New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.
-
Upload
tyree-havins -
Category
Documents
-
view
212 -
download
0
Transcript of New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.
![Page 1: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/1.jpg)
New Bresnahan ModelElementary School Project
Neighborhood Meeting
January 11th 2012
![Page 2: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/2.jpg)
The Massachusetts School BuildingAuthority (MSBA)
Authority Established in 2006Funding from 1 cent of the 6.5 cent
MA sales taxResponsible for all School
Construction in the Commonwealth
![Page 3: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/3.jpg)
History of Submitting required information to MSBA
Required to submit Statement of Interest (SOI)
Statement of Interests Submitted for the Bresnahan School and the Nock/Molin School each year since 2007 indicating priority needs
Both SOI’s voted by School Committee and City Council each year
![Page 4: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/4.jpg)
How as Information Submitted to MSBA Generated?
Previous Feasibility Studies performed and reported existing conditions of SchoolsFacilities Study and Asset 1995Feasibility Study 1997Long-Term Elementary Building Needs Committee Report 2002Updated Long-Term Report 2006
![Page 5: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/5.jpg)
Bresnahan Elementary SchoolPriority Overcrowding
33% Of the Classrooms At The Bresnahan School are in Modular Buildings
![Page 6: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/6.jpg)
The Corridor From The Lobby To The Principal’s And Nurse’s Office Is Also Used For Storage And Copying
Bresnahan Elementary SchoolPriority Overcrowding
![Page 7: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/7.jpg)
Storage and Workspace in a Corridor
Bresnahan Elementary SchoolPriority Overcrowding
![Page 8: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/8.jpg)
Occupational Therapy/Physical Therapy Room Cut Into Cafeteria
Bresnahan Elementary SchoolPriority Overcrowding
![Page 9: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/9.jpg)
Bresnahan Elementary School Priority Health and Safety
Exterior Wall of 1995 Modular Building
![Page 10: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/10.jpg)
Roof Leak in 2003 Modular Connector Corridor
Bresnahan Elementary SchoolPriority Health and Safety
![Page 11: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/11.jpg)
“Unwanted” Access Under Modular Building
Bresnahan Elementary SchoolPriority Health and Safety
![Page 12: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/12.jpg)
Worn-out Door Hardware
Bresnahan Elementary SchoolPriority Health and Safety
![Page 13: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/13.jpg)
Fire Doors Are Inadequate And Not Tied Into The Fire Alarm System
Bresnahan Elementary SchoolPriority Health and Safety
![Page 14: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/14.jpg)
Smoke Detectors Exist But No Fire Sprinklers
Bresnahan Elementary SchoolPriority Health and Safety
![Page 15: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/15.jpg)
Student and Staff Bathrooms Are Old And Worn
Bresnahan Elementary SchoolPriority Health and Safety
![Page 16: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/16.jpg)
Single-Pane Metal-Framed Windows With No Thermal Block Are Very Drafty And Inefficient
Bresnahan Elementary SchoolPriority Building Systems
![Page 17: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/17.jpg)
Wooden Frame Gymnasium Windows Are Dilapidated
Bresnahan Elementary SchoolPriority Building Systems
![Page 18: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/18.jpg)
Classroom Unit Ventilators And Other Mechanical Equipment Are From The Original Construction in 1956
Bresnahan Elementary School Priority Building Systems
![Page 19: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/19.jpg)
“Ponding” And Other Problems Plague The Flat Roof Area Of the Building.
Bresnahan Elementary SchoolPriority Building Systems
![Page 20: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/20.jpg)
Bresnahan Has A Partially Functional Antiquated Pneumatic Control
System And Needs A State Of The Art Computer Controlled System
Bresnahan Elementary SchoolPriority Building Systems
![Page 21: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/21.jpg)
With No Central Air Conditioning Window Air Conditioners Are Relied Upon For Cooling Requirements.
Bresnahan Elementary SchoolPriority Building Systems
![Page 22: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/22.jpg)
The Walk-In Refrigerator In The Kitchen Is No Longer Functional
Bresnahan Elementary SchoolPriority Building Systems
![Page 23: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/23.jpg)
Electrical Panels Are Original To the Building And Filled To Capacity.
Providing Power Requirements For Newer Technology Is Difficult.
Bresnahan Elementary SchoolPriority Program Delivery
![Page 24: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/24.jpg)
What Was the Result of This Year’s SOI Submissions?
We Have Been Invited into MSBA’s
Capital Pipeline!
![Page 25: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/25.jpg)
East Fairhaven Elementary
![Page 26: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/26.jpg)
![Page 27: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/27.jpg)
![Page 28: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/28.jpg)
![Page 29: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/29.jpg)
Proposed Site Plan 1/11/12
![Page 30: New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.](https://reader036.fdocuments.in/reader036/viewer/2022081602/5516609b550346c6758b5f7d/html5/thumbnails/30.jpg)
Neighborhood MeetingJanuary 11th 2012
Questions?