New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring...

53
2013 Partnering Conference New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 September 10, 2013

Transcript of New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring...

Page 1: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

2013 Partnering Conference

New Bridges Over Lake Barkley and Kentucky Lake

US 68/Ky 80

September 10, 2013

Page 2: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

US68/KY80 Corridor

September 10, 2013 2

Completed

In Design

Acquiring R/W

Acquiring R/W

Completed Potential D/B

Page 3: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Design Team

September 10, 2013 3

• KYTC, District 1 • Baker

• Project Management • Arch Design

• Palmer • Approach Span Design • Roadway Design

• Terracon • Geotechnical

• Specialty Firms • Minority Firms

Page 4: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

4

Bridge Sites

Site Map

September 10, 2013 September 10 2013

Page 5: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Kentucky Lake

5 September 10, 2013

Page 6: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Lake Barkley

6 September 10, 2013

Page 7: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

FONSI - 2006

September 10, 2013 7

Purpose and Need

• Address Bridge Deficiencies

• Address Roadway

Deficiencies Lane Widths Clear Zones Sharp Curves Steep Grades Sight Distances

Page 8: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Project Alignment

N

N

Kentucky Lake

Lake Barkley

Eggners Ferry Bridge

Proposed Alignment

Proposed Alignment

Lawrence Memorial Bridge

8 September 10, 2013

Page 9: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Navigational Clearance

Kentucky Lake (Looking Downstream)

Lake Barkley (Looking Upstream)

Navigation Clearance Window

Navigation Clearance Window

• 502’ Minimum Horizontal Clearance

• 60’ Minimum Vertical Clearance

9 September 10, 2013

Page 10: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Kentucky Lake (Looking East)

Lake Barkley (Looking East)

FONSI Bridge Cross Section

10

12'-0"SHOULDER

12'-0"SHOULDER

44'-9" 57'-9"

2 LANES @ 12'-0" = 24'-0"

CL US 68

2%2%

ORIGINAL TYPICAL SECTION(Looking East)

12'-0"SIDEWALK

ANDBIKE PATH

2 LANES @ 12'-0" = 24'-0"6'-0"SHLD.

6'-0"SHLD.

86'-6"

102'-6"

EXISTING TYPICAL SECTION(Looking East)

2 LANES @ 10'-0" = 20'-0"

23'-0"

September 10, 2013

Page 11: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Bridge Type Selection Process

11

Refine Alternatives

CAC Input

Final Alternatives

Public Meeting

Bridge Type

Round 1:

Preliminary Concepts

Round 2:

Preliminary Alternatives

Round 3:

Final Alternatives

Public Meeting Concept

Data CAC Input

Draft Concepts

KYTC Final

Concepts

Alternatives Develop

Draft Alternatives

CAC Input

Public Meeting KYTC

Refine Draft

Alternatives

KYTC

September 10, 2013

Page 12: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Citizens Advisory Council

12

16 Person Committee

• 4 Elected Officials • 2 Industry Representatives • 3 Chamber of Commerce, Tourism Representatives • 3 Planning, Development Agency Representatives • 2 Friends of L.B.L. Representatives • 1 Ky. Western Waterland Representative • 1 US Forestry Service Representative

Counties Represented Calloway Marshall Trigg

September 10, 2013

Page 13: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Round 3 Results

13

Preliminary Costs 102’-6” wide bridge

Option Kentucky Lake Lake Barkley (2008$)

Alternative 1 Diamond Tower Cable Stay

$ 240 M $220 M $ 460 M

Alternative 2 Single Tower Cable Stay

$ 220 M $ 210 M $ 430 M

Alternative 3 Girder

$ 200 M $ 190 M $ 390 M

Alternative 4 Median Tower Cable Stay

$ 250 M $ 240 M $ 490 M

Alternative 1 Alternative 3 Alternative 2 Alternative 4

Includes 20% Contingency September 10, 2013

Page 14: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Bridge Type Selection

14

KYTC Practical Solutions Initiative

• Consider Lower Cost Bridge Types • Consider Reduced Bridge Width • Bridge Type - Be Aesthetically Pleasing • Stay on Schedule

September 10, 2013

Page 15: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Alternative 5 Vertical Rib Tied Arch

15 August 11, 2009

Page 16: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Alternative 6 Basket-Handle Tied Arch

16 August 11, 2009

Page 17: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Bridge Cross Section Reduced

12'-0"SHOULDER

12'-0"SHOULDER2 LANES @ 12'-0" = 24'-0"

C US 68

2%2%

ORIGINAL TYPICAL SECTION(Looking East)

12'-0"SIDEWALK

ANDBIKE PATH

2 LANES @ 12'-0" = 24'-0"6'-0"SHLD.

6'-0"SHLD.

102'-6"

4'-0"SHLD

4'-0"SHLD2 LANES @ 11'-0" = 22'-0"

C US 68

2%

2%

REDUCED SECTION(Looking East)

8'-0"SIDEWALK

ANDBIKE PATH

2 LANES @ 11'-0" = 22'-0"4'-0"SHLD.

4'-0"SHLD.

74'-6"

2%

17 September 10, 2013

Page 18: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Preliminary Costs Summary

18

Option Kentucky

Lake Lake

Barkley Total

(2008$) Alternative 1 Diamond Tower Cable Stay

$ 190 M $ 180 M $ 370 M

Alternative 2 Single Tower Cable Stay

$ 180 M $ 170 M $ 350 M

Alternative 3 Girder Bridge

$ 160 M $ 150 M $ 310 M

Alternative 4 Median Tower Cable Stay

$ 200 M $ 190 M $ 390 M

Alternative 5 Vertical Rib Tied Arch

$ 160 M $ 160M $ 320 M

Alternative 6 Basket-Handle Tied Arch

$ 160 M $ 160 M $ 320 M

74’-6” wide bridge

Page 19: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Bridge Type Selection

19

Preliminary Costs Include

•Environmental Commitments •6,200 Ft Roadway Approaches •11,700 Ft Ped/Bikeway

•Shore to Shore Bridge

NOW MAXIMUM USE OF CAUSEWAYS

Page 20: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Basket-Handle Arch

20 September 10, 2013

Page 21: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

KY Lake

21

Project Lengths

• 9080 Ft Total • 1400 Ft West Causeway • 1000 Ft East Causeway

• 580 Ft Lagoon Bridge • 3611 Ft Lake Bridge

• 1410 Ft West Approach • 550 Ft Arch • 1651 Ft East Approach

September 10, 2013

Page 22: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

KY Lake Status

22 September 10, 2013

Advance Construction Letting

• Lagoon Bridge Construction • Causeway Fill Material • Pile Load Tests

Final Design

• Basket-Handle Arch • Approach Spans • Final Paving & Multi-Use Paths

December 17, 2013 Letting

Page 23: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Lake Barkley

23

Project Lengths

• 6050 Ft Total • 650 Ft West Causeway • 1000 Ft East Causeway

• 3805 Ft Lake Bridge • 1806 Ft West Approach • 550 Ft Arch • 1449 Ft East Approach

September 10, 2013

Page 24: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Lake Barkley Status

24

TS&L/Prel. Engineering Begun

Subsurface Exploration

• Main Span Piers Drilled • Approach Span Piers – Spring 2014

December 2014 Letting

September 10, 2013

Page 25: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

New Madrid Fault Zone

September 10, 2013 25

Project Site

New Madrid, MO

Ohio River Mississippi River

Tennessee River

Cumberland River

Mississippi River

80 Miles

Page 26: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

New Madrid Earthquake

26 September 10, 2013

It Was A BIG One !

• Dec. 16, 1811, M 7.7 • Jan. 23, 1812, M 7.5 • Feb. 7, 1812, M 7.7 • 1800 Aftershocks through Mar. 1812 • Total of 10 of M 6 or Greater

Page 27: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Seismic – KY Lake

27 September 10, 2013

Criteria and Objectives

• AASHTO LRFD Seismic Design • “Essential” Bridge Classification • 1000 Year Return Period • Elastic During Seismic Event • Remain Open After Seismic Event • Minor Repairs After Seismic Event

Page 28: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Seismic – KY Lake

April 3, 2009 28

The Hula Dancer

Page 29: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

29

Seismic – KY Lake

Solutions

September 10, 2013

Corner Bearings (4)

• Seismic Dampers • Isolation Bearings

Middle Bearings (2)

Springs

Page 30: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

30

Seismic – KY Lake

Solutions

• Modular Exp. Joints • 18” Long. Movement • 9” Lat. Movement

September 10, 2013

Page 31: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Advance Construction Contract

31

Construction Letting

• Initial Letting – November 2012 • 1 Bid • Above Engineer’s Estimate • Pile Load Testing Concerns

• 2nd Letting – February 22, 2013 • 2 Bids • Jim Smith Contracting Co. LLC • $24,212,491.14 • 420 Calendar Days Total • Below Engineer’s Estimate

• Award Date – March 01, 2013 • Notice to Proceed – April 18, 2013

September 10, 2013

Page 32: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

32

Advance Construction Contract

Activities

• Causeway Fill • Construct Lagoon Bridge • Pile Load Testing

September 10, 2013

Page 33: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Causeway Section

33

3:1 Slopes

Max Flood, El. 375

Granular Embankment

El. 363

Summer Pool, El. 359 Winter Pool, El. 354

Existing Causeway

Stone Rip Rap

September 10, 2013

Page 34: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Causeway Material

34

QUANTITIES

Granular Embankment Embankment in Place 165,400 CY 172,500 CY

September 10, 2013

Page 35: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Causeway Construction

35 September 10, 2013

Page 36: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Lagoon Bridge

37

Lagoon

580’ Lagoon Bridge

September 10, 2013

Page 37: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Lagoon Bridge

38

ADD Plan/Elevation

September 10, 2013

Page 38: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

39

4'-0"SHLD

4'-0"SHLD2 LANES @ 11'-0" = 22'-0"

CL US 68

2%

TYPICAL SECTION(Looking East)

2 LANES @ 11'-0" = 22'-0"4'-0"SHLD.

4'-0"SHLD.

65'-6"

2%

Lagoon Bridge

September 10, 2013

Page 39: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Lagoon Bridge

40 September 10, 2013

Page 40: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Advance Construction

April 3, 2009 41

Page 41: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

42

Lagoon

September 10, 2013

The Lagoon

Page 42: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

Pile Load Testing

43

Purpose

• Confirm Geot. Parameters • Test Drivability • Refine Ground Response • Test Pile Capacity

September 10, 2013

Page 43: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

44

Pile Load Testing

Test Requirements

• Vert. & Lateral • Dynamic Pile Load • Statnamic Load • Static Load • Fully Instrumented Piles

• Soil Resistance • Depth Response

September 10, 2013

Page 44: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

45

Test Piles • 48” Piles • 72” Piles

• 1.5” Wall • 2” Wall

• Near Causeway • Deep Water

• Open End • Constrictor Plate

Pile Load Testing

September 10, 2013

Page 45: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

46

Pile Load Testing

Early Results • Easy to Drive • Constrictor Plate Appears Effective • Tip Resistance May be Achieved at Higher Elev. • Thinner Walls May be Usable

September 10, 2013

Page 46: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

47

KY Lake Multi-Use Path

Path Onto Bridge

Path Along Water’s Edge

Parking

Kenlake SRP

Lagoon Bridge

WEST APPROACH

US68/KY80

Page 47: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

48

KY Lake Multi-Use Path

Path Along Water’s Edge

Path Onto Bridge

Path Into LBL

EAST APPROACH

US68/KY80

Page 48: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

49

Lake Barkley Multi-Use Path

Parking

Path Into LBL

Path Along Water’s Edge Under Bridge

Path Onto Bridge

WEST APPROACH

Lake Barkley US68/KY80

Page 49: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

50

Lake Barkley Multi-Use Path

EAST APPROACH

Parking

Path Under Bridge

Path To Water Access

Lake Barkley

Path Onto Bridge

US68/KY80

Page 50: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

KY Lake

April 3, 2009 51

Page 51: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

KY Lake Arch

52 September 10, 2013

Page 52: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

KY Lake Arch

53 September 10, 2013

Page 53: New Bridges Over Lake Barkley and Kentucky Lake US 68/Ky 80 Presentatio… · In Design Acquiring R/W Acquiring R/W Completed Potential D/B . Design Team ... Preliminary Concepts

www.lakebridges.com

54

Project Overview

Public Involvement

Current Construction

September 10, 2013