New Dimension of Digital Construction - KIBIM Dimension of... · 4D Mixed Reality Synchro Software...

28
New Dimension of Digital Construction: 4D Mixed Reality Synchro Software Joshua Choi

Transcript of New Dimension of Digital Construction - KIBIM Dimension of... · 4D Mixed Reality Synchro Software...

New Dimension of Digital Construction: 4D Mixed Reality

Synchro Software Joshua Choi

Why 4D? Case Study with Turner & PCL

4D Construction Planning on the (LAX) Midfield Satellite Concourse North Project

Shaohua Guan 4D Planner Synchro, Turner-PCL, A Joint Venture

Sean Zook, R.A. Construction VDC/BIM Manager Turner-PCL, A Joint Venture

Case Study #2 PAX Tunnel

Case Study #1 MSC Core

Questions & Answers

4D Production Team

• (1) Scheduling Manager • (3) CPM Schedulers • (1) 4D Scheduler • (1) VDC Manager • (3) VC Engineers Operation Team input from • Superintendents • Project Managers With BIM support from • Design Consultants • Subcontractors

Realizing the Shared Language

Pulling the BIM Together

Fabrication Models

Navisworks

Synchro

https://partslab.pcl.com/

Civil 3D Revit

PLUGIN

Case Study #1 MSC Core

Jared Landa, Superintendent Bahman Daniali, Senior Scheduler Shao Guan, 4D Planner Sean Zook, VDC Manager Jared Landa, Superintendent Shao Guan, 4D Planner Sean Zook, VDC Manager Shao Guan, 4D Planner Sean Zook, VDC Manager Jared Landa, Superintendent Bahman Daniali, Senior Scheduler Shao Guan, 4D Planner Project Team

Case Study #1

Draft Pictorial Schedule

Draft 4D

Review

Update 4D Plan

Pull Plan Session

Case Study #1

Case Study #1

Case Study #1

Case Study #1

Case Study #1 – Lessons Learned

• Validation

• Optimization

• Communication

• Representation

Case Study #2 –PAX Tunnel Backstory

Case Study #2 – Team & Process

Patrick Goforth, Project Manager Dave Kimmons, Superintendent Ryan Priest, Tunnel Scheduler Shao Guan, 4D Planner Bahman Daniali, Senior Scheduler Stakeholder Consumers

TPJV Executives LAWA Inspectors

Sub-Trades Grading Site Utilities Structural Concrete

Baseline Tunnel

Schedule

Pull Plan Session

Solution(s) Diagrammed

Fragnet Schedule

Developed

Master Schedule Updated

4D Model Synchronized

Case Study #2 – Designing the Plan

Case Study #2 – 4D Simulations

Case Study #2 – Lessons Learned

• Validation

• Optimization

• Communication

• Representation

4D Cloud Data-Base This is the future

Cloud + Mixed Reality Introducing New Dimension for Construction

Case #1: Lobster Vision + Synchro API

Case #1: Live Demo

Case #2: HoloLens at Turner USA

Case #2: HoloLens at Turner USA

video

Live Demo of HoloLens App

Thanks