Prepared by: Program Management Division August 14, 2019 Nebraskas Statewide Transportation Improvement Program Fiscal Years 20202023 Kyle Schneweis—Director

Transcript of Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward...

Page 1: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Prepared by:

Program Management Division August 14, 2019

Nebraska’s Statewide Transportation Improvement Program

Fiscal Years 2020—2023

Kyle Schneweis—Director

Page 2: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska’s transportation planning process, as well as that of the four metropolitan planning areas is being car-ried out in accordance with all federal laws, rules and regulations.

Nebraska’s 2019 through 2022 STIP includes the following:

Financial information showing expected state highway cash revenues for the STIP period,

A summary by fund category of all federal funds expected to be received and obligated by NDOT and the four MPO’s during the STIP period,

A detailed listing of state highway and local projects, excluding projects in the Lincoln, South Sioux City , Grand Island and Omaha MPO’s. MPO projects are included by reference and are shown as a line item by funding cat-egory in the STIP,

A listing of Section 5310 and 5311 transit projects,

Listings of BIA and Federal Lands projects if available at the time of publication. If unavailable, these will be added by revision as they are received.

Additional information on the development of and details included in the STIP can be found at:

http://www.dot.nebraska/projects/publications/stip

Page 3: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Performance Management Inclusion in NDOT STIP

Introduction Federal requirements for implementing performance measures have evolved and now require the State Transportation Improve-ment Plan (STIP) to include provisions for Performance Measures. In July of 2012, federal transportation legislation called the “Moving Ahead for Progress in the 21st Century Act,” commonly referred to as MAP-21, initiated the requirements for perfor-mance measures for state Department of Transportations, transit providers, and for MPOs. In 2015, newly enacted surface transportation legislation called the Fixing America’s Surface Transportation Act (FAST Act), Public Law No. 114-94, required a performance-based approach for the Statewide and Metropolitan Transportation Planning Process, and for transportation deci-sion-making. Final rulemaking and target setting for transportation performance measures began in 2016. Performance measures for the national goals of safety, infrastructure condition, air quality, and transportation system performance were de-veloped in 2017. The implementation of FAST Act requirements for performance measures are currently taking place at the time of this amendment in the spring of 2018. The following sections describe NDOT’s use of performance management in its processes and decision making related to STIP Development.

Cooperation To implement the performance measure requirements of the FAST Act, NDOT has worked with its transportation partners (i.e., the MPOs and transit providers) since 2016. The effort has led to provisions for developing and sharing transportation perfor-mance data, the selection of performance targets, the reporting of performance targets, the reporting of performance to be used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data for State asset management plans, pursuant to 23 C.F.R. 450.314(h).

Project Selection Process The STIP’s purpose is to provide for the development and integrated management and operation of state’s transportation sys-tems. These systems and their performance are complex since they interact with the natural and man-made environment. To better understand the correlation between NDOT action, the environment, and various performance outcomes, the NDOT engag-es in data collection. This data allows decision makers to assess the performance of the system. Unfortunately, data is only the reflection of a complicated interplay between NDOT decisions and the environment. As such, the NDOT leverages perfor-mance outcomes as only a part of its project selection process for the STIP. Other things that NDOT considers in its project se-lection process includes funding, stakeholder input, project readiness, other NDOT performance metrics, and a host of other factors. To put it another way, no single performance number or combination of numbers decide which projects are added to the STIP. The following paragraphs further describes how NDOT is using performance based activities to inform its business practices and influence its planning documents for STIP development. As mentioned previously, transportation systems are comprised of complex interactions between the user, the environment, materials, etc. Federal performance measures set forth in MAP-21 and the FAST Act are essentially high level reflect reflections of what is happening; but may not be able to explain all of what is happening. This is why the NDOT also employs numerous other performance based activities to inform its decision making and project selection.

Page 4: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

At the lowest levels of the organization, teams are beginning to measure daily activity and report performance to their peers during a daily huddle. This performance data is used by the manager to assess the team’s productivity and effectiveness. Ulti-mately, the manger’s performance evaluation is tied to the performance of the team he or she manages. In addition to this, the NDOT is going through an effort to consolidate its data into one single “data warehouse”. The data warehouse will serve a central point where all data collected by the NDOT can be accessed for analysis and reporting. Cur-rently, data is stored in different locations and in different formats, making it difficult to compile and analyze. These efforts to centralize and standardize data are leading to better real time management of projects and processes through the use of dashboards and other reporting. Another effort related to the formation of a data warehouse is NDOT’s business analytics contract. The NDOT has hired a da-ta scientist to help it study statistical correlations between actions, environment and performance outcomes. These studies use statistical models and tools to test hypotheses against performance data. The results of these studies give NDOT a better understanding of which “inputs” have the greatest influence on a desired outcome. For example, NDOT is studying which fac-tors have the greatest influence on number of bids we receive. If we can pinpoint the factors with the greatest influences, we may be able to exploit this knowledge to attract more bids to drive down contract awards. Through these types of studies, NDOT hopes to refine its business practices to improve project delivery and cost effectiveness. The measurement and analysis activities described in the previous paragraphs are important, since they provide quantifiable insights. However, data alone cannot sufficiently inform all aspects of decision making. This data needs to accompany vari-ous planning exercises, like the 3C planning process, to fully form a comprehensive decision making process. For example, planning documents such as the Strategic Highway Safety Plan, the Transportation Asset Management Plan, Freight Plan and others are informed by data and give stakeholders context within they can set a vision, goals, and objectives. At the same time, technological changes, policy changes and other cultural shifts may change the stakeholder’s values, which creates the need to reevaluate which data we collect and analyze. In the end, NDOT needs both data and the 3C planning process to con-tinually refine the decision making related to projects selected for the STIP. The preceding paragraphs describe how multiple inputs, including performance measures influence the program of projects published in the STIP. With that in mind, it’s important to explore the individual performance measures that influence NDOT’s decision making. The following paragraphs describe the specific federal performance measures along with associated NDOT targets.

Page 5: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Safety When it comes to improving safety, the NDOT uses a strategic approach that is based on available safety information for its Highway Safety Improvement Program (HSIP). In accordance with the FHWA final safety performance measure (PM1), NDOT’s HSIP established safety performance measure requirements for the purposes of carrying out the HSIP and also to assess fatali-ties and serious injuries on all public roads. NDOT’s Strategic Highway Safety Plan (SHSP) is a major component and require-ment of the HSIP in accordance with 23 U.S.C. § 148. The NDOT SHSP is a statewide-coordinated safety plan that provides a comprehensive framework for reducing highway fatalities and serious injuries on all public roads. NDOT’s plan identifies the most important safety needs and helps to make decisions on projects for safety concerns. NDOT’s SHSP can be found at. https://dot.nebraska.gov/safety/shsp/ With these things in mind, the NDOT emphasizes the selection of projects for its HSIP that address the two infrastructure-based Critical Emphasis Areas in the SHSP, Roadway Departure crashes and Intersection crashes. Projects are selected from hazard-ous location analysis in one of three different multi-disciplinary safety committees which oversee the HSIP. Before a project is selected, accident studies, collision diagrams, and maps are examined and occasionally a field review is performed. Benefit/cost ratios are also calculated and used for project selection. Each year the selected projects go through a review and are priori-tized in the HSIP Strategic Plan. These projects are then programed in the STIP according to readiness, funding availability, and competing needs.

Safety Targets

The technical provisions for performance measures are specified in the NDOT MPO Operating Manual. To meet the intent of 23 CFR 450.216 (f) (1) and future updates required in 23 CFR 450.216 (f) (2) required for the evaluation of system performance, the actual adopted Safety targets are displayed in Table 1.

Safety Performance Measures - 23 CFR 490 Subpart B

Safety performance measure targets: 1) Number of Fatalities 2) Rate of Fatalities per 100 million VMT 3) Number of Serious Injuries 4) Rate of Serious Injuries per 100 million VMT 5) Number of Non-Motorized Fatalities and Non-Motorized Serious Injuries

Page 6: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

2017 20192017 2019

Yearend

Actual Values

NDOR

Target 2015-

2019A

Actual 2011-

2019B

Baseline 2012-

2017C

Target

Achieved?

Number of Fatalities 236.4 239.2 228 0 239 230.7 225.6 Yes No

Fatality Rate 1.104 1.185 1.09 0.00 1.18 1.118 1.119 Yes Yes

Number of Serious Injuries 1488.8 1451.3 1478 0 1540 1528.7 1548.4 Yes Yes

Serious Injury Rate 6.710 6.710 7.03 0.00 7.50 7.405 7.685 Yes Yes

Number of Non-motorized Fatalities

and Serious Injuries135.4 139.4 143 0 140* 138.3 138.6 Yes Yes

Baseline Year 2017

Calendar Years: 2015 Thru 2019

Calendar Years: 2013 Thru 2017

HSIP Apport.

Year

Target

Calendar

Year

Implementation

Year

2018 2019 2022

If a State has not met or made significant progress toward meeting its targets, the State must comply with the provisions set forth in 23 USC 148(i) for the subsequent fiscal year. The State shall:

1. Use obligation authority equal to the HSIP apportionment for the year prior to the target year, only for HSIP projects.

CONFIDENTIAL INFORMATION:  Federal Law, 23 U.S.C. §409, prohibits the production of this document or its contents in discovery or its use in evidence in a State or Federal Court.  The State of Nebraska has

not waived any privilege it may assert as provided by that law through the dissemination of this document and has not authorized further distribution of this document or its contents to anyone other than the

original recipient.

2. Submit an HSIP Implementation Plan that describes actions the State will take to meet or make significant progress toward meeting its targets. The HSIP Implementation Plan should guide the State's project decisions so that the

combined 148(i) provisions lead to the State meeting or making significant progress toward meeting its safety performance targets in subsequent years.

(B) Actual performance is the 5-year rolling average ending in the year for which the targets were established.

(C) Baseline performance is the 5-year rolling average that ends prior to the year in which the targets were established. Baseline performance is calculated in

order to compare whether the actual outcome was better than the baseline performance

If the State is determined to have not met or made significant progress toward meeting its CY targets, the State will have to use obligation authority equal to

the defined HSIP apportionment year only for HSIP projects in the defined implementation year and submit an HSIP Implementation Plan for the same year.

NEBRASKA HSIP PERFORMANCE MEASURES - Baseline Target Year

(A) Calendar Year (CY) 2019 Targets are established and reported in the August 31, Baseline Year HSIP Annual Report.

Met/Not Met

HSIP PERFORMANCE MEASURE

Projected 2015-

2019 Actual

Avg

Better

Than

Baseline?

Met or Made

Significant

Progress?

2019 Yearend

Actual Values

Projected

2015-2019

Rolling Avg.

5-Year Rolling Average

*Selected target based on projected 5 year trend lines, 10 year trend line projection of 145.6 as well as 2017 yearend vaule 143

Page 7: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Performance Measures #2 and #3 The Nebraska DOT (NDOT) Performance Measure 2 Infrastructure Condition, and Performance Measure 3 System Reliability and Freight Movement performance targets were set on May 20, 2018. The targets are in support of the seven national goals set for the Federal-aid Highway program. The goals are:

• Safety o To achieve a significant reduction in traffic fatalities and serious injuries on all public roads.

• Infrastructure condition o To maintain the highway infrastructure asset system in a state of good repair.

• Congestion reduction o To achieve a significant reduction in congestion on the National Highway System.

• System reliability o To improve the efficiency of the surface transportation system.

• Freight movement and economic vitality o To improve the National Highway Freight Network, strengthen the ability of rural communities to access national and

international trade markets, and support regional economic development. • Environmental sustainability

o To enhance the performance of the transportation system while protecting and enhancing the natural environment. • Reduced project delivery delays

o To reduce project costs, promote jobs and the economy, and expedite the movement of people and goods by accelerating project completion through eliminating delays in the project development and delivery process, including reducing regulatory burdens and improving agencies' work practices.

In order to monitor progress towards these goals, MAP-21 and the FAST Act require the establishment of a number of performance measures by FHWA and the establishment of targets by state DOTs, public transit providers, and metropolitan planning organizations (MPOs). These measures and targets are outlined in the following tables Titled Infrastructure Condition and System Reliability and Freight Movement. States and MPOs will be required to evaluate conditions for these measures; set targets; describe how the projects included in the Statewide Transportation Improvement Program (STIP) and each MPO’s Transportation Improvement Program (TIP) will help achieve progress towards the targets; and report on actual results and whether targets were met for the performance period.

Page 8: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Infrastructure Condition

Performance Measures 2 (PM2) Baseline 2-Year Target

4-Year Target

Percentage of Pavements of the Interstate System in Good Condition

50.0%

Percentage of Pavements of the Interstate System in Poor Condition

5.0%

Percentage of Pavements of the Non-Interstate NHS in Good Condition

63.4% 40.0% 40.0%

Percentage of Pavements of the Non-Interstate NHS in Poor Condition

11.5% 10.0% 10.0%

Percentage of NHS Bridges Classified as in Good Condition 61.0% 55.0% 55.0%

Percentage of NHS Bridges Classified as in Poor Condition 1.9% 10.0% 10.0%

System Reliability and Freight Movement

Performance Measures 3 (PM3) Baseline 2-Year Target

4-Year Target

Percent of the Person-Miles Traveled on the Interstate That Are Reliable

98.9% 98.9% 98.9%

Percent of the Person-Miles Traveled on the Non-Interstate NHS That Are Reliable

92.6%

Truck Travel Time Reliability (TTTR) Index 1.10 1.10 1.10

NDOT met with MPO’s to discuss performance measures, target setting and the process the NDOT was pursuing in setting targets. Once NDOT set its targets for PM 2 and PM 3 there was individual coordination efforts with MPOs as they set their own targets. NDOT uses a performance-based approach to manage its pavement and bridge transportation assets. Each year, NDOT reviews the asset management measures and practices in order to define clear standards, provide the best service, and report on the progress made toward reaching performance goals. This information is compiled and disseminated in NDOT’s annual report found at https://dot.nebraska.gov/news-media/annual-report/.

Page 9: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Moving forward, NDOT will continue to use state performance measures for management of assets and reporting to the annual report. In addition, NDOT will report the following pavement indices to the FHWA to be used in determining targets and/or progress towards target achievement for national performance measures:

1. Average IRI 2. Cracking Percentage 3. Average Depth of Rutting 4. Average Height of Faulting

These indices will be used to determine whether a pavement section is considered Good, Fair, or Poor. NDOT will report the following bridge indices to the FHWA to be used in determining targets and/or progress towards target achievement for national performance measures: 1. Deck rating 2. Superstructure rating 3. Substructure rating 4. Culvert rating These indices will be used to determine whether a structure is considered Good, Fair, or Poor. In some cases, if the state does not meet its targets, there will be restrictions on how certain funding programs can be used or additional planning efforts may be required. Several offices across the NDOT will be working together to implement the required performance measures, target setting, and reporting. The performance measures and targets will be integrated directly and indirectly throughout the planning and programming process. The Nebraska DOT will also continue to coordinate with the state’s public transit providers and MPOs on target setting and monitoring.

Page 10: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Fixed TaxIncremental Tax (C)

LB 610.2015Subtotal

Variable Tax(A)

Wholesale Tax(B)

Total Tax

MOTOR FUEL TAX

NDOTCity/

County Total7.5¢2.0¢

9.5¢3.7¢6.4¢

19.6¢

2.8¢4.0¢

6.8¢0.0¢3.3¢

10.1¢

10.3¢6.0¢

16.3¢3.7¢9.7¢

29.7¢Effective 7-1-2019 thru 12-31-2019

HIGHWAYALLOCATION

FUND

COUNTIES CITIES

STATE HIGHWAYTRUST FUND

HEAVY VEHICLE USE TAXTruck & Trailer Sales Tax

Tire Tax > 40 Pounds

HIGHWAYCASHFUND

NDOTROADS

OPERATIONSCASH FUND

TRANSPORTATIONINFRASTRUCTURE

BANK (TIB)

FEDERALHIGHWAY

TRUSTFUND

BUILD NEBRASKA ACT1/4 of 1% of

General Fund Sales Tax

(A) Adjusted semi-annually. 100% to NDOT(B) Adjusted semi-annually. 66% - NDOT 34% - Cities & Counties(C) Increases 1.5¢ January 1 each year thru 2019. NDOT share 100% to TIB July 2016 thru June 2033.

MOTOR FUEL TAX

FIXED

INCREMENTAL

5% WHOLESALE

July 2019

100%

66%

7.5¢

Nebraska Transportation Financing

2.8¢

34%

50% 50%

85%

VARIABLE

(C)

MOTOR VEHICLE SALES TAXBased on purchase price of any vehicle required to be registered.

5%

STATE HIGHWAYCAPITAL

IMPROVEMENTFUND

RECREATION ROAD FUND

MOTOR VEHICLE FEE FUND(Distributed based on the

Highway Allocation Factors)

STATE AID BRIDGE FUND

MOTOR VEHICLE REGISTRATIONS

$15.00 on Passenger Cars(Fees on other vehicles vary)

53.3%46.6%

FEDERAL MOTOR FUEL TAXES18.4¢ Gasoline 18.4¢ Gasohol 24.4¢ Diesel

(2.86¢ each to Mass Transit Account)

15%

GRADE CROSSING FUND

0.5%

TRAIN MILE TAX

$1.50

Page 11: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

FY FY FY FY FY2018 2019 2020 2021 2022

ReceiptsMotor Fuel Tax 172,224 172,063 177,592 178,782 182,400Diesel Fuel Tax 86,981 87,257 91,067 93,906 95,800Registrations 45,349 43,448 43,931 44,566 45,500Sales Tax on Motor Vehicles 120,628 124,494 127,042 130,727 133,300Other State Receipts 10,265 11,324 10,575 10,675 10,900

Sub-Total State Receipts 435,448 438,586 450,208 458,656 467,900

Federal = State system 269,711 273,949 364,859 341,015 293,000Federal = Local system 31,587 45,670 36,000 36,000 36,000

Federal Transit 9,608 11,499 9,000 9,000 9,000Counties, Cities, & Others 25,657 24,006 21,000 21,000 21,000State Highway Capital Improvement Fund 96,406 63,271 70,325 72,875 72,875Rec Road / Grade Xing / St Aid Bridge 9,925 4,568 8,198 8,293 8,300State Transportation Infrastructure Bank 7,482 9,400 28,067 28,563 28,600State Patrol Carrier Enforcement Transfer Out (8,201) (8,570) (8,960) (9,216) (9,216)General Fund Transfer (7,500) (7,500)

Total Receipts * $870,123 $854,879 $978,697 $966,186 $927,459

Expenditures:Administration 17,879 20,871 18,706 19,078 19,500Supportive Services 28,709 34,204 28,399 28,609 29,200Capital Facilities 4,681 4,279 10,000 10,000 10,000Highway Operations 150,588 167,727 159,856 161,444 164,700Construction = Support & Research 16,957 18,584 19,000 19,400 19,800

Sub Total Non-Construction 218,814 245,665 235,961 238,531 243,200

State System 487,404 429,154 596,569 576,766 588,300Planning & Non-Program projects 71,268 71,657 72,000 72,000 72,000

Sub Total Construction 558,672 500,811 668,569 648,766 660,300

TOTAL STATE HIGHWAY EXPENDITURES 777,486 746,476 904,530 887,297 903,500

48,105 57,096 45,000 45,000 45,000MPO 2,091 2,139 2,100 2,100 2,100Public Transit and Rail 15,488 16,798 17,000 17,000 17,000

TOTAL LOCAL ROADWAY EXPENDITURES 65,684 76,033 64,100 64,100 64,100

Total Expenditures $843,170 $822,509 $968,630 $951,397 $967,60026,953 32,370 10,067 14,789 (40,141)

Fund Balance June 30 $109,322 $141,692 $151,759 $166,548 $126,407

Outstanding Contractual Obligations 549,470$ 694,968$

Z:\Bud & Finance\Budget\State Highway Funds 2270 & 2271 June Financial - Statement of Changes\[STATE HIGHWAY FUND_2270_2271_Change in Fund Balances FederaController Division, Budget & Finance SectionBecky Fleming, Budget & Finance Manager

STATE HIGHWAY FUNDS 2270 & 2271STATEMENT OF RECEIPTS, EXPENDITURES, and

CHANGES IN FUND BALANCES(DOLLARS IN THOUSANDS)

Actual Projected

State Highway System Construction:

Local System (includes ARRA)

Receipts Over (Under) Expenditures

8/13/2019 9:39

Page 12: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Interpreting the project details:

Control and Project Numbers - Project identifiers assigned by NDOT. The first digit in the control number is the field district in which the project is located.

Jurisdiction – entity responsible for carrying out the project.

Work Phases- PE – preliminary engineering ROW – right-of-way acquisition Const / CE – utilities, construction and construction engineering

Fund type and amount expected to be obligated in each fiscal year - Estimates are in year-of-expenditure dollars. For this STIP period, estimates are inflated at a rate of 5% for FY-20 and FY-21 and 3% per year thereafter.

Page 13: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Fund NHPP STP BRO SFTYSTP

LINCOLNSTP

MAPANHFP TAP RTP EM State

Total Fed Funds

Beginning Bal 0 55,882 0 23,844 10,055 43,555 0 4,746 200 109,087 142,000 247,369

FY Alloc/ Apport 190,100 71,240 3,777 20,148 6,500 15,750 11,007 5,800 1,217 0 408,000 325,539

New Balance 190,100 127,122 3,777 43,992 16,555 59,305 11,007 10,546 1,417 109,087 550,000 572,908

Adjustments* 40,000 (40,000) 0 0 0 0 0 0 0 0 0 0

Adjusted Balance 150,100 167,122 3,777 43,992 16,555 59,305 11,007 10,546 1,417 109,087 550,000 572,908

FY Planned 113,398 153,354 3,678 23,634 6,500 45,378 11,007 31,320 516,241 388,269

FY End Balance 36,702 13,768 99 20,358 10,055 13,927 0 10,546 1,417 77,767 33,759 184,639

FY Alloc/ Apport 195,803 73,377 3,777 20,752 6,695 16,223 0 5,974 1,254 0 419,000 323,855

New Balance 192,505 127,145 3,876 41,111 16,750 30,150 0 16,520 2,671 77,767 452,759 508,494

FY Planned 146,982 116,985 3,627 9,682 6,500 16,366 0 39,960 91,456 340,102

FY End Balance 45,523 10,160 249 31,429 10,250 13,784 0 16,520 2,671 37,807 361,304 168,392

FY Alloc/ Apport 201,677 75,579 3,777 21,375 6,896 16,709 0 6,153 1,291 0 423,000 333,457

New Balance 207,200 125,739 4,026 52,804 17,146 30,493 0 22,673 3,962 37,807 784,304 501,849

FY Planned 200,027 118,275 2,337 5,662 6,500 6,834 0 18,300 187,326 357,935

FY End Balance 7,173 7,464 1,689 47,142 10,646 23,659 0 22,673 3,962 19,507 596,978 143,915

FY Alloc/ Apport 207,727 77,846 3,777 22,016 7,103 17,210 0 6,338 1,330 0 423,000 343,347

New Balance 174,900 125,310 5,466 69,158 17,749 40,870 0 29,011 5,291 19,507 1,019,978 487,262

FY Planned 137,126 84,911 3,975 30 6,500 24,315 0 0 211,389 256,857

FY End Balance 37,774 40,399 1,491 69,128 11,249 16,555 0 29,011 5,291 19,507 808,589 230,405

$40 million transferred from NHPP to STP in FY-21, 22, 23

NHPP - National Highway Performance Program Grouped Project Categories:NHFP - National Highway Freight Program TAP - Transportation AlternativesSTP - Surface Transportation Program - includes all funds allocated under this program except Minor SFTY - Safety projects that are not regionally significant

those allocated to Lincoln and MAPA. Also includes miscellaneous funds apportioned RTP - Rec Trails Programfor use on any elibigle Title 23 project; Congestion Mitigation, Equity Bonus, Redistributed funds, Extension of Allocated Programs, etc.

BRO - Surface Transportation Program Funds set aside for off system bridgesSTP Lincoln - STP funds allocated for use in the Lincoln Metroplitan Planning AreaSTP MAPA - STP funds allocated for use in the Omaha Metroplitan Planning AreaEM - Earmarks - Discretionary, Demonstration, Federal Lands and other funds not distributed by federal formulaSFTY - Highway Safety Improvement Program (includes Rail Safety)

FY - 2023

Fund Descriptions:

Summary by Fund Type

FY

FY - 2020FY - 2021

FY - 2022

Page 14: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

00841GControl No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

NDOT Improvement NDOT/LPA Workforce Development and Training Program FY-2020 NDOT/LPA Workforce Development

Statewide

$872Estimate ($1,000)

FY22

Project No STP-STWD(178)

FY23

PE

STP 0872 00 0 0

00959Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Washington

NDOT Improvement Lighting

Statewide Lighting 0.00 0.0

At several intersections statewide

$471Estimate ($1,000)

FY22

Project No HSIP-STWD(142)

FY23

PE

State 00 01 0 0

Const / CE

SFTY 0423 00 0 0

State 047 00 0 0

11599Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Jefferson

NDOT Improvement Replace bridge on new shifted alignment and associated approach work Blue River South of Fairbury N-8 51.55 0.9

Realigned N-8 over the Blue River south of Fairbury

$8,656Estimate ($1,000)

FY22

Project No STP-8-6(104)

FY23

PE

State 00 0250 0 0

ROW

State 035 00 0 0

Const / CE

STP-AC 00 00 6670 0

State 00 00 1701 0

STP 00 00AC Conv 0 6670

State 00 00AC Conv 0 -6670

11718Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Jefferson

NDOT Improvement Mill, resurf 24' rdwy, br repair, br replace

Fairbury North N-15 10.11 11.0

N-15 from US-136 in Fairbury north to N-4

$7,690Estimate ($1,000)

FY22

Project No STP-15-1(110)

FY23

Const / CE

STP 05,587 00AC Conv 0 0

State 0-5,587 00AC Conv 0 0

1

Page 15: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

11781 Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Seward

County Improvement Br replacement and associated approach work Seward South

Co Rd over the Big Blue River 0.1 mi south of Seward

$2,033Estimate ($1,000)

FY22

Project No BRO-7080(27)

FY23

PE

BRO 00 027 0 0

State 00 02 0 0

Local 00 09 0 0

ROW

BRO 00 095 0 0

State 00 024 0 0

Const / CE

State 3760 00 0 0

BRO 1,5000 00 0 0

11895Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Pawnee

NDOT Improvement Mill, resurf 24' rdwy w/4'-6' earth shld, replace 3 br's, conc repair in Du BoisPawnee City Southeast N-50 0.00 12.4

N-8 from Pawnee City to N-50, then south on N-50 to NE/KS state line

$9,815Estimate ($1,000)

FY22

Project No STP-50-1(109)

FY23

PE

State 00 0410 0 0

ROW

State 00 0115 0 0

Const / CE

STP 03,236 00AC Conv 0 0

STP-AC 07,236 00 0 0

State 02,054 00 0 0

State 0-3,236 00AC Conv 0 0

STP 00 00AC Conv 4000 0

State 00 00AC Conv -4000 0

2

Page 16: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

12080Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Seward

NDOT Improvement Urban reconstruction

US-34 North & South, Seward N-15 66.24 1.4

N-15 from BNSF DOT#083457X north 1.4 mi to Seward

$6,015Estimate ($1,000)

FY22

Project No STP-15-2(117)

FY23

PE

State 00 0257 0 0

ROW

State 0280 00 0 0

Const / CE

STP-AC 00 00 4267 0

State 00 00 1211 0

STP 00 00AC Conv 0 4267

State 00 00AC Conv 0 -4267

12704Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cass

NDOT Improvement Conc repair, mill, asph widen/resurf 22' rdwy to 28', br replacement Weeping Water Spur S-13K 0.00 1.9

Weeping Water Spur (S-13K) from N-50 to Weeping Water

$2,909Estimate ($1,000)

FY22

Project No STP-S13K(103)

FY23

PE

State 00 097 0 0

ROW

State 020 00 0 0

Const / CE

STP 00 00 2212 0

State 00 00 580 0

12790BControl No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Seward

NDOT Improvement 6-Lane interstate expansion including gr, str, surf, and s shld Seward - Lincoln I-80 377.90 17.1

I-80 from apprx 1.2 mi west of Sewarc to 0.7 mi west NW 48th St

$340,947Estimate ($1,000)

FY22

Project No NH-80-8(162)

FY23

PE

State 0100,000 00 0 0

Const / CE

NHPP 00 216,8520 0 0

State 00 24,0950 0 0

3

Page 17: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

13028Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Gage

NDOT Improvement Mill, asph resurf 24' rdwy w/6' earth shld

E Jct US-136 - Lewiston Spur N-4 167.47 12.3

N-4 from the East jct US-136 to 3.5 mi east of the Lewiston Spur (S-67A)

$5,634Estimate ($1,000)

FY22

Project No STP-4-6(114)

FY23

PE

State 0181 00 0 0

Const / CE

STP 00 4,2540 0 0

State 00 1,1990 0 0

13098Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Richardson

NDOT Improvement Mill, widen/resurf existing 24' rdwy to 28'

US-75 - N-67 N-62 21.20 9.0

N-62 from US-75 east to N-67

$4,221Estimate ($1,000)

FY22

Project No STP-62-7(105)

FY23

PE

State 0120 00 0 0

ROW

State 100 00 0 0

Const / CE

State 00 00 0 826

STP 00 3,2650 0 0

13102Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Nemaha

NDOT Improvement Asph resurf 24' rdwy w/8' earth shld

Peru Spur - S Jct US-75 N-67 25.83 5.5

N-67 from Peru Spur (S-64G) west to the south jct US-75

$4,204Estimate ($1,000)

FY22

Project No STP-67-1(120)

FY23

PE

State 00 00 15 0

Const / CE

STP 00 00 0 0

State 00 00 0 0

4

Page 18: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

13103Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Nemaha

NDOT Improvement Cold-in-place recycle, widen/resurf 24' rdwy to 28', br repair N Jct US-75 - Brock N-67 34.36 6.5

N-67 from N Jct US-75 west to approx 0.2 mi east of Brock

$5,274Estimate ($1,000)

FY22

Project No STP-67-1(121)

FY23

PE

State 6000 00 0 0

ROW

State 00 00 2 0

Const / CE

STP 00 3,6390 0 0

State 00 1,0330 0 0

13104Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Otoe

NDOT Improvement Mill, resurf 24' rdwy w/6' earth shld, br repair

N-105 North N-67 43.57 8.6

N-67 from N-105 north to E Jct N-128. Includes segment on Talmage Spur (S-66D)

$5,515Estimate ($1,000)

FY22

Project No STP-67-1(122)

FY23

PE

State 0240 00 0 0

ROW

State 300 00 0 0

Const / CE

STP 00 3,8960 0 0

State 00 1,3490 0 0

13161Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Seward

County Improvement New roadway

Karol Kay Blvd, Bader-Hillcrest, Seward 0.00 0.3

Extension of Karol Kay Blvd, from Bader Ave to Hillcrest Dr in Seward

$1,272Estimate ($1,000)

FY22

Project No URB-6763(1)

FY23

PE

STP 00 0176 0 0

STP 00 012 0 0

Local 00 065 0 0

ROW

STP 00 025 0 0

Local 00 06 0 0

Const / CE

STP 0646 00 0 0

Local 0342 00 0 0

5

Page 19: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

13182Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Seward

NDOT Improvement Br rehab, approaches

Blue River, Beaver Crossing L-80E 8.23 0.0

L80E over the west fork of Big Blue river 0.4 mi south of Beaver Crossing

$1,218Estimate ($1,000)

FY22

Project No STP-L80E(113)

FY23

PE

State 00 00 42 0

ROW

State 00 00 0 1

Const / CE

STP 00 9400 0 0

State 00 2350 0 0

13183Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Jefferson

NDOT Improvement Br redeck and associated approach work Blue River Bridge West of Fairbury US-136 149.31 0.0

US-136 over the Blue River 0.6 mi west of Fairbury

$3,246Estimate ($1,000)

FY22

Project No NH-136-6(121)

FY23

PE

State 00 00 110 0

ROW

State 00 00 0 1

Const / CE

NHPP 00 2,4420 0 0

State 00 6930 0 0

13186Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Gage

NDOT Improvement Mill, widen/resurf to 28' rdwy, conc repair, br deck overlay, intersection Adams West N-41 74.46 11.3

N-41 from US-77 east to just east of N-43, including S-34C

$6,899Estimate ($1,000)

FY22

Project No STP-HSIP-41-6(1

FY23

PE

State 00 0215 0 0

ROW

State 00 050 0 0

Const / CE

SFTY-AC 0428 00 0 0

STP-AC 04,787 00 0 0

State 01,419 00 0 0

SFTY 4280 00AC Conv 0 0

STP 4,7870 00AC Conv 0 0

State -5,2150 00AC Conv 0 0

6

Page 20: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

13188Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Pawnee

NDOT Improvement Bridge redeck, approach slabs

Turkey Creek South of Steinauer N-4 189.57 0.0

N-4 over Turkey Creek 1.4 mi southeast of Steinauer

$1,096Estimate ($1,000)

FY22

Project No STP-4-7(107)

FY23

PE

State 00 00 41 0

ROW

State 00 00 0 1

Const / CE

STP 00 8430 0 0

State 00 2110 0 0

13201Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Seward

NDOT Improvement Bridge and associated approach work

Bee Spur Bridge S-80B 1.00 0.0

S-80B (Bee Spur) over Plum Creek

$931Estimate ($1,000)

FY22

Project No STP-S80B(114)

FY23

PE

State 00 00 40 0

ROW

State 00 00 0 4

Const / CE

STP 00 6920 0 0

State 00 1950 0 0

13236Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Johnson

NDOT Improvement Conc repair, joint/crack seal, mill, resurf, culv, guardrail Tecumseh North N-50 32.06 5.9

N-50 from Tecumseh north to approx 2.0 mi north of N-41

$6,637Estimate ($1,000)

FY22

Project No STP-50-1(113)

FY23

PE

State 00 0400 0 0

ROW

State 00 010 0 0

Const / CE

STP-AC 04,850 00 0 0

State 01,377 00 0 0

STP 00 00AC Conv 4850 0

State 00 00AC Conv -4850 0

7

Page 21: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

13238Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Jefferson

NDOT Improvement Br replacement and associated approach work Rose Creek Bridge West of Reynolds N-8 38.52 0.2

N-8 over Rose Creek 1.0 mi west of Reynolds

$2,080Estimate ($1,000)

FY22

Project No STP-8-6(115)

FY23

PE

State 00 065 0 0

ROW

State 010 00 0 0

Const / CE

STP 00 00 1604 0

State 00 00 401 0

13245Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Jefferson

NDOT Improvement Conc repair, mill, resurf, br repair/overlay

Diller South N-103 0.00 4.4

N-103 from N-8 north to Diller

$1,841Estimate ($1,000)

FY22

Project No STP-103-1(111)

FY23

PE

State 00 0100 0 0

ROW

State 00 010 0 0

Const / CE

STP 01,350 00 0 0

State 0381 00 0 0

13246Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Jefferson

NDOT Improvement Conc repair, resurf 24' rdwy w/10' shld, 8' surf Jansen East US-136 156.24 9.8

US-136 from Jansen east to 0.2 mi east of the Jefferson/Gage Co line

$6,610Estimate ($1,000)

FY22

Project No NH-136-6(124)

FY23

PE

State 00 023 0 0

ROW

State 01 00 0 0

Const / CE

NHPP-AC 5,2690 00 0 0

State 1,3170 00 0 0

NHPP 00 00AC Conv 0 5269

State 00 00AC Conv 0 -5269

8

Page 22: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

13249Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Otoe

County Improvement Reconstruct crushed rock rdwy with one continuous curve, br replacement Palmyra Southwest 0.00 0.9

From 1st St/'H' St in Palmyra, southwest to intersection Otoe Cnty Rds 6 & 'G'

$1,460Estimate ($1,000)

FY22

Project No HRRR-7915(1)

FY23

PE

SFTY 00 0226 0 0

State 00 04 0 0

Local 00 025 0 0

ROW

SFTY 00 040 0 0

Local 00 04 0 0

Const / CE

SFTY 01,045 00 0 0

Local 0116 00 0 0

13250Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Butler

NDOT Improvement Mill, resurf 24 rdwy w/10' shld, 8' surf

David City North N-15 92.68 5.6

N-15 from David City north to N-64 including 0.3 mi on N-64

$3,082Estimate ($1,000)

FY22

Project No STP-15-2(124)

FY23

PE

State 00 030 0 0

ROW

State 00 01 0 0

Const / CE

STP 02,441 00 0 0

State 0610 00 0 0

13259Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Saunders

NDOT Improvement Bridge replacement

Elm Creek South of Fremont US-77 111.44 0.0

US-77 over Elm Creek 1.5 mi south of Fremont

$1,718Estimate ($1,000)

FY22

Project No NH-77-2(163)

FY23

PE

State 00 00 85 0

ROW

State 00 00 0 5

Const / CE

NHPP 00 1,2700 0 0

State 00 3580 0 0

9

Page 23: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

13264Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cass

NDOT Improvement Mill, asph resurf 24' rdwy w/10' shld, 8' surf

N-50 East US-34 352.65 7.7

US-34 from approx 0.2 mi east of N-50 east to approx 1.1 mi west of N-67

$8,322Estimate ($1,000)

FY22

Project No NH-34-7(130)

FY23

PE

State 00 0250 0 0

ROW

State 00 0136 0 0

Const / CE

NHPP-AC 06,205 00 0 0

State 01,731 00 0 0

NHPP 6,2050 00AC Conv 0 0

State -6,2050 00AC Conv 0 0

13265Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Saline

NDOT Improvement Mill, resurf, br repair

Wilber North N-103 33.25 9.5

N-103 from Wilber north to the W Jct N-33

$5,458Estimate ($1,000)

FY22

Project No STP-103-1(112)

FY23

PE

State 00 00 30 0

Const / CE

STP 00 00 0 0

State 00 00 0 0

13266Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Gage

NDOT Improvement Mill, asph resurf 24' rdway, br repair/overlay Barneston East N-8 86.64 12.1

N-8 from just west 1st St in Barneston, east to Jct N-99

$4,100Estimate ($1,000)

FY22

Project No STP-8-6(116)

FY23

PE

State 00 0120 0 0

Const / CE

STP 03,100 00 0 0

State 0880 00 0 0

10

Page 24: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

13268Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Otoe

NDOT Improvement Mill, widen/resurf 24' rdwy to 28', br repair/overlay, scour mitigation at CBC Eagle South N-43 22.30 8.0

N-43 from E Jct N-2 north to US-34

$0Estimate ($1,000)

FY22

Project No STP-43-2(107)

FY23

Const / CE

STP 03,675 00AC Conv 0 0

State 0-3,675 00AC Conv 0 0

13270Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Gage

NDOT Improvement Mill, widen/resurf 24' rdwy to 28', 1 br repair, 2 br replacements Adams - Sterling N-41 85.48 6.7

N-41 from just east of N-43 to just east of the east limits of Sterling

$7,230Estimate ($1,000)

FY22

Project No STP-41-6(118)

FY23

PE

State 00 0242 0 0

ROW

State 012 00 0 0

Const / CE

STP-AC 00 00 5581 0

State 00 00 1395 0

STP 00 00AC Conv 0 5581

State 00 00AC Conv 0 -5581

13273AControl No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Seward

NDOT Improvement Urban reconstruction, curb inlets, storm sewer, lighting In Milford US-6 292.26 1.0

US-6 from just west of west lmts Milford to approx 0.2 mi east 'B' St in Milford

$3,966Estimate ($1,000)

FY22

Project No STP-6-6(163)

FY23

PE

State 0134 00 0 0

ROW

State 300 00 0 0

Const / CE

STP 00 00 0 2961

State 00 00 0 841

11

Page 25: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

13275Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Pawnee

NDOT Improvement Resurf, br repair

W Jct N-4 - Tecumseh N-50 20.03 12.0

N-50 from just east of west jct N-50, east to Tecumseh

$9,212Estimate ($1,000)

FY22

Project No STP-50-1(114)

FY23

PE

State 250 00 0 0

Const / CE

STP-AC 00 00 0 0

State 00 00 0 0

STP 00 7,3500AC Conv 0 0

State 00 -7,3500AC Conv 0 0

13276Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Otoe

NDOT Improvement Conc repair, resurf, repair 5-br's, replace 1-br sized CBC w/br sized CBC Syracuse South N-50 37.93 14.0

N-50 from 2.0 mi north of N-41 north to Syracuse

$7,624Estimate ($1,000)

FY22

Project No STP-50-1(115)

FY23

PE

State 00 0756 0 0

ROW

State 015 00 0 0

Const / CE

STP-AC 00 00 5482 0

State 00 00 1371 0

STP 00 00AC Conv 0 5482

State 00 00AC Conv 0 -5482

13277Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Nemaha

NDOT Improvement Mill, resurf, br repair

Nemaha South N-67 12.13 1.5

N-67 from Co Rd 724 to approx 0.2 mi south of the north limits of Nemaha

$1,908Estimate ($1,000)

FY22

Project No STP-67-1(124)

FY23

PE

State 00 085 0 0

ROW

State 00 014 0 0

Const / CE

STP 01,411 00 0 0

State 0398 00 0 0

12

Page 26: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

13278Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Butler

NDOT Improvement Mill, asph resurf 24' rdwy w/10' shld, 8' surf, br repair N-92 South N-15 76.12 11.0

N-15 from Seward/Butler Co line north to the E Jct N-92

$5,376Estimate ($1,000)

FY22

Project No STP-15-2(127)

FY23

PE

State 00 0211 0 0

Const / CE

STP-AC 04,132 00 0 0

State 01,033 00 0 0

STP 00 00AC Conv 4132 0

State 00 00AC Conv -4132 0

13292Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Seward

NDOT Improvement Br replacement and associated approach work, replace flumes Staplehurst Spur Bridge S-80C 2.61 0.1

S-80C (Staplehurst Spur) over the Big Blue River 0.9 mi east of Staplehurst

$1,867Estimate ($1,000)

FY22

Project No STP-S80C(115)

FY23

PE

State 610 00 0 0

ROW

State 00 00 1 0

Const / CE

STP 00 1,4440 0 0

State 00 3610 0 0

13295Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Pawnee

NDOT Improvement Mill, resurf, culv, curb ramp, sidewalk

Table Rock West N-4 191.97 5.1

N-4 from W Jct N-50 to Table Rock, including a segment on N-50

$4,352Estimate ($1,000)

FY22

Project No STP-4-7(108)

FY23

PE

State 00 0261 0 0

ROW

State 00 075 0 0

Const / CE

STP 03,128 00 0 0

State 0888 00 0 0

13

Page 27: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

13299Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Seward

NDOT Improvement Mill, resurf, rumble strips

Seward West US-34 285.71 13.7

US-34 from just west York/Seward Co line east to Seward

$7,124Estimate ($1,000)

FY22

Project No STP-34-6(142)

FY23

PE

State 00 00 15 0

Const / CE

STP 00 00 0 0

State 00 00 0 0

13300Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Seward

NDOT Improvement Mill, resurf

Goehner North L-80G 0.00 5.7

Link L-80G from just south of I-80 north to US-34 north of Goehner

$1,676Estimate ($1,000)

FY22

Project No STP-L80G(116)

FY23

Const / CE

STP 00 00 0 0

State 00 00 0 0

13301Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Seward

NDOT Improvement Mill, resurf

Utica South L-80F 0.00 5.7

Link L-80F from just south I-80 north to US-34 north of Utica

$1,677Estimate ($1,000)

FY22

Project No STP-L80F(117)

FY23

PE

State 10 00 0 0

Const / CE

STP 00 00 0 0

State 00 00 0 0

14

Page 28: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

13302Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Saline

NDOT Improvement Mill, resurf

Jct US-6/N-15 - Crete N-33 0.00 11.1

N-33 from Jct US-6 & N-15, southeast to Crete

$8,138Estimate ($1,000)

FY22

Project No STP-33-6(109)

FY23

PE

State 1030 00 0 0

ROW

State 00 00 5 0

Const / CE

STP 00 6,4240 0 0

State 00 1,6060 0 0

13307Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Richardson

NDOT Improvement Conc repair, mill & resurf existing rdwy & s-shld, br repair, modify turn lanes Verdon East & West US-73 8.14 13.9

US-73 from 5.4 mi southeast of N-67 to 0.2 mi east of Jct US-75

$8,734Estimate ($1,000)

FY22

Project No NH-73-1(119)

FY23

PE

State 00 0661 0 0

ROW

State 01 00 0 0

Const / CE

NHPP-AC 00 00 6299 0

State 00 00 1773 0

NHPP 00 00AC Conv 0 6299

State 00 00AC Conv 0 -6299

13325Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Nemaha

NDOT Improvement Replace br, add approaches

N-62 South Bridge N-105 17.71 0.0

N-105 over Long Branch Creek just north of Pawnee/Richarson/Nemaha Co line

$1,879Estimate ($1,000)

FY22

Project No STP-105-1(108)

FY23

Const / CE

STP 01,326 00AC Conv 0 0

State 0-1,326 00AC Conv 0 0

15

Page 29: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

13326Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Saunders

NDOT Improvement Bridge repair/overlay, seal conc bridge rail, replace guardrail Wahoo Viaduct US-77 92.05 0.0

US-77 br locations approx 0.3 mi south and 1.4 mi north W Jct N-92 west of Wahoo

$2,033Estimate ($1,000)

FY22

Project No NH-77-2(165)

FY23

PE

State 00 0150 0 0

Const / CE

NHPP 01,506 00 0 0

State 0377 00 0 0

13330Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Otoe

NDOT Improvement Mill and resurface existing rdwy with asphalt, earth shld, culv repair, gdrl Burr Spur S-66E 0.00 6.2

S66E (Burr Spur) from jct N-50 to just west of 6th street in Burr

$2,489Estimate ($1,000)

FY22

Project No STP-S66E(104)

FY23

PE

State 00 011 0 0

Const / CE

STP 00 00 1982 0

State 00 00 496 0

13338Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Gage

NDOT Improvement Conc repair, mill, resurf, br repair/overlay, reconstruct median Pickrell North US-77 31.09 7.9

US-77 from 1.0 mi north of Pickrell Spur to 1.8 mi south of Cortland

$8,158Estimate ($1,000)

FY22

Project No NH-77-1(135)

FY23

PE

State 00 0352 0 0

Const / CE

NHPP-AC 06,245 00 0 0

State 01,561 00 0 0

NHPP 6,2450 00AC Conv 0 0

State -6,2450 00AC Conv 0 0

16

Page 30: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

13344Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Jefferson

NDOT Improvement Replace existing bridge with triple 10'x12' CBC Steele City Spur Bridge S-48A 0.15 0.0

S-48A approx 0.3 mi north of Steel City

$494Estimate ($1,000)

FY22

Project No STP-S48A(101)

FY23

PE

State 015 00 0 0

ROW

State 100 00 0 0

Const / CE

STP 00 00 0 375

State 00 00 0 94

13356Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Seward

NDOT Improvement Mill, inlay, br repair

York/Seward County Line - Goehner I-80 365.14 7.5

I-80 from York/Seward county line, east to approx 0.5 mi west of Goehner

$6,217Estimate ($1,000)

FY22

Project No NH-80-8(159)

FY23

PE

State 10 00 0 0

Const / CE

NHPP 00 00 0 0

State 00 00 0 0

13358Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Seward

NDOT Improvement Mill, resurf 4-lane rdwy and shld, conc repair, br repair Goehner - Milford I-80 372.68 9.4

I-80 from approx 0.4 mi west of Goehner to 0.4 mi west of Milford

$10,509Estimate ($1,000)

FY22

Project No NH-80-8(160)

FY23

PE

State 00 0130 0 0

Const / CE

NHPP-AC 09,332 00 0 0

State 01,047 00 0 0

NHPP 9,3320 00AC Conv 0 0

State -9,3320 00AC Conv 0 0

17

Page 31: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

13359Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Seward

NDOT Improvement Conc repair, mill, resurf rdwy and shld, br repair Milford - Lincoln I-80 381.71 13.2

I-80 from 0.4 mi west of Milford to 1.0 mi west of NW 48th St

$11,397Estimate ($1,000)

FY22

Project No NH-80-8(161)

FY23

PE

State 00 099 0 0

Const / CE

NHPP-AC 010,168 00 0 0

State 01,130 00 0 0

NHPP 00 00AC Conv 10168 0

State 00 00AC Conv -10168 0

13371Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Otoe

NDOT Improvement Bridge repair and epoxy polymer overlay

Nebraska City Missouri River Bridge N-2 508.16 0.0

N-2 bridge over the Missouri River east of Nebraska City

$1,283Estimate ($1,000)

FY22

Project No NH-2-7(119)

FY23

PE

State 00 036 0 0

Other 00 083 0 0

Const / CE

NHPP 0284 00 0 0

State 071 00 0 0

Other 0809 00 0 0

13381Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Saunders

NDOT Improvement Br repair/overlay, abutment and approach work, replace expansion joints, gdrl Ashland Viaduct N-66 97.43 0.0

N-66 viaduct over BNSF approx 0.1 mi NW jct N-66 & US-6 in Ashland

$1,397Estimate ($1,000)

FY22

Project No STP-66-6(109)

FY23

PE

State 00 0153 0 0

Const / CE

STP 0995 00 0 0

State 0249 00 0 0

18

Page 32: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

13392Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Saunders

NDOT Improvement Patch, mill and overlay

Ashland East N-66 97.84 3.1

N-66 from just east of Ashland to near the Eugene T Mahoney Park entrance

$1,537Estimate ($1,000)

FY22

Project No STP-66-6(110)

FY23

PE

State 00 00 1 0

Const / CE

STP 00 1,2290 0 0

State 00 3070 0 0

13393Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cass

NDOT Improvement Mill and overlay

Greenwood East US-6 331.22 9.7

US-6 from Greenwood to approx 0.2 mi west Ashland & N-63 from I-80 to Jct US-6

$4,655Estimate ($1,000)

FY22

Project No STP-6-6(164)

FY23

PE

State 00 00 1 0

Const / CE

STP 00 00 0 0

State 00 00 0 0

13394Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Saunders

NDOT Improvement Mill and overlay

Wahoo East US-77 95.41 16.0

US-77 approx 0.4 mi west S Jct US77/N-92 with N-109 to just east of E Jct N-92

$7,374Estimate ($1,000)

FY22

Project No NH-77-2(167)

FY23

PE

State 1430 00 0 0

Const / CE

NHPP 00 5,7850 0 0

State 00 1,4460 0 0

19

Page 33: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

13398Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Johnson

NDOT Improvement Mill, resurf

Tecumseh East US-136 211.33 10.8

US-136 from just east N-50 to approx 1.1 mi east N Jct N-105

$4,638Estimate ($1,000)

FY22

Project No NH-136-7(127)

FY23

PE

State 01 00 0 0

Const / CE

NHPP 00 00 0 0

State 00 00 0 0

13401Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Nemaha

NDOT Improvement Reconstruct s-shld, rumble strips

Auburn North US-75 28.80 13.4

US-75 from approx 0.6 mi north Auburn to 0.2 mi south N-128 south Nebraska City

$477Estimate ($1,000)

FY22

Project No NH-75-1(109)

FY23

PE

State 00 01 0 0

Const / CE

NHPP 00 00 0 0

State 00 00 0 0

13402Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Saline

County Improvement Bridge

Crete Northwest

Approx 0.5 mi north intersection of Rd 2050 with Saltillo Rd NW of Crete

$1,373Estimate ($1,000)

FY22

Project No BRO-7076(25)

FY23

PE

BRO 030 00 0 0

State 08 00 0 0

Const / CE

BRO 00 00 0 1000

State 00 00 0 335

20

Page 34: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

13403Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Saunders

County Improvement Bridge

Touhy Northwest

Rd 31 approx 0.6 mi south intersection with 'H' Rd northwest of Touhy

$559Estimate ($1,000)

FY22

Project No BRO-7078(20)

FY23

PE

BRO 030 00 0 0

State 08 00 0 0

Const / CE

BRO 00 00 0 417

State 00 00 0 104

13405Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Johnson

County Improvement Bridge

Sterling Northwest

Cnty Rd 738 approx 0.5 mi east intersection with 612 Ave northwest of Sterling

$925Estimate ($1,000)

FY22

Project No BRO-7049(24)

FY23

PE

BRO 020 00 0 0

State 05 00 0 0

Const / CE

BRO 00 00 0 600

State 00 00 0 300

13413Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Gage

NDOT Improvement Mill, ovly

Beatrice Southeast US-136 166.00 9.4

US-136 from approx 0.2 mi east Jefferson/Gage cnty line to Beatrice

$3,010Estimate ($1,000)

FY22

Project No NH-136-6(128)

FY23

PE

State 010 00 0 0

Const / CE

NHPP 2,4000 00 0 0

State 6000 00 0 0

21

Page 35: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

13415Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cass

NDOT Improvement Mill, ovly

Murdock Spur - N-50 N-1 7.33 6.2

N-1 from S13A (Murdock Spur) to Jct N-50Includes S13A (Murdock Spur)

$1,050Estimate ($1,000)

FY22

Project No STP-1-7(109)

FY23

PE

State 00 01 0 0

Const / CE

STP 8390 00 0 0

State 2100 00 0 0

20626Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dodge

NDOT Improvement ROW, grading conc pvmt for 4-lane divided expressway, Str, lighting and util North Bend - Fremont US-30 414.94 10.7

US-30 (new alignment) from west of North Bend to the Fremont Bypass

$119,500Estimate ($1,000)

FY22

Project No S-30-6(1044)

FY23

PE

State 00 04,000 0 0

ROW

State 00 02,500 0 0

State 03,000 00 0 0

Const / CE

State 30,0000 00 0 0

State 00 00 20000 0

State 00 00 0 60000

21209Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cass

NDOT Improvement 4-lane divided expressway

Murray - Plattsmouth US-34 373.33 6.8

US-34 from N-1 north 6.3 mi and on US-75 from US-34 north 1.2 mi

$48,087Estimate ($1,000)

FY22

Project No NH-75-2(128)

FY23

PE

State 00 0813 0 0

State 00 01,024 0 0

Local 00 037 0 0

ROW

State 00 0823 0 0

Local 00 077 0 0

Const / CE

EM 20,0000 00 0 0

State 23,8200 00 0 0

Local 1,4930 00 0 0

22

Page 36: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

21704Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Washington

NDOT Improvement Mill, resurf, br repair, br replacements

Blair - Herman US-75 116.35 9.8

US-75 from Blair to 0.2 mi north of the Burt Co line

$11,860Estimate ($1,000)

FY22

Project No STP-75-3(107)

FY23

PE

State 00 01,746 0 0

ROW

State 00 0550 0 0

Const / CE

STP 07,582 00 0 0

State 01,982 00 0 0

22177Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dodge

NDOT Improvement New viaduct

23rd St Viaduct, Fremont 0.5

23rd St from Colorado Ave to Nye Ave in Fremont

$1,325Estimate ($1,000)

FY22

Project No STPN-TMT-5616

FY23

PE

Local 00 025 0 0

Local 0100 00 0 0

ROW

Local 1,2000 00 0 0

22339Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dodge

NDOT Improvement Mill, asph resurf 24' rdwy w/10' shld, 8' surf

North Bend - Fremont US-30 407.50 16.0

US-30 from 3.1 mi east of N-79 east to Fremont

$4,851Estimate ($1,000)

FY22

Project No S-30-6(1048)

FY23

PE

State 030 00 0 0

Const / CE

State 00 00 4821 0

23

Page 37: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

22455Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dodge

NDOT Improvement Conc repair, mill, asph resurf, br repair

In Snyder & East N-91 188.91 4.4

N-91 from approx 0.1 mi east of Snyder east to US-275

$5,702Estimate ($1,000)

FY22

Project No STP-91-6(113)

FY23

PE

State 00 0286 0 0

ROW

State 083 00 0 0

Const / CE

STP-AC 00 00 4154 0

State 00 00 1179 0

STP 00 00AC Conv 0 4154

State 00 00AC Conv 0 -4154

22508Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Washington

NDOT Improvement 2-lane conc pvmt, storm sewer, bike trail

Blair South Bypass 0.00 1.0

Bypass road from US-30 at Hollow Rd east to US-75 at Co Rd P35

$11,816Estimate ($1,000)

FY22

Project No STP-DPS-3854(1)

FY23

PE

EM 00 0579 0 0

ROW

STP 00 01,200 0 0

Local 00 0300 0 0

Const / CE

Local 09,737 00 0 0

22543Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cass

NDOT Improvement Mill, resurf 24' rdwy, rebuild/resurf shld, br repair Union - Murray US-34 366.38 7.3

US-75 & 34 from south of Jct US-34 & 75 near Union, north to south of Jct N-1

$5,671Estimate ($1,000)

FY22

Project No NH-34-7(129)

FY23

PE

State 00 00 35 0

ROW

State 00 00 0 1

Const / CE

NHPP 00 4,3900 0 0

State 00 1,2450 0 0

24

Page 38: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

22568Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Washington

NDOT Improvement Mill, resurf

Fort Calhoun South US-75 101.35 5.3

US-75 from 0.2 mi north of Douglas/Washington Co line north to Fort Calhoun

$4,108Estimate ($1,000)

FY22

Project No NH-75-3(119)

FY23

PE

State 00 0310 0 0

ROW

State 00 012 0 0

Const / CE

NHPP 02,971 00 0 0

State 0815 00 0 0

22582Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dodge

NDOT Improvement Mill, resurf, resurf ramps, br repair/overlay

Douglas County Line North US-275 152.44 4.5

US-275 from E Jct US-30 to Dodge/Douglas Co line, incl US-30 br repair/overlay

$4,242Estimate ($1,000)

FY22

Project No NH-275-6(139)

FY23

PE

State 00 0142 0 0

Const / CE

NHPP-AC 00 00 3280 0

State 00 00 820 0

NHPP 00 00AC Conv 0 3280

State 00 00AC Conv 0 -3280

22590Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Washington

NDOT Improvement Mill, conc repair, urban resurf, ADA curb ramps In Blair N-91 229.97 0.5

N-91 from US-30/75 in Blair southwest 0.5 mi

$687Estimate ($1,000)

FY22

Project No NH-91-7(111)

FY23

PE

State 00 045 0 0

Local 00 010 0 0

ROW

State 00 010 0 0

Local 00 02 0 0

Const / CE

NHPP 0364 00 0 0

State 075 00 0 0

Local 0181 00 0 0

25

Page 39: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

22599Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Washington

NDOT Improvement Mill, resurf existing rdwy and s-shld with asphalt, culv, br deck repair/ovly Blair Southwest US-30 440.37 5.8

US-30 from just northeast of N-31 northeast to Blair

$4,642Estimate ($1,000)

FY22

Project No NH-30-7(118)

FY23

PE

State 1470 00 0 0

ROW

State 00 00 10 0

Const / CE

NHPP 00 3,5830 0 0

State 00 9020 0 0

22688Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dodge

NDOT Improvement Mill, resurf EB rdwy, shld, rumble strips, br repair/overlay Fremont Northeast Bypass US-30 426.09 3.3

EB US-30 from US-77 to just north of US-275 east of Fremont

$2,848Estimate ($1,000)

FY22

Project No NH-30-6(138)

FY23

PE

State 00 0103 0 0

Const / CE

NHPP 02,196 00 0 0

State 0549 00 0 0

22691Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dodge

NDOT Improvement Conc repair, crack/joint seal, roadway sealer, br repair Fremont - US-30 US-77 115.15 1.4

US-77 from 23rd St in Fremont to 0.3 mi south of US-30

$1,112Estimate ($1,000)

FY22

Project No S-77-3(1037)

FY23

PE

State 09 00 0 0

Const / CE

State 00 00 0 1103

26

Page 40: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

22713Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dodge

NDOT Improvement Concrete repair and rehab, br repair

Fremont North, US-30 - US-275 (NB) US-77 117.43 7.1

US-77 from approx 0.6 mi north US-30 grade separation to N Jct US-275/N-91

$4,324Estimate ($1,000)

FY22

Project No NH-77-3(138)

FY23

PE

State 00 00 37 0

Const / CE

NHPP 00 00 0 0

State 00 00 0 0

22720Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dodge

NDOT Improvement Gr, conc pvmt & s-shld reconstruction, culv, br repairs, gdrl US-275 East of Fremont - Arlington US-30 429.28 3.9

US-30 from approx 0.6 mi east US-275 gr separation east to west lmts Arlington

$13,031Estimate ($1,000)

FY22

Project No NH-30-6(139)

FY23

PE

State 8630 00 0 0

ROW

State 00 00 100 0

Const / CE

NHPP 00 9,4530 0 0

State 00 2,6150 0 0

22722Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dodge

NDOT Improvement Gr, new bridges, conc pvmt for new 4-lane divided expressway, ramps Fremont Southeast Beltway 112.43 3.3

US-77 from Platte River on new alignment to new US-275 interchange SE of Fremont

$56,611Estimate ($1,000)

FY22

Project No S-77-3(1036)

FY23

PE

State 00 02,034 0 0

ROW

State 00 03,200 0 0

Const / CE

State 31,3770 00 0 0

State 6,6700 00 0 0

Local 13,3300 00 0 0

27

Page 41: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

22731Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cass

NDOT Improvement Bridge repair/overlay, inlets, replace expansion joints, gdrl Plattsmouth - Bellevue Bridges US-34 382.10 4.1

US-34 bridges from approx 1.4 mi north Plattsmouth to 0.6 mi north Jct US-75

$4,800Estimate ($1,000)

FY22

Project No NH-34-7(132)

FY23

PE

State 00 0145 0 0

Const / CE

NHPP-AC 00 00 3724 0

State 00 00 931 0

NHPP 00 00AC Conv 0 3724

State 00 00AC Conv 0 -3724

22752Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dodge

NDOT Improvement Mill, resurf existing rdwy & s-shld w/asph, conc pvmt sections, ADA, br repair North Bend - US-30 N-79 42.29 2.1

N-79 from 0.5 mi south North Bend to new US-30 Rogers - North Bend alignment

$4,078Estimate ($1,000)

FY22

Project No STP-79-3(108)

FY23

PE

State 00 0141 0 0

ROW

State 020 00 0 0

Const / CE

STP 00 00 3071 0

State 00 00 846 0

22766Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cass

NDOT Improvement Replace viaduct

Louisville Viaduct N-50 76.11 0.0

N-50 viaduct in Louisville

$2,925Estimate ($1,000)

FY22

Project No STP-50-2(138)

FY23

PE

State 00 00 0 1

Const / CE

STP 00 2,3390 0 0

State 00 5850 0 0

28

Page 42: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

22774Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dodge

NDOT Improvement Replace pot bearings in steel girder spans and associated work Missouri River Bridge in Blair US-30 450.55 0.0

US-30 bridge over Missouri River in Blair

$376Estimate ($1,000)

FY22

Project No STR-30-6(1050)

FY23

PE

State 10 00 0 0

Other 10 00 0 0

Const / CE

State 00 00 0 187

Other 00 00 0 187

31208 Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Stanton

County Improvement Bridge replacement and associated approach work Stanton North

Co Road #839 over Indian Creek 2.2 mi north of Stanton

$1,044Estimate ($1,000)

FY22

Project No BRO-7084(7)

FY23

PE

BRO 00 012 0 0

State 00 03 0 0

Local 00 03 0 0

ROW

BRO 00 020 0 0

State 00 03 0 0

Local 00 03 0 0

Const / CE

BRO 0800 00 0 0

State 0200 00 0 0

31490Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Madison

NDOT Improvement Mill, asph widen/resurf existing 24'-rdwy to 28', br repair, gdrl Newman Grove North & South N-45 0.00 9.2

N-45 from Jct N-91 to Jct N-32 except for a small segment; Includes L-58B

$3,856Estimate ($1,000)

FY22

Project No STP-45-3(106)

FY23

PE

State 00 0388 0 0

ROW

State 00 054 0 0

Const / CE

STP 02,659 00 0 0

State 0755 00 0 0

29

Page 43: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

31510Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Knox

NDOT Improvement Bridge replacement, add approaches

Niobrara South Bridge N-14 198.59 0.0

N-14 1.0 mi south of Niobrara over Burgess Creek

$2,855Estimate ($1,000)

FY22

Project No STP-14-4(109)

FY23

PE

State 00 0253 0 0

ROW

State 00 06 0 0

Const / CE

STP 02,025 00 0 0

State 0571 00 0 0

31515Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Wayne

NDOT Improvement Mill, widen/resurf existing 24' rdwy to 28', conc repair, culv, gdrl North Jct US-81 - N-35 N-98 7.46 13.0

N-98 from N Jct US-81, east to Jct N-35

$7,867Estimate ($1,000)

FY22

Project No STP-98-5(106)

FY23

PE

State 00 030 0 0

ROW

State 050 00 0 0

Const / CE

STP-AC 00 00 6230 0

State 00 00 1557 0

STP 00 00AC Conv 0 6230

State 00 00AC Conv 0 -6230

31674Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Knox

NDOT Improvement Gr, str, surf 24' rdwy w/8' shld, 2' surf

Niobrara East & West N-12 151.48 10.6

N-12 east and west of Niobrara on shifted alignment

$214,797Estimate ($1,000)

FY22

Project No S-12-5(1011)

FY23

PE

State 00 06,147 0 0

Other 00 01,886 0 0

ROW

State 00 04 0 0

Other 00 08,730 0 0

Const / CE

Other 198,0300 00 0 0

30

Page 44: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

31677Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cedar

NDOT Improvement Mill, resurf rdwy, replace urban section in Randolph, br repair/replace US-81 - Belden US-20 373.95 10.5

US-20 from US-81 east to approx 1.0 mi west of N-57 west of Belden

$13,717Estimate ($1,000)

FY22

Project No NH-20-5(112)

FY23

PE

State 00 0500 0 0

ROW

State 00 054 0 0

Const / CE

NHPP-AC 010,530 00 0 0

State 02,633 00 0 0

NHPP 00 00AC Conv 5000 0

State 00 00AC Conv -5000 0

NHPP 00 00AC Conv 0 5530

State 00 00AC Conv 0 -5530

31821 Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Knox

County Improvement Br replacement and associated approach work Verdigre North

Co Rd 3.5 mi north of Verdigre crossing Verdigris Creek

$1,956Estimate ($1,000)

FY22

Project No BRO-7054(19)

FY23

PE

BRO 00 0258 0 0

State 00 069 0 0

ROW

BRO 00 08 0 0

State 00 02 0 0

Const / CE

BRO 1,2350 00 0 0

State 3840 00 0 0

31

Page 45: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

31832Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Knox

NDOT Improvement Mill, resurf existing rdwy & s-shld, repair/replace br's, culv,curb & flume,gdrlBloomfield - US-81 N-84 22.39 11.5

N-84 from the east limits of Bloomfield east to Jct US-81

$6,369Estimate ($1,000)

FY22

Project No STP-84-5(108)

FY23

PE

State 00 0218 0 0

ROW

State 055 00 0 0

Const / CE

STP-AC 00 00 4877 0

State 00 00 1219 0

STP 00 00AC Conv 0 4877

State 00 00AC Conv 0 -4877

31883 Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Platte

County Improvement Bridge replacement and associated approach work Monroe Southwest

Co Rd 0.7 mi south and 1.8 mi west of Monroe crossing Columbus Genoa Canal

$0Estimate ($1,000)

FY22

Project No BRO-7071(9)

FY23

PE

BRO 00 074 0 0

Local 00 026 0 0

ROW

BRO 04 00 0 0

State 01 00 0 0

Const / CE

BRO 0600 00 0 0

State 0150 00 0 0

32

Page 46: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

31916Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cedar

NDOT Improvement Mill, resurf 24' rdwy to 28' w/6' earth shld, br repair, curb/flume, gdrl Coleridge - Hartington N-57 57.88 8.7

N-57 from 875 Rd north of Coleridge north to N-84 near Hartington

$6,296Estimate ($1,000)

FY22

Project No STP-57-4(116)

FY23

PE

State 00 0209 0 0

ROW

State 00 010 0 0

Const / CE

STP-AC 04,742 00 0 0

State 01,335 00 0 0

STP 4,7420 00AC Conv 0 0

State -4,7420 00AC Conv 0 0

31922Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Burt

NDOT Improvement Asph resurf 24' rdwy w/10' shld, 8' surf

Lyons - Walthill US-77 148.77 15.1

US-77 from 0.3 mi south of Lyons north to 0.2 mi north of N-94

$8,715Estimate ($1,000)

FY22

Project No NH-77-3(126)

FY23

PE

State 350 00 0 0

Const / CE

NHPP 00 6,9440 0 0

State 00 1,7360 0 0

31949Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cuming

NDOT Improvement Conc repair, mill, widen/resurf 24' rdwy to 28', br repair, extend culv, gdrl West Point West N-32 62.41 10.9

N-32 from near Wisner Rd to approx 0.2 mi east of west lmts West Point

$6,564Estimate ($1,000)

FY22

Project No STP-32-6(113)

FY23

PE

State 00 0195 0 0

ROW

State 00 05 0 0

Const / CE

STP-AC 05,091 00 0 0

State 01,273 00 0 0

STP 5,0910 00AC Conv 0 0

State -5,0910 00AC Conv 0 0

33

Page 47: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

31983Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Platte

NDOT Improvement Replace (SB) & repair (NB) br's over Loup River, CBC to replace br at S030 37787Columbus South Bridges US-30 377.73 0.0

US-30 br's over Loup River & US-30 br approx 0.2 mi north of south lmts Columbus

$10,028Estimate ($1,000)

FY22

Project No NH-30-5(131)

FY23

PE

State 01,052 00 0 0

ROW

State 200 00 0 0

Const / CE

NHPP 00 00 0 6976

State 00 00 0 1980

31989Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Thurston

NDOT Improvement Widen resurf 24' rdwy to 28' w/4' earth shld Macy - Winnebago US-75 158.43 9.6

US-75 from approx 3.0 mi south of N-94 north to 0.9 mi south of the S Jct US-77

$10,744Estimate ($1,000)

FY22

Project No STP-75-4(115)

FY23

PE

State 2820 00 0 0

ROW

State 00 00 272 0

Const / CE

STP 00 7,9500 0 0

State 00 2,2400 0 0

32124Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cuming

NDOT Improvement Mill, resurf rdwy and shld, br repair/overlay

Beemer North L-20A 0.00 5.3

L-20A from N-51 south to US-275 in Beemer

$2,478Estimate ($1,000)

FY22

Project No STP-L20A(102)

FY23

PE

State 00 085 0 0

Const / CE

STP 01,914 00 0 0

State 0479 00 0 0

34

Page 48: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

32127Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Knox

NDOT Improvement Mill, asph resurf

N-121 West N-59 16.00 9.0

N-59 from approx 9.0 mi east of Creighton east to N-121

$3,164Estimate ($1,000)

FY22

Project No STP-59-5(108)

FY23

PE

State 00 075 0 0

Const / CE

STP 02,471 00 0 0

State 0618 00 0 0

32128Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Knox

NDOT Improvement Conc repair, mill & resurf existing rdwy, trench widen/resurf, br repair Creighton East N-59 6.42 9.6

N-59 from approx 0.7 mi east of Creighton east to 540th Ave

$4,491Estimate ($1,000)

FY22

Project No STP-59-5(109)

FY23

PE

State 00 0163 0 0

ROW

State 00 07 0 0

Const / CE

STP-AC 03,412 00 0 0

State 0909 00 0 0

STP 3,4120 00AC Conv 0 0

State -3,4120 00AC Conv 0 0

32136Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Thurston

NDOT Improvement Asph resurf 24' rdwy w/8' shld, 2' surf., br

Pender - Emerson N-9 17.85 12.1

N-9 from Pender north to Emerson, including the Thurston Spur (S-87A)

$7,716Estimate ($1,000)

FY22

Project No STP-9-4(116)

FY23

PE

State 00 00 20 0

Const / CE

STP 00 00 0 0

State 00 00 0 0

35

Page 49: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

32137Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dixon

NDOT Improvement Mill, resurf 24' rdwy, w/8' s shld, bridges repair/replace/rehab, guardrail North of Dixon - South of Martinsburg US-20 399.15 9.6

US-20 from 0.2 mi west of N-116 east to 0.8 mi east of E Jct N-9

$10,129Estimate ($1,000)

FY22

Project No NH-20-6(110)

FY23

PE

State 00 0236 0 0

ROW

State 00 043 0 0

Const / CE

NHPP-AC 07,684 00 0 0

State 02,166 00 0 0

NHPP 7,6840 00AC Conv 0 0

State -7,6840 00AC Conv 0 0

32139Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Burt

NDOT Improvement Conc repair, resurf existing rdwy w/asph, curb & flume, br repair, culv, gdrl Decatur - Macy US-75 149.19 7.8

US-75 from 0.1 mi north of N-51 in Decatur, north to 1.0 mi south of Macy

$6,044Estimate ($1,000)

FY22

Project No STP-75-3(118)

FY23

PE

State 080 00 0 0

Const / CE

STP 00 4,7710 0 0

State 00 1,1930 0 0

32150A Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dakota

NDOT Improvement Resurf, br repair

SW of Hubbard - US-75/77 N-35 59.03 9.4

N-35 from approx 0.4 mi SW of Hubbard, northeast to Jct US-75/77

$5,532Estimate ($1,000)

FY22

Project No NH-35-4(127)

FY23

PE

State 00 00 1 0

Const / CE

NHPP 00 00 0 0

State 00 00 0 0

36

Page 50: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

32190Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Platte

County Improvement New viaduct

Columbus East Viaduct 0.00 0.0

E 29th Ave, from E 8th St north to US-301.0 mi east of Columbus

$13,983Estimate ($1,000)

FY22

Project No RRZ-71(33)

FY23

PE

SFTY 00 0237 0 0

State 00 0722 0 0

State 00 020 0 0

Other 00 0113 0 0

Local 00 0677 0 0

Const / CE

SFTY 010,382 00 0 0

Other 01,221 00 0 0

Local 0611 00 0 0

32213Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Antelope

NDOT Improvement Bridge replacement

Clearwater East Bridge US-275 35.96 0.0

US-275 over a stream 4.7 mi east of Clearwater

$878Estimate ($1,000)

FY22

Project No NH-275-5(145)

FY23

PE

State 00 050 0 0

ROW

State 00 09 0 0

Const / CE

NHPP 0640 00 0 0

State 0179 00 0 0

32220Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cuming

NDOT Improvement Replace br's w/CBC and associated rdwy work Wisner Southeast Bridges US-275 104.68 0.0

US-275 over a stream approx 2.6 mi southeast of Wisner

$2,816Estimate ($1,000)

FY22

Project No NH-275-6(143)

FY23

PE

State 00 0205 0 0

ROW

State 00 027 0 0

Const / CE

NHPP 02,038 00 0 0

State 0546 00 0 0

37

Page 51: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

32223Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cuming

NDOT Improvement Bridge replacements

Pender South Bridges N-9 13.97 0.0

N-9 at three bridge locations approx 3.1, 1.9 and 0.2 mi south of Pender

$2,617Estimate ($1,000)

FY22

Project No STP-9-3(105)

FY23

PE

State 10 00 0 0

Const / CE

STP 00 00 0 0

State 00 00 0 0

32228Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Colfax

NDOT Improvement Br repair/overlay, painting

In Schuyler N-15 108.33 0.0

N-15 viaduct approx 0.2 mi south of 16th St in Schuyler

$1,044Estimate ($1,000)

FY22

Project No STP-15-3(116)

FY23

PE

State 00 024 0 0

ROW

State 00 01 0 0

Const / CE

STP 0815 00 0 0

State 0204 00 0 0

38

Page 52: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

32234Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Platte

NDOT Improvement Urban reconstruction, lighting, traffic signals, ADA 23rd St, Columbus US-30 379.44 2.7

US-30 from just east of N Jct US-81 east to 11th Ave in Columbus

$18,277Estimate ($1,000)

FY22

Project No NH-30-5(134)

FY23

PE

State 00 0831 0 0

Local 00 032 0 0

ROW

State 0160 00 0 0

Local 040 00 0 0

Const / CE

NHPP-AC 13,2650 00 0 0

State 5060 00 0 0

Local 3,4430 00 0 0

NHPP 00 00AC Conv 7265 0

State 00 00AC Conv -7265 0

NHPP 00 00AC Conv 0 6000

State 00 00AC Conv 0 -6000

32236 Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Knox

NDOT Improvement Mill, widen/resurf 24' rdwy to 28', replace 1 br, repair 1 br, culv, flumes Verdigre - Niobrara N-14 187.98 11.5

N-14 from Jct N-84 & S-54A (Verdigre Spur) north to W Jct N-12 in Niobrara

$0Estimate ($1,000)

FY22

Project No STP-14-4(115)

FY23

Const / CE

STP 04,880 00AC Conv 0 0

State 0-4,880 00AC Conv 0 0

39

Page 53: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

32238Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dixon

NDOT Improvement Mill, resurf, 2 bridge replacements

E Jct US-20 - N-12 N-9 50.98 10.0

N-9 from E Jct US-20, northeast to N-12 0.5 mi south of Ponca

$7,158Estimate ($1,000)

FY22

Project No STP-9-4(118)

FY23

PE

State 00 0520 0 0

ROW

State 00 085 0 0

Const / CE

STP-AC 05,113 00 0 0

State 01,440 00 0 0

STP 5,1130 00AC Conv 0 0

State -5,1130 00AC Conv 0 0

32240Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Knox

NDOT Improvement Mill, resurf 24' rdwy with 5' earth shld

Crofton West N-12 177.16 12.0

N-12 from Hoboe Creek east to E Jct N-121

$5,271Estimate ($1,000)

FY22

Project No STP-12-5(120)

FY23

PE

State 020 00 0 0

Const / CE

STP 00 4,2010 0 0

State 00 1,0500 0 0

32249Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Burt

NDOT Improvement Deploy closed circuit TV cameras

District 3 CCTV Cameras US-77 141.31 0.0

At 8 locations on N-9, US-77, N-32, US-20 and US-81 in District 3

$309Estimate ($1,000)

FY22

Project No ITS-NH-STP-77-3

FY23

PE

State 00 013 0 0

Const / CE

NHPP 0143 00 0 0

STP 088 00 0 0

State 065 00 0 0

40

Page 54: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

32252Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Knox

NDOT Improvement Br repair/overlay

Standing Bear Bridge NE of Niobrara N-14 203.30 0.0

N-14 Standing Bear Bridge over Missouri River northeast of Niobrara

$691Estimate ($1,000)

FY22

Project No STP-14-4(118)

FY23

PE

State 00 028 0 0

Other 00 013 0 0

Const / CE

STP 0354 00 0 0

State 088 00 0 0

Other 0208 00 0 0

32256Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cedar

NDOT Improvement Mill, resurf 28' rdwy, br repair/overlay, extend culv, seal br rail, culv, gdrl Hartington North N-57 67.33 6.7

N-57 from Norwegian Bow Cr bridge approx 0.2 mi north Hartington to Jct N-12

$5,295Estimate ($1,000)

FY22

Project No STP-57-4(118)

FY23

PE

State 00 0176 0 0

ROW

State 00 010 0 0

Const / CE

STP-AC 04,087 00 0 0

State 01,022 00 0 0

STP 4,0870 00AC Conv 0 0

State -4,0870 00AC Conv 0 0

32257 Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Burt

NDOT Improvement Conc repair, mill, resurf, br replacement

Tekamah North US-75 133.44 6.1

US-75 from just north of Tekamah north to 8.8 mi south of Decatur

$7,300Estimate ($1,000)

FY22

Project No STP-75-3(122)

FY23

Const/CE

STP 05,612 00AC Conv 0 0

State 0-5,612 00AC Conv 0 0

41

Page 55: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

32262Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Boone

NDOT Improvement Conc repair, mill, inlay, curb and gutter, sidewalk ramps, br In Albion, Petersburg & Elgin N-14 121.43 3.8

Three segements of N-14 in the areas of Albion, Petersburg and Elgin

$3,552Estimate ($1,000)

FY22

Project No STP-14-3(119)

FY23

PE

State 00 0329 0 0

ROW

State 00 024 0 0

Const / CE

STP 02,492 00 0 0

State 0707 00 0 0

32263Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cedar

NDOT Improvement Mill, asph resurf rdwy, br repait, earth shld rehab N-59 - N-84 N-15 182.94 9.8

N-15 from N-59 north to approx 0.2 mi south of N-84

$3,489Estimate ($1,000)

FY22

Project No STP-15-4(121)

FY23

PE

State 00 085 0 0

Const / CE

STP 02,651 00 0 0

State 0753 00 0 0

32278Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Knox

NDOT Improvement Br Redeck

Santee South Bridge S-54D 1.57 0.0

S-54D (Santee Spur) over Lost Creek approx 1.6 mi northeast of N-12

$454Estimate ($1,000)

FY22

Project No STP-S54D(104)

FY23

PE

State 00 00 1 0

Const / CE

STP 00 00 0 0

State 00 00 0 0

42

Page 56: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

32280Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Knox

NDOT Improvement Mill,resurf existing rdwy, br repair, w iden turn lanes & shld,curb & flume,gdrlCrofton North N-121 66.73 9.7

N-121 from N-12 north to approx 1.4 mi east of the Knox/Cedar Co line

$4,902Estimate ($1,000)

FY22

Project No STP-121-4(113)

FY23

PE

State 00 0550 0 0

ROW

State 00 020 0 0

Const / CE

STP 03,466 00 0 0

State 0866 00 0 0

32283Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Pierce

NDOT Improvement Mill, resurf existing rdwy, add s-shld, repair light poles Pierce Northwest N-13 9.24 4.7

N-13 from approx 0.4 mi SE of NW lmts of Pierce, NW to just NW of Jct N-121

$2,022Estimate ($1,000)

FY22

Project No STP-13-4(112)

FY23

PE

State 00 064 0 0

ROW

State 00 05 0 0

Const / CE

STP 01,562 00 0 0

State 0391 00 0 0

32284Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Antelope

NDOT Improvement Resurf

US-20 - N-59 N-14 170.91 8.3

N-14 from Jct US-20 to Jct N-59

$3,936Estimate ($1,000)

FY22

Project No STP-14-4(117)

FY23

PE

State 00 00 1 0

Const / CE

STP 00 00 0 0

State 00 00 0 0

43

Page 57: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

32285Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Burt

NDOT Improvement Mill, resurf, br repair, replace approaches

Tekamah South US-75 126.19 5.8

US-75 from Washington/Burt Co line to 0.4 mi north of south limits of Tekamah

$3,295Estimate ($1,000)

FY22

Project No STP-75-3(123)

FY23

PE

State 00 0142 0 0

ROW

State 00 020 0 0

Const / CE

STP 02,506 00 0 0

State 0627 00 0 0

32286Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Colfax

NDOT Improvement Mill, resurf existing rdwy & s-shld with asphalt, br repair, gdrl N-91 South N-15 111.25 15.3

N-15 from approx 1.8 mi north US-30 grade separation north of Schuyler-Jct N-91

$8,045Estimate ($1,000)

FY22

Project No STP-15-3(119)

FY23

PE

State 00 0191 0 0

Const / CE

STP-AC 00 00 6283 0

State 00 00 1571 0

STP 00 00AC Conv 0 6283

State 00 00AC Conv 0 -6283

32287Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Platte

NDOT Improvement Conc repair, mill, resurf existing rdwy and s-shld, br repair, culv, gdrl Columbus East & North US-30 382.10 7.7

US-30 from Columbus east approx 2.3 mi; includes rwo segments on US-81

$6,737Estimate ($1,000)

FY22

Project No NH-30-5(135)

FY23

PE

State 00 0574 0 0

Const / CE

NHPP-AC 04,930 00 0 0

State 01,233 00 0 0

NHPP 4,9300 00AC Conv 0 0

State -4,9300 00AC Conv 0 0

44

Page 58: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

32288Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cedar

NDOT Improvement Resurf

N-12 North & South N-15 192.74 9.3

N-15 from N-84 to W jct N-12; and E jct N-12 to just south of South Dakota line

$4,340Estimate ($1,000)

FY22

Project No STP-NH-15-4(12

FY23

PE

State 1240 00 0 0

Const / CE

NHPP 00 00 0 0

STP 00 00 0 0

State 00 00 0 0

32289Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cuming

NDOT Improvement Resurf, br repair

N. Jct. N-51 - S. Jct. N-9 N-16 0.00 10.6

N-16 from N jct N-51 to S jct N-9

$6,227Estimate ($1,000)

FY22

Project No STP-16-3(110)

FY23

PE

State 10 00 0 0

Const / CE

STP-AC 00 00 0 0

State 00 00 0 0

STP 00 4,9810AC Conv 0 0

State 00 -4,9810AC Conv 0 0

32290Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Stanton

NDOT Improvement Resurf

N-57 East N-32 47.46 15.0

N-32 from N-59 east to just east of Wisner Rd

$5,340Estimate ($1,000)

FY22

Project No STP-32-6(115)

FY23

PE

State 10 00 0 0

Const / CE

STP 00 4,2710 0 0

State 00 1,0680 0 0

45

Page 59: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

32291Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Antelope

NDOT Improvement Resurf

Orchard East & West US-20 328.83 8.8

US-20 from Holt/Antelope Co line east to Royal

$5,086Estimate ($1,000)

FY22

Project No NH-20-5(113)

FY23

PE

State 00 00 1 0

Const / CE

NHPP 00 00 0 0

State 00 00 0 0

32292Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Platte

NDOT Improvement Resurf, replace two bridges

Monroe East & West N-22 75.95 13.2

N-22 from Nance/Platte Co line east to approx 0.3 mi west of US-81

$9,554Estimate ($1,000)

FY22

Project No STP-22-5(119)

FY23

PE

State 10 00 0 0

Const / CE

STP-AC 00 00 0 0

State 00 00 0 0

STP 00 7,6420AC Conv 0 0

State 00 -7,6420AC Conv 0 0

32293Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Pierce

NDOT Improvement Resurf

S. Jct. N-98 - US-20 US-81 168.94 11.1

US-81 from S Jct N-98, north to just north of Jct US-20

$6,250Estimate ($1,000)

FY22

Project No NH-81-4(126)

FY23

PE

State 10 00 0 0

Const / CE

NHPP 00 00 0 0

State 00 00 0 0

46

Page 60: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

32294Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Pierce

NDOT Improvement Resurf

In Plainview & West US-20 351.87 4.0

US-20 from 1.0 mi west of the Antelope/Pierce Co line thru Plainview

$2,147Estimate ($1,000)

FY22

Project No NH-20-5(114)

FY23

PE

State 00 00 1 0

Const / CE

NHPP 00 00 0 0

State 00 00 0 0

32295Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Thurston

NDOT Improvement Resurf

N-94 - Winnebago US-77 163.91 5.6

US-77 from just north of Jct N-94 to just south of Jct US-275 south of Winnebago

$3,221Estimate ($1,000)

FY22

Project No NH-77-4(127)

FY23

PE

State 01 00 0 0

Const / CE

NHPP 00 00 0 2576

State 00 00 0 644

32296Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Burt

NDOT Improvement Mill, resurf existing rdwy & s-shld, culv, br repair and gdrl US-77 - US-75 N-51 24.49 11.0

N-51 from just west of Jct US-77, east to just west of S jct US-75

$8,009Estimate ($1,000)

FY22

Project No STP-51-7(106)

FY23

PE

State 00 0604 0 0

ROW

State 0150 00 0 0

Const / CE

STP 00 00 5804 0

State 00 00 1451 0

47

Page 61: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

32297Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cedar

NDOT Improvement Conc pvmt repair, sealing cracks & joints, replace CBC, conc pvmt, storm sewer In Hartington N-57 66.06 2.0

N-57 from S Jct N-84 to just north Norwegian Bow Creek Bridge in Hartington

$1,039Estimate ($1,000)

FY22

Project No STP-57-4(120)

FY23

PE

State 00 04 0 0

ROW

State 02 00 0 0

Const / CE

STP 8220 00 0 0

State 2110 00 0 0

32302Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cuming

NDOT Improvement 4-lane gr, str, surf

Scribner - West Point US-275 114.00 19.7

US-275 from Scribner to West Point

$124,521Estimate ($1,000)

FY22

Project No S-275-6(1050)

FY23

PE

State 00 011,521 0 0

ROW

State 00 05,000 0 0

Const / CE

State 020,000 00 0 0

State 50,0000 00 0 0

State 00 00 0 38000

32312Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dixon

NDOT Improvement Bridge replacements

Norfolk NE Bridges N-116 0.62 0.0

At various highway bridge locations northeast of Norfolk

$11,340Estimate ($1,000)

FY22

Project No STP-D3(107)

FY23

PE

State 00 01 0 0

Const / CE

STP-AC 9,0710 00 0 0

State 2,2680 00 0 0

STP 00 9,0710AC Conv 0 0

State 00 -9,0710AC Conv 0 0

48

Page 62: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

32313Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Knox

County Improvement Bridge

Center West

Rd 881 (Bazille St) approx 0.7 mi west of intersection N-13 in Center

$1,248Estimate ($1,000)

FY22

Project No BRO-7054(22)

FY23

PE

BRO 020 00 0 0

Const / CE

BRO 00 00 1228 0

32314Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Madison

County Improvement Bridge

Jackson Street in Madison

Jackson Street south of 2nd St N in Madison

$673Estimate ($1,000)

FY22

Project No BRO-7059(16)

FY23

PE

BRO 010 00 0 0

Local 03 00 0 0

Const / CE

BRO 00 00 528 0

Local 00 00 132 0

32315Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Madison

County Improvement Bridge

Norfolk North

W Eisenhower Ave approx 0.4 mi east intersection US-81 north of Norfolk

$582Estimate ($1,000)

FY22

Project No BRO-7059(17)

FY23

PE

BRO 01 00 0 0

Const / CE

BRO 00 00 581 0

32319Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Stanton

NDOT Improvement Corridor study for NEPA & Tr Operation, Hwy & Br Design, Survey, ROW Plans Norfolk - Wisner US-275 86.10 15.7

US-275 from N-57 approx 8.6 mi east Norfolk to Wisner

$2,688Estimate ($1,000)

FY22

Project No S-275-6(1052)

FY23

PE

State 02,688 00 0 0

49

Page 63: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

32319AControl No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Stanton

County Improvement 4-lane gr, str, surf

N-57 - East Jct N-15 US-275 86.08 10.0

US-275 from Jct N-57 to east Jct N-15 north of Pilger

$25,000Estimate ($1,000)

FY22

Project No TIB-275-6(149)

FY23

PE

State 00 050 0 0

Const / CE

EM 19,9600 00 0 0

State 4,9900 00 0 0

32320Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Knox

NDOT Improvement Br replacement, build temp br due to March 2019 flood event Niobrara West Bridges N-12 159.83 0.0

N-12 bridges west of Niobrara (Site#'s D3-3 and D3-4)

$48,231Estimate ($1,000)

FY22

Project No ER-12-5(122)

FY23

Const / CE

STP 047,265 00AC Conv 0 0

STP 0-47,265 00ER Conv 0 0

ER 047,265 00ER Conv 0 0

State 01,000 00AC Conv 0 0

41086Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Adams

NDOT Improvement Gr, culv, 1.9 mi conc pvmt - 5 lane urban section, 3.2 mi 4-lane divided sectionHastings Southeast US-6 212.70 2.4

US-6 from just west 'J' St to just west BNSF RR xing approx 1.3 mi east Hastings

$35,439Estimate ($1,000)

FY22

Project No S-6-4(1022)

FY23

PE

State 00 0220 0 0

State 00 01,733 0 0

Local 00 0433 0 0

ROW

State 04,800 00 0 0

Local 01,200 00 0 0

Const / CE

State 00 20,9600 0 0

State 00 8530 0 0

Local 00 5,2400 0 0

50

Page 64: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

41704Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Hall

NDOT Improvement 4 lane divided rdwy on new alignment

US-281 West, Grand Island US-30 308.84 3.7

US-30 from 1.4 mi west of Grand Island to 0.4 mi west of N-2

$29,257Estimate ($1,000)

FY22

Project No S-30-4(1046)

FY23

PE

State 00 0910 0 0

State 00 01,216 0 0

Local 00 0191 0 0

ROW

State 03,861 00 0 0

State 02 00 0 0

Local 0508 00 0 0

Const / CE

State 00 00 20370 0

Local 00 00 2199 0

41977Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Polk

NDOT Improvement Urban

In Stromsburg US-81 78.26 0.7

US-81 in Stromsburg

$1,399Estimate ($1,000)

FY22

Project No NH-81-2(134)

FY23

PE

State 420 00 0 0

Const / CE

NHPP 00 1,0630 0 0

State 00 2940 0 0

51

Page 65: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

42335 Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Merrick

County Improvement Br replacement and associated approach work Palmer Northwest

Merrick Rd over Rock Creek 5.7 mi north and 1.8 mi west of Palmer

$1,099Estimate ($1,000)

FY22

Project No BRO-7061(27)

FY23

PE

BRO 00 040 0 0

State 00 07 0 0

Local 00 05 0 0

ROW

BRO 04 00 0 0

State 01 00 0 0

Const / CE

BRO 8340 00 0 0

State 2080 00 0 0

42404Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

York

NDOT Improvement Asph resurf 24' rdwy w/6'-10' shld, 2' - 8' surf, br repair Henderson Spur S-93A 0.00 6.7

Henderson Spur (S-93A) except for approx 0.3 mi section

$4,582Estimate ($1,000)

FY22

Project No STP-S93A(107)

FY23

PE

State 0151 00 0 0

Const / CE

STP 00 3,5450 0 0

State 00 8860 0 0

42543Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Thayer

NDOT Improvement Widen/resurf existing 24'-rdwy to 28', shld widening, br sized culvs, gdrl Nuckolls Co Line - L85F US-136 116.28 12.1

US-136 from Nuckolls Co line to 1.2 mi west of Jct US-81

$8,985Estimate ($1,000)

FY22

Project No STP-136-5(113)

FY23

PE

State 0276 00 0 0

ROW

State 4000 00 0 0

Const / CE

STP 00 6,2890 0 0

State 00 2,0200 0 0

52

Page 66: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

42564AControl No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

York

NDOT Improvement Mill, conc resurf 24' rdwy, asph resurf 8' shld, intersection median islands York West US-34 262.04 9.8

US-34 from 0.2 mi east of the Henderson Spur east to the south jct with US-81

$7,565Estimate ($1,000)

FY22

Project No STP-34-5(117)

FY23

PE

State 00 0105 0 0

ROW

State 00 01 0 0

Const / CE

STP-AC 05,967 00 0 0

State 01,492 00 0 0

STP 5,9670 00AC Conv 0 0

State -5,9670 00AC Conv 0 0

42573Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Sherman

NDOT Improvement Mill, resurf 24' rdwy w/4' earth shld, conc repair, br's, gdrl North Jct N-92 - N-70 N-58 41.82 10.4

N-58 from N Jct N-92 north to N-58

$5,762Estimate ($1,000)

FY22

Project No STP-58-2(109)

FY23

PE

State 00 0145 0 0

ROW

State 00 012 0 0

Const / CE

STP-AC 04,484 00 0 0

State 01,121 00 0 0

STP 4,4840 00AC Conv 0 0

State -4,4840 00AC Conv 0 0

42576 Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Sherman

NDOT Improvement Conc repair, asph resurf, br repair

Ravenna North N-68 2.20 12.0

N-68 from 0.1 mi north Buffalo/Sherman Co line north to L82A & east to N-58

$5,451Estimate ($1,000)

FY22

Project No STP-68-2(103)

FY23

Const / CE

STP 04,088 00AC Conv 0 0

State 0-4,088 00AC Conv 0 0

53

Page 67: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

42602Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Sherman

NDOT Improvement Widen/resurf 24' rdwy to 28', br repair

Loup City West N-92 308.81 11.5

N-92 from Custer/Sherman Co. line east to 0.1 mi east of N-58

$6,756Estimate ($1,000)

FY22

Project No STP-92-4(110)

FY23

PE

State 0258 00 0 0

ROW

State 500 00 0 0

Const / CE

STP-AC 00 00 0 5033

State 00 00 0 1415

STP 00 5,0330AC Conv 0 0

State 00 -5,0330AC Conv 0 0

42605Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Greeley

NDOT Improvement Mill, resurf 24' rdwy w/earth shld, curb/flumes Scotia East N-22 15.81 8.4

N-22 from 0.1 mi east of Scotia east to US-281

$6,267Estimate ($1,000)

FY22

Project No STP-22-4(113)

FY23

PE

State 045 00 0 0

ROW

State 500 00 0 0

Const / CE

STP-AC 00 00 0 4938

State 00 00 0 1234

STP 00 4,9380AC Conv 0 0

State 00 -4,9380AC Conv 0 0

42608Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Clay

NDOT Improvement Conc repair, mill, resurf existing rdwy with asphalt S Jct N-14 - Ong Spur N-74 52.03 12.5

N-74 from S jct N-14 east to just east of Ong Spur; includes Ong Spur

$4,141Estimate ($1,000)

FY22

Project No STP-74-5(110)

FY23

PE

State 00 0175 0 0

Const / CE

STP 03,164 00 0 0

State 0802 00 0 0

54

Page 68: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

42610Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Clay

NDOT Improvement Mill, conc repair, resurf rdwy & s-shld, br repair, culv, replace median, lgtingHarvard - Sutton US-6 227.98 16.2

US-6 from 0.3 mi east of the Harvard Spur to Sutton including S-18A

$5,784Estimate ($1,000)

FY22

Project No STP-6-5(114)

FY23

PE

State 00 0145 0 0

ROW

State 00 010 0 0

Const / CE

STP-AC 04,503 00 0 0

State 01,126 00 0 0

STP 00 00AC Conv 4503 0

State 00 00AC Conv -4503 0

42611Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Thayer

NDOT Improvement Mill, asph resurf existing rdwy & s-shld, curb & flume, br repair, gdrl Hardy - Chester N-8 7.28 17.5

N-8 from just west Main St in Hardy to just west of east lmts Chester & S-85A

$6,614Estimate ($1,000)

FY22

Project No STP-8-5(108)

FY23

PE

State 00 0316 0 0

ROW

State 00 010 0 0

Const / CE

STP-AC 05,030 00 0 0

State 01,258 00 0 0

STP 5,0300 00AC Conv 0 0

State -5,0300 00AC Conv 0 0

42612 Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Buffalo

NDOT Improvement Widen/resurf 24' rdwy to 28', br repair, rumble strips, urban section Pleasanton South N-10 65.46 10.4

N-10 from approx 4.9 mi north Jct N-40 to approx 0.4 mi north of S Loup River

$10,272Estimate ($1,000)

FY22

Project No STP-10-2(122)

FY23

Const/CE

STP 07,277 00AC Conv 0 0

State 0-7,277 00AC Conv 0 0

55

Page 69: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

42617Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Webster

NDOT Improvement Mill, resurf 24' rdwy w/3' earth shld, br replacement Red Cloud West US-136 64.35 10.9

US-136 from Franklin/Webster Co line east to US-281 in Red Cloud

$11,641Estimate ($1,000)

FY22

Project No STP-136-4(115)

FY23

PE

State 00 0856 0 0

ROW

State 00 0186 0 0

Const / CE

STP-AC 08,356 00 0 0

State 02,243 00 0 0

STP 8,3560 00AC Conv 0 0

State -8,3560 00AC Conv 0 0

42619Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Webster

NDOT Improvement Remove brick, reconstruct urban section, pvmt repair, mill and resurf In Red Cloud US-281 5.84 0.3

On US-281 at the jct with US-136 in Red Cloud

$2,682Estimate ($1,000)

FY22

Project No STP-281-1(117)

FY23

PE

State 00 00 76 0

Const / CE

STP 00 1,9750 0 0

State 00 4940 0 0

Local 00 1370 0 0

42673 Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Hall

NDOT Improvement Mill, resurf dual 24' rdwy, widen shoulders, br repair Wood River - Platte River I-80 299.38 11.5

I-80 from 0.8 mi west of Wood River to 1.2 mi west of west Gr Island Interchange

$11,455Estimate ($1,000)

FY22

Project No NH-80-6(107)

FY23

Const/CE

NHPP 05,770 00AC Conv 0 0

State 0-5,770 00AC Conv 0 0

56

Page 70: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

42716Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Clay

NDOT Improvement Br repair/redeck, abutment repair, add approaches Deweese Spur Bridge S-18C 4.79 0.0

Deweese Spur (S-18C) 0.4 mi northest of Deweese

$836Estimate ($1,000)

FY22

Project No STP-S18C(107)

FY23

PE

State 00 00 55 0

ROW

State 00 00 0 1

Const / CE

STP 00 6110 0 0

State 00 1690 0 0

42732Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Hamilton

NDOT Improvement Mill, asph resurf, conc repair, br repair

Aurora East & West I-80 329.06 8.9

I-80 from approx 2.9 mi west of Aurora east to 5.4 mi east of Aurora

$8,779Estimate ($1,000)

FY22

Project No NH-80-7(161)

FY23

PE

State 00 090 0 0

Const / CE

NHPP-AC 07,820 00 0 0

State 0869 00 0 0

NHPP 7,8200 00AC Conv 0 0

State -7,8200 00AC Conv 0 0

42742Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Adams

NDOT Improvement Replace superstructure 39' clear rdwy, approach slabs, gr beams on piles & gdrl Hastings Regional Center Spur Bridge S-1C 0.30 0.0

At bridge over Pawnee Creek on S-1C (Hastings Regional Center Spur)

$794Estimate ($1,000)

FY22

Project No STP-S01C(102)

FY23

PE

State 220 00 0 0

Const / CE

STP 00 6180 0 0

State 00 1540 0 0

57

Page 71: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

42756Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Buffalo

NDOT Improvement Replace dual 4-lane conc rdwy & s-shld, br widen/redeck, ramp, culv, asph resurfDawson Co Line - Odessa I-80 255.09 9.9

I-80 from Dawson/Buffalo Co line east to 0.4 mi west of Odessa

$45,050Estimate ($1,000)

FY22

Project No NH-80-5(76)

FY23

PE

State 02,550 00 0 0

ROW

State 10 00 0 0

Const / CE

NHPP-AC 00 00 0 33995

State 00 00 0 8504

NHPP 00 33,9950AC Conv 0 0

State 00 -33,9950AC Conv 0 0

42756AControl No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Buffalo

NDOT Improvement Crossovers

Dawson Co Line - Odessa Crossovers I-80 255.09 0.0

Along I-80 between the Dawson Co line and the Odessa Interchange

$2,889Estimate ($1,000)

FY22

Project No NH-80-5(77)

FY23

PE

State 050 00 0 0

Const / CE

NHPP 00 00 2555 0

State 00 00 284 0

42765Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Buffalo

NDOT Improvement Widen/resurf 24' rdwy to 28', earth shld widen, culvs, asph patching Shelton Link L-10D 0.28 3.7

Shelton Link (L-10D) from I-80 north to US-30

$2,508Estimate ($1,000)

FY22

Project No STP-L10D(104)

FY23

PE

State 00 0200 0 0

ROW

State 00 0409 0 0

Const / CE

STP 01,481 00 0 0

State 0418 00 0 0

58

Page 72: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

42766Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Hall

NDOT Improvement Resurf

Prosser Spur S-40D 1.13 5.0

Prosser Spur (S-40D) from approx 1.1 mi south of N-11 south to Prosser

$2,477Estimate ($1,000)

FY22

Project No STP-S40D(107)

FY23

PE

State 150 00 0 0

Const / CE

STP 00 00 0 0

State 00 00 0 0

42774Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Fillmore

NDOT Improvement Widen/resurf, modify loop/ramp terminals, conc repair Fairmont West Interchange US-6 256.00 0.5

US-6 from approx 0.2 mi east of west lmts Fairmont, east to 0.3 mi west 6th Ave

$966Estimate ($1,000)

FY22

Project No STP-6-5(115)

FY23

PE

State 00 030 0 0

ROW

State 00 018 0 0

Const / CE

STP 0734 00 0 0

State 0184 00 0 0

42776Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Hall

NDOT Improvement Repair/overlay 3 br, sealing, approach slabs, mill, resurf rdwy In Grand Island Bridges US-30 313.66 0.4

Jct US-30/US-281/N-2 and from Old Lincoln Hwy to Grant St in Grand Island

$5,163Estimate ($1,000)

FY22

Project No NH-30-4(162)

FY23

PE

State 00 0274 0 0

ROW

State 027 00 0 0

Const / CE

NHPP 00 00 3766 0

State 00 00 869 0

Local 00 00 227 0

59

Page 73: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

42777Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Hamilton

NDOT Improvement Resurf

US-34 - W Jct I-80 N-2 367.24 3.3

N-2 from E Jct US-34 south to just north of I-80

$1,619Estimate ($1,000)

FY22

Project No STP-2-5(103)

FY23

PE

State 00 00 1 0

Const / CE

STP 00 00 0 0

State 00 00 0 0

42779Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Fillmore

NDOT Improvement Mill, resurf rdwy and shld

Sutton - Grafton US-6 242.43 7.4

US-6 from near NE limits Sutton to approx 0.2 mi east of west limits of Grafton

$3,361Estimate ($1,000)

FY22

Project No STP-6-5(116)

FY23

PE

State 00 013 0 0

ROW

State 00 015 0 0

Const / CE

STP 02,596 00 0 0

State 0737 00 0 0

42780Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Nuckolls

NDOT Improvement Gr, mill, resurf rdwy and shld, br repair/overlay Superior - Hardy N-8 0.52 6.8

N-8 from Superior east to just west of Main St in Hardy

$3,516Estimate ($1,000)

FY22

Project No STP-8-5(111)

FY23

PE

State 00 0380 0 0

Const / CE

STP 02,509 00 0 0

State 0627 00 0 0

60

Page 74: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

42781Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Buffalo

NDOT Improvement Conc repair, resurf, ADA ramps, br repair

Gibbon - Shelton US-30 285.71 7.3

US-30 from just west of L-10C in Gibbon to 0.2 mi east of Shelton

$4,956Estimate ($1,000)

FY22

Project No STP-30-4(161)

FY23

PE

State 00 0280 0 0

ROW

State 029 00 0 0

Const / CE

STP 3,6280 00 0 0

State 1,0190 00 0 0

42782Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Polk

NDOT Improvement Conc pvmt reconstruction, repair, mill, asph resurf In Stromsburg & North US-81 78.26 4.5

US-81 from approx 0.1 mi north of south lmts Stromsburg to 0.2 mi south of N-92

$7,708Estimate ($1,000)

FY22

Project No NH-81-2(145)

FY23

PE

State 00 0299 0 0

ROW

State 05 00 0 0

Const / CE

NHPP-AC 00 00 5767 0

State 00 00 1637 0

NHPP 00 00AC Conv 0 5767

State 00 00AC Conv 0 -5767

42783Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Howard

NDOT Improvement Mill, resurf

N-11 West N-92 333.92 10.1

N-92 from Sherman/Howard Co line east to 0.4 mi west of N-11 including S-47A

$5,608Estimate ($1,000)

FY22

Project No STP-92-4(115)

FY23

PE

State 00 022 0 0

Const / CE

STP 00 00 4469 0

State 00 00 1117 0

61

Page 75: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

42784Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Adams

NDOT Improvement Mill, resurf existing rdwy, install granular subdrains, construct beveled edge Trumbull Spur S-1D 0.00 5.4

Trumbull Spur (S-1D) from US-34/281 to Trumbull

$1,421Estimate ($1,000)

FY22

Project No STP-S01D(103)

FY23

PE

State 00 025 0 0

Const / CE

STP 1,1170 00 0 0

State 2790 00 0 0

42785Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Polk

NDOT Improvement Mill, asph resurf rdwy and shld, repair 1 br, replace 2 br Oscelola East & West US-81 83.11 12.2

US-81 from 0.2 mi east of W Jct N-92 west of Osceola east to E Jct N-92

$7,965Estimate ($1,000)

FY22

Project No NH-81-2(146)

FY23

PE

State 00 0465 0 0

ROW

State 00 055 0 0

Const / CE

NHPP-AC 05,938 00 0 0

State 01,507 00 0 0

NHPP 5,9380 00AC Conv 0 0

State -5,9380 00AC Conv 0 0

42786Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Sherman

NDOT Improvement Resurf

Hazard East N-2 316.69 6.2

N-2 from just northwest of N-10 southeast to 1.0 mi southeast of Sweetwater

$3,200Estimate ($1,000)

FY22

Project No NH-2-4(111)

FY23

PE

State 00 00 20 0

Const / CE

NHPP 00 00 0 0

State 00 00 0 0

62

Page 76: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

42787Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Hall

NDOT Improvement Resurf

Cairo - Grand Island N-2 343.73 12.5

N-2 from Cairo southeast to US-281 in Grand Island

$9,216Estimate ($1,000)

FY22

Project No NH-2-4(112)

FY23

PE

State 00 053 0 0

ROW

State 010 00 0 0

Const / CE

NHPP-AC 00 00 7292 0

State 00 00 1662 0

Local 00 00 199 0

NHPP 00 00AC Conv 0 7292

State 00 00AC Conv 0 -7292

42788Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Adams

NDOT Improvement Replace US-6 conc pvmt; repair conc pvmt seal cracks & joints ADA curb ramps US-6 & US-34, Hastings US-6 211.29 2.3

US-6 & US-34 segments at US-6/34/281 intersection in Hastings

$8,265Estimate ($1,000)

FY22

Project No NH-6-4(129)

FY23

PE

State 00 0614 0 0

ROW

State 00 0400 0 0

Local 00 0100 0 0

Const / CE

NHPP-AC 05,433 00 0 0

State 0156 00 0 0

Local 01,562 00 0 0

NHPP 00 00AC Conv 5433 0

State 00 00AC Conv -5433 0

63

Page 77: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

42789Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Fillmore

NDOT Improvement Right turn lane improvement, lighting, extend median drain pipe Geneva North US-81 40.15 0.2

US-81 approx 1.3 mi north of north lmts of Geneva

$388Estimate ($1,000)

FY22

Project No HSIP-81-1(122)

FY23

PE

State 00 027 0 0

Const / CE

SFTY 0320 00 0 0

State 041 00 0 0

42791Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Hamilton

NDOT Improvement Mill, resurf dual 24'rdwy and shld, conc repair, br repair/overlay, ramp resurf Phillips - Giltner I-80 318.58 6.3

I-80 from 0.4 mi east of Phillips to 0.4 mi west of Giltner

$8,701Estimate ($1,000)

FY22

Project No NH-80-7(163)

FY23

PE

State 0213 00 0 0

Const / CE

NHPP 00 00 0 7639

State 00 00 0 849

42794Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Buffalo

NDOT Improvement Conc repair, mill and resurf rdwy and s-shld, ramp repair/resurf, gdrl Gibbon - Shelton I-80 283.70 7.3

I-80 from just west Gibbon Interchange to just west Shelton Interchange

$7,730Estimate ($1,000)

FY22

Project No NH-80-6(113)

FY23

PE

State 00 032 0 0

Const / CE

NHPP-AC 00 00 6928 0

State 00 00 770 0

NHPP 00 00AC Conv 0 6928

State 00 00AC Conv 0 -6928

64

Page 78: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

42795Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Hall

NDOT Improvement Conc repair, mill, resurf rdwy and shld, br repair Shelton - Wood River I-80 290.96 9.0

I-80 from just west of Shelton to just west of Wood River

$14,353Estimate ($1,000)

FY22

Project No NH-80-6(114)

FY23

PE

State 00 0189 0 0

Const / CE

NHPP-AC 012,748 00 0 0

State 01,416 00 0 0

NHPP 00 00AC Conv 12748 0

State 00 00AC Conv -12748 0

42815Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Webster

NDOT Improvement Resurf

Red Cloud North & Cowles Spur US-281 6.17 9.8

US-281 from Red Cloud to approx 0.3 mi north of Cowles Spur; includes S-91B

$4,970Estimate ($1,000)

FY22

Project No STP-281-1(118)

FY23

PE

State 2000 00 0 0

Const / CE

STP-AC 00 00 0 0

State 00 00 0 0

STP 00 3,8160AC Conv 0 0

State 00 -3,8160AC Conv 0 0

42816Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Polk

NDOT Improvement Mill, resurf, br repair

N-92 - Silver Creek N-39 0.00 9.8

N-39 from N-92 to US-30 west of Silver Creek

$4,867Estimate ($1,000)

FY22

Project No STP-39-2(107)

FY23

PE

State 00 0102 0 0

Const / CE

STP 00 00 3812 0

State 00 00 953 0

65

Page 79: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

42817Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Nuckolls

NDOT Improvement Mill, repair and resurf existing rdwy and s-shld, curb repair, br repair, gdrl Superior North & South N-14 0.00 6.4

N-14 in two segments from Nebraska/Kansas State line to S Jct US-136

$4,040Estimate ($1,000)

FY22

Project No STP-14-1(123)

FY23

PE

State 00 0141 0 0

ROW

State 05 00 0 0

Const / CE

STP 00 00 3115 0

State 00 00 779 0

42819Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Hall

NDOT Improvement Resurf

In Grand Island & South (SB) US-34 226.74 5.4

US-34 from 2.2 mi south of Grand Island north to N Jct US-281 / W Jct N-2

$2,730Estimate ($1,000)

FY22

Project No NH-34-4(134)

FY23

PE

State 10 00 0 0

Const / CE

NHPP 00 00 0 0

State 00 00 0 0

42821Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Polk

NDOT Improvement Mill, resurf existing rdwy & s-shld, br repair, gdrl Polk East N-66 11.60 9.4

N-66 from east lmts Polk to Jct US-81

$4,330Estimate ($1,000)

FY22

Project No STP-66-5(107)

FY23

PE

State 00 024 0 0

Const / CE

STP 03,445 00 0 0

State 0861 00 0 0

66

Page 80: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

42822Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Polk

NDOT Improvement Mill, resurf existing rdwy & s-shld with asphalt, br repair, culv, gdrl Gresham North & South N-69 55.04 20.9

N-69 from jct US-34 to Jct US-81 & N-92

$9,262Estimate ($1,000)

FY22

Project No STP-69-2(105)

FY23

PE

State 00 0331 0 0

ROW

State 010 00 0 0

Const / CE

STP 7,1370 00 0 0

State 1,7840 00 0 0

42824Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Thayer

NDOT Improvement Resurf, br repair

US-81 - Gilead US-136 129.74 6.5

US-136 from approx 0.2 mi west of Jct US-81 to approx 1.6 mi west Gilead

$3,715Estimate ($1,000)

FY22

Project No NH-136-5(112)

FY23

PE

State 01 00 0 0

Const / CE

NHPP 00 00 0 2971

State 00 00 0 743

42826Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Howard

NDOT Improvement Resurf

St Libory North & South US-281 78.45 6.1

US-281 from approx 1.8 mi south of Hall/Howard Co line to just north of N-58

$6,003Estimate ($1,000)

FY22

Project No NH-281-2(129)

FY23

PE

State 10 00 0 0

Const / CE

NHPP 00 4,8020 0 0

State 00 1,2000 0 0

67

Page 81: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

42827Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Adams

NDOT Improvement Mill, resurf existing rdwy and s-shld with asphalt, br repair, culv repair, gdrlAyr North & South US-281 26.79 14.1

US-281 from Blue Hill to just north of W Assumption Rd south of Hastings

$9,153Estimate ($1,000)

FY22

Project No STP-281-1(119)

FY23

PE

State 00 046 0 0

ROW

State 010 00 0 0

Const / CE

STP 00 00 7278 0

State 00 00 1819 0

42829Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Clay

NDOT Improvement Resurf

Clay Center East N-41 0.34 11.6

N-41 from just east of Clay Center to Clay/Fillmore Co line

$5,998Estimate ($1,000)

FY22

Project No STP-41-5(108)

FY23

PE

State 10 00 0 0

Const / CE

STP 00 4,7980 0 0

State 00 1,1990 0 0

42841Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Hamilton

NDOT Improvement Conc repair, mill, resurf rdwy and shld, br repair/overlay Hampton - Henderson I-80 337.63 7.9

I-80 from 0.5 mi west of Hamption to 2.9 mi east of Henderson

$10,876Estimate ($1,000)

FY22

Project No NH-80-7(166)

FY23

PE

State 00 085 0 0

Const / CE

NHPP-AC 09,712 00 0 0

State 01,079 00 0 0

NHPP 9,7120 00AC Conv 0 0

State -9,7120 00AC Conv 0 0

68

Page 82: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

42851Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Thayer

NDOT Improvement Replace viaduct

UPRR Viaduct North of Belvidere US-81 18.56 0.0

US-81 at UPRR viaduct approx 0.5 mi north of Belvidere Spur (S-85D)

$1,789Estimate ($1,000)

FY22

Project No NH-81-1(123)

FY23

PE

State 00 00 1 0

Const / CE

NHPP 00 00 0 0

State 00 00 0 0

42852Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Buffalo

NDOT Improvement Replace existing rdwy & s-shld with conc pvmt, reconstruct Intch, br replacementOdessa - Kearney (EB) I-80 263.31 9.3

I-80 (EB) approx 0.4 mi west Odessa Link L10-B to 0.4 mi west N-44 gr separation

$33,183Estimate ($1,000)

FY22

Project No NH-80-5(83)

FY23

PE

State 00 0899 0 0

ROW

State 020 00 0 0

Const / CE

NHPP-AC 00 00 28269 0

State 00 00 3995 0

NHPP 00 00AC Conv 0 8269

State 00 00AC Conv 0 -8269

NHPP 00 20,0000AC Conv 0 0

State 00 -20,0000AC Conv 0 0

42852AControl No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Buffalo

NDOT Improvement Construct crossover for Odessa - Kearney (EB) reconst project Odessa - Kearney East Crossover I-80 272.23 0.0

I-80 approx 0.4 mi west of N-44 gr separation in Kearney

$922Estimate ($1,000)

FY22

Project No NH-80-5(84)

FY23

PE

State 00 032 0 0

Const / CE

NHPP 00 00 801 0

State 00 00 89 0

69

Page 83: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

42867Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Fillmore

NDOT Improvement Replace asph and base w/conc pvmt on drainable base, gdrl Fillmore/Saline County Line West N-74 86.97 1.0

N-74 from approx 3.4 mi east Ohiowa Spur (S-30C) to Fillmore/Saline county line

$1,634Estimate ($1,000)

FY22

Project No STP-74-5(114)

FY23

PE

State 00 0150 0 0

Const / CE

STP 01,187 00 0 0

State 0297 00 0 0

42868Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Nance

NDOT Improvement Mill, resurf, br repair

Fullerton North N-14 98.00 8.9

N-14 from north limits of Fullerton to just south of N-52

$4,616Estimate ($1,000)

FY22

Project No STP-14-3(120)

FY23

PE

State 00 0310 0 0

ROW

State 00 05 0 0

Const / CE

STP 03,441 00 0 0

State 0860 00 0 0

42869Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Polk

NDOT Improvement Resurf

Columbus South US-81 104.80 4.8

US-81 from 0.4 mi south of N-64 to 0.7 mi south of S Jct US-30 south of Columbus

$3,528Estimate ($1,000)

FY22

Project No NH-81-2(148)

FY23

PE

State 01 00 0 0

Const / CE

NHPP 00 00 0 0

State 00 00 0 0

70

Page 84: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

42870Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Thayer

NDOT Improvement Reconstruct existing shoulders with concrete, br buttress remodel Hebron South - Bruning North Shlds US-81 8.10 16.9

US-81 from 1.7 mi south of L-85F to 0.5 mi south of Thayer/Fillmore Co Line

$13,987Estimate ($1,000)

FY22

Project No NH-81-1(124)

FY23

PE

State 075 00 0 0

Const / CE

NHPP-AC 00 00 11130 0

State 00 00 2782 0

NHPP 00 00AC Conv 0 11130

State 00 00AC Conv 0 -11130

42871Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Fillmore

NDOT Improvement Conc repair, jt and crack sealing, mill, resurf existing rdwy and s-shld Strang North US-81 28.38 6.5

US-81 from approx 0.6 mi north of N-74 to 1.8 mi south of N-41

$3,022Estimate ($1,000)

FY22

Project No NH-81-1(125)

FY23

PE

State 00 0267 0 0

Const / CE

NHPP 00 00 2204 0

State 00 00 551 0

42872Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Clay

NDOT Improvement Resurf

In Clay Center & North N-14 37.16 5.1

N-14 from approx 0.3 mi south Clay Center to W Jct US-6; includes S-18D Spur

$2,438Estimate ($1,000)

FY22

Project No STP-14-1(124)

FY23

PE

State 10 00 0 0

Const / CE

STP 00 00 0 0

State 00 00 0 0

71

Page 85: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

42885Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Adams

NDOT Improvement Intersection improvements

US-6 and Adams Central Intersection US-6 208.22 0.5

US-6/Adams Central Intersection approx 1.2 mi west S-1C Hastings Regional Center

$3,365Estimate ($1,000)

FY22

Project No MISC-6-4(1025)

FY23

PE

State 00 0336 0 0

Local 00 084 0 0

ROW

State 00 042 0 0

Local 00 042 0 0

Const / CE

State 01,834 00 0 0

Local 01,027 00 0 0

42886Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Hall

NDOT Improvement Increase vertical clearance by raising br height or lower rdwy Wood River Interchange I-80 300.00 0.3

I-80 at Wood River interchange

$2,301Estimate ($1,000)

FY22

Project No NH-80-6(117)

FY23

PE

State 00 00 1 0

Const / CE

NHPP 00 2,1000 0 0

State 00 2000 0 0

42888Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Hamilton

NDOT Improvement Conc repair, mill, resurf existing rdwy & s-shld with asphalt, br repair Giltner East I-80 324.55 4.7

I-80 from Giltner Intch east to approx 2.7 mi west Aurora

$4,079Estimate ($1,000)

FY22

Project No NH-80-7(169)

FY23

PE

State 00 022 0 0

Const / CE

NHPP 00 00 3651 0

State 00 00 406 0

72

Page 86: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

42889Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

York

NDOT Improvement Seal & replace expansion joints, br overlay

York Bypass Bridges US-81 61.23 0.0

US-81 bridges west of York

$472Estimate ($1,000)

FY22

Project No NH-81-2(149)

FY23

PE

State 00 00 1 0

Const / CE

NHPP 00 3770 0 0

State 00 940 0 0

42892Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Nance

County Improvement Bridge

Genoa West

Cnty Rd approx 0.25 mi south intersection with N 485th St west of Genoa

$757Estimate ($1,000)

FY22

Project No BRO-7063(8)

FY23

PE

BRO 500 00 0 0

Const / CE

BRO 00 00 0 707

42893Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Hall

NDOT Improvement Build new high mast lighting towers, install buried cable & control boxes Wood River Interchange Lighting I-80 299.80 1.0

I-80 at the Wood River Interchange

$220Estimate ($1,000)

FY22

Project No ELEC-80-6(1046)

FY23

PE

State 00 01 0 0

Const / CE

State 0219 00 0 0

42894Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Hall

NDOT Improvement Build new high mast lighting towers, install buried cable & control boxes West Grand Island Interchange Lighting I-80 311.50 1.5

I-80 at the Grand Island Interchange

$660Estimate ($1,000)

FY22

Project No ELEC-80-6(1047)

FY23

PE

State 00 03 0 0

Const / CE

State 0657 00 0 0

73

Page 87: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

50937Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Sheridan

NDOT Improvement Asph widen/resurf 24' rdwy to 28'

Gordon North N-27 222.65 13.6

N-27 from US-20 in Gordon north to the South Dakota line

$11,099Estimate ($1,000)

FY22

Project No STP-27-4(107)

FY23

PE

State 00 00 235 0

ROW

State 00 00 0 1

Const / CE

STP 00 8,4660 0 0

State 00 2,3970 0 0

51003AControl No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Sheridan

NDOT Improvement Asph conc resurf/widen to 28' rdwy w/6' earth shld 6 Miles North Of Rushville North N-87 61.44 10.7

N-87 from 4.6 mi south of S Dakota line south 10.7 mi

$7,356Estimate ($1,000)

FY22

Project No STP-87-4(114)

FY23

PE

State 00 00 250 0

ROW

State 00 00 0 256

Const / CE

STP 00 5,2690 0 0

State 00 1,5810 0 0

51018Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Sioux

NDOT Improvement Asph resurf 24' rdwy w/6' earth shld

Watson Ranch South N-71 80.96 9.0

N-71 from approximately 9 mi north of the Sioux Co. line north 9.3 mi

$4,040Estimate ($1,000)

FY22

Project No STP-71-4(116)

FY23

PE

State 00 00 50 0

Const / CE

STP 00 3,1130 0 0

State 00 8770 0 0

74

Page 88: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

51105Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Sioux

NDOT Improvement Mill, resurf 22' rdwy w/4' earth shld

Agate North & South N-29 40.84 14.8

N-29 from the Niobrara River near Agate north 9.1 mi

$3,050Estimate ($1,000)

FY22

Project No STP-29-4(106)

FY23

PE

State 00 070 0 0

Const / CE

STP-AC 02,384 00 0 0

State 0596 00 0 0

STP 2,3840 00AC Conv 0 0

State -2,3840 00AC Conv 0 0

51184Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Scotts Bluff

NDOT Improvement Asph resurf 24' rdwy w/10' shld, 8' surf, br repair Scottsbluff North N-71 64.49 6.8

N-71 from E jct US-26 north to the Sioux Co. line

$1,598Estimate ($1,000)

FY22

Project No STP-71-3(119)

FY23

PE

State 00 076 0 0

Const / CE

STP 00 00 1218 0

State 00 00 304 0

51185Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dawes

NDOT Improvement Asph conc resurf 24'-rdwy with 7.5'-shld, 1.5'-surf, br repair Crawford North N-71 141.21 7.2

On N-71 from Crawford north 7.17 miles

$3,352Estimate ($1,000)

FY22

Project No STP-71-4(118)

FY23

PE

State 300 00 0 0

ROW

State 00 00 14 0

Const / CE

STP 00 2,5810 0 0

State 00 7270 0 0

75

Page 89: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

51268Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Morrill

NDOT Improvement Asph widen/resurf 24' to 28' rdwy w/4' earth shld, br repair Broadwater Southwest N-92 64.62 8.0

N-92 from US-385 east to US-26 in Broadwater

$7,040Estimate ($1,000)

FY22

Project No STP-92-1(117)

FY23

PE

State 00 0161 0 0

ROW

State 0200 00 0 0

Const / CE

STP 00 00 5210 0

State 00 00 1469 0

51275AControl No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cheyenne

NDOT Improvement Replace rest area building

Sidney EB Rest Area Buildings I-80 51.40 0.0

Along I-80 at the Sidney eastbound rest area

$4,028Estimate ($1,000)

FY22

Project No NH-80-1(169)

FY23

PE

State 00 0135 0 0

Const / CE

NHPP 03,504 00 0 0

State 0389 00 0 0

51276AControl No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cheyenne

NDOT Improvement Replace rest area building

Sidney WB Rest Area Building I-80 61.37 0.0

Along I-80 at the Sidney westbound rest area

$1,119Estimate ($1,000)

FY22

Project No NH-80-2(92)

FY23

PE

State 1250 00 0 0

Const / CE

NHPP 00 8950 0 0

State 00 990 0 0

51299Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Morrill

NDOT Improvement New viaduct

BNSF, Bridgeport US-26 60.92 0.0

US-26 at BNSF grade crossing DOT#089-081B on the west edge of Bridgeport

$25Estimate ($1,000)

FY22

Project No RRZ-TMT-26-1(1

FY23

PE

State 00 025 0 0

76

Page 90: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

51302Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cheyenne

NDOT Improvement Conc pvmt, br repair/overlay, intersection improvements, shld widening Sidney Link L-17J 0.54 3.2

2.2 mi on Sidney Link (L17J) near I-80 Interchange and 0.9 mi on US-30

$10,886Estimate ($1,000)

FY22

Project No STP-L17J(107)

FY23

PE

State 00 0399 0 0

ROW

State 00 010 0 0

Const / CE

STP-AC 08,042 00 0 0

State 0480 00 0 0

Local 01,955 00 0 0

STP 4,0420 00AC Conv 0 0

State -4,0420 00AC Conv 0 0

STP 00 00AC Conv 4000 0

State 00 00AC Conv -4000 0

51392Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Scotts Bluff

NDOT Improvement Mill, resurf rdwy & shld, br repair/overlay, conc repair, ADA in Lyman Wyoming State Line East N-92 0.00 18.9

N-92 from Wyoming Line east to approx 2.5 mi west of Terrytown Spur, S-79H

$3,714Estimate ($1,000)

FY22

Project No STP-92-1(124)

FY23

PE

State 00 046 0 0

ROW

State 00 010 0 0

Const / CE

STP 02,833 00 0 0

State 0825 00 0 0

77

Page 91: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

51399Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Box Butte

NDOT Improvement Conc repair, mill, resurf variable width rdwy

Cody Ave East, Alliance N-2 86.00 1.5

N-2 from 0.3 mi east of Cody Ave east 1.5 mi in Alliance

$2,309Estimate ($1,000)

FY22

Project No NH-2-1(123)

FY23

PE

State 00 063 0 0

Local 00 016 0 0

ROW

State 00 05 0 0

Local 00 01 0 0

Const / CE

NHPP 01,735 00 0 0

State 044 00 0 0

Local 0445 00 0 0

51401Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cheyenne

NDOT Improvement Asph widen/resurf 24' rdwy to 28' w/4' earth shld Lodgepole - Chappell US-30 77.03 9.2

US-30 from Lodgepole to Chappell

$4,730Estimate ($1,000)

FY22

Project No STP-30-1(129)

FY23

PE

State 00 00 1 0

Const / CE

STP 00 00 0 0

State 00 00 0 0

51443Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Morrill

NDOT Improvement 4-lane reconstruction

L-62A North US-385 84.50 14.2

US-385 from L-62A north 14.2 mi

$37,466Estimate ($1,000)

FY22

Project No DPS-385-3(119)

FY23

PE

State 00 0590 0 0

Const / CE

EM 00 00 18300 0

State 00 00 18576 0

78

Page 92: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

51463A Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Deuel

NDOT Improvement Resurf existing rdwy, br repair

US-138 West US-30 97.57 10.4

US-30 from approx 2.2 mi east N-27, east to approx 0.25 mi east US-138

$7,953Estimate ($1,000)

FY22

Project No STP-30-1(140)

FY23

PE

State 10 00 0 0

Const / CE

STP-AC 00 00 0 0

State 00 00 0 0

STP 00 6,3620AC Conv 0 0

State 00 -6,3620AC Conv 0 0

51470Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Morrill

NDOT Improvement Mill, resurf existing rdwy and s-shld with asphalt Dalton North US-385 54.48 8.0

US-385 from the Cheyenne Co line north to 3.2 mi south of US-26/N-92

$3,861Estimate ($1,000)

FY22

Project No NH-385-3(120)

FY23

PE

State 00 016 0 0

Const / CE

NHPP 03,076 00 0 0

State 0769 00 0 0

51519 Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Deuel

NDOT Improvement Replace 4-lane conc pvmt and shld, br repair/replace, remove crossover Chappell - N-27 I-80 84.63 9.9

I-80 from approx 0.6 mi west of L-25A to 0.8 mi west of N-27

$49,878Estimate ($1,000)

FY22

Project No NH-80-2(103)

FY23

Const / CE

NHPP 5,9520 00AC Conv 0 0

Const / CE

NHPP 05,000 00AC Conv 0 0

State 0-5,000 00AC Conv 0 0

State -5,9520 00AC Conv 0 0

79

Page 93: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

51535Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cheyenne

NDOT Improvement 4 Lane conc pvmt replacement, br repair/rehab, rest area ramps, parking Brownson East I-80 46.81 7.1

I-80 from 2.0 mi west of L-17C east 7.4 mi

$37,318Estimate ($1,000)

FY22

Project No NH-80-1(192)

FY23

PE

State 00 01,341 0 0

ROW

State 00 012 0 0

Const / CE

NHPP-AC 032,368 00 0 0

State 03,597 00 0 0

NHPP 5,0000 00AC Conv 0 0

State -5,0000 00AC Conv 0 0

NHPP 00 00AC Conv 27368 0

State 00 00AC Conv -27368 0

51541Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Sheridan

NDOT Improvement Mill, resurf rdwy and shld, urban conc repair, br repair In Gordon & South N-27 210.14 12.5

N-27 from 0.4 mi south of the Niobrara River north through Gordon

$4,126Estimate ($1,000)

FY22

Project No STP-27-4(109)

FY23

PE

State 00 080 0 0

ROW

State 00 010 0 0

Const / CE

STP-AC 03,229 00 0 0

State 0807 00 0 0

STP 3,2290 00AC Conv 0 0

State -3,2290 00AC Conv 0 0

80

Page 94: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

51544Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Sioux

NDOT Improvement Mill, resurf existing rdwy, curb ramps, br repair In Mitchell & North N-29 12.75 17.5

N-29 from Jct US-26 in Mitchell north to approx 5.4 mi north Str# S02902486

$4,375Estimate ($1,000)

FY22

Project No STP-29-4(110)

FY23

PE

State 00 0424 0 0

ROW

State 010 00 0 0

Const / CE

STP 00 00 3153 0

State 00 00 788 0

51546Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Garden

NDOT Improvement Mill, resurf existing rdwy, earth shld const, br repairs, culv and gdrl Oshkosh South N-27 110.18 8.7

N-27 from 4.0 mi north of the Deuel/Garden Co line north to US-26/N92 in Oshkosh

$3,480Estimate ($1,000)

FY22

Project No STP-27-3(102)

FY23

PE

State 00 0352 0 0

Const / CE

STP 00 00 2502 0

State 00 00 626 0

51548Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Sheridan

NDOT Improvement Mill, resurf, curb & gutter repair, br repair

Hay Springs - Rushville US-20 78.87 12.9

N-20 from W Jct N-87 east through Rushville

$4,356Estimate ($1,000)

FY22

Project No NH-20-2(142)

FY23

PE

State 00 040 0 0

ROW

State 00 010 0 0

Const / CE

NHPP 03,445 00 0 0

State 0861 00 0 0

81

Page 95: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

51549Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Sioux

NDOT Improvement Mill, resurf 24' rdwy w/10' shld, 8' surf, conc repair, ramp repair Crawford West US-20 25.21 10.7

N-20 from 5.8 mi west of the Sioux/Dawes Co line to just west of Crawford

$3,412Estimate ($1,000)

FY22

Project No NH-20-1(148)

FY23

PE

State 00 014 0 0

Const / CE

NHPP 00 00 2718 0

State 00 00 680 0

51550Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cheyenne

NDOT Improvement Mill, resurf rdwy and shld, conc repair, br repair Potter East & West US-30 37.11 14.9

US-30 from Kimball/Cheyenne Co line east to L-17C, including L-17B & L-17C

$5,843Estimate ($1,000)

FY22

Project No STP-30-1(137)

FY23

PE

State 00 0408 0 0

Const / CE

STP-AC 04,348 00 0 0

State 01,087 00 0 0

STP 00 00AC Conv 4348 0

State 00 00AC Conv -4348 0

51558Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Deuel

NDOT Improvement Mill, asph resurf rdwy and shld, conc repari, br repair Colorado Line - Chappell US-385 0.00 8.6

US-385 from NE/CO state line to E Jct US-30 in Chappell; includes L-25A segment

$4,298Estimate ($1,000)

FY22

Project No STP-385-2(113)

FY23

PE

State 00 0130 0 0

ROW

State 00 027 0 0

Const / CE

STP 03,313 00 0 0

State 0828 00 0 0

82

Page 96: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

51560Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Kimball

NDOT Improvement Mill, Widen/resurf existing 24' rdwy to 28', br repair, gdrl Bushnell - Kimball US-30 9.56 11.4

US-30 from Jct L-53C, east to west limits limits of Kimball

$5,802Estimate ($1,000)

FY22

Project No STP-30-1(138)

FY23

PE

State 1490 00 0 0

ROW

State 00 00 10 0

Const / CE

STP 00 4,5140 0 0

State 00 1,1290 0 0

51561Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Banner

NDOT Improvement Resurf

S Jct. N-71 East N-88 23.54 20.4

N-88 from S Jct N-71 to approx 0.4 mi east Banner/Morrill C/L

$8,001Estimate ($1,000)

FY22

Project No STP-88-1(110)

FY23

PE

State 10 00 0 0

Const / CE

STP 00 6,4000 0 0

State 00 1,6000 0 0

51583Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Kimball

NDOT Improvement Gr, replace conc pvmt 4-lane divided interstate Bushnell - West Kimball I-80 9.50 9.5

I-80 from 1.0 mi east of Bushnell to 1.7 mi west of Kimball

$40,927Estimate ($1,000)

FY22

Project No NH-80-1(196)

FY23

PE

State 00 01,709 0 0

Const / CE

NHPP-AC 00 00 34446 0

State 00 00 4772 0

NHPP 00 00AC Conv 0 10446

State 00 00AC Conv 0 -10446

NHPP 00 20,0000AC Conv 0 0

State 00 -20,0000AC Conv 0 0

83

Page 97: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

51583AControl No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Kimball

NDOT Improvement Grading, lighting and paving an interstate median crossover Bushnell - West Kimball Crossover I-80 19.00 0.0

I-80 approx 1.7 mi west N-71 grade separation

$904Estimate ($1,000)

FY22

Project No NH-80-1(200)

FY23

PE

State 00 030 0 0

Const / CE

NHPP 7870 00 0 0

State 870 00 0 0

51584Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Kimball

NDOT Improvement 4-Lane gr, str, conc pvmt

West Kimball - East Kimball I-80 19.00 4.5

I-80 from 1.7 mi west of N-71 to 2.8 mi east of N-71

$26,064Estimate ($1,000)

FY22

Project No NH-80-1(197)

FY23

PE

State 00 00 5 0

Const / CE

NHPP 00 00 0 0

State 00 00 0 0

51585Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cheyenne

NDOT Improvement 4-Lane gr, str, conc pvmt

Sidney - Sunol (EB) I-80 60.70 8.0

I-80 (EB) from approx 0.2 mi W Sidney (WB) rest area to approx 0.9 W L-17E link

$22,227Estimate ($1,000)

FY22

Project No NH-80-2(109)

FY23

PE

State 00 00 1 0

Const / CE

NHPP 00 00 0 0

State 00 00 0 0

51589Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cheyenne

NDOT Improvement Joint seal

Sunol - Lodgepole I-80 68.67 6.8

I-80 from approx 1.0 mi west Sunol link L17E to 1.2 mi west Lodgepole link L17F

$601Estimate ($1,000)

FY22

Project No NH-80-2(111)

FY23

Const / CE

NHPP 00 00 0 0

State 00 00 0 0

84

Page 98: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

51590Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cheyenne

NDOT Improvement Joint seal

West Sidney - East Sidney I-80 53.98 6.7

I-80 from approx 1.5 mi west N-19 to 0.8 mi east Sidney East link L17J

$613Estimate ($1,000)

FY22

Project No NH-80-1(199)

FY23

Const / CE

NHPP 00 00 0 0

State 00 00 0 0

51591Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Deuel

NDOT Improvement Joint seal

Oshkosh - I-76 I-80 94.56 7.5

I-80 from west N-27 to 0.5 mi west I-76

$224Estimate ($1,000)

FY22

Project No NH-80-2(112)

FY23

Const / CE

NHPP 00 2020 0 0

State 00 220 0 0

51598Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Kimball

NDOT Improvement Install new dynamic message signs

District 5 DMS I-80 2.71 0.0

I-80 at locations in Kimball and Deuel counties

$926Estimate ($1,000)

FY22

Project No ITS-NH-D5(104)

FY23

PE

State 00 04 0 0

Const / CE

NHPP 00 00 0 0

State 00 00 0 0

51599Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cheyenne

NDOT Improvement Install variable speed advisory sign systems

D5 Variable Speed Advisory Signs I-80 0.14 0.0

Along I-80 at 30 locations in Kimball, Cheyenne and Deuel counties

$3,526Estimate ($1,000)

FY22

Project No ITS-NH-D5(105)

FY23

PE

State 00 016 0 0

Const / CE

NHPP 03,159 00 0 0

State 0351 00 0 0

85

Page 99: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

60823Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Hooker

NDOT Improvement Mill, widen/resurf rdwy to 24', curb, flumes, storm sewer Tryon - Mullen N-97 44.23 12.7

N-97 from near McPherson/Hooker Co line to approx 9.9 mi south of Mullen

$9,374Estimate ($1,000)

FY22

Project No STP-97-3(102)

FY23

PE

State 00 0791 0 0

ROW

State 00 034 0 0

Const / CE

STP-AC 06,659 00 0 0

State 01,890 00 0 0

STP 6,6590 00AC Conv 0 0

State -6,6590 00AC Conv 0 0

60942Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Custer

NDOT Improvement Viaduct rehab, br replacement, conc pvmt Ansley Viaduct US-183 88.85 0.6

US-183 from just east of W Jct N-2 to approx 0.1 mi north of E Jct N-92

$9,586Estimate ($1,000)

FY22

Project No STP-183-3(112)

FY23

Const / CE

STP 4,7930 00AC Conv 0 0

State 4,7930 00AC Conv 0 0

61361Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Lincoln

NDOT Improvement Urban reconstruction, 10" conc pvmt, storm sewer, lighting, tr signals, util Philip - 1st St (SB), North Platte 82.53 0.5

(SB)US-83 (Jeffers St) from Philip St south to 1st St in North PLatte

$4,048Estimate ($1,000)

FY22

Project No NH-83-2(130)

FY23

PE

State 0135 00 0 0

ROW

State 2000 00 0 0

Const / CE

NHPP 00 00 0 2892

State 00 00 0 821

86

Page 100: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

61363Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Lincoln

NDOT Improvement Urban reconstruction, 10" conc pvmt, storm sewer, lighting, tr signals, util Leota - Philip (SB), North Platte 82.04 0.5

(SB)US-83 (Jeffers St) from Leota St south to Philip St in North Platte

$3,637Estimate ($1,000)

FY22

Project No NH-83-2(132)

FY23

PE

State 0124 00 0 0

ROW

State 1000 00 0 0

Const / CE

NHPP 00 00 0 2658

State 00 00 0 755

61370AControl No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Keith

NDOT Improvement Replace rest area building

Ogallala EB Rest Area Building I-80 122.70 0.0

EB Ogallala rest area 3.5 mi west of the Ogallala Interchange

$3,005Estimate ($1,000)

FY22

Project No NH-80-3(134)

FY23

PE

State 00 0144 0 0

Const / CE

NHPP 02,575 00 0 0

State 0286 00 0 0

61371A Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Keith

NDOT Improvement Replace rest area building

Ogallala WB Rest Area Buildings I-80 132.15 0.0

Along I-80 at the westbound Ogallala rest area

$1,234Estimate ($1,000)

FY22

Project No NH-80-3(155)

FY23

PE

State 00 00 121 0

Const / CE

NHPP 00 00 0 0

State 00 00 0 0

87

Page 101: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

61457Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dawson

County Improvement New viaduct

Lexington East Viaduct 0.00 0.0

County Rd 435 over UPRR/US-30/E Walnut St in Lexington

$11,174Estimate ($1,000)

FY22

Project No RRZ-TMT-1705(3

FY23

PE

SFTY 00 030 0 0

STP-AC 00 08 0 0

State 00 02 0 0

Other 00 02 0 0

Local 00 0821 0 0

ROW

SFTY 0170 00 0 0

STP 0159 00 0 0

State 010 00 0 0

Other 010 00 0 0

Local 051 00 0 0

Const / CE

SFTY 4,7720 00 0 0

STP 2900 00 0 0

State 2810 00 0 0

Other 2810 00 0 0

Local 4,2870 00 0 0

61515Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Custer

NDOT Improvement Mill, resurf 24'-rdwy w/s-shld, curb & flume, culv, gdrl, preserve br piles Westerville East N-70 88.12 9.3

N-70 from S Jct US-183 east to approx 0.3 mi east Custer/Valley Co line

$5,012Estimate ($1,000)

FY22

Project No STP-70-3(108)

FY23

PE

State 00 0100 0 0

ROW

State 00 01 0 0

Const / CE

STP-AC 03,929 00 0 0

State 0982 00 0 0

STP 3,9290 00AC Conv 0 0

State -3,9290 00AC Conv 0 0

88

Page 102: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

61522Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dawson

NDOT Improvement Resurf dual 24' divided interstate, shld widening, rumble strips, br Darr - Lexington I-80 230.55 7.1

I-80 from approx 0.6 mi west of Darr to approx 0.4 mi east of Lexington

$7,319Estimate ($1,000)

FY22

Project No NH-80-4(141)

FY23

PE

State 300 00 0 0

Const / CE

NHPP 00 6,5600 0 0

State 00 7290 0 0

61561Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Grant

NDOT Improvement Mill, resurf existing rdwy and s-shld, ADA, erosion control curb, fog seal flumeHyannis - Whitman N-2 145.44 13.6

N-2 from just west of W Jct N-61 in Hyannis east to approx 0.3 mi west Whitman

$6,586Estimate ($1,000)

FY22

Project No NH-2-2(117)

FY23

PE

State 00 0205 0 0

ROW

State 00 028 0 0

Const / CE

NHPP 05,082 00 0 0

State 01,271 00 0 0

89

Page 103: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

61565Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Keith

NDOT Improvement 4-Lane divided interstate, str, ramps, new rest area, resurf L-51A Brule - Ogallala I-80 115.49 11.3

I-80 from 1.8 mi west of Brule east to 1.0 mi west of Ogallala interchange

$44,215Estimate ($1,000)

FY22

Project No NH-STP-80-3(15

FY23

PE

State 00 0751 0 0

ROW

State 00 01 0 0

Const / CE

STP-AC 01,420 00 0 0

STP 01,420 00AC Conv 0 0

NHPP 010,000 00AC Conv 0 0

NHPP-AC 036,115 00 0 0

State 0-11,420 00AC Conv 0 0

State 05,928 00 0 0

NHPP 10,0000 00AC Conv 0 0

State -10,0000 00AC Conv 0 0

NHPP 00 00AC Conv 16115 0

State 00 00AC Conv -16115 0

61566 Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Deuel

NDOT Improvement Gr, conc pvmt, interchange, 3 br replacements, MSE walls, lighting Big Springs West I-80 102.09 7.4

On section of I-80 and all of I-76 from Colorado line to I-80/I-76 interchange

$49,096Estimate ($1,000)

FY22

Project No NH-80-2(100)

FY23

Const / CE

NHPP 00 00AC Conv 14435 0

Const / CE

NHFP 011,007 00AC Conv 0 0

State 0-11,007 00AC Conv 0 0

State 00 00AC Conv -14435 0

90

Page 104: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

61569Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Hooker

NDOT Improvement Mill, resurf 24' rdwy, urban section in Mullen Mullen South N-97 56.82 10.2

N-97 from N-2 in Mullen south approx 10.2 mi

$5,369Estimate ($1,000)

FY22

Project No STP-97-3(104)

FY23

PE

State 00 0303 0 0

ROW

State 00 010 0 0

Const / CE

STP-AC 03,938 00 0 0

State 01,118 00 0 0

STP 3,9380 00AC Conv 0 0

State -3,9380 00AC Conv 0 0

61584Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dawson

NDOT Improvement Bridge replacement and associated approach work Farmers/Merchant Canal Bridge, Cozad N-21 13.19 0.0

N-21 at Farmers/Merchant canal near Cozad

$467Estimate ($1,000)

FY22

Project No STP-21-2(113)

FY23

PE

State 017 00 0 0

ROW

State 50 00 0 0

Const / CE

STP 00 00 0 347

State 00 00 0 98

61586Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Keith

NDOT Improvement 4-Lane divided gr, conc pvmt, ramps, safety rest area parking Ogallala - Roscoe I-80 125.65 7.2

I-80 from approx 0.4 mi west of Ogallala to approx 1.1 mi west of Roscoe

$36,934Estimate ($1,000)

FY22

Project No NH-80-3(156)

FY23

PE

State 1,2310 00 0 0

ROW

State 00 00 100 0

Const / CE

NHPP 00 32,0430 0 0

State 00 3,5600 0 0

91

Page 105: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

61586AControl No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Keith

NDOT Improvement Slip ramps and crossover repair work

Ogallala - Roscoe Crossovers I-80 125.65 0.0

Along I-80 from Ogallala to Roscoe

$770Estimate ($1,000)

FY22

Project No NH-80-3(157)

FY23

PE

State 00 020 0 0

Const / CE

NHPP 6750 00 0 0

State 750 00 0 0

61587Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dawson

NDOT Improvement Conc pvmt

Lexington - Overton I-80 238.27 9.6

I-80 from approx 1.1 mi east of US-283 to approx 0.7 mi west of L-24B

$33,527Estimate ($1,000)

FY22

Project No NH-80-5(75)

FY23

PE

State 00 01,324 0 0

Const / CE

NHPP-AC 28,9830 00 0 0

State 3,2200 00 0 0

NHPP 00 00AC Conv 28983 0

State 00 00AC Conv -28983 0

61587AControl No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dawson

NDOT Improvement Crossovers

Lexington - Overton Crossovers I-80 238.27 0.0

I-80 at two locations between Lexington and Overton

$1,134Estimate ($1,000)

FY22

Project No NH-80-5(78)

FY23

PE

State 00 080 0 0

Const / CE

NHPP 0949 00 0 0

State 0105 00 0 0

92

Page 106: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

61593Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Keith

NDOT Improvement Mill, resurf rdwy w/conc pvmt and resurf s-shld w/asph Ogallala - Roscoe US-30 127.54 6.2

US-30 from approx 0.2 mi east Ogallala to approx 0.1 west Roscoe link (L-51B)

$3,731Estimate ($1,000)

FY22

Project No STP-30-2(146)

FY23

PE

State 00 060 0 0

Const / CE

STP 02,937 00 0 0

State 0734 00 0 0

61595Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Thomas

NDOT Improvement Mill, asph resurf, fog seal curbs, br repair/overlay Thedford West N-2 202.09 4.6

N-2 from approx 6.2 mi east of Seneca Spur (S-86A) to 3.3 mi west of Thedford

$2,886Estimate ($1,000)

FY22

Project No NH-2-2(120)

FY23

PE

State 00 095 0 0

Const / CE

NHPP 00 00 2233 0

State 00 00 558 0

61597Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Custer

NDOT Improvement Mill, resurf existing rdwy & s-shld, br repair, culv, ADA curb ramps Oconto North & South N-21 49.60 12.4

N-21 from approx 3.1 mi south to 9.0 mi north of Oconto

$5,249Estimate ($1,000)

FY22

Project No STP-21-3(105)

FY23

PE

State 00 0192 0 0

ROW

State 00 010 0 0

Const / CE

STP 03,931 00 0 0

State 01,116 00 0 0

93

Page 107: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

61598Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Lincoln

NDOT Improvement Resurf

Lake Maloney South US-83 61.82 14.9

US-83 from 6.2 mi north of the N Jct N-23 to 0.3 mi south of Maloney Rec Rd

$15,928Estimate ($1,000)

FY22

Project No NH-83-2(141)

FY23

PE

State 500 00 0 0

ROW

State 00 00 44 0

Const / CE

NHPP-AC 00 00 0 0

State 00 00 0 0

State 00 00 0 0

NHPP 00 8,1480AC Conv 0 0

State 00 -8,1480AC Conv 0 0

61605Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dawson

NDOT Improvement Mill, resurf rdwy, conc repair, joint/crack seal, br repair/overlay Eustis - Cozad N-21 2.55 12.5

N-21 from N-23 north to approx 0.2 mi south of I-80 south of Cozad

$7,682Estimate ($1,000)

FY22

Project No STP-21-2(114)

FY23

PE

State 00 0405 0 0

ROW

State 00 010 0 0

Const / CE

STP-AC 05,659 00 0 0

State 01,608 00 0 0

STP 00 00AC Conv 5659 0

State 00 00AC Conv -5659 0

61612Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Lincoln

NDOT Improvement Br redeck, replace approaches, abutments, GB on pile, bearing devices, gdrl North Platte East Bridge US-30 180.50 0.0

lS-30 over the North Platte River 0.4 mi east of North Plate

$2,289Estimate ($1,000)

FY22

Project No STP-30-2(148)

FY23

PE

State 00 075 0 0

Const / CE

STP 01,771 00 0 0

State 0443 00 0 0

94

Page 108: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

61613Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

McPherson

NDOT Improvement Mill, widen/resurf 24' rdwy to 28'

Tryon West N-92 190.26 13.6

N-92 from 0.6 mi east of Arthur/McPherson Co line to 0.1 mi west of Tryon

$5,768Estimate ($1,000)

FY22

Project No STP-92-2(111)

FY23

PE

State 100 00 0 0

ROW

State 00 00 5 0

Const / CE

STP 00 4,6020 0 0

State 00 1,1510 0 0

61615Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Thomas

NDOT Improvement Mill, resurf, ADA

Halsey West & East N-2 221.49 6.7

N-2 from approx 5.0 mi west Halsey to 0.6 mi east Thomas/Blaine county line

$3,132Estimate ($1,000)

FY22

Project No NH-2-2(121)

FY23

PE

State 00 090 0 0

Const / CE

NHPP 02,369 00 0 0

State 0673 00 0 0

61616Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Blaine

NDOT Improvement Mill, resurf existing rdwy and s-shld w/asphalt, br repair, gdrl Halsey - Dunning N-2 228.14 10.7

N-2 from approx 0.5 mi east of Halsey east to approx 0.8 mi south of Dunning

$5,197Estimate ($1,000)

FY22

Project No NH-2-3(123)

FY23

PE

State 00 034 0 0

Const / CE

NHPP-AC 00 00 4108 0

State 00 00 1055 0

NHPP 00 00AC Conv 0 4108

State 00 00AC Conv 0 -4108

95

Page 109: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

61617Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Lincoln

NDOT Improvement Mill, resurf existing rdwy and s-shld

Hershey - North Platte US-30 164.13 11.3

US-30 from approx 0.1 mi west Jct L-56C in Hershey to North Platte

$6,245Estimate ($1,000)

FY22

Project No STP-30-2(149)

FY23

PE

State 00 0219 0 0

Const / CE

STP 00 00 4821 0

State 00 00 1205 0

61618Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

McPherson

NDOT Improvement Mill, resurf existing 24'-rdwy, curb & flume, culv, earth shld const Tryon North N-97 31.06 13.1

N-97 from W Jct N-92, north to the McPherson/Hooker Co line

$5,847Estimate ($1,000)

FY22

Project No STP-97-3(106)

FY23

PE

State 00 0520 0 0

ROW

State 010 00 0 0

Const / CE

STP 00 00 4254 0

State 00 00 1063 0

61619Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Keith

NDOT Improvement Mill, resurf rdwy & s-shld, br repair, gdrl

Kingsley Dam South N-61 88.47 11.7

N-61 in 3-segments from N jct US-26 to just N of S end Kingley Dam;US-26 segment

$5,560Estimate ($1,000)

FY22

Project No STP-NH-61-2(11

FY23

PE

State 00 0241 0 0

Const / CE

STP 00 00 3009 0

NHPP 00 00 1246 0

State 00 00 1064 0

96

Page 110: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

61620Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Thomas

NDOT Improvement Mill, resurf 24'-rdwy with 10' shld, 8'-surf, curb and flumes Thedford North US-83 149.25 7.3

US-83 from E Jct N-2 north to Thomas/Cherry Co line

$2,921Estimate ($1,000)

FY22

Project No NH-83-3(110)

FY23

PE

State 00 070 0 0

Const / CE

NHPP-AC 02,281 00 0 0

State 0570 00 0 0

NHPP 2,2810 00AC Conv 0 0

State -2,2810 00AC Conv 0 0

61628Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Custer

NDOT Improvement Mill, resurf existing rdwy and s-shld w/asphalt Anselmo - Merna N-2 258.04 12.3

N-2 from Anselmo to approx 1.1 mi southeast of W Jct N-92 southeast of Merna

$5,105Estimate ($1,000)

FY22

Project No NH-2-3(124)

FY23

PE

State 00 022 0 0

ROW

State 010 00 0 0

Const / CE

NHPP-AC 00 00 4058 0

State 00 00 1015 0

NHPP 00 00AC Conv 0 4058

State 00 00AC Conv 0 -4058

61629Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Keith

NDOT Improvement Conc repair, diamond grinding, joint sealing

Kingsley Dam N-61 96.05 2.4

N-61 from near south end Kingsley Dam to approx 0.5 mi south of north end of dam

$844Estimate ($1,000)

FY22

Project No STP-61-2(116)

FY23

Const / CE

STP 00 00 0 0

State 00 00 0 0

97

Page 111: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

61630Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Lincoln

NDOT Improvement Resurf

Wallace North N-25 80.51 12.2

N-25 from Jct N-23 to approx 4.7 mi south UPRR viaduct

$4,941Estimate ($1,000)

FY22

Project No STP-25-2(109)

FY23

PE

State 10 00 0 0

Const / CE

STP 00 00 0 0

State 00 00 0 0

61631Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Keith

NDOT Improvement Mill, resurf rdwy & shld, curb/flumes, cable guardrail Garden/Keith Co. Line East US-26 128.71 7.8

US-26 from 1.7 mi east of Garden/Keith Co line to 2.7 mi west of Lakeview Rd

$3,264Estimate ($1,000)

FY22

Project No NH-26-2(152)

FY23

PE

State 00 013 0 0

Const / CE

NHPP 00 00 2601 0

State 00 00 650 0

61632Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Keith

NDOT Improvement Conc repair, asph resurf, ramps, joint seal, pvmt marking In Ogallala & Surrounding Area US-30 126.29 7.1

US-30, US-26 and N-61 in Ogallala and the surrounding area

$2,169Estimate ($1,000)

FY22

Project No STP-NH-30-2(15

FY23

Const / CE

STP 00 1,2480 0 0

NHPP 00 4870 0 0

State 00 4340 0 0

61633Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

McPherson

NDOT Improvement Resurf

Tryon South N-97 19.90 10.9

N-97 from E Jct N-92 south approx 6.7 mi & approx 0.2 mi east Tryon - E Jct N-97

$6,386Estimate ($1,000)

FY22

Project No STP-97-3(107)

FY23

PE

State 01 00 0 0

Const / CE

STP 00 00 0 5108

State 00 00 0 1277

98

Page 112: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

61635Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dawson

NDOT Improvement Viaduct repair

Cozad Viaduct N-21 13.67 0.0

Viaduct over US-30 and UPRR in Cozad

$1,872Estimate ($1,000)

FY22

Project No STP-21-2(116)

FY23

PE

State 00 00 1 0

Const / CE

STP 00 00 0 0

State 00 00 0 0

61637Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Lincoln

NDOT Improvement Crack seal

South Channel Platte River - Brady I-80 185.74 12.7

I-80 from approx 4.7 mi west Maxwell Spur S56A to 0.6 mi west Brady Link L56D

$366Estimate ($1,000)

FY22

Project No NH-80-4(149)

FY23

PE

State 00 023 0 0

Const / CE

NHPP 00 00 309 0

State 00 00 34 0

61639Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Lincoln

NDOT Improvement Crack seal

Sutherland - Hershey I-80 157.74 6.4

I-80 from approx 0.3 mi west N-25 grade sep to 0.4 mi west L-56C grade sep

$168Estimate ($1,000)

FY22

Project No NH-80-3(161)

FY23

PE

State 00 01 0 0

Const / CE

NHPP 00 00 150 0

State 00 00 17 0

99

Page 113: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

61641Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Lincoln

NDOT Improvement Crack seal

Brady East I-80 198.40 7.2

I-80 from approx 0.6 mi west of L-56D to 2.6 me we of the Lincoln/Dawson Co line

$197Estimate ($1,000)

FY22

Project No NH-80-4(151)

FY23

PE

State 00 01 0 0

Const / CE

NHPP 0176 00 0 0

State 020 00 0 0

61642Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dawson

NDOT Improvement Crack seal

Gothenburg - Darr I-80 215.60 15.0

I-80 from approx 3.8 mi east of Gothenburg to Darr

$421Estimate ($1,000)

FY22

Project No NH-80-4(152)

FY23

PE

State 00 01 0 0

Const / CE

NHPP 00 00 0 0

State 00 00 0 0

61643Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Keith

NDOT Improvement Crack seal

Big Springs - Brule I-80 106.31 9.2

I-80 from 1.1 mi west of Big Springs to 1.8 mi west of Brule

$893Estimate ($1,000)

FY22

Project No NH-80-3(162)

FY23

PE

State 00 00 1 0

Const / CE

NHPP 00 00 0 0

State 00 00 0 0

100

Page 114: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

61647Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dawson

NDOT Improvement Mill, resurf rdwy & s-shld, repair 2 andreplace 2-br's w/br sized CBC's, gdrl Lexington North N-21 28.62 8.0

N-21 from approx 0.4 mi So. of north lmts Lexington to 6.6 mi So. Eddyville Road

$3,809Estimate ($1,000)

FY22

Project No STP-21-2(118)

FY23

PE

State 00 055 0 0

ROW

State 00 010 0 0

Const / CE

STP 02,995 00 0 0

State 0749 00 0 0

61650Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Lincoln

NDOT Improvement Install overhead dynamic message signs

District 6 Overhead DMS I-80 156.02 0.0

I-80 at four locations from Sutherland to Gothenburg

$654Estimate ($1,000)

FY22

Project No ITS-NH-D6(106)

FY23

PE

State 00 08 0 0

Const / CE

NHPP 0567 00 0 0

State 079 00 0 0

61653Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Grant

NDOT Improvement Install sidemount dynamic message signs District 6 Sidemount DMS N-2 144.87 0.0

At 14 highway locations in district 6

$2,447Estimate ($1,000)

FY22

Project No ITS-NH-STP-D6(1

FY23

PE

State 00 011 0 0

Const / CE

NHPP 01,392 00 0 0

STP 0557 00 0 0

State 0487 00 0 0

101

Page 115: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

61654Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dawson

NDOT Improvement Install CCTV camera towers

District 6-Districtwide CCTV Cameras US-30 157.00 0.0

At 18 highway locations in District 6

$1,013Estimate ($1,000)

FY22

Project No ITS-NH-STP-D6(1

FY23

PE

State 00 010 0 0

Const / CE

NHPP 0178 00 0 0

STP 0624 00 0 0

State 0201 00 0 0

61655Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Lincoln

NDOT Improvement Repair, mill & resurf existing asph rdwy, br replacement and gdrl I-80 South S-56A 2.04 1.9

S-56A from just south I-80 grade sep to just south Ft McPherson Nat'l Cemetery

$5,380Estimate ($1,000)

FY22

Project No STP-S56A(108)

FY23

PE

State 0181 00 0 0

ROW

State 150 00 0 0

Const / CE

STP-AC 00 00 0 4147

State 00 00 0 1037

STP 00 4,1470AC Conv 0 0

State 00 -4,1470AC Conv 0 0

61656Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Deuel

NDOT Improvement Install variable speed advisory sign system

District 6 Variable Speed Advisory I-80 102.15 0.0

Along I-80 corridor in Deuel, Keith, Lincoln and Dawson counties

$4,315Estimate ($1,000)

FY22

Project No ITS-NH-D6(109)

FY23

PE

State 00 018 0 0

Const / CE

NHPP 00 00 3867 0

State 00 00 430 0

102

Page 116: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

61659Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Keith

NDOT Improvement Crack seal

West of Ogallala - West of Roscoe I-80 126.25 6.6

I-80 from approx 0.1 mi west Ogallala to 1.1 mi west of Roscoe Link L-51B

$158Estimate ($1,000)

FY22

Project No NH-80-3(164)

FY23

PE

State 00 01 0 0

Const / CE

NHPP 0141 00 0 0

State 016 00 0 0

61661Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dawson

NDOT Improvement Mill, conc repair, resurf rdwy & inside Shld, fog seal outside shld, br repair Gothenburg - Cozad I-80 212.70 9.3

I-80 from approx 0.9 mi east N-47 gr sep to 0.5 mi west N-21 gr sep

$3,799Estimate ($1,000)

FY22

Project No NH-80-4(153)

FY23

PE

State 00 030 0 0

Const / CE

NHPP 00 00 3392 0

State 00 00 377 0

61663Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Lincoln

NDOT Improvement Resurf rdwy & inside s-shld

Brady East I-80 198.40 7.2

I-80 approx 0.6 mi west L-56D gr separation to 2.6 mi west Lincoln/Dawson C/L

$1,475Estimate ($1,000)

FY22

Project No NH-80-4(154)

FY23

PE

State 00 00 1 0

Const / CE

NHPP 00 1,3270 0 0

State 00 1470 0 0

103

Page 117: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

61664Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dawson

NDOT Improvement Interstate reconstruction, br

Overton East I-80 248.11 6.8

I-80 from just west Overton Interchange, east to Dawson/Buffalo Co Line

$38,303Estimate ($1,000)

FY22

Project No NH-80-5(86)

FY23

PE

State 01,297 00 0 0

Const / CE

NHPP-AC 00 00 0 33305

State 00 00 0 3701

NHPP 00 33,3050AC Conv 0 0

State 00 -33,3050AC Conv 0 0

61666Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Lincoln

NDOT Improvement Mill, resurf existing rdwy

Sutherland South N-25 92.68 12.0

South of Sutherland

$5,997Estimate ($1,000)

FY22

Project No STP-25-2(110)

FY23

PE

State 00 00 1 0

Const / CE

STP 00 4,7970 0 0

State 00 1,1990 0 0

61667Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Custer

NDOT Improvement Resurf, replace curb & flume

Ansley North US-183 89.38 7.0

US-183 from approx 0.2 mi north of E JctN-92 to 0.2 mi north of N Jct N70

$2,771Estimate ($1,000)

FY22

Project No STP-183-3(121)

FY23

PE

State 00 00 1 0

Const / CE

STP 00 2,2160 0 0

State 00 5540 0 0

104

Page 118: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

61668Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Keith

NDOT Improvement Mill, resurf existing rdwy to 28' top

Lemoyne East N-92 131.88 6.8

N-92 near Lemoyne, east to near S Jct N-61

$2,410Estimate ($1,000)

FY22

Project No STP-92-2(112)

FY23

PE

State 00 00 1 0

Const / CE

STP 00 1,9270 0 0

State 00 4820 0 0

61669Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Lincoln

NDOT Improvement Update and improve traffic signal controllers In North Platte Traffic Signals US-83 82.00 3.0

Along US-83 and US-30 at various Street locations in North Platte

$158Estimate ($1,000)

FY22

Project No ELEC-83-2(1035)

FY23

PE

State 00 02 0 0

Local 00 02 0 0

Const / CE

State 077 00 0 0

Local 077 00 0 0

61672Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dawson

County Improvement Bridge

Cozad South

Approx 0.75 mi west intersection Rd 754 with N-21 south of Cozad

$870Estimate ($1,000)

FY22

Project No BRO-7296(1)

FY23

PE

BRO 80 00 0 0

Local 20 00 0 0

Const / CE

BRO 00 00 0 688

Local 00 00 0 172

105

Page 119: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

61675Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

McPherson

NDOT Improvement Resurf

In Tryon and In Stapleton N-92 203.47 1.0

N-92 from W Jct N-97 to just east Tryon & near W lmts Stapleton to N Jct US-83

$1,755Estimate ($1,000)

FY22

Project No STP-92-2(113)

FY23

PE

State 10 00 0 0

Const / CE

STP 00 1,4030 0 0

State 00 3510 0 0

61681Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dawson

NDOT Improvement Extend culverts, eliminate guardrail

Lexington East & West I-80 221.15 0.0

I-80 from just west of Cozad Canal to approx 1.6 mi west of Buffalo Co Line

$671Estimate ($1,000)

FY22

Project No HSIP-80-4(156)

FY23

PE

State 00 01 0 0

Const / CE

SFTY 6030 00 0 0

State 670 00 0 0

61684Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dawson

NDOT Improvement Mill existing conc and resurf w/asph

In Gothenburg N-47 62.90 1.6

N-47 from 7th St/US30 Viaduct to just north of north lmts Gothenburg & L24D link

$701Estimate ($1,000)

FY22

Project No STP-47-2(113)

FY23

PE

State 00 00 1 0

Const / CE

STP 00 5600 0 0

State 00 1400 0 0

106

Page 120: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

61685Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Custer

NDOT Improvement Mill, patch, resurf, intersection improvement In Broken Bow N-2 277.87 2.4

N-2 in Broken Bow. Includes N-2/N-70 intersection improvements

$1,755Estimate ($1,000)

FY22

Project No NH-2-3(125)

FY23

PE

State 00 00 1 0

Const / CE

NHPP 00 1,4030 0 0

State 00 3510 0 0

70510Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Franklin

NDOT Improvement Mill, asph resurf rdwy & s-shld, curb/flumes, conc repair, br repair, RR Xings Franklin South N-10 0.00 7.9

N-10 from Kansas Line north to S Jct US-136; includes approx 1.0 mi on US-136

$6,200Estimate ($1,000)

FY22

Project No STP-10-1(104)

FY23

PE

State 00 0265 0 0

ROW

State 00 0152 0 0

Const / CE

STP 04,504 00 0 0

State 01,279 00 0 0

70585Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Hayes

NDOT Improvement RESURF

Palisade North N-25A 0.00 6.0

PALISADE NORTH

$2,777Estimate ($1,000)

FY22

Project No S-25A-1(1006)

FY23

PE

State 00 00 81 0

ROW

State 00 00 0 4

Const / CE

State 00 2,6920 0 0

107

Page 121: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

70587Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Furnas

NDOT Improvement Mill, resurf existing rdwy and s-shld w/asphalt, br repair, gdrl Cambridge South N-47 7.70 5.4

N-47 from approximately 4.4 mi south Cambridge, north to jct US-6/34

$2,350Estimate ($1,000)

FY22

Project No STP-47-1(101)

FY23

PE

State 0133 00 0 0

ROW

State 50 00 0 0

Const / CE

STP 00 00 0 1769

State 00 00 0 443

70592Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Franklin

NDOT Improvement Mill, widen/resurf existing rdwy to 28' br repair & widening, gdrl Naponee - Bloomington US-136 41.59 5.7

US-136 from just west jct S-31C to just east Central Ave in Bloomington

$5,578Estimate ($1,000)

FY22

Project No STP-136-4(110)

FY23

PE

State 0520 00 0 0

Const / CE

STP 00 4,0460 0 0

State 00 1,0120 0 0

70639AControl No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Harlan

NDOT Improvement Replace two bridges, add new approaches and gr beam on piles, gdrl Orleans South Bridges N-89 63.28 0.0

N-89 over Flag Creel & Republican River approx 0.5 and 1.5 mi south of Orleans

$6,430Estimate ($1,000)

FY22

Project No STP-89-3(111)

FY23

PE

State 00 0235 0 0

ROW

State 00 030 0 0

Const / CE

STP 04,802 00 0 0

State 01,363 00 0 0

108

Page 122: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

70850Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Furnas

NDOT Improvement Asph resurf 24' rdwy, widen shld from 2' to 6', br Oxford North N-46 7.96 4.0

N-46 from US-136 in Oxford north to US-34

$3,430Estimate ($1,000)

FY22

Project No STP-46-1(105)

FY23

PE

State 00 0300 0 0

ROW

State 00 037 0 0

Const / CE

STP 00 00 0 0

State 00 00 0 0

70886AControl No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Hitchcock

NDOT Improvement Hydrated lime slurry stablization, resurf, conc repair, br repair Culbertson South N-17 6.80 10.3

N-17 from Culbertons South to 6.8 mi north of the Kansas line

$5,131Estimate ($1,000)

FY22

Project No STP-17-1(108)

FY23

PE

State 00 090 0 0

ROW

State 060 00 0 0

Const / CE

STP 00 00 3878 0

State 00 00 1103 0

70919Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Chase

NDOT Improvement Mill, widen/resurf existing 24'-rdwy to 28', urban section, curb & flume, culv Champion Spur S-15A 0.00 6.7

S-15A (Champion Spur) from US-6 in Imperial southwest to Champion

$5,333Estimate ($1,000)

FY22

Project No STP-S15A(101)

FY23

PE

State 00 0112 0 0

ROW

State 015 00 0 0

Const / CE

STP 00 00 4165 0

State 00 00 1041 0

109

Page 123: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

71018Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dundy

County Improvement Widen and realign rdwy

Benkelman Northeast 0.00 0.4

Snake Rd to Max-Wanuneta Rd northeast of Benkelman

$203Estimate ($1,000)

FY22

Project No HSIP-1315(11)

FY23

PE

SFTY 00 045 0 0

State 00 02 0 0

Local 00 011 0 0

ROW

SFTY 00 08 0 0

Local 00 02 0 0

Const / CE

SFTY 0108 00 0 0

Local 027 00 0 0

71100Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Chase

NDOT Improvement Mill, resurf 24' rdwy w/6' earth shld, curb/flume Enders South N-61 26.87 3.6

N-61 from approx 2.5 mi north of Dundy/Chase Co line north to E Jct US-6

$1,325Estimate ($1,000)

FY22

Project No STP-61-1(109)

FY23

PE

State 055 00 0 0

Const / CE

STP 00 00 0 1015

State 00 00 0 255

71162Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Dundy

NDOT Improvement Mill, resurf 24' rdwy with 4' earth shld

Indian Creek North N-61 11.93 6.5

N-61 from just north Indian Creek to approx 5.9 mi south of Dundy/Chase Co line

$2,573Estimate ($1,000)

FY22

Project No STP-61-1(111)

FY23

PE

State 010 00 0 0

Const / CE

STP 00 00 0 2050

State 00 00 0 513

110

Page 124: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

71163Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Franklin

NDOT Improvement Mill, widen/resurf 24' rdwy to 28', extend culv, curb & flume, gdrl Franklin North N-10 7.33 6.8

N-10 from US-136 north of Franklin north to approx 6.2 mi south of N-4

$4,370Estimate ($1,000)

FY22

Project No STP-10-1(111)

FY23

Const / CE

STP 03,138 00AC Conv 0 0

State 0-3,138 00AC Conv 0 0

71165Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Gosper

NDOT Improvement Mill, widen/resurf 24' rdwy to 28', urban resurf, br repair, curb/flume In Arapahoe & North US-283 20.59 10.8

US-283 from Arapahoe to approx 3.0 mi south of N-18

$6,165Estimate ($1,000)

FY22

Project No STP-283-1(117)

FY23

PE

State 00 0265 0 0

ROW

State 025 00 0 0

Const / CE

STP 00 00 4527 0

State 00 00 1348 0

71171Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Furnas

NDOT Improvement Br replacement, add approaches

Arapahoe West Bridge US-6 125.68 0.0

US-6 over Muddy Creek 0.2 mi west of Arapahoe

$1,897Estimate ($1,000)

FY22

Project No NH-6-3(127)

FY23

PE

State 00 060 0 0

ROW

State 05 00 0 0

Const / CE

NHPP 00 00 1429 0

State 00 00 403 0

111

Page 125: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

71176Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Frontier

NDOT Improvement 2 Br replacements and associated approach work Stockville East & Curtis South Bridges N-18 10.63 0.0

N-18 over Medicine Creek 0.3 mi east of Stockville and 0.2 mi south of Curtis

$3,312Estimate ($1,000)

FY22

Project No STP-18-2(111)

FY23

PE

State 1260 00 0 0

ROW

State 00 00 1 0

Const / CE

STP 00 2,5480 0 0

State 00 6370 0 0

71182Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Hitchcock

NDOT Improvement Mill, resurf rdwy & shld, curb/flumes, br repair/overlay, curb ramps Trenton North N-25 13.24 9.6

N-25 from approx 0.6 mi south of Trenton north to US-6

$6,312Estimate ($1,000)

FY22

Project No STP-25-1(111)

FY23

PE

State 00 0390 0 0

ROW

State 00 020 0 0

Const / CE

STP-AC 04,597 00 0 0

State 01,305 00 0 0

STP 4,5970 00AC Conv 0 0

State -4,5970 00AC Conv 0 0

71183Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Perkins

NDOT Improvement Mill, widen/resurf 24' rdwy to 28'

Chase/Perkins Co Line North N-61 53.56 10.6

N-61 from Chase/Perkins Co line north to the E Jct N-23

$4,539Estimate ($1,000)

FY22

Project No STP-61-2(114)

FY23

PE

State 00 0120 0 0

Const / CE

STP 03,535 00 0 0

State 0884 00 0 0

112

Page 126: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

71189Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Phelps

NDOT Improvement Mill, resurf existing rdwy & s-shld w/asph, ADA curb ramp, br repair, culv, gdrlHoldrege South US-183 20.97 9.4

US-183 from just south jct N-4, north to just south jct US-6 & 34 in Holdrege

$5,095Estimate ($1,000)

FY22

Project No NH-183-1(118)

FY23

PE

State 00 051 0 0

ROW

State 00 010 0 0

Const / CE

NHPP-AC 04,027 00 0 0

State 01,007 00 0 0

NHPP 4,0270 00AC Conv 0 0

State -4,0270 00AC Conv 0 0

71190Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Perkins

NDOT Improvement Resurf

Brandon - E Jct N-61 N-23 8.12 13.3

N-23 from just east of Brandon east to just east of E jct N-61 east of Grant

$5,869Estimate ($1,000)

FY22

Project No STP-23-2(129)

FY23

PE

State 0212 00 0 0

Const / CE

STP 00 00 0 0

State 00 00 0 0

71191Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Kearney

NDOT Improvement Resurf, br

Minden North N-10 34.20 11.7

N-10 from 0.6 mi north of Minden north to 0.5 mi north of the Buffalo Co line

$5,573Estimate ($1,000)

FY22

Project No STP-10-1(113)

FY23

PE

State 200 00 0 0

Const / CE

STP-AC 00 00 0 0

State 00 00 0 0

STP 00 4,4420AC Conv 0 0

State 00 -4,4420AC Conv 0 0

113

Page 127: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

71192Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Frontier

NDOT Improvement Mill, asph resurf, curb/flumes, add passing lanes Frazier Creek North & South US-83 35.00 9.8

US-83 from 8.6 mi north of Frontier Co line north to 3.2 mi south of S Jct N-23

$8,187Estimate ($1,000)

FY22

Project No NH-83-1(118)

FY23

PE

State 00 028 0 0

ROW

State 00 0136 0 0

Const / CE

NHPP-AC 03,082 00 0 0

State 01,078 00 0 0

State 03,863 00 0 0

NHPP 3,0820 00AC Conv 0 0

State -3,0820 00AC Conv 0 0

71196Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Kearney

NDOT Improvement Mill, resurf existing rdwy & s-shld, shld widening, C&G repair, br repair, flumeN-4 - Minden N-10 20.38 13.8

N-10 from N-4 north to just south of US-6/34 in Minden

$6,973Estimate ($1,000)

FY22

Project No STP-10-1(114)

FY23

Const / CE

STP 05,186 00AC Conv 0 0

State 0-5,186 00AC Conv 0 0

71207Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Phelps

NDOT Improvement Resurf

Atlanta - Holdrege US-6 150.35 6.5

US-6 from 0.7 mi southwest of Atlanta to 0.4 mi southwest of Holdrege

$3,836Estimate ($1,000)

FY22

Project No NH-6-3(128)

FY23

PE

State 00 00 1 0

Const / CE

NHPP 00 00 0 0

State 00 00 0 0

114

Page 128: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

71208Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Harlan

NDOT Improvement Resurf

N-46 - Atlanta US-6 140.40 10.0

US-6 from approx 0.2 mi west of N-46 to approx 0.7 mi southwest of Atlanta

$5,845Estimate ($1,000)

FY22

Project No NH-6-3(129)

FY23

PE

State 00 00 1 0

Const / CE

NHPP 00 00 0 0

State 00 00 0 0

71209Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Hitchcock

NDOT Improvement Mill, trench widen/resurf existing 24' rdwy to 28', br repair, gdrl Palisade - N-25 US-6 57.36 6.6

US-6 from Palisade southeast to just southeast of Jct N-25

$4,657Estimate ($1,000)

FY22

Project No NH-6-2(132)

FY23

PE

State 300 00 0 0

ROW

State 00 00 5 0

Const / CE

NHPP 00 3,6980 0 0

State 00 9240 0 0

71223Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Harlan

NDOT Improvement Resurf

In Orleans and East US-136 22.30 5.2

US-136 from approx 0.1 mi NW of Jct N-89 to Jct US-183; includes 0.1 mi on N-89

$2,191Estimate ($1,000)

FY22

Project No STP-136-3(111)

FY23

PE

State 10 00 0 0

Const / CE

STP 00 00 0 0

State 00 00 0 0

115

Page 129: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

71224Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Phelps

NDOT Improvement Resurf

Holdrege - Funk US-6 159.64 7.1

US-6 from approx 0.2 mi west of east lmts Holdrege to 0.7 mi east of Funk

$3,110Estimate ($1,000)

FY22

Project No NH-6-3(131)

FY23

PE

State 10 00 0 0

Const / CE

NHPP 00 00 0 0

State 00 00 0 0

71228Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Kearney

NDOT Improvement Resurf

Wilcox - W Jct US-6/34 N-44 25.50 7.0

N-44 from approx 0.5 mi north Wilcox to W Jct US-6/34

$2,303Estimate ($1,000)

FY22

Project No STP-44-1(105)

FY23

PE

State 00 00 1 0

Const / CE

STP 00 00 0 0

State 00 00 0 0

71229Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Franklin

NDOT Improvement Resurf

N-4 - Wilcox N-44 20.00 5.5

N-44 from Jct N-4 to Wilcox

$1,823Estimate ($1,000)

FY22

Project No STP-44-1(106)

FY23

PE

State 00 00 1 0

Const / CE

STP 00 00 0 0

State 00 00 0 0

116

Page 130: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

71232Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Frontier

NDOT Improvement Mill, resurf existing rdwy & s-shld, br repair, add passing lanes Wellfleet South US-83 44.75 11.0

US-83 from approx 0.3 mi south of S Jct N-23 to 0.3 mi south Wellfleet

$15,830Estimate ($1,000)

FY22

Project No NH-83-1(120)

FY23

PE

State 2590 00 0 0

ROW

State 00 00 62 0

Const / CE

NHPP 00 9,1140 0 0

State 00 3,7770 0 0

State 00 2,6180 0 0

80640Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cherry

NDOT Improvement Mill, resurf 24' rdwy w/3.5' s-shld, erosion erosion control curb & flume, culv Snake River North & South N-61 190.78 15.0

N-61 from 9.6 mi south of Snake River, north to 11.7 mi south of Niobrara River

$7,994Estimate ($1,000)

FY22

Project No STP-61-4(107)

FY23

PE

State 00 0380 0 0

ROW

State 00 025 0 0

Const / CE

STP-AC 06,071 00 0 0

STP 06,071 00AC Conv 0 0

State 01,518 00 0 0

State 0-6,071 00AC Conv 0 0

80662Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cherry

NDOT Improvement Widen/resurf 24' rdwy to 28'

Merriman South N-61 219.63 6.1

N-61 from 2.0 mi north of Niobrara River north 6.1 mi to W Jct US-20

$3,525Estimate ($1,000)

FY22

Project No STP-61-4(110)

FY23

PE

State 00 00 390 0

ROW

State 00 00 0 135

Const / CE

STP 00 2,3400 0 0

State 00 6600 0 0

117

Page 131: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

80683Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Keya Paha

NDOT Improvement Cold-in-place recycle 28' rdwy w/2' earth shld, br Burton East N-12 65.46 12.7

N-12 from 0.6 mi east of Burton Creek east to the south jct N-137

$7,473Estimate ($1,000)

FY22

Project No STP-12-3(106)

FY23

PE

State 2230 00 0 0

Const / CE

STP 00 5,6400 0 0

State 00 1,6100 0 0

80690AControl No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Keya Paha

NDOT Improvement Mill, widen/resurf 24' rdwy to 28', curb/flumes, br repair Niobrara River - N-7 US-183 207.17 4.3

US-183 from just north of Brown/Keya Paha Co line north to N-7

$3,463Estimate ($1,000)

FY22

Project No STP-183-4(113)

FY23

PE

State 00 0120 0 0

ROW

State 010 00 0 0

Const / CE

STP 00 00 2666 0

State 00 00 667 0

80731Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cherry

NDOT Improvement Mill, widen/resurf existing 22'-rdwy to 24'

Merritt Reservoir North N-97 110.35 5.1

N-97 from 0.1 mi south Merritt Res Rec Rd (R-16C) north 5.05 mi

$2,357Estimate ($1,000)

FY22

Project No STP-97-4(110)

FY23

PE

State 1400 00 0 0

ROW

State 00 00 50 0

Const / CE

STP 00 1,7340 0 0

State 00 4330 0 0

118

Page 132: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

80758 Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Holt

County Improvement 2 bridge replacements and associated approach work O'Neill West

Co Rd 4.0 mi west of O'Neill over the Elkhorn River & overflow stream

$2,163Estimate ($1,000)

FY22

Project No BRO-7045(28)

FY23

PE

BRO 00 0315 0 0

State 00 058 0 0

Local 00 044 0 0

ROW

BRO 00 044 0 0

State 00 06 0 0

Local 00 07 0 0

Const / CE

BRO 01,300 00 0 0

State 0192 00 0 0

Local 0197 00 0 0

80804Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Brown

NDOT Improvement Mill, widen/resurf 24' to 28' rdwy w/4' earth shld In Ainsworth & South N-7 36.36 7.2

N-7 from US-20 in Ainsworth south 7.3 mi

$6,317Estimate ($1,000)

FY22

Project No STP-7-4(112)

FY23

PE

State 600 00 0 0

Const / CE

STP-AC 00 00 0 0

State 00 00 0 0

STP 00 4,9240AC Conv 0 0

State 00 -4,9240AC Conv 0 0

119

Page 133: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

80817Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cherry

County Improvement Gr, culv, asph surf, parking area, guardrail

Niobrara Scenic River Corridor 0.00 3.3

Sparks River Rd from lookout where surfacing changes to gravel north to N-12

$3,181Estimate ($1,000)

FY22

Project No TCSP-16(36)

FY23

PE

EM 00 0620 0 0

State 00 015 0 0

ROW

State 00 073 0 0

Const / CE

EM 0320 00 0 0

State 02,153 00 0 0

80854Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Keya Paha

NDOT Improvement Mill, resurf existing 24' rdwy to 28' and gdrl

Norden East N-12 29.13 11.2

N-12 from approx 0.1 mi west Norden to approx 5.0 mi west Jct Meadville Road

$6,058Estimate ($1,000)

FY22

Project No STP-12-3(110)

FY23

PE

State 0218 00 0 0

Const / CE

STP-AC 00 00 0 4672

State 00 00 0 1168

STP 00 4,6720AC Conv 0 0

State 00 -4,6720AC Conv 0 0

80859Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Loup

NDOT Improvement Asph resurf 24' rdwy w/6' shld, 2' surf

Blaine/Loup Co Line Southeast N-91 24.66 6.3

N-91 from approx 0.1 mi west of Blaine/Loup Co line southeast 6.5 mi

$2,459Estimate ($1,000)

FY22

Project No STP-91-3(112)

FY23

PE

State 110 00 0 0

Const / CE

STP 00 1,7870 0 0

State 00 6610 0 0

120

Page 134: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

80862Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cherry

NDOT Improvement Mill, resurf 24' rdwy w/4' earth shld

Grant/Cherry Co Line North (3R Resurf) N-61 165.86 7.4

N-61 from the Grant/Cherry Co. line north 7.4 mi

$2,989Estimate ($1,000)

FY22

Project No STP-61-4(114)

FY23

PE

State 130 00 0 0

Const / CE

STP 00 2,3800 0 0

State 00 5960 0 0

80863Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Brown

NDOT Improvement Replace pvmt, curb, drainage, curb ramps In Ainsworth US-20 241.95 1.4

US-20 in Ainsworth

$5,653Estimate ($1,000)

FY22

Project No NH-20-3(113)

FY23

PE

State 00 0206 0 0

ROW

State 00 050 0 0

Const / CE

NHPP-AC 04,204 00 0 0

State 01,193 00 0 0

NHPP 4,2040 00AC Conv 0 0

State -4,2040 00AC Conv 0 0

80864Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Holt

NDOT Improvement 40'-66' b-b urban reconstruction

E Jct US-20 South In O'Neill US-281 182.81 0.5

US-281 from approx 0.4 mi north Elkhorn River to E Jct US-20 & US-275 in O'Neill

$3,395Estimate ($1,000)

FY22

Project No NH-281-4(124)

FY23

PE

State 00 0118 0 0

ROW

State 00 020 0 0

Const / CE

NHPP 02,537 00 0 0

State 0720 00 0 0

121

Page 135: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

80865Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cherry

NDOT Improvement Urban reconstruction, curb inlets & storm sewer, curb & flume, br repair, resurfIn Valentine US-83 212.78 2.1

US-83 from N Jct US-20 in Valentine NW to Minnechaduza Cr br; approx 0.7 mi N-12

$7,150Estimate ($1,000)

FY22

Project No NH-STP-83-4(11

FY23

PE

State 00 0885 0 0

ROW

State 00 0100 0 0

Const / CE

STP 0319 00 0 0

NHPP-AC 04,499 00 0 0

State 01,347 00 0 0

NHPP 4,4990 00AC Conv 0 0

State -4,4990 00AC Conv 0 0

80866Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Loup

NDOT Improvement Widen/resurf 22' rdwy to 28', br repair/overlay, curb/flumes US-183 Southeast N-96 0.00 13.6

N-96 from US-183 southeast to approx 1.7 mi north of the Calamus River

$6,725Estimate ($1,000)

FY22

Project No STP-96-3(101)

FY23

PE

State 00 0215 0 0

ROW

State 00 022 0 0

Const / CE

STP-AC 05,054 00 0 0

State 01,434 00 0 0

STP 5,0540 00AC Conv 0 0

State -5,0540 00AC Conv 0 0

80867Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cherry

NDOT Improvement Asph resurf existing rdwy and shld

Sparks East N-12 18.64 3.5

N-12 from 0.6 mi east of Sparks Rd to juest west of the Cherry/Keya Paha Co line

$1,658Estimate ($1,000)

FY22

Project No STP-12-2(107)

FY23

PE

State 00 06 0 0

Const / CE

STP 00 00 1252 0

State 00 00 400 0

122

Page 136: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

80868Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Keya Paha

NDOT Improvement Mill, resurf existing rdwy & s-shld with asph, curb & flume, br repair, gdrl Rock/Keya Paha County Line North N-7 73.15 4.5

N-7 from just south Niobrara River bridge to approx 6.7 mi SE of jct US-183

$2,815Estimate ($1,000)

FY22

Project No STP-7-4(118)

FY23

PE

State 00 034 0 0

ROW

State 010 00 0 0

Const / CE

STP 00 00 2217 0

State 00 00 554 0

80869Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Rock

NDOT Improvement Mill, widen/resurf 24' rdwy to 28'

Rose South US-183 148.23 6.4

US-183 from Loup/Rock Co line north 6.4 mi to Rose

$2,631Estimate ($1,000)

FY22

Project No STP-183-4(115)

FY23

PE

State 90 00 0 0

Const / CE

STP 00 2,0970 0 0

State 00 5250 0 0

80870Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Keya Paha

NDOT Improvement Mill, resurf 24' rdwy w/4' shld, 2' surf

Norden West N-12 22.16 7.0

N-12 from Norden west to the Cherry/Keya Paha Co. line

$2,004Estimate ($1,000)

FY22

Project No STP-12-3(108)

FY23

PE

State 00 00 12 0

Const / CE

STP 00 1,5930 0 0

State 00 3990 0 0

123

Page 137: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

80902Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Blaine

NDOT Improvement Mill, asph resurf rdwy and shld, br repair/overlay Brewster North N-7 0.00 8.4

N-7 from N-91 south of Brewster, north to 2.5 mi south of Blaine/Brown Co line

$2,652Estimate ($1,000)

FY22

Project No STP-7-3(103)

FY23

PE

State 00 040 0 0

Const / CE

STP 02,035 00 0 0

State 0577 00 0 0

80944Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cherry

NDOT Improvement Bridge replacement, re-aligned rdwy resurf, curb & flume, gdrl Minnechaduza Creek Bridge N-12 3.78 0.4

N-12 bridge over Minnechaduza Cr on new alignment approx 3.0 mi east Valentine

$2,293Estimate ($1,000)

FY22

Project No STP-12-2(106)

FY23

PE

State 074 00 0 0

ROW

State 500 00 0 0

Const / CE

STP 00 00 0 1735

State 00 00 0 434

80956Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Holt

NDOT Improvement Replace two bridge's 40' clear rdwy, replace rdwy to accomodate br work, gdrl O'Neill Southeast Bridges US-20 310.67 0.5

US-20 from approx 0.2 mi NW of Elkhorn River br to 0.2 SE of Dry Creek br

$5,257Estimate ($1,000)

FY22

Project No NH-20-4(126)

FY23

PE

State 00 00 168 0

ROW

State 00 00 0 30

Const / CE

NHPP 00 4,0470 0 0

State 00 1,0120 0 0

124

Page 138: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

80967Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Brown

NDOT Improvement Bridge repair/overlay

Long Pine Bridge US-20 250.01 0.2

US-20 over Long Pine Creek 1.7 mi west ot the Brown/Rock Co line

$1,889Estimate ($1,000)

FY22

Project No NH-20-3(114)

FY23

PE

State 00 0102 0 0

Const / CE

NHPP 01,430 00 0 0

State 0357 00 0 0

80991Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cherry

NDOT Improvement Microsurfacing

S-16B North & South US-83 186.93 10.2

US-83 from 9.1 mi south of Valentine Refuge Spur (S-16B) north approx 10.2 mi

$983Estimate ($1,000)

FY22

Project No NH-83-4(119)

FY23

PE

State 00 01 0 0

Const / CE

NHPP 0786 00 0 0

State 0196 00 0 0

80993Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Rock

NDOT Improvement Microsurface 24' rdwy w/8' shld, 2' s urf

Rose North US-183 154.62 17.6

US-183 from Rose to 9.8 mi south of Bassett

$1,648Estimate ($1,000)

FY22

Project No STP-183-4(117)

FY23

PE

State 00 01 0 0

Const / CE

STP 00 00 0 0

State 00 00 0 0

125

Page 139: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

81002Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cherry

NDOT Improvement Mill, resurf rdwy and shld, curb/flumes

Snake River - Niobrara River N-61 205.77 10.3

N-61 from approx 5.4 mi north of Snake River to 1.4 mi south of Niobrara River

$7,106Estimate ($1,000)

FY22

Project No STP-61-4(116)

FY23

PE

State 00 0198 0 0

Const / CE

STP-AC 02,763 00 0 0

State 0691 00 0 0

STP 2,7630 00AC Conv 0 0

State 6910 00AC Conv 0 0

81003Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Boyd

NDOT Improvement Resurf, br

In Butte & North N-11 181.82 7.3

N-11 from approx 0.3 mi west of Butte north to the South Dakota line

$4,882Estimate ($1,000)

FY22

Project No STP-11-4(118)

FY23

PE

State 1140 00 0 0

Const / CE

STP 00 3,8140 0 0

State 00 9540 0 0

81005Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Rock

NDOT Improvement Resurf

Bassett South US-183 172.21 10.1

US-183 from approx 9.9 mi South Bassett, north to E Jct US-20 & N-7 in Bassett

$4,796Estimate ($1,000)

FY22

Project No STP-183-4(118)

FY23

PE

State 01 00 0 0

Const / CE

STP 00 00 0 0

State 00 00 0 0

126

Page 140: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

81007Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Brown

NDOT Improvement Microsurfacing

Ainsworth Area Microsurfacing N-7 8.36 31.6

Various locations on US-20 and N-7 in the Ainsworth area

$2,159Estimate ($1,000)

FY22

Project No STP-NH-7-4(122)

FY23

PE

State 01 00 0 0

Const / CE

STP 00 00 0 892

NHPP 00 00 0 834

State 00 00 0 432

81008Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cherry

NDOT Improvement Microsurfacing

Valentine Area Microsurfacing US-20 111.94 58.3

Various locations on US-20, US-83 and N-12 in the Valentine area

$3,976Estimate ($1,000)

FY22

Project No NH-STP-20-2(14

FY23

PE

State 00 01 0 0

Const / CE

STP 00 00 310 0

NHPP 00 00 2870 0

State 00 00 795 0

81009Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Holt

NDOT Improvement Microsurfacing

O'Neill Area Microsurfacing US-20 309.06 50.6

Various locations on US-275, US-281, US-20, N-70 & N-95 in the O'Neill area

$3,562Estimate ($1,000)

FY22

Project No NH-STP-20-4(12

FY23

PE

State 10 00 0 0

Const / CE

NHPP 00 1,7760 0 0

STP 00 1,0730 0 0

State 00 7120 0 0

127

Page 141: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

81010Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Holt

NDOT Improvement Diamond grinding, joint and panel repair

In O'Neill US-20 307.61 1.8

US-20 from just west of E Jct US-281 & NW Jct US275 to just southeast of O'Neill

$480Estimate ($1,000)

FY22

Project No RD-20-4(1031)

FY23

PE

State 00 02 0 0

Const / CE

State 0478 00 0 0

81015 Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Boyd

County Improvement Bridge replacement and associated approach work Monowi West

Co Road 897 bridge C000822615 approx 0.5 mi west of Monowi

$1,239Estimate ($1,000)

FY22

Project No BRO-7008(13)

FY23

PE

BRO 00 0157 0 0

Local 00 042 0 0

ROW

BRO 00 023 0 0

Local 00 06 0 0

Const / CE

BRO 0809 00 0 0

Local 0202 00 0 0

81017Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Garfield

NDOT Improvement Deploy CCTV cameras

District 8 CCTV Cameras N-11 93.70 0.0

Distict 8 - at 5 locations districtwide

$229Estimate ($1,000)

FY22

Project No ITS-STP-D8(103)

FY23

PE

State 00 09 0 0

Const / CE

STP 0172 00 0 0

State 048 00 0 0

128

Page 142: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

81021Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cherry

NDOT Improvement Install culvert

Alkali Pond Culvert N-97 104.17 0.0

N-97 approx 1.3 mi north of Brownlee Rd

$182Estimate ($1,000)

FY22

Project No STP-97-4(112)

FY23

PE

State 00 01 0 0

Const / CE

STP 0145 00 0 0

State 036 00 0 0

81024Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Holt

NDOT Improvement Resurf

Boyd/Holt Co Line North & South US-281 204.09 5.8

US-281 from approx 3.9 south to 1.9 mi north Holt/Boyd county line

$3,362Estimate ($1,000)

FY22

Project No NH-281-4(128)

FY23

PE

State 10 00 0 0

Const / CE

NHPP 00 00 0 0

State 00 00 0 0

81025Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Holt

NDOT Improvement Mill, resurf existing rdwy & s-shld with asph, br repair and gdrl Eagle Creek North & South US-281 196.88 7.2

US-281 from approx 11.6 mi north O'Neill to 3.9 mi south Holt/Boyd county line

$3,830Estimate ($1,000)

FY22

Project No NH-281-4(129)

FY23

PE

State 00 0305 0 0

Const / CE

NHPP 02,820 00 0 0

State 0705 00 0 0

129

Page 143: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

81026Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Holt

NDOT Improvement Mill, resurf existing rdwy & s-shld with asphalt, br repair, gdrl Stafford - Holt/Antelope County Line US-20 320.74 8.1

US-20 from SE jct US-275 east to Holt/Antelope county line

$4,147Estimate ($1,000)

FY22

Project No NH-20-4(127)

FY23

PE

State 00 0114 0 0

Const / CE

NHPP 00 00 3226 0

State 00 00 807 0

81027Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cherry

NDOT Improvement Mill, resurf existing rdwy & s-shld, curb & flume, culv, gdrl Merriman - Eli US-20 135.84 10.2

US-20 from just west of E Jct N-61 in Merriman, east to intersection with Eli Rd

$4,721Estimate ($1,000)

FY22

Project No NH-20-2(145)

FY23

PE

State 00 0267 0 0

Const / CE

NHPP 00 00 3563 0

State 00 00 891 0

81028Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cherry

NDOT Improvement Microsurfacing rdwy, fog seal shld

North of Thomas/Cherry Co Line North US-83 160.48 10.1

US-83 from 3.9 mi north of Thomas/Cherry Co line to just south of Brownlee Road

$946Estimate ($1,000)

FY22

Project No NH-83-4(120)

FY23

PE

State 00 04 0 0

Const / CE

NHPP 00 00 0 0

State 00 00 0 0

130

Page 144: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

81030Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cherry

NDOT Improvement Microsurfacing

Merriman Area Microsurfacing US-20 118.25 13.9

US-20 from approx 16.9 to 8.5 mi west Merriman; N-61 E Jct US-20 to SD Line

$1,556Estimate ($1,000)

FY22

Project No NH-STP-20-2(14

FY23

PE

State 00 00 1 0

Const / CE

STP 00 00 0 0

NHPP 00 00 0 0

State 00 00 0 0

81036Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Holt

County Improvement Bridge

Atkinson Southeast

477 Ave approx 0.7 mi south intersection with US-20 southeast Atkinson

$613Estimate ($1,000)

FY22

Project No BRO-7045(37)

FY23

PE

BRO 050 00 0 0

Const / CE

BRO 00 00 0 563

81037Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Cherry

NDOT Improvement Replace concrete pavement

West 4th Street in Valentine US-83 213.36 0.8

US-83 from Jct N-12 to Minnechuduza Creek bridge in Valentine

$5,702Estimate ($1,000)

FY22

Project No NH-83-4(121)

FY23

PE

State 026 00 0 0

Const / CE

NHPP 00 4,5410 0 0

State 00 1,1350 0 0

131

Page 145: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

81039Control No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Holt

NDOT Improvement Br replacment due to March 2019 flood event Nobrara River at Holt/Boyd Co Line US-281 208.01 0.0

US-281 over the Niobrara River at the Holt/Boyd Co Line

$29,630Estimate ($1,000)

FY22

Project No ER-281-4(130)

FY23

Const / CE

STP 0-23,680 00ER Conv 0 0

ER 023,680 00ER Conv 0 0

STP 023,680 00 0 0

State 05,950 00 0 0

GIAMPOControl No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Improvement

Listed in GIAMPO's 2020 - 2023 TIP

Estimate ($1,000)

FY22

Project No

FY23

SFTY 0406 00 0 0

State 02,167 00 0 0

Local 0292 00 0 0

NHPP 11,0590 00 0 0

Local 1,4900 00 0 0

State 7,2940 00 0 0

SFTY 9820 00 0 0

NHPP 00 00 2183 0

State 00 00 20915 0

132

Page 146: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

LincolnControl No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Improvement

Listed in Lincoln's 2020 - 2023 TIP

Estimate ($1,000)

FY22

Project No

FY23

Other 01,787 00 0 0

LC 06,500 00 0 0

NHPP 04,049 00 0 0

EM 031,000 00 0 0

TAP 077 00 0 0

SFTY 04,770 00 0 0

LN 09,363 00 0 0

State 011,341 00 0 0

State 32,4540 00 0 0

STP 6,1500 00 0 0

LC 6,5000 00 0 0

SFTY 1,9350 00 0 0

TAP 7940 00 0 0

NHPP 3,5280 00 0 0

LN 7,5400 00 0 0

State 00 00 30801 0

LN 00 00 7141.4 0

NHPP 00 00 3204 0

LC 00 00 6500 0

SFTY 00 00 5632 0

TAP 00 00 20.5 0

STP 00 00 0 9722

LC 00 00 0 6500

Other 00 00 0 2066.4

LN 00 00 0 12568.4

State 00 00 0 32430

TAP 00 00 0 573

133

Page 147: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

MAPAControl No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Improvement

Listed in MAPA's 2020 - 2023 TIP

Estimate ($1,000)

FY22

Project No

FY23

SFTY 05,980 00 0 0

MAPA 045,378 00 0 0

TAP 0406 00 0 0

State 08,786 00 0 0

NHPP 031,062 00 0 0

Local 0-18,662 00 0 0

STP 01,732 00 0 0

SFTY 9320 00 0 0

TAP 3,4920 00 0 0

Local 9,4960 00 0 0

MAPA 16,3660 00 0 0

STP 3,2270 00 0 0

NHPP 23,8990 00 0 0

State 5,2810 00 0 0

State 00 00 5083 0

TAP 00 00 1442 0

MAPA 00 00 6833.53 0

NHPP 00 00 19471 0

Local 00 00 -6000.03 0

STP 00 00 1217 0

Local 00 00 0 771.31

State 00 00 0 22768

TAP 00 00 0 857

NHPP 00 00 0 2938

MAPA 00 00 0 24315.02

134

Page 148: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska's Statewide Transportation Improvement Program FY 2020 Thru FY 2023

SIMPCOControl No

CountyLengthHwy Begin RP

Total Project Cost:

Jurisdiction

Location:

Detailed Termini:

Prev FY FY21FY20 Future FY

Improvement

Listed in SIMPCO's 2020 - 2023 TIP

Estimate ($1,000)

FY22

Project No

FY23

State 02,400 00 0 0

SFTY 030 00 0 0

NHPP 010,700 00 0 0

SFTY 300 00 0 0

NHPP 6,1340 00 0 0

SFTY 00 00 30 0

SFTY 00 00 0 30

135

Page 149: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

FTA Program Budget and Federal Funds Source FFY Apport. Location Fund Scope 2019-2020 2020-2021 2021-2022 2022-2023BudgetPlanning Federal 442-00 1,200,306$ 1,100,000$ 550,000$ 575,000$ Planning Local/State 442-00 300,077$ 275,000$ 137,500$ 143,750$ Planning Total 442-00 1,500,383$ 1,375,000$ 687,500$ 718,750$

Federal Funds SourceGrant NE-80-0024 2014 Urban Federal 442-00 103,652$ -$ -$ -$ Application 1815-2019-2 2016-2017 Urban Federal 442-00 1,096,654$ -$ -$ -$ Application 1815-2019-8 2018-2019 Urban Federal 442-00 -$ 1,100,000$ -$ -$ Application 1815-2020-# (estimated) 2020 Urban Federal 442-00 -$ -$ 550,000$ -$ Application 1815-2021-# (estimated) 2021 Urban Federal 442-00 -$ -$ -$ 575,000$

1,200,306$ 1,100,000$ 550,000$ 575,000$

FTA Program Budget and Federal Funds Source FFY Apport. Location Fund Scope 2019-2020 2020-2021 2021-2022 2022-2023BudgetThird Party Contract Federal 117-00 152,640$ 168,000$ 185,000$ 185,000$ Third Party Contract Local/State 117-00 38,160$ 42,000$ 46,250$ 46,250$ Third Party Contract Total 117-00 190,800$ 210,000$ 231,250$ 231,250$

Federal Funds SourceGrant NE-2019-001-01 2017 Rural Federal 117-00 32,000$ 32,000$ -$ -$ Application 1815-2020-# (estimated) 2020 Rural Federal 117-00 -$ -$ 40,000$ 40,000$ NDOT (FHWA CMAQ) 2020-2023 Urban Federal 117-00 120,640$ 136,000$ 145,000$ 145,000$

152,640$ 168,000$ 185,000$ 185,000$

FTA Program Budget and Federal Funds Source FFY Apport. Location Fund Scope 2019-2020 2020-2021 2021-2022 2022-2023BudgetBus-Rolling Stock Federal 111-00 256,021$ 438,150$ 383,555$ 748,099$ Bus-Rolling Stock Local/State 111-00 64,006$ 109,538$ 95,889$ 187,025$ Bus-Rolling Stock Total 111-00 320,027$ 547,688$ 479,444$ 935,124$

Federal Funds SourceGrant NE-16-X040 2013 Rural Federal 111-00 27,404$ 32,000$ -$ -$ Grant NE-2016-007-01 2014 Rural Federal 111-00 2,421$ -$ -$ -$ Grant NE-2017-009-01 2016 Rural Federal 111-00 226,196$ 406,150$ -$ -$ Application 1815-2019-5 2017-2019 Rural Federal 111-00 -$ -$ 383,555$ 748,099$

256,021$ 438,150$ 383,555$ 748,099$

BudgetBus-Equipment_Facilities Federal 114-00 50,000$ 50,000$ 50,000$ 50,000$ Bus-Equipment_Facilities Local/State 114-00 12,500$ 12,500$ 12,500$ 12,500$ Bus-Equipment_Facilities Total 114-00 62,500$ 62,500$ 62,500$ 62,500$

Federal Funds SourceApplication 1815-2019-5 2017-2019 Rural Federal 114-00 50,000$ 50,000$ 50,000$ -$ Application 1815-2020-# (estimated) 2020 Rural Federal 114-00 -$ -$ 50,000$

50,000$ 50,000$ 50,000$ 50,000$

BudgetThird Party Contract Federal 117-00 48,007$ 55,000$ 55,000$ 55,000$ Third Party Contract Local/State 117-00 12,002$ 13,750$ 13,750$ 13,750$ Third Party Contract Total 117-00 60,009$ 68,750$ 68,750$ 68,750$

Federal Funds SourceGrant NE-2016-007-02 2014 Rural Federal 117-00 8,007$ -$ -$ -$ Grant NE-2017-009-02 2016 Rural Federal 117-00 40,000$ -$ -$ -$ Application 1815-2019-5 2017-2019 Rural Federal 117-00 -$ 55,000$ 55,000$ 55,000$

48,007$ 55,000$ 55,000$ 55,000$

BudgetOperating Assistance Federal 300-00 40,458$ -$ -$ -$ Operating Assistance Local/State 300-00 40,458$ -$ -$ -$ Operating Assistance Total 300-00 80,916$ -$ -$ -$

Federal Funds SourceGrant NE-2016-007-02 2014 Rural Federal 300-00 7,819$ -$ -$ -$ Grant NE-2017-009-03 2016 Rural Federal 300-00 32,639$ -$ -$ -$

40,458$ -$ -$ -$

Nebraska Department of Transportation

Statewide Transportation Improvement ProgramPublic Transit Services

Updated: 07/17/2019

Metropolitan Planning

5303

Vanpools

5307

Enhanced Mobility of Seniors and Individuals with Disabilities

5310 RURAL

Page 150: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska Department of Transportation

Statewide Transportation Improvement ProgramPublic Transit Services

Updated: 07/17/2019

FTA Program Budget and Federal Funds Source FFY Apport. Location Fund Scope 2019-2020 2020-2021 2021-2022 2022-2023BudgetBus-Rolling Stock Federal 111-00 110,000$ 113,000$ 116,004$ 104,000$ Bus-Rolling Stock Local/State 111-00 27,500$ 28,250$ 29,001$ 26,000$ Bus-Rolling Stock Total 111-00 137,500$ 141,250$ 145,005$ 130,000$

Federal Funds SourceGrant NE-2016-009-01 2014 Gr Island Federal 111-00 19,016$ -$ -$ -$ Application 1815-2019-7 2017-2019 Gr Island Federal 111-00 90,984$ 113,000$ 110,897$ -$ Application 1815-2020-# (estimated) 2020 Gr Island Federal 111-00 -$ -$ 5,107$ 104,000$

110,000$ 113,000$ 116,004$ 104,000$

BudgetBus-Equipment_Facilities Federal 114-00 102,025$ -$ -$ -$ Bus-Equipment_Facilities Local/State 114-00 25,507$ -$ -$ -$ Bus-Equipment_Facilities Total 114-00 127,532$ -$ -$ -$

Federal Funds SourceGrant NE-2018-016-01 2016 Gr Island Federal 114-00 102,025$ -$ -$ -$

102,025$ -$ -$ -$

BudgetThird Party Contract Federal 117-00 32,939$ -$ -$ -$ Third Party Contract Local/State 117-00 8,235$ -$ -$ -$ Third Party Contract Total 117-00 41,174$ -$ -$ -$

Federal Funds SourceGrant NE-2016-009-03 2014 Gr Island Federal 117-00 32,939$ -$ -$ -$

32,939$ -$ -$ -$

BudgetOperating Assistance Federal 300-00 20,000$ -$ -$ -$ Operating Assistance Local/State 300-00 20,000$ -$ -$ -$ Operating Assistance Total 300-00 40,000$ -$ -$ -$

Federal Funds SourceGrant NE-2016-009-02 2014 Gr Island Federal 300-00 20,000$ -$ -$ -$

20,000$ -$ -$ -$

FTA Program Budget and Federal Funds Source FFY Apport. Location Fund Scope 2019-2020 2020-2021 2021-2022 2022-2023BudgetBus-Rolling Stock Federal 111-00 342,597$ 511,409$ 449,192$ 349,538$ Bus-Rolling Stock Local/State 111-00 85,650$ 127,853$ 112,298$ 87,385$ Bus-Rolling Stock Total 111-00 428,247$ 639,262$ 561,490$ 436,923$

Federal Funds SourceGrant NE-2018-016-02 2016 Lincoln Federal 111-00 161,627$ -$ -$ -$ Application 1815-2019-4 2017-2019 Omaha Federal 111-00 180,970$ 317,520$ 247,290$ -$ Application 1815-2019-7 2017-2019 Lincoln Federal 111-00 -$ 193,889$ 201,902$ 99,538$ Application 1815-2020-# (estimated) 2020 Lincoln Federal 111-00 -$ -$ -$ -$ Application 1815-2020-# (estimated) 2020 Omaha Federal 111-00 -$ -$ -$ 250,000$

342,597$ 511,409$ 449,192$ 349,538$

BudgetBus-Equipment_Facilities Federal 114-00 6,296$ 5,000$ 5,000$ 5,000$ Bus-Equipment_Facilities Local/State 114-00 1,574$ 1,250$ 1,250$ 1,250$ Bus-Equipment_Facilities Total 114-00 7,870$ 6,250$ 6,250$ 6,250$

Federal Funds SourceGrant NE-2016-010-04 2014 Lincoln Federal 114-00 1,296$ -$ -$ -$ Grant NE-2017-015-02 2015 Lincoln Federal 114-00 5,000$ -$ -$ -$ Application 1815-2019-7 2017-2019 Lincoln Federal 114-00 -$ 5,000$ 5,000$ 5,000$

6,296$ 5,000$ 5,000$ 5,000$

BudgetThird Party Contract Federal 117-00 45,770$ 47,288$ 48,000$ 48,000$ Third Party Contract Local/State 117-00 11,443$ 11,822$ 12,000$ 12,000$ Third Party Contract Total 117-00 57,213$ 59,110$ 60,000$ 60,000$

Federal Funds SourceGrant NE-2016-010-03 2014 Lincoln Federal 117-00 45,770$ -$ -$ -$ Grant NE-2017-015-03 2015 Lincoln Federal 117-00 -$ 47,288$ -$ -$ Application 1815-2019-7 2017-2019 Lincoln Federal 117-00 -$ -$ 48,000$ 48,000$

45,770$ 47,288$ 48,000$ 48,000$

BudgetOperating Assistance Federal 300-00 8,000$ -$ -$ -$ Operating Assistance Local/State 300-00 8,000$ -$ -$ -$ Operating Assistance Total 300-00 16,000$ -$ -$ -$

Federal Funds SourceGrant NE-2016-010-02 2014 Lincoln Federal 300-00 8,000$ -$ -$ -$

8,000$ -$ -$ -$

5310 SMALL URBAN

Enhanced Mobility of Seniors and Individuals with Disabilities

Enhanced Mobility of Seniors and Individuals with Disabilities

5310 LARGE URBAN

Page 151: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska Department of Transportation

Statewide Transportation Improvement ProgramPublic Transit Services

Updated: 07/17/2019

FTA Program Budget and Federal Funds Source FFY Apport. Location Fund Scope 2019-2020 2020-2021 2021-2022 2022-2023BudgetBus-Rolling Stock Federal 111-00 627,305$ 500,000$ 500,000$ 500,000$ Bus-Rolling Stock Local/State 111-00 156,827$ 125,000$ 125,000$ 125,000$ Bus-Rolling Stock Total 111-00 784,132$ 625,000$ 625,000$ 625,000$

Federal Funds SourceGrant NE-2018-015-04 2016 Rural Federal 111-00 127,305$ -$ -$ -$ Application 1815-2019-4 2019 Rural Federal 111-00 500,000$ 500,000$ 500,000$ -$ Application 1815-2021-# (estimated) 2021 Rural Federal 111-00 -$ -$ -$ 500,000$

627,305$ 500,000$ 500,000$ 500,000$

BudgetThird Party Contract Federal 170-00 1,749,871$ 1,749,871$ 1,750,000$ 1,750,000$ Third Party Contract Local/State 170-00 437,468$ 437,468$ 437,500$ 437,500$ Third Party Contract Total 170-00 2,187,339$ 2,187,339$ 2,187,500$ 2,187,500$

Federal Funds SourceGrant NE-2017-013-03 2015 Rural Federal 170-00 1,749,871$ 1,749,871$ -$ -$ Application 1815-2019-4 2019 Rural Federal 170-00 -$ -$ 1,250,000$ -$ Application 1815-2021-# (estimated) 2021 Rural Federal 170-00 -$ -$ 500,000$ 1,750,000$

1,749,871$ 1,749,871$ 1,750,000$ 1,750,000$

BudgetBus Equipment & Facilities Federal 114-00 650,000$ 722,724$ 750,000$ 750,000$ Bus Equipment & Facilities Local/State 114-00 162,500$ 180,681$ 187,500$ 187,500$ Bus Equipment & Facilities Total 114-00 812,500$ 903,405$ 937,500$ 937,500$

Federal Funds SourceApplication 1815-2019-4 2019 Rural Federal 114-00 650,000$ 722,724$ -$ -$ Application 1815-2021-# (estimated) 2021 Rural Federal 114-00 -$ -$ 750,000$ -$ Application 1815-2022-# (estimated) 2022 Rural Federal 114-00 -$ -$ -$ 750,000$

650,000$ 722,724$ 750,000$ 750,000$

BudgetOperating Assistance Federal 300-00 3,800,000$ 3,876,000$ 3,953,520$ 4,000,000$ Operating Assistance Local/State 300-00 3,800,000$ 3,876,000$ 3,953,520$ 4,000,000$ Operating Assistance Total 300-00 7,600,000$ 7,752,000$ 7,907,040$ 8,000,000$

Federal Funds SourceGrant NE-2018-015-03 2016 Rural Federal 300-00 714,569$ -$ -$ -$ Application 1815-2019-3 2017-2019 Rural Federal 300-00 3,085,431$ 3,876,000$ 505,279$ -$ Application 1815-2020-# (estimated) 2020 Rural Federal 300-00 -$ -$ 3,448,241$ -$ Application 1815-2021-# (estimated) 2021-2022 Rural Federal 300-00 -$ -$ -$ 4,000,000$

3,800,000$ 3,876,000$ 3,953,520$ 4,000,000$

BudgetRTAP Federal 435-00 137,000$ 138,056$ 139,000$ 188,510$ RTAP Local/State 435-00 -$ -$ -$ -$ RTAP Total 435-00 137,000$ 138,056$ 139,000$ 188,510$

Federal Funds SourceGrant NE-2017-013-01 2015 Rural Federal 435-00 51,338$ -$ -$ -$ Grant NE-2018-015-01 2016 Rural Federal 435-00 18,662$ 70,000$ 44,399$ -$ Application 1815-2019-3 2017-2019 Rural Federal 435-00 67,000$ 68,056$ 94,601$ 188,510$

137,000$ 138,056$ 139,000$ 188,510$

BudgetState Admin Federal 610-00 860,562$ 802,740$ 829,515$ 902,520$ State Admin Local/State 610-00 -$ -$ -$ -$ State Admin Total 610-00 860,562$ 802,740$ 829,515$ 902,520$

Federal Funds SourceGrant NE-2017-013-06 2015 Statewide Federal 610-00 90,172$ -$ -$ -$ Grant-NE-2018-015-01 2016 Statewide Federal 610-00 770,390$ -$ -$ -$ Application 1815-2019-3 2017-2019 Statewide Federal 610-00 -$ 802,740$ 829,515$ 902,520$

860,562$ 802,740$ 829,515$ 902,520$

BudgetNon-Operating Assistance Federal 620-00 3,869,992$ 4,141,760$ 4,200,000$ 4,300,000$ Non-Operating Assistance Local/State 620-00 967,498$ 1,035,440$ 1,050,000$ 1,075,000$ Non-Operating Assistance Total 620-00 4,837,490$ 5,177,200$ 5,250,000$ 5,375,000$

Federal Funds SourceGrant NE-2018-015-03 2016 Rural Federal 620-00 69,992$ -$ -$ -$ Application 1815-2019-3 2017-2019 Rural Federal 620-00 3,800,000$ 4,141,760$ -$ -$ Application 1815-2020-# (estimated) 2020 Rural Federal 620-00 -$ -$ 4,200,000$ -$ Application 1815-2021-# (estimated) 2021-2022 Rural Federal 620-00 -$ -$ -$ 4,300,000$

3,869,992$ 4,141,760$ 4,200,000$ 4,300,000$

BudgetIntercity Bus Federal 634-00 510,712$ 458,152$ 458,151$ 458,152$ Intercity Bus Local/State 634-00 510,712$ 458,152$ 458,151$ 458,152$ Intercity Bus Total 634-00 1,021,424$ 916,304$ 916,302$ 916,304$

Federal Funds SourceGrant NE-2018-015-02 2016 Rural Federal 634-00 52,561$ -$ -$ -$ Application 1815-2019-3 2017-2019 Rural Federal 634-00 458,151$ 458,152$ 458,151$ 458,152$

510,712$ 458,152$ 458,151$ 458,152$

Rural Area Grants and Rural Transit Assistance Program (RTAP)

5311 and 5311

(

b

)(

3

)

Page 152: Nebraska s Statewide Transportation Improvement Program ... · used in tracking progress toward obtainment of critical outcomes for the region of the MPO, and the collection of data

Nebraska Department of Transportation

Statewide Transportation Improvement ProgramPublic Transit Services

Updated: 07/17/2019

FTA Program Budget and Federal Funds Source FFY Apport. Location Fund Scope 2019-2020 2020-2021 2021-2022 2022-2023BudgetBus-Equipment_Facilities Federal 96,819$ 101,356$ 102,000$ 102,000$ Bus-Equipment_Facilities Local/State 24,205$ 25,339$ 25,500$ 25,500$ Bus-Equipment_Facilities Total 121,024$ 126,695$ 127,500$ 127,500$

Federal Funds SourceGrant NE-2016-004-01 2013 Gr Island Federal 96,819$ -$ -$ -$ Grant NE-2018-012-01 2014 Gr Island Federal -$ 101,356$ -$ -$ Application 1815-2020-# (estimated) 2018 GI/S Sioux Federal -$ -$ 102,000$ -$ Application 1815-2021-# (estimated) 2019 GI/S Sioux Federal -$ -$ -$ 102,000$

96,819$ 101,356$ 102,000$ 102,000$

Comments:5310 Rural Bus-Rolling Stock: Application 1815-2019-5 Federal Budget for FY 2022-2023 includes both FFYs 18 and 19 apportionments until the STIP is updated in 2020 to include FY 2023-2024.

5310 Small Urban Grand Island Bus-Rolling Stock: 1815-2020-# (pending FY 20 apportionment) is programmed at $109,107, $5,107 to cover the remaining projected cost for two (2) small buses and $104,000 as the remaining funds from the apportionment. Other funds, either as carryover from prior fiscal years or a new apportionment may need to be programmed.

5310 Large Urban Lincoln FFY 20 Pending Apportionment: An estimated amount is programmed in FY 2022-2023 though it is to identify the apportionment amount only. It is projected the amount will be carried forward into FY 2023-2024.

5310 Large Urban Omaha FFY 20 Estimated Apportionment: An estimated amount is programmed in FY 2022-2023 though it is to identify the allocation of the apportionment by the Metropolitan Area Planning Agency (MAPA). This amount will likely be carried forward into FY 2023-2024.

Bus and Bus Facilities5339 SM URB