Minutes of meeting between held between M/S DCL and M/S ORIENT on 29-01-2014
M/S ORIENT M/S DCL
Mr. Raghava rao Mr. k.Vijay Anand
M/S DCL arrived the on 29-01-2014 and done the following
1. DCL engineer Mr. .Vijay Anand inspected the VML in presence of M/S ORIENT and found no damage
2. M/S DCL explained the function of VML 3. M/S DCL explained how to remove the VML caps ,house pipes ,solenoid values and
header pipe(by welding) to reduce the size of VML in order to enter in to the tunnel 4. M/S ORIENT suggested to remove the outlet duct in order to reduce more size 5. After the stock age M/S ORIENT will remove the above mentioned material in presence
of M/S DCL 6. M/S DCL left the site on 29-01-2014
M/S ORIENT M/S DCL
Minutes of meeting held between M/S ORIENT CEMENT LTD AND M/S DCL on 28-05-2014 AT DEVAPUR SITE
M/S ORIENT CEMENT LTD M/S DCL
Mr.M.Venkat Ramaiah Mr. Surya Narsimha Raju
Mr. Ch. V. Raghava rao
Mr. Ch.Ramulu
M/S DCL Engineer visited Devapur site and discussed the following:.
1. DCL Engineer Mr.Surya Narsimha Raju inspected the VML dust collector inside the tunnel belt conveyor of Cement Mill-II for fan exhaust duct to be connected to outside of tunnel.
2. M/S DCL will give the conformation mail for the above.3. M/S DCL requested OCL to release the order for the remaining 8 VML
Mr. Surya will be leaving Devapur site on 28.05.2014 evening.
M/S ORIENT CEMENT LTD M/S DCL