NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.

38
NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005

Transcript of NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.

Page 1: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.

NEESR-VTCRPI Centrifuge Calibration

Da Ha

Sept. 26, 2005

Page 2: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.

Dummy Pipe Setup (Not to scale)

1A 2A 3A

1B 2B 3B

Strain Gages

1B 2B 3B

1A 2A 3A

Ideal Shape:

Real Shape( Exaggerated):

Page 3: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.

Step Loading Tension Test

Loading: 1kg, 2kg, 4kg and 6kg

Page 4: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.

0 500 1000 1500 2000 2500 3000 3500 40000

100

200

300

400

500

600

700Filtered Strain Gage Readings

Time (sec)

Str

ain

Gag

e R

eadi

ngs

(mic

ro s

trai

n)

A1A2A3B1B2B3

Page 5: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.

Tension Test:

• Pre-existing curvature effects recorded strain

• Gages with pre-existing tension creep

• Will use load- strain data to calculate E

Page 6: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.

Cantilever Test #1

Loading Sequence: 224g, 424 g, 224g and 0g

3B 2B 1B

3A 2A 1A

Load

32.75”4” 28.75”

Page 7: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.
Page 8: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.
Page 9: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.
Page 10: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.
Page 11: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.

Cantilever Test #1:

• Inelastic behavior at moderate strain of 0.4%- non-zero strain after loads removed

• Axial strain, although small, not consistent with geometry of load. Modulus in tension different than modulus in compression?

Page 12: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.

Cantilever Test #2

Loading: 124g, 224g and 324g

1A 2A 3A

1B 2B 3B

Load

32.75”4” 28.75”

Page 13: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.
Page 14: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.
Page 15: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.
Page 16: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.
Page 17: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.
Page 18: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.
Page 19: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.

Tension Test w/ Splitbox

No Soil 1G Test

Peak Displacement= 1.1cm

Page 20: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.
Page 21: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.
Page 22: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.

Expected Strain

Page 23: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.
Page 24: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.

No Soil Splitbox Test:

• Difference between measured and expected strain may be due to compliance of end connecters at box wall.

• Small bending strain likely due to pre-existing curvature

Page 25: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.

Centrifuge Dummy [email protected]

6 Strain Gages, 1 malfunctioned at beginning and another malfunctioned @

3.2% strain

Page 26: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.
Page 27: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.
Page 28: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.
Page 29: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.

Dummy Pipe Setup (Not to scale)

1A 2A 3A

1B 2B 3B

Strain Gages

Malfunctioned

Malfunctioned

Page 30: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.
Page 31: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.

Centrifuge Dummy Test:

• End connection acting like pin

• Due to strain gage malfunction cannot calculate axial and bending strains

Page 32: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.

After Test Check:

• Soil Unit Weight = 13.0 kN/m3=> = 33o

Expected Unit Weight = 14.4 kN/m3=> = 37o

• Water Content = 3.0%

Expected Water Content= 4.0%

Page 33: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.

Photos from Dummy Test

Page 34: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.
Page 35: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.
Page 36: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.
Page 37: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.
Page 38: NEESR-VTC RPI Centrifuge Calibration Da Ha Sept. 26, 2005.