Need for Duct Leakage

download Need for Duct Leakage

of 28

Transcript of Need for Duct Leakage

  • 8/13/2019 Need for Duct Leakage

    1/28

    TESTINGFOR

    DUCT

    LEAKAGE

    Engineered Air Balance Co., Inc.

    Spring, Texas

  • 8/13/2019 Need for Duct Leakage

    2/28

    WhatShouldBeSpecifiedAssociatedAirBalance ASHRAE 2012DuctConstructionChapter

    TypeofSystem Minimum

    Test

    Maximum

    Allowable

    System

    Condition

    TestPressure1,7

    in.wc(Pa)

    Allowabl

    System

    Pressure , Leakage Leakage

    1.Fractionalhorsepowerfan

    systems;fan

    coils,

    small

    exhaust/supplyfans,andresidential

    0.50WC

    (125 pa)

    2% Operating

    System

    Operating

    Pressure

    5%

    systems

    Construction

    .

    2.Smallsystems;splitDXsystems 1.00WC 2%

    (940l/s),

    and

    residential

    systems

    1 Testpressureshouldnotexceedthepressureratingoftheduct.7Itisrecommendedthatthepressureratingoftheductbeequaltothefanshutoffpressureifthepossibility

    o ans uo ex s se er n sys emsor nsys emsw smo e re ampercon ro .

  • 8/13/2019 Need for Duct Leakage

    3/28

    WhatShouldBeSpecified

    AssociatedAirBalance ASHRAE 2012DuctConstructionChapterounc tan ar ystemsan qu pment an oo

    TypeofSystem Minimum

    TestPressure

    Maximum

    Allowable

    System

    Condition

    TestPressure1,7,in.wc

    Allowable

    System1,7

    Leakage (Pa) Leakage

    3.VAVandCAVboxesand

    associateddownstream

    2

    1.00WC

    (250pa)

    2% Operating

    System

    Not

    Addressed

    4.Singlezone,multizone,

    returnducts,andexhaust

    ducts stems

    2.00WC

    (500pa)

    2% Operating

    System

    Operating

    Pressure

    5%

    Durin 2.0 500 5%

    Construction

    1 Testpressureshouldnotexceedthepressureratingoftheduct.7Itisrecommendedthatthepressureratingoftheductbeequaltothefanshutoffpressureifthepossibilityoffanshutoff

    .

  • 8/13/2019 Need for Duct Leakage

    4/28

    WhatShouldBeSpecified

    AssociatedAirBalanceCouncilAABCStandard ASHRAE 2012DuctConstructionChapterSystemsandEquipmentHandbook

    TypeofSystem Minimum

    Test

    Pressure

    1,7

    Maximum

    Allowable

    Leakage

    System

    Condition

    TestPressure1,7,

    in.wc(Pa)

    Allowable

    System

    Leakage. cons an vo ume uc s

    inchasesandconcealed

    spaces,mainreturnducts

    onVAV8 andCAV8 systems

    .

    (745pa)

    pera ng

    System

    o resse

    During

    Construction

    NotAddressed

    1 Testpressureshouldnotexceedthepressureratingoftheduct.7Itisrecommendedthatthepressureratingoftheductbeequaltothefanshutoffpressureifthe

    possibilityoffanshutoffexistseitherinVAVsystemsorinsystemswithsmoke/firedampercontrol.8

    .

    outlet,thentheboxshouldbeincludedintheupstreamleakagetesting.

  • 8/13/2019 Need for Duct Leakage

    5/28

    WhatShouldBeSpecifiedAssociatedAirBalanceCouncilAABCStandard ASHRAE 2012DuctConstructionChapterSystemsandEquipmentHandbook

    Typeof

    System Minimum

    Test

    Pressure1,7

    Maximum

    Allowable

    Leaka e

    System

    Condition

    TestPressure

    1,7,

    in.wc(Pa)

    Allowable

    System

    Leaka e

    6.SupplyductsforVAV8 and

    CAV

    8

    systemsVAVandCAVterminal

    4.00WC

    (995

    pa)

    1% Operating

    System

    Operating

    Pressure

    5%

    boxestestedwith

    upstreamductwork

    Construction

    4.0 (1000)

    Downstream

    Box: 1.0(250)

    estpressure

    s ou

    not

    excee

    t e

    pressure

    rat ng

    o

    t e

    uct.7Itisrecommendedthatthepressureratingoftheductbeequaltothefanshutoffpressureifthe

    possibilityoffanshutoffexistseitherinVAVsystemsorinsystemswithsmoke/firedampercontrol.8 Itisassumedthattheprimaryairdamperislocatedattheterminalboxinlet. Ifinsteadthisdamperis

    att eterm na oxout et,t ent eterm na oxs ou e nc u e nt eupstream ea agetest ng.

  • 8/13/2019 Need for Duct Leakage

    6/28

    WhatShouldBeSpecified

    AssociatedAirBalance ASHRAE 2012DuctConstructionChapterounc tan ar ystemsan qu pment an oo

    TypeofSystem Minimum Maximum System TestPressure1,7, Allowable

    Test

    Pressure1,7Allowable

    Leakage

    Condition in.wc(Pa) System

    Leakage

    7.Dual

    duct

    systems,

    both

    6.00

    WC 1% Operating

    Operating

    5%

    o uc an co uc pa ys em ressure

    During

    Construction

    6.0(1500) 5%

    .

    g

    pressure

    n u c on

    system .

    (1495pa) . pera ng

    System pera ng

    Pressure

    During

    Construction

    6.0(1500) 5%

    1 Testpressureshouldnotexceedthepressureratingoftheduct.

    5 Largeinduction

    systems

    may

    have

    higher

    pressure

    requirements,

    i.e.,

    10

    WC

    (2490

    pa)

    7Itisrecommendedthatthepressureratingoftheductbeequaltothefanshutoffpressureifthe

  • 8/13/2019 Need for Duct Leakage

    7/28

    WhatShouldBeSpecifiedAssociatedAirBalance ASHRAE 2012DuctConstructionChapter

    ounc an ar ys emsan qu pmen an ooTypeofSystem Minimum

    Test

    Maximum

    Allowable

    System

    Condition

    TestPressure1,7,

    in.wc(Pa)

    Allowable

    System

    Pressure1,7 Leakage Leakage

    9.Manifoldedexhaustsystems

    Exhaustsystems

    for

    labs

    6.00WC6

    (1495pa)

    0.5% Operating

    System

    NotAddressed

    During

    Construction

    NotA resse

    10.Grease ductsystems 4.00WC

    (995pa)

    0% Operating

    System

    NotAddressed

    DuringConstruction

    NotAddressed

    1 Testpressureshouldnotexceedthepressureratingoftheduct.6 Largemanifoldexhaustsystemsmayhavehigherpressurerequirements,i.e.,10WC(2490pa)7Itisrecommendedthatthepressureratingoftheductbeequaltothefanshutoffpressureifthe

    possibilityof

    fan

    shut

    off

    exists

    either

    in

    VAV

    systems

    or

    in

    systems

    with

    smoke/fire

    damper

    control.

  • 8/13/2019 Need for Duct Leakage

    8/28

    WhatShouldBeSpecifiedAssociatedAirBalance ASHRAE 2012DuctConstructionChapter

    Typeof

    System Minimum

    Test

    Pressure1,7

    MaximumAllowable

    Leakage

    System

    ConditionTest

    Pressure

    1,7,

    in.WC(Pa)Allowable

    System

    Leakage

    11.VAV8 andCAV8 return

    systems

    Not

    Addressed

    Operating

    System

    Operating

    Pressure

    5%

    During

    Downstream 5%

    Construction box:3.0(750)

    Upstreambox:

    1.0(250)

    1 Test ressureshouldnotexceedthe ressureratin oftheduct.

    7Itis

    recommended

    that

    the

    pressure

    rating

    of

    the

    duct

    be

    equal

    to

    the

    fan

    shut

    off

    pressure

    ifthe

    possibilityoffanshutoffexistseitherinVAVsystemsorinsystemswithsmoke/firedampercontrol.8 Itisassumedthattheprimaryairdamperislocatedattheterminalboxinlet. Ifinsteadthisdamperis

    attheterminalboxoutlet thentheterminalboxshouldbeincludedintheu streamleaka etestin .

  • 8/13/2019 Need for Duct Leakage

    9/28

    WhatShouldBeSpecified

    AssociatedAirBalance ASHRAE 2012DuctConstructionChapterCouncilAABCStandard SystemsandEquipmentHandbook

    TypeofSystem Minimum

    Test

    Maximum

    Allowable

    System

    Condition

    TestPressure1,7,in.WC

    Allowabl

    eSystem

    Pressure1,7

    Leakage (Pa) Leakage

    12.

    Chilled

    beam

    primary

    su l

    2.00 WC

    (500 pa)

    1% Operating

    S stem

    Operating

    Pressure

    5%

    During

    Construction

    4.0(1000) 5%

    1 .

    7ItisrecommendedthatthepressureratingoftheductbeequaltothefanshutoffpressureifthepossibilityoffanshutoffexistseitherinVAVsystemsorinsystemswithsmoke/firedampercontrol.

  • 8/13/2019 Need for Duct Leakage

    10/28

  • 8/13/2019 Need for Duct Leakage

    11/28

    WhatShouldBeSpecified

    ssoc a e r a anceCouncilAABCStandard

    uc ons ruc on ap erSystemsandEquipmentHandbook

    TypeofSystem Minimum

    Test

    Maximum

    Allowable

    System

    Condition

    TestPressure1,7,

    in.wc(Pa)

    Allowable

    System

    Pressure1,7 Leakage Leakage

    Specified design

    15.Airhandlingunits

    .

    (2500pa)

    1%

    Sitetest by

    Manufacturer

    pressure

    Operating

    Pressure

    2.0(500)

    1 .

    7Itisrecommendedthatthepressureratingoftheductbeequaltothefanshutoffpressureifthe

    possibility

    of

    fan

    shut

    off

    exists

    either

    in

    VAV

    systems

    or

    in

    systems

    with

    smoke/fire

    damper

    control.

  • 8/13/2019 Need for Duct Leakage

    12/28

    WhatShouldBeSpecified

    AssociatedAirBalanceCouncilAABCStandard ASHRAE 2012DuctConstructionChapterSystemsandEquipmentHandbook

    Test

    Pressure1,7Allowable

    Leakage

    Condition

    1,7,in.wc(Pa)

    System

    Leakage

    16.Multizone

    supply

    Item

    4

    2% Operating

    Operating

    5%

    systems;Multizone

    returnsystems;

    Multizoneexhaust

    above

    2.00WC

    (500Pa)

    System Pressure

    During

    Construction

    2.0(500) 5%

    1 Testpressureshouldnotexceedthepressureratingoftheduct.7Itisrecommendedthatthepressureratingoftheductbeequaltothefanshutoffpressureif

    the ossibilit offanshutoffexistseitherinVAVs stemsorins stemswithsmoke firedam er

    control.

  • 8/13/2019 Need for Duct Leakage

    13/28

    WhatShouldBeSpecified

    ForAir

    Handling

    Units

    (AHU)with

    total

    static

    pressures

    (TSP)

    below

    4WCIwouldsuggestthetestrequirementbe2xTSPnottoexceed

    10 WC.Suggestpane e ection eteste uring t eAHU

    pressuretest.

    Instrumentationused

    to

    measure

    the

    pressure

    across

    the

    orifice

    tubemusthave.01WCresolution.

  • 8/13/2019 Need for Duct Leakage

    14/28

    DeflectionTesting

    Deflectionlimit

    of

    L/250

    shall

    be

    demonstrated.

    Measurements

    shallbetakenatmidpointofLusingdialindicatorsreadingin

    1 1000t s. Mountingo ia in icatorss a ein epen ento t e

    unitcasing. Multiplemeasurementsshallbemade. Dialindicator

    shallbe

    mounted

    at

    mid

    point

    of

    L

    on

    the

    seams.

    L

    is

    defined

    as

    theheightofthelargestpanelonthesidesoftheAHU,widthofthe

    largestpanelacrossthetopoftheAHU,andthesmallerofwidthor

    heightofthelargestpanelfortheendsoftheAHU. Theseare

    knownas

    the

    governing

    panels.

  • 8/13/2019 Need for Duct Leakage

    15/28

  • 8/13/2019 Need for Duct Leakage

    16/28

    IssuesofSealingDucttoaLeakageClassandSealClass

    Case1:PriortoSMACNAHVACAirDuctLeakageTestManual,1985two

    ent ca p aseso aresearc u ngwere u t y erentcontractors.

    TheAHUsystemsweredualduct.Phase1bycontractorArequired

    increasingthe

    RPM

    and

    loading

    the

    125HP

    motors

    (156

    amps)to

    maintain

    .

    requireddecreasingtheRPMwhichloweredtheampdraw(92amps)to

    maintainthestaticpressureattheendofthesystem.

  • 8/13/2019 Need for Duct Leakage

    17/28

    IssuesofSealingDucttoaLeakageClassandSealClass

    Case2:

    Two

    identical

    ten

    story

    office

    buildings

    were

    built

    by

    the

    same

    contractors.Theoutsideair(OSA)andtoiletexhaustductrisersinthe

    .

    identicalsizesandhadthesamerateddesignairflow.Thespecification

    requiredapressuretestof3.0andleakagetonotexceed2%.BuildingA

    .

    ductsealingbyteamBfailedmanytimesandfinallypassedafter3weeks

    ofextrasealing.

  • 8/13/2019 Need for Duct Leakage

    18/28

    IssuesofSealingDucttoaLeakageClassandSealClass

    Case3:

    A

    96

    x96

    main

    exhaust

    duct

    was

    designed

    for

    180,000

    CFM.

    The

    sealclasswasAandtheleakageclasswas6.Thespecificationsrequired

    .

    andfoundtheleakagetobebetween8%to15%.Theductwasinstalledin

    aninterstitialspace andthetopoftheductranbetweenthebeams.An

    andnotthetopandbottom.

  • 8/13/2019 Need for Duct Leakage

    19/28

    IssuesofSealingDucttoaLeakageClassandSealClass

    Case4:

    Connection

    of

    plenum

    boxes

    to

    diffusers.

    On

    ahard

    ducted

    systemthediffuserswereconnectedtoplenumboxes.Thediffusers

    wereinsta e wit zipscrewsoneac si e.Ourtesting oun 15%

    leakage.Theplenumboxeshadtobedisconnectedfromthebranch

    ductand

    the

    diffuser

    and

    plenum

    removed

    to

    properly

    seal

    the

    connection.Afterthediffusersandplenumboxeswerereinstalled

    noleakagewasdetected.

  • 8/13/2019 Need for Duct Leakage

    20/28

    ReportingDuctLeakage Job Number

    Job

    Name DescriptionofDuctTested

    er orme yan nesses

    Equipmenttagordesignationoftheprimarymover

    DesignCFM

    of

    Test

    Section

    TestEquipmentOrificeSizeandCalibrationDate

    RequiredSP ActualSP

    AllowableLeaka einCFMDeterminedb %ofDuctBein Tested

    ActualLeakage

    CFM

    Pass/Fail

  • 8/13/2019 Need for Duct Leakage

    21/28

    AnticipatedCost

    Thesecostsarebasedontheassumptionthatbuildingsare

    designedontheaverageof1CFM/Ft2 andthecostisapproximately$2.00/ Ft2

    ShouldbeSpecifiedAbove CFM Cost/Year=Leak %

    xCFMx$2.00

    Construction ChapterCost/Year=Leak %xCFMx$2.00

    1.&2.SmallSystems

    (multiples)

    2000 $80 $200

    3.TerminalBox Downstream

    Ductwork(multiples)1570 $62.80 $157.00

    . , ,

    VAV,CAV

    . .

  • 8/13/2019 Need for Duct Leakage

    22/28

    AnticipatedCost

    TypeofSystemFromWhatShouldbeSpecifiedAbove MaximumCFM AABC StandardsCost/Year=Leak % x CFM x

    ASHRAE2012DuctConstructionCha ter Cost Year =

    $2.00

    Leak %xCFMx$2.00

    5.DuctsinChases 50000 $1000 $5000

    6.VAVandCAVSupplyDucts 80000 $1600 $8000

    7.DualDuctS stems 150000 $3000 $15000

    8.High

    Pressure

    Induction 100000 $1000 $10000

    9.ManifoldExhaustSystem 200000 $2000 $20000

    . rease uc s o resse

    11.VAV&CAVReturnSystems 100000 $1000used1% $10000

  • 8/13/2019 Need for Duct Leakage

    23/28

    AnticipatedCost

    TypeofSystemFromWhatShouldbeSpecifiedAbove MaximumCFM AABCStandardCost/Year=Leak %x CFM x 2.00

    ASHRAE2012DuctConstructionCha ter Cost Year=Leak %xCFMx$2.00

    12.ChilledBeam 20000 $200used.5% $2000

    13.Supply&Returnlocated

    Outdoors

    30000 $0used0% $3000

    14.Exhaust

    Ductwork 200000 $4000

    used

    1% $8000

    15.AHUs 150000 $3000 $3000

    16. Multizone S stems 25000 1000 used 2% 2500

  • 8/13/2019 Need for Duct Leakage

    24/28

    AnticipatedCost

    The$2.00

    per

    CFM

    came

    from

    an

    estimated

    value

    when

    TC

    5.2

    was

    analyzingterminalboxleakage.ThesamecostperCFMwasfound

    to etrueina7400 t o icewit 5roo topsing ezoneunits.

    ResearchbuildingoperatorshavestatedtheircostperCFMranges

    between$4.00

    to

    $8.00

    per

    CFM

    depending

    on

    how

    many

    100%

    OSAsystemsareservingthebuildingandhowmanyspaceshave

    highairchangerates.

  • 8/13/2019 Need for Duct Leakage

    25/28

    WhatDoesASHRAEStandard90.1Addendumcq add

    6.4.4.2Ductwork

    and

    Plenum

    Leakage

    6.4.4.2.1DuctSealing.Ductworkandallplenumswithpressureclass

    ratingsshallbeconstructedtosealclassA,asrequiredtomeetthe

    requirementsofsection6.4.4.2.2,andwasstandardindustry

    practice(see

    Informative

    Appendix

    E).

    .....

    All

    connections

    shall

    be

    sealed,includingbutnotlimitedtospinins,taps,otherbranch

    connections,accessdoors,accesspanels,andductconnectionsto

    equipment.Sealingthatwouldvoidproductlistingsisnotrequired.

    Spirallock

    seems

    need

    not

    be

    sealed.

    All

    duct

    pressure

    class

    ratings

    shallbedesignatedinthedesigndocuments.

  • 8/13/2019 Need for Duct Leakage

    26/28

    WhatDoesASHRAEStandard90.1Addendumcq add

    6.4.4.2.2DuctLeakageTests.Ductworkthatisdesignedtooperateat

    staticpressuresinexcessof3in.wcandallductworklocated

    outdoorsshall

    be

    leak

    tested

    according

    to

    industry

    accepted

    test

    rocedures seeInformativeA endixE .Re resentativesections

    totalingnolessthan25%ofthetotalinstalledductareafor

    designatedpressureclassshallbetested.Allsectionsshallbe

    selected b the buildin owner or the desi nated re resentative of

    thebuildingowner.Positivepressureleakagetestingisacceptable

    fornegativepressureductwork.Themaximumpermittedduct

    = 0.65 = max max

    leakageCFM/100

    ft2 duct

    surface

    area.

    CL=for,ductleakageclass,

    CFM/100ft2 ductsurfaceareaat1in.wc.P=testpressure,which

    , .

  • 8/13/2019 Need for Duct Leakage

    27/28

    Summary

    Ihaveseenonseveralprojects sampleleakagetestingofthe

    ductworkspecifiedandthesealingofthesampleducttobebetter

    thanthe

    remaining

    ductwork.

    Iwould

    suggest

    that

    100%

    of

    the

    ductworkbetested.

    TosaveenergyIwouldsuggestthatductworkabove3WCbe

    testedattheductratedpressureandnotexceed1%leakage.

    e uc ra e pressures ou ew a era e ansys ems u

    offpressurewouldbeifadamperfailed.Thestaticpressuresetting

    forthelimitswitchesmustbesetbelowthemaximum test

    pressure

    o

    t e

    uct. Tonotpressuretestductworkandassumethesealantwillbe

    appliedproperlyhassavedmoneyonthefrontendbutcostthe

    ownerdearlythroughoutthelifeofthesystem.

  • 8/13/2019 Need for Duct Leakage

    28/28

    QUESTIONS

    IT COULD BE WORSE