSH-E3615B
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 395/464
1452 VSH-E3615C
1453 VSH-E3615D
1454 VSH-E3615E
1455 VSH-E3615F
1456 VSH-E3615G
1457 VSH-E3615H
1458VSH-E3615I
1459 VSH-E3615J
1460 VSH-E3615K
1461 VSH-E3615L
1462 VSH-E3615M
1463 VSH-E3615N
1464 VSH-E3615O
1465 VSH-E3615P
1466 VSH-E3625A
1467 VSH-E3625B
1468 VSH-E3625C
1469 VSH-E3625D
1470 VSH-E3625E
1471 VSH-E3625F
1472 VSH-E3625G
1473 VSH-E3625H
1474 VSH-E3625I
1475 VSH-E3625J
1476 VSH-E3625K
1477 VSH-E3625L
1478 VSH-E3625M
1479VSH-E3625N
1480 VSH-E3625O
1481 VSH-E3625P
1482 VSH-E3635A
1483 VSH-E3635B
1484 VSH-E3635C
1485 VSH-E3635D
1486 VSH-E3635E
1487 VSH-E3635F
1488 VSH-E3635G
1489 VSH-E3635H
1490 VSH-E3635I
1491 VSH-E3635J
1492 VSH-E3635K
1493 VSH-E3635L
1494 VSH-E3635M
1495 VSH-E3635N
1496 VSH-E3635O
1497 VSH-E3635P
1498 VSH-E3645A
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 396/464
1499 VSH-E3645B
1500 VSH-E3645C
1501 VSH-E3645D
1502 VSH-E3645E
1503 VSH-E3645F
1504 VSH-E3645G
1505VSH-E3645H
1506 VSH-E3645I
1507 VSH-E3645J
1508 VSH-E3645K
1509 VSH-E3645L
1510 VSH-E3645M
1511 VSH-E3645N
1512 VSH-E3645O
1513 VSH-E3645P
1514 VSH-E3655A
1515 VSH-E3655B
1516 VSH-E3655C
1517 VSH-E3655D
1518 VSH-E3655E
1519 VSH-E3655F
1520 VSH-E3655G
1521 VSH-E3655H
1522 VSH-E3655I
1523 VSH-E3655J
1524 VSH-E3655K
1525 VSH-E3655L
1526VSH-E3655M
1527 VSH-E3655N
1528 VSH-E3655O
1529 VSH-E3655P
1530 VSH-E3665A
1531 VSH-E3665B
1532 VSH-E3665C
1533 VSH-E3665D
1534 VSH-E3665E
1535 VSH-E3665F
1536 VSH-E3665G
1537 VSH-E3665H
1538 VSH-E3665I
1539 VSH-E3665J
1540 VSH-E3665K
1541 VSH-E3665L
1542 VSH-E3665M
1543 VSH-E3665N
1544 VSH-E3665O
1545 VSH-E3665P
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 397/464
1546 VSH-E3675A
1547 VSH-E3675B
1548 VSH-E3675C
1549 VSH-E3675D
1550 VSH-E3675E
1551 VSH-E3675F
1552VSH-E3675G
1553 VSH-E3675H
1554 VSH-E3675I
1555 VSH-E3675J
1556 VSH-E3675K
1557 VSH-E3675L
1558 VSH-E3675M
1559 VSH-E3675N
1560 VSH-E3675O
1561 VSH-E3675P
1562 VT-E1510
1563 VT-E1520
1564 VT-E1530
1565 VT-E1540
1566 VT-E1550
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 398/464
REDICTIVE OR B/D BASIS.
Main Euipment
BOG-A
BOG-A
BOG-A
BOG-A
BOG-B
BOG-B
BOG-B
BOG-B
BOG-C
BOG-C
BOG-C
BOG-CDrain drum V-902
Drain drum V-902
Drain drum V-903
Drain drum V-903
P-101A
P-101B
P-101C
P-101D
P-102A
P-102B
P-102C
P-102D
P-104A
P-104A
P-104B
P-104B
P-104C
P-104C
P-104D
P-104D
P-104EP-104E
P-103A
P-103B
P-103C
P-103D
P-106A
P-106B
P-106C
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 399/464
P-106D
P-105A
P-105A
P-105B
P-105B
P-105C
P-105CP-105D
P-105D
P-105E
P-105E
V-101 LNG Level
P104A pot LNG Level
P104B pot LNG Level
P104C pot LNG Level
P104D pot LNG Level
P104E pot LNG Level
Purge flow for T-101 internal tank
Purge flow for T-102 internal tank
Dual Media Filter
IW Pressure at Suction of P-601A
Diesel Oil Storage Tank
IW Pressure at Suction of P-601A
V-303
V-301A
V-301A
V-301B
V-301BV-301C
V-301C
V-301D
V-301D
V-301E
V-301E
V-301F
V-301F
V-301G
V-301G
T-301
Flare stack water drain level
Diesel Oil Storage Tank
T-101
T-102
V-902 pit water acomulation level
V-903 pit water acomulation level
T-301
Water Tank T-604
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 400/464
Water Tank T-604
Water Tank T-604
Water Tank T-604
Storage Pit T-605
Storage Pit T-605
PW Overhead Tank (T-603)
V-702AV-702B
T-301
Level of Hot water Drain(T-310)
Flare line boot drain
V-101 LNG LEVEL
V-103 LNG LEVEL
V-902 LNG LEVEL
V-903 LNG LEVEL
Strainer delta press. in LNG unloading line 101A
Strainer delta press. in LNG unloading line 101B
Strainer delta press. in LNG unloading line 101C
C-101A suction strainer delta pressure
C-101B suction strainer delta pressure
C-101C suction strainer delta pressure
P-104A pot delta pressure
P-104B pot delta pressure
P-104C pot delta pressure
P-104D pot delta pressure
P-104E pot delta pressure
Pressure across stainer STR-7100
G301A ExaustG301B Exaust
G301C Exaust
LNG Pressure in LNG unloading line 101A
LNG Pressure in LNG unloading line 101B
LNG Pressure in LNG unloading line 101C
IA to LNG Carrier
NG Pressure at L-102A inlet
LNG Pressure in LNG Unloading Header
V-101 Pressure
Pressure Inlet at PCV-1930
Pressure at Outlet of PCV-1930
NG pressure at PV-1302 inlet
NG pressure at V-101outlet
T-101 annular space pressure
T-101 Gauge Pressure
GNI purging pressure for T-101 inner tank
GNI purging pressure for T-101 annular space
GNI purging pressure for T-101 annular space
LNG pressure at MOVP-1101 outlet
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 401/464
LNG pressure at MOVP-1102 outlet
P-101B LNG discharge pressure
P-101A purging pressure
P-101A Power Terminal Header Purging Pressure
P-101B LNG discharge pressure
P-101B purging pressure
P-101B Power Terminal Header Purging PressureP-101C LNG discharge pressure
P-101C purging pressure
P-101C Power Terminal Header Purging Pressure
Spare pump LNG discharge pressure
Spare pump purging pressure
Spare Pump Power Terminal Header Purging Pressure
T-102 annular space pressure
T-102 Gauge Pressure
GNI purging pressure for T-102 inner tank
GNI purging pressure for T-102 annular space
GNI purging pressure for T-102 annular space
LNG pressure at MOVP-1201 outlet
LNG pressure at MOVP-1202 outlet
P-102A LNG discharge pressure
P-102A purging pressure
P-102A Power Terminal Header Purging Pressure
P-102B LNG discharge pressure
P-102B purging pressure
P-102B Power Terminal Header Purging Pressure
P-102C LNG discharge pressure
P-102C purging pressureP-102C Power Terminal Header Purging Pressure
Spare pump LNG discharge pressure
Spare pump purging pressure
Spare Pump Power Terminal Header Purging Pressure
HP gas reducing pressure
HP Pump Discharge Header
Inlet of PCV-1403
Outlet of PCV-1403
NG Pressure at V-101 outlet
V-102 NG outlet pressure
V-103 Pressure
Pressure at Inlet of PCV-1403
Pressure at Outlet of PCV-1403
V-104 Pressure
V-104 LNG Outlet pressure
P-104A LNG discharge pressure
P-104A LNG Suction Pressure
P-104A Terminal Header Purging Pressure
P-104B LNG discharge pressure
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 402/464
P-104B LNG suction Pressure
P-104B Terminal Header Purging Pressure
P-104C LNG discharge pressure
P-104C LNG suction Pressure
P-104C Terminal Header Purging Pressure
P-104D LNG discharge pressure
P-104D LNG suction PressureP-104D Terminal Header Purging Pressure
P-104E LNG discharge pressure
P-104E LNG suction Pressure
P-104E Terminal Header Purging Pressure
E-106A NG outlet pressure
E-106A Venting pressure
E-106B NG outlet pressure
E-106B Venting pressure
E-104A NG outlet pressure
E-104A Glycol Water inlet pressure
E-104A Venting pressure
E-104B NG outlet pressure
E-104B Glycol Water inlet pressure
E-104B Venting pressure
E-104C NG outlet pressure
E-104C Glycol Water inlet pressure
E-104C Venting pressure
E-104D NG outlet pressure
E-104D Glycol Water inlet pressure
E-104D Venting pressure
E-104E NG outlet pressureE-104E Glycol Water inlet pressure
E-104E Venting pressure
E-104F NG outlet pressure
E-104F Glycol Water inlet pressure
E-104F Venting pressure
E-104G NG outlet pressure
E-104G Glycol Water inlet pressure
E-104G Venting pressure
NG Send Out Pressure
V-902 Pressure
Pressure at Inlet of PCV-1910
Pressure at Outlet of PCV-1910
P-901 terminal header purging pressure
P-901 LNG discharge pressure
V-902 Pressure
V-902 Pressure
V-903 Pressure
V-903 Pressure
V-903 Pressure
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 403/464
Pressure at Inlet at PCV-1920
Pressure at Outlet of PCV-1920
P-902 terminal Header purging pressure
P-902 LNG discharge pressure
LP Fuel gas inlet pressure
LP Fuel gas pressure
E-202A/B FG outlet pressureU-102 FG outlet pressure
V-301A suction
P-301A discharge
V-301A
P-304 suction
P-304 discharge
P-301A suction
V-303
P-305 suction
V-301B suction
P-301B discharge
V-301B
P-301B suction
V-301C suction
P-301C discharge
V-301C
P-301C suction
V-301D suction
P-301D discharge
V-301D
P-301D suctionV-301E suction
P-301E discharge
V-301E
P-301E suction
V-301F suction
P-301F discharge
V-301F
P-301F suction
V-301G suction
P-301G discharge
V-301G
P-301G suction
P-1101 A/B Hot Water Drain Pump
IW to Gardening
P-303A discharge
P-303B discharge
E-340A/B/C Outlet
P-301A suction
P-301B suction
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 404/464
P-310 A/B Hot Water Drain Pump
P-310 B Discharge
GTG-301A inlet pressure
GTG-301B inlet pressure
GTG-301C inlet pressure
P-401A Diesel pressure at Discharge
P-401B Diesel pressure at DischargeP-401A suction
P-401B suction
IW Pressure at Suction of P-601A
IW Pressure at discharge of P-601A
IW Pressure at Suction of P-601B
IW Pressure at discharge of P-601B
PW Pressure at discharge of P-602A
PW Pressure at discharge of P-602B
Dual Media Filter
Dual Media Filter
Dual Media Filter
IW Header Pressure of Jetty Head
IW Header end (CPP)
IW Header end (future tank)
PW Header end (main/substation)
PW Header end (U-303)
Inlet To Flare System
V-702A
V-702B
V-703A
V-703BV-704
V-705
PA Header and (flare)
PA Header and (future tank)
PA Header and (future tank)
IA Header and (flare)
IA Header and (future tank)
GNI main header
GNI Header process at Jetty Head
GNI Header pressure at Trestle MOVPS
N2 Header and (future tank)
FG pressure at front flame generator inlet
-
-
-
-
-
Process vent for MOV (Diag 1-02, 1-03, 1-09)
Process vent for MOV (Diag 1-02, 1-03, 1-09)
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 405/464
Process vent for MOV (Diag 1-02, 1-03, 1-09)
Process vent for MOV (Diag 1-02, 1-03, 1-09)
Process vent for MOV (Diag 9-01, 9-02, 9-03, 9-04)
Process vent for MOV (Diag 9-01, 9-02, 9-03, 9-04)
Process vent for MOV (Diag 9-01, 9-02, 9-03, 9-04)
Process vent for MOV (Diag 9-01, 9-02, 9-03, 9-04)
Process vent for MOV (Diag 9-01, 9-02, 9-03, 9-04)IA Main Header
LNG Sampling Unit (U-111A)
LNG Sampling Unit (U-111B)
Purge flow for LT-1001
Purge flow T-101 annular space
Purge flow for LT-1403
Purge flow for P-901 power terminal header
Purge flow for P-902 power terminal header
Purge flow for LT-3001
PW makeup Line
Air purge for LT-3005
Purge flow for LT-6001
LPG Stroage
HW Overflow Line
P303A / B discharge
T-101 Level,Temperature, Densitimeter
T-102 , Temperature, Densitimeter
LNG tempreature in draining line 101A
LNG tenperature in draining line 101 B
LNG temperature in draining line 101C
LNG temperature in LNG unloading headerV-101 LNG temperature (bottom)
LNG temperature in drain return line
Vent gas temperature
E-108 NG inlet
V-101 NG outlet
LNG in on shore LNG unloading line
LNG in on shore LNG unloading line
P-101A LNG discharge
P-101B LNG discharge
P-101C LNG discharge
Spare in tank pump discharge
P-102A LNG discharge
P-102B LNG discharge
P-102C LNG discharge
Spare in tank pump discharge
V-102 NG outlet
V-104 LNG bypass
P-104A LNG discharge
P-104A Pot drain
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 406/464
P-104B LNG discharge
P-104B Pot drain
P-104C LNG Discharge
P-104C Pot drain
P-104D cooling down
P-104D Pot drain
P-104E LNG dischargeP-104E Pot drain
E-106A NG outlet
E-106A Hot Water Inlet
E-106B NG outlet
E-106B Hot Water Inlet
E-104A NG outlet
E-104A GW inlet
E-104A GW outlet
E-104B NG outlet
E-104B GW inlet
E-104B GW outlet
E-104C NG outlet
E-104C GW inlet
E-104C GW outlet
E-104D NG outlet
E-104D GW inlet
E-104D GW outlet
E-104E NG outlet
E-104E GW inlet
E-104E GW outlet
E-104F NG outletE-104F GW inlet
E-104F GW outlet
E-104G NG outlet
E-104G GW inlet
E-104G GW outlet
LP FG Inlet
E-201 FG outlet
E-202A/B FG outlet
P-301A Discharge
E-301A GW Outlet
E-302A GW Outlet
E-303A GW Outlet
E-304A GW Outlet
E-305A GW Outlet
E-306A GW Outlet
E-307A GW Outlet
E-308A GW Outlet
E-309A GW Outlet
E-310A GW Outlet
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 407/464
E-311A GW Outlet
E-312A GW Outlet
E-313A GW Outlet
E-314A GW Outlet
E-315A GW Outlet
E-316A GW Outlet
P-301B DischargeE-301B GW Outlet
E-302B GW Outlet
E-303B GW Outlet
E-304B GW Outlet
E-305B GW Outlet
E-306B GW Outlet
E-307B GW Outlet
E-308B GW Outlet
E-309B GW Outlet
E-310B GW Outlet
E-311B GW Outlet
E-312B GW Outlet
E-313B GW Outlet
E-314B GW Outlet
E-315B GW Outlet
E-316B GW Outlet
P-301C Discharge
E-301C GW Outlet
E-302C GW Outlet
E-303C GW Outlet
E-304C GW OutletE-305C GW Outlet
E-306C GW Outlet
E-307C GW Outlet
E-308C GW Outlet
E-309C GW Outlet
E-310C GW Outlet
E-311C GW Outlet
E-312C GW Outlet
E-313C GW Outlet
E-314C GW Outlet
E-314C GW Outlet
E-316C GW Outlet
P-301D Discharge
E-301D GW Outlet
E-302D GW Outlet
E-303D GW Outlet
E-304D GW Outlet
E-305D GW Outlet
E-306D GW Outlet
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 408/464
E-307D GW Outlet
E-308D GW Outlet
E-309D GW Outlet
E-310D GW Outlet
E-311D GW Outlet
E-312D GW Outlet
E-313D GW OutletE-314D GW Outlet
E-315D GW Outlet
E-316D GW Outlet
P-301E Discharge
E-301E GW Outlet
E-302E GW Outlet
E-303E GW Outlet
E-304E GW Outlet
E-305E GW Outlet
E-306E GW Outlet
E-307E GW Outlet
E-308E GW Outlet
E-309E GW Outlet
E-310E GW Outlet
E-311E GW Outlet
E-312E GW Outlet
E-313E GW Outlet
E-314E GW Outlet
E-315E GW Outlet
E-316E GW Outlet
P-301F DischargeE-301F GW Outlet
E-302F GW Outlet
E-303F GW Outlet
E-304F GW Outlet
E-305F GW Outlet
E-306F GW Outlet
E-307F GW Outlet
E-308F GW Outlet
E-309F GW Outlet
E-310F GW Outlet
E-311F GW Outlet
E-312F GW Outlet
E-313F GW Outlet
E-314F GW Outlet
E-315F GW Outlet
E-316F GW Outlet
E-301G GW Outlet
E-301G GW Outlet
E-302G GW Outlet
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 409/464
E-303G GW Outlet
E-304G GW Outlet
E-305G GW Outlet
E-306G GW Outlet
E-307G GW Outlet
E-308G GW Outlet
E-309G GW OutletE-310G GW Outlet
E-311G GW Outlet
E-312G GW Outlet
E-313G GW Outlet
E-314G GW Outlet
E-315G GW Outlet
E-316G GW Outlet
P-303 A/B Discharge
E-340A/B/C HW outlet
E-340A HW outlet
E-340B HW outlet
E-340C HW outlet
G-301A Exaust
G-301A Exaust
G-301B Exaust
G-301A
G-301B Exaust
G-301B Exaust
G-301B Exaust
G-310B
G-301C ExaustG-301C Exaust
G-301C Exaust
G-301C
Drain Header to Drain Return Header
E-106A NG Outlet
E-106B NG outlet
LNG Unloading Line (Top, Skin)
LNG Unloading Line (Bottom, Skin)
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 410/464
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Uloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top, Skin)LNG Unloading Line (Bottom Skin)
LNG Unoading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top, Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 411/464
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)
LNG Unloading Line (Bottom Skin)
LNG Unloading Line (Top Skin)LNG Unloading Line (Bottom Skin)
T-101 Inner Tank Wall
T-101 Inner Tank Wall
T-101 Inner Tank Wall
T-101 Inner Tank Wall
T-101 Inner Tank Wall
T-101 Inner Tank Wall
T-101 Annular bottom space
T-101 Annular bottom space
T-101 Annular bottom space
T-101 Annular bottom space
T-101 Inner Tank Bottom Plate
T-101 Inner Tank Bottom Plate
T-101 Inner Tank Bottom Plate
T-101 Inner Tank Bottom Plate
T-101 Inner Tank Bottom Plate
T-101 Inner Tank Bottom Plate
T-101 Inner Tank Bottom Plate
T-101 Inner Tank Bottom Plate
T-101 Inner Tank Bottom Plate
T-101 Inner Tank Bottom PlateT-101 Inner Tank Bottom Plate
T-101 Inner Tank Bottom Plate
T-102 LNG/NG
T-102 LNG/NG
T-102 NG under suspended deck
T-102 NG above suspended deck
T-102 Inner Tank Wall
T-102 Inner Tank Wall
T-102 Inner Tank Wall
T-102 Inner Tank Wall
T-102 Inner Tank Wall
T-102 Inner Tank Wall
T-102 Annular bottom space
T-102 Annular bottom space
T-102 Annular bottom space
T-102 Annular bottom space
T-102 Inner Tank Bottom Plate
T-102 Inner Tank Bottom Plate
T-102 Inner Tank Bottom Plate
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 412/464
T-102 Inner Tank Bottom Plate
T-102 Inner Tank Bottom Plate
T-102 Inner Tank Bottom Plate
T-102 Inner Tank Bottom Plate
T-102 Inner Tank Bottom Plate
T-102 Inner Tank Bottom Plate
T-102 Inner Tank Bottom PlateT-102 Inner Tank Bottom Plate
T-102 Inner Tank Bottom Plate
E-301A/E-302A Outlet
E-301A/E-302A Outlet
E-305A/E-306A Outlet
E-307A/E-308A Outlet
E-309A/E-310A Outlet
E-311A/E-312A Outlet
E-313A/E-314A Outlet
E-315A/E-316A Outlet
E-301B/E-302B Outlet
E-303B/E-304B Outlet
E-305B/E-306B Outlet
E-307B/E-308B Outlet
E-309B/E-310B Outlet
E-311B/E-312B Outlet
E-313B/E-314B Outlet
E-315B/E-316B Outlet
E-301C/E-302C Outlet
E-303C/E-304C Outlet
E-305C/E-306C OutletE-307C/E-308C Outlet
E-309C/E-310C Outlet
E-311C/E-312C Outlet
E-313C/E-314C Outlet
E-315C/E-316C Outlet
E-301D/E-302D Outlet
E-303D/E-304D Outlet
E-305D/E-306D Outlet
E-307D/E-308D Outlet
E-309D/E-310D Outlet
E-311D/E-312D Outlet
E-313D/E-314D Outlet
E-315D/E-316D Outlet
E-301E/E-302E Outlet
E-303E/E-304E Outlet
E-305E/E-306E Outlet
E-307E/E-308E Outlet
E-309E/E-310E Outlet
E-311E/E-312E Outlet
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 413/464
E-313E/E-314E Outlet
E-315E/E-316E Outlet
E-301F/E-302F Outlet
E-303F/E-304F Outlet
E-305F/E-306F Outlet
E-307F/E-308F Outlet
E-309F/E-310F OutletE-311F/E-312F Outlet
E-313F/E-314F Outlet
E-315F/E-316F Outlet
E-301G/E-302G Outlet
E-303G/E-304G Outlet
E-305G/E-306G Outlet
E-307G/E-308G Outlet
E-309G/E-310G Outlet
E-311G/E-312G Outlet
E-313G/E-314G Outlet
E-315G/E-316G Outlet
E-301A Fan
E-302A Fan
E-303A Fan
E-304A Fan
E-305A Fan
E-306A Fan
E-307A Fan
E-308A Fan
E-309A Fan
E-310A FanE-311A Fan
E-312A Fan
E-313A Fan
E-314A Fan
E-315A Fan
E-316A Fan
E-301B Fan
E-302B Fan
E-303B Fan
E-304B Fan
E-305B Fan
E-306B Fan
E-307B Fan
E-308B Fan
E-309B Fan
E-310B Fan
E-311B Fan
E-312B Fan
E-313B Fan
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 414/464
E-314B Fan
E-315B Fan
E-316B Fan
E-301C Fan
E-302C Fan
E-303C Fan
E-304C FanE-305C Fan
E-306C Fan
E-307C Fan
E-308C Fan
E-309C Fan
E-310C Fan
E-311C Fan
E-312C Fan
E-313C Fan
E-314C Fan
E-315C Fan
E-316C Fan
E-301D Fan
E-302D Fan
E-303D Fan
E-304D Fan
E-305D Fan
E-306D Fan
E-307D Fan
E-308D Fan
E-309D FanE-310D Fan
E-311D Fan
E-312D Fan
E-313D Fan
E-314D Fan
E-315D Fan
E-316D Fan
E-301E Fan
E-302E Fan
E-303E Fan
E-304E Fan
E-305E Fan
E-306E Fan
E-307E Fan
E-308E Fan
E-309E Fan
E-310E Fan
E-311E Fan
E-312E Fan
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 415/464
E-313E Fan
E-314E Fan
E-315E Fan
E-316E Fan
E-301F Fan
E-302F Fan
E-303F FanE-304F Fan
E-305F Fan
E-306F Fan
E-307F Fan
E-308F Fan
E-309F Fan
E-310F Fan
E-311F Fan
E-312F Fan
E-313F Fan
E-314F Fan
E-315F Fan
E-316F Fan
E-301G Fan
E-302G Fan
E-303G Fan
E-304G Fan
E-305G Fan
E-306G Fan
E-307G Fan
E-308G FanE-309G Fan
E-310G Fan
E-311G Fan
E-312G Fan
E-313G Fan
E-314G Fan
E-315G Fan
E-316G Fan
LNG Recirculation Flow to T-101
LNG Recirculation Flow to T-102
NG Return Flow to Ship
V-104 NG Inlet Flow
V-104 LNG Inlet Flow
V-801 Outlet
LNG Recirculation Flow to T-103
Sampling Unit U-115
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 416/464
Liquid Nitrogen Tank
V-305
V-302A
V-302A
V-302BV-302B
V-302C
V-302C
V-302D
V-302D
V-302E
V-302E
V-302F
V-302F
V-302G
V-302G
T-303
V-306
V-306
T-302
V-304
T-302
T-103 LNG LEVEL
T-103 LNG LEVEL
T-103
T-104
P105A pot LNG Level
P105B pot LNG Level
P105C pot LNG Level
P105D pot LNG Level
P105E pot LNG Level
V-304
Pit (P-1102A)Pump For K-902
Pit (P-1102B)Pump For K-903
Condensate Water
T-302
Air Dryer
IW Header end
PA Header end
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 417/464
IA Header end
HP gas reducing pressure
T-103 annular space pressure
T-103 Gauge Pressure
GNI purging pressure for T-103 inner tank
GNI purging pressure for T-103 foamglass layer spaceGNI purging pressure for T-103 annular space
LNG pressure at MOVP-E1101 outlet
LNG pressure at MOVP-E1102 outlet
P-103B LNG discharge pressure
P-103A purging pressure
P-103A Power Terminal Header Purging Pressure
P-103B LNG discharge pressure
P-103B purging pressure
P-103B Power Terminal Header Purging Pressure
P-103C LNG discharge pressure
P-103C purging pressure
P-103C Power Terminal Header Purging Pressure
Spare pump LNG discharge pressure
Spare pump purging pressure
Spare Pump Power Terminal Header Purging Pressure
T-104 annular space pressure
T-104 Gauge Pressure
GNI purging pressure for T-104 inner tank
GNI purging pressure for T-104 foamglass layer space
GNI purging pressure for T-104 annular space
LNG pressure at MOVP-E1201 outletLNG pressure at MOVP-E1202 outlet
P-106A LNG discharge pressure
P-106A purging pressure
P-106A Power Terminal Header Purging Pressure
P-106B LNG discharge pressure
P-106B purging pressure
P-106B Power Terminal Header Purging Pressure
P-106C LNG discharge pressure
P-106C purging pressure
P-106C Power Terminal Header Purging Pressure
Spare pump LNG discharge pressure
Spare pump purging pressure
Spare Pump Power Terminal Header Purging Pressure
HP pump dischrge header pressure
P-105A LNG discharge pressure
P-105A LNG Suction pressure
P-105A Terminal Header Purging Pressure
P-105B LNG discharge pressure
P-105B LNG suction pressure
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 418/464
P-105B Terminal Header Purging Pressure
P-105C LNG discharge pressure
P-105C LNG suction pressure
P-105C Terminal Header Purging Pressure
P-105D LNG discharge pressure
P-105D LNG suction pressure
P-105D Terminal Header Purging PressureP-105E LNG discharge pressure
P-105E LNG suction pressure
P-105E terminal header purging pressure
E-105A NG outlet pressure
E-105A Glycol Water inlet pressure
P-302A Suction
E-105A Venting pressure
E-105B NG outlet pressure
E-105B Glycol Water inlet pressure
P-302B Suction
E-105B Venting pressure
E-105C NG outlet pressure
E-105C Glycol Water inlet pressure
P-302C Suction
E-105C Venting pressure
E-105D NG outlet pressure
E-105D Glycol Water inlet pressure
P-302D Suction
E-105D Venting pressure
E-105E NG outlet pressure
E-105E Glycol Water inlet pressureP-302E Suction
E-105E Venting pressure
E-105F NG outlet pressure
E-105F Glycol Water inlet pressure
P-302F Suction
E-105F Venting pressure
E-105G NG outlet pressure
E-105G Glycol Water inlet pressure
P-302G Suction
E-105G Venting pressure
E-109 NG outlet pressure
E-109 Glycol Water inlet pressure
E-109 Venting pressure
E-107A NG outlet pressure
E-107A Venting pressure
E-107B NG outlet pressure
E-107B Venting pressure
NG Send Out Pressure
U-103A metering run 1 pressure
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 419/464
U-103A metering run 2 pressure
U-103A metering run 3 pressure
U-115 Sampling Unit pressure
U-115 Sampling Unit pressure
P-330A Discharge
P-330B Discharge
GTG-301D inlet pressureGTG-301E inlet pressure
P-306A suction
P-306A discharge
P-306B suction
P-306B discharge
V-305
E-340D/E Outlet
P306A/B Suction
V-305
P-302A discharge
V-302A
P-302A suction
P-302B discharge
V-302B
P-302B suction
P-302C discharge
V-302C
P-302C suction
P-302D discharge
V-302D
P-302D suction
P-302E discharge
V-302E
P-302E suction
P-302F discharge
V-302F
P-302F suction
P-302G discharge
V-302G
P-302G suction
P-307A Suction
P-307B Suction
P-307B discharge
GNI to V-306
P-307A/B Suction
P-309 outlet
P-308A suction
P-308B Suction
P-308A Discharge
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 420/464
P-308B Discharge
T-302
U-115 Sampling Unit pressure
U-704AU-704B
U-703A
U-703B
P-xxxA Discharge
P-xxxB Discharge
P-xxxC Discharge
Liquid Nitrogen Tank
G/W/Chilled Water Exchanger(E-351)
G/W/Chilled Water Exchanger(E-351)
Purge flow for T-103 internal tank
Purge flow for T-104 internal tank
P-105A pot delta pressure
P-105B pot delta pressure
P-105C pot delta pressure
P-105D pot delta pressure
P-105E pot delta pressure
G-301D Exaust
G301E Exaust
V-305 N2 Inlet
LNG Pressure for T-103 Drain Return
LNG Pressure for T-104 Drain ReturnPurge flow T-103 annular space
Air Purge for LT-E3683
Air Purge for LT-E6050
Air Purge for LT-E3005
Air Purge for LT-E3006
T-103 Level,Temperature and density
T-104 Level, Temperature, Density
Drain header to drain return header
P-103A LNG discharge
P-103B LNG discharge
P-103C LNG discharge
Spare in tank pump discharge
P-106A LNG discharge
P-106B LNG discharge
P-106C LNG discharge
Spare in tank pump discharge
P-105A LNG discharge
P-105A pot drain
P-105B LNG discharge
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 421/464
P-105B pot drain
P-105C LNG Discharge
P-105C pot drain
P-105D LNG Discharge
P-105D Pot drain
P-105E LNG discharge
P-105E Pot DrainE-105A NG outlet
E-105A GW inlet
E-105A GW outlet
E-105B NG outlet
E-105B GW inlet
E-105B GW outlet
E-105C NG outlet
E-105C GW inlet
E-105C GW outlet
E-105D NG Outlet
E-105D GW inlet
E-105D GW Outlet
E-105E NG outlet
E-105E GW inlet
E-105E GW outlet
E-105F NG outlet
E-105F GW inlet
E-105F GW outlet
E-105G NG outlet
E-105G GW inlet
E-105G GW outletE-109 NG outlet
E-109 GW inlet
E-109 GW outlet
E-107A NG outlet
E-107B NG outlet
G-301D Exaust
G-301D Exaust
G-301D Exaust
G-301E Exaust
G-301E Exaust
G-301E Exaust
V-305
P-306 A/B Discharge
E-340D HW Outlet
E-340E HW Outlet
E-340D/E HW Outlet
P-302A Discharge
E-321A GW Outlet
E-322A GW Outlet
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 422/464
E-323A GW Outlet
E-324A GW Outlet
E-325A GW Outlet
E-326A GW Outlet
E-327A GW Outlet
E-328A GW Outlet
E-329A GW OutletE-330A GW Outlet
E-331A GW Outlet
E-332A GW Outlet
E-333A GW Outlet
E-334A GW Outlet
E-335A GW Outlet
E-336A GW Outlet
P-302B Discharge
E-321B GW Outlet
E-322B GW Outlet
E-323B GW Outlet
E-324B GW Outlet
E-325B GW Outlet
E-326B GW Outlet
E-327B GW Outlet
E-328B GW Outlet
E-329B GW Outlet
E-330B GW Outlet
E-331B GW Outlet
E-332B GW Outlet
E-333B GW OutletE-334B GW Outlet
E-335B GW Outlet
E-336B GW Outlet
P-302C Discharge
E-321C GW Outlet
E-322C GW Outlet
E-323C GW Outlet
E-324C GW Outlet
E-325C GW Outlet
E-326C GW Outlet
E-327C GW Outlet
E-328C GW Outlet
E-329C GW Outlet
E-330C GW Outlet
E-331C GW Outlet
E-332C GW Outlet
E-333C GW Outlet
E-334C GW Outlet
E-335C GW Outlet
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 423/464
E-336C GW Outlet
P-302D Discharge
E-321D GW Outlet
E-322D GW Outlet
E-323D GW Outlet
E-324D GW Outlet
E-325D GW OutletE-326D GW Outlet
E-327D GW Outlet
E-328D GW Outlet
E-329D GW Outlet
E-330D GW Outlet
E-331D GW Outlet
E-332D GW Outlet
E-333D GW Outlet
E-334D GW Outlet
E-335D GW Outlet
E-336D GW Outlet
P-302E Discharge
E-321E GW Outlet
E-322E GW Outlet
E-323E GW Outlet
E-324E GW Outlet
E-325E GW Outlet
E-326E GW Outlet
E-327E GW Outlet
E-328E GW Outlet
E-329E GW OutletE-330E GW Outlet
E-331E GW Outlet
E-332E GW Outlet
E-333E GW Outlet
E-334E GW Outlet
E-335E GW Outlet
E-336E GW Outlet
P-302F Discharge
E-321F GW Outlet
E-322F GW Outlet
E-323F GW Outlet
E-324F GW Outlet
E-325F GW Outlet
E-326F GW Outlet
E-327F GW Outlet
E-328F GW Outlet
E-329F GW Outlet
E-330F GW Outlet
E-331F GW Outlet
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 424/464
E-332F GW Outlet
E-333F GW Outlet
E-334F GW Outlet
E-335F GW Outlet
E-336F GW Outlet
E-302G Discharge
E-321G GW OutletE-322G GW Outlet
E-323G GW Outlet
E-324G GW Outlet
E-325G GW Outlet
E-326G GW Outlet
E-327G GW Outlet
E-328G GW Outlet
E-329G GW Outlet
E-330G GW Outlet
E-331G GW Outlet
E-332G GW Outlet
E-333G GW Outlet
E-334G GW Outlet
E-335G GW Outlet
E-336G GW Outlet
V-304
P-308A/B discharge
Guest house Outlet
Admin Block Outlet
Nitrogen Plant Outlet
E-350 HW OutletE-350 HW Outlet
E-350 HW Outlet
E-350 HW Outlet
U-704A
U-704B
U-703A
U-703B
LNG unloading line (u/s of MOVP-1101)(top,skin)
LNG unloading line (u/s of MOVP-1101)(bottom,skin)
LNG unloading line (d/s of MOVP-1101)(top,skin)
LNG unloading line (d/s of MOVP-1101)(bottom,skin)
LNG unloading line (u/s of MOVP-1102)(top,skin)
LNG unloading line (u/s of MOVP-1102)(bottom,skin)
LNG unloading line (d/s of MOVP-1102)(top,skin)
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 425/464
LNG unloading line (d/s of MOVP-1102)(bottom,skin)
LNG unloading line (tank roof of T-101)(top,skin)
LNG unloading line (tank roof of T-101)(bottom,skin)
LNG unloading line (tank roof of T-101)(top,skin)
LNG unloading line (tank roof of T-101)(bottom,skin)
LNG unloading line (u/s of MOVP-1201)(top,skin)
LNG unloading line (u/s of MOVP-1201)(bottom,skin)LNG unloading line (d/s of MOVP-1201)(top,skin)
LNG unloading line (d/s of MOVP-1201)(bottom,skin)
LNG unloading line (u/s of MOVP-1202)(top,skin)
LNG unloading line (u/s of MOVP-1202)(bottom,skin)
LNG unloading line (d/s of MOVP-1202)(top,skin)
LNG unloading line (d/s of MOVP-1202)(bottom,skin)
LNG unloading line (tank roof of T-102)(top,skin)
LNG unloading line (tank roof of T-102)(bottom,skin)
LNG unloading line (tank roof of T-102)(top,skin)
LNG unloading line (tank roof of T-102)(bottom,skin)
LNG unloading line (top,skin)
LNG unloading line (bottom,skin)
LNG unloading line (top,skin)
LNG unloading line (bottom,skin)
LNG unloading line (top,skin)
LNG unloading line (bottom,skin)
LNG unloading line (top,skin)
LNG unloading line (bottom,skin)
LNG unloading line (top,skin)
LNG unloading line (bottom,skin)
LNG unloading line (top,skin)LNG unloading line (bottom,skin)
LNG unloading line (top,skin)
LNG unloading line (bottom,skin)
LNG unloading line (top,skin)
LNG unloading line (bottom,skin)
LNG unloading line (top,skin)
LNG unloading line (bottom,skin)
Spare in tank pump discharge
LNG Recirculation Line
LNG unloading line (top,skin)
LNG unloading line (bottom,skin)
LNG unloading line (top,skin)
LNG unloading line (bottom,skin)
LNG unloading line (top,skin)
LNG unloading line (bottom,skin)
LNG unloading line (top,skin)
LNG unloading line (bottom,skin)
LNG unloading line (top,skin)
LNG unloading line (bottom,skin)
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 426/464
LNG unloading line (top,skin)
LNG unloading line (bottom,skin)
LNG unloading line (top,skin)
LNG unloading line (bottom,skin)
LNG unloading line (top,skin)
LNG unloading line (bottom,skin)
LNG unloading line (top,skin)LNG unloading line (bottom,skin)
LNG unloading line (top,skin)
LNG unloading line (bottom,skin)
LNG unloading line (top,skin)
LNG unloading line (bottom,skin)
LNG unloading line (top,skin)
LNG unloading line (bottom,skin)
T-103 NG under suspended deck
T-103 Inner Tank Wall
T-103 Inner Tank Wall
T-103 Inner Tank Wall
T-103 Inner Tank Wall
T-103 Inner Tank Wall
T-103 Inner Tank Wall
T-103 Annular bottom space
T-103 Annular bottom space
T-103 Annular bottom space
T-103 Annular bottom space
T-103 Inner Tank Bottom Plate
T-103 Inner Tank Bottom Plate
T-103 Inner Tank Bottom PlateT-103 Inner Tank Bottom Plate
T-103 Inner Tank Bottom Plate
T-103 Inner Tank Bottom Plate
T-103 Inner Tank Bottom Plate
T-103 Inner Tank Bottom Plate
T-103 Inner Tank Bottom Plate
T-103 Inner Tank Bottom Plate
T-103 Inner Tank Bottom Plate
T-103 Inner Tank Bottom Plate
LNG unloading line (u/s of MOVP-E1101)(top,skin)
LNG unloading line (u/s of MOVP-E1101)(bottom,skin)
LNG unloading line (d/s of MOVP-E1101)(top,skin)
LNG unloading line (d/s of MOVP-E1101)(bottom,skin)
LNG unloading line (u/s of MOVP-E1102)(top,skin)
LNG unloading line (u/s of MOVP-E1102)(bottom,skin)
LNG unloading line (d/s of MOVP-E1102)(top,skin)
LNG unloading line (d/s of MOVP-E1102)(bottom,skin)
LNG unloading line (tank roof of T-103)(top,skin)
LNG unloading line (tank roof of T-103)(bottom,skin)
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 427/464
LNG unloading line (tank roof of T-103)(top,skin)
LNG unloading line (tank roof of T-103)(bottom,skin)
T-104 Inner Tank Wall
T-104 Inner Tank Wall
T-104 Inner Tank Wall
T-104 Inner Tank Wall
T-104 Inner Tank WallT-104 Inner Tank Wall
T-104 Annular bottom space
T-104 Annular bottom space
T-104 Annular bottom space
T-104 Annular bottom space
T-104 Inner Tank Bottom Plate
T-104 Inner Tank Bottom Plate
T-104 Inner Tank Bottom Plate
T-104 Inner Tank Bottom Plate
T-104 Inner Tank Bottom Plate
T-104 Inner Tank Bottom Plate
T-104 Inner Tank Bottom Plate
T-104 Inner Tank Bottom Plate
T-104 Inner Tank Bottom Plate
T-104 Inner Tank Bottom Plate
T-104 Inner Tank Bottom Plate
T-104 Inner Tank Bottom Plate
LNG unloading line (u/s of MOVP-E1201)(top,skin)
LNG unloading line (u/s of MOVP-E1201)(bottom,skin)
LNG unloading line (d/s of MOVP-E1201)(top,skin)
LNG unloading line (d/s of MOVP-E1201)(bottom,skin)LNG unloading line (u/s of MOVP-E1202)(top,skin)
LNG unloading line (u/s of MOVP-E1202)(bottom,skin)
LNG unloading line (d/s of MOVP-E1202)(top,skin)
LNG unloading line (d/s of MOVP-E1202)(bottom,skin)
LNG unloading line (tank roof of T-104)(top,skin)
LNG unloading line (tank roof of T-104)(bottom,skin)
LNG unloading line (tank roof of T-104)(top,skin)
LNG unloading line (tank roof of T-104)(bottom,skin)
E-321A/E-322A Outlet
E-323A/E-324A Outlet
E-325A/E-326A Outlet
E-327A/E-328A Outlet
E-329A/E-330A Outlet
E-331A/E-332A Outlet
E-333A/E-334A Outlet
E-335A/E-336A Outlet
E-321B/E-322B Outlet
E-323B/E-324B Outlet
E-325B/E-326B Outlet
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 428/464
E-327B/E-328B Outlet
E-329B/E-330B Outlet
E-331B/E-332B Outlet
E-333B/E-334B Outlet
E-335B/E-336B Outlet
E-321C/E-322C Outlet
E-323C/E-324C OutletE-325C/E-326C Outlet
E-327C/E-328C Outlet
E-329C/E-330C Outlet
E-331C/E-332C Outlet
E-333C/E-334C Outlet
E-335C/E-336C Outlet
E-321D/E-322D Outlet
E-323D/E-324D Outlet
E-325D/E-326D Outlet
E-327D/E-328D Outlet
E-329D/E-330D Outlet
E-331D/E-332D Outlet
E-333D/E-334D Outlet
E-335D/E-336D Outlet
E-321E/E-322E Outlet
E-323E/E-324E Outlet
E-325E/E-326E Outlet
E-327E/E-328E Outlet
E-329E/E-330E Outlet
E-331E/E-332E Outlet
E-333E/E-334E OutletE-335E/E-336E Outlet
E-321F/E-322F Outlet
E-323F/E-324F Outlet
E-325F/E-326F Outlet
E-327F/E-328F Outlet
E-329F/E-330F Outlet
E-331F/E-332F Outlet
E-333F/E-334F Outlet
E-335F/E-336F Outlet
E-321G/E-322G Outlet
E-323G/E-324G Outlet
E-325G/E-326G Outlet
E-327G/E-328G Outlet
E-329G/E-330G Outlet
E-331G/E-332G Outlet
E-333G/E-334G Outlet
E-335G/E-336G Outlet
E-321A Fan
E-322A Fan
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 429/464
E-323A Fan
E-324A Fan
E-325A Fan
E-326A Fan
E-327A Fan
E-328A Fan
E-329A FanE-330A Fan
E-331A Fan
E-332A Fan
E-333A Fan
E-334A Fan
E-335A Fan
E-336A Fan
E-321B Fan
E-322B Fan
E-323B Fan
E-324B Fan
E-325B Fan
E-326B Fan
E-327B Fan
E-328B Fan
E-329B Fan
E-330B Fan
E-331B Fan
E-332B Fan
E-333B Fan
E-334B FanE-335B Fan
E-336B Fan
E-321C Fan
E-322C Fan
E-323C Fan
E-324C Fan
E-325C Fan
E-326C Fan
E-327C Fan
E-328C Fan
E-329C Fan
E-330C Fan
E-331C Fan
E-332C Fan
E-333C Fan
E-334C Fan
E-335C Fan
E-336C Fan
E-321D Fan
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 430/464
E-322D Fan
E-323D Fan
E-324D Fan
E-325D Fan
E-326D Fan
E-327D Fan
E-328D FanE-329D Fan
E-330D Fan
E-331D Fan
E-332D Fan
E-333D Fan
E-334D Fan
E-335D Fan
E-336D Fan
E-321E Fan
E-322E Fan
E-323E Fan
E-324E Fan
E-325E Fan
E-326E Fan
E-327E Fan
E-328E Fan
E-329E Fan
E-330E Fan
E-331E Fan
E-332E Fan
E-333E FanE-334E Fan
E-335E Fan
E-336E Fan
E-321F Fan
E-322F Fan
E-323F Fan
E-324F Fan
E-325F Fan
E-326F Fan
E-327F Fan
E-328F Fan
E-329F Fan
E-330F Fan
E-331F Fan
E-332F Fan
E-333F Fan
E-334F Fan
E-335F Fan
E-336F Fan
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 431/464
E-321G Fan
E-322G Fan
E-323G Fan
E-324G Fan
E-325G Fan
E-326G Fan
E-327G FanE-328G Fan
E-329G Fan
E-330G Fan
E-331G Fan
E-332G Fan
E-333G Fan
E-334G Fan
E-335G Fan
E-336G Fan
P-105A
P-105B
P-105C
P-105D
P-105E
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 432/464
PM plan Description ACTIVITY PM
Preventive Maintenanc of FI-1450 Checking No
Preventive Maintenanc of FI-1451 Checking No
Preventive Maintenanc of FI-1452 Checking No
Preventive Maintenanc of FI-1453 Checking No
Preventive Maintenanc of FI-1460 Checking No
Preventive Maintenanc of FI-1461 Checking No
Preventive Maintenanc of FI-1462 Checking No
Preventive Maintenanc of FI-1463 Checking No
Preventive Maintenanc of FI-1470 Checking No
Preventive Maintenanc of FI-1471 Checking No
Preventive Maintenanc of FI-1472 Checking No
Preventive Maintenanc of FI-1473 Checking NoPreventive Maintenanc of FI-1910 Checking No
Preventive Maintenanc of FI-1911 Checking No
Preventive Maintenanc of FI-1920 Checking No
Preventive Maintenanc of FI-1921 Checking No
Preventive Maintenanc of FI-1122 Checking No
Preventive Maintenanc of FI-1132 Checking No
Preventive Maintenanc of FI-1142 Checking No
Preventive Maintenanc of FI-1152 Checking No
Preventive Maintenanc of FI-1222 Checking No
Preventive Maintenanc of FI-1232 Checking No
Preventive Maintenanc of FI-1242 Checking No
Preventive Maintenanc of FI-1252 Checking No
Preventive Maintenanc of FI-1511 Checking No
Preventive Maintenanc of FI-1512 Checking No
Preventive Maintenanc of FI-1521 Checking No
Preventive Maintenanc of FI-1522 Checking No
Preventive Maintenanc of FI-1531 Checking No
Preventive Maintenanc of FI-1532 Checking No
Preventive Maintenanc of FI-1541 Checking No
Preventive Maintenanc of FI-1542 Checking No
Preventive Maintenanc of FI-1551 Checking NoPreventive Maintenanc of FI-1552 Checking No
Preventive Maintenanc of FI-E1122 Checking No
Preventive Maintenanc of FI-E1132 Checking No
Preventive Maintenanc of FI-E1142 Checking No
Preventive Maintenanc of FI-E1152 Checking No
Preventive Maintenanc of FI-E1222 Checking No
Preventive Maintenanc of FI-E1232 Checking No
Preventive Maintenanc of FI-E1242 Checking No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 433/464
Preventive Maintenanc of FI-E1252 Checking No
Preventive Maintenanc of FI-E1511 Checking No
Preventive Maintenanc of FI-E1512 Checking No
Preventive Maintenanc of FI-E1521 Checking No
Preventive Maintenanc of FI-E1522 Checking No
Preventive Maintenanc of FI-E1531 Checking No
Preventive Maintenanc of FI-E1532 Checking NoPreventive Maintenanc of FI-E1541 Checking No
Preventive Maintenanc of FI-E1542 Checking No
Preventive Maintenanc of FI-E1551 Checking No
Preventive Maintenanc of FI-E1552 Checking No
Capacitance Level Switch No
Capacitance Level Switch No
Capacitance Level Switch No
Capacitance Level Switch No
Capacitance Level Switch No
Capacitance Level Switch No
DP Indicator No
DP Indicator No
DP indicator with switch No
DP Type Flow Transmitter No
Float and Board Type Level Gauge No
Flow Indicator No
Level Gauge No
Level Gauge No
Level Gauge No
Level Gauge No
Level Gauge NoLevel Gauge No
Level Gauge No
Level Gauge No
Level Gauge No
Level Gauge No
Level Gauge No
Level Gauge No
Level Gauge No
Level Gauge No
Level Gauge No
Level Gauge No
Level Gauge No
Level Indicating Transmitter No
Level Switch No
Level Switch No
Level Switch No
Level Switch No
Level Switch No
Level Switch No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 434/464
Level Switch No
Level Switch No
Level Switch No
Level Switch No
Level Switch No
Level Switch No
Level Switch NoLevel Switch No
Level Transmitter No
Level Transmitter No
Level Transmitter No
Magnetic Type LT No
Magnetic Type LT No
Magnetic Type LT No
Magnetic Type LT No
Press. Diffe. Gauge No
Press. Diffe. Gauge No
Press. Diffe. Gauge No
Press. Diffe. Gauge No
Press. Diffe. Gauge No
Press. Diffe. Gauge No
Press. Diffe. Gauge No
Press. Diffe. Gauge No
Press. Diffe. Gauge No
Press. Diffe. Gauge No
Press. Diffe. Gauge No
Press. Diffe. Gauge No
Press. Diffe. Gauge NoPress. Diffe. Gauge No
Press. Diffe. Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 435/464
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge NoPressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge NoPressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 436/464
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge NoPressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge NoPressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 437/464
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge NoPressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge NoPressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 438/464
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge NoPressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge NoPressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 439/464
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge NoPressure Switch No
Pressure Transmitter No
Pressure Transmitter No
Rotameter No
Rotameter No
Rotameter No
Rotameter No
Rotameter No
Rotameter No
Rotameter No
Rotameter No
Rotameter No
Rotameter No
Rotameter No
Rotameter No
Servo type Transmitter No
Servo type Transmitter No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge NoTemperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 440/464
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge NoTemperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge NoTemperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 441/464
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge NoTemperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge NoTemperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 442/464
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge NoTemperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge NoTemperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 443/464
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge NoTemperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge NoTemperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Indicator No
Temperature Indicator No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 444/464
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter NoTemperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter NoTemperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 445/464
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter NoTemperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter NoTemperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 446/464
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter NoTemperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter NoTemperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 447/464
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter NoTemperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch NoVibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 448/464
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch NoVibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch NoVibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 449/464
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch NoVibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch NoVibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vortex Flow Meter No
Vortex Flow Meter No
Vortex Flow Meter No
Vortex Flow Meter No
Vortex Flow Meter No
Vortex Flow Meter No
Vortex Flow Meter No
Flow Indicator No
Level Gauge No
Level Gauge No
Level Gauge No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 450/464
Level Gauge No
Level Gauge No
Level Gauge No
Level Gauge (Reflex type) No
Level Gauge (Reflex type) No
Level Gauge (Reflex type) No
Level Gauge (Reflex type) NoLevel Gauge (Reflex type) No
Level Gauge (Reflex type) No
Level Gauge (Reflex type) No
Level Gauge (Reflex type) No
Level Gauge (Reflex type) No
Level Gauge (Reflex type) No
Level Gauge (Reflex type) No
Level Gauge (Reflex type) No
Level Gauge (Reflex type) No
Level Gauge (Reflex type) No
Level Gauge (Reflex type) No
Level Gauge (Reflex type) No
Level Gauge (Reflex type) No
Level Gauge (Reflex type) No
Level Indicator No
Level Indicator No
Level Indicator (Float & Tape type) No
Level Indicator Transmitter No
Level Indicator Transmitter No
Level Switch No
Level Switch NoLevel Switch No
Level Switch No
Level Switch No
Level Switch No
Level Switch (Capacitance Type) No
Level Switch (Capacitance Type) No
Level Switch (Capacitance Type) No
Level Switch (Capacitance Type) No
Level Switch (Capacitance Type) No
Level Switch (Displacer Type) No
Level Switch (Displacer Type) No
Level Switch (Displacer Type) No
Level Switch (Displacer Type) No
Level Switch (Displacer Type) No
Level Transmitter (Float and Tape type) No
Level Transmitter (Float and Tape type) No
MoistureTransmitter No
Pressure Gauge No
Pressure Gauge No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 451/464
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge NoPressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge NoPressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 452/464
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge NoPressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge NoPressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 453/464
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge NoPressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge NoPressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 454/464
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge NoPressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge No
Pressure Gauge (Differential Type ) No
Pressure Gauge (Differential Type ) No
Pressure Gauge (Differential Type ) No
Pressure Gauge (Differential Type ) No
Pressure Gauge (Differential Type ) No
Pressure Gauge (Differential Type ) No
Pressure Gauge (Differential Type ) No
Pressure Gauge (Differential Type ) No
Pressure Gauge (Differential Type ) No
Pressure Gauge (Differential Type ) No
Pressure Gauge (Differential Type ) No
Pressure Switch No
Pressure Switch No
Pressure Switch NoRotameter (Metal Tube Rotameter) No
Rotameter (Purge Type Rotameter) No
Rotameter (Purge Type Rotameter) No
Rotameter (Purge Type Rotameter) No
Rotameter (Purge Type Rotameter) No
Servo type Transmitter No
Servo type Transmitter No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 455/464
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge NoTemperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge NoTemperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 456/464
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge NoTemperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge NoTemperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 457/464
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge NoTemperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge NoTemperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 458/464
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge NoTemperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge NoTemperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Gauge No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 459/464
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter NoTemperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter NoTemperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 460/464
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter NoTemperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter NoTemperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 461/464
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter NoTemperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter NoTemperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 462/464
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter NoTemperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter NoTemperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Temperature Transmitter No
Vibration Switch No
Vibration Switch No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 463/464
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch NoVibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch NoVibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
8/22/2019 New PM Plan With Total Inst List_8 YEARS
http://slidepdf.com/reader/full/new-pm-plan-with-total-inst-list8-years 464/464
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch NoVibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No
Vibration Switch No