NEW CONSTRUCTION TECHNOLOGY

52
Company LOGO NEW CONSTRUCTION TECHNOLOGY A proposal having opportunity to generate Rs 2,10,600 Cr. (US $468 Billion) the saving part only for construction Industry world wide every year “By Marketing New Construction Technology and issuing Licenses World Wide” for a technology which reduces the cost of construction by 36% (Patent Under Process) Mail.id ;[email protected] Innovation by- Suresh Chawla www.sureshchawla.com

description

NEW CONSTRUCTION TECHNOLOGY. A proposal having opportunity to generate Rs 2,10,600 Cr. (US $468 Billion) the saving part only for construction Industry world wide every year - PowerPoint PPT Presentation

Transcript of NEW CONSTRUCTION TECHNOLOGY

Page 1: NEW CONSTRUCTION TECHNOLOGY

Company

LOGO

NEW CONSTRUCTION TECHNOLOGY

A proposal having opportunity to generate Rs 2,10,600 Cr. (US $468 Billion) the saving part only for

construction Industry world wide every year “By Marketing New Construction Technology and issuing

Licenses World Wide” for a technology which reduces the cost of construction by 36% (Patent Under Process)

Mail.id ;[email protected] by- Suresh Chawla

www.sureshchawla.com

Page 2: NEW CONSTRUCTION TECHNOLOGY

INDIA HAD IT ALL

Indian mythology : In Mahabharta, Vishvakrama created “ Dwarika” in one night for Lord Krishna when he fled Mathura for fear of Jarasandh Raksha to save brahmins.

When Pandvas were separated from Duryodhana the barren land of Indraprastha was converted in to their beautiful capital in unbelievable time frame.

It looked like an epic and dream to me before innovation of my technology, but having innovated the technology

“when i found out that on third day, 1000s of families can be settled in 1000sof units of houses made in R.C.C which would last 100 years with electricity, sanitation and water supply in place.

It looked no surprise to me that technology to create long lasting structures in no time was in deed prevail ant in olden times in India.

(This technology is reincarnation of same technology)

Page 3: NEW CONSTRUCTION TECHNOLOGY

NO BODY WILL EVER CONSTRUCT A HOUSE OR CARRY OUT ANY KIND OF R.C.C.CONSTRUCTIONS ON THIS EARTH USING PRESENT CONSTRUCTION TECHNIQUES, ONCE NEW CONSTRUCTION TECHNOLOGY IS MADE PUBLIC

WHY : 1) When a house owner or a builder who wants to build a house or a

multistory building or a Fly -over will see one floor of his dream houses/building which is going to last 100 years is ready in one single day cast in situ &not prefabricated that too at 36% lower in cost

2)With all Columns, Beams and Walls including internal tiles/ external stone – cladding etc complete pending curing & painting only

3) With all doors& window duly painted with all Fittings and Glass in place in single day

4) With all concealed electric conduits, all fire fighting and heating pipes in place, with all concealed water supply - pipes, sanitary, plumbing pipes etc in place and for that matter all concealed items in place .

5) With all concealed electrical, T.V. telephone, fire-fighting, heating, air-

conditioning and all other kinds of wirings in place in single day.

6) With inside walls ready for POP in 24 hours in one option or left for curing the interior walls as well as exterior as per the period required

Page 4: NEW CONSTRUCTION TECHNOLOGY

NEW TECHNOLOGY CONVERTS THE CONSTRUCTION INDUSTRY INTO MOST SIMPLE

PROCESS ON EARTH

7) Not only that but scaffolding out side the building which is required for entire building & for entire construction period is not required in this technology and in its place scaffolding for only one floor of whole multistory building is required at one time

8) Not only that but all ornamental exteriors, domes, chajjas, recesses, balconies etc can be in place & cost of construction can be reduced drastically

9) Not only that but the owner does: not require to look for any labor

be it a mason or a plumber or a carpenter, a painter or an electrician or even a single laborer at his site of construction.

10) Not only that but the technology is so simple that from a villager constructing a single room to a Contractor constructing Fly-Overs, Bridges Dams. Drains, Columns for Mass Transportation ,Water Tanks, Man Hole Covers, and what not will use this technology to save on cost, enormous time . “The cost over run will be a thing of past”

11) Not only that but the design of the house is by architect and structure designer and not prefabricated or mass construction

Page 5: NEW CONSTRUCTION TECHNOLOGY

NEW TECHNOLOGY CONVERTS THE CONSTRUCTION INDUSTRY INTO MOST SIMPLE

PROCESS ON EARTH

12) Not only that but for a pre -designed house which will now be available on web sites and though albums in workshops round the corner provided by leading corporate houses who will adopt the technology as industry, the owners will not require Architects and Structural Designers and other Consultants also.

.

Why any one on this earth will ever think of making his house or carry out any kind of civil construction on this earth using present technologies when one can avail this technology at much reduced cost i.e. 36% lower than present construction cost as explained here after and in shortest possible time required for all kinds of constructions be it:

“Buildings, Bridges, elevated corridors for transport, fly-over's, roads, drainage, dams, water tanks , man hole covers etc.

Page 6: NEW CONSTRUCTION TECHNOLOGY

SUPER FAST CONSTRUCTION TECHNOLOGY

INNOVATION : NEW PROCESS INNOVATION : NEW PROCESS

INVENTOR : SURESH CHAWLAINVENTOR : SURESH CHAWLA

PROSPECTS: WORLDWIDEPROSPECTS: WORLDWIDE

INVENTOR DESIRES : SALE/ SHARING OF REVENUE INVENTOR DESIRES : SALE/ SHARING OF REVENUE

MARKETING: ISSUE OF LICENSE & SELLING TECHMARKETING: ISSUE OF LICENSE & SELLING TECH

APPLICATION: ALL RCC CONSTRUCTIONS APPLICATION: ALL RCC CONSTRUCTIONS A

: ALL WOODEN CONSTRUCTIONS : ALL WOODEN CONSTRUCTIONS

Page 7: NEW CONSTRUCTION TECHNOLOGY

SUPER FAST CONSTRUCTION

A revolution in construction

industry is waiting to happen which will turn all present construction techniques upside down and obsolete

Page 8: NEW CONSTRUCTION TECHNOLOGY

DISPLAY OF TECHNOLOGY

Page 9: NEW CONSTRUCTION TECHNOLOGY

DISPLAY OF TECHNOLOGY. IF IT IS OK FOR ONE UNIT IS OK FOR MULTIPLE UNITS

Page 10: NEW CONSTRUCTION TECHNOLOGY

DISPLAY OF TECHNOLOGY IF IT IS OK FOR ONE UNIT IT IS SAME FOR MUTIPLE UNITS

Page 11: NEW CONSTRUCTION TECHNOLOGY

EVEN FLOATING R.C.C. CONSTRUCTIONS OF ALL KINDS CAN BE CREATED IN WATER AS WELL

Page 12: NEW CONSTRUCTION TECHNOLOGY

POSSIBLE TO CREATE FLOATING R.C.C PLATFORMS AT LEAST COST

Page 13: NEW CONSTRUCTION TECHNOLOGY

POSSIBLE TO CREATE FLOATING R.C.C PORTS AT LEAST COST WITH OUT REQUIREMENT OF BACK FILLIG

Page 14: NEW CONSTRUCTION TECHNOLOGY

LOW COST HOUSING IN A SINGLE DAY POSSIBLE

Page 15: NEW CONSTRUCTION TECHNOLOGY

LOW COST HOUSE CONSTRUCTED IN 8 HOURS

Page 16: NEW CONSTRUCTION TECHNOLOGY

PRACTICAL DEMONSTRATION OF LOW COST HOUSE IN JUNE 2010 IN ODISH STATE

Page 17: NEW CONSTRUCTION TECHNOLOGY

POSSIBLE TO CONSTRUCT R.C.C. STORAGE DOMES IN 7 DAYS

Page 18: NEW CONSTRUCTION TECHNOLOGY

DEMOSTRATION OF TECHNOLOGY CAN ALSO BE MADE ON DEMAND

TECHNOLOGY HAS BEEN PRACTICALLY DEMONSTERATED BUT CAN BE INSTANTLY DEMONSTRATED TO WILLING PARTENERS WHO WANT TO MARKET THE TECHNOLOGY GLOBALLY WHICH HAS CAPACITY TO CHANGE THE CONSTRUCTION SECTOR FOR ALL TIMES TO COME IN TERMS OF COST AND TIME & AT THE SAME TIME BRING BILLIONS OF DOLLARS FROM SALE OF TECHNOLOGY

Page 19: NEW CONSTRUCTION TECHNOLOGY

EXPERIENCE IN CONSTRUCTION SECTOR

As a builder, Suresh Chawla interfaced mechanical engineering with civil engineering to complete numerous projects at fastest speed.

Soon he became most favored class 1 contractor. Having the surprising energy level and desire to produce

fast results, he identified Exhibition Ground in Delhi where emergency works were the order of the day and International and domestic Exhibitions are held on regular basis. Full profile can be seen by visiting web site ---presentations at right top under head (projects executed) some of the mentionable projects are provide here after

 

Page 20: NEW CONSTRUCTION TECHNOLOGY

EXPERIENCE IN CONSTRUCTION

Civil and interiors of National Museum Delhi 90 days Civil and interiors of Delhi High court 90 days Civil and Interiors, Hotel Vasant continental Delhi 70 days

Dome type Cinema Theatre50 ft high,70ft Dia including interiors exteriors at APPU GHAR Delhi                 6 Days(FASTEST BUILDING EVER MADEANY WHERE IN THE WORLD)

First Amusement Park of India in Delhi (APPU GHAR)                          46 Days

Setting up of 11 amusement parks in various cities of India in 18 monthsOr on an average for each park          45 days each

Page 21: NEW CONSTRUCTION TECHNOLOGY

Bihar Pavilion  3 storey building of approx. 12,000 sq ft area right from foundation to exteriors to interiors etc complete at Pragati Maidan-Delhi                              40 days

UP Pavilion  5 storey building of approx 20,000 sq ft area right from foundation to exteriors To interiors etc complete at Pragati Maidan-Delhi                          90 days

Construction of 12 buildings in engineering college in Raya choti (Andhra Pradesh) 180 days

Construction of 5 floor school building Yamuna nagar(Haryana) 42 days

Page 22: NEW CONSTRUCTION TECHNOLOGY

TECHNOLOGY

Proposed Construction

technology is using the same materials in a different process and IS NOT A PREFAB. It is cast at site in RCC using all existing construction codes and structural designs.

Page 23: NEW CONSTRUCTION TECHNOLOGY

APPLICATIONS

THIS TECHNOLOGY MAKES IT POSSIBLE TO

CONSTRUCT PERSONALIZED HOUSES, BUILDINGS FLY OVERS, BRIDGES, DAMS, HYDEL PROJECTS FOOTPATHS, DRAINAGES, SEWAGE & MAN HOLES ETC. WATER STORAGE TANKS AND TREATMENT PLANTS NUCLEAR PLANTS STRUCTURES FOR ELEAVTED MASS TRANSPORT

SYSTEMS ALL KINDS OF RCC CONSTRUCTIONS IN SHORTEST

POSSIBLE TIME AT ALMOST 25% LESS COST THE TECHNOLOGY MAKES IT POSSIBLE TO CONSTUCT

EVEN WOODEN HOUSES IN SHORTEST POSSIBLE TIME WHILE FOLLOWING ALL CODES OF CONSTRUCTIONS OF DIFFERENT REGIONS APPLICABLE AS IN CASE OF USA AND ELSEWHEE IN THE WOLRD

Page 24: NEW CONSTRUCTION TECHNOLOGY

ADVANTAGES

Your Dream Houses, Multi-Story Buildings, Bridges, Flyovers and other Civil Structures made as per designs of your Architects, Structural Designers &Consultants in shortest possible time frame at lowest cost & with no cost over runs. Technology offers freedom to construct many floors at one time.

Don’t need to put up with Carpenters, Masons, Plumbers, Electricians, Workers and even Supervisors anymore.

More Earthquake resistant, longer life span constructions than brick work constructions which have 35 years of life where as R.C.C. Constructions have 100 years of life span at less cost as compared to present technologies.

No mass construction or similar designs as in prefabricated buildings.

The word delay for Mega Projects planned by Governments World wide will become “Past Tense” and cost over runs because of inflation and increase in cost of basic materials will become rare and projects planned by Governments will meet required “Schedules in Cost & Time Frames”

Page 25: NEW CONSTRUCTION TECHNOLOGY

ADVANTAGES OF USING THIS TECHNOLOGY

Lot of companies will benefit from this technology like Steel & Cement Manufacturers, Truck Mounted Concrete Pump Manufacturers, Cement Concrete Mixing Plant Manufacturers, Batching Plant Manufacturers and Building Material Manufacturers etc. due to sudden spurt in demand for basic materials and machinery once technology is made public.

Corporate will latch on to the technology to convert construction sector in to an industry & provide constructions on web sites & through their net work of work shops around the world to provide machine finished constructions & provide a respect to the sector by providing their trade name to Constructions. Corporate will not only provide their names to the trade but Technology will open one more opening for Architects Structural Designers and Consultants to provide innovative designs to Corporate who will conduct competitions to extract best designs and constructions world wide.

Companies taking long time to construct wooden houses in USA will benefit in time cost, labor and cost over runs by using our technology which is suitable for wooden constructions as well.

Page 26: NEW CONSTRUCTION TECHNOLOGY

OBJECTIVE

To limit time required for Reinforcement binding Scaffolding Door window frames fixing Concealed Conduits Electric boxes GI Pipes CI Pipes Rainwater Pipes TrapsTo ZERO

Page 27: NEW CONSTRUCTION TECHNOLOGY

TIME FRAME TECHNOLOGY OFFERS FOR VARIOUS KINDS OF CONSTRUCTIONS

EXAMPLE 2Fly- OverDay zero- Order For fly-Over placed,

upper layer of ground clearing startsDay -15 Ground prepared, PCC CastDay -20 basic work complete, Concrete casting begins Day-22 Beams, slabs work starts Day -30-40 over fly over ready for Traffic

Page 28: NEW CONSTRUCTION TECHNOLOGY

TIME FRAME TECHNOLOGY OFFERS FOR VARIOUS KINDS OF CONSTRUCTIONS

EXAMPLE 3Columns for Elevated Transport

Day Zero- Order placed for all Columns

Digging starts

Day -15 - Digging complete, PCC in Position

Day-16 - Concrete casting starts for as

many Columns as, the capacity of

Truck mounted Concreting Pumps

Page 29: NEW CONSTRUCTION TECHNOLOGY

TECHNOLOGY TURNS TABLES

* The advent of this technology will make present day method of construction redundant and obsolete

*It converts the most tedious method of constructions to most simplest act on this planet.

Page 30: NEW CONSTRUCTION TECHNOLOGY

OPTIONS ON INTERNET

Now multinational companies

engaged in development of software can also sell houses, buildings and all kinds of constructions online. The new technology opens one more sector for multinational companies not only for RCC constructions but wooden buildings as made in USA taking long time for each house to all such constructions world wide.

Page 31: NEW CONSTRUCTION TECHNOLOGY

PRESENT CONSTRUCTION CYCLE DIAGRAM

WALLS PLASTERED AGAIN

WALLS PLASTERED AGAIN

ELECTRICAL & PLUMBING WORK

STARTS

ELECTRICAL & PLUMBING WORK

STARTS

SHUTTERING &

SCAFFOLDING

SHUTTERING &

SCAFFOLDING

REINFORCEMENT BOUND TO EXTENDED

STEEL MEMBER

REINFORCEMENT BOUND TO EXTENDED

STEEL MEMBER

DIGGING CONSTRUCTION METHODS

PRESENT TECHNOLOGY

REINFORCEMENT BOUND AT SITE

REINFORCEMENT BOUND AT SITE

WALLS ERrECTED

WALLS ERrECTED

FOUNDATION CAST

FOUNDATION CASTSHUTTERING

& SCAFFOLDING

SHUTTERING &

SCAFFOLDING

Page 32: NEW CONSTRUCTION TECHNOLOGY

SUPER FAST CONSTRUCTION Progress Diagram

•Concreting starts once clearances from inspectors is

obtained.• Basic structure with doors,

windows, tiles, stone cladding i/c concealed water

pipes, electrical wiring & conduits etc will be handed

over by next day.

•Concreting starts once clearances from inspectors is

obtained.• Basic structure with doors,

windows, tiles, stone cladding i/c concealed water

pipes, electrical wiring & conduits etc will be handed

over by next day.

• Once ready with digging, construction team will reach with basic infrastructure,

which can be inspected by architect,

electrical, plumbing and other inspectors

• Once ready with digging, construction team will reach with basic infrastructure,

which can be inspected by architect,

electrical, plumbing and other inspectors

• • Place the order with

workshop who has license to undertake this process of

construction• Provide structural,

electrical, plumbing architectural drawings

• Start digging at your site

• • Place the order with

workshop who has license to undertake this process of

construction• Provide structural,

electrical, plumbing architectural drawings

• Start digging at your site

STEP 1STEP 1 STEP 2STEP 2STEP 3STEP 3

Page 33: NEW CONSTRUCTION TECHNOLOGY

WHERE CONSTRUCTIONS WILL BE BUILT NOW

NOT ONLY HOUSES BUT ALL KINDS OF RCC CONSTRUCTIONS FROM NOW ON WILL BE CARRIED OUT IN SMALL AND BIG WORK SHOPS WHO WILL GET LICENSES FROM US OR OUR ASSOCIATE MARKETING COMPANY TO BUILD ALL KINDS OF CONSTRUCTIONS , BE IT FLY OVERS, BRIDGES, STRUCTURES FOR MASS TRANSPORT, WOODEN HOUSING SYSTEMS,DAMS, WATER STORAGE TANKS,NUCLEAR PLANTS ETC IN SHORTEST POSSIBLE TIME AT LOWEST COST AND WITH LEAST LABOR FORCE.

Page 34: NEW CONSTRUCTION TECHNOLOGY

COMPARISON OF COST BETWEEN PRESENT AND PROPOSED TECHNOLOGY

Context : India

ASSUMPTIONS

Basis for rates in market as on 1/05/11 CONSIDERING COSTS 1:2:4 (in INR)

CEMENT CONCRETE/cum 4500 STEEL/ton 40000 Bricks (1000) 3000 Building materials current prices Normal building 3 bedroom, 3 stories Cost comparison up to basic

structure

Page 35: NEW CONSTRUCTION TECHNOLOGY

COMPARISON OF COST BETWEEN PRESENT AND PROPOSED TECHNOLOGY

PRESENT TECHNOLOGYNORMAL CONSTRUCTIONS(Basic structure)A normal construction up to basic structure, 3 stories, involves:

A) Basic Materials @ Rs 550per sq ft B) Labor @ Rs 150 per sq

ft C) Supervision, over heads @ Rs 50 per sq

ft -------------------------------- TOTAL Rs 750 per sq ft D) Cost overruns 10-15% Considering 12 months ( normal time ) Rs 80

average -------------------------- COST ESTIMATES Rs 830 per sq ft

Page 36: NEW CONSTRUCTION TECHNOLOGY

COMPARISON OF COST BETWEEN PRESENT AND PROPOSED TECHNOLOGY

PROPOSED TECHNOLOGYNORMAL COSTRUCTION A) basic materials Rs 550 B) labor and supervision Rs 60

------------------------- Cost Rs 610 per sq ft

cost over runs considering max 20 days required up to three stories basic structure nil COST ESTIMATES Rs 610 per sq ft

Saving = Rs 830-Rs 610 =Rs 220/sft or 36%

Page 37: NEW CONSTRUCTION TECHNOLOGY

ANA LYSIS OF SAVINGS FROM PROPOSED TECHNOLOGY

Following factors result in savings for proposed technology as compared to present technology

It is only labor , supervision and cost over runs which cause difference in costs.

The more the time the more labor, supervision and cost over run

The more the activities the more the labor cost

PRESENT TECHNOLOGY A) Labor 27% B) supervision ,overheads 10% C) Cost overrun (average) 11% ------------------------------------ TOTAL 48%

Page 38: NEW CONSTRUCTION TECHNOLOGY

SAVINGS FROM PROPOSED TECHNOLOGY

PROPOSED TECHNOLOGY A) Labor cost due to less activities 9% B) Supervision, over head savings 3% c) Cost overrun due to less time nil

--------------------- TOTAL 12%

SAVING 48-12 36%

THERE WILL BE FURTHER SAVING BECAUSE NO PLASTER IS REQUIRED ON CONCRETE WALLS

THERE WILL BE MORE SAVING BECAUSE OF LESS THICKNESS REQUIRED FOR

R.C.C. WALLS AS COMPARED TO BRICK WALLS

THESE FACTORS HAVE NOT BEEN CONSIDERED AT THIS STAGE.

Page 39: NEW CONSTRUCTION TECHNOLOGY

COMPARISON OF COST BETWEEN PRESENT AND PROPOSED TECHNOLOGY

COST SAVINGS 36% SAVING IN OVERALL COST OFCONSTRUCTIONS RESULTING FROM

^ labor ^ supervision ^ cost overrun ^ no plaster reqd less thick ness of walls rqd TIME SAVING 500 %

Page 40: NEW CONSTRUCTION TECHNOLOGY

3-D Pie Chart

Supervision Saving 10%

Cost overrun saving 11%

Time savings-500%

Labor&No plasterSaving -27%

Page 41: NEW CONSTRUCTION TECHNOLOGY

PROJECTED COST SAVINGS FOR THE CONSTRUCTION INDUSTRY WOLDWIDE (statistics for year 2010)

ASSUMPTIONS: 85 % of cement produced in the world goes for new

constructions 15% goes for repairs 90% of cement used for new constructions is used for

R.C.C. 50% of structural Steel being used at present world wide

as construction material for buildings, bridges and other civil structures for faster Construction at 30% higher cost than RCC will shift to RCC ,once our technology is released ( because of cost and time reduction)

Total consumption of cement for year 2010 is ( 3294 million Tones)

Page 42: NEW CONSTRUCTION TECHNOLOGY

PROJECTED COST SAVINGS FOR THE CONSTRUCTION INDUSTRY WOLDWIDE

Total consumption of Steel for year 2010 world wide as 1257 million tones

Steel consumption for civil works as 50% of total consumption will be 628 million tones or say 600 million tones

Considering 120 Million tones of steel used at present as building materials at 30% higher cost for constructions will shift to RCC once our technology is made public

Considering cost of cement as 40% of cost of RCC constructions For mix of 1:2:4 (average mix) @ Rs 4500/cum (US$100 /cum) Once our technology is made public, the use of brick work, block &stone work etc will become obsolete (because of cost, time,

labor reduction & no requirement of plaster) Considering 5% increase in volumes of construction every year till Year 2020

Page 43: NEW CONSTRUCTION TECHNOLOGY

COST OF CONSTRUCTIONS WORLDWIDE (using costs in Indian rupee and converting in Dollar Terms)

(Cement prices have increased considerably since 2004)

CEMENT, CONCRETE, COARSE SAND + LABOR Consumption of cement in year 2010 3294 million tones say 3200 million tones or 3200000000000 kg CONSIDERING 6.4 BAGS or 320kg of cement will produce 1 cu.m of R.C.C. =3200000000000/320

: TOTAL CONCRETE CU.M 10000000000 cu m Cost of constructions 10000000000 cu mtr x Rs 4500 per cum Rs 45000000000000 or 4500000 crores Or (considering Rs 4500 crores as US$1 Billion 4500000 /4500 =US$1000 Billion Taking 75% for new constructions the cost of R.C.C =US$750 Billion

Total cost of RCC world wide = US$ Billion 500 (A)

Page 44: NEW CONSTRUCTION TECHNOLOGY

COST OF CONSTRUCTIONS WORLDWIDE (using costs in Indian rupee and converting in Dollar Terms)

STEEL CONSUMPTION in RCC work Steel prices have increase dramatically in last 7 years from Rs 16 per kg to Rs

40 per kg now for plain and twisted bars used in RCC Any project started five years before and not completed till now has seen

100% increase in steel prices. Time factor plays a very vital role in construction industry. Here under we are considering only normal saving while taking consumption of

average steel consumption. 10000000000 cum of RCC @60 Kg Per cum/average= 600000000000 kg 0r 50% of total world consumtion = 600 million tones Cost of steel used taking basic cost at Rs 40000 per tone + Rs 2000 per tones as labor + Rs 1000 per tone as wastage etc Cost of steel used =600000000 tones x Rs 43000/tone= Rs 25800000000000

or2580000cr/4500cr/billion Or US $Billion 573 Say US$570 billion Taking 75% as new constructions the cost of steel used world wide will be

US$ 427.5 billion or say US$ 430 Billion (B)

Page 45: NEW CONSTRUCTION TECHNOLOGY

COST OF CONSTRUCTIONS WORLDWIDE (using costs in Indian rupee and converting in Dollar Terms)

FORM WORK AND OTHER COSTS FOR RCC

Taking 10% as cost of form work, over

head etc COST OF FORM WORK OVER HEAD=750+430 =1180/10 US$ 118 BILLION Say US$ 120 BILLION (C)

Page 46: NEW CONSTRUCTION TECHNOLOGY

SAVING FOR PRESENT RCC CONSTRUCTIONS WORLDWIDE (using costs in Indian rupee and converting in Dollar Terms)

D) SAVING FOR RCC CONSTRUCTIONS 35%

of (A+B+C+D) or

Of US$ 750 +430+120 = US$ Billion 1300

Saving world wide=

36%of 1300Billion = US$468 Billion

Page 47: NEW CONSTRUCTION TECHNOLOGY

TOTAL SAVING TILL 2020WITH 5% INCREASE YEAR AFTER YEAR

SAVING FOR YEAR 10-11 US $ Billion 468 11-12 US $ Billion 490 12-13 US $ Billion 515 13-14 US $ Billion 540 14-15 US $ Billion 567 15-16 US $ Billion 600 16-17 US $ Billion 630 17-18 US $ Billion 660 18-19 US $ Billion 693 19-20 US $ Billion 726

-

Page 48: NEW CONSTRUCTION TECHNOLOGY

MARKETING STRATEGY SUGGESTED

First of all we target big builders of all countries to sell the technology as well as to issue licenses to use the technology to get big chunk of money to begin with.

Second target could be one agency for each city of the world who could be made sole distributor for each city who in turn can appoint sub distributors for each locality to issue licenses to small workshop.

It will be for that distributor to monitor violations as fixed return can be fixed on each distributor.

For villages, we can fix district wise distributors for them to take care of each village or town in that district

Page 49: NEW CONSTRUCTION TECHNOLOGY

Marketing Diagram

PROPOSED MARKETING STRATEGY

Purchase/sale Of technology Sole

distributorshipIssue of licenses

Monitor piracy

Page 50: NEW CONSTRUCTION TECHNOLOGY

BENEFITS TO ASSOCIATING COMPANY

There will be savings in construction cost to Company associating, if the company is in construction business

Company Associating with us will issue licenses for a license fee for the use of this technology

Considering the size of construction business the associating company can generate Billions by marketing new construction technology and issuing licenses

Page 51: NEW CONSTRUCTION TECHNOLOGY

WHAT WE ARE LOOKING FROM YOU

We are looking for association with a company who is willing to apply and/or carry out marketing of our new Construction Technology and also give out licenses world wide on a suitable financial model

Page 52: NEW CONSTRUCTION TECHNOLOGY

CONTACT

SURESH CHAWLA B-1/411 JANAK PURI NEW DELHI-11005891-11-29215758, 25503209 O9350248154,0 9810868151FAX 91-11-25522933 EMAIL : [email protected] www.sureshchawla.com