New High School · 2019-11-05 · New High School PRIOR TO THE BOND - DESIGN WORKSHOP 1250...

20
November 4, 2019 New High School Alamance-Burlington School System

Transcript of New High School · 2019-11-05 · New High School PRIOR TO THE BOND - DESIGN WORKSHOP 1250...

Page 1: New High School · 2019-11-05 · New High School PRIOR TO THE BOND - DESIGN WORKSHOP 1250 students/ 1500 core 220,000 square feet

November 4, 2019

New High SchoolAlamance-Burlington School System

Page 2: New High School · 2019-11-05 · New High School PRIOR TO THE BOND - DESIGN WORKSHOP 1250 students/ 1500 core 220,000 square feet

PRIOR TO THE BOND - DESIGN WORKSHOP MAY 17 & 18, 2017

Commons Themes

• Public facilities grouped together w/shared Commons (3 of 4)• Media Center adjacent to Commons (3 of 4)• Band/Chorus adjacent to Auditorium and Visual Arts• Administration and Guidance together (3 of 4)• CTE integrated within academic wing• Courtyards (1 open courtyard, 2 enclosed courtyards)• Dispersed science classrooms• Two Story Academic House• Flexibility to accommodate interdisciplinary model

Page 3: New High School · 2019-11-05 · New High School PRIOR TO THE BOND - DESIGN WORKSHOP 1250 students/ 1500 core 220,000 square feet

OPTION 1

OPTION 2

OPTION 3

OPTION 4

New High SchoolPRIOR TO THE BOND - DESIGN WORKSHOP

Page 4: New High School · 2019-11-05 · New High School PRIOR TO THE BOND - DESIGN WORKSHOP 1250 students/ 1500 core 220,000 square feet

New High SchoolPRIOR TO THE BOND - DESIGN WORKSHOP

1250 students/ 1500 core220,000 square feet

Page 5: New High School · 2019-11-05 · New High School PRIOR TO THE BOND - DESIGN WORKSHOP 1250 students/ 1500 core 220,000 square feet

PRIOR TO THE BOND - DESIGN WORKSHOP

Page 6: New High School · 2019-11-05 · New High School PRIOR TO THE BOND - DESIGN WORKSHOP 1250 students/ 1500 core 220,000 square feet

• ABSS Central Office Staff

• Board of Education

• County Commissioners

• Town Council Members

• Alamance Chamber Member

• School Principals

• Community members

NEW HIGH SCHOOL DESIGN WORKSHOP October 28, 2019

PARTICIPANTS:

Page 7: New High School · 2019-11-05 · New High School PRIOR TO THE BOND - DESIGN WORKSHOP 1250 students/ 1500 core 220,000 square feet

• Opportunities & Challenges

• Idea Mining

• Image Mining

• Overview

WORKSHOP AGENDA

Page 8: New High School · 2019-11-05 · New High School PRIOR TO THE BOND - DESIGN WORKSHOP 1250 students/ 1500 core 220,000 square feet

OPPORTUNITIES & CHALLENGES• Reducing over capacity

• Space for varying learning styles

• Traffic

• New identity for school and students

• State of the art facility

• Planning for growth

• Blending school cultures

• Global outlook

• Budget

• Community use of facilities

• Assessing life cycle cost and spending funds smartly

Page 9: New High School · 2019-11-05 · New High School PRIOR TO THE BOND - DESIGN WORKSHOP 1250 students/ 1500 core 220,000 square feet

IDEA MINING

Page 10: New High School · 2019-11-05 · New High School PRIOR TO THE BOND - DESIGN WORKSHOP 1250 students/ 1500 core 220,000 square feet

IDEA MINING

Page 11: New High School · 2019-11-05 · New High School PRIOR TO THE BOND - DESIGN WORKSHOP 1250 students/ 1500 core 220,000 square feet
Page 12: New High School · 2019-11-05 · New High School PRIOR TO THE BOND - DESIGN WORKSHOP 1250 students/ 1500 core 220,000 square feet

IMAGE MINING

Page 13: New High School · 2019-11-05 · New High School PRIOR TO THE BOND - DESIGN WORKSHOP 1250 students/ 1500 core 220,000 square feet

IMAGE MINING

• Not all glass – being purposeful on where glass is

• Acknowledging the history of the area while respecting that students will be coming from the other high schools

• Blend of modern, collegiate, and the site vernacular (farm)

EXTERIOR

Page 14: New High School · 2019-11-05 · New High School PRIOR TO THE BOND - DESIGN WORKSHOP 1250 students/ 1500 core 220,000 square feet

IMAGE MINING

• Secure outdoor space for students

• Combination of hardscape and landscape – ease of maintenance

• Adjacency to dining for outdoor dining

EXTERIOR

Page 15: New High School · 2019-11-05 · New High School PRIOR TO THE BOND - DESIGN WORKSHOP 1250 students/ 1500 core 220,000 square feet

IMAGE MINING

• Clear front entrance

• Wayfinding

• Not parking directly in front -less visible

• Green Space and walkways for students

• Two story building – breakup massing, not one big box

EXTERIOR

Page 16: New High School · 2019-11-05 · New High School PRIOR TO THE BOND - DESIGN WORKSHOP 1250 students/ 1500 core 220,000 square feet

IMAGE MINING

• Open & purposeful space

• Flexible furniture

• Wide hallways

• Collaborative learning

• Spaces to accommodate different learning styles

INTERIOR

Page 17: New High School · 2019-11-05 · New High School PRIOR TO THE BOND - DESIGN WORKSHOP 1250 students/ 1500 core 220,000 square feet

IMAGE MINING

• Daylight and views

• Security

• Durable spaces

• Flexibility

• State of the Art

INTERIOR

Page 18: New High School · 2019-11-05 · New High School PRIOR TO THE BOND - DESIGN WORKSHOP 1250 students/ 1500 core 220,000 square feet

IMAGE MINING

• Community Use

• Clear delineation between public and academic

• New identity/ School Pride

• Nice but functional auditorium

• Durable materials

INTERIOR

Page 19: New High School · 2019-11-05 · New High School PRIOR TO THE BOND - DESIGN WORKSHOP 1250 students/ 1500 core 220,000 square feet

IMAGE MINING

• Food court atmosphere

• Collegiate-feel

• Design to encourage recycling and sustainability

INTERIOR

Page 20: New High School · 2019-11-05 · New High School PRIOR TO THE BOND - DESIGN WORKSHOP 1250 students/ 1500 core 220,000 square feet