NEW LINES (CONSTRUCTION)

29
7.1.1 SOUTH CENTRAL RAILWAY ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15 (Figures in thousand of Rupees) Item No. RE 2014-15 1 Peddapalli-Karimnagar-Nizamabad (177.49 km) Cap. 42,76,20 2 Nandyal-Yerraguntla (126 km) Cap. 122,75,00 3 Munirabad-Mahabubnagar (246 km) Cap. 45,00,00 EBR 80,00,00 4 Macherla-Nalgonda (92 km) Cap. 2,50,00 5 Gulbarga-Bidar (140 km) Cap. 120,20,15 EBR 190,00,00 6 Gadwal-Raichur (60 km) Cap. 16,48,61 7 Kakinada-Pithapuram (21.5 km) Cap. 2,00 8 Kotipalli-Narsapur (57.21 km) Cap. 5,00,00 EBR 5,00,00 9 Obulavaripalle-Krishnapattnam (113 km) Dep(RVN) .. EBR 208,00,00 EBR .. 10 Manoharabad-Kotapalli (148.9 km) Cap. 5,00,00 11 Vishnupuram-Janapahar (11 km) Cap. 5,00,00 12 Jaggayyapet-Mallacheruvu (19.1 km) with new material modification for Mallacheruvu- Janapahar (24 km) Cap. 80,00,00 13 Cuddapah-Bangalore (Bangarapet) (255.4 km) Cap. 20,00,00 EBR 10,00,00 14 Bhadrachalam Road-Sattupalli (56.25 km) Cap. 1 EBR 10,00,00 15 Nadikude-Srikalahasti (309 km) Cap. 5,00,00 EBR 5,00,00 16# Gudur-Durgarajapatnam (41.55 km) Cap. 1 17 Bhadrachallam-Kovvur (151 km) Cap. 1 18 Akkanapet-Medak (17.20 km) Cap. 10,00,00 EBR 10,00,00 19 Cumbum - Proddutur (142 km) Cap. 10,00 20 Kondapalli - Kothagudem (125 km) Cap. 1 21 Manugur - Ramagundam (200 km) Cap. 50,00 TOTAL-WORKS IN PROGRESS Cap. 480,32,00 EBR 518,00,00 TOTAL-New Lines (Construction) Cap. 480,32,00 EBR 518,00,00 22 Guntur-Guntakal & Guntakal-Kalluru (478 km) incl. Pendekallu-Gooty new line with lifting of Kalluru-Dharmavaram (76 km) Cap. 4,28,00 C.Fund .. DRF .. DF(4) .. R. Allocation Particulars NEW LINES (CONSTRUCTION) A - Works in Progress GAUGE CONVERSION A - Works in Progress

Transcript of NEW LINES (CONSTRUCTION)

7.1.1

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15

1 Peddapalli-Karimnagar-Nizamabad (177.49 km) Cap. 42,76,20

2 Nandyal-Yerraguntla (126 km) Cap. 122,75,00

3 Munirabad-Mahabubnagar (246 km) Cap. 45,00,00

EBR 80,00,00

4 Macherla-Nalgonda (92 km) Cap. 2,50,00

5 Gulbarga-Bidar (140 km) Cap. 120,20,15

EBR 190,00,00

6 Gadwal-Raichur (60 km) Cap. 16,48,61

7 Kakinada-Pithapuram (21.5 km) Cap. 2,00

8 Kotipalli-Narsapur (57.21 km) Cap. 5,00,00

EBR 5,00,00

9 Obulavaripalle-Krishnapattnam (113 km) Dep(RVN) ..

EBR 208,00,00

EBR ..

10 Manoharabad-Kotapalli (148.9 km) Cap. 5,00,00

11 Vishnupuram-Janapahar (11 km) Cap. 5,00,00

12 Jaggayyapet-Mallacheruvu (19.1 km) with new material modification for Mallacheruvu-

Janapahar (24 km)

Cap. 80,00,00

13 Cuddapah-Bangalore (Bangarapet) (255.4 km) Cap. 20,00,00

EBR 10,00,00

14 Bhadrachalam Road-Sattupalli (56.25 km) Cap. 1

EBR 10,00,00

15 Nadikude-Srikalahasti (309 km) Cap. 5,00,00

EBR 5,00,00

16# Gudur-Durgarajapatnam (41.55 km) Cap. 1

17 Bhadrachallam-Kovvur (151 km) Cap. 1

18 Akkanapet-Medak (17.20 km) Cap. 10,00,00

EBR 10,00,00

19 Cumbum - Proddutur (142 km) Cap. 10,00

20 Kondapalli - Kothagudem (125 km) Cap. 1

21 Manugur - Ramagundam (200 km) Cap. 50,00

TOTAL-WORKS IN PROGRESS Cap. 480,32,00

EBR 518,00,00

TOTAL-New Lines (Construction) Cap. 480,32,00

EBR 518,00,00

22 Guntur-Guntakal & Guntakal-Kalluru (478 km) incl. Pendekallu-Gooty new line with

lifting of Kalluru-Dharmavaram (76 km)

Cap. 4,28,00

C.Fund ..

DRF ..

DF(4) ..

R.

AllocationParticulars

NEW LINES (CONSTRUCTION)

A - Works in Progress

GAUGE CONVERSION

A - Works in Progress

7.1.2

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

23 Mudkhed-Adilabad (167 km) Cap. 3,30,00

C.Fund ..

DRF ..

24 Dharmavaram-Pakala (227 km) Cap. 70,00

C.Fund ..

TOTAL-WORKS IN PROGRESS Cap. 8,28,00

TOTAL-Gauge Conversion Cap. 8,28,00

25 Guntur-Tenali - Doubling with electrification (24.38 km) Cap. 8,00,00

EBR 50,00,00

26 Raghavapuram-Mandamari (24.47 km) - Patch tripling Cap. 21,12,00

C.Fund ..

27 Hospet-Guntakal (115 km) Cap. ..

Dep(RVN) ..

EBR 2,00,00

28 Gudur-Renigunta (83 km) & Renigunta-Tirupati (9.34 km) Cap. 2,87,00

C.Fund ..

DRF ..

EBR ..

29 Gooty-Renigunta - Patch doubling (151.04 km) Cap. ..

Dep(RVN) 4,18,00

30 Raichur-Guntakal (81.1 km) Dep(RVN) 41,77,00

31 Daund-Gulbarga - Doubling (224.9 km) and Pune-Guntakal - Electrification (641.37

km)

Dep(RVN) 275,05,00

32 Mancheryal-Peddampet - Patch tripling (4.37 km) Cap. 30,00,00

33 Krishnapatnam-Venkatachalam - Doubling with electrification (23 km) EBR 5,00,00

34 Mudkhed-Parbhani (81.43 km) Cap. 5,00,00

35 Vijaywada-Gudivada- Bhimavaram-Narasapur, Gudivada-Machlipatnam and

Bhimavaram-Nidadavolu(221 km) - Doubling with electrification

Cap. 20,00,00

EBR ..

36 Kazipet-Vijaywada (219.64 km) - 3rd line with electrification Cap. 15,00,00

TOTAL-WORKS IN PROGRESS Cap. 101,99,00

Dep(RVN) 321,00,00

EBR 57,00,00

TOTAL-Doubling Cap. 101,99,00

Dep(RVN) 321,00,00

EBR 57,00,00

37 Vijayawada - Modification of yard to enable relinquishment of land DRF 4,85,97

DF(3) 1,00,00

38 Motumari - Bypass with overhead alignment towards Jaggayapet branch line at

Kazipet end

Cap. 40,00

GAUGE CONVERSION

DOUBLING

A - Works in Progress

TRAFFIC FACILITIES-YARD REMODELLING & OTHERS

A - Works in Progress

7.1.3

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

39 Tadikalapudi - Addl. loop DF(3) 1,00

40 Vemuru - New crossing station with standard layout Cap. 50,00

41 Tirupati - Development of entry from southern side DF(3) 1,50

42 Vijayawada-Mustabada - Automatic block system (12.9 km) DF(3) 1,16,25

43 Maltekdi - Crossing station in lieu of sanctioned work at Pathrad Cap. ..

44 Renigunta - Bypass line connecting Gudur-Renigunta to Gooty-Renigunta line DF(3) 10,00

45 Prasannayanapalle - Standard layout DF(3) 10,00

46 Bommasamudram - Conversion of halt station to crossing station DF(3) 1,00

47 Visakhapatnam - Crossovers connecting lines-I & II to Gudivada DF(3) 75,00

48 Nancherla-Guntakal West - Bypass line Cap. 5,00

49 Navabpalem, Annavaram, Ravikampadu, Regupalem & Elemanchali - Crossovers

and common loops

Cap. 5,00

50 Aswapuram - Standard lay out DF(3) 50,00

51 Vijayawada - Modification to bulb and CR goods lines DF(3) 1,00,00

52 Yedlapur - Bypass line for traffic from Raichur to Raichur thermal power station Cap. 60,00

EBR ..

53 Sangamjagarlamudi - New crossing station Cap. 1,10

54 Pericherla - Standard layout of station Cap. 1

55 Secunderabad - Extension of washing siding with shunting neck for 26 coaches at

military siding end (2 pit lines & 4 stabling lines)

DF(3) 2,00,00

56 Tarur, Peragaon, Selu, Kodi & Satuna - Addl loops Cap. 50,01

EBR ..

57 Mungalipattu - New crossing station with standard layout Cap. 18,00

58 Poodur - New crossing station Cap. 5,00

59 Ramagundam Yard - Bypass line with traction distribution for direct entry & exit from

Kazipet end

Cap. 1,76,94

60 Sanathnagar - Development of terminal facilities and yard remodelling Cap. 1,02,06

EBR ..

61 Mirkhel & Pingli - 2nd loop lines Cap. ..

C.Fund ..

62 Daulatabad - Addl. facilities for military siding Cap. ..

EBR ..

63 Ramalingampalli - New crossing station Cap. 2,00,00

64 Kukkadam & Rayanaguda - Crossing stations Cap. 2,20,00

65 Divitipalli - New crossing station Cap. 50,00

66 Bandarupalli - Standard layout Cap. 50,00

EBR ..

67 Taticherla - Addl loop line Cap. 58,25

EBR ..

TRAFFIC FACILITIES-YARD REMODELLING & OTHERS

7.1.4

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

68 Garladinne - Addl loop line (715 m) Cap. 84,78

EBR ..

69 Gudur Jn - Addl platform between road No.4 to 7 DF(3) 25,00

70 Regupalem, Elamanchali & Narasingapalli - Extension of loop lines to 720 m DF(3) 1,75,00

EBR ..

71 Bommaipalli - Crossing station with standard layout Cap. 15,00

EBR ..

72 Umdanagar-Timmapur - New crossing station Cap. 1,50,00

EBR ..

73 Cheruvumadhavaram - Standard layout DF(3) 4,26,87

74 Machilipatnam - Extension of platform & stabling lines with provision of a platform

and signalling arrangement for new passenger line

DF(3) 20,00

75 Gajulapalli, Santamagaluru & Ramannapet - Standard layout DF(3) 1,18,19

76 Krishnammakona - Conversion of C-class station to A-class DF(3) 1,00,00

77 Guntakal - Connectivity of road No.1, 2 & 3 to Gooty end and bypass arrangements

from Nandyal-Wadi line

DF(3) ..

78 Nashkal - Up directional loop DF(3) 75,00

79 Bhadrachalam Road-Manuguru - Addl loop DF(3) 15,00

80 Edduladoddi - Standard layouts with provision of loop line DF(3) 1,45,19

81 Works costing below Rs.2.5 crore each Cap. 60,63

DRF 1,93,03

DF(1) 5,43,85

DF(3) 3,14,77

DF(4) ..

TOTAL-WORKS IN PROGRESS Cap. 14,01,78

DRF 6,79,00

DF(1) 5,43,85

DF(3) 20,79,77

DF(4) ..

82 Works costing below Rs.2.5 crore each Cap. 10,22

DRF 50,00 DF(1) 5,00

DF(3) 20,00

DF(4) 5,00

TOTAL-NEW WORKS Cap. 10,22

DRF 50,00

DF(1) 5,00

DF(3) 20,00

DF(4) 5,00

TOTAL-Traffic Facilities-Yard Remodelling & Others Cap. 14,12,00

DRF 7,29,00

DF(1) 5,48,85

DF(3) 20,99,77

DF(4) 5,00

TRAFFIC FACILITIES-YARD REMODELLING & OTHERS

B - New Works

7.1.5

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

83 South Central Railway - Unreserved ticketing system (under Railway Board) DF(1) 5,00

84 South Central Railway - Automatic ticket vending machines Cap. ..

85 South Central Railway - Extension of unreserved ticketing system to E-category

stations

DF(1) 50,00

86 South Central Railway - Extension of automatic ticket vending machines Cap. 12,39,00

87 Works costing below Rs.2.5 crore each DRF 6,55,00

DF(1) 40,00

DF(3) 10,00

TOTAL-WORKS IN PROGRESS Cap. 12,39,00

DRF 6,55,00

DF(1) 95,00

DF(3) 10,00

88 South Central Railway - Repl of 858 Nos of dumb terminals & thin clients with

unreserved ticketing system thin clients with monitors and keyboards

DRF 1,89,22

89 South Central Railway - Rep of routers, line drivers and LAN extender equipment of

passenger reservation system / unreserved ticketing system

DRF 2,00,00

90 Works costing below Rs.2.5 crore each DRF 4,59,78

DF(1) 10,00

DF(3) 10,00

TOTAL-NEW WORKS DRF 8,49,00

DF(1) 10,00

DF(3) 10,00

TOTAL-Computerisation Cap. 12,39,00

DRF 15,04,00

DF(1) 1,05,00

DF(3) 20,00

91 Leased Assets - Payment of Capital component of lease charges to Indian Railway

Finance Corporation

C.Fund 518,70,00

TOTAL-WORKS IN PROGRESS C.Fund 518,70,00

TOTAL-Leased Assets - Payment of Capital Component C.Fund 518,70,00

92 South Central Railway - Manning of unmanned level crossings (190 Nos) S.Fund 6,91,80

93 Vijayawada-Visakhapatnam - 6-quad cable for level crossing gates (B-route) S.Fund 2,10,00

94 Wadi-Guntakal - Improvement to approach roads at level crossings by fibre

reinforced precast RCC blocks (51 level crossings)

S.Fund 86,66

95 Vijayawada Division - Electrically operated lifting barriers (50 Nos) (A & B-routes) S.Fund 10,00

COMPUTERISATION

A - Works in Progress

B - New Works

LEASED ASSETS - PAYMENT OF CAPITAL COMPONENT

A - Works in Progress

ROAD SAFETY WORKS-LEVEL CROSSINGS.

A - Works in Progress

7.1.6

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

96 Vijayawada, Guntur, Secunderabad & Nanded - Interlocking of level crossing gates

(6, 4, 1 & 1 Nos respectively)

S.Fund 1,60,02

97 Vijayawada Division - Pre-fabricated reinforced RCC blocks (375 level crossings) S.Fund ..

98 Hyderabad Division - Upgradation & improvement to road surfaces with precast RCC

slabs (190 level crossings)

S.Fund 1,00,00

99 Guntur Division - Fibre reinforced precast RCC blocks at level crossings (261 Nos) S.Fund 2,00,00

100 Vijayawada Division - Approach warning at special class level crossing gates (26

gates) (A & B-routes)

S.Fund 1,60,19

101 Secunderabad Division - Approach warning at special class level crossing gates (16

gates) (A & B-routes)

S.Fund 64,80

102 Guntakal Division - Improvement to level crossing surfaces with fibre reinfoacement

precast RCC blocks (south section)

S.Fund 2,00

103 Vijayawada Division - Solar-wind hybrid power lighting system at level crossing gates

(120 Nos)

S.Fund ..

104 Secunderabad Division - Interlocking of manned level crossing gates (6 Nos) (A-

route)

S.Fund 40,00

105 Vijayawada Division - Mini data loggers at mid-section interlocked level crossings (55

gates)

S.Fund 1,20,00

106 Guntur Division - Reliability improvement work at level crossings (24 gates) S.Fund 5,00

107 Balharshah-Kazipet - Reliability improvement work at level crossing communication

by addl. 6-quad cable (125 km) (22 gates)

S.Fund 70,00

108 Nanded Division - Addl. 6-quad cable for gate communication S.Fund 2,76,00

109 Kazipet-Vijayawada - Reliability improvement work at level crossing communication

by addl. 6-quad cable (125 km) (23 gates)

S.Fund 1,00,00

110 Kazipet-Secunderabad-Wadi - Reliability improvement work at level crossing

communication by addl. 6-quad cable (120 km) (16 gates)

S.Fund 65,00

111 Guntakal Division - Electricaly operated lifting barriers in lieu of mechanical ones at

interlocked level crossing gates (100 Nos)

S.Fund 2,42,00

112 South Central Railway - Manning of unmanned level crossing gates (110 Nos) S.Fund 4,00,00

113 Works costing below Rs.2.5 crore each S.Fund 37,66,57

TOTAL-WORKS IN PROGRESS S.Fund 67,70,04

114 Works costing below Rs.2.5 crore each S.Fund 1,00,00

TOTAL-NEW WORKS S.Fund 1,00,00

TOTAL-Road Safety Works-Level Crossings. S.Fund 68,70,04

115 Palakollu-Gorintada - Road over bridge in lieu of B-lass level crossing No.23 S.Fund 1,10,00

EBR ..

ROAD SAFETY WORKS-LEVEL CROSSINGS.

B - New Works

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

A - Works in Progress

7.1.7

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

116 Peddampet-Ramagundam - Road over bridge in lieu of level crossing No.51 S.Fund 2,20,00

EBR ..

117 Zangalapalli-Prasannayapalli - 2-lane road over bridge in lieu of level crossing

No.124 on national highway No.205

S.Fund 10,20

EBR ..

118 Chittapur - Malkhaid Road - Road over bridge in lieu of level crossing No.3/A S.Fund 9,00,00

EBR ..

119 Pulla-Chebrol - Road over bridge in lieu of level crossing No.364 S.Fund 2

EBR ..

120 Vedayapalem-Nellore - Road over bridge in lieu of level crossing No.113 S.Fund 2

EBR ..

121 Vedayapalem-Nellore - Road over bridge in lieu of level crossing No.112 S.Fund 2

EBR ..

122 Kurnool Town-Dupadu - Road over bridge in lieu of level crossing No.135 S.Fund 1,04,00

EBR ..

123 Alluru Road-Bitragunta - Road over bridge in lieu of level crossing No.144 S.Fund 2

EBR ..

124 Vejandla-Guntur - Road over bridge in lieu of level crossing No.249 S.Fund 2

EBR ..

125 Chinnakuntapalle-Mudigubba - Road under bridge in lieu of level crossing No.23 S.Fund 60,00

126 Dharmavaram-Chigicherla - Road under bridge in lieu of level crossing No.115 S.Fund 90,00

127 Gooty-Turukapalli - Road under bridge in lieu of level crossing No.160 S.Fund 10,00

128 Mudigubba-Kadiri - Road under bridge in lieu of level crossing No.27 S.Fund 60,00

129 Kuruchedu-Juturu - Road under bridge in lieu of level crossing No.164 S.Fund 60,00

130 Ramarajupalli-Turukapalli - Road under bridge in lieu of level crossing No.155 S.Fund 80,00

131 Guntakal-Tugali - Road under bridges in lieu of level crossing Nos.127 & 130 S.Fund 1,00,00

132 Gooty-Patakottacheruvu - Road under bridge in lieu of level crossing No.180 S.Fund 60,00

133 Pamidi-Ramarajupalli - Road under bridge in lieu of level crossing No.149 S.Fund 10,00

134 Kalasamudram-Kadiri - Road under bridge in lieu of level crossing No.38 S.Fund 10,00

135 Betamcherla-Bugganapalle Cement Nagar - Road under bridge in lieu of level

crossing No.165

S.Fund 66,76

136 Guntakal-Maddikera - Road under bridge in lieu of level crossing No.128 S.Fund 10,00

137 Nalgonda-Thipparthy - Limited height subway in lieu of level crossing No.46 S.Fund 2,10,00

138 Thipparthy-Miryalaguda - Limited height subway in lieu of level crossing No.60 S.Fund 2,10,00

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

7.1.8

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

139 Pangaon-Ghatnandur - Road under bridge in lieu of level crossing No.111 S.Fund 1

140 Secunderabad-Dhone - Road under bridge in lieu of level crossing Nos.143 & 139 S.Fund 2,10,00

141 Secunderabad-Mudkhed - Road under bridge in lieu of level crossing No.162, 170 &

171

S.Fund 4,00,00

142 Secunderabad - Road under bridge in lieu of level crossing No.134 near Kurnool

Town & Dupadu

S.Fund 1,00,00

143 Guntur-Mangalgiri - Road over bridge in lieu of level crossing No.2 S.Fund 2

EBR ..

144 Dichpalli-Nizamabad - 2-lane road over bridge & limited use subway in lieu of level

crossing No.193

S.Fund 2

EBR ..

145 Tanguturu-Surareddypalem - Road over bridge in lieu of level crossing No.193 S.Fund 2

EBR ..

146 Raigir-Wangapalli - 2-lane road over bridge & limited use subway in lieu of level

crossing No.33

S.Fund 2

EBR ..

147 Cherlapally-Ghatkesar - Road over bridge in lieu of level crossing No.12 S.Fund 2,50,00

EBR ..

148 Raghunathpalli-Ippaguda - 2-lane road over bridge & limited use subway in lieu of

level crossing No.44

S.Fund 2

EBR ..

149 Gudur-Oduru - Road over bridge in lieu of level crossing No 99-A and Gudur-

Kondagunta - level crossing No 99-B

S.Fund 5,50,00

EBR ..

150 Guntur-Nallapadu - Road under bridge in lieu of level crossing No.312 S.Fund 2

EBR ..

151 Sirpur Town-Vempalli - 2-lane road over bridge & limited use subway in lieu of level

crossing No.80

S.Fund 2

EBR ..

152 Gudivada-Kautaram - Road over bridge in lieu of level crossing No.3 S.Fund 2

EBR ..

153 Rovindrakhani-Manchiryal - Road over bridge & limited height subway in lieu of level

crossing No.57

S.Fund 1,00,00

EBR ..

154 Gudivada-Motur - 2-lane road over bridge in lieu of level crossing No. 52 S.Fund 2

EBR ..

155 Puthalapattu-Chittoor - 2- lane road over bridge in lieu of level crossing No.14 S.Fund 2

EBR ..

156 Puthalapattu-Chittoor - 2-lane road over bridge in lieu of level crossing No.18 S.Fund 2

EBR ..

157 Puthalapattu-Chittoor - 2-lane road over bridge in lieu of level crossing No.23 S.Fund 2

EBR ..

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

7.1.9

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

158 Raichur Yard - Road under bridge in lieu of level crossing No.218 S.Fund 2,25,00

EBR ..

159 Sirpur Kagaznagar Yard - Road over bridge in lieu of level crossing No 77 S.Fund 50,00

EBR ..

160 Sriramnagar-Gadwal - 2-lane road over bridge in lieu of level crossing No.99 S.Fund 3,50,00

EBR ..

161 Ananthapur-Prasannapalli - Road over bridge in lieu of level crossing No.127 S.Fund 5,02

EBR ..

162 Safilguda - Road under bridge in lieu of level crossing No 254 S.Fund 2

EBR ..

163 Anaparthi-Balabhadrapuram - 2-lane road over bridge in lieu of level crossing No.415 S.Fund 2

EBR ..

164 Lallaguda Halt Station Yard - Road under bridge in lieu of level crossing No.256 S.Fund 2

EBR ..

165 Bikkavolu-Medapadu - 2-lane road over bridge in lieu of level crossing No.419 S.Fund 2

EBR ..

166 Ghanapur-Nashkal - Road over bridge in lieu of level crossing No 49 S.Fund 3,50,00

EBR ..

167 Balaharshah-Manikgarh - Road over bridge in lieu of level crossing No 96 S.Fund 96,00

EBR ..

168 Yakatpura-Huppuguda - Road under bridge in lieu of level crossing No 5 S.Fund 1,00,00

EBR ..

169 Huppuguda-Falaknuma - Road over bridge in lieu of level crossing No 6 S.Fund 1

EBR ..

170 Bayyavaram-Anakapalli - Road over bridge in lieu of level crossing No 483-E S.Fund 95,00

EBR ..

171 Stuartapuram-Bapatla - Road over bridge in lieu of level crossing No 255 S.Fund 20

EBR ..

172 Cuddapah-Krishnapuram - Road over bridge in lieu of level crossing No 122 S.Fund 2

EBR ..

173 Anaparthy-Bikkavolu - Road over bridge in lieu of level crossing No 417 S.Fund 19,85

EBR ..

174 Cherlapalli-Ghatkesar - Road over bridge in lieu of level crossing No 13 S.Fund 1,00

EBR ..

175 Dhone-Bogolu & Dhone-Malkapuram - Road over bridge in lieu of level crossing No

166 & 150 respectively

S.Fund 1,75,00

EBR ..

176 Wangapalli-Aler - Road over bridge in lieu of level crossing No 37 S.Fund 7,00

EBR ..

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

7.1.10

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

177 Yerragudipadu-Yerraguntla - Road over bridge in lieu of level crossing No 138 S.Fund 40,00

EBR ..

178 Renigunta-Tirupathi - Road over bridge in lieu of level crossing No 111 S.Fund 80,00

179 Chalavaripalli-Tadipatri - Road over bridge in lieu of level crossing No 161 S.Fund 1,60,00

EBR ..

180 Lingampalli (Station Yard) - Road over bridge in lieu of level crossing No 25 S.Fund 10,00

EBR ..

181 Vatluru-Eluru - Road over bridge in lieu of level crossing No 347 S.Fund 2

EBR ..

182 Aurangabad-Chikalthana - Road over bridge in lieu of level crossing No.54 S.Fund 1,25,00

EBR ..

183 Kazipet-Warangal - Road over bridge in lieu of level crossing No 62-T S.Fund 2

EBR ..

184 Vatlur-Powerpet - Road over bridge in lieu of level crossing No.343 S.Fund 1,00

EBR ..

185 Dwarapudi-Anaparthi - Road over bridge in lieu of level crossing No 410 S.Fund 2,00

EBR ..

186 Mahabubabad - Road under bridge at level crossing No.81 (instead of road over

bridge)

S.Fund 2,50,00

EBR ..

187 Kesamudram - Road over bridge at level crossing No 77 & 78 S.Fund 1,50,00

EBR ..

188 Bayyavaram-Anakapalli - Road over bridge at level crossing No 485 S.Fund 71,00

EBR ..

189 Guntur-Nandyal - Road over bridge in lieu of level crossing No 286 S.Fund 1,39,00

EBR ..

190 Renigunta-Guntakal - Road over bridge in lieu of level crossing No 145 S.Fund 2,00

EBR ..

191 Nandyal-Dhone - Road over bridge in lieu of level crossing No 183 S.Fund 1

EBR ..

192 Elamanchili-Narasingapalli - Road over bridge in lieu of level crossing No 475 S.Fund 3,99,99

EBR ..

193 Secunderabad-Wadi - Road over bridge in lieu of level crossing No 20 S.Fund 20,00

EBR ..

194 Secunderabad-Wadi - Road under bridge in lieu of level crossing No 21 S.Fund 1,50,00

EBR ..

195 Guntakal-Wadi - Road over bridge in lieu of level crossing No 197 S.Fund 80,00

EBR ..

196 Secunderabad-Kazipet - Road over bridge in lieu of level crossing No 15-T S.Fund 50,00

EBR ..

197 Rechni Road-Bellampalli - Road over bridge in lieu of level crossing No 61 S.Fund 2,50,00

EBR ..

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

7.1.11

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

198 Kazipet-Vijaywada - Road over bridge in lieu of level crossing No 128 S.Fund 2,00,00

EBR ..

199 Samalkot-Kakinada Port - Road over bridge in lieu of level crossing No 7 S.Fund 2,40,00

EBR ..

200 Kavali Yard - Road over bridge in lieu of level crossing No 158 S.Fund 4,86,00

EBR ..

201 Gudur-Vijaywada - Road over bridge in lieu of level crossing No 103 S.Fund 2,91,00

EBR ..

202 Secunderabad-Dhone - Road over bridge in lieu of level crossing No 55 S.Fund 2,40,01

EBR ..

203 Renigunta-Guntakal - Road over bridge in lieu of level crossing No 179-A S.Fund 1

EBR ..

204 Vijaywada-Rajamundry - Road over bridge in lieu of level crossing No 334-E S.Fund 2

EBR ..

205 Vijayawada-Gudivada - Road over bridge in lieu of level crossing No 8 S.Fund 2

EBR ..

206 Nidadavolu Station Yard - Road over bridge in lieu of level crossing No.381 S.Fund 2

EBR ..

207 Pagidipalli-Bhongir - Road over bridge in lieu of level crossing No.28 S.Fund 1,00,00

EBR ..

208 Ghatkesar-Bibinagar - Road over bridge in lieu of level crossing No.22 S.Fund 50,00

EBR ..

209 Kazipet-Balharshah - Normal height subway in lieu of level crossing No.81, 83 & 98 S.Fund 21,99

R.

210 Ammuguda-Moula Ali - Road under bridge in lieu of level crossing No.BP-8 S.Fund 5,00

EBR ..

211 Ammuguda-Moula Ali - Road under bridge in lieu of level crossing No.BP-11 S.Fund 5,00

EBR ..

212 Samalkot-Kakinada - Road over bridge in lieu of level crossing No.13 & Kakinada

(GFCL siding) - level crossing No.1

S.Fund 2

EBR ..

213 Kadapa-Kamalapuram - Road over bridge in lieu of level crossing No.120 S.Fund 2

EBR ..

214 Khammam-Pandillapalli - Road over bridge in lieu of level crossing No.106 S.Fund 2

EBR ..

215 Devarakadra-Kaukuntla - Road over bridge in lieu of level crossing No.73 S.Fund 1,20,00

EBR ..

216 Secunderabad Division - Limited use subways (road under bridges) in lieu of level

crossings at various locations (14 Nos)

S.Fund 91,25

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

7.1.12

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

217 Jammikunta Station Yard - Road over bridge in lieu of level crossing No 21 S.Fund 40,00

EBR ..

218 Works costing below Rs.2.5 crore each S.Fund 52,88,96

TOTAL-WORKS IN PROGRESS S.Fund 146,24,87

219 Works costing below Rs.2.5 crore each S.Fund 6,00,00

TOTAL-NEW WORKS S.Fund 6,00,00

TOTAL-Road Safety Works-Road Over/Under Bridges. S.Fund 152,24,87

220 Gudur-Vijayawada - CTR(P) - 4.578 km & TRR(P) - 8.054 km DRF 1,54,00

221 Dhone - Guntakal - CTR(P) - 2.3 km DRF 99,00

222 Nandyal-Dhone - CTR(P) - 5.3 km DRF 99,00

223 Ballharshah - Cheruvu Madhavaram - Rehabilitation of weak formation (49 km) DRF 2,31,00

224 Tanguturu - Duggirala - Rehabilitation of weak formation (20.6 km) DRF 55,00

225 Gunadala - Pithapuram & Ventrapragada - Gudivada - Rehabilitation of weak

formation (25.97 km & 1.9 km respectively)

DRF 1,10,00

226 Nandyal - Guntakal - Rehabilitation of weak formation (9.3 km) DRF 55,00

227 Balharshah-Kazipet - TTR (33 sets), TBR - 18.45 km & TFR - 7.69 km DRF 2,42,00

228 Nallapadu-Nandyal - TTR (9 sets) & TFTR - 21.1 km DRF 5,50

229 Mudkhed-Adilabad-Pimpalkutti - TFTR - 13.6 km DRF 1,10,00

230 Wadi-Secunderabad - TRR(S) - 7.906 km DRF 11,00

231 Nallapadu - Nandyal - CTR(P) - 17 km DRF 55,00

232 Vijayawada - Visakhapatnam - Complete Track Renewal (Primary) - 14.01 km &

Through Rail Renewal (Primary) - 9.91 km

DRF 1,65,00

233 Balharshah - Vijayawada - Complete Track Renewal (Primary) - 4.56 km & Through

Rail Renewal (Primary) - 12.19 km

DRF 11,00

234 Nallapadu-Nandyal - CTR(P) - 15.56 km & TRR(P) - 6.738 km DRF 55,00

235 Kavutaram-Machilipatnam - TRR(P) - 11.45 km DRF 1,10,00

236 Secunderabad Military Siding - CTR - 11.5 km (S) DRF 53,79

EBR ..

Complete Track Renewal

237 Vijayawada - Vishakhapattnam - CTR(P) - 9.99 km & TRR(P) - 16.52 km DRF 3,30,00

238 Guntur-Krishna Canal - CTR(P) - 13.2 km & TRR(P) - 4.15 km DRF 2,20,00

239 Pagidipalli - Nadikudi - CTR(P) - 1.82 km & TRR(P) - 8.08 km DRF 2,20,00

240 Tenali-Guntur - CTR(P) - TRR(P) - 4.8 km DRF 1,10,00

241 Wadi - Secunderabad - CTR(P) - 22.56 km, TRR(P) - 25 km & TSR - 1.54 km DRF 3,30,00

242 Guntakal-Wadi - CTR(P) - 7.53 km & TRR(P) - 23.39 km DRF 4,40,00

ROAD SAFETY WORKS-ROAD OVER/UNDER BRIDGES.

B - New Works

TRACK RENEWALS

A - Works in Progress

7.1.13

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

243 Manmad - Mudkhed - CTR(P) - 7 km & TSR(P) - 26 km DRF 2,20,00

244 Motumari-Jaggayyapet - CTR(P) - 5.28 km DRF 2,20,00

245 Gudur-Vijayawada - CTR(S) - 0.91 km, TRR(S) - 5.555 km & TSR(S) - 0.83 km DRF 2,20,00

246 Nadikudi-Macherla - CTR(S) - 2.80 km (yard lines) DRF 55,00

247 Nellore - Stuartpuram - CTR - 20.57 km, TRR - 5.13 km & TSR - 8.08 km (P) DRF 3,30,00

248 Vijayawada-Duvvada - CTR - 21.82 km & TRR - 20.71 km & 2.57 km (P) DRF 3,30,00

249 Vijayawada - Gudivada-Bhimavaram - CTR - 3.3 km & TRR - 1.5 km (S) (yard lines) DRF 1,10,00

250 Sattenapalli - Piduguralla - CTR - 20 km (P) DRF 55,00

251 Gudur - Vijayawada - CTR - 1.2 km & TRR - 3.22 km (S) (yard lines) DRF 1,10,00

252 Warangal - Kondapalli - CTR - 5.3 km & TRR - 50.32 km (P) DRF 1,10,00

253 Secunderabad - Yasantapur - CTR - 15.19 km & TRR - 7.25 km (P) DRF 1,54,00

254 Wadi - Secunderabad - CTR - 5.5 km & TRR - 3.82 km (P) DRF 55,00

255 Kovvur -Thadi - CTR - 12.29 km & TRR - 14.04 km (P) DRF 1,10,00

256 Vijayawada - Visakhapatnam (Yard Lines) - CTR - 1.913 km & TRR - 3.48 km (S) DRF 2,20,00

257 Krishna - Wadi - CTR - 26.85 km & TRR - 7.07 km (P) DRF 1,54,00

258 Wadi - Guntakal (Yard Lines) - CTR - 4.275 km & TRR - 2.65 km (S) DRF 55,00

259 Gooty - Dharmavaram - CTR - 23.93 km & TRR - 0.12 km (P) DRF 38,50

260 Bellamkonda - Nadikude - CTR - 31.25 km (P) DRF 1,10,00

261 Vejendla - Guntur - CTR - 4.85 km (P) DRF 7,70

262 Satulur - Narasaraopet - CTR - 8.5 km (P) DRF 1,10,00

263 Balharshah-Gangineni - CTR(P) - 1 km & TRR(P) - 51.91 km DRF 2,20,00

264 Gudur-Duggirala - CTR(P) - 1.65 km & TRR(P) - 1.9 km DRF 1,10,00

265 Sulehalli-Secunderabad - CTR(P) - 17.75 km & TRR(P) - 28.15 km DRF 2,20,00

266 Vijayawada-Chagallu - CTR(P) - 0.65 km & TRR(P) - 26.79 km DRF 2,20,00

267 Renigunta-Mamanduru - CTR(P) - 11.19 km DRF 15,40

268 Lingiri-Wadi - CTR(P) - 6.31 km & TRR(P) - 2.75 km DRF 2,20,00

269 Dharmavaram-Anantapur - CTR(P) - 20.23 km & TRR(P) - 8.35 km DRF 55,00

270 Malkapuram-Dhone - CTR(P) - 11.10 km DRF 1,65,00

271 Guntur-Siripuram - CTR(P) - 11.15 km & TRR(S) - 5.50 km DRF 1,10,00

272 Guntur-Pedakakani - CTR(P) - 3 km DRF 1,10,00

273 Matalakunta-Ghatnandur - CTR(P) - 1.07 km, TRR(P) - 10.03 km & TSR(P) - 22.285

km

DRF 2,20,00

274 Bhadrachalam Road-Pandurangapuram - CTR(P) - 1.10 km & TRR(P) - 5.65 km DRF 1,10,00

275 Secunderabad-Jangaon - CTR (P) - 8.90 km & TRR(P) - 21.55 km DRF 2,20,00

TRACK RENEWALS

7.1.14

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

276 Dharur-Begumpet - CTR(P) - 5.53 km & TRR(P) - 1.15 km DRF 1,65,00

277 Vijayawada-Bikkavolu - CTR(P) - 15.43 km & TRR(P) - 9.03 km DRF 2,20,00

278 Gudur-Vijayawada - CTR(S) - 10.5 km & TRR(S) - 4.55 km (yard lines) DRF 3,85,00

279 Isivi-Wadi - CTR(P) - 4.23 km & TRR(P) - 13.44 km DRF 2,20,00

280 Thipparthi-Vishnupuram - CTR(P) - 3.63 km & TRR(P) - 19.12 km DRF 2,20,00

281 Wadi-Secunderabad - CTR(S) - 6.35 km & TRR(S) - 4.48 km (yard lines) DRF 1,10,00

282 Guntur-Bandarupalle - CTR(P) - 2.60 km & TSR(P) - 4 km DRF 1,10,00

283 Vijayawada-Bhimavaram-Nidadavolu - CTR(S) - 2.44 km & TRR(S) - 3.37 km (yard

lines)

DRF 2,20,00

284 Gudur-Renigunta-Tirupati - CTR(S) - 3.608 km & TRR(S) - 3.622 km (yard lines) DRF 1,10,00

285 Tarur-Potul - TSR(P) - 48.80 km DRF 5,50,00

286 Dornakal-Manuguru - TRR(P) - 3.75 km DRF 77,00

287 Peddapalli-Kothapalli - CTR(P) - 1.905 km & TRR(P) - 33.625 km DRF 1,10,00

288 Motumari-Makkapeta - CTR(P) - 10.40 km DRF 2,20,00

289 Khandwa-Akola - CTR(S) - 18.50 km DRF 1,65,00

290 Secunderabad-Kazipet - CTR(S) - 8.87 km, TRR(S) - 8.67 km & TSR(S) - 3.61 km

(yard lines)

DRF 1,10,00

291 Wadi-Secunderabad - CTR(S) - 2.90 km, TRR(S) - 0.62 km & TSR(S) - 1.80 km

(yard lines)

DRF 55,00

292 Tirupati (Carriage Repair Shop) - CTR(S) - 4.78 km (yard lines) DRF 1,10,00

293 Narsingapalli - Thadi - Complete Track Renewal (Primary) - 8.48 km DRF 3,30,00

294 Nalwar - Wadi - Complete Track Renewal (Primary) - 5.32 km DRF 1,10,00

295 Guntur - Nallapadu - Complete Track Renewal (Primary) - 2.4 km DRF 55,00

296 Phirangipuram - Narsaraopet - Complete Track Renewal (Primary) - 12.94 km DRF 1,10,00

Through Rail Renewal

297 Kazipet-Vijayawada - TRR(P) - 44.94 km DRF 5,50,00

298 Balharshah-Kazipet - TRR(P) - 3.25 km DRF 1,65,00

299 Tenali-Repalle - TRR(P) - 10.08 km DRF 1,10,00

300 Gudur-Renigunta - TRR(P) - 7.52 km DRF 3,30,00

301 Mudkhed - Secunderabad - TRR(P) - 3.7 km DRF 2,20,00

302 Balharshah-Kazipet - TRR(S) - 14.387 km DRF 1,65,00

303 Vijayawada-Visakhapatnam - TRR(S) - 7.059 km DRF 2,20,00

304 Nalgonda - Nadikude - TRR - 25.58 km & TSR - 14.53 km (P) DRF 4,40,00

305 Balharshah - Hasanparti Road - TRR - 53.52 km (P) DRF 1,10,00

306 Talamanchi - Vijayawada - TRR - 2.1 km & TSR - 11.4 km (P) DRF 2,20,00

307 Chitta-Udgir - TRR - 4 km & TSR - 26.78 km (P) DRF 1,10,00

308 Ghatkesar-Wangapalli - TRR(P) - 8.94 km DRF 2,75,00

TRACK RENEWALS

7.1.15

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

309 Vishnupuram-Nadikudi- TRR(P) - 11.63 km DRF 1,10,00

310 Yenugonda-Mahbubnagar - TRR(P) - 3.98 km DRF 11,00

311 Balharshah-Kazipet - TRR(P) - 38.14 km DRF 15,40,00

312 Kazipet-Errupalem - TRR(P) - 39.91 km DRF 3,30,00

313 Tenali-Bhattiprolu - TRR(P) - 9.46 km DRF 3,30,00

314 Mahbubnagar Town-Maniyamkonda - TRR(P) - 3.20 km DRF 55,00

315 Vikarabad-Marpalli - TRR(P) - 7 km DRF 2,20,00

316 Tenali-Repalle - TRR(P) - 12.77 km DRF 44,00

317 Secunderabad-Dhone - TRR(S) - 13.50 km (yard lines) DRF 3,30,00

318 Hasanparti - Kazipet Town & Nekonda - Dornakal - Through Rail Renewal (Primary) -

24.03 km

DRF 2,20,00

319 Gudur - Venkatachalam - Through Rail Renewal (Primary) - 7 km DRF 2,20,00

Through Sleeper Renewal

320 Gurujala - Macherla - TSR - 18.56 km (P) DRF 1,10,00

321 Venkatachalam-Bitragunta - TSR(P) - 5.95 km DRF 1,65,00

322 Tenali-Vejandla - TSR(P) - 7.80 km DRF 1,10,00

Ballast

323 Parli Vaijnath - Parbhani - TFR & TBR - 61.68 km DRF 2,20,00

324 Guntakal - Dhone - Nandyal - TBR - 45.45 km, TFR - 73 km & TTR (5 sets) DRF 77,00

325 Renigunta-Guntakal - TFR - 31.68 km, TBR - 42.35 km & TWR - 42.34 km (2479

joints)

DRF 2,75,00

326 Balharshah - Vijayawada - TBR - 74.74 km, TFR - 70.85 km, TFTR - 46 km & TTR

(CMS) (32 sets)

DRF 4,95,00

327 Secunderabad - Kazipet - TBR - 96.89 km & TFR - 12.55 km DRF 1,10,00

328 Wadi - Secunderabad - TBR - 72.36 km & TFR - 72.46 km DRF 1,10,00

329 Wadi - Guntakal - TBR - 56.04 km, TWR - 25.87 km, TFR - 46.74 km & TTR (58

sets)

DRF 1,37,50

330 Pagidipalli - Nadikude - TBR - 53 km DRF 22

331 Balharshah-Vijayawada - TBR - 218.17 km, TFR - 226.55 km, TFTR - 15.48 km &

TTR -14 sets

DRF 6,60,00

332 Gudur-Vijayawada - TBR - 39.19 km, TFR - 20.25 km & TTR - 16 sets DRF 1,65,00

333 Secunderabad-Kazipet - TBR - 8.85 km, TFR - 54.78 km, TFTR - 11 km & TTR - 75

sets

DRF 4,40,00

334 Wadi-Secunderabad - TBR - 3.2 km, TFR - 52.13 km, TFTR - 29.08 km & TTR - 9

sets

DRF 3,30,00

335 Vijayawada-Visakhapatnam - TBR - 61.48 km, TBTR - 852 Nos, TFR - 58.77 km &

TTR - 6 sets

DRF 2,20,00

336 Renigunta-Guntakal - TBR - 23.18 km & TFR - 22.50 km DRF 1,65,00

337 Guntakal-Wadi - TBR - 2.09 km, TFR - 9.81 km & TTR - 18 sets DRF 55,00

338 Vikarabad-Parli Vaijnath - TBR - 3.64 km, TFR - 41.98 km & TFTR - 8 km DRF 55,00

TRACK RENEWALS

7.1.16

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

339 Dornakal-Manuguru - TBR - 15.65 km & TFR - 39.90 km DRF 1,10,00

340 Tenali-Repalle - TBR - 26.03 km DRF 55,00

341 Secunderabad-Kazipet - TTR - 1 set, TFR - 3.10 km, TBR - 11.30 km and thick web

switches & weldable CMS crossings - 13 sets

DRF 1,10,00

342 Guntakal-Wadi - TBR - 27.55 km & TFTR - 15.30 km DRF 7,15,00

343 Katpadi-Tirupati - TBR - 74.85 km DRF 1,10,00

344 Mudkhed-Secunderabad - TBR - 86.79 km DRF 3,30,00

Points & Crossings

345 Gooty - Dharmavaram - TTR (14 sets) & TFR - 23.61 km DRF 12,65

346 Manmad - Mudkhed - TTR (28 sets) & TWR - 20 km DRF 55,00

347 Pagidipalli-Nadikudi - TTR (37 sets) DRF 1,10,00

348 Secunderabad - Kazipet - TTR (64 sets), TFR - 86.12 km & TBR - 12.43 km DRF 1,10,00

349 Wadi - Secunderabad - TTR (24 sets), TFR - 44 km, TBR - 59.14 km & TFTR - 8 km DRF 55,00

350 Manmad - Mudkhed - TTR (34 sets) & TWR - 94.95 km DRF 2,20,00

351 South Central Railway - Through turnout renewal (rails) with thick web switches &

weldable CMS crossings (381 sets)

DRF 2,20,00

352 Balharshah-Vijayawada - TTR (35 sets), TFR - 98.9 km, TBR - 93.02 km & thick web

switches (356 sets)

DRF 1,65,00

353 Bapatla-Tsunduru - TTR (138 sets), TFR - 39.9 km, TBR - 9.65 km, TFTR - 44.75 km

and thick web switches (290 sets)

DRF 1,65,00

354 Secunderabad-Kazipet - TTR (14 sets) & thick web switches (126 sets) DRF 5,50,00

355 Vijayawada-Gudivada-Bhimavaram - TFR - 2 km, TBR - 3.6 km, TTR (1 set) and

Bellary-Guntakal - Thick web switches with weldable CMS crossings (55 sets)

DRF 3,30,00

356 Guntur - Nadikude - TTR (27 sets) & trap switches (15 Nos) DRF 44,00

357 Nallapadu-Nandyal - TTR (9 sets), trap switches (9 Nos), TFR - 52.6 km, TBR - 52.6

km, TWR - 75.25 km & Nandyal-Dhone - Thick web switches (89 sets)

DRF 1,10,00

358 Mahabubnagar-Kurnool Town - TTR (19 sets), trap switches (7 Nos), TFR - 47.86 km

& TBR - 154.4 km

DRF 2,20,00

359 Manmad - Aurangabad - TTR (40 sets), trap switches (10 Nos), TBR - 59.65 km,

TWR - 227 km

DRF 3,30,00

360 Vijayawada-Visakhapatnam - TTR (7 sets), TFR - 58.41 km & TBR - 85.58 km DRF 5,39,00

361 Renigunta - Guntakal - TTR (429 sets), TFR - 97.68 km, TBR - 107.85 km & TWR -

38.55 km

DRF 8,80,00

362 Gooty - Dharmavaram - TTR (43 sets) DRF 2,20,00

363 South Central Railway - TTR - 300 sets DRF 7,33,34

364 Guntur-Nadikudi - TWR - 11.35 km & TTR - 29 sets DRF 1,10,00

Others

365 Manmad - Mudkhed - TFR - 237 km & TBR - 69 km DRF 68,28

TRACK RENEWALS

7.1.17

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

366 Kazipet-Vijayawada - TBR - 7 km, TFR - 35.79 km & TTRR (22 sets) DRF 1,10,00

367 Gudur-Vijayawada - TTR (36 sets) & TFTR - 3.5 km DRF 3,30,00

368 Secunderabad-Kazipet - TTR (81 sets), TBR - 3 km & TFR - 1.19 km DRF 4,40,00

369 Wadi-Secunderabad - TTR (79 sets) & TFR - 2.87 km DRF 2,20,00

370 Vijayawada-Visakhapatnam - TTR (8 Nos), TTRR(49 sets), TBR - 19.55 km & TFR -

11.459 km (various locations)

DRF 4,40,00

371 Renigunta-Guntakal - TTR (35 sets), TBR - 2.86 km & TFR - 13 km DRF 1,10,00

372 Guntakal-Wadi - TBR - 100.26 km & TFTR - 31.6 km DRF 2,20,00

373 Gudur - Renigunta - Tirupati - TBR - 15.92 km, TTR (17 sets) & TFR - 83.05 km DRF 2,20,00

374 Guntur-Krishna Canal - TTR (5 sets) & TFTR - 5.8 km DRF 55,00

375 Mudkhed-Secunderabad - TFR - 39 km, TWR - 16.6 km & TFTR - 31 km DRF 55,00

376 Secunderabad-Dhone - TWR - 39.49 km DRF 3,30,00

377 Manmad-Mudkhed - TFTR - 19.3 km & TBR - 14 km DRF 1,10,00

378 Purna-Akola - TFTR - 18 km DRF 1,10,00

379 Itikyala - Kurnool Town - TFR - 76 km & TFTR - 12 km DRF 22,00

380 Itikyala-Kurnool Town - Through formation treatment - 17 km DRF 5,50,00

381 Kodi - Mugat - TFTR - 18 km DRF 1,10,00

382 Nallapadu-Nandyal - TWR - 40.81 km DRF 33,00

383 Mudkhed - Secunderabad - TFR - 48.6 km DRF 11,00

384 Secunderabad-Dhone - TWR - 104 km DRF 8,25,00

385 Parli Vaijnath-Parbhani - TWR - 63.36 km DRF 1,10,00

386 Khandwa-Akola - TBTR - 1983 Nos DRF 2,20,00

387 Balharshah-Kazipet - TTR - 11 sets, TFR - 27.92 km, TBR - 2.60 km and thick web

switches & weldable CMS crossing - 38 sets

DRF 1,10,00

388 Kazipet-Vijayawada - TTR - 3 sets, TFR - 31.02 km, TBR - 17.57 km and thick web

switches & weldable CMS crossing - 22 sets

DRF 1,10,00

389 Gudur-Vijayawada - Thick web switches & weldable CMS crossing - 18 sets, TFR -

48.55 km and TBR - 5.68 km

DRF 1,10,00

390 Wadi-Secunderabad - TFR - 23.60 km & TTR - 26 sets DRF 1,10,00

391 Vijayawada-Visakhapatnam - TTR - 8 sets, TFR - 15.81 km & TBR - 11.95 km DRF 1,98,00

392 Pagidipalli-Nadikudi - TBR - 2.28 km & TWR - 21.97 km DRF 1,10,00

393 Nallapadu-Nandyal - TWR - 46.34 km DRF 55,00

394 Works costing below Rs.2.5 crore each DRF 37,14,85

TOTAL-WORKS IN PROGRESS DRF 378,53,73

Complete Track Renewal

395 Khandwa -Akola - CTR(S) - 28.4 km DRF 5,50,00

396 Gudur-Vijayawada (up & down) - CTR(P) - 3.8 km & TRR(P) - 16.362 km DRF 5,50,00

TRACK RENEWALS

B - New Works

7.1.18

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

397 Renigunta-Guntakal (up & down) - CTR(P) - 4 km DRF 2,20,25

398 Guntakal-Wadi (up & down) - CTR(P) - 6.59 km & TRR(P) - 38.19 km DRF 7,70,00

399 Dharmavaram-Gooty (SL) - CTR(P) - 2.4 km DRF 1,35,72

400 Nallapadu-Nandyal (SL) - CTR(P) - 2.5 km DRF 1,36,99

401 Manmad-Mudkhed (SL) - CTR(P) - 4 km DRF 2,36,54

402 Manikgarh-Gadchandur (SL) - CTR(P) - 1.28 km & TRR(P) - 0.7 km DRF 93,60

Through Rail Renewal

403 Balharshah-Kazipet (up & down) - TRR(P) -18.458 km DRF 6,57,24

404 Kazipet-Kondapalli (up & down) - TRR(P) - 21.46 km DRF 7,64,13

405 Works costing below Rs.2.5 crore each DRF 1,31,80

TOTAL-NEW WORKS DRF 42,46,27

TOTAL-Track Renewals DRF 421,00,00

406 Yeddulapuram-Krishna - Rebuilding of bridge No.1249 across river Krishna Cap. ..

DRF 12,25

SRSF ..

407 Vijayawada-Visakhapatnam - Galvanized hand railing/catwalk with structural steel

members on arches (bridge No.248-III across river Godavari)

DRF 50,00

408 Mantralayam Road-Matmari - Rebuilding of bridge No.1017 across river

Tungabhadra

DRF 10,00

SRSF ..

409 Singarayakonda-Tanguturu - Repl. of bridge No.528/down with reinforced concrete

cement twin boxes

DRF 1

410 Donakonda-Guntakal - Regrading of track in cause-way portion upto bridge No 223

on Kundu river incl. rebuilding of bridges (4 Nos)

Cap. ..

DRF 8,50

411 Singarayakonda-Tanguturu - Repl. of bridge No.528/up with reinforced concrete

cement twin boxes

DRF 1

412 Lingeri-Yadgiri - Rebuilding of bridge No.1204 as pre-stressed concrete slabs Cap. ..

DRF 1

R.

413 Manikgarh-Balharshah - Rebuilding (bridge No.298/up over river Wardha) DRF 50,00

414 Chinaganjam-Uppugunduru-Ammanabrolu - Construction of bridges by box culverts

(5 locations)

Cap. 1,50,00

415 Malliyala-Panyam - Regirdering with new welded plate girders incl. repl. of channel

sleepers (9 bridges, 23 spans)

DRF 20,00

R.

416 Cumbum-Tarlupadu - Repl with steel girders & steel channel sleepers (bridge

No.376)

DRF 4,99

R.

TRACK RENEWALS

BRIDGE WORKS

A - Works in Progress

7.1.19

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

417 Hyderabad Division - Repl. of stone top culvert bridges with reinforced concrete

cement box (30 bridges)

DRF 80,00

418 Guntur-Nandyal - Repl of 6.10 m span slabs with pre-stressed concrete slabs to

MBG standard (16 bridges) (28 spans of bridge No.377)

DRF 1

R.

419 Works costing below Rs.2.5 crore each Cap. 35,00

DRF 11,64,22

DF(3) 1,40,00

DF(4) 5,00

TOTAL-WORKS IN PROGRESS Cap. 1,85,00

DRF 14,00,00

DF(3) 1,40,00

DF(4) 5,00

420 Works costing below Rs.2.5 crore each DRF 1,00,00

TOTAL-NEW WORKS DRF 1,00,00

TOTAL-Bridge Works Cap. 1,85,00

DRF 15,00,00

DF(3) 1,40,00

DF(4) 5,00

421 Vasco - Madgaon - Londa - Hubli - Guntakal - Renigunta - Anti collision device DF(4) 1

422 Sirpur Kaghaznagar & Repallewada - Repl of signalling gears DRF 47,00

423 Balharshah-Kazipet - Repl. of signalling gears at intermediate block sections (8 block

sections)

DRF 5,97,00

424 Manikgarh - Centralised operation of points & signals in place of end cabins (A & B-

cabins)

DRF 1

425 Secunderabad Division - Repl. of indoor & outdoor signalling arrangement (3 C-class

stations)

DRF 2,62,98

426 Warangal-Chintalpalli & Gundratimadugu-Dornakal - Repl of intermediate block

equipment

DRF 70,00

427 Guntakal Division - Block proving by axle counters (35 block sections) DF(4) 4,85,00

428 Vikarabad-Parli Vaijnath - Upgradation of standard-I interlocking into standard-III (16

stations)

DF(4) 3,50,00

429 Secunderabad Division - Dual detection for improvement of reliability of block proving

by axle counters (75 sections)

DF(4) 3,66,00

430 Secunderabad Division - Integrated power supply systems (29 stations) (A & B-

routes)

DF(4) 1,40,00

431 Nanded Division - Integrated power supply (24 stations) DF(3) 11,00

432 Vikarabad-Parli Vaijnath-Parbhani - Optic fibre cable (400 km) DF(3) 1,22,65

433 Kazipet - Repl. of lever frames, indoor wiring & outdoor gears at bypass and goods

cabins by electronic interlocking

DRF 20,00

BRIDGE WORKS

B - New Works

SIGNALLING AND TELECOMMUNICATION

A - Works in Progress

7.1.20

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

434 Wadi-Raichur-Matmari - Block proving by axle counters (13 block sections) DF(4) 1,80,00

435 Guntakal-Guntur - Optic fibre cable (402 km) DF(3) 2,02,87

436 Renigunta-Pullampet - Block proving by axle counters (7 block sections) DF(4) 78,00

437 Akola-Khandwa - Repl. of overhead alignment with 6-quad underground cable (metre

gauge route) (173 km)

DRF 1,03,50

438 Secunderabad-Wadi - Block proving by axle counters (18 block sections) (feeder to

high density network route No.7)

DF(4) 3,22,95

439 Secunderabad, Vijayawada, Hyderabad, Nanded & Guntur Divisions - Axle counters /

track circuits (D-route) (35 stations) (62 running lines)

DF(4) 37,81

440 Pullampet-Renigunta - Double distant signals (high density network route No.7) (B-

route)

DF(3) 12,01

441 Bibinagar-Secunderabad-Hyderabad-Lingampalli - Repl.of RE cable by quad cable

(60 km)

DRF 90,00

442 Krishna Canal-Guntur-Pagidipalli - Block proving by axle counters (26 blocks) DF(4) 3,50,00

443 Gudur-Renigunta-Tirupati - Block proving by axle counters (11 blocks) (B-route) DF(4) 40,00

444 Parbhani-Jalna - Block proving by axle counters (11 blocks) (B-route) DF(4) 30,00

445 Vijayawada-Gudivada-Machilipatnam, Gudivada-Bhimavaram-Narsapur &

Bhimavaram-Nidadavolu - Optic fibre cable (222 km)

DF(3) 12,00

446 Mudkhed-Pimpalkutti - Optic fibre cable (222 km) (14 stations) DF(3) 2,76,05

447 Secunderabad, Guntakal, Hyderabad & Guntur Divisions - Optic fibre cable (267 km)

(14 stations)

DF(3) 2,98,10

448 Motumarri-Jaggayyapet, Moula Ali-Ammuguda-Sanatnagar & Karepalli-Singareni -

Repl of RE cable by 6-quad cable (66 km)

DRF 55,50

449 Mudkhed-Parbhani - Block proving by axle counters (8 block sections) DF(4) 5,00

450 Secunderabad Division - Train protection & warning system (110 rkm) DF(4) 1

451 South Central Railway - Isolation & upgradation/alteration of signalling (3 stations) DF(4) 5,00

452 Works costing below Rs.2.5 crore each Cap. 1,40,00

DRF 17,55,00

DF(3) 4,84,68

DF(4) 10,38,70

TOTAL-WORKS IN PROGRESS Cap. 1,40,00

DRF 30,00,99

DF(3) 14,19,36

DF(4) 34,28,48

452a Rechni Road-Wihirgaon - Repl of outdoor signalling & telecom gears of stations (A-

route) (high density network-5)

DRF 1

453 Works costing below Rs.2.5 crore each DRF 99,00

DF(4) 1,00,00

TOTAL-NEW WORKS DRF 99,01

DF(4) 1,00,00

SIGNALLING AND TELECOMMUNICATION

B - New Works

7.1.21

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

TOTAL-Signalling and Telecommunication Cap. 1,40,00

DRF 31,00,00

DF(3) 14,19,36

DF(4) 35,28,48

454 Bhoiguda & Taranaka - Dedicated 33 kv supply from state supply authorities at 33 kv

sub-stations

DF(3) 10,00

455 Tarnaka & Bhoiguda - Repl of 5 mva transformers at 33 kv substations DRF 1

456 Tirupati Workshop - Repl. of high tension oil-type circuit breakers with vacuum and

low tension circuit breakers with air circuit breakers etc

DRF 50,00

457 Secunderabad Division - Repl of transformers with associated high tension

equipment (Phase-I)

DRF 1,20,00

458 South Central Railway - Solar photo voltaic power plants (500 kwp capacity) (5

locations)

Cap. 1

459 Works costing below Rs.2.5 crore each Cap. ..

DRF 1,50,98

DF(3) 83,98

TOTAL-WORKS IN PROGRESS Cap. 1

DRF 3,20,99

DF(3) 93,98

460 Hyderabad Division - Extension of high tension power supply from Tarnaka &

Bhoiguda sub-stations with auto changeover switching systems

DF(3) 1,00

461 Works costing below Rs.2.5 crore each DRF 1

DF(3) 2

TOTAL-NEW WORKS DRF 1

DF(3) 1,02

TOTAL-Other Electrical Works excl TRD Cap. 1

DRF 3,21,00

DF(3) 95,00

462 Secunderabad Divison - Copper cadmium wire (65 sq mm) (65 km) DRF 38,60

463 Secunderabad Division - Repl. of alluminium catenary wire with cadmium copper

catenary wire (65 sq mm) (100 tkm)

DRF 2,37,46

464 Vijaywada Division - Repl of copper catenary wire (65 sq mm) (55 km) DRF 51

465 Nekonda, Kondapalli & Padugupadu (Traction Sub-stations) - Repl. of 12.5 mva

transformer with 21.6 / 30.24 mva

DRF 3,65,00

466 Venkatagiri - Upgradation of 132/27 kv 13.5 mva transformers with 21.6 mva DF(3) 21,85

467 Kondapalli - Upgradation of 132/25 kv 13.5 mva transformers with 21.6/30.24 mva Cap. 1,60,00

468 Vijayawada-Gudur - Repl. of catenary wire (65 sq mm) (55 km) DRF 1,06,20

469 Rajahmundry - Repl. of 12.5 mva transformer with 21.6/30.24 mva DRF 1,00

470 Secunderabad Division - 12.5 mva traction substation using released transformer &

switchgear

Cap. 1,11,00

OTHER ELECTRICAL WORKS EXCL TRD

A - Works in Progress

B - New Works

TRACTION DISTRIBUTION WORKS

A - Works in Progress

7.1.22

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

471 Vijayawada-Gudur - Repl.of copper cadmium catenary wire (65 sq mm) (19/2.10 mm)

with inspan droppers etc

DRF 33,54

472 Bellampalli-Balharshah & Secunderabad-Hyderabad - Repl of aluminium catenary

wire with cadmium copper wire (65 sq mm) (65 km)

DRF ..

473 Gudur-Vijayawada - Repl of cantiliver assemblies in saline polluted areas (2500 Nos) DRF 38,15

474 Nalgonda & Ramagundam - Repl of 12.5 mva traction transformers by 21.6 / 30.24

mva with associated switchgear (1 No each)

DRF 60,00

475 Gudur & Bapatla (Traction Sub-stations) - Repl of 12.5 mva transformer with 21.6 /

30.24 mva with switchgear etc

DRF 4,05,00

476 Works costing below Rs.2.5 crore each DRF 1,06,94

DF(3) 3,33,15

TOTAL-WORKS IN PROGRESS Cap. 2,71,00

DRF 13,92,40

DF(3) 3,55,00

477 Secunderabad Division - Repl of alluminium catenary wire with cadmium copper

catenary wire (65 sq mm) (65 tkm)

DRF 60

478 Works costing below Rs.2.5 crore each DRF ..

DF(3) ..

TOTAL-NEW WORKS DRF 60

DF(3) ..

TOTAL-Traction Distribution Works Cap. 2,71,00

DRF 13,93,00

DF(3) 3,55,00

479 Machilipatnam (Carriage & Wagon Depot) - Augmentation of coach maintenance

facilities

Cap. 1

DF(3) 1

480 Lallaguda (Carriage Workshop) - Facilities for maintainance of LHB coaches DF(3) 1

481 Guntakal (Diesel Loco Shed) - Augmentation of capacity by 50 high horse power

locos

Cap. 1

482 Narsapur (Carriage & Wagon Depot) - 24-coach length pit line as per Camtech

design

DF(3) 1

483 Nanded (Carriage & Wagon Depot) - New pit line as per Camtech design DRF 2,20,00

484 Lallaguda (Electric Loco Shed) - Augmentation of homing capacity from 175 to 200

locos

Cap. 1

485 Lallaguda (Electric Loco Shed) - Maintenance facilities for homing WAG9 locos DF(3) 28,00

486 Ramagundam - Waist level lighting arrangement on line No.R2, R4 & R5 DF(3) 1

487 Vijayawada (Electric Loco Shed) - Augmentation of homing capacity from 175 to 225

locos

Cap. 1

TRACTION DISTRIBUTION WORKS

B - New Works

WORKSHOPS INCLUDING PRODUCTION UNITS

A - Works in Progress

7.1.23

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

488 Moula Ali (Diesel Shed) - Addl infrastructure facilities for holding 100 WDM2

locomotives

DF(3) 39,00

489 Kazipet - Camtech design pit lines (26-coach length) (2 Nos) and service building DF(3) 1

490 Lallaguda - Modernisation of workshop Cap. 2,98,62

DRF 1,45,00

491 Lallaguda (Electric Loco Shed) - Augmentation of homing capacity from 150 to 175

locos

Cap. 2,50,00

492 Kakinada Port - Facilities for freight stock examination & repair DF(3) 77,49

493 Sanathnagar - Freight train examination facilities DF(3) 29,00

494 Tirupati (Carriage Shop) - Covered accommodation for intermediate overhauling

activities with 10 t crane arrangement on both bays

DF(3) 1

495 Lallaguda (Electric Loco Shed) - Augmentation of homing capacity of electric locos

from 100 to 150

DF(3) 29,00

496 Vijayawada (Electric Loco Shed) - Augmentation of homing capacity of electric locos

from 120 to 175

DF(3) 65,00

497 Lallaguda (Carriage Workshop) - Infrastructural facilities for maintenance of special

coaching stock

DF(3) 1

498 Bellampalli - Freight train examination facilities DF(3) 71,00

499 Ramagundam - Augmentation of routine overhauling facilities DF(3) 1

500 Guntakal - Setting up of new electric loco shed for homing 100 locos (Phase-I) Cap. 5,00,00

501 Kacheguda (Carriage & Wagon Depot) - Conversion of stabling line into 4th pit line

and provision of one stabling line

DF(3) 13,50

502 Nanded (Carriage & Wagon Depot) - Extension of sick line shed / intermediate

overhauling shed & service buildings

DF(3) 1,80,00

503 Gooty (Diesel Loco Shed) - Augmentation of berthing capacity of locomotives (3 Nos) DF(3) 14,00

504 Kacheguda (Carriage & Wagon Depot) - Upgradation of pit lines (No.1 & 2) DF(3) 1

505 Hyderabad (Coaching Depot) - Catwalk between line No.9 & 10 and 11 & 12 DRF 1

DF(3) 1

506 Rayanapadu - Modernisation of wagon workshop Cap. 1,40,00

DRF 2,55,00

507 Guntur - Addl Camtech design pit line (560 m) DF(3) 2,40,00

508 Lallaguda Shops - Shed for intermediate overhauling of bogies Cap. 3,96,86

509 Maula Ali (Diesel Loco Shed) - Facilities for homing 6 diesel electrical multiple unit

rakes

DF(3) 1,00,00

510 Guntur - Intermediate overhauling shed at coaching depot DF(3) 1

511 Tirupati - Conversion of washing line to pit line at coaching depot DF(3) 1

512 Kazipet - Augmentation of holding capacity of electric loco shed from 100 to 125

alternative current locos

DF(3) 34,00

513 Tirupati - Conversion of stabling line into pit line DF(3) 3,00,00

WORKSHOPS INCLUDING PRODUCTION UNITS

7.1.24

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

514 Gooty (Diesel Loco Shed) - New shed for WDG4 loco maintenance DF(3) 1,45,00

515 Gooty (Diesel Shed) - Augmentation of homing capacity to 150 locos DF(3) 1,65,00

516 Kazipet - Setting up of wagon manufacturing unit EBR 5,00,00

517 Kurnool - Setting up facilities for coach midlife rehabilitation workshop Cap. 7,00

518 Workshop to manufacture fiat bogies for LHB design coaches, Yadgir Cap. 29,58,08

519 Works costing below Rs.2.5 crore each Cap. 25,97

DRF 50,00

DF(3) 90,00

TOTAL-WORKS IN PROGRESS Cap. 45,76,57

DRF 6,70,01

DF(3) 16,20,11

EBR 5,00,00

520 Works costing below Rs.2.5 crore each Cap. 5,00

DRF 5,00

DF(3) 5,00

TOTAL-NEW WORKS Cap. 5,00

DRF 5,00

DF(3) 5,00

TOTAL-Workshops including Production Units Cap. 45,81,57

DRF 6,75,01

DF(3) 16,25,11

EBR 5,00,00

521 Secunderabad - Type-V - 31 units Cap. 1,00,00

522 Pakala-Dharmavaram - Repl of quarters, type-II - 26 & type-III - 9 units DRF 25,13

523 Kacheguda - Repl. of quarters, type-I - 40 units DRF 25,00

524 Moula Ali - Type IV - 8, type-III - 25 & type-II - 60 units for 7th battalion Railway

Protection Special Force

Cap. 2,80,00

525 Secunderabad (Chilkalguda) - Repl. of quarters, type-II - 60 units DRF 25,00

526 Guntakal (Prabhat Nagar) - Repl.of quarters, type-II - 40 units DRF 1,06,38

527 Secunderabad Division - Repl.of K & J-type quarters, type-II - 58 units (7 locations) DRF 65,00

528 Secunderabad Division - Repl.of K & J-type quarters, type-II - 101 units (8 locations) DRF 15,00

529 Nandyal - Repl of quarters, type-II - 100 & type-III - 25 units DRF 1,58,75

530 Guntur Division - Repl of quarters, type-II - 50 units DRF 60,10

531 Works costing below Rs.2.5 crore each Cap. 4,25,00

DRF 4,03,64

TOTAL-WORKS IN PROGRESS Cap. 8,05,00

DRF 8,84,00

WORKSHOPS INCLUDING PRODUCTION UNITS

B - New Works

STAFF QUARTERS

A - Works in Progress

7.1.25

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

532 Works costing below Rs.2.5 crore each Cap. ..

DRF ..

TOTAL-NEW WORKS Cap. ..

DRF ..

TOTAL-Staff Quarters Cap. 8,05,00

DRF 8,84,00

533 Secunderabad - Development of sports complex DF(2) 25,00

534 Lallaguda - Addl. 80 bedded acommodation at central hospital DF(2) 2,87,00

535 Hyderabad & Secunderabad Divisions - Rewiring of staff quarters (750 units each

respetively)

DRF 84,00

536 Nanded - 50-bedded new divisional hospital DF(2) 15,00

537 Secunderabad Area - Augmentation of water supply by taking separate water supply

connection for residential area

DF(2) 2,34,59

538 Vijayawada-Gudur - Repl. of doors & windows etc. (10 units each at 4 stations) and

repl. of pipelines (9 stations)

DRF 10,00

539 Ongole, Samalkot, Guntur, Dornakal, Cuddappah, Mahboobnagar & Nanded -

Community halls

DF(2) 8,83

540 Secunderbaad-Kazipet - Improvement to railway quarters DRF 1,29,57

541 Sirpur Kagaznagar - Railway's own water supply arrangement and new tank in lieu of

RCC tank

DF(2) 5,00

542 Guntakal Division - Improvement to quarters, drainage, roads, pipelines etc. incl.

construction of reinforced concrete cement overhead tanks

DRF 20,00

DF(2) 84,28

543 Secunderabad - Setting up of hockey academy with astro turf in hockey stadium at

railway sports complex

DF(2) ..

544 Tirupati - Upgradation of hospital to 50-bedded hospital DF(2) 20,00

545 North Lallaguda & Sitafal Mandi - Augmentation of water supply by high level water

tanks and repl. of pipeline

DRF 99,17

546 Works costing below Rs.2.5 crore each Cap. 83,00

DRF 1,72,38

DF(1) 2,21

DF(2) 6,99,01

DF(3) 26,15

TOTAL-WORKS IN PROGRESS Cap. 83,00

DRF 5,15,12

DF(1) 2,21

DF(2) 13,78,71

DF(3) 26,15

547 Works costing below Rs.2.5 crore each Cap. 2,00

DRF 88

DF(2) 1,00

TOTAL-NEW WORKS Cap. 2,00

DRF 88

DF(2) 1,00

STAFF QUARTERS

B - New Works

AMENITIES FOR STAFF

A - Works in Progress

B - New Works

7.1.26

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

TOTAL-Amenities for Staff Cap. 85,00

DRF 5,16,00

DF(1) 2,21

DF(2) 13,79,71

DF(3) 26,15

548 Aurangabad - Repl of station building DRF 32,63

549 Secunderabad - Escalators (4 Nos) DF(1) 47,16

550 Tirupati - Open waiting hall, improvement to concourse, cloak room, addl. toilets,

linen room, modification to parcel office, air conditioning system for waiting hall

DF(1) 1,00,00

551 Vijayawada - Escalators (platform Nos.2/3, 4/5 & 10) DF(3) 72,11

552 Chittoor - Desirable amenities in connection with model station DF(1) 80,00

553 Vijayawada - Augmentation of water supply DF(1) 5,00,00

554 Mantralayam Road & Renigunta - Improvement to watering facilities DF(1) 12,00

555 Nellore - Escalators (platform Nos.1, 2/3 & 4) DF(1) 2,16,60

556 Raichur - Washable apron for other end maintenance DF(1) 79,84

557 Guntakal - Foot over bridge connecting platform Nos.6 - 1 DF(1) 25,00

558 Bhalki & Latur Road - Foot over bridge conncting platform No.1 - 2 DF(1) 2,35,12

559 South Central Railway - Escalators at major stations (4 Nos) (2 stations)

(Supplementary 08-09 Item)

DF(1) 1,85,90

560 South Central Railway - Escalators at various stations (8 Nos) (4 stations) DF(1) 2,30,00

561 Aurangabad, Hyderabad, Nanded & Tirupati - Joint development of stations in

association with Ministry of Tourism (PB 781/2012-13/NR)

DF(1) 37,46

EBR ..

562 Works costing below Rs.2.5 crore each DRF 10,59,06

DF(1) 51,43,52

DF(2) 1,37,39

DF(3) 18,10,13

TOTAL-WORKS IN PROGRESS DRF 10,91,69

DF(1) 68,92,60

DF(2) 1,37,39

DF(3) 18,82,24

563 Works costing below Rs.2.5 crore each DRF 2,00,00

DF(1) 2,20,00

TOTAL-NEW WORKS DRF 2,00,00

DF(1) 2,20,00

TOTAL-Passenger Amenities DRF 12,91,69

DF(1) 71,12,60

DF(2) 1,37,39

DF(3) 18,82,24

564 Guntur - Setting up of new division Cap. 5,81

DF(3) 5,22

565 Secunderabad - New office building for Hyderabad division DRF ..

PASSENGER AMENITIES

A - Works in Progress

B - New Works

OTHER SPECIFIED WORKS

A - Works in Progress

7.1.27

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

566 Tirupati - Acquisition of land for development of infrastructure, parking facilities etc Cap. 6,25,00

567 Lallaguda (System Training Centre) - Improvement to training facilities incl.

auditorium etc

DF(3) 10,00

568 Vijayawada - Multi disciplinary training centre DF(3) 35,00

569 Maula Ali - Upgradation & modernisation of railway protection force training centre DF(3) 15,00

570 Kazipet - Upgradation of civil engineering training school for group C & D staff of

Secunderabad & Hyderabad divisions

DF(3) 25,00

571 Lallaguda (Electrical System Training Centre) - Strengthening / upgradation of

training facilities

DF(3) 76,11

572 Vijayawada - Upgradation of running room DF(3) 27,50

573 Secunderabad (IRISET) - Electrical and signal & telecommunication laboratories

building

DF(3) 1,55,15

574 Secunderabad (IRISET) - Augumentation of e-learning centre DF(3) 1,37,17

575 South Central Railway - Integrated security system (3 stations) Cap. 3,01,39

576 Seethanagaram - New pipeline from Krishna canal to Guntur station DF(3) 74,39

577 Vijayawada (Electric Traction Training Centre) - Enhancement of beds in hostel from

180 to 320

DF(3) 1,50

578 Secunderabad - Upgradation of facilities at centralised training academy for Railway

Accounts

DF(3) 1,88,00

579 Vijayawada (Electric Traction Training Centre) - Strengthening/upgradation of training

facilities

DF(3) ..

580 Visakhapatnam - Upgradation of running room DF(3) 18,50

581 South Central Railway - Boundary wall / fencing to prevent encroachment on railway

land (PB 821/2012-13/NR)

DF(3) 1,47,95

582 Moula Ali - Setting up of Indian Railway Institute of Finance Management DF(3) 2,00,00

583 Works costing below Rs.2.5 crore each Cap. 44,80

DRF 2,12,00

DF(2) 30,34

DF(3) 7,07,48

DF(4) 98,61

TOTAL-WORKS IN PROGRESS Cap. 9,77,00

DRF 2,12,00

DF(2) 30,34

DF(3) 18,23,97

DF(4) 98,61

584 Works costing below Rs.2.5 crore each Cap. ..

DRF ..

DF(3) 80,00

TOTAL-NEW WORKS Cap. ..

DRF ..

DF(3) 80,00

OTHER SPECIFIED WORKS

B - New Works

7.1.28

SOUTH CENTRAL RAILWAY

ASSETS-ACQUISITION, CONSTRUCTION AND REPLACEMENT FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15AllocationParticulars

TOTAL-Other Specified Works Cap. 9,77,00

DRF 2,12,00

DF(2) 30,34

DF(3) 19,03,97

DF(4) 98,61

585 Hyderabad-Secunderabad - Multi modal transport system (Phase-II) MAC 20,00,00

EBR ..

TOTAL-WORKS IN PROGRESS MAC 20,00,00

TOTAL-Metropolitan Transport Projects MAC 20,00,00

TOTAL-WORKS IN PROGRESS MAC 20,00,00

Cap. 687,37,36

C.Fund 518,70,00

DRF 486,74,93

DF(1) 75,33,66

DF(2) 15,46,44

DF(3) 94,50,58

DF(4) 35,32,09

S.Fund 213,94,91

Dep(RVN) 321,00,00

EBR 580,00,00

TOTAL - NEW WORKS Cap. 17,22

DRF 55,50,77

DF(1) 2,35,00

DF(2) 1,00

DF(3) 1,16,02

DF(4) 1,05,00

S.Fund 7,00,00

GRAND TOTAL MAC 20,00,00

Cap. 687,54,58

C.Fund 518,70,00

DRF 542,25,70

DF(1) 77,68,66

DF(2) 15,47,44

DF(3) 95,66,60

DF(4) 36,37,09

S.Fund 220,94,91

Dep(RVN) 321,00,00

EBR 580,00,00

METROPOLITAN TRANSPORT PROJECTS

A - Works in Progress

7.2.1

SOUTH CENTRAL RAILWAY

MACHINERY AND PLANT PROGRAM FOR 2014-15

(Figures in thousand of Rupees)

Item

No.

RE 2014-15

586 Guntakal - Simulators in-motion type Cap. 1

587 System of online monitoring of rolling stock (OMRS) (4 Nos) DF(3) 1

588 Lalaguda - 3-phase electric loco simulator Cap. 1

589 Gooty - CNC surface wheel lathe DRF 1,38,34

590 Secunderabad - Crane EOT (30 ton) (22 m) DF(3) 1

591 Tirupati Workshop - CNC Press Brake Hydraulic (400 ton) DRF 1

592 Guntakal - Simulator in motion (EME locos) Cap. 1

593 9 colour web offset printing machine for PRS & UTS ticket rolls for printing multy

colour on both sides

DRF 9,10,00

594 Gooty - Wheel Lathe Under floor DRF 1

595 Vijaywada Diesel Hydraulic Buldozer 75 T DF(3) 1

596 Maula Ali - Simulator in motion DF(3) 1

597 Secunderabad - Hydraulic Bulldozer DF(3) 1

598 Tirupati - Wheel Ptess Hydraulic - 500 Ton DRF 2,37,40

599 Guntapalli - Wheel Ptess Hydraulic - 500 Ton DRF 2,37,40

600 Lalaguda- Cardiac catheterisation laboratory system DRF 1

601 Works costing below Rs.2.5 crore each Cap. 2,12,96

DRF 44,81

DF(2) 97,45

DF(3) 6,75,96

TOTAL-PROGRAMMED DELIVERIES Cap. 2,12,99

DRF 15,67,98

DF(2) 97,45

DF(3) 6,76,01

602 Rainapadu Workshop - CNC Surface Wheel Lathe DRF 1

603 Works costing below Rs.2.5 crore each Cap. 1

DRF 1

DF(2) 1

DF(3) 1

TOTAL-NEW ACQUISITION Cap. 1

DRF 2

DF(2) 1

DF(3) 1

TOTAL-Machinery & Plant Cap. 2,13,00

DRF 15,68,00

DF(2) 97,46

DF(3) 6,76,02

B - NEW ACQUISITION

AllocationParticulars

A - PROGRAMMED DELIVERIES