New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and...

44
New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller

Transcript of New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and...

Page 1: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Invitation to dialog

Call for tenders for Horns Rev 3 and Kriegers FlakDirector Hanne Windemuller

Page 2: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Today

•Introduction

•Presentation of Horns Rev 3 and Kriegers Flak

•Presentations and discussions on the 12 questions for dialog

•Summary of the result of the first round of dialog concerning pre-investigations.

Coffee break at 14.25

Page 3: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

New offshore projects

Tender for 450 MW near shore wind farms

Horns Rev 3: 400 MW

Kriegers Flak: 600 MW

Horns Rev 3

Kriegers Flak50 MW turbines for research and development

Page 4: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Role of the Danish Energy Agency

Responsible for the call for tenders

Contracting authority

Responsible authority for EIA offshore

One-stop-shop for permits

Page 5: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Role of Energinet.dk

Finance, construct and operate platform and sea cable

Bringing power from new OWF ashore and strengthen grid

Secure that grid connection is available in due time

Conduct pre-investigations and EIA for the offshore wind farms

Page 6: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

The tender proces

Negotiated procedure with prequalification and dialog

Focus on competition and dialog

The dialog:Bilateral meetings May 27 – 30Deadline for written contributions June 7

Page 7: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Horns Rev C Platform Design400 MW Transformer PlatformPoint of interface to the Concession Owner

Page 8: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark Horns Rev 3: Layout of the Grid-connection

Platform

HRCBlåbjerg

Endrup Revsing

Holsted

Platform, 3 pcs. 140 MVA transformers

Offshore cables, 220 kVLocation B: 34 km

Onshorecables, 150 kVRute: 15 km

Onshore Cables, 220 kVHR2 rute: 58,0 kmShort rute: 47,0 km

Overheadlines, 400 kVTotal OHL length: 29,3 km

Blåbjerg, new 220 kV GIS Cable Station,

Page 9: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Horns Rev 3: Platform location

• Platform located 34 km from the Coastline

• Water depths at platform positions: app. 18 meters

• Platform to be located at the perimeters of the area for the turbines.

Page 10: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Kriegers Flak

• Combined Grid Connection• Wind Farm and Interconnector

• Cooperation with 50Hertz Transmission GmbH

• CO-financed by the European Union

• In operation from July 1st 2018

• Grid connection – two AC platforms

• 400 kV AC connection in Ishøj

Page 11: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Kriegers Flak 600 MW in the Baltic Sea

Pre-investigation area devided in two: West 69 km2 East 110 km2

Central area reserved for gravel extraction

Platform locations fixed:

West 200 MW AC East 400 MW AC

(+ 600 MW HVDC platform)

Wind Turbine location allowed within West and East area.

Kriegers Flak

Page 12: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Conditions for prequalification

• DEA will conduct a prequalification of potential tenderers

• Requirements for financial and technical capacity

• Only prequalified tenderer will be entitled to submit a tender

• Requirements adapted to the company set-up of the

individual applicants

Page 13: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Requirements for financial capacity

• Expected projectsum may amount to no more than 25 % of

the tenderer’s business (or parent company)

• Equity-ratio requirement of 20 %

• Credit rating of BBB- with ”Standard & Poors”, ”Moody’s” or

”Poors”

• Submit general financial information on earnings for the past

3 years, equity capital, equity ratio and EBIT margin (all in the

consortium)

Page 14: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Requirements for technical capacity

• Documenting experience in:– project development and establishment of offshore wind

farms or other large –scale offshore installationsor – operation of large offshore wind farms above a specific

size, e.g. 100 MW

• Question: Any questions to the requirements under consideration for financial or technical capacity?

Page 15: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Compliance with tender

• Compliance penalty • Bank guarantee placed as collateral for the penalty• 400 mill. for Horns Rev 3 and 600 mill. for Kriegers Flak • Bank (first of declaration of intention and later of guarantee)

needs ratings with “Standard & Poors” of A-, with Moody’s” of A3 and with “Fitch” of A-.

• Guarantee released when spent 1 bn. in establishment of Horns Rev 3 or 1 ½ bn. on Kriegers Flak

• Question: Will the intended model on compliance penalty influence interest in tendering the wind farms? Will this affect the price offered?

Page 16: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Award criteria

• Lowest price is the only award criterion

• Open to include other criteria than price, if

– the criteria are reasonable and relevant

– contribute to increased competition

– without additional costs for the tenderer

• Question: What criteria other than price could be relevant ?

Page 17: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Financial terms

• The price supplement is the difference between the ”price pr. kWh bid” and the spot price for electricity

• The supplement will be given for the first 20/30 TWh

• No price supplement in hours with negative spot prices

• Compensation for delayed grid connection and for limits on production.

Questions:

• Is the supplement for 20/30 TWh the right level?• Other comments?

Page 18: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

September 2013 Contract notice

Timetable for tendering procedureHorns Rev 3

2013 2014 … 20202015

29 November 2013 Deadline for prequalification

2 September 2014Deadline for preliminary tenders

1 December 2014Deadline for binding tenders

Early 2015Concession contract and construction permit

From 1 January 2017 Guaranteed connection to the grid

Early 2020Full operation of offshore farm

Page 19: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

29 Nove

mber 2013

Deadlin

e for p

re-qualifica

tion

September 2

013

Contract

notice

2 September 2

014

Deadlin

e for p

reliminary

tenders

1 December 2

014

Deadlin

e for b

inding tenders

Early

2015

Concessi

on contra

ct and

constr

uction perm

it

From 1 Ja

nuary 2017

Guaranteed connecti

on to th

e grid

1 January

2020

Full o

peration of o

ffshore fa

rm

Timetable for tendering procedureHorns Rev 3

2013 2014 … 20202015

Questions:• Timing of prequalification?• Other comments?

Page 20: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

February 2014 Contract notice

29 April 2015Deadline for preliminary tenders

31 August 2015 Deadline for binding tenders

From 1 July 2018 Guaranteed connection to the grid

Early 2020Full operation of offshore farm

Timetable for tendering proceduresKriegers Flak

2013 2014 … 20202015

29 April 2014 Prequalification

September/October 2015 Concession contract and construction permit

Page 21: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

29 April 2014

Prequalifica

tion

Febru

ary 2014

Contract

notice

29 April 2015

Deadlin

e for p

reliminary

tenders

31 Augu

st 2015

Deadlin

e for b

inding tenders

September/O

ctober 2

015

Concessi

on contra

ct and

constr

uction perm

it

From 1 Ju

ly 2018

Guaranteed connecti

on to th

e grid

1. January

2020

Full o

peration of o

ffshore fa

rm

Timetable for tendering proceduresKriegers Flak

2013 2014 … 20202015

Questions:• Timing of prequalification?• Other comments?

Page 22: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Compliance with deadline for completing the wind farms

The political energy agreement: The two wind farms are in full production from 1 January 2020.

Questions:• How can DEA ensure a fair and sufficient incentive to

complete the farms before 2020?• Will an economic incentive/sanction affect the interest in the

tender?• Will the incentive affect the price offered?

Page 23: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Capacity of the farms

A required minimum of 395/595 MW and a maximum of 405/605 MW for Horns Rev 3 and Kriegers Flak respectively.

Page 24: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Horns Rev 3 area is reduced

Page 25: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Maximum area for construction

Maximum area: 44 km2 per 200 MW is being considered.

Question: Would a smaller area than 44 km2 per 200 MW be acceptable and if so, how small could the area be?

Page 26: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Concession for Kriegers Flak - one or two?

Question: Should it be possible to split Kriegers Flak into two concessions? Kriegers Flak

Page 27: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Horns Rev C Platform Design400 MW Transformer PlatformPoint of interface to the Concession Owner

Page 28: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Horns Rev 3: Platform location

• Platform located 34 km from the Coastline

• Water depths at platform positions: app. 18 meters

• Platform to be located at the perimeters of the area for the turbines.

Page 29: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Horns Rev C Platform – Design decisions• HRC will be designed based on the Anholt platform

• 3 pcs. of 140 (200) MVA transformere to be installed at the Topside – point of interface to the Concession Owner

• LV-supply (auxiliary power): 3 pcs aux.transformers and 2 pcs of dieselgenerators

• MV earthing resistors to be designed and installed by Concession Owner

Page 30: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Horns Rev Platform – Electrical diagram

MV busbar 1b

220/MV kV140 (200) MVA

Wind turbine radials

Energinet.dk

Concession Owner

MV busbar 2b MV busbar 3b

NONO

Y

D

Y

D

Y

D

NC NC NC

Aux. Power 1MV/0.4 kV630 kVA

Z

Y

Aux. Power 2MV/0.4 kV630 kVA

Z

Y

Aux. Power 3MV/0.4 kV630 kVA

Z

Y

MV busbar 1a MV busbar 2a MV busbar 3a

NO

220/MV kV140 (200) MVA

220/MV kV140 (200) MVA

Room A Room B Room C

220 kV export cable to shore

220 kV GIS switchgear

*) Only if 33kV is chosen

*)

*) *) *)

*) *)

Grid voltage in the wind farm:33 kV or 66 kV

Number of wind turbine radials: at 33 kV: 12 stk. (3 x 4 ) at 66 kV: 9 stk. (3 x 3)

Wind turbine radials Wind turbine radials

Page 31: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Horns Rev 3 - Timeline

Kriegers Flak – MV specification same date as for Horns Rev 3Kriegers Flak – MV switchgear delivery early 2017

Page 32: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

TSOOWFO

ff sh

ore

win

d fa

rm 4

00 M

WO

ffsho

re w

ind

farm

200

MW

8.2

km15

km

Krigers Flak

Single line diagram

Solution 2xAC + DC

POD 14-03-2013

MV

MV

MV

150/MV KV140/200 MVA

YD

YD

MV/0.4 kV630 kVA

YD

MV/0.4 kV630 kVA

MV/0.4 kV 630 kVA

NO

NO

ZY

ZY

ZY

150/MV kV140/200 MVA

150/MV kV140/200 MVA

MV

MV

150/MV kV140 (200) MVA

YD

YD

MV/0.4 kV630 kVA

MV/0.4 kV630 kVA

NO

ZY

ZY

150/MV kV140 (200) MVA

150 kV

150 kV

150 kV 150 kV

Transition joints

HV

DC

Sub

mar

ine

cabl

es 6

00

MW

HVDC Land cables 600 MW

83.3

km

5.5 km

VSC Converter 600 MW

0.1 kmVSC Converter

600 MW

Submarine cable 200 MW

Submarine cable 200 MW

Sub

ma

rine

cab

le

200

MW

Cable (in air)200 MW

Cable (in air)200 MW

Exis. station400 kV

DK1400 MW platform

DK2 200 MW platform

Baltic 2 Baltic 1 Bentwisch

HVDC OSS platform

IshøjThe KF HVDC platform is to be located 15-30 m from KF 400 MW platform with 1 or 2 bridges between. The 150 kV AC cables between the platforms is to be installed on the bridge(s)

150 kV Reactor50-100 Mvar

Wind park array voltageMV kV: 33 kV or 66 kV

*) For connection in the future

150 kV

*)

*)

Optional extension SE

150 kV

±320kV

±320kV

Legend:

Contractors Scope of Supply

+ 320 kV

- 320 kV

From converter

From converter

To Ishøj

To Ishøj

To DC breaker

To DC breaker

From DC breaker

From DC breaker

To Sweden

To Sweden

To Germany

To Germany

Alternative DC Switchtyard 2 x 6 disconnectors

Dok.no.: 49652-13 Sag: 12/1297

Page 33: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Technical Project Description for both sites are published – and we would like your comments!

Pre-investigations and EIA for: Horns Rev 3, Project manager: Betina Haugaard Heron, Energinet.dkKriegers Flak, Project manager: Pernille Skyt, Energinet.dk

In brief we will present the technical project description for Horns Rev 3 and Kriegers Flak – our main question to you is:

• Will the current draft technical project description ensure the flexibility necessary to select technical solutions for projects on Horns Rev 3 and Kriegers Flak?

Page 34: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Technical Projects Descriptions – the overall objectives

The overall objectives of the published technical project descriptions are:• Provide description of the main technical parts: wind turbines,

park layouts, foundations design, inter-array cables and installation methods.

• Use this as the technical foundation for the environmental impact assessment

• Provide a combination of a “most likely” and a “worst case” approach

• Enable the EIA to secure as high degree of flexibility as possible in order to allow the concession winner to design and built the most optimal offshore wind farm.

Page 35: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Horns Rev 3: Location of pre-investigation area

• App. 160 km2

• Has been reduced since February 2013

• The wind farm area will cover an area of app. 80-90 km2

• Flexibility for coming developer

Page 36: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Kriegers Flak: Location of pre-investigation area

• Exclusion zone central in the area. Here two-three platforms and export cables to Denmark and Germany, will be established

• 200MW turbines west of exclusion zone (pre-investigation area: 70 km2)

• 400MW turbines east of exclusion zone• (pre-investigation area: 110 km2) Flexibility for coming developer

• Overall area: 250 km2

• Water depths 15 - 30 mDistance to shore 15 km

• Distance to harbour 20-40 km

Page 37: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Specifications for different turbinesTurbine Capacity (MW)

Rotor Diameter (m)

Total Height (m) Hub Height above MSL (m)

Swept area(m2)

Wind farms

3.0MW 112m 135m or site specific

79m or site specific

9,852 m2 Northwind

3.6MW 120m 141,6m or site specific

81,6m or site specific

11,500m2 Anholt Offshore Wind Farm

4.0MW 130m 153m or site specific

88m or site specific

13,300m2 -

6.0MW 154m 177m or site specific

100m or site specific

18,600 m2 -

8.0MW 164m 187m or site specific

105m or site specific

21,124m2 -

Smallest turbine for Horns Rev 3 and Kriegers Flak: 3.0 MWLargest turbine for Horne Rev 3 and Kriegers Flak: 8.0 MWDo you agree ?

Page 38: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Different locations and layouts of turbines have been modelled

3.6 MW: NS: 640 m3.6 MW: EW: 1.170 m

8.0 MW: NS: 1.050 m8.0 MW: EW: 1.781 m

Modelled by DTU Wind Energy, 2013

Pernille Holm Skyt
Jeg synes, at vi skal droppe denne slide - pga. ændringer i HR 3 området...og fordi det ved nærmere eftertanke er uheldingt, at vi ikke har sikret offentliggørelse af DTU rapport .....lad os lige vende det !!!
Page 39: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Parklayout - 3 MW turbinesWest: 67 turbinesEast: 133 turbines

Parklayout - 8 MW turbinesWest: 25 turbinesEast: 50 turbines

Kriegers Flak – park layouts

Modelled by DTU Wind Energy, 2013

Page 40: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Turbine foundations

Three main types are included:• Monopile• Gravitation• Jacket

The different types of foundations have different impacts concerning e.g.:

• Installation noise• Seabed preparation• Scour protection• ‘Footprint’• Hydrodynamic impacts• Risk of ship collisionAll of this will be covered in the EIA

Page 41: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Technical dialogue: Questions related to Geo Investigations (UXO, geophysical, geological, geotechnical issues)

Note has been published summarizing the comments in anonymous form, including answers or responses to the input.In summary, the following suggestions have been included in the geotechnical survey program: • More CPTs at both sites • Pressure meter tests • Dynamic laboratory tests• Acoustic Corer will not be part of the program

Expected publishing dates:July 2013: Geophysical survey results31. December 2013: Geotechnical factual reports28. February 2014: Updated 3D geological models

Page 42: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Technical dialogue: Questions related to MetOcean

Note has been published summarizing the comments in anonymous form, including answers or responses to the input. Additionally, methodology notes have been published.

In summary:• No met-masts will be established at the two sites• The level for MetOcean studies at the two sites will be identical, with natural differences as

existing data from the two areas varies.• Some developers hold more detailed knowledge on MetOcean data than others in the two

areas. DEA and Energinet.dk will make efforts to equalize the advantage potential developers may have compared to others.

• Estimations on productivity will not be part of the MetOcean studies. • Certification of the conducted MetOcean studies, or a verification of a third party is sought.• Notes describing the methodology for the MetOcean studies are published; please comment!• Metocean studies will be completed as planned, late 2013.

Page 43: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Road map of the technical dialog 2013

• May 13: Kick-off conference.

• May 27 – 30: Invitation to participate in bilateral meetings.

• May 31: Deadline for written contributions regarding Metocean.

• June 7: Deadline for written contributions. • Go to www.ens.dk/offshorewind in order to read more about

the tenders and to subscribe to the newsletter.

Page 44: New Offshore Wind Tenders in Denmark Invitation to dialog Call for tenders for Horns Rev 3 and Kriegers Flak Director Hanne Windemuller.

New Offshore Wind Tenders in Denmark

Summary point

• The Danish Energy Agency is open to hearing all relevant proposals and input to ensure that the tendering procedures reflect current market conditions.

• These may be proposals for contract terms, etc. which may be able to reduce or increase the price, or enhance knowledge about market conditions of significance to the price in the tendering period.