NEES-CABER Group Meeting 01/25/08 Research Team at GW Professor Pedro F. Silva Graduate student Linh...

12
NEES-CABER Group Meeting 01/25/08 Research Team at GW Professor Pedro F. Silva Graduate student Linh Nguyen

Transcript of NEES-CABER Group Meeting 01/25/08 Research Team at GW Professor Pedro F. Silva Graduate student Linh...

Page 1: NEES-CABER Group Meeting 01/25/08 Research Team at GW Professor Pedro F. Silva Graduate student Linh Nguyen.

NEES-CABER Group Meeting01/25/08

Research Team at GWProfessor Pedro F. Silva

Graduate student Linh Nguyen

Page 2: NEES-CABER Group Meeting 01/25/08 Research Team at GW Professor Pedro F. Silva Graduate student Linh Nguyen.

Objective

1. Construction options for testing specimens at UIUC

2. Preliminary cost estimate

3. Work progress using shake table at GW

4. Coordination with other teams

Page 3: NEES-CABER Group Meeting 01/25/08 Research Team at GW Professor Pedro F. Silva Graduate student Linh Nguyen.

Construction options• Option 1: All three columns to be built by the

staff at UIUC• Option 2: All three columns to be built by local

contractors with instrumentation to be prepared by GW students

• Option 3: All three columns to be built by local contractors with steel cages for circular portion of these columns and instrumentation are prepared by GW students at GW campus

Page 4: NEES-CABER Group Meeting 01/25/08 Research Team at GW Professor Pedro F. Silva Graduate student Linh Nguyen.

Specimen size used for cost estimate purposes only

Information needed from UIUC (discuss it later)1. Sizes and reinforcement layout for top and bottom blocks

Page 5: NEES-CABER Group Meeting 01/25/08 Research Team at GW Professor Pedro F. Silva Graduate student Linh Nguyen.

Work to be done by contractors and research team in option 2

• Contractor will– furnish 6000 (?) psi concrete and reinforcing bars

for the base, the cap, and the circular portion of all three columns.

– Assemble reinforcing cages– provide formwork– cast all three units– transport the completed units to UIUC.

• Project team will provide and install instrumentation on reinforcement.

Page 6: NEES-CABER Group Meeting 01/25/08 Research Team at GW Professor Pedro F. Silva Graduate student Linh Nguyen.

Work to be done by contractors and research team in option 3

• Contractor will– furnish 6000 (?) psi concrete reinforcing bars for

the base and the cap only of all three columns. – Assemble reinforcing cages for stub blocks– provide formwork– cast all three units– Transport the completed units to UIUC

• At GWU Project team will – assemble column reinforcing cages– install instrumentation on reinforcement

Page 7: NEES-CABER Group Meeting 01/25/08 Research Team at GW Professor Pedro F. Silva Graduate student Linh Nguyen.

Contractors participating

There are three contractors:

- Egyptian Concrete Co. (EPC)

- A-VAN-STEP Concrete (AVS)

- Atlanticwood (AW)

Page 8: NEES-CABER Group Meeting 01/25/08 Research Team at GW Professor Pedro F. Silva Graduate student Linh Nguyen.

Cost estimate for each options

Page 9: NEES-CABER Group Meeting 01/25/08 Research Team at GW Professor Pedro F. Silva Graduate student Linh Nguyen.

Shake table at GW- There have been a delay due to training

availability from support contractor.

- Two team members have been trained since January 18th, 2008

- Bridge structures have been assembled in the lab

- Testing using shake table will be carried out intensively in February

Page 10: NEES-CABER Group Meeting 01/25/08 Research Team at GW Professor Pedro F. Silva Graduate student Linh Nguyen.

Shake table at GW

Page 11: NEES-CABER Group Meeting 01/25/08 Research Team at GW Professor Pedro F. Silva Graduate student Linh Nguyen.

Coordination with other teams1. At UIUC, costs that need to be considered after the three columns are delivered to the

lab? I believe that there is some sort of agreement for members using NEES lab facility without charges, is it true?

2. Need to know the column height limitations at UIUC 3. I would like to get information for building the top and bottom stub blocks4. Length requirements for instrumentation cables5. I am assuming that the instrumentation will be the same as the columns already tested

at UMR. Can I also have the instrumentation plan for the columns that are currently being tested at UIUC and UNR. Is this information available at NEES central.

6. I have asked NEESinc for an account with NEEScentral.7. The time frame available for testing these three columns.8. I would like to arrive at UIUC two days prior to our meeting to have a one on one

discussion and to get familiar better with all the testing needs at UIUC.9. Is there any consideration or suggestion? May I have info of the contact person?10. Professor Belarbi, Dr. Silva told me that there is steel donated to the project. If so, may I

have contact information? How much could it probably be?11. Column size: any considerations (to be discussed in the FEB meeting?) 12. In order to better prepare for this meeting(Feb) and to get good progress I would like to

get information from the columns tested at Reno and UIUC. 13. I have performed bridge system analysis using opensees and I understand that

UIUC/UCLA team has been working intensively on bridge system. May I have some information about your progress and your findings? May I contact your team member? (email or tel.)

14. Earthquake record who will be providing the data file.15. For this chosen earthquake record we will also need to know the levels

Page 12: NEES-CABER Group Meeting 01/25/08 Research Team at GW Professor Pedro F. Silva Graduate student Linh Nguyen.

THANK YOU VERY MUCH !!!!

Questions?