New Membrane and GAC Treatment Plant for TOC

RemovalAWWA California-Nevada Section

Brian Shoener

Provost & Pritchard Consulting Group

Fresno, California

October 2, 2013

Page 2: New Membrane and GAC Treatment Plant for TOC Removalca-nv-awwa.org/canv/downloads/sessions/16/Session1… ·  · 2013-10-02New Membrane and GAC Treatment Plant for TOC Removal ...

Outline Background of existing operations

Problem

Alternatives

Solution

Issues

Results

Lessons

Page 3: New Membrane and GAC Treatment Plant for TOC Removalca-nv-awwa.org/canv/downloads/sessions/16/Session1… ·  · 2013-10-02New Membrane and GAC Treatment Plant for TOC Removal ...

Background Two Water Sources

Reservoir Gravity feed to plant

Bad water quality

River Pumped to plant – Two

1000 HP pumps

Good water quality

Page 4: New Membrane and GAC Treatment Plant for TOC Removalca-nv-awwa.org/canv/downloads/sessions/16/Session1… ·  · 2013-10-02New Membrane and GAC Treatment Plant for TOC Removal ...

Background Existing Treatment Plant

500 gpm (0.72 MGD)

Sedimentation basin No sludge removal

Two dual media pressure filters

Chlorine gas

1 MG storage tank Gravity feeds most of

system

Page 5: New Membrane and GAC Treatment Plant for TOC Removalca-nv-awwa.org/canv/downloads/sessions/16/Session1… ·  · 2013-10-02New Membrane and GAC Treatment Plant for TOC Removal ...

Problem Reservoir

High TOC Up to 6.1 ppm

High turbidity Up to 144 NTU

Iron

Manganese

Page 6: New Membrane and GAC Treatment Plant for TOC Removalca-nv-awwa.org/canv/downloads/sessions/16/Session1… ·  · 2013-10-02New Membrane and GAC Treatment Plant for TOC Removal ...

Problem River

Excellent water quality

But………

River flow must be above a certain rate

Pumping is expensive

Bacteriological concerns at low flow

Page 7: New Membrane and GAC Treatment Plant for TOC Removalca-nv-awwa.org/canv/downloads/sessions/16/Session1… ·  · 2013-10-02New Membrane and GAC Treatment Plant for TOC Removal ...

Problem Plant cannot meet DBPs

and turbidity

THMs > 120

HAA5 > 180

Did pre-chlorinate –stopped due to DBPs

But… now causing manganese problems and biological growth in basins

Page 8: New Membrane and GAC Treatment Plant for TOC Removalca-nv-awwa.org/canv/downloads/sessions/16/Session1… ·  · 2013-10-02New Membrane and GAC Treatment Plant for TOC Removal ...

Problem No room to expand

SRF and Prop 50 Funding

Page 9: New Membrane and GAC Treatment Plant for TOC Removalca-nv-awwa.org/canv/downloads/sessions/16/Session1… ·  · 2013-10-02New Membrane and GAC Treatment Plant for TOC Removal ...

Alternatives Install clarifier

Allow coagulation /sedimentation to reduce TOC & turbidity

Membranes

Page 10: New Membrane and GAC Treatment Plant for TOC Removalca-nv-awwa.org/canv/downloads/sessions/16/Session1… ·  · 2013-10-02New Membrane and GAC Treatment Plant for TOC Removal ...

Alternatives Additional TOC Removal &

DBP Reduction

Ion Exchange – Piloted for 2 weeks. Worked

Brine handling and disposal issues

Chloramines Not feasible. Complexity.

Distribution system – wells using chlorine

Public acceptance problems

Page 11: New Membrane and GAC Treatment Plant for TOC Removalca-nv-awwa.org/canv/downloads/sessions/16/Session1… ·  · 2013-10-02New Membrane and GAC Treatment Plant for TOC Removal ...

Alternatives Additional TOC Removal &

DBP Reduction

Granular Activated Carbon Easy to operate

Helps taste and odor

Page 12: New Membrane and GAC Treatment Plant for TOC Removalca-nv-awwa.org/canv/downloads/sessions/16/Session1… ·  · 2013-10-02New Membrane and GAC Treatment Plant for TOC Removal ...

Solution Clarifier, membrane and

GAC

How to build upgrades and keep plant operating?

Build clarifier and feed existing filters

Fill in existing ponds

Construct building for membranes and GAC

Page 13: New Membrane and GAC Treatment Plant for TOC Removalca-nv-awwa.org/canv/downloads/sessions/16/Session1… ·  · 2013-10-02New Membrane and GAC Treatment Plant for TOC Removal ...

Solution

Page 14: New Membrane and GAC Treatment Plant for TOC Removalca-nv-awwa.org/canv/downloads/sessions/16/Session1… ·  · 2013-10-02New Membrane and GAC Treatment Plant for TOC Removal ...

Solution Client wants to bid

three different membrane vendors

Design for largest membrane system

Ability to run all or a portion of flow thru GAC

Page 15: New Membrane and GAC Treatment Plant for TOC Removalca-nv-awwa.org/canv/downloads/sessions/16/Session1… ·  · 2013-10-02New Membrane and GAC Treatment Plant for TOC Removal ...

Lesson Learned All vendors have

different:

Skid sizes

Inlet/outlet

orientations

Waste drains

Air compressors

Page 16: New Membrane and GAC Treatment Plant for TOC Removalca-nv-awwa.org/canv/downloads/sessions/16/Session1… ·  · 2013-10-02New Membrane and GAC Treatment Plant for TOC Removal ...

Lesson Learned Chosen vendor would

not move feed pumps off skid.

Next vendor supplied inaccurate design drawings

Page 17: New Membrane and GAC Treatment Plant for TOC Removalca-nv-awwa.org/canv/downloads/sessions/16/Session1… ·  · 2013-10-02New Membrane and GAC Treatment Plant for TOC Removal ...

Planned Operation 3 Modes

Normal – Thru clarifier and pumped to membranes

Bypass Pumped –Bypass clarifier and pumped to membranes

Bypass Gravity –Bypass clarifier and directly feed membranes

Page 18: New Membrane and GAC Treatment Plant for TOC Removalca-nv-awwa.org/canv/downloads/sessions/16/Session1… ·  · 2013-10-02New Membrane and GAC Treatment Plant for TOC Removal ...

Startup Issues New membranes have air

assisted backwash draining. This affects:

Backwash every 30 minutes

CIP every 30 days

MW every 30 days

Causes high velocity discharge

Overwhelmed gravity drains

Page 19: New Membrane and GAC Treatment Plant for TOC Removalca-nv-awwa.org/canv/downloads/sessions/16/Session1… ·  · 2013-10-02New Membrane and GAC Treatment Plant for TOC Removal ...

Startup Issues Variable pressure from

reservoir and flow restrictions due to influent pipe size

Limited flow to 560 gpm from reservoir

Caused issues with backwash return

Bypass gravity mode cannot provide enough flow to feed one skid and backwash the other

Page 20: New Membrane and GAC Treatment Plant for TOC Removalca-nv-awwa.org/canv/downloads/sessions/16/Session1… ·  · 2013-10-02New Membrane and GAC Treatment Plant for TOC Removal ...

Acceptance Test First start up attempt

Worked through many alarms

Second attempt

Vendor replaced some valving

Completely redid vendor supplied program

Everything worked

Page 21: New Membrane and GAC Treatment Plant for TOC Removalca-nv-awwa.org/canv/downloads/sessions/16/Session1… ·  · 2013-10-02New Membrane and GAC Treatment Plant for TOC Removal ...

Operational Results Clarifier alone with

existing filters produced excellent TOC results.

TOC Removal

5 mg/L raw water

3.5 mg/L after clarifier

1 mg/L after membranes

ND after GAC

Page 22: New Membrane and GAC Treatment Plant for TOC Removalca-nv-awwa.org/canv/downloads/sessions/16/Session1… ·  · 2013-10-02New Membrane and GAC Treatment Plant for TOC Removal ...

It was all going well until……

Page 23: New Membrane and GAC Treatment Plant for TOC Removalca-nv-awwa.org/canv/downloads/sessions/16/Session1… ·  · 2013-10-02New Membrane and GAC Treatment Plant for TOC Removal ...

It was all going well until……

Page 24: New Membrane and GAC Treatment Plant for TOC Removalca-nv-awwa.org/canv/downloads/sessions/16/Session1… ·  · 2013-10-02New Membrane and GAC Treatment Plant for TOC Removal ...

Thank You Questions?