New January 20, 2016 Steering Committee Discussion about Bond … · 2016. 11. 29. · January 20,...
Transcript of New January 20, 2016 Steering Committee Discussion about Bond … · 2016. 11. 29. · January 20,...
![Page 1: New January 20, 2016 Steering Committee Discussion about Bond … · 2016. 11. 29. · January 20, 2016 Steering Committee Discussion about Bond Funding for Projects. Issue One Bond](https://reader033.fdocuments.in/reader033/viewer/2022060522/6050b5701ab0be688b295f9e/html5/thumbnails/1.jpg)
South Burlington School District
January 20, 2016
Steering Committee
Discussion about
Bond Funding for Projects
![Page 2: New January 20, 2016 Steering Committee Discussion about Bond … · 2016. 11. 29. · January 20, 2016 Steering Committee Discussion about Bond Funding for Projects. Issue One Bond](https://reader033.fdocuments.in/reader033/viewer/2022060522/6050b5701ab0be688b295f9e/html5/thumbnails/2.jpg)
Issue One Bond in FY 2017 - $2,500,000
SBSD FACILITIES STEWARDSHIP PLAN updated 12/17/2015
Three Year Focus for FY'17 - FY'19
"Draft for Planning & Discussion" Projects proposed to be funded with capital improvement bonds
Project or Equipment Description Location FY 2017 FY 2018 FY 2019 3 Year Total
Munson Field Project - a. Synthetic turf replacement, b. Replace track surface,
c. Safety net at end of field, d. Field event area upgrade, & e. fencing. ATHLETIC FIELDS 715,000$ -$ -$ 715,000$
Window replacements (to be completed in phases) (ADA & abatement) SBHS 200,000$ 132,000$ 286,000$ 618,000$
Restroom upgrades for ADA compliance and remodeling SBHS 180,000$ 180,000$ 180,000$ 540,000$
Flooring - carpet & asbestos floor tile replacement FHTMS 75,000$ 75,000$
Roof over Gymnasium coating SBHS 74,000$ -$ -$ 74,000$
Remove gym ceiling tile - in conjunction with roof replacement SBHS 50,000$ -$ -$ 50,000$
Transportation Office - ADA upgrade of parking lot & small office upgrade TRANSPORTATION 45,000$ -$ -$ 45,000$
Parking lot - Access road repaving (to be performed by City DPW) ORCHARD 33,000$ -$ -$ 33,000$
Subtotal Projects 1,372,000$ 312,000$ 466,000$ 2,150,000$
Plus: Design, engineering, architecture, hazardous material remediation, legal,
permitting, contingency, etc. (Soft Costs) ALL 274,400$ 42,600$ 36,800$ 353,800$
Total Estimated Costs 1,646,400$ 354,600$ 502,800$ 2,503,800$
![Page 3: New January 20, 2016 Steering Committee Discussion about Bond … · 2016. 11. 29. · January 20, 2016 Steering Committee Discussion about Bond Funding for Projects. Issue One Bond](https://reader033.fdocuments.in/reader033/viewer/2022060522/6050b5701ab0be688b295f9e/html5/thumbnails/3.jpg)
ESTIMATED BOND COSTS - $2,500,000 PROPOSAL
Term 20 years
1st year interest payment $49,641
Average annual payment $162,913
Average increase in tax rate 0.745 cents
Average single family home ($366k) annual cost $27
Average condominium ($226k) annual cost $20
![Page 4: New January 20, 2016 Steering Committee Discussion about Bond … · 2016. 11. 29. · January 20, 2016 Steering Committee Discussion about Bond Funding for Projects. Issue One Bond](https://reader033.fdocuments.in/reader033/viewer/2022060522/6050b5701ab0be688b295f9e/html5/thumbnails/4.jpg)
![Page 5: New January 20, 2016 Steering Committee Discussion about Bond … · 2016. 11. 29. · January 20, 2016 Steering Committee Discussion about Bond Funding for Projects. Issue One Bond](https://reader033.fdocuments.in/reader033/viewer/2022060522/6050b5701ab0be688b295f9e/html5/thumbnails/5.jpg)
Athletic Fields
Turf Replacement and set up new field event areas and safety nets: $450,000
Less: dedicated revenues ($ 75,000)
Net to Bond $375,000
Track Replacement and possible track expansion $340,000
Total $715,000
![Page 6: New January 20, 2016 Steering Committee Discussion about Bond … · 2016. 11. 29. · January 20, 2016 Steering Committee Discussion about Bond Funding for Projects. Issue One Bond](https://reader033.fdocuments.in/reader033/viewer/2022060522/6050b5701ab0be688b295f9e/html5/thumbnails/6.jpg)
Munson Field Turf and Track –Proposed FY 2017
![Page 7: New January 20, 2016 Steering Committee Discussion about Bond … · 2016. 11. 29. · January 20, 2016 Steering Committee Discussion about Bond Funding for Projects. Issue One Bond](https://reader033.fdocuments.in/reader033/viewer/2022060522/6050b5701ab0be688b295f9e/html5/thumbnails/7.jpg)
Munson Field Turf and Track –Proposed FY 2017
![Page 8: New January 20, 2016 Steering Committee Discussion about Bond … · 2016. 11. 29. · January 20, 2016 Steering Committee Discussion about Bond Funding for Projects. Issue One Bond](https://reader033.fdocuments.in/reader033/viewer/2022060522/6050b5701ab0be688b295f9e/html5/thumbnails/8.jpg)
SUMMER 2016 – REPLACE WINDOWS IN 8 CLASSROOMS &2 SMALLER ROOMS (WEST WING – NORTH SIDE) $200,000
SUMMER 2017 – REPLACE BIG PICTURE ROOMS AND 2ND FLOOR BAND ROOM WINDOWS $132,000
SUMMER 2018 – REPLACE WINDOWS IN 12 CLASSROOMS (EAST WING - NORTH SIDE) & 2 SMALLER ROOMS $286,000
(POSSIBLY COMBINE WORK INTO TWO YEARS)
TOTAL $618,000
SBHS Window Replacement
![Page 9: New January 20, 2016 Steering Committee Discussion about Bond … · 2016. 11. 29. · January 20, 2016 Steering Committee Discussion about Bond Funding for Projects. Issue One Bond](https://reader033.fdocuments.in/reader033/viewer/2022060522/6050b5701ab0be688b295f9e/html5/thumbnails/9.jpg)
Old Windows at HS - north west sideProposed for FY 2017
![Page 10: New January 20, 2016 Steering Committee Discussion about Bond … · 2016. 11. 29. · January 20, 2016 Steering Committee Discussion about Bond Funding for Projects. Issue One Bond](https://reader033.fdocuments.in/reader033/viewer/2022060522/6050b5701ab0be688b295f9e/html5/thumbnails/10.jpg)
SBHS Restroom Replacement
Summer 2016 – Remodel and Upgrade women’s restroom on the 1st floor. $180,000
Summer 2017 – Remodel and upgrade men’s restroom on the 1st floor. $180,000
Summer 2018 – remodel and upgrade women’s restroom on the 2nd floor. $180,000
Total $540,000
![Page 11: New January 20, 2016 Steering Committee Discussion about Bond … · 2016. 11. 29. · January 20, 2016 Steering Committee Discussion about Bond Funding for Projects. Issue One Bond](https://reader033.fdocuments.in/reader033/viewer/2022060522/6050b5701ab0be688b295f9e/html5/thumbnails/11.jpg)
SBHS Girls Bathroom ADA & Upgrade –Proposed for FY 2017
![Page 12: New January 20, 2016 Steering Committee Discussion about Bond … · 2016. 11. 29. · January 20, 2016 Steering Committee Discussion about Bond Funding for Projects. Issue One Bond](https://reader033.fdocuments.in/reader033/viewer/2022060522/6050b5701ab0be688b295f9e/html5/thumbnails/12.jpg)
Tuttle Middle School Cafeteria floor tile replacement & asbestos material remediation
• The original tile in the cafeteria, installed in 1969, is wearing thin and needs to be replaced. The area needs to be sealed off and not be in use for 3 – 4 weeks this summer. $75,000
Since 2009, the district has replaced floor tile in most of the hallways in this school according to an annual allocation in the stewardship plan.
![Page 13: New January 20, 2016 Steering Committee Discussion about Bond … · 2016. 11. 29. · January 20, 2016 Steering Committee Discussion about Bond Funding for Projects. Issue One Bond](https://reader033.fdocuments.in/reader033/viewer/2022060522/6050b5701ab0be688b295f9e/html5/thumbnails/13.jpg)
FHTMS Cafeteria Floor Tile Replacement Proposed for FY 2017
![Page 14: New January 20, 2016 Steering Committee Discussion about Bond … · 2016. 11. 29. · January 20, 2016 Steering Committee Discussion about Bond Funding for Projects. Issue One Bond](https://reader033.fdocuments.in/reader033/viewer/2022060522/6050b5701ab0be688b295f9e/html5/thumbnails/14.jpg)
SBHS Roof
Gymnasium Roof Replacement
This roof is 22 years old and needs to be restored. It also needs to have a protective coating applied to extend its life by about 10 years.
$74,000
![Page 15: New January 20, 2016 Steering Committee Discussion about Bond … · 2016. 11. 29. · January 20, 2016 Steering Committee Discussion about Bond Funding for Projects. Issue One Bond](https://reader033.fdocuments.in/reader033/viewer/2022060522/6050b5701ab0be688b295f9e/html5/thumbnails/15.jpg)
HS Roof - Coating for Gym RoofProposed for FY 2017
![Page 16: New January 20, 2016 Steering Committee Discussion about Bond … · 2016. 11. 29. · January 20, 2016 Steering Committee Discussion about Bond Funding for Projects. Issue One Bond](https://reader033.fdocuments.in/reader033/viewer/2022060522/6050b5701ab0be688b295f9e/html5/thumbnails/16.jpg)
SBHS Gym Tile Ceiling
• The tile need to be removed for safety purposes.
• The ceiling grid will be removed.
• The wiring that has been concealed by these tiles will be rerouted.
$50,000
![Page 17: New January 20, 2016 Steering Committee Discussion about Bond … · 2016. 11. 29. · January 20, 2016 Steering Committee Discussion about Bond Funding for Projects. Issue One Bond](https://reader033.fdocuments.in/reader033/viewer/2022060522/6050b5701ab0be688b295f9e/html5/thumbnails/17.jpg)
SBHS Gym – Remove Ceiling TileProposed in FY 2017
![Page 18: New January 20, 2016 Steering Committee Discussion about Bond … · 2016. 11. 29. · January 20, 2016 Steering Committee Discussion about Bond Funding for Projects. Issue One Bond](https://reader033.fdocuments.in/reader033/viewer/2022060522/6050b5701ab0be688b295f9e/html5/thumbnails/18.jpg)
Other ProjectsOrchard School Access Road Repaving
• Work to be included in with City road repair bid.
• Estimated cost is $33,000
Bus Office Upgrade
• Building upgrade of roof and flooring and sun control awning
• Estimated Cost is $45,000