New and Modified Work Book Templates
Florida Department of Environmental
Protection
April 26, 2012
Jack RobertsPetroleum Cleanup Section OneBureau of Petroleum Storage Systems
![Page 2: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/2.jpg)
Section A : Packaged Work Scopes
2
![Page 3: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/3.jpg)
3
A-1: Pumping Test or Multi-Phase Pilot Test (In
House)The base hrs have been changed from 12 to 10, kits from 120% to 100%
Excluded permit hrs and NPDES feeCan now task any combination of
whole or partial days (1/10 day)Should be adjusted to nearest 1/10
day actual
![Page 4: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/4.jpg)
4
A-2: Air Sparging And/Or Vapor Extraction Pilot
Test (In-House)Merged prior separate single or
combined templatesChanged base hrs from 14 to 10,
kits from 140% to 100%Excluded permit hoursCan now task any combination of
whole or partial days by 1/10Should be adjusted to nearest 1/10
day actual
![Page 5: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/5.jpg)
A-2: Air Sparging And/Or Vapor Extraction Pilot Test
(In-House)
5
Before After
![Page 6: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/6.jpg)
6
A-3: Monthly O&M VisitCan be used for in house inspection
to evaluate DEP-owned equipment not located at subject property for potential re-use reservation
Do not use for subcontractors
![Page 7: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/7.jpg)
7
A-4, 5, 6: Small Medium & Large RAI Monthly
AllowancesAdded water level measurements
![Page 8: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/8.jpg)
8
Section B: Office Activities, Part I
![Page 9: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/9.jpg)
9
B-1: Proposal PreparationExcluded for LTNAM work orders or
when only task is RAP, RAPMOD or continuation of on-going NAM or PARM
![Page 10: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/10.jpg)
10
B-4: Site Health & Safety Plan
Must be comprehensiveNot allowed more than once per contractor, except in extenuating circumstances
![Page 11: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/11.jpg)
11
B-5: Notice Of Discovery of Contamination Package
Includes copies of existing contamination plume maps
![Page 12: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/12.jpg)
12
Section C : Field Activities
![Page 13: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/13.jpg)
13
Section C : Field ActivitiesC-3 & 4: Drilling Setup• Now 1 & 2 person options with
corresponding 1 or 2 person kit• Changed 2 hrs to 1 hr/person and 20% to
10% kit• Excluded time for on/off site utility
clearance• Does not apply to well abandonment or
DPT, but may apply to drilling with auger attachment only of DPT rig
![Page 14: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/14.jpg)
14
Section C : Field ActivitiesC-5 through 16: SB for Soil Screening or Piezometer Install (all depths) & Single or Double Cased Well Installation Up to 40 ft• Now 1 & 2 person options with
corresponding 1 or 2 person kit
![Page 15: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/15.jpg)
15
Section C : Field ActivitiesC-17 through 22: Single Cased Recovery or Multi-Phase Well Installation/Injection Well Installation/Soil Vapor Extraction Well Installation (all up to 40 ft)• Now 1 & 2 person options with
corresponding 1 or 2 person kit• Added multi-phase wells and injection
wells• Changed MW installation kit to
piezometer or remediation well installation kit
• Excludes TOC survey if applicable• Includes ½ hr for development
![Page 16: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/16.jpg)
Section C : Field Activities
16
Well Install: Single Case/Multi Case/ Recovery/AS/Soil VE < 40’(> 40’ use backup spreadsheet and enter in Section D: Other Field Work)
![Page 17: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/17.jpg)
17
Section C : Field ActivitiesC- 23: Well or Piezometer
Abandonment• One Person• Added 10% modified level D • Added 10% per diem
![Page 18: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/18.jpg)
18
Section C : Field Activities
C-25, 26, 29, 30: Well Sampling with Water Level and Area Survey• Now 1 & 2 person options with
corresponding 1 or 2 person kit
![Page 19: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/19.jpg)
19
C-31 Through 34: Oversight Kits & Per
Diem All may be tasked in any* combination of whole or partial day (1/10 day)• *Per diem requires > 1 consecutive day of
field work, otherwise prorated to 1/10 day Oversight Kit is 2 person soil
assessment kit less per diem (one size fits all)• For field work (includes required sampling
and testing equipment) Oversight Allowance has vehicle and
modified level D for 2 persons (one size fits all) • For use when sampling/testing equipment is
not required
![Page 20: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/20.jpg)
Section C: Field Activities Before After
20
![Page 21: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/21.jpg)
21
Section H: Office Activities, Part II
![Page 22: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/22.jpg)
22
H-1: General/SA ReportChanged 25% to 20% of field work
in sections C & DNot used after SAR approvalReiterate existing $10K cap per
work order
![Page 23: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/23.jpg)
23
H-2: Letter/NPDES ReportThough limited to quarterly,
includes 3 monthly discharge reports on DEP form 62-620.910(10)
![Page 24: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/24.jpg)
24
H-4: O&M Annual ReportMust be signed and sealed by registered P.E.
![Page 25: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/25.jpg)
25
H-7 Through 10: RAP or RAPMOD, All Levels, Full &
Limited ScopeMust be signed and sealed by
registered P.E. No proposal prep allowed if only
scope of work
![Page 26: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/26.jpg)
H-14: Construction Drawings and Specifications
Generally not allowed in conjunction with source removal work orders
26
![Page 27: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/27.jpg)
H-15: Bid Package, Solicitation and Evaluation
This document should be prepared either subsequent to or concurrent with the preparation of construction drawings (used to say prior to)
27
![Page 28: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/28.jpg)
H-19: Long Term Natural Attenuation Plan
For LTNAM only
No proposal prep if only scope of work
28
![Page 29: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/29.jpg)
H-20 & 21: RA Interim and General RA Reports
Use depends on the level of effort
See Template Descriptions in Appendix A.1
See SOP Section 5.8.3 for template report options for SSA during RA Phase
29September 25, 2007
![Page 30: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/30.jpg)
Section H: Office Activities, Part IIBefore After
30
![Page 31: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/31.jpg)
Template Report Options for SSA During RA Phase
Section 5.8.3 – Three template report options • H-20: RA Interim Report – use directly if
sampling 10 or less MWs or installing & sampling 3 or less MWs/borings
• H-21: RA General Report – use equivalent in ‘Other’ report type (H-26) if sampling 10 to 20 MWs or installing & sampling 4 to 10 MWs/borings
• H-17: Soil Source Removal Report – use equivalent in ‘Other’ report type (H-26) if sampling more than 20 MWs or installing & sampling more than 10 MWs/borings
31
![Page 32: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/32.jpg)
Template Equipment Kits (18)
All kits, except In-House RAC, FP Recovery and Oversight split into 1 & 2 person options
Added Oversight Kit (with equipment) and Oversight Allowance (no equipment), excludes per diem, one size covers 1 or 2 persons
Added wash tubs, garbage can/bags, rake, sample labels and step ladder to example expendables list
32
![Page 33: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/33.jpg)
Equipment Rate Schedule: (1 and 2 Person Options)
33
![Page 34: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/34.jpg)
Equipment Rate Schedule: Oversight Kits
34
![Page 35: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/35.jpg)
Equipment Rate Schedule: Added Expendables
35
![Page 36: New and Modified Work Book Templates Florida Department of Environmental Protection April 26, 2012 Jack Roberts Petroleum Cleanup Section One Bureau of.](https://reader036.fdocuments.in/reader036/viewer/2022062620/551b2c6d550346d41a8b4bf5/html5/thumbnails/36.jpg)
SOP Appendix A.1The preapproval template
workbooks, template descriptions, template breakdown, and template equipment kit rate schedules can be found in SOP Appendix A.1