NEW FRONTIERSBE PART OF BUILDING THE FUTURE
KU Engineering Expansion ProjectTo accommodate 60 percent growth in student enrollment and 30 new faculty members, the KU School of Engineering is adding 185,000 square feet by Fall 2015. These new technologically advanced spaces will ensure KU is the premier school of engineering in the state and region.
EXPANSION TIMELINE
A NEW FRONT DOOR FOR ENGINEERINGMore and more students are
choosing to earn their engineering and computing degrees at the University of Kansas. KU Engineering’s undergraduate enrollment is expected to grow by 60 percent as established in the school’s Building on Excellence Initiative. To meet increasing demand, the School of Engineering must add 60 percent to the school’s footprint. The KU Engineering Expansion Project offers premier work and study space that will carry the school to greater heights.
The expansion includes:
• $105 million investment in facilities
• Four new structures – two on the main campus and two on KU’s West Campus – totalling 185,000 square feet
• Innovative “active-learning” classrooms that promote understanding
• Student success areas for new student recruitment, projects, tutoring and retention, and collaboration
• An enhanced career center• Teaching and research labs• A grand entry – a new front
door – and integration into the engineering complex
A facet of the expansion takes place on KU’s West Campus and provides space for :
• Capstone design projects• Student competition projects• Fabrication and machine shops• Large-scale structures research
A student project center and the new Hill Engineering Research and Development Center add more than 7,000 square feet for student capstone projects and student groups, such as:
• Jayhawk Motorsports • Aerospace Heavylift Team• Chem-E Car Team• Engineers Without Borders• KU EcoHawks
FALL 2012M2SEC research center opens(46,898 sq. ft.)
SUMMER 2013Hill Engineering Research & Development Center opens(4,350 sq. ft.)
FALL 2014West Campus Building opens(24,709 sq. ft.)
FALL 2015Main Campus Building opens(109,819 sq. ft.)
MAIN CAMPUS EXPANSIONMain Campus Building & M2SEC
These areas will let students work with faculty to expand their knowledge, explore their creativity and develop their potential.
The West Campus site also will become home to a revolutionary structural testing facility, with a 40-foot strong wall and two 20-ton cranes.
West Campus Building
Hill Engineering R&D Center on West Campus
WEST CAMPUS EXPANSION
“The designs incorporate features students have said they want and need – student organization offices, more group study space and enhanced computing and library resources.”
— Mason Jones, Chemical Engineering, 2014
BUILDING ON EXCELLENCE INITIATIVE GOALS & PROGRESS60% growth in B.S. graduates by 2021
60% growth in Ph.D. graduates by 2021
30 additional faculty by 2018
38% growth in undergraduate graduates since 2008
42% growth in doctoral student graduates since 2008
9 additional faculty since 2012
BUILDING FOR STUDENT SUCCESS
Every element of new space is designed to cultivate student success:
• State-of-the-art classrooms that enhance access to cutting-edge curriculum
• Teaching and research laboratories that allow students to apply what they learn and push the boundaries
• Collaboration and study spaces, which are critical for students to hone their teamwork and communication skills while building their technical expertise
The main building will become the new front door for the KU School of Engineering and home for :
• Student recruitment, with - A celebratory entry - Meeting space for prospective
students and their families • Retention efforts, such as tutoring
• Group and individual study space - Student organization space - Project workrooms & resources• Engineering Career CenterThe structure’s grand entry will
showcase engineering at KU. A distinctive atrium will greet prospective students with displays and study areas bathed in natural light.
The expansion also will renovate portions of Spahr Engineering Library, opening the floor plan while also providing small group study rooms, space for student organizations to meet and a workroom to tackle a variety of projects. This multi-use area will become a crossroads for engineering and computing students – a place to connect, cultivate and create – and a small café will fuel students in the middle of something big.
“The expansion not only shows that the engineering school is interested in giving students the best, but also that the school is able to continue growing for years to come.”
— Joci Hansen, Architectural Engineering, 2015
KU Engineering students learn leadership and communication techniques through several enrichment programs led by the school – all aimed at ensuring students are successful before and after graduation.
‘ACTIVE-LEARNING’ CLASSROOMS FOR DEEPER UNDERSTANDING
Additional classroom space in the new Main Campus Building helps ensure students spend more time learning and developing ideas.
The new classroom designs foster active-learning teaching techniques:
• Provide a higher quality classroom experience
• Reach different learning styles• Promote student interaction and
communication skills• Accommodate a variety of
classroom sizes
Unlike a traditional tiered lecture hall, these “active” or “flipped” classrooms have flat floors, white boards, tables for groups of students to interact collaboratively and a variety of novel audio-visual devices to ensure students can view and share ideas and information from every point in the room, regardless of class size.
• One 160-seat classroom• One 120-seat classroom• One 90-seat classroom• Three 60-seat classrooms
“In every class and project, students are working in pairs or small groups to solve problems, so the new active-learning classrooms will pull this atmosphere into the classroom environment.”
— Amanda Parks, Electrical Engineering, 2015
Students work together in teams to solve problems during class as professors move about the room to ensure all students grasp the concepts.
BRINGING DISCOVERY TO THE FOREFRONT
Both the Main Campus Building and the West Campus Building provide needed space for faculty and students to conduct research and innovate. New teaching labs will provide state-of-the-art facilities and equipment for :
• Illumination• Power• Unit operations/wet chemistry• Mechanics of materials• Instrumentation • Building Thermal Science• Environmental, and more
The West Campus Building offers dedicated space for student competition and capstone design projects and a structural testing lab with 40-foot strong walls. The Main Campus Building will attract the best professors to KU with more than a dozen new research labs.
Dedicated spaces (sq. ft.):
• Classroom laboratory and project design space (14,197)
• Student success space (20,539)• Active learning classrooms (15,635)• Research laboratory space (35,341)
“I am ecstatic about having state-of-the-art space and resources to complete my senior capstone project.”
— Al Papa Silva, Mechanical Engineering, 2016
Student Project Center, West Campus Building
“We see the Hill Research & Development Center as an opportunity for engineering students to learn by doing with hands-on experience, turning ideas into sustainable products and services now and in future generations. We are so pleased to be able to support the University and School in this important time of growth.”
— Sue and Ron Hill, Mechanical Engineering, 1957
BLUEPRINTS FOR THE FUTURE
UP
DN
UP
CLASSROOM 120
GRAD OFFICES
OPEN ABOVE
TO M2SEC
THERMOFLUIDS
FACULTYRESEARCH
IMAGING SUITE
CO
RR
IDO
R
LOBBY
AREA-WAY
A/V
KU-IT
HALL
ENVIRONMENTAL
LEARNED HALL BASEMENT
M2SEC
LEARNED BASEMENT ACCESSSPAHR LIBRARY ABOVE
CLA
SSR
OO
M 9
0SUPPORT
EQU
IPM
ENT
SENIOR DESIGN
WOMEN
MEN
CORRIDOR
CORRIDOR
COLLABORATION
IMAG
ING
DIS
TIL.
HIG
H B
AY
GRAD OFFICESELEC.
DISPLAY
OFFICE
GRAD. OFF.
GR
AD. O
FF.
CN
TRL.
RM
.
COLLAB.
�����������
FACULTYRESEARCHUNASSIGNED
COLLAB.
DIR
TY P
REP
UNIT OPS / WET CHEMISTRY
ANALYTICAL CHEMISTRY FAC. RESEARCH
LEARNED HALL BASEMENT
COLLAB.
OFFICE
OFFICE
FACULTYRESEARCHUNASSIGNED
GROUND FLOOR07.10.130 8' 16' 32'
Ground floor
UP
UP
BTS
TO L
EAR
NED
TO L
EAR
NED
TO M
2SEC
RO
OF
FACULTYRESEARCH
FACULTYRESEARCH
CLASSROOM 60
OPENTO
BELOW
COLLABORATION
FACULTYRESEARCH
ILLUM.
A/V
KU-IT
GR
AD. O
FFIC
E
SPAHR LIBRARY
SKYLIGHT
M2SEC
high windows
TO L
EAR
NED
TUTORING
GRAD. OFF.OPEN
TO BELOWM
ENW
OM
EN
STOR.
CORRIDOR
STUDY LOUNGE
OFFICE
CONF.
STOR.
CO
RR
IDO
R
GRAD. OFFICE
18 ft² /?
COLLAB.
FACULTYRESEARCH
UNASSIGNED
FACULTYRESEARCH
UNASSIGNED
FACULTYRESEARCH
UNASSIGNEDBALCONY
STUDYSTUDYSTUDYSTUDY
WORKROOM
ELEC
TRIC
AL
POWER LAB
CLASSROOM 60
STAIR
2ND FLOOR07.10.130 8' 16' 32'
DN
DN
FACULTYRESEARCH
CLASSROOM 60
MECH. OF MAT.
FACULTYRESEARCH
FACULTYRESEARCH
FACULTYRESEARCH
FACULTYRESEARCH -UNASSIGNED
OPEN TO BELOW
RECEIVING
FACULTYRESEARCH
A/V
IT
GRAD. OFFICE
�������
�����������
�������
SPAHR LIBRARY
OPENTO
BELOW
INSTRUMENTATION
GR
AD. O
FFIC
E
LEARNED HALL
M2SEC
CAREERCENTER
AREA-WAY
CONF.
KITCHENDEAN
COPY/PRINT
UNDERGRAD. RECRUITMENT & RETENTION SUITEELEV
MEN
LOBBY
VEST.
CO
RR
IDO
R
STUDY STUDY STUDY STUDYOFFICE
WORK ROOM
OFFICE
OFFICE OFFICE OFFICE
OFFICECONF.
VEN
D.C
AFE
KITCH.
EHSFAC. MGR.
HAL
L
WO
MEN
DIS
TILL
ATIO
N
COLLAB.
WORK/FILE
MECHMECH
STOR.
ELEC
TRIC
AL
CORRIDOR
CO
RR
IDO
R
CORRIDOR
ELEC.
������� �������
UP
DN
UP
R.R.
LEARNED HALL
BALCONY
1ST FLOOR07.10.130 8' 16' 32'
Main Campus Building Second floor, with Spahr Library
First floor, with Spahr Library
CLASSROOM LABORATORY
CLASSROOM
RESEARCH LABORATORY
STUDENT SUCCESS
SUPPORT
CIRCULATION
DN
236 SF
OFFICE104
112 SF
IT106
75 SF
JC108
131 SF
MEN110
131 SF
WOMEN112
95 SF
STORAGE120A
919 SF
CORRIDOR/STUDENTSPACE
1C1129 SF
WELDING120B
2838 SF
STUDENT FABRICATION105
797 SF
SHOP120
89 SF
ELEVATOR LOBBY100A
335 SF
MECHANICAL114
10764 SF
HIGH BAY102
430 SF
ELECTRICAL102A
532 SF
PUMP ROOM102B
206 SF
OFFICE102E
104 SF
STORAGE102D
254 SF
STAIR A21S2
63 SF
ELEVATOR1E1
172 SF
STAIR A11S1
271 SF
LOBBY100
FIRST FLOOR PLAN07/10/2013 4' 08'16'N
West Campus Building
“Being able to attract new faculty of the caliber of Dr. Reza Barati to teach and conduct leading research in petroleum engineering is very exciting. We’re pleased that our gift will help him get started quickly in his new role at KU.”
— Allyn Risley, Petroleum Engineering, 1972
FUNDING OUR FUTURE
The KU School of Engineering is in the midst of a transformational growth plan for students, faculty, and facilities. We are engaging many partners in our comprehensive expansion, and leveraging investments from the State of Kansas through the University Engineering Initiative Act, NIST, and others. Please join us in taking the school to new heights through FAR ABOVE and beyond!
CONNECT WITH US
Michael S. Branicky, Sc.D., P.E. Dean of Engineering
785-864-2930 [email protected]
Amy Spikes Development Director & Team Leader 785-832-7467
Molly Paugh Development Director
785-832-7319 [email protected]
Susan Reilly Development Director
785-832-7351 [email protected]
Megan Hill Assistant Director Corporate and
Foundation Development 785-832-7381 [email protected]
Our expansion project offers many ways to share your legacy. Alumni, industry partners, and friends will find exciting naming opportunities that honor their outstanding generosity and investment – and help us achieve our goals.
Main Campus Building – $30,000,000Main Campus Research Center (M2SEC) – $7,000,000Main Building Grand Entrance – $5,000,000West Campus Building – $4,000,000160-seat Classroom – $1,500,000 West Campus Structural Testing Lab – $1,000,000120-seat Classroom – $1,000,000 KU EcoHawks Facility – Funded (Hill Engineering R&D Center) 90-seat Classroom – $500,000 West Campus Student Project Center – $500,000Engineering Student Success Center – $500,000Classroom Labs – $100,000 to $500,000Engineering Career Center – Funded (Ladd Career Center)20-ton Cranes – $300,000 60-seat Classrooms – $250,000, eachFaculty Research Suites – $100,000, eachStudent Success Areas – $25,000 to $100,000
Other avenues to invest in the future of the school:• New faculty lab start-up
packages• Named professorships• Scholarships• Graduate fellowships
• Lab equipment• On-going support for student
programs and teams• Student project equipment• Peer mentoring
YOU & KU: THE CORNERSTONE
Hill Engineering R&D Center & KU EcoHawks
MAKE A GIFT: WWW.FARABOVE.ORG
We invite you to be a part of our bright future. Contact a member of our team to see the difference you can make.