WESTON Ref. No. 01-0331 Corporate Environmental Programs General Electric Company WO Woodlawn Ave., Pittsfield, MA 01201 Transmitted Via Hand Delivery and Federal Express March 23, 2000 Bryan Olson U.S. EPA New England Mail Code: HBT One Congress Street Boston, MA 02203 Re: Modifications to Leachate Collection System, Building 71 On-Plant Consolidation Area - GE-Pittsfield/Housatonic River Site Pittsfield, Massachusetts Dear Mr. Olson: I. Introduction This letter summarizes recent activities conducted by the General Electric Company (GE) regarding modifications to the existing leachate collection system at the Building 71 On-Plant Consolidation Area (OPCA) in Pittsfield, Massachusetts. As you know, in 1999 GE designed and constructed the first phase of the Building 71 OPCA for the consolidation of materials resulting from various removal actions within the GE-Pittsfield/Housatomc River Site. In accordance with a document entitled Detailed Work Plan for On- Plant Consolidation Areas [Work Plan; Blasland, Bouck & Lee, Inc. (BBL), June, 1999], an approximate 2-acre area of the Building 71 OPCA was constructed. This area included, among other items, the construction of the impermeable base liner system, the leachate collection system, and stormwater management facilities. However, remediation materials generated in 1999 were not actively consolidated within the Building 71 OPCA; instead, with approval from the United States Environmental Protection Agency (USEPA), these materials (approximately 9,000 cubic yards) were placed and secured in a temporary stockpile located immediately adjacent to the Building 71 OPCA. In anticipation of consolidating the existing stockpile materials within the Building 71 OPCA in the next few months (and thus, initiating "active" operations of the OPCA), GE has identified certain modifications related to the existing leachate collection system. These activities are primarily related to the existing leachate collection manhole, including physical changestothe manhole and the installation of the permanent leachate pumps (and related piping, controls, and instrumentation). The remainder of this letter summarizes these construction activities and identifies the anticipated implementation schedule. Although this letter is being provided to the USEPA for informational purposes, GE would welcome and consider any timely USEPA comments concerning this letter.

Transcript of New MODIFICATIONS TO LEACHATE COLLECTION SYSTEM, … · 2020. 9. 4. · construction of the...

Page 1: New MODIFICATIONS TO LEACHATE COLLECTION SYSTEM, … · 2020. 9. 4. · construction of the impermeable base liner system, the leachate collection system, ... identified and designed

WESTON Ref. No.

01-0331Corporate Environmental ProgramsGeneral Electric CompanyWO Woodlawn Ave., Pittsfield, MA 01201

Transmitted Via Hand Delivery and Federal Express

March 23, 2000

Bryan OlsonU.S. EPA New EnglandMail Code: HBTOne Congress StreetBoston, MA 02203

Re: Modifications to Leachate Collection System,Building 71 On-Plant Consolidation Area -GE-Pittsfield/Housatonic River SitePittsfield, Massachusetts

Dear Mr. Olson:

I. Introduction

This letter summarizes recent activities conducted by the General Electric Company (GE) regardingmodifications to the existing leachate collection system at the Building 71 On-Plant Consolidation Area(OPCA) in Pittsfield, Massachusetts. As you know, in 1999 GE designed and constructed the first phase ofthe Building 71 OPCA for the consolidation of materials resulting from various removal actions within theGE-Pittsfield/Housatomc River Site. In accordance with a document entitled Detailed Work Plan for On-Plant Consolidation Areas [Work Plan; Blasland, Bouck & Lee, Inc. (BBL), June, 1999], an approximate2-acre area of the Building 71 OPCA was constructed. This area included, among other items, theconstruction of the impermeable base liner system, the leachate collection system, and stormwatermanagement facilities. However, remediation materials generated in 1999 were not actively consolidatedwithin the Building 71 OPCA; instead, with approval from the United States Environmental ProtectionAgency (USEPA), these materials (approximately 9,000 cubic yards) were placed and secured in a temporarystockpile located immediately adjacent to the Building 71 OPCA.

In anticipation of consolidating the existing stockpile materials within the Building 71 OPCA in the next fewmonths (and thus, initiating "active" operations of the OPCA), GE has identified certain modifications relatedto the existing leachate collection system. These activities are primarily related to the existing leachatecollection manhole, including physical changes to the manhole and the installation of the permanent leachatepumps (and related piping, controls, and instrumentation). The remainder of this letter summarizes theseconstruction activities and identifies the anticipated implementation schedule. Although this letter is beingprovided to the USEPA for informational purposes, GE would welcome and consider any timely USEPAcomments concerning this letter.

Page 2: New MODIFICATIONS TO LEACHATE COLLECTION SYSTEM, … · 2020. 9. 4. · construction of the impermeable base liner system, the leachate collection system, ... identified and designed

Mr. Byran OlsonMarch 23, 2000

Page 2 of3

II. Anticipated Construction Activities

The 1999 Building 71 OPCA construction activities included provisions to collect and convey (for subsequenttransport prior to treatment/disposal) any leachate that may be generated from the materials placed in theBuilding 71 OPCA. The existing components of the leachate collection system include the base liner, theleachate collection/conveyance piping, and the leachate collection manhole.

As currently constructed, the existing leachate collection system is fully functional and could support, withmanual attendance, "active" use of the Building 71 OPCA. However, over the last several weeks, GE hasidentified and designed modifications to the existing system that allow its future operation to be moreautomated and closer to the anticipated configuration of the final leachate collection system (once the activeconsolidation activities are concluded and closure activities have been completed). As described below, themajority of these modifications pertain to the existing leachate collection manhole.

Attachment 1 to this letter contains the technical drawings and specifications that Blasland, Bouck & Lee, Inc.(BBL) has prepared. The anticipated modifications to the leachate collection system are fully described withinthese drawings/specifications, and are summarized as follows:

• The existing leachate collection manhole will be extended in height by approximately 5 Vz feet. Thenew section will be consistent with the current manhole section (i.e., double-wall, high-densitypolyethylene construction). The existing manhole cover and access hatch will be removed and reused,and following the manhole extension, an access platform will be constructed and the surrounding areawill be graded.

• Within the collection manhole, two leachate pumps (each with a design pumping rate of approximately40 gallons per minute [gpm] when operated individually, and approximately 65 gpm when operatedconcurrently) will be installed. Also included within the collection manhole will be various equipmentto support the pump operations, including piping and valves, level floats, explosion-proofinstrumentation, and related appurtences.

• External to the leachate collection manhole, several activities will be performed, including a partialrelocation of the existing, double-wall leachate conveyance forcemain, provision of electrical powerfrom an existing source, and installation of instrumentation/control wiring between control panelslocated at the leachate collection manhole and the temporary leachate collection/transfer area (discussedbelow).

In summary, the activities described above are intended to allow future leachate collection and conveyanceoperations to be conducted without full-time attendance by GE personnel. As leachate is generated within theBuilding 71 OPCA, it will be conveyed (via gravity flow) to the leachate collection manhole. There, the levelcontrols within the manhole will initiate pump operations. The control logic within the manhole provides foralternate operation of the two pumps (under dry- or low-flow conditions) and both pumps concurrently, ifneeded, under high flow conditions. The control logic also includes provisions to detect and notify GE (viaan autodialer) of potential alarm conditions (e.g., high water level, pump failure, etc.).

The collection of leachate for subsequent disposition will be conducted in a manner similar to that describedin the Work Plan. In general, leachate pumped from the collection manhole will be routed to a designatedcollection area where a temporary storage tank (e.g., a frac tank) and a remote control panel will be located.Once the final method of leachate treatment is determined, and sufficient data are collected regarding actuallong-term leachate generation rates and characteristics, a final permanent storage facility can be designed, ifwarranted.

Page 3: New MODIFICATIONS TO LEACHATE COLLECTION SYSTEM, … · 2020. 9. 4. · construction of the impermeable base liner system, the leachate collection system, ... identified and designed

Mr. Byran OlsonMarch 23, 2000

Page 3 of3

III. Anticipated Schedule

This letter provides a summary of the modifications identified by GE related to the leachate collection systemfor the Building 71 OPCA. Separate from this letter, GE has prepared detailed design drawings and technicalspecifications for these modifications, and is currently using these materials to solicit cost proposals fromqualified contractors.

GE anticipates that contractor selection will occur within the next few days and that construction activities willcommence shortly thereafter. Tentatively, construction ~ and subsequent start-up testing — of the modifiedleachate collection system will be completed in early May 2000, to allow "active" operation of the OPCA tocommence in mid-May 2000.

Please contact me with any questions concerning this letter and scope of the leachate collection systemmodification.

Sincerely,

Andrew T. Silfer, P.E.Senior Technical Manager

JMN/plh

Enclosure

U:\PLH0O\337OI543.WPD

cc: Tim Conway, Esq., EPA Jeffrey Bernstein, Esq., Bernstein, Cushner & KimmelMichael Nalipinski, EPA Public Repositories ECL 1 -P-IV(A)( 1)Holly Inglis, EPAK.C. Milkevicious, EPAHolly Inglis, MAAGDawn Veilluex, Weston, Inc.Robert Bell, Esq., DEPJ. Lyn Cutler, DEPAlan Weinberg, DEPJohn Ziegler, DEPBetsy Harper, Esq., MAAGCynthia Huber, Esq., DOJAndrew Thomas, Jr., Esq., GEMichael Carroll, GEJohn Novotny, P.E., GEMayor Gerald S. DoyleJames Nuss, P.E., LSP, BBLJames Bieke, Esq., Shea & Gardner

Page 4: New MODIFICATIONS TO LEACHATE COLLECTION SYSTEM, … · 2020. 9. 4. · construction of the impermeable base liner system, the leachate collection system, ... identified and designed

Attachment 1

Page 5: New MODIFICATIONS TO LEACHATE COLLECTION SYSTEM, … · 2020. 9. 4. · construction of the impermeable base liner system, the leachate collection system, ... identified and designed

ATTACHMENT 1TECHNICAL DRAWINGS

LEACHATE COLLECTIONANHOLE ODIFICATIONS

/r.PFFEJ'FNCE. PITTSFIEU3 EAST, MASS. USGS QUAD., 7.5 M1N. SERIES, 1988

LOCATION MAP

r2(XB ft

BUILDING 71 ON-PLANTCONSOLIDATION AREA

MARCH 2000

PREPARED FOR:

General Electric CompanyPittsfield, Massachusetts

PREPARED BY;

BLASLAND, BOUCK & LEE, INC.engineers & scientists

INDEX TO DRAWINGS

COVER SHEET1 SITE PLAN2 LEACHATE COLLECTION MANHOLE EXTENSION3 LEACHATE COLLECTION MANHOLE - PUMPS AND PIPING4 LEACHATE COLLECTION MANHOLE - PLATFORM PLAN AND SECTION5 ELEMENTARY DIAGRAMS AND DETAILS6 TECHNICAL SPECIFICATIONS AND ABBREVIATIONS

Page 6: New MODIFICATIONS TO LEACHATE COLLECTION SYSTEM, … · 2020. 9. 4. · construction of the impermeable base liner system, the leachate collection system, ... identified and designed

^BUILD ING 71 OPCA

EXISTING 6 >HDPE LEACHATECONVEYANCE PIPE

PROPOSED PLATFORM(SEE SHEET 4)

PROPOSED FLYGTCONTROL PANEL(SEE SHEET 5)

PROPOSED ELECTRICALAND CONTROL PULLBOX (TYP.)(REFER TO DETAIL ON SHEET 5)

EXISTING LEACHATCOLLECTION MANHOLETO BE EXTENDEDSEE SHEET 2)

I—EDGE OF EXISTINGLINER SYSTEM

RELOCATE FORCEMAIN(REFER TO DETAIL

EXISTING 2"0 HDPE OH SHEET 3)LEACHATE CONVEYANCEFORCEMAIN PIPECONTAINED IN 4"« HDPE

SEE TRENCHDETAIL ONSHEET 5

PROPOSED REMOTEANNUNCIATOR PANEL(REFER TO DETAILON SHEET 5)RIP RAP ON ROADWAY

TO BE REMOVED ANDREPLACED WITH CLEANTOPSOIL AND SEEDED

RIP RAPBASIN INLET

r\ L_ NEW 4 ' - 0 TALL,8"» CONCRETEFILLED STEEL PIPE( 6 * - O " DEEP)TYP. I OF 2

LEACHATE CONVEYANCEFORCEMAIN TO BE EXCAVATED";CUT, AND RELOCATED TO NEWLOCATION. TRENCH TO BEREUSED FOR POWER CONDUIT

ELECTRIC AND CONTROLCONDUITS SHALL RUN INTRENCH (REFER TO DETAILON SHEET 5)

STORMWATER BASIN

BASIN OUTLET STRUCTURE

EXISTING STORMSEWER DRAIN PIPE

EXISTING BOULDERS INTHIS AREA TO BERELOCATED TO >ACCOMODATE TRENCH x

EXCAVATION

3 #6, 1 #SG1-1/2" RGS

EXISTINGABOVE GROUNDSTEAM PIPE

20185X01. DWG.: 0N=», OFF=REF': CQNT-DJD/CONT-MV8i /6 /00 8YR-54-DCC KLN OCC«185035/20185GO1, DWG

PROVIDE AND INSTALL60A, 3P DISCONNECT SWITCHAT EXISTING PANEL UNDEREXISTING 100A. 480V SWITCH"(G.E. TO CONNECT POWER)

LEGEND

1019 INDEX CONTOUR LINE

INTERMEDIATE CONTOUR LINE

PERIMETER DRAINAGE DITCH

CULVERT

CHAIN LINK FENCE

EDGE OF BRUSH AND WOODS

1. ELEVATIONS SHOWN ARE REFERENCED TO NATIONALGEODETIC VERTICAL DATUM (NGVD) 1929.

2. HORIZONTAL DATUM IS REFERENCED TO THEMASSACHUSETTS STATE PLANE COORDINATE SYSTEM(NAD 1927).

CONTOUR INTERVAL EQUALS 1 FOOT.

DIFFERENCES NOTED BY THE CONTRACTORBETWEEN BASE MAP INFORMATION AND ACTUALSITE CONDITIONS. WHICH MAY AFFECT THE DESIGNCONFIGURATION, SHALL BE SUBMITTED TO GE.MODIFICATIONS MAY BE MADE TO THE DESIGNCONFIGURATION DURING PERFORMANCE OF THESITE WORK AT THE DISCRETION OF G.E.

CONTRACTOR SHALL VERIFY THE PRESENCE ANDLOCATION OF ALL ABOVE GROUND AND UNDERGROUND SITE FEATURES IN THE VICINITY OFPROPOSED CONSTRUCTION ACTIVITIES PRIOR TOCOMMENCEMENT OF SITE WORK. ADDITIONAL SITEFEATURES MAY BE PRESENT WHICH ARE NOTSHOWN ON THIS DRAWING. IT SHALL BE THECONTRACTOR'S RESP0N3BIUTY TO COORDINATEWITH GE TO DETERMINE THE PRESENCE ANDLOCATION OF SUCH FEATURES SHOULD THEY EXISTAND THE LOCATION OF ON-SITE EASEMENTS,LEASE UNES, AND RIGHT-OF-WAYS.

INFORMATION REGARDING SITE SURVEY CONTROLWILL BE PROVIDED BY G.E. FOR CONTRACTOR USEPRIOR TO COMMENCEMENT OF SITE WORK. ITSHALL BE THE CONTRACTOR'S RESPONSIBILITY TOESTABLISH AND MAINTAIN CONSTRUCTION SURVEYCONTROL DURING PERFORMANCE OF THECONTRACT WORK.

CONTRACTOR SHALL ASSUME EXISTING FENCING ATPERIMETER OF SITE IS G.E.'s PROPERTY LINE. NOWORK SHALL BE PERFORMED OUTSIDE THEPROPERTY UNE WITHOUT G.E.'s PRIOR APPROVALG.E. WILL OBTAIN APPROVALS FOR ANY WORKWITHIN IDENTIFIED LEASE OR EASEMENT AREAS.

CONTRACTOR SHALL PROVIDE ALL LOCAL(NON-ENVIRONMENTAL) PERMITS AND MAKEARRANGEMENTS FOR LOCAL INSPECTIONS (ASNECESSARY).

CONTRACTOR SHALL FURNISH AND PLACE PROPERGUARDS FOR PREVENTION OF ACCIDENTS, PROVIDEALL TRENCH SHORING, SCAFFOLDING, SHIELDING,DUST/FUME PROTECTION, SAFETY RAILINGS,BARRIERS, OR OTHER SAFETY FEATURES REQUIRED.THE CONTRACTOR SHALL PROVIDE AND MAINTAINSUFFICIENT LIGHTS DURING NIGHT HOURS TOSECURE SUCH PROTECTION.

10. CONTRACTOR SHALL BE SOLELY RESPONSIBLE FORINITIATING, MAINTAINING, AND SUPERVISING ALLSAFETY PRECAUTIONS AND PROGRAMS INCONNECTION WITH THIS CONTRACT. THECONTRACTOR SHALL TAKE ALL NECESSARYPRECAUTIONS FOR THE SAFETY OF, AND SHALLPROVIDE THE NECESSARY PRECAUTION TOPREVENT DAMAGE, INJURY, OR LOSS TO ALLEMPLOYEES ON THE WORK AND ANY OTHERPERSONS WHO MAY BE AFFECTED THEREBY.

EXISTING SURFACES OR FEATURES NOT SPECIFIEDFOR MODIFICATION THAT ARE DAMAGED ORDESTROYEO AS A RESULT OF WORK PERFORMEDUNDER THIS CONTRACT SHALL BE RESTORED BYTHE CONTRACTOR TO THEIR PREC0NSTRUCT10NCONOITION IN A TIMELY MANNER.

ALL CONTRACTOR RELATED ACTIVITIES SHALL BEPERFORMED IN A MANNER WHICH ALLOWS FOR ALLNECESSARY OPERATING ACTIVITIES ASSOCIATEDWITH THE PITTSFELD GENERATING COMPANY ANDGENERAL DYNAMIC COMPANY FACILITIES. ANYWORK DEEMED NECESSARY WHICH MAY AFFECTTHOSE FACILITIES SHALL BE BROUGHT TO THEATTENTION OF G.E. PRIOR TO COMMENCEMENT OFSUCH WORK. G.E. SHALL PROVIDE THECONTRACTOR WITH AUTHORIZATION TO PROCEEDPROVIDED G.E. AND THE AFFECTED PARTY(IES)DEEM THE ACION NECESSARY AND ACCEPTABLE.

Graphic Scale

flS DRAWING IS THE PRCPERTY OF BLASOND, 80OCK tc:E, WC. AND MAT NOT B£ REPRODUCED OR ALTERED

WHOLE OR IN PART WITHOUT WE EXPRESS WRITTENEMISSION Of 8LASLAND. 8OUCK * LEE, INC.

Project Mgr.

Designed by

Drown by _

Checked by

Prof. Eng. _

PE License

BBLBLASIAND, BOUCK k LEE, INC.engineers & scientists

GENERAL ELECTRIC • PtTTSFiELD, MASSACHUSETTS

LEACHATE COLLECTION MANHOLE MODIFICATIONS

SITE PLAN

File Number201.85.01F

DateMARCH 2000

Blosiond, Bouck & Lee,Corporate Headquarters6723 Towpolh RoadSyracuse, NY 13214315-446-3120

Page 7: New MODIFICATIONS TO LEACHATE COLLECTION SYSTEM, … · 2020. 9. 4. · construction of the impermeable base liner system, the leachate collection system, ... identified and designed

EXISTING PRECAST CONCRETE6 ' - Q " * MANHOLE TOP SECTION TOBE REMOVED AND REINSTALLED ONTOP OF PROPOSED HOPE RISEREXTENSION (SEE NOTE 4)

PLATFORM DECKING (TYP.)(SEE DETAIL ON SHEET 4 )

EXISTING3'-6*x3'-6"BILCO JD-5ALALUMINUM HATCH

PROPOSED 2 0 SDR11HOPE LEAK DETECTIONPIPE EXTENSION

PROPOSED 2 0 SDR 11HOPE LEAK DETECTIONBYPASS TO BE TIEDINTO EXISTING 2"* LEAKDETECTION PIPE

SEE CONNECTIONDETAIL THIS SHEET

EXISTING 3 0CONDUIT STUB

APPROX. EL. 1020.72"

CONTRACTOR TO PROVIDE 5 ' - 6 "LONG, 5 * - 0 * * DOUBLE WALLRISER EXTENSION (ASMANUFACTURED BY PLEXCO)

PROPOSED GRADE

APPROX. EL. 1014.72'

EXISTING 6"9 SDR-17HOPE CARRIER PIPE WITH10"* SDR-17 HDPECONTAINMENT PIPE

APPROX. C_ EL. 1009.72

EXISTING 2"0 SDR11HDPE LEAK DETECTION PIPE"

NOTES:

1. VIEW DOES NOT REFLECT ORIENTATION. SEE PLANVIEW ON SHEET 3 FOR ORIENTATION.

2. BACKFILL AROUND MANHOLE EXTENSION WITHCLEAN SOIL APPROVED BY G.E., AND APPLYSEED AND STRAW MULCH TO GRADED SURFACE.

3. ROUTE HATCH DRAIN INTO MANHOLE.

4. EXISTING CONCRETE POURED AROUND 6 ' - O " 0PRECAST TOP SECTION TO BE PULVERIZED ANDSTOCKPILED ON-SITE AT A LOCATION APPROVEDBY G.E. ONLY 6'-G"sS PRECAST MANHOLE TOPSECTION IS TO BE REUSED.

EXISTING 5"-0"f» HOPEDOUBLE WALL MANHOLE

APPROX. (£ EL. 1012.76'

APPROX. C_ EL. 1012.22'

CUSS I, DIVISION IHAZARDOUS AREA

-EXISTING 2 > HDPEFLANGE ADAPTOR

APPROX. C_ EL. 1010.22"

PROPOSED MANHOLEEXTENSION

TO BE DETERMINEDBY MANUFACTURER

HDPE CENTERINGCOLLAR

SHOP EXTRUSION WELD

SHOP DRILL 2"0LEAK DETECTIONBYPASS WEEP HOLE

PROPOSED 2"0 SDR-11LEAK DETECTION BYPASS(SEE NOTE 1)

TO BE DETERMINEDBY MANUFACTURER

TO BE DETERMINEDBY MANUFACTURER

FIELD EXTRUSIONWELD

SHOP EXTRUSION WELD

SHOP BEVEL BOTTOMOF INTERIOR WALL

TO BE DETERMINEDBY MANUFACTURER

FIELD EXTRUSION WELD

FIELD SCRAPE INTERIOREDGE OF EXISTING MANHOLE

GEONET SPACE AT ENDSOF EXISTING AND PROPOSEDMANHOLE SECTIONS TO BEEXTRUSION WELDED CLOSED

EXISTING MANHOLE

•APPROX. EL. 1003.72'

V///////////////////////////////'/////////////////////f/////////////A-APPROX. EL. 1002.51"

NOTES:

1. SHOP TO INSTALL 12* SECTION OF 2*# BYPASS PIPE AND CONTRACTORTO FIELD CUT TO SZE.

2. CONTRACTOR SHALL COORDINATE MANHOLE EXTENSION WITH LOCALSUPPLIER AND ENGINEER. TECHNICAL SUBMITTALS SHALL BE DEVELOPEDBY CONTRACTOR AND REVIEWED BY G.E. AND ENGINEER PRIOR TOMATERIAL ORDERING. ALL AS-BUILT INFORMATION PERTAINING TO THEEXISTING MANHOLE WILL BE TRANSMITTED TO THE SUCCESSFUL BIDDER.

CONNECTION DETAILNOT TO SCALE

LEACHATE COLLECTION MANHOLE(_: 0N=», OFF=R£fP: CONT-OJD/CONT-MVB3/8/00 SYR-54-0CC KLN OCC20185035/20185G02.BWC

SCALE: 3/4*-t'-0"

Graphic Scof€

2"/4"-r-o* |""5H

THIS DRAMMG 18 THE PROPERTY OF BLASiANO, BOUCK *EE, INC. A W MAY NOT BE REPRODUCED OR ALTERED

N WHOLE OR IN PART WITHOUT THE EXPRESS WRITTENE R i S S O N Of BtASiAND, BOOCK & LEE, INC.

Project Uqr.

Designed by

Drown by _

Checked by

Prof. Eng, _ .

PE License

HBLBIASIANP, BOOCK k i l l , INC,

engineers & scientists

GENERAL ELECTRIC • PITTSFIELO, MASSACHUSETTS

LEACHATE COLLECTION MANHOLE MODIFICATIONS

LEACHATE COLLECTIONMANHOLE EXTENSION

File Number201.85.02F

DoteMARCH 2000

Blastond, Bcuck k Lee, inc.Corporate Heodcjoarters8723 Towpoth RoadSyracuse, NY 13214315-446-9120

Page 8: New MODIFICATIONS TO LEACHATE COLLECTION SYSTEM, … · 2020. 9. 4. · construction of the impermeable base liner system, the leachate collection system, ... identified and designed

SLOPE EXCAVATION INACCORDANCE WITH OSHA

EXISTING FORCE MAIN (2"0SDR-17 HOPE CARRIERPIPE WITH 4"0 SDR-17HOPE CONTAINMENT PIPE)

1 - 1 / 2 " X 1 - 1 / 2 " X 1 / 4 " ANGLE (TYP.)FASTEN TO UNDERSIDE OFCONCRETE COVER WITH (2)3 / 8 " x 2 " S.S. ANCHOR BOLTS

BUTTERFLY VALVEOPERATOR

1 / 4 " S.S. U-BOLT, NUTAND WASHER EACH SIDE

RELOCATED LEACHATE FORCEMAINTRENCH DETAIL

BUTTERFLY VALVE OPERATORSUPPORT DETAIL

NOT TO SCALE NOT TO SCALE

MANHOLE LEAKSENSOR PIPE

EXISTING 3 ' - 6 " x 3 ' - 6 "BILCO JD-5ALALUMINUM HATCH

EXISTING FLANGEADAPTOR-

SUBMERSIBLE PUMP

EXISTING 6"0 SDR-17HDPE CARRIER PIPE WITH10*0 SDR-17 HDPECONTAINMENT PIPE

2"0 HDPE FORCEMAINCONTAINED

-%"* WAFER BUTTERFLYVALVE EXTENSION HANDLETO TOP OF MANHOLE(SEE SUPPORT DETAIL)

2" STEEL FLANGE

3 / 4 " 0 x 2 " CARBON STEELNIPPLE AND 3 / 4 " CARBONSTEEL BALL VALVE

SUBMERSIBLE PUMP

2 0 SCH, 40GALVANIZEDSTEEL PIPE

EXISTING 3~ssCONDUIT STUB (TYP.)

PUN

CONT-DJD/CONT—MVB3/S/00 SYR-54-BCC KIM DCC20185035/20185M01.DWG

1. EXISTING HATCH MUST BE ALIGNED SO PUMP GUIDES INTERSECTWITH CONCRETE PORTION OF COVER.

2. CONTRACTOR TO REMOVE CONDUIT CAPS AND ADO COUPLINGSTO CONNECT NEW POWER AND CONTROL CONDUITS.

3. DETAILS OF MANHOLE SECTION ARE ROTATED FOR CLARITY.

4. SEE SHEET 2 FOR APPROXIMATE LENGTHS AND ELEVATIONS OFEXISTING STRUCTURES.

EXISTING3 ' -6"x3 ' -6 "BILCO JD-5ALALUMINUM HATCH

ATTACH TO PL/.TFORM

PUMP CONTROLPANEL NEMA 4X S.S.(BY FLYGT)

CORE DRILLFOR 2"0 TUBE

STAINLESS STEELEYEBOLT FOR PUMPCHAIN (TYP.)

KELLEMS GRIP (TYP.)

PUMP MANUFACTURER'SCABLE

PROPOSED 2"«< SDR11HDPE LEAK DETECTIONPIPE EXTENSION

CONTRACTOR TO PROVIDE5 * - 6 " LONG, 5 ' -Q"0 DOUBLEWALL RISER EXTENSION (ASMANUFACTURED BY PLEXCO)- \

REUSE EXISTING CONCRETEMANHOLE TOP AND HATCH(SEE PLAN FOR ALIGNMENT)

TOP OF PLATFORM(SEE SHEET 4)

POWERCONDUIT(SEE NOTE 2)

EXISTING 3 0CONDUIT STUBS

CONTROL CONDUIT(SEE NOTE 2)

CUSS I, DIVISION IHAZARDOUS AREAl " i WAFERBUTTERFLY VALVE

3/4" i»x2" CARBON STEELNIPPLE AND 3 / 4 " CARBONSTEEL BAU VALVE

PUMP MANUFACTURER SCABLE

3 / 4 * * SCH. 40GALVANIZED STEELPUMP GUIDES (TYP.)

2 SWING CHECKVALVE (TYP.)

PUMP LIFTING CHAIN(TYP.)

SUBMERSIBLE PUMP

EXISTING 6"0 SDR-17HDPE CARRIER PIPE WITH10"* SDR-17 HDPECONTAINMENT PIPE

WEIGHTED LEVEL FLOATBY FLYGT (TYP.)

2"0 SCH. 40GALVANIZED STEEL PIPE

EXISTING 2"» S0R11HDPE LEAK DETECTION PIPE

EXISTING 5'-O"0 HDPEDOUBLE WALL MANHOLE

SUBMERSIBLE PUMP

ANCHOR BOLTS

LEAK DETECTION SENSOR

LEACHATE COLLECTION MANHOLESCALE: 3 /4"= i ' -a "

Graphic Soaie

MB 0RAWNC IS THE PR0PEF71 OF BLASLAND. BOUCK <StEC. INC AND UAY NOT BE REPRODUCED OR ALIERED

WBOtE C« iN P4RT WHH0JT THE EXPf-EGS vWtTTENOf BLASIAND. B->:"K 4- |£E. inc.

Project Mgr.

Designed by

Drown by _ .

Checked by

Prof. Eng. _ .

PE License

BBLBlAStANP, BQOCK k LEE, INC.engineers & scientists

GENERAL ELECTRIC • PITTSFIELD, MASSACHUSETTS

LEACHATE COLLECTION MANHOLE MODIFICATIONS

LEACHATE COLLECTION MANHOLEPUMPS AND PIPING

File Number201.85.03F

DateMARCH 2000

Biosland, Bouck & Lee, Inc.Corporate Headquarters6723 Towpath RoadSyracuse, NY 13214315-446-9120

Page 9: New MODIFICATIONS TO LEACHATE COLLECTION SYSTEM, … · 2020. 9. 4. · construction of the impermeable base liner system, the leachate collection system, ... identified and designed

-ACCESS ROAD"

REMOVABLE RAIUNG SECTIOK

(1) 2x8

REMOVABLE RAIUNG SECTION

EXISTING CONCRETEPAD 7 ' - 0 "

HAND AND INTERMEDIATERAILING, AND TOE PLATE(BOTH SIDES) EXISTING

MANHOLE5'-0"

PERMANENT HANDRAIL,INTERMEDIATE RAIL,TOE PLATE, AND TRELLISAROUND ENTIRE PLATFORMEXCEPT AS NOTED

\

BOARD FOR MOUNTINGELECTRICAL EQUIPMENT8 ' x 4 ' x 3 / 4 " MARINEGRADE PLYWOOD-

BOARD FOR MOUNTINGELECTRICAL EQUIPMENT8 'x4 'x3 /4" MARINEGRADE PLYWOOD

OVERLAP POSTS A MINIMUM OFt ' - O " AND ATTACH WITH(3) - 1"0 S.S. BOLTS, NUTS,WASHERS. AND 4 " x l 2 " x 1 / 4 "GALVANIZED STEEL PLATES

(1) 2x12

2x8 DECK JOISTSSPACED © i ' - 6 " O.C,

DECKING (SEE NOTE 2)

4x4 POST (TYP.)(SEE NOTE 5)

2x8 STRINGERS

2x10 STEPS

12 * SONOT TUBE (TYP.)

— CONCRETE BASE (TYP.)

CLEAN COMPACTEDGRAVEL ( D U . Y = 2 " )

5 ' -O"0 HOPE MANHOLE

DECK PLANSCALE; 1/2*=1'-G*

SECTIONSCALE: 1/2'=1'-0*

GENERAL NOTES;

1. ALL LUMBER SHALL BE PRESSURE-TREATED SOUTHERN YELLOW PINEWITH A MINIMUM ALLOWABLE BENDING STRESS OF 1,700 PS, AND AMINIMUM ALLOWABLE HORIZONTAL SHEAR STRESS OF 150 PSI.

2 . ALL DECKING SHALL BE 2x6 LUMBER.

3. ALL HARDWARE SHALL BE GALVANIZED.

4 . ALL CONCRETE SHALL HAVE A MINIMUM 28 DAY C0MPRES3VESTRENGTH OF 3,000 PSt.

5. LENGTHS OF 4x4 POSTS SHALL BE FIELD VERIFIED FOLLOWINGMANHOLE EXTEN3QN AND SETTING OF THE CONCRETE CAP,

L: 0N=», 0fF=R£fCONT-D.O/C0NT-MVB

3/6/00 SYR-54-DCC20185035/20185S01.DWG

Graphic Scote

THIS DRAWMG IS THE PROPERTY OF BLASUW0, BOWX SLEE, INC. AN0 MAY NOT BE REPRODUCED OR ALTERQ)

WHOLE OR IN PART WITHOUT W E EXPRESS WRITTENG W I S S Q t i O f BiASLANO, BOJCK * LEE. INC,

Project Mgr,

Designed by

Drawn by _

Checked by

Prof. Eng. _

PE License

BBLBLASUW, BOUCK k LEE, INC.engineers & scientists

GENERAL ELECTRIC • PtTTSFlEU), MASSACHUSETTS

LEACHATE COLLECTION MANHOLE MODIFICATIONS

LEACHATE COLLECTION MANHOLEPLATFORM PLAN AND SECTION

STRUCTURAL

file Number201.85.04f

MARCH 2000

Blosiond, Bouck & Lee, Inc.Corporate Headquarters8723 Towpoth RoodSyracuse. NY 13214315-448-9120

Page 10: New MODIFICATIONS TO LEACHATE COLLECTION SYSTEM, … · 2020. 9. 4. · construction of the impermeable base liner system, the leachate collection system, ... identified and designed

I—3 #6, 1 #8G, 1 -1 /?" RGS

3A DISC. SW,EMA 4 15A FU

480V, 3P .60 HZ.

FLYGT PUMP CONTROL PANEL

8 TSP. 3" RGSINTRINSICALLY SAFE

TEAR DROP LEVELFLOAT (TYP.)

SUBMERSIBLE PUMP

SUBMERSIBLE PUMP

NEMA 4 S.S.FUSED DISCONNECTSWITCHES •

BOND EQUIPMENTTO GROUND (TYP.)-

MANHOLE HIGH LEVEL ALARM

STORAGE TANK HIGH LEVEL ALARM

STORAGE TANK REDUNDANT HIGH LEVEL ALARM

2 TSP, 3 / 4 " RGSINTRINSICALLY SAFE

MANHOLELEAK FLOAT

FLOAT (TYP.)

2 TSP, 3 / 4 " RGSINTRINSICALLY SAFETO LEAK FLOAT 41> I I !

-3/4"x10'-0"GROUND ROD

ELECTRICAL ONE-LINE DIAGRAM ELECTRICAL RISER DIAGRAMNOT TO SCALE NOT TO SCALE

EXISTING GRADE

CLEAN BACKFILL

CLEAN SAND (6"MIN. ON ALL SIDES)

3 / 4 " RGS

1 - 1 / 2 " RGS

BURIED ELECTRIC LINEWARNING TAPE

WARNING TAPE

17"x3O"x3O" DEEP PRECASTPOLYMER CONCRETE PULL BOXWITH CONCRETE COVER LOGO "ELECTRIC"

OLS

mm-FLYGT PUMP CONTROL

PANEL WITH LOCKABLECOVER

•8'x4'x3/4" THICKMARINE GRADE PLYWOOD

o-OO-o

ED

• SEAL-OFF (TYP.)

-EXPLOSION PROOFJUNCTION BOX

4x4 POST (TYP.)

TOP OF PLATFORM

4

V

U

L1 11 i1 |1 11 11 II 1

8 TSP, 3" RGSINTRINSICALLY SAFETO LEVEL FLOATS

MANUFACTURER'S CABLE3" RGS TO PUMPS

10 #14, 3 #12,3 /4" RGS TO REMOTEANNUNCIATOR PANEL

ELECTRICAL LEGEND:

MOTOR OVERLOAD

AUXILIARY CONTACT ONMOTOR STARTER

NORMALLY OPEN CONTACT (N.O.)

NORMALLY CLOSED CONTACT (N.C.)

GROUND

TRANSFORMER

MOTOR OVERLOAD HEATER

FUSE

CIRCUIT BREAKER (C.B.)

INDICATING LIGHT (R)ED, (Y)ELLOW,(G)REEN, (W)HITE

JUNCTION BOX

GROUND FAULT INTERRUPT RECEPTACLE

FLOAT SWITCH

LEAD LAGPUMP "ON* PUMP "ON-

HIGH LEVEL HIGH LEVELIN IN

MANHOLE TANK

oEMERGENCY , .

STOP LJJFOR PUMPS GFI

-LOCKABLE COVER

4"x4" MOUSE HOLE

TRENCH DETAIL PULL BOX DETAIL

L-CONDULET AND C-CONDULETCONDUIT BODIES WITH GASKETEDCOVERS ONE 3ZE LARGER THANCONDUIT SIZE WITH REDUCINGBUSHINGS

6" (MIN.) COMPACTEDCLEAN GRAVEL

10 #14, 3 #12,3 / 4 " RGS TO PUMPCONTROL PANEL-

- 6 0 WATTINCANDSECENT LIGHT

• 16"x12"x8" DEEPNEMA 4 S.S. BOXHOFFMAN CAT. NO.A-16H12BLP

t r

I I.-

-SEAL-OFF

-STAINLESS STEELKINDORF. PROVIDEBRACKETS TOSUPPORT PANELTO KINDORF

12

- 2 TSP, 3 / 4 " RGSTO FUTURE TANKLEVEL (INTRINSICALLYSAFE)

-CONCRETE

NOT TO SCALE NOT TO SCALE

NOTE:

CONTRACTOR TO PROVIDE INTRINSIC RELAYS FOR BOTH TANKLEVEL aOATS.

REMOTE ANNUNCIATORPANEL RISER DIAGRAM

NOT TO SCALE

L: 0N=», OfF=REFP: CONT-0JD/COMT-MVB3/2/00 SYR-54-DCC20185035/201S5E01 .DWG

Graphic Scole

IMS DRAWING tS THE PROPERTY Of BLASIAND, BOUCKLEE, INC. Mm MM NOT BE REPRODUCED OR ALTEREDM WDl£ OR ill PART WITHOUT THE EXPRESS WRITTENPERMISSION OF BtASUWD, BOUCK * LEE. IMC.

Project Mgr. .

Designed by .

Drown by

Checked by .

Prof. Eng. _ .

PE License

BBLBtASLANP, BOUCK k LEE, INC.engineers & scientists

GENERAL ELECTRIC • PiTTSFlELD, MASSACHUSETTS

LEACHATE COLLECTION MANHOLE MODIFICATIONS

ONE-LINE DIAGRAM, RISER DIAGRAMS,AND DETAILS

File Number20I.85.05F

DoteMARCH 2000

Biasfand, Bouck & Lee, iCorporate Headquarters6723 Towpoth RoadSyracuse, NY 13214315-446-9120

Page 11: New MODIFICATIONS TO LEACHATE COLLECTION SYSTEM, … · 2020. 9. 4. · construction of the impermeable base liner system, the leachate collection system, ... identified and designed

MFCHANIHAI SPECIFICATIONS:

1 GALVANIZED STEEL PIPE SHALL BE SCHEDULE 40, MEETING THE REQUIREMENTS OF ASTM A53.' ALL THREADED JOINTS WILL BE TEFLON TAPE SEALED. GALVANIZED STEEL PIPE SHALL BE

PRESSURE TESTED PER MANUFACTURER'S SPECIFICATIONS. ZERO LEAKAGE IS REQUIRED FORALL PIPE JOINTS. GALVANIZED STEEL PIPE SHALL TRANSITION WITH A 2"0 STEEL THREADEDPIPE FLANGE AT THE BUTTERFLY VALVE.

2. CHECK VALVES SHALL BE BRONZE OR CAST IRON 2"0 SWING CHECK VALVES WITH FEMALETHREADED CONNECTIONS BRONZE SEAT, AND A MINIMUM WORKING PRESSURE OF 200 PSIG.

3. BUTTERFLY VALVE SHALL BE CAST OR DUCTILE IRON 2"0 WAFER-STYLE BUTTERFLY VALVE WITHTEFLON SEATS, AN EXTENSION HANDLE TO THE TOP OF THE MANHOLE, AND A MINIMUM WORKINGPRESSURE OF 200 PSIG.

4 SUBMERSIBLE PUMP SHALL BE ITT FLYGT SUBMERSIBLE PUMP MODEL MP3067-211 WITH1.9-HORSEPOWER, 460 VOLT, 60 HERTZ, 3 PHASE, EXPLOSION-PROOF MOTOR; GUIDE RAIL KIT;AND 128-MILLIMETER DIAMETER IMPELLER. PUMP CAPACITY SHALL B£ 36 GALLONS PER MINUTE AT46 FEET TOTAL DYNAMIC HEAD.

STRUCTURAL/CIVIL SPECIFICATIONS:

1. ALL LUMBER SHALL BE PRESSURE-TREATED SOUTHERN YELLOW PINE WITH A MINIMUM ALLOWABLEBENDING STRESS OF 1,700 P 3 , AND A MINUMUM ALLOWABLE HORIZONTAL SHEAR STRESS OF 150 P S .

2. ALL CONCRETE SHALL HAVE A MINIMUM 28 DAY COMPRESSIVE STRENGTH OF 3,000 PSI.

ABBREVIATIONS:

A

0

iDISC

ELFUGFI

GPM

HOPE

HP

JB

IR

KVA

MAX.

MIN.

MH

NEMA

OPCA

OSHA

P

P 3

RGS

SDR

SS

SW

TSP

TYP

V

VAC

AMP

DIAMETER

CENTERLINE

DISCONNECT

ELEVATION

FUSE

GROUND FAULT INTERRUPT

GALLONS PER MINUTE

HIGH DENSITY POLYETHYLENE

HORSEPOWER

JUNCTION BOX

INTRINSIC RELAY

KILOVOLT AMPERE

MAXIMUM

MINIMUM

MANHOLE

NATIONAL ELECTRICAL MANUFACTURERS ASSOCIATION

ON-PLANT CONSOLIDATION AREA

OCCUPATIONAL SAFETY AND HEALTH ASSOCIATION

PHASE

POUNDS PER SQUARE INCH

RIGID GALVANIZED STEEL

STANDARD DIMENSIONAL RATIO

STAINLESS STEEL

SWITCH

TWISTED SHIELDED PAIR

TYPICAL

VOLTAGE

VOLTAGE ALTERNATING CURRENT

I: OH**; OFF=KFP: CONT-DJD/CONT-MVB3/3/00 SYR-54-DCC20185035/20185003. D WG

ELECTRICAL SPECIFICATIONS:

GENERAL

1. CONTRACTOR SHALL USE GENERAL ELECTRIC EQUIPMENT WHENEVERPOSSIBLE.

2. ALL ELECTRICAL EQUIPMENT SHALL BE U.L. USTED AND LABELED.

3. ALL ELECTRICAL WORK SHALL BE IN ACCORDANCE WITH THELATEST REVISION OF NFPA-70, NATIONAL ELECTRIC CODE (NEC).

CONDUITS

RIGID METAL CONDUIT (RGS)

1. GALVANIZED STEEL, HOT DIPPED ZINC, ANSI STANDARD C80 1AND C80.4.

2. MANUFACTURERS SHALL BE ALLIED TUBE & CONDUITCORPORATION; TRIANGLE WIRE & CABLE INC.; OR EQUAL.

3. JUNCTION BOXES AND FITTINGS SHALL BE OF GALVANIZEDCAST IRON OR COPPER FREE ALUMINUM.

JUNCTION BOXES

1. JUNCTION BOXES IN AREAS CLASSFIED AS HAZARDOUS OR WHERE INDICATED ONDRAWINGS, MANUFACTURER SHALL BE CROUSE-HINDS SERIES EJB, OR KILLARKSERIES XB.

WIRES AND CABLES

A. GENERAL

1. ALL CONDUCTORS, UNLESS OTHERWISE NOTED, SHALL BESTRANDED COPPER, CONSTRUCTED OF SOFT DRAWN ORANNEALED COPPER.

2. CONDUCTORS INSULATION SHALL BE COLOR CODED, WITHCOLOR OF INSULATION ONE COLOR THROUGHOUT THEENTIRE RUN.

A. 480 VAC, 3 PHASE, 3 WIREPHASE A - BROWNPHASE B - ORANGEPHASE C - YELLOWGROUND - GREEN

B. 120/240 VAC, SINGLE PHASE, 3 WIRECONDUCTOR 1 - BLACKCONDUCTOR 2 - REDNEUTRAL - WHITEGROUND - GREEN

B. LOW VOLTAGE CONDUCTORS

1. ALL CONDUCTORS FOR POWER, LIGHTING AND 120 VACCONTROL SHALL BE RATED A MINIMUM 600 VAC.

2. CONDUCTORS SHALL BE CONSTRUCTED OF UNCOATED CLASS CCOPPER CONCENTRIC-LAY-STRANDED WIRES.

3. POWER AND LIGHTING CONDUCTORS SHALL BE TYPE THHN-90C,THWN-2-90C WITH PVC INSULATION AND NYLON JACKET.

C. CONNECTORS

1. PIGTAIL SPLICING #10 AND SMALLER, USE TAPERED SPRINGWIRE NUTS: IDEAL WING NUT; BUCHANAN B-CAP; T&B PIGGIES,OR EQUAL.

2. FOR TERMINATION OF #14 CONTROL WIRES TO TERMINALS, USEINSULATED COMPRESSION SPADE TYPE CONNECTORS: BURNDYHYDENT; T&B STA-KON OR EQUAL.

3. SPLICES AND TERMINALS FOR #8 AND LARGER SHALL BECOPPER C0MPRES90N TYPE: BURNDY HYDENT OR HYLUG;T&B, STA-CON OR EQUAL

4. FIXTURE CONNECTIONS SHALL BE: T&B STA-KON SERIES PT-66M;IDEAL CRIMP SLEEVE NO. 410 WITH LONG BARREL OR EQUAL.

!. GROUNDING OF ELECTRICAL SYSTEMS AND EQUIPMENT SHALL,AS A MINIMUM, MEET THE REQUIREMENTS OF THE NECARTICLE 250 OR SHALL EXCEED ARTICLE 250 AS HEREINSPECIFIED,

2. ALL CONDUITS SHALL HAVE AN INTERNAL GROUNDCONDUCTOR. THIS GROUND CONDUCTOR SHALL BE PROVIDEDALTHOUGH IT MAY NOT BE SHOWN OR SCHEDULED ON THEPUNS.

3 GROUNDING ELECTRODE CONDUCTORS SHALL BE A MINIMUM' OF 8 AWG BARE STRANDED COPPER.

4. GROUND RODS SHALL BE 3 / 4 " IN DIAMETER, 10 FEET LONG, STEELCORE WITH COPPER MOLTEN WELDED OR ELECTROLYTIC ALLY BONDEDTO EXTERIOR.

5. ALL CONNECTIONS SHALL BE MADE WITH COMPRESSION ORMECHANICAL CONNECTORS.

1. 120 VAC AUTODIALER SHALL HAVE THE ABILITY TO MONITOR fOURINPUT CHANNELS, AND RECORD FIVE USER MESSAGES, FOUR CHANNELALARMS AND STATION ID.

2. UPON ALARM CONDITION, AUTODIALER SHALL AUTOMATICALLY CALL ALIST OF UP TO 8 PRE-PROGRAMMED NUMBERS OVER A CELLULARPHONE CHANNEL.

3. THE AUTODIALER SHALL HAVE 20 HOUR BATTERY BACKUP.

4. AUTODIALER SHALL HAVE INTEGRAL SURGE PROTECTION ON POWER ANOSIGNAL LINES.

5. MANUFACTURER: RACO GUARD-IT WITH OPTION GAC-GBB-GCELL-AC.

ENCLOSURES SHALL BE NEMA RATED FOR LOCATION UNLESSOTHERWISE NOTED.

1. WET LOCATIONS OR OUTDOORS, ENCLOSURES SHALL BE NEMATYPE 4, STAINLESS STEEL.

2. ENCLOSURES SHALL HAVE NAMEPLATE ON THE EXTERIORIDENTIFYING THE APPLICATION FUNCTION OF THE EQUIPMENTENCLOSED.

WIRING DEVICES

PROVIDE AS INDICATED.

CIRCUIT PROTECTION DEVICES

GENERAL

1. CIRCUIT BREAKERS SHALL BE OF THE PLUG-ON TYPE. UNLESSOTHERWISE SHOWN, BREAKERS SHALL BE RATED AT 20AMPERES.

2. CIRCUIT BREAKERS SHALL HAVE A MINIMUM INTERRUPTINGRATING OF 10,000 AMPERES RMS SYMMETRICAL AT 240 VAC OR14,000 AMPERES AT 480 VAC UNLESS OTHERWISE SHOWN.

DISCONNECT SWITCHES

1. HEAVY DUTY SAFETY SWITCH, FUSED OR NON-FUSED ASSHOWN OR NOTED.

2. DISCONNECT SWITCHES SHALL BE G.E. HEAVY DUTY SAFETYSWITCH.

1. PULL BOXES SHALL BE USED IN OUTDOOR LOCATIONS ONLY FORPULLING. NO SPLICES SHALL BE ALLOWED.

2. PULL BOX SHALL BE CONSTRUCTED OF PRECAST CONCRETE ANOSCREWED GASKETED COVER WITH STAINLESS STEEL BOLTS.

TRANSFORMERS

1. SINGLE PHASE TRANSFORMERS SHALL BE 480V PRIMARY AND120/240V SECONDARY.

2. TRANSFORMERS SHALL BE SUITABLE FOR USE OUTDOORS.

3. TRANSFORMER COILS SHALL BE OF THE CONTINUOUS WOUNDCONSTRUCTION, U.L. USTED.

4. MANUFACTURER SHALL BE GENERAL ELECTRIC.

RELAYS

1. INTRINSIC RELAYS (IR) SHALL BE SUITABLE FOR USE ON CIRCUITS THATSERVE HAZARDOUS LOCATIONS AND SHALL BE APPROVED BY FACTORYMUTUAL (FM) FOR USE IN CLASS I, DIV, 1 AREAS. OUTPUT CONTACTSSHALL BE RATED 5 AMPS AT 120 VAC. MANUFACTURER SHALL BE GEMSSAFE-PAK.

UGHTS

1. 60 WATT INCANDESCENT, ENCLOSED AND GASKETED SUITABLE FOR WETLOCATIONS. PROVIDE GUARD. MANUFACTURER SHALL BE GENERALELECTRIC MODEL H 7 - 1 - 1 5 F - 3 C - D D .

flQATS

1. MECHANICAL TILTING SWITCH ENCAPSULATED IN PVC. CABLE LENGTH TOBE DETERMINED IN FIELD. MANUFACTURER: FLYGT ENM-10.

2. LEAK DETECTION SENSOR SHALL BE A COMPACT SIZE WITH SLOSH SHIELDANO WEIGHTED COLLAR SUITABLE FOR LEAK DETECTION IN STAND PIPES.a O A T SHALL BE CONSTRUCTED OF BUNA N WITH PVC WETTED PARTS ANDPVC CABLE JACKET. MANUFACTURER: GEMS L S - 7 5 0 SERIES.

FLYGT DUPLEX SUBMERSIBLE PUMP CONTROL PANEL

1. 480 VOLT, 3 PHASE, 60 HZ.

2. INDIVIDUAL PUMP CIRCUIT BREAKERS.

3. PUMP ALTERNATOR.

4. LEAD-LAG PUMP LOGIC.

5. (4) INTRINSICALLY SAFE FLOATS: OFF, LEAD, LAG, AND HIGH.

6. INDIVIDUAL H - O - A AND RUN UGHT.

7. MINICAS SUBMERSIBLE PUMP MODULES FOR EACH PUMP.

8. INDICATING UGHT FOR EACH FLOAT.

9. CONTROL POWER TRANSFORMERS.

10. THERMOSTAT AND PANEL HEATER.

11. CONTACTS FOR REMOTE CIRCUITS FOR ALARM CONDITION.

Graphic Scale

IMS DRAWWG IS THE PROPERTY Of BlASLAND, 80UCK *LEE, INC. ANO MAY NOT BE REPRODUCED OR ALTEREDIM WHOLE OR IH PART WITHOUT THE EXPRESS WRITTEN=>ERMISSON Of BLASLANO. BOUCK & LEE, INC.

Project Mgr. .

Designed by .

Drown by _ _

Checked by .

Prof. Ertg,

PE License

BBLBL4SUND, BOUCK k i l l , INC,engineers & scientists

GENERAL ELECTRIC • PITTSFIELD, MASSACHUSETTS

LEACHATE COLLECTION MANHOLE MODIFICATIONS

TECHNICAL SPECIFICATIONSAND ABBREVIATIONS

GENERAL

File Number201.85.06F

DateMARCH 2000Blastand, Bouck & Lee, Inc.Corporate Headquarters6723 Towpoth RoadSyracuse, NY 13214315-446-9120